A method for evaluating buried-hill productivity considering the influence of geostress on fracture effectiveness
By analyzing the characteristics of drilling-induced fractures and well wall collapse fractures around the wellbore, combining electrical imaging logging data, calculating the impact of ground stress on the fracture, establishing capacity impact factors, the problem of difficult evaluating the capacity of cracked metamorphic rock reservoirs is solved. Provides accurate capacity forecasts and drilling design guidance, improving economics and efficiency.
Patent Information
- Application Number
- CN202210841075.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-18
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-07-18
AI Technical Summary
In the cracked metamorphic rock submount reservoir, it is difficult for the existing technology to accurately characterize parameters such as porosity and permeability, which affects the capacity evaluation of oil and gas reservoirs, resulting in poor exploration decision-making and development results.
By analyzing the geometric and orientation characteristics of the drilling-induced joints and well wall collapse joints around the wellbore, combining electrical imaging logging data, the impact of ground stress on the fractures is calculated, and the capacity impact factor is established, and the production capacity of single and other wells is predicted.
The main control factors of crack reservoir production capacity are clarified, and new drilling well trajectory design guidance is provided, which avoids drilling of low-yield and low-efficiency wells, which is highly economical and versatile.
Smart Images

Figure CN115185005B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a buried hill reservoir productivity evaluation method, and in particular to a buried hill productivity evaluation method, device, medium and equipment that considers the influence of ground stress on crack effectiveness. Background Art
[0002] During the formation drilling process, stress concentration will be generated around the circular wellbore, resulting in different stress magnitudes at different locations around the wellbore. The stress concentration around the wellbore causes the stress at local locations of the wellbore wall to exceed the rock strength, causing the wellbore wall to collapse and form wellbore wall collapse cracks; when the mud density is increased to ensure drilling safety, the stress concentration around the wellbore causes certain locations of the wellbore wall to form a tensile stress state, thereby forming tensile cracks, also called drilling induced cracks. In a circular wellbore, the wellbore wall collapse crack orientation and the drilling induced crack orientation present a 90° angle, that is, the wellbore wall collapse crack orientation and the drilling induced crack orientation are perpendicular to each other.
[0003] In porous reservoirs, pores are the key factor affecting productivity. Therefore, parameters such as porosity, the proportion of different pore sizes, and permeability can accurately characterize the productivity of oil and gas reservoirs. However, in fractured buried-hill reservoirs, especially fractured metamorphic rock buried-hill reservoirs, conventional physical parameters such as porosity and permeability and fracture parameters such as fracture density and fracture aperture are difficult to accurately characterize the productivity of oil and gas reservoirs.
[0004] Oil and gas production capacity directly affects exploration decisions, development effects and economic benefits. Therefore, a production capacity evaluation method based on the influence of geostress on fracture effectiveness is invented for fractured metamorphic buried-hill reservoirs. This method can clarify the main controlling factors of the production capacity of fractured buried-hill reservoirs and provide guidance for production capacity evaluation and new drilling trajectory design. Summary of the invention
[0005] In view of the above problems, the purpose of the present invention is to provide a method for evaluating the production capacity of buried hills by considering the influence of ground stress on the effectiveness of fractures.
[0006] To achieve the above object, the present invention adopts the following technical solutions:
[0007] One aspect of the present invention provides a method for evaluating buried hill productivity taking into account the influence of ground stress on fracture effectiveness, comprising the steps of:
[0008] Obtain the types and characteristics of fractures developed in the cores drilled from the target layer;
[0009] Obtain the geometric and azimuthal characteristics of drilling-induced fractures and wellbore collapse fractures around the wellbore;
[0010] Analyze the response characteristics of the open fractures, drilling-induced fractures and wellbore collapse fractures developed on the core on the vertical electrical imaging logging data, and establish the development patterns of different types of fractures and their characteristics on the electrical imaging logging data;
[0011] By processing and interpreting the electrical imaging logging data collected from the target layer of the fractured oil and gas reservoir, the fracture tendency information of each high-conductivity fracture, drilling-induced fracture, and wellbore collapse fracture in the target layer of the fractured oil and gas reservoir is obtained, and the main direction of the high-conductivity fracture in each well is determined based on the rose diagram of the direction of the high-conductivity fracture in a single well, and the main orientation of the drilling-induced fracture and wellbore collapse fracture in each well is determined based on the rose diagram of the drilling-induced fracture and wellbore collapse fracture in a single well to obtain the horizontal maximum principal stress orientation;
[0012] Calculate the azimuth difference between the strike of each high-conductivity fracture in a single well and the azimuth of the maximum horizontal principal stress, so as to obtain the azimuth difference statistical histogram between the strike of each high-conductivity fracture and the azimuth of the maximum horizontal principal stress in each well for analysis of the main controlling factors of productivity;
[0013] According to the azimuth difference between the main trend of single well fractures and the azimuth of the maximum horizontal principal stress, combined with the calculated permeability and the divided effective thickness of the reservoir, the productivity influencing factor IP is constructed;
[0014] Based on well testing or test operations, the single well open flow rate Q is calculated AOF ;
[0015] A production capacity equation between the unimpeded flow rate of a single well and the production capacity influencing factors is established, and the production capacities of the remaining wells are calculated based on the production capacity equation.
[0016] Furthermore, the geometric and azimuthal characteristics of drilling-induced fractures and wellbore collapse fractures around the wellbore are obtained, including:
[0017] Based on formulas (1), (2) and (3), the stress distribution around the circular wellbore is calculated, the characteristics of the drilling induced fractures and the wellbore collapse fractures on the wellbore cross section are analyzed, and the geometric and azimuthal characteristics of the drilling induced fractures and the wellbore collapse fractures around the wellbore are obtained. The formulas (1), (2) and (3) are respectively:
[0018]
[0019]
[0020]
[0021] Where: rr is the radial stress, MPa; σ θθ is the hoop stress, MPa; σ rθ is the vertical stress, MPa; S Hmax is the maximum horizontal principal stress, MPa; S hmin is the minimum horizontal principal stress, MPa; θ is the position at any position and S Hmax The angle between the directions, deg; ΔP is the mud pressure P m and pore pressure P oThe difference, MPa; σ ΔT is the stress caused by the temperature difference between mud and formation, MPa; R is the wellbore radius, in; r is the distance from any position to the center of the wellbore, in.
[0022] Furthermore, logging instruments are used to collect electrical imaging logging data in the target layer. Based on the collected electrical imaging logging data, the response characteristics of the open fractures, drilling-induced fractures and wellbore collapse fractures developed on the core on the vertical electrical imaging logging data are analyzed, and the development patterns of different types of fractures and their characteristics on the electrical imaging logging data are established.
[0023] Furthermore, the calculation formula of the horizontal maximum principal stress orientation Strike_S is as follows:
[0024] Strike_S=Strike_DIF (4)
[0025] Strike_S=Strike_breakout±90° (5)
[0026] Where Strike_DIF is the strike of the drilling-induced fracture, deg; Strike_breakout is the strike of the collapse fracture, deg, and the azimuth value of Strike_S is between [0,180].
[0027] Furthermore, the calculation method of the azimuth difference STRIKE_dif between the main strike of the single well fracture and the horizontal maximum principal stress azimuth is the same as the calculation method of the azimuth difference Strike_dif between the strike of each high-conductivity fracture in the single well and the horizontal maximum principal stress azimuth.
[0028] Furthermore, the capacity influencing factor IP is shown in formula (6):
[0029] IP=K·H-STRIKE_dif (6)
[0030] Where STRIKE_dif is the azimuth difference between the main strike of the single well fracture and the horizontal maximum principal stress azimuth, deg; K is the calculated permeability, mD; H is the divided effective thickness of the reservoir, m.
[0031] Furthermore, the single well unobstructed flow rate Q is established AOF The capacity equation between the capacity influencing factor IP is as shown in formula (7):
[0032] Q AOF =6.46·e 0.0053·IP (7)
[0033] In a second aspect, the present invention further provides a buried hill productivity evaluation device that takes into account the influence of ground stress on the effectiveness of fractures, comprising:
[0034] The first processing unit is used to obtain the type and characteristics of fractures developed in the core drilled from the target layer;
[0035] The second processing unit is used to obtain the geometric and azimuthal characteristics of the drilling-induced fractures and the wellbore collapse fractures around the wellbore;
[0036] The third processing unit is used to analyze the response characteristics of the open fractures, drilling-induced fractures and wellbore collapse fractures developed on the core on the vertical electrical imaging logging data, and to establish the development patterns of different types of fractures and their characteristics on the electrical imaging logging data;
[0037] The fourth processing unit is used to obtain fracture tendency information of each high-conductivity fracture, drilling-induced fracture, and wellbore collapse fracture in the target layer of the fractured oil and gas reservoir by processing and interpreting the electrical imaging logging data collected in the target layer of the fractured oil and gas reservoir, and determine the main direction of the high-conductivity fracture in each well according to the trend rose diagram of the high-conductivity fracture in the single well, and determine the main orientation of the drilling-induced fracture and the wellbore collapse fracture in each well according to the rose diagram of the drilling-induced fracture and the wellbore collapse fracture in the single well to obtain the horizontal maximum principal stress orientation;
[0038] The fifth processing unit is used to calculate the azimuth difference between the strike of each high-conductivity fracture in a single well and the azimuth of the maximum horizontal principal stress, so as to obtain a statistical histogram of the azimuth difference between the strike of each high-conductivity fracture and the azimuth of the maximum horizontal principal stress in each well to analyze the main controlling factors of productivity;
[0039] The sixth processing unit is used to construct the productivity influencing factor IP according to the azimuth difference between the main trend of the single well fracture and the horizontal maximum principal stress azimuth, combined with the calculated permeability and the divided effective thickness of the reservoir;
[0040] The seventh processing unit is used to calculate the single well unobstructed flow rate Q based on the well test or test operation AOF ;
[0041] The eighth processing unit is used to establish a production capacity equation between the unimpeded flow rate of a single well and the production capacity influencing factor, and calculate the production capacity of the remaining wells according to the production capacity equation.
[0042] In a third aspect, the present invention further provides a computer-readable storage medium storing computer instructions, wherein the computer instructions are used to implement the method for evaluating the production capacity of a buried hill considering the influence of ground stress on the effectiveness of fractures when executed by a processor.
[0043] In a fourth aspect, the present invention also provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method for evaluating the production capacity of a buried hill that takes into account the influence of ground stress on the effectiveness of fractures when executing the computer program.
[0044] The present invention adopts the above technical solution, which has the following advantages:
[0045] 1. The analysis method based on the influence of geostress on fracture effectiveness of the present invention can clarify the essential reason for the difference in production capacity of fractured reservoirs with strong heterogeneity: the angle between the maximum principal stress direction and the fracture direction affects the fracture effectiveness, and the fracture effectiveness determines the production capacity. The smaller the angle, the more effective the fracture is and the higher the production capacity is, which points out a new direction for production capacity evaluation.
[0046] 2. The method of the present invention avoids carrying out a large number of well tests and testing operations, can effectively save costs, and can avoid drilling low-yield and low-efficiency wells, and has strong economic efficiency.
[0047] 3. The present invention is a method for evaluating the production capacity of buried hill reservoirs based on fracture effectiveness analysis, which provides an effective method with strong versatility and good economy, and can be widely used in the production capacity evaluation of fractured reservoirs in carbonate and metamorphic buried hills. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] By reading the detailed description of the preferred embodiment below, various other advantages and benefits will become clear to those of ordinary skill in the art. The accompanying drawings are only used to illustrate the purpose of the preferred embodiment and are not considered to be limitations of the present invention. In the entire drawings, the same reference numerals are used to represent the same components.
[0049] In the attached picture:
[0050] Figure 1 It is the fracture distribution map of the core column of the buried hill fracture reservoir;
[0051] Figure 2 It is the stress magnitude distribution diagram of the wellbore cross section of a circular wellbore;
[0052] Figure 3 It is the response characteristics of the fractures in the buried hill fracture reservoir of Well 7 in gas reservoir B on the electrical imaging logging.
[0053] Figure 4 It is the response characteristic of drilling-induced fractures in some formation sections of the metamorphic buried hill fracture reservoir in Well 6 of gas reservoir B on the electrical imaging logging.
[0054] Figure 5 It is the response characteristic of the wellbore collapse cracks in some strata of the metamorphic rock buried hill fracture reservoir in Well 6 of gas reservoir B on the electrical imaging logging.
[0055] Figure 6 (a), (b) and (c) are the strike rose diagrams of high-conductivity fractures, drilling-induced fractures and wellbore collapse fractures in the metamorphic buried hill fracture reservoir of Well 5 in gas reservoir B.
[0056] Figure 7 This is the flow chart for calculating the azimuth difference between the high-conductivity fracture and the horizontal maximum principal stress in a single well;
[0057] Figure 8 (a), (b), (c), (d) and (e) are the statistical histograms of the azimuth difference between each high-conductivity fracture and the horizontal maximum principal stress in Well B1, Well B2, Well B5, Well B6 and Well B7 in gas reservoir B, respectively;
[0058] Fig. 9 This is a relationship diagram between the open flow rate and productivity influencing factors of wells B1, B2, B5, B6 and B7 in gas reservoir B. DETAILED DESCRIPTION
[0059] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0060] An embodiment of the present invention provides a method for evaluating buried hill productivity taking into account the influence of ground stress on fracture effectiveness, comprising the steps of:
[0061] 1) By analyzing the core samples taken from a certain depth of the formation, a comprehensive analysis is conducted on the fracture characteristics developed in the core column to obtain the types and characteristics of the developed fractures (such as open fractures and filled fractures. The open fractures on the rock are the high-conductivity fractures on the electrical imaging logging).
[0062] 2) Based on the Kirsch equation, the stress distribution around the circular wellbore is calculated according to the formula, and combined with the Mohr-Coulomb failure criterion, the characteristics of drilling-induced fractures and wellbore collapse fractures on the wellbore cross section are analyzed to obtain the geometric and azimuthal characteristics of drilling-induced fractures and wellbore collapse fractures around the wellbore.
[0063] According to the Kirsch equation, the formula for calculating the stress around the wellbore under the strike-slip fault stress environment is as follows:
[0064]
[0065]
[0066]
[0067] Where: rr is the radial stress, MPa; σ θθ is the hoop stress, MPa; σ rθ is the vertical stress, MPa; S Hmaxis the maximum horizontal principal stress, MPa; S hmin is the minimum horizontal principal stress, MPa; θ is the position at any position and S Hmax The angle between the directions, deg; ΔP is the mud pressure P m and pore pressure P o The difference, MPa; σ ΔT is the stress caused by the temperature difference between mud and formation, MPa; R is the wellbore radius, in; r is the distance from any position to the center of the wellbore, in.
[0068] 3) Using logging instruments to collect electrical imaging logging data in the buried hill reservoir; based on the collected electrical imaging logging data, analyzing the response characteristics of different types of fractures such as the open fractures developed on the core column in step 1), the drilling induced fractures and the wellbore collapse fractures in step 2) on the vertical electrical imaging logging data, and establishing the development patterns of different types of fractures and their characteristics on the electrical imaging logging data.
[0069] 4) By processing and interpreting the electrical imaging logging data collected from the target layer of the fractured oil and gas reservoir, the fracture tendency information of each high-conductivity fracture, drilling-induced fracture, and wellbore collapse fracture in the target layer of the fractured oil and gas reservoir is obtained, and the main direction of the high-conductivity fracture in each well is determined according to the trend rose diagram of the high-conductivity fracture in the single well, and the main orientation of the drilling-induced fracture and the wellbore collapse fracture in each well is determined according to the trend rose diagram of the drilling-induced fracture and the wellbore collapse fracture in the single well to obtain the horizontal maximum principal stress orientation Strike_S, the formula is as follows:
[0070] Strike_S=Strike_DIF (4)
[0071] Strike_S=Strike_breakout±90° (5)
[0072] Where, Strike_DIF is the direction of drilling-induced fractures, deg; Strike_breakout is the direction of collapse fractures, deg. Among them, the azimuth value of Strike_S is between [0,180].
[0073] Drilling-induced fractures and wellbore collapse fractures do not necessarily exist at the same time in a single well. Since there is a 90° azimuth difference between the two, when the two exist at the same time, the reliability of fracture picking can be verified by checking whether the two azimuths are vertical and the horizontal maximum principal stress azimuth can be obtained; when only one fracture exists, the horizontal maximum principal stress azimuth can be obtained by converting the above formula. Based on electrical imaging logging data, the following software such as Geolog and Techlog can be used to pick up high-conductivity fractures, drilling-induced fractures and wellbore collapse fractures and calculate the inclination of each high-conductivity fracture, drilling-induced fracture and wellbore collapse fracture. The above software can further be used to produce the trend rose diagram of high-conductivity fractures, drilling-induced fractures and wellbore collapse fractures.
[0074] 5) Calculate the azimuth difference between the strike of each high-conductivity fracture in a single well and the azimuth difference between the main azimuth of the fracture in a single well and the azimuth of the horizontal maximum principal stress, and draw a statistical histogram of the azimuth difference between the strike of each high-conductivity fracture in a single well and the azimuth of the horizontal maximum principal stress to analyze the main controlling factors of production capacity.
[0075] 6) According to the azimuth difference between the main orientation of the fracture in a single well and the orientation of the maximum horizontal principal stress, combined with the calculated permeability and the divided effective thickness of the reservoir, the productivity influencing factor IP is constructed:
[0076] IP=K·H-STRIKE_dif (6)
[0077] Where STRIKE_dif is the azimuth difference between the main strike of the single well fracture and the horizontal maximum principal stress azimuth, deg; K is the calculated permeability, mD; H is the divided effective thickness of the reservoir, m.
[0078] 7) Based on the well test or test operation, the actual daily gas production of the well is obtained, and then the binomial production capacity equation and the "one-point method" production capacity equation are used to calculate the open-flow rate of the well.
[0079] The open flow rate is an important indicator for evaluating the production capacity of a gas well, indicating the production of a gas well when the bottom of the well is completely open. At the oil and gas field site, the bottom hole pressure and wellhead flow rate in the stable gas flow stage can be derived from the seepage mechanics to derive the following relationship for calculating the open flow rate of a gas well using the binomial method:
[0080] p R 2 -p wf 2 =aq g +bq g 2 (7)
[0081] Where: a, b are the laminar coefficient and turbulent coefficient of the binomial capacity equation, respectively, and are dimensionless; p R is the formation pressure, MPa; p wf is the bottom hole flow pressure, MPa; q g is the gas production, 10 4 m 3 / d.
[0082] The capacity equation of the "one point method" is as follows, and this capacity equation belongs to the prior art:
[0083]
[0084] p D =(p R 2 -pwf 2 ) / p R 2 (9)
[0085] α=a / (a+bq AOF ) (10)
[0086] Where: a, b are the laminar coefficient and turbulent coefficient of the binomial capacity equation, respectively, and are dimensionless; p D is dimensionless pressure; q AOF is unimpeded flow, 10 4 m 3 / d; α is the empirical coefficient of the “one-point method” capacity equation.
[0087] 8) Establish a capacity equation between the open flow rate of each well and the capacity influencing factors; for newly drilled wells in Oilfield B, use the established capacity relationship to predict the capacity based on the calculated capacity influencing factors.
[0088] The analysis method based on the influence of geostress on fracture effectiveness of the present invention can clarify the essential reasons for the differences in productivity of fractured reservoirs with strong heterogeneity and point out a new direction for productivity evaluation.
[0089] Example 1
[0090] Example 1: Take a metamorphic rock buried hill fractured condensate gas reservoir B as an example.
[0091] 1) Based on the core sample of metamorphic buried hill fractured condensate gas reservoir B at a certain depth in the formation, a comprehensive analysis of the fractures developed in the core column was conducted, and it was found that the types of open fractures developed were mainly medium-low angle fractures, and the density of fractures was distributed between 12 and 14 per meter, mainly high-conductivity fractures, such as Figure 1 shown.
[0092] 2) According to formulas (1), (2) and (3) in the Kirsch equation, the stress distribution around the circular wellbore is calculated, and the characteristics of drilling-induced fractures and wellbore collapse fractures on the wellbore cross section are analyzed in combination with the Mohr-Coulomb failure criterion, and the geometric and azimuthal characteristics of drilling-induced fractures and wellbore collapse fractures around the wellbore are obtained ( Figure 2 ).
[0093] like Figure 2 As shown, on a circular wellbore cross section, S Hmax Represents the maximum horizontal principal stress, and the arrow direction indicates the stress direction; S hmin It represents the minimum horizontal principal stress, and the direction of the arrow indicates the stress direction; Wbo represents the opening angle of the collapse fracture.
[0094] 3) Use logging instruments to collect electrical imaging logging data in the target layer of metamorphic buried-hill condensate gas reservoir B; Based on the electrical imaging logging data collected by Well B1, analyze the response characteristics of the open fractures developed on the core column in step 1) on the electrical imaging logging data. The electrical imaging logging data show the existence of high-conductivity fractures ( Figure 3 ).
[0095] like Figure 3 As shown in the figure, in the well logging response high conductivity fracture and the corresponding drilling core map in Well B1, the first track is the formation depth; the second track is the natural gamma and wellbore curve; and the third track is the electrical imaging logging data.
[0096] 4) Using logging instruments to collect electrical imaging logging data in the target layer of metamorphic buried-hill condensate gas reservoir B; based on the electrical imaging logging data collected by Well B6, the response characteristics of different types of fractures such as drilling-induced fractures and wellbore collapse fractures in step 2) on the vertical electrical imaging logging data, and the development patterns of different types of fractures and their characteristics on the electrical imaging logging data are established, such as Figure 4 and Figure 5 shown.
[0097] like Figure 4 As shown in the logging response diagram of some layers of Well B6, the first track is the formation depth; the second track is the natural gamma, well diameter, and drill bit diameter curves; the third track is the ultra-deep resistivity and deep resistivity curves; the fourth track is the P-wave time difference, density, and neutron porosity curves; and the fifth track is the electrical imaging logging data.
[0098] like Figure 5 As shown in the logging response diagram of some layers of Well B6, the first track is the formation depth; the second track is the natural gamma, well diameter, and drill bit diameter curves; the third track is the ultra-deep resistivity and deep resistivity curves; the fourth track is the P-wave time difference, density, and neutron porosity curves; and the fifth track is the electrical imaging logging data.
[0099] 5) By processing and interpreting the electrical imaging logging data collected from the target layer of the fractured oil and gas reservoir, the fracture tendency information of each high-conductivity fracture, drilling-induced fracture, and wellbore collapse fracture in the target layer of the fractured oil and gas reservoir can be obtained, and the main direction of the high-conductivity fracture in each well can be determined according to the rose diagram of the direction of the high-conductivity fracture in a single well, and the main orientation of the drilling-induced fracture (if any) and wellbore collapse fracture (if any) in each well can be determined according to the rose diagram of the direction of the high-conductivity fracture in a single well, and the orientation of the horizontal maximum principal stress can be obtained, such as Figure 6 shown.
[0100] Figure 6 This is the rose diagram of the strike of high-conductivity fractures, drilling-induced fractures and wellbore collapse fractures in Well B5. The main strike of the high-conductivity fractures is 140°; the main orientation of the drilling-induced fractures in Well B5 is 140.05°, and the main orientation of the wellbore collapse fractures is 50°, so the orientation of the maximum horizontal principal stress is 140.05°.
[0101] 6) Calculate the azimuth difference Strike_dif between the strike direction of each high-conductivity fracture in a single well and the azimuth of the horizontal maximum principal stress ( Figure 7 ), thus obtaining the azimuth difference statistical histogram of the direction of each well's high conductivity fracture and the horizontal maximum principal stress orientation to analyze the main control factors of productivity, such as Figure 8 The calculation method of the azimuth difference STRIKE_dif between the main strike of the fracture in a single well and the azimuth difference Strike_dif between the strike of each high-conductivity fracture and the azimuth of the horizontal maximum principal stress is the same as that of the azimuth difference Strike_dif between the strike of each high-conductivity fracture and the azimuth of the horizontal maximum principal stress.
[0102] Figure 7 This is a flow chart for calculating the azimuth difference between the strike of a high-conductivity fracture in a single well and the azimuth of the maximum horizontal principal stress. Azimuth represents the inclination of a single fracture, deg; Strike represents the strike of a single fracture, deg; Strike_S represents the azimuth of the maximum horizontal principal stress; ABS (Strike-Strike_S) represents the absolute value of the difference between Strike and Strike_S, deg; Strike_dif represents the difference between the strike of a single fracture and the azimuth of the maximum horizontal principal stress, deg.
[0103] Figure 8 It is a statistical histogram of the azimuth difference between the strike of each fracture and the azimuth of the maximum horizontal principal stress in seven wells. The horizontal axis is the distribution range of the azimuth difference between the strike of a single fracture and the azimuth of the maximum horizontal principal stress, and the vertical axis is the fracture frequency.
[0104] 7) According to the azimuth difference between the main strike of the single well fracture and the horizontal maximum principal stress, combined with the permeability calculated based on the Stoneley wave and the divided effective reservoir thickness, the production capacity influencing factors are constructed, as shown in Table 1.
[0105] Table 1 Productivity influencing factors IP of five wells in metamorphic rock buried hill fracture gas reservoir B
[0106]
[0107] Note: Well B7 has two main groups of fractures, NW-SE and NE-SW, with strikes of 70° and 110° respectively (the strikes are considered to be distributed between 0° and 180°). Among them, the group of fractures with a strike of 70° in the NW-SW direction has a large angle with the ground stress and is considered to be an invalid fracture and is not included in the calculation.
[0108] 8) Based on the well testing or test operations of the five wells in gas reservoir B, according to the actual daily gas production of each well, the binomial production capacity equation in equations (7)-(10) and the "one-point method" production capacity equation are used to calculate the open-flow rate of the well, as shown in Table 2.
[0109] Table 2 Open flow rates Q of five wells in metamorphic rock buried hill fracture gas reservoir B AOF result
[0110]
[0111]
[0112] 9) Establish a production capacity equation between the unimpeded flow rate of a single well and the factors affecting production capacity; for newly drilled wells in Oilfield B, use the established production capacity relationship to predict production capacity based on the factors affecting the production capacity of a single well.
[0113] Productivity influencing factors IP and open flow rate Q of metamorphic rock buried hill fracture reservoir in gas reservoir B AOF The functional relationship of Fig. 9 As shown below:
[0114] Q AOF =6.46·e 0.0053·IP
[0115] A newly drilled well B4 in the metamorphic rock buried hill fracture gas reservoir B has a productivity influencing factor IP = 466.50. The open flow rate Q is predicted based on the established productivity equation. AOF =76.56×10 4 m 3 / d; After it is actually put into production, the unobstructed flow rate Q is calculated based on a large amount of production test data combined with formula (4) AOF =80.00×10 4 m 3 / d, the relative error between the predicted capacity and the actual capacity is only 4.30%.
[0116] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for evaluating buried hill productivity considering the influence of geostress on fracture effectiveness, characterized in that: Includes steps: Obtain the types and characteristics of fractures developed in the cores drilled from the target layer; Obtain the geometric and azimuthal characteristics of drilling-induced fractures and wellbore collapse fractures around the wellbore; Analyze the response characteristics of the open fractures, drilling-induced fractures and wellbore collapse fractures developed on the core on the vertical electrical imaging logging data, and establish the development patterns of different types of fractures and their characteristics on the electrical imaging logging data; By processing and interpreting the electrical imaging logging data collected from the target layer of the fractured oil and gas reservoir, the fracture tendency information of each high-conductivity fracture, drilling-induced fracture, and wellbore collapse fracture in the target layer of the fractured oil and gas reservoir is obtained, and the main fracture direction of each well is determined based on the rose diagram of the high-conductivity fracture in the single well, and the main orientation of the drilling-induced fracture and wellbore collapse fracture in each well is determined based on the rose diagram of the drilling-induced fracture and wellbore collapse fracture in the single well to obtain the horizontal maximum principal stress orientation; Calculate the azimuth difference between the strike of each high-conductivity fracture in a single well and the azimuth of the maximum horizontal principal stress, so as to obtain the azimuth difference statistical histogram between the strike of each high-conductivity fracture and the azimuth of the maximum horizontal principal stress in each well for analysis of the main controlling factors of productivity; According to the azimuth difference between the main trend of single well fractures and the azimuth of the maximum horizontal principal stress, combined with the calculated permeability and the divided effective thickness of the reservoir, the productivity influencing factor IP is constructed; Based on well testing or test operations, the single well open flow rate Q is calculated AOF ; A production capacity equation between the unimpeded flow rate of a single well and the production capacity influencing factors is established, and the production capacities of the remaining wells are calculated based on the production capacity equation.
2. The method for evaluating buried hill productivity considering the influence of ground stress on fracture effectiveness according to claim 1, characterized in that: The geometric and azimuthal characteristics of drilling-induced fractures and wellbore collapse fractures around the wellbore are obtained by: Based on formulas (1), (2), (3) and the Mohr-Coulomb failure criterion, the stress distribution around the circular wellbore is calculated, and the characteristics of the drilling-induced fractures and the wellbore collapse fractures on the wellbore cross section are analyzed to obtain the geometric and azimuthal characteristics of the drilling-induced fractures and the wellbore collapse fractures around the wellbore. The formulas (1), (2) and (3) are respectively: Where: rr is the radial stress, MPa; σ θθ is the hoop stress, MPa; σ rθ is the vertical stress, MPa; S Hmax is the maximum horizontal principal stress, MPa; S hmin is the minimum horizontal principal stress, MPa; θ is the position at any position and S Hmax The angle between the directions, deg; ΔP is the mud pressure P m and pore pressure P o The difference, MPa; σ ΔT is the stress caused by the temperature difference between mud and formation, MPa; R is the wellbore radius, in; r is the distance from any position to the center of the wellbore, in.
3. The method for evaluating buried hill productivity considering the influence of ground stress on fracture effectiveness according to claim 1, characterized in that: The electrical imaging logging data are collected in the target layer using logging instruments. Based on the collected electrical imaging logging data, the response characteristics of the open fractures developed on the core, the numerically simulated drilling-induced fractures and the wellbore collapse fractures on the vertical electrical imaging logging data are analyzed, and the development patterns of different types of fractures and their characteristics on the electrical imaging logging data are established.
4. The method for evaluating buried hill productivity considering the influence of ground stress on fracture effectiveness according to claim 1, characterized in that: The calculation formula of the horizontal maximum principal stress direction Strike_S is as follows: Strike_S=Strike_DIF (4) Strike_S=Strike_breakout±90° (5) Where Strike_DIF is the strike of the drilling-induced fracture, deg; Strike_breakout is the strike of the collapse fracture, deg, and the azimuth value of Strike_S is between [0,180].
5. The method for evaluating buried hill productivity considering the influence of ground stress on fracture effectiveness according to claim 1, characterized in that: The calculation method of the azimuth difference STRIKE_dif between the main strike of a single well fracture and the horizontal maximum principal stress azimuth is the same as the calculation method of the azimuth difference Strike_dif between the strike of each high-conductivity fracture in a single well and the horizontal maximum principal stress azimuth.
6. The method for evaluating buried hill productivity considering the influence of ground stress on fracture effectiveness according to claim 5, characterized in that: The capacity influencing factor IP is shown in formula (6): IP=K·H-STRIKE_dif (6) Where STRIKE_dif is the azimuth difference between the main strike of the single well fracture and the horizontal maximum principal stress azimuth, deg; K is the calculated permeability, mD; H is the divided effective thickness of the reservoir, m.
7. The method for evaluating buried hill productivity considering the influence of ground stress on fracture effectiveness according to claim 1, characterized in that: Establish single well unobstructed flow Q AOF The capacity equation between the capacity influencing factors is shown in formula (7): Q AOF =6.46·e 0.0053·IP (7)。 8. A buried hill productivity evaluation device considering the influence of ground stress on the effectiveness of fractures, characterized in that: include: The first processing unit is used to obtain the type and characteristics of fractures developed in the core drilled from the target layer; The second processing unit is used to obtain the geometric and azimuthal characteristics of the drilling-induced fractures and the wellbore collapse fractures around the wellbore; The third processing unit is used to analyze the response characteristics of the open fractures developed on the core, the numerically simulated drilling-induced fractures and the wellbore collapse fractures on the vertical electrical imaging logging data, and to establish the development patterns of different types of fractures and their characteristics on the electrical imaging logging data; The fourth processing unit is used to obtain fracture tendency information of each high-conductivity fracture, drilling-induced fracture, and wellbore collapse fracture in the target layer of the fractured oil and gas reservoir by processing and interpreting the electrical imaging logging data collected in the target layer of the fractured oil and gas reservoir, and determine the main direction of the high-conductivity fracture in each well according to the trend rose diagram of the high-conductivity fracture in the single well, and determine the main orientation of the drilling-induced fracture and the wellbore collapse fracture in each well according to the rose diagram of the drilling-induced fracture and the wellbore collapse fracture in the single well to obtain the horizontal maximum principal stress orientation; The fifth processing unit is used to calculate the azimuth difference between the strike of each high-conductivity fracture in a single well and the azimuth of the maximum horizontal principal stress, so as to obtain a statistical histogram of the azimuth difference between the strike of each high-conductivity fracture and the azimuth of the maximum horizontal principal stress in each well to analyze the main controlling factors of productivity; The sixth processing unit is used to construct the productivity influencing factor IP according to the azimuth difference between the main trend of the single well fracture and the horizontal maximum principal stress azimuth, combined with the calculated permeability and the divided effective thickness of the reservoir; The seventh processing unit is used to calculate the single well unobstructed flow rate Q based on the well test or test operation AOF ; The eighth processing unit is used to establish a production capacity equation between the unimpeded flow rate of a single well and the production capacity influencing factor, and calculate the production capacity of the remaining wells according to the production capacity equation.
9. A computer-readable storage medium, characterized in that: Computer instructions are stored, and the computer instructions are used to implement the buried hill productivity evaluation method considering the influence of ground stress on fracture effectiveness as described in any one of claims 1 to 7 when executed by a processor.
10. A computer device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the method for evaluating the production capacity of a buried hill considering the influence of ground stress on the effectiveness of fractures as described in any one of claims 1 to 7 when executing the computer program.