A coal seam dynamic fracturing method and fracturing device based on high-power electric pulse

Using high-power electric pulse technology to create cracks in coal seams solves the problems of poor safety, limited scope of application and environmental pollution of traditional fracturing technology, and achieves fast, safe and efficient coalbed methane mining.

CN113266352BInactive Publication Date: 2024-10-11ZHONGBEI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110717785.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-28
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional fracturing technology has problems such as poor safety, limited scope of application, unsatisfactory effects, and destructive effects on the environment. In particular, explosive fracturing technology has low safety and is highly destructive, while hydraulic fracturing technology takes a long time to increase pressure and is harmful to the environment. The permeability of coalbed methane is reduced, and there are problems of equipment consumption and pollution.

Method used

Using the dynamic fracturing method of coal seams based on high-power electric pulses, the electrodes at both ends of the conductive detonator generate ultra-high voltage to breakdown the conductive detonator, releasing thermal energy and vaporizing carbon dioxide to form high-speed and high-pressure gas, which is used to create cracks in the coal seam. The design A fracturing device including a cylindrical hollow rubber bladder head sealer, a tail sealer and a steel frame body, which realizes the process of converting electrical energy into heat energy.

Benefits of technology

It achieves rapid pressure increase, safe and efficient fracturing effects, reduces the risk of environmental pollution, simplifies the construction process, improves economic benefits, and is suitable for a wider range of underground mining scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113266352B_ABST
    Figure CN113266352B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of fracturing devices for coalbed methane exploitation, and specifically to a method and device for dynamic fracturing of coal seams based on high-power electric pulses. It includes a head plugger and a tail plugger in the form of a cylindrical hollow rubber bag, a steel frame and an electric detonating tube arranged between the head plugger and the tail plugger; the electric detonating tube includes an insulating pressure-resistant rubber hose with annular electrodes installed at both ends, one end of the insulating pressure-resistant rubber hose close to the head plugger is a closed structure, and one end of the insulating pressure-resistant rubber hose close to the tail plugger is connected to the injection tube; the steel frame is arranged outside the electric detonating tube. After the annular electrodes at both ends of the electric detonating tube are connected, the electric explosion-vaporization-fracturing process occurs rapidly, the boost time is short, and the fracturing effect is good. The present invention uses high-power electric pulses to break through the electric detonating tube, releases heat energy to vaporize CO2 to form high-speed high-pressure gas, and acts on the coal seam to fractur the coal seam. Compared with the explosive fracturing technology, it is safer to directly use high-energy materials to fracturize coal seams.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of fracturing devices for coal bed gas exploitation, in particular to a coal bed dynamic fracturing method and a fracturing device based on high-power electric pulses. Background Art

[0002] Coalbed methane, commonly known as gas, is stored in coal seams in three states: free, adsorbed, and dissolved. It is mainly adsorbed on the surface of the micropores of coal in the adsorbed state. Before mining coalbed methane, it is usually necessary to use fracturing methods to form cracks in the coal body so that the adsorbed coalbed methane can be separated from the coal body before mining. Fracturing technology is widely used in underground oil, natural gas, coalbed methane, shale gas mining, and pre-cracking and permeability enhancement processes for underground coalbed gas extraction in coal mines.

[0003] Traditional fracturing technology is mainly divided into explosive fracturing technology and hydraulic fracturing technology according to different energy sources. Practice shows that existing fracturing technology has common problems due to its own principle. Explosive fracturing technology has a fast pressure increase, it is easy to form cracks, and the fracturing efficiency is high. However, the pressure increase is not easy to control, and it often destroys the geological structure and causes mine collapse. Therefore, the safety of explosive fracturing technology is poor, the success rate is low, and the scope of application is very limited. It is only applicable to open hole wells. Hydraulic fracturing technology is highly safe, not easy to cause mine collapse, and the scale of fracturing is large. But its disadvantages are also obvious: first, the hydraulic fracturing pressure increase time is too long, and the fracturing effect is not satisfactory. Secondly, hydraulic fracturing will form a stress concentration area on the crack wall, reducing the permeability of coalbed methane near the crack. In addition, hydraulic fracturing technology requires a large number of special equipment, and a large amount of materials such as fracturing fluid and fracturing sand containing toxic and harmful components will be consumed during the construction process, which will not only cost a lot of money, but also pollute groundwater. Therefore, the scope of application of hydraulic fracturing technology is also limited, and it is only applicable to wells with higher production.

[0004] Therefore, it is necessary to invent a fracturing technology that has good effects, wide application range, high safety, and no pollution to the environment. Summary of the invention

[0005] In view of the problems that traditional fracturing technology has unsatisfactory effects, limited scope of application, poor safety, and significant destructiveness to the environment, the present invention provides a coal seam dynamic fracturing method and a fracturing device based on high-power electric pulses.

[0006] The present invention is achieved through the following technical scheme: a dynamic fracturing method for coal seams based on high-power electric pulses, that is, ultra-high voltage is generated by electrodes at both ends of the electric detonating tube, and the ultra-high voltage is used to break down the electric detonating tube filled with electric detonating fluid, releasing heat energy, vaporizing supercritical carbon dioxide in the borehole to form high-speed high-pressure gas, which acts on the coal seam to generate cracks, thereby realizing the process of converting electrical energy into thermal energy.

[0007] The present invention also provides a coal seam dynamic fracturing device based on high-power electric pulses, comprising a head plugger and a tail plugger in the form of cylindrical hollow rubber bags, a steel frame and an electric detonator arranged between the head plugger and the tail plugger,

[0008] A first connector is fixedly arranged at one end of the tail of the head occluder;

[0009] A second connector is fixedly arranged at one end of the head of the tail plugger, a main feed channel tube is penetrated in the tail plugger in the axial direction, one end of the tail of the main feed channel tube extends out of the tail plugger, and one end of the head extends out of the second connector, and the inner cavity of the tail plugger is divided by the main feed channel tube to form an annular cavity, an injection tube with a valve is connected between one end of the main feed channel tube near the head plugger and one end of the electric detonating tube, a CO2 injection head with a valve connected to the outside is arranged on the wall of one end of the main feed channel tube near the head plugger, a water supply pipe with a valve is connected and fixed between the first connector and the second connector, the water supply pipe connects the inner cavity of the head plugger with the annular inner cavity of the tail plugger, a water injection head with a valve is provided on the tail plugger, and the water injection head is connected to the annular cavity of the tail plugger;

[0010] The electric detonator comprises an insulating pressure-resistant rubber tube with annular electrodes installed at both ends, one end of the insulating pressure-resistant rubber tube close to the head plugger is a closed structure, and one end of the insulating pressure-resistant rubber tube close to the tail plugger is connected to the injection tube;

[0011] The steel bar frame is connected between the first connector and the second connector, and the steel bar frame is arranged around the electric detonating tube and the water supply pipe.

[0012] As a further improvement of the technical solution of the present invention, the steel frame includes a plurality of inner steel hoops welded together to a plurality of steel bars outside all the inner steel hoops, and outer steel hoops corresponding to the inner steel hoops arranged outside the steel bars.

[0013] As a further improvement of the technical solution of the present invention, a plurality of connecting ribs are welded and connected between each inner steel bar hoop and the corresponding outer steel bar hoop.

[0014] As a further improvement of the technical solution of the present invention, each steel bar is provided with inner pull rings at both ends, and the first connecting head and the second connecting head corresponding to the inner pull rings are provided with outer pull rings which are sleeved with the inner pull rings.

[0015] As a further improvement of the technical solution of the present invention, the first connector and the second connector are in a cover structure, and the first connector and the second connector are respectively fixedly sleeved with the tail end of the head occluder and the head end of the tail occluder.

[0016] As a further improvement of the technical solution of the present invention, the cover portions of the first connector and the second connector are in a regular octagon.

[0017] Compared with the prior art, the coal seam dynamic fracturing method and fracturing device based on high-power electric pulses of the present invention have the following beneficial effects:

[0018] (1) After the annular electrodes at both ends of the electric detonating cord are connected, the electric explosion-vaporization-fracturing process occurs rapidly, the pressure rise time is short, and the fracturing effect is good.

[0019] (2) The present invention uses high-power electric pulses to break through the electric detonating tube, releasing heat energy to vaporize CO2 to form high-speed high-pressure gas, which acts on the coal seam to fracture the coal seam. Compared with the explosive fracturing technology that directly uses high-energy materials to explode and fracture the coal seam, it is safer.

[0020] (3) After the construction of the present invention is completed, the substances produced will not penetrate into the ground and pollute the groundwater. Compared with hydraulic fracturing, it is more environmentally friendly.

[0021] (4) The present invention is easy to operate. It only needs to pull the head to send the fracturing device to the designated position, and then start the injection and fracturing operations. It improves the construction efficiency of the fracturing operation, reduces the cost of fracturing, and improves the economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 It is a schematic diagram of the structure of the coal seam dynamic fracturing device based on high-power electric pulses according to the present invention.

[0024] Figure 2 It is a schematic diagram of the connection between the steel bar frame and the first connecting head and the second connecting head.

[0025] Figure 3 It is a structural schematic diagram of the steel frame.

[0026] Figure 4 It is a schematic diagram of the connection between the head occluder and the tail occluder.

[0027] Figure 5 It is a structural schematic diagram of the electric detonator.

[0028] Figure 6 This is a usage status diagram of the coal seam dynamic fracturing device based on high-power electric pulses.

[0029] In the figure: 1-head plugger, 101-first connector, 2-tail plugger, 201-main feed channel pipe, 202-drug injection pipe, 203-CO2 injection head, 204-second connector, 205-water delivery pipe, 206-water injection head, 3-steel frame, 301-inner steel hoop, 302-outer steel hoop, 303-steel rod, 304-connecting rib, 305-inner pull ring, 4-electric detonating tube, 401-annular electrode, 402-insulating pressure-resistant hose. DETAILED DESCRIPTION

[0030] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.

[0031] The present invention provides a method for dynamic fracturing of coal seams based on high-power electric pulses, namely, ultra-high voltage is generated by electrodes at both ends of an electric detonating tube 4, and the electric detonating tube 4 filled with an electric detonating fluid is broken down by the ultra-high voltage to release heat energy, vaporize supercritical carbon dioxide in a borehole to form high-speed high-pressure gas, and act on the coal seam to generate cracks, thereby realizing the process of converting electrical energy into thermal energy.

[0032] In this embodiment, the electrodes at both ends of the electric squib 4 may be ring electrodes 401. Of course, in order to apply voltage to both ends of the electric squib 4, electrodes of other shapes may also be used.

[0033] In addition, in this embodiment, the ultra-high voltage is not a fixed voltage. The voltage value of the ultra-high voltage is related to the explosive fluid and the detonating tube 4. Any ultra-high voltage that can break through the detonating tube 4 filled with explosive fluid can be used.

[0034] The present invention further provides a specific embodiment of a coal seam dynamic fracturing device based on high-power electric pulses, which includes a head plugger 1 and a tail plugger 2 in the form of cylindrical hollow rubber bags, a steel frame 3 and an electric detonating tube 4 arranged between the head plugger 1 and the tail plugger 2,

[0035] A first connector 101 is fixedly provided at one end of the tail of the head occluder 1;

[0036] A second connector 204 is fixedly arranged at one end of the head of the tail plugger 2, a main feed channel tube 201 is penetrated in the tail plugger 2 along the axial direction, one end of the tail of the main feed channel tube 201 extends out of the tail plugger 2, and one end of the head extends out of the second connector 204, and the inner cavity of the tail plugger 2 is divided by the main feed channel tube 201 to form an annular cavity, and an injection tube 202 with a valve is arranged between one end of the main feed channel tube 201 close to the head plugger 1 and one end of the electric detonating tube 4. A CO2 injection head 203 with a valve connected to the outside is provided on the wall of one end of the total feed channel tube 201 close to the head plugger 1. A water delivery pipe 205 with a valve is connected and fixed between the first connector 101 and the second connector 204. The water delivery pipe 205 connects the inner cavity of the head plugger 1 with the annular inner cavity of the tail plugger 2. A water injection head 206 with a valve is provided on the tail plugger 2. The water injection head 206 is connected to the annular cavity of the tail plugger 2.

[0037] The electric detonator 4 comprises an insulating pressure-resistant rubber tube 402 with annular electrodes 401 installed at both ends, one end of the insulating pressure-resistant rubber tube 402 close to the head plugger 1 is a closed structure, and one end of the insulating pressure-resistant rubber tube 402 close to the tail plugger 2 is connected to the injection tube 202;

[0038] The steel frame 3 is connected between the first connector 101 and the second connector 204 , and the steel frame 3 is disposed outside the electric detonating tube 4 and the water supply pipe 205 .

[0039] The following provides a method for using the fracturing device of the present invention:

[0040] S1. Preparation process: Close all valves of the fracturing device, connect the water injection head 206 to the hose, and connect the main feed channel pipe 201 to the feed pipe. Install wires on the annular electrodes 401 at both ends of the electric detonating tube 4, then connect the cables, lead out the cables, connect to the explosion-proof power supply, and control the annular electrodes 401 of the electric detonating tube 4 through the switch. Use the traction device to send the fracturing device to the designated operation position of the drilling hole.

[0041] S2, injection process: keep the valve of injection pipe 202 open and the CO2 injection head 203 closed. The feed pipe is connected to the external medicine bottle, and the external medicine bottle injects the electric detonating liquid into the electric detonating tube 4 through the dosing pump. After filling, close the valve of injection pipe 202.

[0042] S3, sealing process: keep the valves of the water injection head 206 and the water supply pipe 205 open, and the outer end of the water injection head 206 is connected to the supply station. The water tank of the supply station is pressurized by the water pump, and water is injected into the annular inner cavity of the tail plug 2, and then injected into the head plug 1 through the water supply pipe 205, so that the two plugs expand and contact the borehole wall. The two plugs are filled with water, and the two plugs are tightly matched with the borehole wall, and the valves of the water injection head 206 and the water supply pipe 205 are closed. At this time, the borehole between the two expanded plugs is equivalent to a closed space, which can seal the gas-liquid mixed CO2 injected in the subsequent process.

[0043] S4, CO2 injection process: Keep the valve of the injection pipe 202 closed and the CO2 injection head 203 open. The feed pipe is connected to the CO2 cylinder. The CO2 in the cylinder is pumped through the pressure pump to increase the fracturing pressure to 8Mpa, so that the CO2 remains in a gas-liquid mixed state. Then, the gas-liquid mixed CO2 is injected into the borehole space sealed by the two plugging devices through the CO2 injection head 203. Then, the CO2 injection head 203 is closed.

[0044] S5, electric explosion-fracturing process: turn on the electric explosion switch, connect the annular electrodes 401 at both ends of the electric explosion tube 4, the annular electrodes 401 at both ends of the electric explosion tube 4 generate ultra-high voltage, break through the electric explosion tube 4 to form a passage, and release a large amount of heat energy. The gas-liquid mixed CO2 outside the tube absorbs the heat energy generated by the electric explosion and vaporizes instantly, forming high-speed high-pressure gas, which acts on the coal seam, causing several cracks on it, achieving the fracturing effect.

[0045] In the present invention, since the annular electrode 401 is located in the steel frame 3, the connected wire is not affected by the drilling. In specific implementation, the wire on the annular electrode 401 can be pre-buried in the rubber layer of the tail occluder 2 and then connected to the cable.

[0046] Specifically, in order to avoid the influence of drilling on the water injection head 206 , the water injection head 206 can be arranged on the tail end surface of the tail plugger 2 .

[0047] like Figure 3 As shown, this embodiment further provides a specific implementation of the steel frame 3, the steel frame 3 includes a plurality of inner steel hoops 301, a plurality of steel bars 303 welded together outside all the inner steel hoops 301, and outer steel hoops 302 corresponding to the inner steel hoops 301 and arranged outside the steel bars 303. The steel frame 3 of this structure can avoid the influence of the drilling environment on the electric detonator 4 and other devices, and play a role in protecting the components of the fracturing device.

[0048] Specifically, all the steel bars 303 are arranged equidistantly between the inner steel hoop 301 and the outer steel hoop 302 .

[0049] In order to further enhance the structural strength of the steel frame 3 , a plurality of connecting bars 304 are welded between each inner steel hoop 301 and the corresponding outer steel hoop 302 .

[0050] The present invention further provides a connection method between the steel frame 3 and the first connecting head 101 and the second connecting head 204, that is, each steel bar 303 is provided with an inner pull ring 305 at both ends, and the first connecting head 101 and the second connecting head 204 corresponding to the inner pull ring 305 are provided with an outer pull ring that is socketed with the inner pull ring 305.

[0051] In specific implementation, threaded blind holes are respectively provided on the first connector 101 and the second connector 204 corresponding to the outer pull ring. The outer pull ring has a screw, which is threadedly matched with the threaded blind hole, so that the outer pull ring is fixed on the first connector 101 and the second connector 204.

[0052] Specifically, this embodiment also provides an implementation of the first connector 101 and the second connector 204, that is, the first connector 101 and the second connector 204 are in a cover structure, and the first connector 101 and the second connector 204 are fixedly connected to the tail end of the head occluder 1 and the head end of the tail occluder 2, respectively.

[0053] like Figure 2 As shown, the cover parts of the first connector 101 and the second connector 204 are in a regular octagon.

[0054] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A coal seam dynamic fracturing device based on high-power electric pulses, characterized in that: The invention comprises a head occluder (1) and a tail occluder (2) in the form of a cylindrical hollow rubber bag, a steel frame (3) and an electric detonator (4) arranged between the head occluder (1) and the tail occluder (2), A first connector (101) is fixedly provided at one end of the tail of the head plugger (1); A second connector (204) is fixedly provided at one end of the head of the tail plug (2), a main feed channel tube (201) is inserted into the tail plug (2) along the axial direction, a tail end of the main feed channel tube (201) extends out of the tail plug (2), and a head end extends out of the second connector (204), and the inner cavity of the tail plug (2) is divided by the main feed channel tube (201) to form an annular cavity, and a drug injection tube (202) with a valve is provided between one end of the main feed channel tube (201) close to the head plug (1) and one end of the electric detonating tube (4), A CO2 injection head (203) with a valve connected to the outside is provided on the wall of one end of the main feed channel tube (201) close to the head plug (1); a water supply pipe (205) with a valve is connected and fixed between the first connector (101) and the second connector (204); the water supply pipe (205) connects the inner cavity of the head plug (1) with the annular inner cavity of the tail plug (2); a water injection head (206) with a valve is provided on the tail plug (2); the water injection head (206) is connected to the annular cavity of the tail plug (2); The electric detonator (4) comprises an insulating pressure-resistant rubber tube (402) with annular electrodes (401) installed at both ends, one end of the insulating pressure-resistant rubber tube (402) close to the head plug (1) is a closed structure, and one end of the insulating pressure-resistant rubber tube (402) close to the tail plug (2) is connected to the injection tube (202); The steel frame (3) is connected between the first connector (101) and the second connector (204), and the steel frame (3) is arranged outside the electric detonating tube (4) and the water supply pipe (205); The method for using the fracturing device comprises: S1, preparation process: close all valves of the fracturing device, connect the water injection head (206) to the hose, and connect the main feed channel pipe (201) to the feed pipe; install wires on the annular electrodes (401) at both ends of the electric detonating tube (4), connect the cables, lead out the cables, connect them to the explosion-proof power supply, and control the annular electrodes (401) of the electric detonating tube (4) through the switch; use the traction device to send the fracturing device to the designated operation position of the drilling hole; S2, injection process: keep the valve of the injection pipe (202) open, the CO2 injection head (203) closed, the feed pipe is connected to the external medicine bottle, and the external medicine bottle injects the electric detonating liquid into the electric detonating tube (4) through the dosing pump; after the injection is full, close the valve of the injection pipe (202); S3, sealing process: keep the valves of the water injection head (206) and the water supply pipe (205) open, connect the outer end of the water injection head (206) to the supply station, pressurize the water tank of the supply station with a water pump, inject water into the annular inner cavity of the tail plug (2), and then inject water into the head plug (1) through the water supply pipe (205), so that the two plugs expand and contact the borehole wall; the two plugs are filled with water, the two plugs are tightly matched with the borehole wall, and the valves of the water injection head (206) and the water supply pipe (205) are closed; at this time, the borehole between the two expanded plugs is equivalent to a closed space, which can seal the gas-liquid mixed CO2 injected in the subsequent process; S4, CO2 injection process: keep the valve of the injection tube (202) closed and the CO2 injection head (203) open, and connect the feeding tube to the CO2 cylinder; the CO2 in the cylinder is pressurized to 8MPa by a pressure pump to keep the CO2 in a gas-liquid mixed state; then, the gas-liquid mixed CO2 is injected into the drilled hole space sealed by the two plugging devices through the CO2 injection head (203); then, close the CO2 injection head (203); S5, electric explosion-fracturing process: turn on the electric explosion switch, connect the annular electrodes (401) at both ends of the electric explosion tube (4), and the annular electrodes (401) at both ends of the electric explosion tube (4) generate ultra-high voltage, which breaks down the electric explosion tube (4) to form a passage, releasing a large amount of heat energy; the gas-liquid mixed CO2 outside the tube absorbs the heat energy generated by the electric explosion and vaporizes instantly, forming high-speed high-pressure gas, which acts on the coal seam, causing several cracks on the coal seam, thereby achieving a fracturing effect.

2. A coal seam dynamic fracturing device based on high-power electric pulse according to claim 1, characterized in that: The steel bar frame (3) comprises a plurality of inner steel bar hoops (301), a plurality of steel bar rods (303) welded together outside all the inner steel bar hoops (301), and outer steel bar hoops (302) corresponding to the inner steel bar hoops (301) and arranged outside the steel bar rods (303).

3. A coal seam dynamic fracturing device based on high-power electric pulse according to claim 2, characterized in that: A plurality of connecting ribs (304) are welded between each inner steel bar hoop (301) and the corresponding outer steel bar hoop (302).

4. A coal seam dynamic fracturing device based on high-power electric pulse according to claim 2, characterized in that: Each steel bar (303) is provided with an inner pull ring (305) at both ends, and an outer pull ring sleeved with the inner pull ring (305) is provided on the first connecting head (101) and the second connecting head (204) corresponding to the inner pull ring (305).

5. The coal seam dynamic fracturing device based on high-power electric pulse according to claim 1 is characterized in that: The first connector (101) and the second connector (204) are in a cover structure, and the first connector (101) and the second connector (204) are respectively fixedly sleeved with the tail end of the head occluder (1) and the head end of the tail occluder (2).

6. A coal seam dynamic fracturing device based on high-power electric pulse according to claim 5, characterized in that: The cover parts of the first connector (101) and the second connector (204) are in the shape of a regular octagon.