A structure and method for preventing seepage at the intersection of a grouting curtain and a water diversion pipeline
Through the circumferential consolidation and curtain structure and the two-stage grouting method, the problems of complicated construction and large investment in anti-seepage treatment at the intersection of the grouting curtain and the water diversion pipe are solved, achieving efficient and convenient anti-seepage effect and reducing the need for water diversion pipes. Construction interference.
Patent Information
- Application Number
- CN202010340854.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-26
- Publication Date
- 2024-09-27
- Estimated Expiration
- 2040-04-26
AI Technical Summary
The existing technology has problems such as complex construction, long construction period, and large investment in the anti-seepage treatment at the intersection of the grouting curtain and the water diversion pipe, making it difficult to ensure the anti-seepage quality and construction convenience.
Adopting a circumferential consolidation and curtain structure, through the first phase of bare rock grouting and the second phase of covered heavy grouting, circumferential curtain grouting holes are set around the water diversion pipe, and grouting galleries are set up above and below the water diversion pipe to reduce the impact on water diversion. Eliminate the interference of pipeline construction and simplify the construction process.
This ensures the anti-seepage quality of the grouting curtain without the need to expand the hole or pour concrete, simplify the construction process, reduce investment, and improve construction efficiency.
Smart Images

Figure CN111379268B
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water conservancy and hydropower engineering, and in particular relates to an anti-seepage treatment method for the intersection of a grouting curtain and a water diversion pipeline. Background Art
[0002] Most of the underground powerhouses of conventional hydropower stations adopt the head development method. The underground powerhouse caverns are located in the mountain below the normal water storage level of the reservoir area. The surrounding rock seepage characteristics will become an important factor affecting the safety and normal operation of the project. The rock mass groundwater seepage problem cannot be ignored. In order to reduce leakage and improve the permeability stability of the surrounding rock, the project mainly adopts grouting curtain anti-seepage. The anti-seepage curtain is arranged on the upstream side of the powerhouse, so the water diversion pipeline inevitably needs to pass through the anti-seepage curtain.
[0003] In order to ensure the closure of the anti-seepage curtain, a certain distance is generally reserved between the anti-seepage grouting curtain hole and the excavation structure line of the water diversion pipeline, and then the circumferential curtain is arranged in the water diversion pipeline to overlap the anti-seepage curtain to ensure the closure of the anti-seepage curtain. However, there are many processes in the water diversion pipeline, especially the pressure steel pipe construction process is complicated and the installation period is long. The large-scale grouting in the water diversion pipeline in the later stage will occupy the linear construction period of the water diversion pipeline; another way is to expand the water diversion pipeline tunnel, pour the first phase of concrete, and then perform circumferential grouting curtain along the first phase of concrete. This method does not interfere with the subsequent construction of the water diversion pipeline, but it requires expanding the tunnel and pouring the first phase of concrete, which requires large investment and long construction period; another way is to first perform grouting curtain in the rock mass near the water diversion pipeline, and then excavate the water diversion pipeline. This method requires the excavation and support of the grouting gallery and the construction of the grouting curtain in advance, otherwise it will affect the construction progress of the water diversion pipeline. Summary of the invention
[0004] The present invention aims to overcome the above-mentioned problems in the prior art and to provide a method for anti-seepage treatment of the intersection of a grouting curtain and a water diversion pipe, which can ensure the anti-seepage quality of the grouting curtain and facilitate construction and save investment. The method does not require the expansion of the tunnel body and the pouring of the first phase of concrete, and has no special requirements on the construction process of the water diversion pipe and the curtain grouting.
[0005] To achieve the above object, the present invention adopts the following technical solutions:
[0006] The present invention discloses an anti-seepage treatment structure for the intersection of a grouting curtain and a water diversion pipe, comprising a water diversion pipe, a grouting curtain and an annular consolidation and curtain. The water diversion pipe passes through the grouting curtain, the annular consolidation and curtain is arranged around the water diversion pipe and overlapped with the grouting curtain, the annular consolidation and curtain comprises annular curtain grouting holes, first-phase bare rock curtain grouting, and second-phase covered heavy grouting. The first-phase bare rock curtain grouting and the second-phase covered heavy grouting fill the annular curtain grouting holes from the inside out.
[0007] Preferably, the annular consolidation and curtain includes annular curtain grouting holes, first-phase bare rock curtain grouting, and second-phase covered heavy grouting. The annular curtain grouting holes are arranged around the water diversion pipe. The first-phase bare rock curtain grouting and the second-phase covered heavy grouting are arranged from the inside to the outside in the annular curtain grouting holes. The depth of the second-phase covered heavy grouting is 1.5m.
[0008] Preferably, grouting galleries are provided above and below the water diversion pipeline, respectively, and the grouting curtain extends from the upper grouting gallery to the lower grouting gallery.
[0009] Preferably, the number of rows of the annular grouting curtain holes is 1 to 2 more than the number of rows of the grouting curtain holes.
[0010] Preferably, the annular consolidation and curtain comprises annular curtain grouting holes, the annular curtain grouting holes are arranged around the water diversion pipe, and the hole spacing of the annular curtain grouting holes is less than or equal to 2m.
[0011] Preferably, the depth of the annular curtain grouting hole is greater than the depth of the blasting loosening zone or is determined according to the depth of the hole section that fails the water pressure test. The grouting pressure of the annular consolidation and curtain adopts the grouting curtain pressure, and the overlap length of the grouting curtain and the annular consolidation and curtain is 2m.
[0012] The present invention also provides a method for anti-seepage treatment of the intersection of a grouting curtain and a water diversion pipeline, the method comprising the following steps:
[0013] Step 1, excavating and supporting the grouting gallery within the influence range of the preset water diversion pipeline, respectively above and below the preset water diversion pipeline position;
[0014] Step 2, complete the excavation and support of the water diversion pipeline;
[0015] Step 3: Drill several rows of circumferential curtain grouting holes around the water diversion pipeline to carry out the first-stage bare rock curtain grouting. During the first-stage bare rock curtain grouting, the grout stopper is stuck at about 1.5m inside the rock wall of the water diversion pipeline, and the 1.5m deep circumferential curtain grouting holes are reserved but not grouted temporarily.
[0016] Step 4, pouring the lining concrete of the water diversion pipeline, embedding the casing in the lining concrete to indicate the hole position of the annular curtain grouting hole, and after the lining concrete construction is completed, performing the second-phase covered heavy grouting construction on the reserved 1.5m annular curtain grouting hole along the embedded casing;
[0017] Step 5: flexibly select the time to construct the grouting curtain through the grouting gallery, and reserve a distance of 4m between the excavation line of the water diversion pipeline.
[0018] The beneficial effects of the present invention are as follows: the present invention adopts a one-drilling two-stage grouting method for the annular curtain grouting of the water diversion pipeline, and divides the annular curtain grouting into two stages: first-stage bare rock grouting and second-stage heavy grouting with cover. The first-stage bare rock grouting can be implemented immediately after the excavation and support of the water diversion pipeline is completed, and there are no special requirements for the construction procedures of the water diversion pipeline and the curtain grouting, thereby reducing the interference of the curtain grouting of the water diversion pipeline on the subsequent construction of the water diversion pipeline. The second-stage heavy grouting with cover does not require re-drilling after pouring concrete, has fewer construction procedures, less grouting engineering, and is convenient to construct, thereby ensuring the anti-seepage quality of the grouting curtain and saving investment. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a cross-sectional schematic diagram of an embodiment of the present invention.
[0020] Figure 2 It is a schematic elevation view of an embodiment of the present invention.
[0021] Figure 3 It is a schematic diagram of the annular consolidation and grouting curtain of the water diversion pipeline according to an embodiment of the present invention.
[0022] Markings in the figure: 1. Grouting gallery; 2. Water diversion pipeline; 3. Grouting curtain; 4. Annular consolidation and curtain; 401. Annular curtain grouting hole; 402. First-phase bare rock curtain grouting; 403. Second-phase covered heavy grouting; 5. Embedded casing; 6. Lining concrete. DETAILED DESCRIPTION
[0023] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0024] like Figure 1 , Figure 2 , Figure 3 As shown, an anti-seepage treatment structure of the intersection of a grouting curtain and a water diversion pipe of the present invention is characterized in that it includes a grouting gallery 1, a water diversion pipe 2, a grouting curtain 3 and an annular consolidation and curtain 4. The grouting gallery 1 is respectively arranged above and below the water diversion pipe 2, and the grouting curtain 3 extends from the upper grouting gallery 1 to the lower grouting gallery 1. The water diversion pipe 2 passes through the grouting curtain 3, and the annular consolidation and curtain 4 is arranged around the water diversion pipe 2 and overlapped with the grouting curtain 3.
[0025] The annular consolidation and curtain 4 includes annular curtain grouting holes 401, first-phase bare rock curtain grouting 402, and second-phase covered heavy grouting 403. The annular curtain grouting holes 401 are arranged around the water diversion pipe 2. The first-phase bare rock curtain grouting 402 and the second-phase covered heavy grouting 403 are arranged from the inside to the outside in the annular curtain grouting holes 401. The depth of the second-phase covered heavy grouting 403 is 1.5m.
[0026] The annular consolidation and curtain 4 includes annular curtain grouting holes 401, and the annular curtain grouting holes 401 are arranged around the water diversion pipe 2, and the hole spacing of the annular curtain grouting holes 401 is less than or equal to 2m.
[0027] The hole depth of the annular curtain grouting hole 401 is greater than the blasting loosening zone depth or is determined according to the hole depth of the hole section that fails the water pressure test. The grouting pressure of the annular consolidation and curtain 4 adopts the grouting curtain pressure.
[0028] The number of rows of the annular grouting curtain holes 4 is 1 to 2 more than the number of rows of the grouting curtain 3. This ensures the overlap thickness. The depth of the annular curtain grouting holes 4 should be able to ensure an overlap length of at least 2m with the curtain grouting holes 3. The annular curtain grouting holes 4 at the bottom of the water diversion pipeline 2 need to be deepened and denser to effectively overlap with the overlap curtain 3 of the lower grouting gallery 1.
[0029] The present invention provides a method for anti-seepage treatment of the intersection of a grouting curtain and a water diversion pipeline, characterized in that the method comprises the following steps:
[0030] Step 1: excavate and support the grouting gallery 1 within the influence range of the preset water diversion pipeline 2, respectively above and below the position of the preset water diversion pipeline 2.
[0031] Step 2, complete the excavation and support of the water diversion pipeline 2.
[0032] Step 3, several rows of circumferential curtain grouting holes 401 are drilled around the water diversion pipe 2, and the first-stage bare rock curtain grouting 402 is performed. During the first-stage bare rock curtain grouting 402, the grouting stopper is stuck at about 1.5m in the rock wall of the water diversion pipe 2, and the 1.5m deep circumferential curtain grouting holes 401 are reserved for temporary grouting. The grouting stopper is stuck at a depth of about 1.5m to ensure that the grouting pressure can be increased to the design pressure, avoid grouting leakage, ensure the quality of deep surrounding rock grouting, and properly protect the 1.5m deep borehole 4-2 that has not yet been grouted to prevent blockage.
[0033] Step 4, pour the lining concrete 6 of the water diversion pipeline 2, embed the sleeve 5 in the lining concrete 6 to indicate the hole position of the annular curtain grouting hole 401, and after the construction of the lining concrete 6 is completed, the second phase of the heavy grouting 403 with cover is carried out along the embedded sleeve 5 on the reserved 1.5m annular curtain grouting hole 401. The grouting plug is stuck in the lining concrete 6 to ensure that the surrounding rock of the water diversion pipeline 2 and the contact surface between the surrounding rock and the lining concrete 6 can be grouted densely without weak parts. When grouting, the grouting pressure should be properly controlled and monitoring should be strengthened to prevent damage caused by lifting.
[0034] Step 5, flexibly choose the time to construct the grouting curtain 3 through the grouting gallery 1, and reserve a distance of 4m between the excavation line of the water diversion pipeline 2 to avoid the grouting curtain 3 from entering the water diversion pipeline 2, avoid affecting the stability of the surrounding rock of the water diversion pipeline 2, and ensure the grouting quality.
[0035] The present invention adopts a one-time drilling and two-stage grouting method for the annular curtain grouting of the water diversion pipeline, and divides the annular curtain grouting into two stages: the first stage bare rock grouting and the second stage heavy grouting with cover. The first stage bare rock grouting can be implemented immediately after the excavation and support of the water diversion pipeline is completed, and there are no special requirements for the construction procedures of the water diversion pipeline and the curtain grouting, thereby reducing the interference of the curtain grouting of the water diversion pipeline on the subsequent construction of the water diversion pipeline. The second stage heavy grouting with cover does not need to be re-drilled after pouring concrete, has fewer construction procedures, less grouting engineering, and is convenient to construct, thereby ensuring the anti-seepage quality of the grouting curtain and saving investment.
Claims
1. An anti-seepage treatment structure for the intersection of a grouting curtain and a water diversion pipeline, Its characteristics are: It comprises a water diversion pipeline (2), a grouting curtain (3) and an annular consolidation and curtain (4), wherein the water diversion pipeline (2) passes through the grouting curtain (3), the annular consolidation and curtain (4) is arranged around the water diversion pipeline (2) and overlaps with the grouting curtain (3), the annular consolidation and curtain (4) comprises an annular curtain grouting hole (401), a first-stage bare rock curtain grouting (402), and a second-stage covered heavy grouting (403), and the first-stage bare rock curtain grouting (402) and the second-stage covered heavy grouting (403) fill the annular curtain grouting hole (401) from the inside out; The anti-seepage treatment method for the intersection of the grouting curtain and the water diversion pipeline comprises the following steps: Step 1, excavating and supporting the grouting gallery (1) within the influence range of the preset water diversion pipeline (2), respectively above and below the position of the preset water diversion pipeline (2); Step 2, completing the excavation and support of the water diversion pipeline (2); Step 3, drilling several rows of circumferential curtain grouting holes (401) around the water diversion pipe (2), and performing the first-stage bare rock curtain grouting (402). During the first-stage bare rock curtain grouting (402), the grout stopper is stuck at about 1.5 m inside the rock wall of the water diversion pipe (2), and the circumferential curtain grouting holes (401) with a depth of 1.5 m are reserved and are not grouted temporarily; Step 4, pouring the lining concrete (6) of the water diversion pipe (2), embedding the sleeve (5) in the lining concrete to indicate the hole position of the annular curtain grouting hole (401), and after the construction of the lining concrete (6) is completed, performing the second-stage covered heavy grouting (403) grouting construction on the reserved 1.5m annular curtain grouting hole (401) along the embedded sleeve (5); Step 5, flexibly select the time to construct the grouting curtain (3) through the grouting gallery (1), and reserve a distance of 4m between the excavation line of the water diversion pipeline (2).
2. The anti-seepage treatment structure at the intersection of the grouting curtain and the water diversion pipeline according to claim 1, Its characteristics are: The number of rows of the annular curtain grouting holes (401) is 1 to 2 more than the number of rows of the grouting curtain (3).
3. The anti-seepage treatment structure at the intersection of the grouting curtain and the water diversion pipeline according to claim 1, Its characteristics are: The annular consolidation and curtain (4) comprises annular curtain grouting holes (401), the annular curtain grouting holes (401) are arranged around the water diversion pipe (2), and the hole spacing of the annular curtain grouting holes (401) is less than or equal to 2m.
4. The anti-seepage treatment structure at the intersection of the grouting curtain and the water diversion pipeline according to claim 1, Its characteristics are: The overlap length of the grouting curtain (3) and the annular consolidation curtain (4) is 2m.