In-situ acquisition device and method for rock mass multi-dimensional information parameters

Through integrated equipment and technology, real-time collection of rock mass characteristics information in underground mining of metal mines has been achieved, solving the problems of low efficiency and high cost in traditional construction, and promoting mechanization, intelligence and unmanned development.

CN116752949BActive Publication Date: 2024-11-05CENT SOUTH UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310814220.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-04
Publication Date
2024-11-05
Estimated Expiration
2043-07-04

AI Technical Summary

Technical Problem

In underground mining of traditional metal mines, the preparation process before tunnel construction is time-consuming and costly, and timely assessment of the mechanical characteristics and structural surface characteristics of rocks cannot be achieved, affecting the efficiency of engineering and hindering the refined and intelligent development of resource mining.

Method used

Integrate discrete equipment such as drilling monitoring devices, drilling imagers, geotechnical acoustic wavemeters, and use complex terrain drive technology, multi-sensor fusion technology and digital image processing technology to realize multi-dimensional information parameters of rock mass characteristics through multi-function monitoring vehicles. Obtain in situ.

Benefits of technology

The quality of the project construction has been improved, real-time collection of rock mechanic parameters, structural surface images and mineral components has been achieved, laying the foundation for the mechanized, intelligent and unmanned development of metal mines, and reducing construction costs and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116752949B_ABST
    Figure CN116752949B_ABST
Patent Text Reader

Abstract

The present application relates to an in-situ acquisition device and method for multi-dimensional information parameters of rock mass, which includes a multi-functional monitoring vehicle body, a connecting rod 1 is hinged on the top of the functional monitoring vehicle body, a connecting rod 2 is hinged on the end of the connecting rod 1 away from the multi-functional monitoring vehicle body, a drill rod is hinged on the end of the connecting rod 2 away from the connecting rod 1, and a coring drill bit is fixedly connected to the end of the drill rod away from the connecting rod 2; a displacement sensor, a pressure sensor, a torque sensor, and a speed sensor are arranged on the drill rod for real-time recording of the speed, thrust, torque, drilling speed, and rock breaking specific energy during the drilling process; a geotechnical sonicator, a high-definition multi-functional drilling panoramic imager, a hollow inclusion stress gauge, a portable digital color core scanner, a portable point load meter system, and a near-infrared mineral analyzer are arranged on the multi-functional monitoring vehicle body. The present application has the effect of realizing the in-situ acquisition of multi-dimensional information parameters of rock mass characteristics.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of underground mining of metal mines, and in particular to an in-situ acquisition device and method for multi-dimensional information parameters of rock masses. Background Art

[0002] The development and utilization of underground metal mineral resources is an important support for the development of the national economy, and the development and mining process of underground mining is the core project of mine production and mining development. Currently, the construction of underground mining of metal mines mostly uses traditional technology.

[0003] The preparation process before conventional tunnel construction usually requires on-site drilling, coring, sample processing and laboratory testing to obtain the mechanical properties and structural surface characteristics of the rock mass. The procedure is time-consuming and costly, and it cannot provide timely evaluation compared to in-situ monitoring, which affects the efficiency of the project and cannot meet the needs of resource mining from extensive to refined and intelligent development. With the development of science and technology, the new in-situ monitoring equipment makes it easier to collect rock mass characteristics such as mechanical parameters, structural surface images, and mineral composition in real time.

[0004] Therefore, it is an urgent problem to be solved by integrating discrete equipment such as drilling monitoring devices, borehole imagers, and geotechnical sonic instruments, and using complex terrain driving technology, multi-sensor fusion technology, digital image processing technology, etc. to achieve in-situ acquisition of multi-dimensional information parameters of rock mass characteristics, thereby laying a certain foundation for the mechanized, intelligent, and unmanned development of metal mines. Summary of the invention

[0005] In order to realize the integration of discrete equipment such as drilling monitoring devices, borehole imagers, and geotechnical sonic instruments, and utilize complex terrain driving technology, multi-sensor fusion technology, digital image processing technology, etc. to realize the in-situ acquisition of multi-dimensional information parameters of rock mass characteristics, this application provides an in-situ acquisition device for multi-dimensional information parameters of rock mass.

[0006] The in-situ acquisition device of rock mass multi-dimensional information parameters provided in this application adopts the following technical solution:

[0007] A device for acquiring multi-dimensional information parameters of a rock mass in situ, comprising a multifunctional monitoring vehicle body, wherein a connecting rod 1 is hinged on the top of the functional monitoring vehicle body, a connecting rod 2 is hinged on the end of the connecting rod 1 away from the multifunctional monitoring vehicle body, a drill rod is hinged on the end of the connecting rod 2 away from the connecting rod 1, and a coring drill bit is fixedly connected to the end of the drill rod away from the connecting rod 2; a displacement sensor, a pressure sensor, a torque sensor, and a rotation speed sensor are arranged on the drill rod for real-time recording of the rotation speed, thrust, torque, drilling speed, and rock breaking specific energy during drilling; a support frame is fixedly connected to the top of the multifunctional monitoring vehicle body, a geotechnical sonic wave meter and a high-definition multifunctional drilling panoramic imager are arranged on the top of the support frame, the geotechnical sonic wave meter is used to monitor the wave velocity of the rock mass along the borehole generated by coring drilling, and divide the loosening zone of the rock mass according to the sound wave velocity, and the high-definition multifunctional drilling panoramic imager is used to acquire the rock mass of the borehole wall The multifunctional monitoring vehicle is equipped with a high-definition digital image of the rock mass to identify and extract the structural surface features; the multifunctional monitoring vehicle body is provided with a hollow inclusion stress gauge, which is used to test the size of the rock mass ground stress and its distribution along the way; the multifunctional monitoring vehicle body is provided with a portable digital color core scanner, which is used to scan the cores taken out by drilling, and the scanned core wall image is compared with the high-definition digital image of the hole wall rock mass obtained by the high-definition multifunctional drilling panoramic imager to determine the spatial characteristics of the core in the borehole, so as to realize the core repositioning; the multifunctional monitoring vehicle body is provided with a portable point load meter system and a near-infrared mineral analyzer, the portable point load meter system is used to load the core with multi-directional point loads to obtain the compressive strength and tensile strength of the rock, and the near-infrared mineral analyzer is used to directly analyze and obtain the mineral composition of the core fragments.

[0008] By adopting the above technical solution, by integrating discrete equipment such as drilling monitoring devices, borehole imagers, and geotechnical sonic instruments on a multi-functional inspection vehicle, and utilizing complex terrain multi-functional monitoring vehicles, multi-sensor fusion technology, and digital image processing technology, the in-situ acquisition of multi-dimensional information parameters of rock mass characteristics is achieved, thereby improving the poor quality of traditional engineering construction and the difficulty in achieving refined operations, laying a certain foundation for the mechanized, intelligent, and unmanned development of metal mines.

[0009] Optionally, the multifunctional monitoring vehicle body is further provided with:

[0010] The drilling and while-drilling analysis module is used to control the positions of connecting rods 1 and 2 and then use the coring drill bit to drill the core, while collecting while-drilling parameters for mechanical property analysis;

[0011] An in-hole television module is used to obtain a high-definition digital image of the borehole wall through an in-hole television device, and quickly and accurately extract structural surface features;

[0012] The in-hole acoustic wave test module is used to control the geotechnical acoustic wave instrument to monitor the longitudinal wave velocity of the rock mass in the drilling area and divide the range of the rock mass loosening area;

[0013] In-hole stress test module, used to guide the hollow inclusion stress gauge to measure the in-situ stress based on the borehole casing stress relief method;

[0014] A core scanning and repositioning module, which is used to collect the core image scanned by a portable digital color core scanner and then automatically compare it with the hole wall image to realize core repositioning;

[0015] The core point load test module is used to calculate and analyze the test results of the point load instrument system to obtain the compression and tensile strength of the core;

[0016] The core fragment mineral composition analysis module is used to analyze and collect the mineral composition of core fragments based on near-infrared spectroscopy technology; the electronic core modeling module is used to generate full-process and full-information electronic cores of the rock mass based on computer digital twin technology.

[0017] By adopting the above technical solutions, the drilling and while-drilling analysis module, in-hole television module, in-hole acoustic wave testing module, in-hole stress testing module, core scanning and repositioning module, core point load testing module, core fragment mineral composition analysis module, and electronic core modeling module can realize the in-situ acquisition of multi-dimensional information parameters of rock mass characteristics, laying a certain foundation for the mechanized, intelligent, and unmanned development of metal mines.

[0018] Optionally, a shock absorbing mechanism is provided at the connection between the connecting rod 1 and the multifunctional monitoring vehicle body; the shock absorbing mechanism includes a shock absorbing pad fixedly connected to the multifunctional monitoring vehicle body, four guide columns are fixedly connected to the top of the shock absorbing pad, the axial direction of the guide columns is vertically arranged, and a positioning seat is slidably connected to the guide columns, the connecting rod 1 is hinged to the positioning seat, the guide columns are located at the four corners of the positioning seat, two shock absorbing springs are sleeved on each guide column, the shock absorbing springs are respectively located on both sides of the positioning seat, and the ends of the shock absorbing springs close to the positioning seat are fixedly connected to the positioning seat.

[0019] By adopting the above technical solution, when the drill rod drives the connecting rod to vibrate, the positioning seat slides along the guide column, and the positioning seat moves downward to compress the shock-absorbing spring at the bottom, while stretching the shock-absorbing spring at the top; when the positioning seat slides upward, the shock-absorbing spring at the bottom is stretched and the shock-absorbing spring at the top is compressed, and the connecting rod drives the positioning seat to vibrate reciprocatingly, and the positioning seat drives the stretching or contraction of the shock-absorbing spring, which can consume shock waves and thereby reduce the vibration of the drill rod vibration on the multi-functional monitoring vehicle body.

[0020] Optionally, two connecting rods are hinged at the middle position of the bottom of the positioning seat, and the ends of the connecting rods are hinged at the middle position of the bottom of the positioning seat. A sliding column is fixedly connected to the top of the shock-absorbing pad. The axial direction of the sliding column is horizontally set. Two sliders are slidingly connected on the sliding column. One end of the connecting rod away from the positioning seat is fixedly connected to a slider respectively. A return spring is sleeved on the sliding column, and the return spring is located on the opposite side of the slider.

[0021] By adopting the above technical solution, when the positioning seat slides downward, the positioning seat pushes the connecting rod to move downward, so that the connecting rod pushes the slider to compress the return spring. The compression of the return spring forms a damping force on the vibration of the positioning seat. The stretching and contraction of the return spring can further reduce the vibration of the positioning seat.

[0022] Optionally, two limit plates are fixedly connected to the top of the shock-absorbing pad, and the two limit plates are symmetrically fixedly connected to both sides of the shock-absorbing pad. A guide groove is vertically opened on the limit plate, and guide blocks are fixedly connected to both sides of the positioning seat. The guide blocks extend into the guide grooves and can slide in the guide grooves. A pull rope is fixedly connected to the bottom of the guide block, and a guide wheel is fixedly connected to the top of the shock-absorbing pad. An auxiliary spring is fixedly connected to the limit plate, one end of the auxiliary spring is fixedly connected to the limit plate, and the other end is fixedly connected to the pull rope. After the pull rope passes through the guide wheel, both ends of the pull rope are respectively fixed to the limit plate and the auxiliary spring.

[0023] By adopting the above technical solution, when the positioning seat vibrates vertically, the positioning seat drives the auxiliary spring to contract or relax through the pull rope, thereby reducing the vibration of the positioning seat, thereby reducing the vibration of the drill pipe on the multi-functional monitoring vehicle body.

[0024] Optionally, baffles are provided at the four corners of the top of the shock-absorbing pad, the baffles are vertically arranged and correspond to the ends of the limiting plates, the two ends of the limiting plates are respectively fixedly connected with an arc-shaped shock-absorbing plate 1, and an arc-shaped shock-absorbing plate 2 is also provided on the baffle, the bending directions of the shock-absorbing plate 1 and the shock-absorbing plate 2 are opposite, and the middle parts of the shock-absorbing plate 1 and the shock-absorbing plate 2 abut against each other, and the shock-absorbing plate 1 and the shock-absorbing plate 2 are both elastic steel plates.

[0025] By adopting the above technical solution, the core drilling bit drives the positioning seat to vibrate through the connecting rod 1, and the positioning seat pushes the shock absorbing plate 1 and the shock absorbing plate 2 to deform, thereby consuming the shock wave, reducing the vibration of the shock wave on the multi-functional monitoring vehicle body, and thus reducing the size of the core drilling bit.

[0026] Optionally, a buffer mechanism is provided at the connection between the second connecting rod and the first connecting rod; a plug-in slot is provided at the end of the second connecting rod, the buffer mechanism includes a buffer rod hinged to the end of the first connecting rod, the buffer rod is plugged into the plug-in slot, the end of the second connecting rod is fixedly connected to two fixed rods, the fixed rods are symmetrically arranged on both sides of the plug-in slot, a buffer block is fixedly connected to the fixed rod, a sliding block is fixedly connected to the bottom of the buffer block, a sliding slot is provided on the buffer rod, and the sliding block is slidably connected in the sliding slot; a plurality of stamping columns are fixedly connected to the side of the buffer block away from the connecting block, a buffer spring is provided on the outer sleeve of the stamping column, a partition is fixedly connected to the buffer rod, a through hole is provided on the partition corresponding to the position of the stamping column, the through hole is used for the stamping column to pass through, and the buffer spring is located between the buffer block and the partition.

[0027] By adopting the above technical solution, during the drilling process, after the coring drill bit collides with the rock, the connecting rod 2 pushes the buffer block to slide through the fixed rod, and the buffer block squeezes the buffer spring, while driving the punch column to slide and squeeze the buffer column. The buffer spring is compressed to give the buffer block a certain amount of space for movement, so that the coring drill bit can have a certain amount of buffer space after being squeezed by external force, thereby further extending the service life of the coring drill bit.

[0028] Optionally, a material baffle plate is fixedly connected to the buffer rod, and a plurality of V-grooves are provided on the side of the material baffle plate close to the buffer block. A plurality of buffer columns are fixedly connected to the buffer rod, and the buffer columns are located in the V-grooves of the material baffle plate. After the stamping columns pass through the through holes of the partition, they correspond one-to-one with the buffer columns.

[0029] By adopting the above technical solution, during the drilling process, after the coring drill bit collides with the rock, the connecting rod 2 pushes the buffer block to slide through the fixed rod, and the buffer block drives the punching column to slide and squeeze the buffer column. The deformation of the buffer column gives the buffer block a certain amount of movement space, so that the coring drill bit can have a certain amount of buffer space after being squeezed by external force, thereby further extending the service life of the coring drill bit.

[0030] In order to realize the integration of discrete equipment such as drilling monitoring devices, borehole imagers, and geotechnical sonic instruments, and utilize complex terrain driving technology, multi-sensor fusion technology, digital image processing technology, etc. to realize the in-situ acquisition of multi-dimensional information parameters of rock mass characteristics, this application provides an in-situ acquisition method of multi-dimensional information parameters of rock mass.

[0031] The in-situ acquisition method of rock mass multi-dimensional information parameters provided in this application adopts the following technical solutions:

[0032] A method for in-situ acquisition of rock mass multi-dimensional information parameters comprises the following steps:

[0033] S1. Drilling parameters collection: Drilling is performed on the rock mass to be constructed by using the drill rod and coring drill bit on the multifunctional monitoring vehicle. The rotation speed, thrust, torque, drilling speed and rock breaking specific energy of the drilling process are recorded in real time at intervals of s by using the drilling monitoring devices such as displacement sensors, pressure sensors, torque sensors and rotation speed sensors. The recorded data are uploaded to the data processing system for storage and processing. The drilling parameters are first collected and calculated by the drilling monitoring device, and then a relationship model between the drilling parameters and mechanical properties is established.

[0034] S2. High-definition photography in the hole: In the borehole generated by the above drilling, a high-definition multifunctional borehole panoramic imager is used to obtain high-definition digital images of the borehole wall rock mass, so as to identify and extract structural surface features; the image processing system automatically collects, expands, splices and records the borehole wall images, and then directly describes the core structural surface features through computer vision technology;

[0035] S3. In-hole wave velocity test: Use a geotechnical sonic instrument to monitor the wave velocity of the rock mass along the hole, and divide the loose rock mass area according to the sonic velocity;

[0036] S4. Borehole stress meter measurement: The size and distribution of rock mass ground stress are tested by hollow inclusion stress meter;

[0037] S5. Digital scanning of the core: Scan the core obtained by drilling with a portable digital color core scanner, and compare the scanned core wall image with the hole wall image obtained in the drilling step A to determine the spatial characteristics of the core in the borehole, so as to achieve core relocation;

[0038] S6. Core mechanical test: The rock core is subjected to multi-directional point load loading by a portable point load meter system to obtain the compressive strength and tensile strength of the rock; the rock core scanned in step S is placed in the portable point load meter system for multi-directional loading test, and the compressive strength and tensile strength are indirectly obtained by selecting a corresponding rock and a representative model based on the existing domestic test research results on the relationship between point load strength and uniaxial compressive strength and tensile strength;

[0039] S7. Infrared spectrum analysis of rock blocks: The mineral composition of the core fragments is directly analyzed by a near-infrared mineral analyzer;

[0040] S8. Generate electronic rock core with full information of the entire process of rock mass: store the spatial posture information of the entire drilling core, mechanical properties of the rock mass, mineral composition of the rock mass, rock structure surface information, rock mass acoustic wave velocity, ground stress and other information obtained above into the electronic rock core library, and generate electronic rock core with full information of the entire process of rock mass through computer digital twin technology.

[0041] By using the above technical solution, the in-situ acquisition method of the multi-dimensional information parameters of the rock mass mainly constructs the full-process and full-information electronic rock core of the rock mass, which contains information such as the mechanical properties of the rock mass, the structural surface characteristics, the distribution of the loose area of ​​the rock mass, the mineral composition of the rock mass, and the spatial posture of the rock core through the above eight steps. While remotely guiding the actual construction, it solves the complicated process of transporting and managing the physical rock core, and the electronic rock core data is comprehensive and reliable, which has important theoretical and application value for the refined construction of underground mining in metal mines. In addition, the multifunctional monitoring vehicle is equipped with a crawler walking mechanism and can be remotely controlled, and various modules are integrated to realize flexible underground intelligent construction exploration. The core drilling of the rock mass to be mined is carried out through the drilling and drilling analysis modules, and then other modules are used to collect information such as drilling images and ground stress distribution, and then the information is statistically analyzed separately. On the basis of in-situ monitoring of the rock mass, multifunctional integrated continuous drilling monitoring can be realized, and the operation process is simple, which greatly improves the exploration efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a schematic diagram of the overall structure of Example 1 of the present application.

[0043] Figure 2 It is a flow chart of each module in the first embodiment.

[0044] Figure 3 It is a structural schematic diagram for highlighting the shock absorbing mechanism and the suction and buffering mechanism in the first embodiment.

[0045] Figure 4 It is a cross-sectional view of the shock absorbing mechanism in the first embodiment.

[0046] Figure 5 This is a cross-sectional view made to highlight the guide column in the first embodiment.

[0047] Figure 6 It is a structural schematic diagram for highlighting the buffer mechanism in the first embodiment.

[0048] Figure 7 It is a cross-sectional view made to highlight the buffer mechanism in the first embodiment.

[0049] Figure 8 yes Figure 6 Enlarged view of part A.

[0050] Fig. 9 This is a flow chart of the second embodiment of the present application.

[0051] Description of the accompanying drawings: 1. Multifunctional monitoring vehicle body; 11. Connecting rod 1; 12. Connecting rod 2; 121. Plug-in slot; 13. Drill rod; 14. Coring drill bit; 15. Support frame; 16. Shock-absorbing mechanism; 161. Shock-absorbing pad; 162. Limiting plate; 1621. Guide groove; 163. Guide column; 164. Positioning seat; 1641. Guide block; 165. Shock-absorbing spring; 166. Connecting rod; 1661, sliding column; 1662, sliding block; 1663, reset spring; 167, pull rope; 1671, guide wheel; 1672, auxiliary spring; 168, baffle; 1681, shock absorbing plate 1; 1682, shock absorbing plate 2; 17, buffer mechanism; 171, buffer rod; 172, fixing rod; 173, connecting block; 174, buffer block; 1741, sliding block; 1742, slide groove; 175. Material blocking plate; 1751. V-shaped groove; 1752. Buffer column; 176. Stamping column; 177. Buffer spring; 178. Partition plate; 1781. Through hole; 2. Displacement sensor; 3. Pressure sensor; 4. Torque sensor; 5. Speed ​​sensor; 6. Geotechnical sonic instrument; 7. High-definition multifunctional drilling panoramic imager; 8. Hollow inclusion stress gauge; 9. Portable digital color core scanner; 10. Portable point load meter system; 11. Near-infrared mineral analyzer; 110. Drilling and while-drilling analysis module; 120. In-hole TV module; 130. In-hole sonic test module; 140. In-hole stress test module; 150. Core scanning and repositioning module; 160. Core point load test module; 170. Core fragment mineral composition analysis module; 180. Electronic core modeling module. DETAILED DESCRIPTION

[0052] The following is combined with Figure 1-9 This application is described in further detail.

[0053] Embodiment 1:

[0054] The first embodiment of the present application discloses a device for in-situ acquisition of multi-dimensional information parameters of rock mass. Figure 1 The in-situ acquisition device for multi-dimensional information parameters of rock mass comprises a multifunctional monitoring vehicle body 1, which is used to run into the rock mass to be constructed; a connecting rod 11 is hinged on the top of the multifunctional monitoring vehicle body 1, a connecting rod 2 12 is hinged on the end of the connecting rod 11 away from the multifunctional monitoring vehicle body 1, a drill rod 13 is hinged on the end of the connecting rod 2 12 away from the connecting rod 1 11, and a coring drill bit 14 is fixedly connected to the end of the drill rod 13 away from the connecting rod 2 12; a displacement sensor 2, a pressure sensor 3, a torque sensor 4, and a speed sensor 5 are arranged on the drill rod 13 for real-time recording of the speed, thrust, torque, drilling speed and rock breaking specific energy during the drilling process.

[0055] A support frame 15 is fixedly connected to the top of the multifunctional monitoring vehicle body 1, and the support frame 15 is arranged in a door shape. A geotechnical sonic wave meter 6 and a high-definition multifunctional borehole panoramic imager 7 are arranged on the top of the support frame 15. The geotechnical sonic wave meter 6 is used to monitor the wave velocity of the rock mass along the borehole generated by coring drilling, and divide the rock mass loosening zone according to the sound wave velocity; the high-definition multifunctional borehole panoramic imager 7 is used to obtain a high-definition digital image of the borehole wall rock mass, so as to identify and extract structural surface features. The high-definition multifunctional borehole panoramic imager 7 selects a probe of a suitable size in the borehole generated by the above-mentioned coring drilling to continuously display the borehole wall image in 360° all-round and continuous manner, and uses a computer to control image acquisition and image processing to achieve conversion between analog and digital.

[0056] The multifunctional monitoring vehicle body 1 is provided with a hollow inclusion stress meter 8, which is used to test the size of rock mass ground stress and its distribution along the way; the multifunctional monitoring vehicle body 1 is provided with a portable digital color core scanner 9, which is used to scan the cores taken out by drilling, and the scanned core wall image is compared with the high-definition digital image of the hole wall rock mass obtained by the high-definition multifunctional drilling panoramic imager 7 to determine the spatial characteristics of the core in the borehole, so as to realize the repositioning of the core. The multifunctional monitoring vehicle body 1 is provided with a portable point load meter system 10 and a near-infrared mineral analyzer 11, and the portable point load meter system 10 is used to load the core with multi-directional point loads to obtain the compressive strength and tensile strength of the rock. The near-infrared mineral analyzer 11 is used to directly analyze and obtain the mineral composition of the core fragments.

[0057] In addition, refer to Figure 2 The multifunctional monitoring vehicle body 1 is also provided with:

[0058] The drilling and while-drilling analysis module 110 is used to control the positions of the connecting rod 1 and the connecting rod 2 to drill the core using the coring drill bit 14, and collect while-drilling parameters for mechanical property analysis;

[0059] The in-hole TV module 120 is used to obtain a high-definition digital image of the borehole wall through the in-hole TV device, and quickly and accurately extract the structural surface features;

[0060] The in-hole acoustic wave testing module 130 is used to control the geotechnical acoustic wave instrument 6 to monitor the longitudinal wave velocity of the rock mass in the drilling area and divide the range of the rock mass loosening area;

[0061] The in-hole stress testing module 140 is used to guide the hollow inclusion stress meter 8 to measure the in-situ stress based on the borehole casing stress relief method; the core scanning and repositioning module 150 is used to collect the core image scanned by the portable digital color core scanner 9 and then automatically compare it with the hole wall image to realize the core repositioning;

[0062] The core point load test module 160 is used to calculate and analyze the test results of the point load meter system to obtain the compressive and tensile strength of the core; the core fragment mineral composition analysis module 170 is used to analyze and collect the mineral composition of the core fragments based on near-infrared spectroscopy technology; the electronic core modeling module 180 is used to generate full-process and full-information electronic cores of the rock mass based on computer digital twin technology.

[0063] Reference Figure 3 During the drilling process, the vibration of the drill rod 13 drives the multifunctional monitoring vehicle body 1 to vibrate, thereby driving the displacement sensor 2, pressure sensor 3, torque sensor 4, speed sensor 5, geotechnical sonic instrument 6 and high-definition multifunctional drilling panoramic imager 7 on the multifunctional monitoring vehicle body 1 to vibrate, which is easy to damage the components of the instrument. In order to reduce the vibration of the drill rod 13 on the multifunctional detection vehicle body 1, a shock absorbing mechanism 16 is provided at the connection between the connecting rod 11 and the multifunctional monitoring vehicle body 1.

[0064] Reference Figure 4 and Figure 5 The shock absorbing mechanism 16 includes a shock absorbing pad 161 fixedly connected to the multifunctional monitoring vehicle body 1, two limit plates 162 are fixedly connected to the top of the shock absorbing pad 161, and the two limit plates 162 are symmetrically fixedly connected to the two sides of the shock absorbing pad 161. Four guide columns 163 are fixedly connected to the top of the shock absorbing pad 161. The axial direction of the guide column 163 is vertically arranged, and a positioning seat 164 is slidably connected to the guide column 163. The connecting rod 11 is hinged on the positioning seat 164. The guide column 163 is located at the four corners of the positioning seat 164. Two shock absorbing springs 165 are sleeved on each guide column 163. The shock absorbing springs 165 are respectively located on the positioning seats 164. On both sides, the ends of the shock-absorbing spring 165 close to the positioning seat 164 are fixedly connected to the positioning seat 164; when the drill rod 13 drives the connecting rod 11 to vibrate, the positioning seat 164 slides along the guide column 163, and the positioning seat 164 moves downward to compress the shock-absorbing spring 165 at the bottom, and at the same time stretch the shock-absorbing spring 165 at the top; when the positioning seat 164 slides upward, the shock-absorbing spring 165 at the bottom is stretched and the shock-absorbing spring 165 at the top is compressed, and the connecting rod 11 drives the positioning seat 164 to vibrate reciprocatingly, and the positioning seat 164 drives the shock-absorbing spring 165 to stretch or contract, which can consume shock waves, thereby reducing the vibration of the drill rod 13 on the multi-functional monitoring vehicle body 1.

[0065] Two connecting rods 166 are hinged at the middle position of the bottom of the positioning seat 164, and the ends of the connecting rods 166 are hinged at the middle position of the bottom of the positioning seat 164. A rod sliding column 1661 is fixedly connected to the top of the shock-absorbing pad 161. The axial direction of the sliding column 1661 is horizontally arranged, and two sliders 1662 are slidingly connected to the sliding column 1661. The end of the connecting rod 166 away from the positioning seat 164 is respectively fixedly connected to a slider 1662, and a return spring 1663 is sleeved on the sliding column 1661. The return spring 1663 is located on the opposite side of the slider 1662; when the positioning seat 164 slides downward, the positioning seat 164 pushes the connecting rod 166 to move downward, so that the connecting rod 166 pushes the slider 1662 to compress the return spring 1663, and the compression of the return spring 1663 forms a damping force on the vibration of the positioning seat 164. The extension and contraction of the return spring 1663 can further reduce the vibration of the positioning seat 164.

[0066] In order to further reduce the vibration of the drill rod 13 on the multifunctional monitoring vehicle body 1, a guide groove 1621 is vertically opened on the limit plate 162, and guide blocks 1641 are fixedly connected on both sides of the positioning seat 164. The guide blocks 1641 extend into the guide groove 1621 and can slide in the guide groove 1621. The bottom of the guide block 1641 is fixedly connected to a pull rope 167, and the top of the shock-absorbing pad 161 is fixedly connected to a guide wheel 1671, which is located below the pull rope 167. The limit plate 162 is fixedly connected to an auxiliary Spring 1672, auxiliary spring 1672 is vertically arranged, the top of the auxiliary spring 1672 is fixedly connected to the limit plate 162, and the bottom is fixedly connected to the pull rope 167. After the pull rope 167 passes through the guide wheel 1671, the two ends are respectively fixed to the limit plate 162 and the auxiliary spring 1672; when the positioning seat 164 vibrates vertically, the positioning seat 164 drives the auxiliary spring 1672 to contract or relax through the pull rope 167, thereby reducing the vibration of the positioning seat 164, thereby reducing the vibration of the drill rod 13 on the multi-functional monitoring vehicle body 1.

[0067] Baffles 168 are provided at the four corners of the top of the shock-absorbing pad 161. The baffles 168 are vertically arranged and correspond to the ends of the limiting plate 162. The two ends of the limiting plate 162 are respectively fixedly connected with arc-shaped shock-absorbing plates 1 1681, and the shock-absorbing plates 1 1681 are elastic steel plates. Arc-shaped shock-absorbing plates 1 1682 are also provided on the baffle 168. The bending directions of the shock-absorbing plates 1 1681 and 1682 are opposite, and the middle parts of the shock-absorbing plates 1 1681 and 1682 are abutted against each other; the connecting rod 1 11 drives the positioning seat 164 to vibrate, and the positioning seat 164 pushes the shock-absorbing plates 1 1681 and 1682 to deform, thereby consuming shock waves and reducing the vibration of the multi-functional monitoring vehicle body 1 caused by the shock waves.

[0068] Reference Figure 3 and Figure 6 When the coring drill bit 14 is drilling, there are a lot of rocks in the rock mass, and the coring drill bit 14 directly impacts the rocks, which can easily damage the coring drill bit 14 and reduce the service life of the coring drill bit 14. In order to reduce the impact force between the coring drill bit 14 and the rocks, a buffer mechanism 17 is provided at the connection between the connecting rod 2 12 and the connecting rod 1 11.

[0069] Reference Figure 7 and Figure 8 The end of the connecting rod 12 is provided with a plug-in groove 121, and the buffer mechanism 17 includes a buffer rod 171 hinged to the end of the connecting rod 11, and the buffer rod 171 is plugged into the plug-in groove 121. The end of the connecting rod 12 is fixedly connected with two fixed rods 172, and the fixed rods 172 are symmetrically arranged on both sides of the plug-in groove 121. A connecting block 173 is fixedly connected to the fixed rod 172, and a buffer block 174 is fixedly connected to the connecting block 173. A sliding block 1741 is fixedly connected to the bottom of the buffer block 174, and a sliding groove 1742 is provided on the buffer rod 171. The sliding block 1741 is slidably connected in the sliding groove 1742; a baffle plate 175 is fixedly connected to the buffer rod 171, and a plurality of V-shaped grooves are provided on the side of the baffle plate 175 close to the buffer block 174 1751, a plurality of buffer columns 1752 are fixedly connected to the buffer rod 171, the buffer columns 1752 are made of rubber material, and the buffer columns 1752 are located in the V-groove 1751 of the baffle plate 175; a plurality of stamping columns 176 are fixedly connected to the side of the buffer block 174 away from the connecting block 173, and a buffer spring 177 is provided on the outer sleeve of the stamping column 176, and a partition 178 is fixedly connected to the buffer rod 171, and the partition 178 is vertically arranged, and a through hole 1781 is opened in the partition 178 corresponding to the position of the stamping column 176, and the through hole 1781 is used for the stamping column 176 to pass through, and the buffer spring 177 is located between the buffer block 174 and the partition 178, and the stamping column 176 passes through the through hole 1781 of the partition 178 and corresponds to the buffer column 1752 one by one.

[0070] When the coring drill bit 14 collides with the rock during the drilling process, the connecting rod 12 pushes the buffer block 174 to slide through the fixed rod 172, and the buffer block 174 squeezes the buffer spring 177, while driving the stamping column 176 to slide and squeeze the buffer column 1752. The compression of the buffer spring 177 and the deformation of the buffer column 1752 can give the buffer block 174 a certain amount of room for movement, so that the coring drill bit 14 can have a certain amount of buffer space after being squeezed by external force, thereby further extending the service life of the coring drill bit 14.

[0071] The implementation principle of the in-situ acquisition device of the rock mass multi-dimensional information parameters in the first embodiment of the present application is as follows: the multi-functional monitoring vehicle body 1 is driven into the rock mass tunnel to be constructed, and the coring drill 14 is used to drill and sample the rock mass. The multi-functional monitoring vehicle body 1 has a displacement sensor 2, a pressure sensor 3, a torque sensor 4, and a speed sensor 5 for real-time recording of the speed, thrust, torque, drilling speed, and rock breaking specific energy during the drilling process. At the same time, by integrating discrete equipment such as the drilling monitoring device, the borehole imager, and the rock and soil sonicator 6, the in-situ acquisition of the multi-dimensional information parameters of the rock mass characteristics is achieved by using complex terrain driving technology, multi-sensor fusion technology, and digital image processing technology, which lays a certain foundation for the mechanization, intelligence, and unmanned development of metal mines. The new in-situ monitoring equipment makes it easier to collect rock mass characteristics such as mechanical parameters, structural surface images, and mineral composition in real time.

[0072] Embodiment 2:

[0073] The second embodiment of the present application discloses a method for in-situ acquisition of multi-dimensional information parameters of rock mass, referring to Fig. 9 The method is applied to the in-situ acquisition device for rock mass multi-dimensional information parameters in the first embodiment, and comprises the following steps:

[0074] S1. Drilling parameters collection: The multifunctional monitoring vehicle 1 is used to perform core drilling on the rock mass to be constructed. The drilling parameters are first collected and calculated by the drilling monitoring device, and then a relationship model between the drilling parameters and mechanical properties is established.

[0075] After adjusting the positions of the drill rod 13 and the coring drill bit 14 of the multifunctional monitoring vehicle body 1 and setting the initial drilling parameters, coring drilling is performed on the rock mass to be constructed; the rotation speed, thrust, torque, drilling speed and rock breaking specific energy are recorded in real time at intervals of 1 second through the displacement sensor 2, pressure sensor 3, torque sensor 4, rotation speed sensor 5 and other downhole monitoring devices, and the recorded data are uploaded to the data processing system for storage and processing. Then, downhole parameters including rotation speed N, thrust F, torque T, drilling speed ROP and rock breaking specific energy SE are used as input parameters, and a prediction model of rock mass mechanical properties is established through regression analysis or machine learning, so as to directly predict rock mass mechanical properties through downhole parameters and rock breaking specific energy.

[0076] The drilling parameters include rotation speed (N), thrust (F), torque (T), rate of penetration (ROP) calculated based on displacement, and rock breaking specific energy (SE). The calculation formula of rock breaking specific energy is as follows:

[0077]

[0078] Where F is the propulsion force, A is the drilling area, N is the rotation speed, T is the torque, and V is the drilling speed.

[0079] S2, high-definition photography in the hole: in the borehole generated by the above drilling, a high-definition multifunctional borehole panoramic imager 7 is used to obtain a high-definition digital image of the rock mass on the hole wall, so as to identify and extract the structural surface features;

[0080] Among them, the high-definition multifunctional drilling panoramic imager 711 includes a host, a probe, a depth counter, a transmission cable, etc.; the probes are divided into different diameter sizes of Φ24mm, Φ40mm, Φ52mm, and Φ65mm, and the CCD camera resolution reaches 1920*1080.

[0081] For example, a high-definition multifunctional borehole panoramic imager 7 is used to select a probe of appropriate size in the borehole generated by the coring drilling to continuously display the borehole wall image in 360° all directions, and a computer is used to control the image acquisition and image processing to achieve analog-to-digital conversion. The image processing system automatically collects, expands, splices, and records the borehole wall image, and then directly describes the core structural surface characteristics through computer vision technology. In addition, the inclination, dip angle, and width of the structural surface crack can be directly and automatically calculated and extracted, with a width accuracy of up to 0.1 mm and an azimuth angle of up to 0.1 degrees.

[0082] S3, in-hole wave velocity test: monitor the wave velocity of the rock mass along the hole using the geotechnical sonic instrument 6, and divide the loose rock mass area according to the sonic velocity;

[0083] The geotechnical sonic instrument 6 includes a host, a signal line, a plane probe, and a one-transmit-two-receive probe, etc.; the sound time measurement accuracy is 0.1μs, the sound amplitude accuracy is better than 2%, and the sound time measurement range is (0~4000)Δt+(0~16383)Δt (Δt is the sampling interval);

[0084] For example, a single-hole acoustic wave method is used and a dual-receive probe is used to transmit ultrasonic waves in the borehole to measure the wave velocity of ultrasonic waves on the rock wall. The sampling interval is 0.1μs to 1638.3μs and the bandwidth is 5 to 250kHz. Among them, the acoustic wave velocity increases with the increase of surrounding rock stress. If the integrity of the tunnel surrounding rock is good, the stability is strong and the acoustic wave velocity is high. Otherwise, the wave velocity is low. According to the longitudinal wave propagation time and the distance between the S1 and S2 receivers, the longitudinal wave velocity Vp is calculated. The calculation formula is as follows:

[0085]

[0086] Where: ΔL is the distance between the two receivers, m; t1 and t2 are the time to reach receiver S1 and receiver S2, respectively. The velocity values ​​obtained at each measuring point are plotted into a longitudinal wave velocity (Vp)-hole depth (L) relationship curve, and the range of the loose zone is divided according to the change of the velocity in the curve.

[0087] S4, borehole stress meter measurement: the size and distribution of rock mass ground stress are tested by hollow inclusion stress meter 8;

[0088] The hollow package stress gauge 8 is composed of a series of strain gauges encapsulated on the inner wall of a hollow tube with a known elastic modulus, and the stress range can reach up to 100 MPa.

[0089] Exemplarily, a hollow inclusion stress gauge 8 is placed in a borehole, and epoxy resin is used to cast and fix the hollow inclusion stress gauge 8 in the borehole. The strain response of the rock mass is monitored during the borehole core stress relief method test to obtain the magnitude of the ground stress of the rock mass. The change of rock mass stress over time can also be measured through long-term borehole monitoring.

[0090] S5, digital scanning of core: the core drilled and taken out is scanned by a portable digital color core scanner 912, and the scanned core wall image is compared with the hole wall image obtained in the drilling step A2 to determine the spatial characteristics (position and orientation) of the core in the borehole, so as to achieve core relocation.

[0091] Among them, the main structure of the portable digital color core scanner 9 includes a stage, a bracket, a high-precision scanning lens, a precision-machined plane mirror, etc.; the working mode is divided into a 360° rotation scanning mode and a Plane flatbed scanning mode, which are used to scan cores and core boxes within one meter respectively.

[0092] Exemplarily, the core is first placed in a portable digital color core scanner 9, and the core is scanned using a 360° rotation scanning mode, and compared with the image of the rock wall in the borehole taken by the high-definition multifunctional borehole panoramic imager 7 in step S2 to determine its initial spatial characteristics.

[0093] S6. Core mechanical test: The core is subjected to multi-directional point load loading by a portable point load meter system 10 to obtain the compressive strength and tensile strength of the rock.

[0094] The portable point load meter system 10 can test a test size of 15 to 50 mm, a loading stroke of 11 mm, and a maximum load of 100 kN.

[0095] Exemplarily, the rock core scanned in step S4 is placed in a portable point load meter system 10 for multi-directional loading test, and the compressive strength and tensile strength are indirectly obtained by selecting a corresponding rock and a representative model according to the existing domestic experimental research results on the relationship between point load strength and uniaxial compressive strength and tensile strength;

[0096] S7, infrared spectrum analysis of rock blocks: directly analyzing and obtaining the mineral composition of the core fragments through a near-infrared mineral analyzer 11;

[0097] The near-infrared mineral analyzer 11 is composed of a host, a pistol-type probe, an optical fiber and a handheld microcomputer PDA.

[0098] Exemplarily, the hardware parts of the near-infrared mineral analyzer 11 are assembled, the target rock block after being loaded and damaged in step S5 is scanned with a probe, a spectrum library is established using DARWin SP spectrum acquisition software, and mineral identification is performed using EZ-ID software to obtain the mineral composition of the core.

[0099] S8. Generate electronic rock core with full information of the entire process of rock mass: store the spatial posture information of the entire drilling core, mechanical properties of the rock mass, mineral composition of the rock mass, rock structure surface information, rock mass acoustic wave velocity, ground stress and other information obtained above into the electronic rock core library, and generate electronic rock core with full information of the entire process of rock mass through computer digital twin technology.

[0100] Exemplarily, an electronic core intelligent management system is selected based on a computer platform, and the storage module is used to store a three-dimensional dynamic image established by coupling parameters such as hole inclination, hole depth, hole diameter, hole wall image and rock mechanical properties through a high-definition multifunctional drilling panoramic imager 7 and a portable digital color core scanner 9, as well as to store information such as mechanical parameters, structural surface characteristics, loose zone range, ground stress, mineral composition, etc. related to each core; the display module can simultaneously display the relevant parameters of any of the cores; the analysis module can perform sub-item analysis on any core according to the relevant parameters, realize functions such as rock structure classification and surrounding rock engineering geological classification, and lay the foundation for guiding actual underground construction.

[0101] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An in-situ acquisition device for multi-dimensional information parameters of rock mass, Features: The utility model comprises a multifunctional monitoring vehicle body (1), wherein a connecting rod 1 (11) is hingedly connected to the top of the functional monitoring vehicle body, a connecting rod 2 (12) is hingedly connected to the end of the connecting rod 1 (11) away from the multifunctional monitoring vehicle body (1), a drill rod (13) is hingedly connected to one end of the connecting rod 2 (12) away from the connecting rod 1 (11), and a core drilling bit (14) is fixedly connected to one end of the drill rod (13) away from the connecting rod 2 (12); A shock absorbing mechanism (16) is provided at the connection point between the connecting rod 1 (11) and the multifunctional monitoring vehicle body (1); The shock absorbing mechanism (16) comprises a shock absorbing pad (161) fixedly connected to the multifunctional monitoring vehicle body (1), four guide columns (163) are fixedly connected to the top of the shock absorbing pad (161), the axial direction of the guide column (163) is vertically arranged, a positioning seat (164) is slidably connected to the guide column (163), a connecting rod (11) is hinged to the positioning seat (164), the guide column (163) is located at four corners of the positioning seat (164), each guide column (163) is sleeved with two shock absorbing springs (165), the shock absorbing springs (165) are respectively located on both sides of the positioning seat (164), and the ends of the shock absorbing springs (165) close to the positioning seat (164) are fixedly connected to the positioning seat (164); Two connecting rods (166) are hinged at the middle position of the bottom of the positioning seat (164), and the ends of the connecting rods (166) are hinged at the middle position of the bottom of the positioning seat (164). A rod sliding column (1661) is fixedly connected to the top of the shock-absorbing pad (161). The axial direction of the sliding column (1661) is horizontally arranged. Two sliding blocks (1662) are slidingly connected to the sliding column (1661). One end of the connecting rod (166) away from the positioning seat (164) is fixedly connected to a sliding block (1662). A return spring (1663) is sleeved on the sliding column (1661), and the return spring (1663) is located on the opposite side of the sliding block (1662). The drill rod (13) is provided with a displacement sensor (2), a pressure sensor (3), a torque sensor (4), and a rotation speed sensor (5) for real-time recording of the rotation speed, propulsion force, torque, drilling speed, and rock-breaking specific energy during the drilling process; The top of the multifunctional monitoring vehicle body (1) is fixedly connected to a support frame (15), and the top of the support frame (15) is provided with a geotechnical sonic instrument (6) and a high-definition multifunctional borehole panoramic imager (7). The geotechnical sonic instrument (6) is used to monitor the wave velocity of the rock mass along the borehole generated by coring drilling, and to divide the rock mass loosening zone according to the sound wave velocity. The high-definition multifunctional borehole panoramic imager (7) is used to obtain a high-definition digital image of the borehole wall rock mass, so as to identify and extract structural surface features. The multifunctional monitoring vehicle body (1) is provided with a hollow inclusion stress meter (8), and the hollow inclusion stress meter (8) is used to test the magnitude of rock mass ground stress and its distribution along the way; The multifunctional monitoring vehicle body (1) is provided with a portable digital color core scanner (9), which is used to scan the cores taken out after drilling, and the scanned core wall image is compared with the high-definition digital image of the hole wall rock body obtained by the high-definition multifunctional drilling panoramic imager (7) to determine the spatial characteristics of the core in the borehole, so as to realize the relocation of the core; The multifunctional monitoring vehicle body (1) is provided with a portable point load meter system (10) and a near-infrared mineral analyzer. The portable point load meter system (10) is used to perform multi-directional point load loading on the rock core to obtain the compressive strength and tensile strength of the rock. The near-infrared mineral analyzer is used to directly analyze and obtain the mineral composition of the rock core fragments.

2. The in-situ acquisition device for rock mass multi-dimensional information parameters according to claim 1, Features: The multifunctional monitoring vehicle body (1) is also provided with: A drilling and while-drilling analysis module (110) is used to control the first connecting rod (11) and the second connecting rod (12) to adjust their positions and then use a coring drill bit (14) to drill the core, while collecting while-drilling parameters for mechanical property analysis; An in-hole television module (120) is used to obtain a high-definition digital image of the borehole wall through an in-hole television device, and to quickly and accurately extract structural surface features; The in-hole acoustic wave testing module (130) is used to control the geotechnical acoustic wave instrument (6) to monitor the longitudinal wave velocity of the rock mass in the drilling area and then divide the rock mass loosening area range; An in-hole stress testing module (140) for guiding a hollow inclusion stress meter (8) to measure in-situ stress based on a borehole casing stress relief method; A core scanning and repositioning module (150) is used to collect the core image scanned by the portable digital color core scanner (9) and then automatically compare it with the hole wall image to achieve core repositioning; A core point load test module (160) is used to calculate and analyze the test results of the point load instrument system to obtain the compression and tensile strength of the core; A core fragment mineral composition analysis module (170), used for analyzing and collecting the mineral composition of the core fragments according to near infrared spectroscopy technology; The electronic rock core modeling module (180) is used to generate full-process and full-information electronic rock core of rock mass based on computer digital twin technology.

3. The in-situ acquisition device for multi-dimensional information parameters of rock mass according to claim 1, Features: The top of the shock-absorbing pad (161) is fixedly connected to two limit plates (162), the two limit plates (162) are symmetrically fixedly connected to the two sides of the shock-absorbing pad, the limit plates (162) are vertically provided with guide grooves (1621), the two sides of the positioning seat (164) are fixedly connected to guide blocks (1641), the guide blocks (1641) extend into the guide grooves (1621) and can slide in the guide grooves (1621), and the bottom of the guide blocks (1641) is fixedly connected to the guide grooves (1621). The top of the shock-absorbing pad (161) is fixedly connected with a pull rope (167), the top of the shock-absorbing pad (161) is fixedly connected with a guide wheel (1671), the limiting plate (162) is fixedly connected with an auxiliary spring (1672), one end of the auxiliary spring (1672) is fixedly connected to the limiting plate (162), and the other end is fixedly connected to the pull rope (167), and the two ends of the pull rope (167) are respectively fixed to the limiting plate (162) and the auxiliary spring (1672) after passing through the guide wheel (1671).

4. The in-situ acquisition device for rock mass multi-dimensional information parameters according to claim 1, Features: Baffles (168) are provided at the four corners of the top of the shock-absorbing pad (161). The baffles (168) are vertically arranged and correspond to the ends of the limiting plate (162). The two ends of the limiting plate (162) are respectively fixedly connected with arc-shaped shock-absorbing plates 1 (1681). The baffles (168) are also provided with arc-shaped shock-absorbing plates 2 (1682). The bending directions of the shock-absorbing plates 1 (1681) and 1682 are opposite, and the middle parts of the shock-absorbing plates 1 (1681) and 1682 are mutually abutted. The shock-absorbing plates 1 (1681) and 1682 are both elastic steel plates.

5. The in-situ acquisition device for rock mass multi-dimensional information parameters according to claim 1, Features: A buffer mechanism (17) is provided at the connection between the second connecting rod (12) and the first connecting rod (11); The end of the second connecting rod (12) is provided with a plug-in slot (121), the buffer mechanism (17) comprises a buffer rod (171) hinged to the end of the first connecting rod (11), the buffer rod (171) is plugged into the plug-in slot (121), the end of the second connecting rod (12) is fixedly connected with two fixed rods (172), the fixed rods (172) are symmetrically arranged on both sides of the plug-in slot (121), a buffer block (174) is fixedly connected to the fixed rod (172), the bottom of the buffer block (174) is fixedly connected to a sliding block (1741), and the buffer rod (171) is provided with a sliding slot (171). 742), the sliding block (1741) is slidably connected in the sliding groove (1742); a plurality of stamping columns (176) are fixedly connected to the side of the buffer block (174) away from the connecting block (173), a buffer spring (177) is provided on the outer sleeve of the stamping column (176), a partition (178) is fixedly connected to the buffer rod (171), a through hole (1781) is opened on the partition (178) at a position corresponding to the stamping column (176), the through hole (1781) is used for the stamping column (176) to pass through, and the buffer spring (177) is located between the buffer block (174) and the partition (178).

6. The in-situ acquisition device for multi-dimensional information parameters of rock mass according to claim 5, Features: The buffer rod (171) is fixedly connected to a material baffle plate (175), and a plurality of V-shaped grooves (1751) are provided on a side of the material baffle plate (175) close to the buffer block (174). A plurality of buffer columns (1752) are fixedly connected to the buffer rod (171), and the buffer columns (1752) are located in the V-shaped grooves (1751) of the material baffle plate (175). The punching columns (176) pass through the through holes (1781) of the partition plate (178) and correspond one-to-one with the buffer columns (1752).