A converter explosion-proof method based on gas pulse

Through the converter explosion-proof system based on gas pulses, real-time monitoring and prediction of combustible gas parameters, and targeted dilution, solve the problem of insufficient explosion protection of the converter gas full dry sensible heat recovery system, and achieve more efficient explosion-proof effects and production safety.

CN117587187BActive Publication Date: 2024-10-25INST OF MECHANICS CHINESE ACAD OF SCI
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202311528023.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-16
Publication Date
2024-10-25
Estimated Expiration
2043-11-16

AI Technical Summary

Technical Problem

The existing converter gas all-dry sensible heat recovery system has deficiencies in explosion protection. The existing automatic control system cannot effectively avoid explosion leakage, and the nitrogen injection is wasteful and inaccurate, making it difficult to ensure the long-term safe and stable operation of the system.

Method used

A converter explosion-proof system based on gas pulses is adopted to monitor combustible gas parameters in real time through pre- and post-monitoring units, use a prediction unit to predict parameters, and perform targeted dilution through a diluting gas supply unit and control unit to ensure that the combustible gas concentration is below Explosion limit, improve injection accuracy and effectiveness.

Benefits of technology

It achieves comprehensive explosion protection for the converter, reduces the risk of explosion leakage, reduces the waste of inert gas sources, improves injection accuracy and effectiveness, and ensures safe and efficient production of the converter.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117587187B_ABST
    Figure CN117587187B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses a converter explosion-proof system and a converter explosion-proof method based on gas pulses. The converter gas waste heat recovery device is formed with an inlet pipe and an outlet pipe. The converter explosion-proof system includes: a front monitoring unit connected to the inlet pipe for monitoring real-time combustible gas parameters; a rear monitoring unit connected to the outlet pipe for monitoring real-time combustible gas parameters; a prediction unit for obtaining predicted combustible gas parameters; a dilution gas providing unit for providing dilution gas; and a control unit for controlling the dilution gas providing unit to provide dilution gas. The present invention realizes accurate predictive explosion-proof by real-time prediction of CO and O2 concentrations in coal gas and efficient mixing of pulse injection. It adopts front and rear injection to improve the accuracy and effectiveness of explosion-proof, and ensures the pressure stability of the system, avoiding the problems of low efficiency and high cost caused by blind injection of traditional jet explosion suppression technology and large-scale injection of inert gas.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present invention relate to the technical field of safe recovery of converter gas waste heat, and in particular to a converter explosion-proof system and a converter explosion-proof method based on gas pulses. Background Art

[0002] The fully dry sensible heat recovery process of converter gas is an alternative process to the existing converter OG method and LT method of water spraying / water mist spraying. It can fully recover the sensible heat resources of the converter gas at about 850°C after the vaporization and cooling flue. However, since the converter gas (CO mass fraction is 60% to 80%) is a flammable and explosive gas, once it reaches the explosion limit, it will deflagrate when encountering a high-temperature ignition source, causing damage to the equipment. Electrostatic precipitators are equipment with frequent explosion accidents. Because there are electric sparks inside, low concentrations (CO concentration 10%, O 2 Concentration 3%) will cause explosion. Although explosion relief valves are installed, the high pressure at the moment of explosion relief may still cause equipment damage, and the explosion relief impact poses a threat to nearby personnel and objects. At the same time, explosion relief or reducing the voltage in advance to avoid explosion relief will cause the dust removal efficiency to decrease, which will seriously affect normal production. The explosion-proof solution of the converter gas full dry sensible heat recovery energy-saving system is very important to ensure the long-term safe and stable operation of the system.

[0003] The existing automatic control system for preventing converter gas explosion with publication number CN108265154A is mainly aimed at wet electrostatic precipitators, which use CO or O 2 The upper limit of concentration is 20% as the nitrogen injection condition. As long as one of the concentrations exceeds the limit of ≤20%, nitrogen will be injected. If the concentrations of both gases are greater than 20% at the same time, the automatic control system will directly shut down the high-voltage electric field of the wet electrostatic precipitator to avoid explosion. The laser analyzer is installed at the front section of the gas pipeline at the outlet of the OG wet dust removal equipment, and the nitrogen injection ring is installed at the rear section of the gas pipeline at the outlet of the OG wet dust removal equipment.

[0004] For the above system, the setting of any one or two concentrations exceeding 20% ​​at the same time can only avoid very rare high-concentration, large-scale explosions. Moreover, there is no risk of explosion if any one of the items does not reach the explosion limit, and the setting of any one of the items exceeding 20% ​​is likely to cause nitrogen waste. The installation location of the nitrogen injection device cannot protect the front-end equipment for the full dry sensible heat recovery process. At the same time, the diameter of the converter gas pipeline is generally large, and it is difficult to ensure the uniformity of the mixing of the injected nitrogen and the coal gas. The above device does not monitor the injection effect. Summary of the invention

[0005] To this end, an embodiment of the present invention provides a converter explosion-proof system and a converter explosion-proof method based on gas pulses. By monitoring the combustible gas in the converter inlet pipe and the outlet pipe respectively, the combustible gas parameters are predicted in a targeted manner, and the corresponding combustible gas is diluted according to the prediction results, thereby solving and reducing the potential possibility of explosion in the full-dry converter waste heat recovery system, reducing the waste of inert gas sources, improving the injection accuracy and effectiveness, and ensuring safe and efficient production of the converter.

[0006] In order to achieve the above object, the embodiments of the present invention provide the following technical solutions:

[0007] In one aspect of an embodiment of the present invention, a converter explosion-proof system based on gas pulse is provided, wherein a converter gas waste heat recovery device is formed with an inlet pipe and an outlet pipe, and the converter explosion-proof system comprises:

[0008] A front monitoring unit, connected to the inlet pipe, for monitoring real-time combustible gas parameters near one end of the inlet pipe;

[0009] A post-monitoring unit, connected to the outlet pipe, for monitoring real-time combustible gas parameters near one end of the outlet pipe;

[0010] A prediction unit, used for obtaining predicted combustible gas parameters according to the monitored real-time combustible gas parameters;

[0011] a dilution gas supply unit, connected to the inlet pipe and / or the outlet pipe, and used to supply dilution gas to the inlet pipe and / or the outlet pipe;

[0012] A control unit is used to control the dilution gas providing unit to provide dilution gas according to the real-time combustible gas parameter and / or the predicted combustible gas parameter.

[0013] As a preferred embodiment of the present invention, the combustible gas includes oxygen and carbon monoxide.

[0014] As a preferred embodiment of the present invention, the pre-detection unit includes a pre-CO concentration monitor for monitoring carbon monoxide near one end of the inlet pipe, and a pre-O concentration monitor for monitoring oxygen near one end of the inlet pipe. 2 Concentration monitor;

[0015] The post-monitoring unit includes a post-CO concentration monitor for monitoring the concentration of oxygen near one end of the outlet pipe and a post-O2 monitor for monitoring the concentration of oxygen near one end of the outlet pipe. 2 Concentration monitor.

[0016] As a preferred solution of the present invention, the prediction unit uses the least squares method to perform linear fitting on the real-time combustible gas parameters and estimate the regression coefficients so as to minimize the residual sum of squares between the observed values ​​and the fitted values, thereby obtaining a prediction equation, and predicting the combustible gas parameters based on the obtained prediction equation.

[0017] As a preferred solution of the present invention, the dilution gas providing unit is connected to the inlet pipe and the outlet pipe respectively; and,

[0018] The dilution gas supply unit at least comprises a dilution gas storage tank, a front pipe connected between the dilution gas storage tank and the inlet pipe, a front pulse valve group for opening or closing the front pipe, a rear pipe connected between the dilution gas storage tank and the outlet pipe, and a rear pulse valve group for opening or closing the rear pipe;

[0019] The control unit controls the front pulse valve group and the rear pulse valve group to open or close.

[0020] As a preferred solution of the present invention, the front pulse valve group and / or the rear pulse valve group each include a plurality of pulse valves, and each of the plurality of pulse valves can be set to be open or closed.

[0021] As a preferred solution of the present invention, when the pipe body of the inlet pipe and / or the outlet pipe extends in the vertical direction, the plurality of pulse valves are arranged around in the circumferential direction;

[0022] When the pipe body of the inlet pipe and / or the outlet pipe extends in the horizontal direction, the plurality of pulse valves are located on one side close to the top of the pipe body.

[0023] As a preferred solution of the present invention, the control unit can adjustably open one or more of the pulse valves according to the predicted changes in the combustible gas parameters.

[0024] In another aspect of the embodiment of the present invention, a converter explosion-proof method based on gas pulse is provided, using the converter explosion-proof system described above, and the converter explosion-proof method comprises:

[0025] S100, monitoring the real-time combustible gas parameters of the inlet pipeline and the outlet pipeline;

[0026] S200, based on the real-time combustible gas parameters of the inlet pipeline, 2 Concentration is predicted to obtain predicted combustible gas parameters;

[0027] S300, selectively introducing dilution gas into the inlet pipe according to the obtained predicted combustible gas parameters;

[0028] S400: selectively introduce dilution gas into the outlet pipeline according to the real-time combustible gas parameters of the outlet pipeline that are fed back.

[0029] As a preferred solution of the present invention, in step S300, the flow rate of the dilution gas introduced into the inlet pipe is different according to the different numerical ranges of the predicted combustible gas parameters.

[0030] As a preferred solution of the present invention, in step S400, the flow rate of the dilution gas introduced into the outlet pipeline is different according to different real-time combustible gas parameters of the outlet pipeline.

[0031] As a preferred solution of the present invention, in step S300, when the predicted concentration of CO is not less than 10%, if:

[0032] O 2 When the predicted concentration is less than 3%, no dilution gas is introduced;

[0033] O 2 When the predicted concentration is not less than 3% and less than 4%, the dilution gas is introduced at a first flow rate;

[0034] O 2 When the predicted concentration is not less than 4% and less than 5%, the dilution gas is introduced at a second flow rate;

[0035] O 2 When the predicted concentration is not less than 5% and less than 6%, the dilution gas is introduced at the third flow rate;

[0036] O 2 When the predicted concentration is not less than 6%, the dilution gas is introduced at a fourth flow rate; and,

[0037] The first flow rate, the second flow rate, the third flow rate, and the fourth flow rate increase sequentially.

[0038] As a preferred solution of the present invention, in step S300, when O 2 When the predicted concentration is not less than 3%, if:

[0039] If the predicted concentration of CO is less than 10%, no dilution gas is introduced;

[0040] When the predicted concentration of CO is not less than 10% and less than 11%, the dilution gas is introduced at the fifth flow rate;

[0041] When the predicted concentration of CO is not less than 11% and less than 12%, the dilution gas is introduced at the sixth flow rate;

[0042] When the predicted concentration of CO is not less than 12% and less than 13%, the dilution gas is introduced at the seventh flow rate;

[0043] When the predicted concentration of CO is not less than 13%, the dilution gas is introduced at an eighth flow rate; and the fifth flow rate, the sixth flow rate, the seventh flow rate and the eighth flow rate are increased in sequence.

[0044] As a preferred solution of the present invention, in step S400, 2 If the actual concentration of is not less than 3% or the actual concentration of CO is not less than 10%, dilution gas is introduced.

[0045] The embodiments of the present invention have the following advantages:

[0046] 1. The front monitoring unit is used in conjunction with the prediction unit to predict the combustible gas parameters in advance, and then the combustible gas is diluted in a targeted manner through the control unit to achieve explosion protection for the converter. On this basis, the post-monitoring unit is further combined to monitor the dilution gas injection effect in the previous step, and to prevent the waste heat recovery device in the converter from leaking air and posing a threat to downstream pipelines and equipment, which has the advantage of comprehensive explosion protection.

[0047] 2. Use real-time monitoring, real-time prediction, and real-time control to accurately control at least one combustible gas (including but not limited to CO and O 2 ) concentration is lower than the explosion limit, making the whole system have the characteristics of advance prediction and precise explosion prevention in a practical sense. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0049] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so as to facilitate understanding and reading by persons familiar with the technology. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantial technical significance. Any structural modification, change in proportion or adjustment of size shall still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.

[0050] Figure 1 A schematic structural diagram of a converter explosion-proof system provided in an embodiment of the present invention;

[0051] Figure 2 A layout diagram of a pre-pulse valve group or a post-pulse valve group provided in an embodiment of the present invention;

[0052] Figure 3 This is a layout diagram of another pre-pulse valve group or post-pulse valve group provided in an embodiment of the present invention.

[0053] In the figure:

[0054] 1-Pre-CO concentration monitor; 2-Pre-O 2 Concentration monitor; 3- post-CO concentration monitor; 4- post-O 2 Concentration monitor; 5-computer module; 6-control cabinet; 7-dilution gas storage tank; 8-front pulse valve group; 9-rear pulse valve group; 10-inlet pipe; 11-outlet pipe;

[0055] 51-data storage unit; 52-prediction unit; 53-control unit;

[0056] 81 - first pulse valve; 82 - second pulse valve; 83 - third pulse valve; 84 - fourth pulse valve. DETAILED DESCRIPTION

[0057] The following is a description of the implementation of the present invention by specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0058] like Figure 1 As shown, the present invention provides a converter explosion-proof system based on gas pulse, specifically, comprising: a front CO concentration monitor 1, a front O 2 Concentration monitor 2, post-CO concentration monitor 3, post-O 2 Concentration monitor 4, data processing control module (used to collect data, and process the data in a targeted manner according to the collected relevant data, and further issue control instructions according to the processed results, which may specifically include a computer module 5 and a control cabinet 6, wherein the computer module 5 further includes a data storage unit 51, a prediction unit 52 and a control unit 53, wherein the control unit 53 specifically implements the control of the dilution gas supply unit through the control cabinet 6), a dilution gas supply unit (including a dilution gas storage tank 7, a front pulse valve group 8 and a rear pulse valve group 9), and an inlet pipe 10 and an outlet pipe 11 on the converter.

[0059] Pre-CO concentration monitor 1 and pre-O 2The concentration monitor 2 is installed in the inlet pipe 10 of the waste heat recovery device, and the pre-pulse valve group 8 is also installed in the inlet pipe 10 of the waste heat recovery device. 2 The concentration monitor 4 is installed at the outlet pipe 11 of the waste heat recovery device, and the post-pulse valve group 9 is also installed at the outlet pipe 11 of the waste heat recovery device. Specifically, the pre-pulse valve group 8 and the post-pulse valve group 9 are installed at the flue gas inlet of the waste heat recovery device, that is, the pre-pulse valve group 8 is located between the dilution gas storage tank 7 and the inlet pipe 10, and the post-pulse valve group 9 is located between the dilution gas storage tank 7 and the outlet pipe 11.

[0060] The computer module 5 uses the data storage unit 51 to save the monitoring data, uses the prediction unit 52 to call and analyze the monitoring data, and uses the control unit 53 to give the control strategy instructions of the front pulse valve group 8. The control cabinet 6 performs electrical control on the front pulse valve group 8, and the front pulse valve group 8 performs strategic jetting action. At the same time, the control unit 53 calls the data of the data storage unit 51 to monitor the concentration of the coal gas components after passing through the waste heat recovery device in real time. The control unit 53 2 The data of the concentration monitor 4 determines whether to perform the second injection.

[0061] The dilution gas storage tank 7 uses a gas that does not participate in the combustion reaction as the dilution gas for supply, for example, it can be an inert gas, or it can be nitrogen, CO, etc. 2 wait.

[0062] Furthermore, the multiple pulse valves in the front pulse valve group 8 and the rear pulse valve group 9 are arranged in a targeted manner according to the setting orientation of the front pipeline and the rear pipeline. It should be noted that the front pulse valve group 8 corresponds to the front pipeline, and the rear pulse valve group 9 corresponds to the rear pipeline, that is, the front pulse valve group 8 is arranged according to the setting orientation of the front pipeline, and the rear pulse valve group 9 is only arranged according to the setting orientation of the rear pipeline. At the same time, the use of pulse valves can help improve the mixing uniformity of high-speed flowing coal gas and dilution gas, especially for converter pipelines with larger diameters, and has the advantage of high efficiency and explosion protection.

[0063] For the sake of convenience, the front pipe and the rear pipe are collectively referred to as flues, and the front pulse valve group 8 and the rear pulse valve group 9 are collectively referred to as valve groups. Based on this, when the flue is a horizontal pipe, the multiple pulse valves in the valve group are only arranged on the upper side of the pipe; when the flue is a vertical pipe, the multiple pulse valves in the valve group are evenly arranged along the circumferential direction on the pipe. Through such an arrangement, it is avoided that the pulse valve is blocked by dust accumulation when the flue is arranged in a horizontal direction (mainly the pulse valve arranged on the lower side is prone to blockage). Figure 2 and Figure 3As shown, the specific arrangement of the two valve groups of the present invention, where the number of pulse valves on each valve group is four (of course, this is a specific embodiment, and the present invention is not limited to the specific setting value of four). Figure 2 The layout diagram of the valve group on the vertically arranged flue; Figure 3 This is a layout diagram of the valve group on the horizontally arranged flue. At the same time, it needs to be further explained that the layout orientations of the front pipe and the rear pipe are not necessarily the same, that is, the front pipe and the rear pipe can be arranged horizontally at the same time, can be arranged vertically at the same time, or one can be arranged horizontally and the other can be arranged vertically. The two are independent of each other and do not affect each other, so no further explanation will be given here.

[0064] The prediction unit 52 performs real-time fitting on the data in the data storage unit 51, and uses the prediction model obtained by fitting to predict the future CO, O 2 The concentration of the gas is predicted in real time, and the predicted data is transmitted to the control unit 53. The control unit 53 determines the opening number of the front pulse valve group 8 according to the predicted concentration level; at the same time, the control unit 53 obtains the data in the data storage unit 51 to monitor the concentration change of the gas components in the outlet pipeline 11, and calmly determines the opening number of the rear pulse valve group 9.

[0065] Furthermore, the prediction unit 52 is implemented as follows: a first-order polynomial algorithm and a least squares algorithm are used to fit the prediction equation, and the equation with the smallest variance is selected in real time for prediction.

[0066] Based on this, the converter explosion-proof method of the present invention is specifically as follows:

[0067] Through the front CO concentration monitor 1 and the front O 2 Concentration monitor monitors CO and O in coal gas 2 The historical and real-time data are stored in the data storage unit 51; the prediction unit 52 fits the prediction equation in real time by calling the latest (at least within 5 seconds) at least 5 sets of data obtained in real time from the data storage unit 51, and predicts CO and O 2 The concentration is predicted; CO and O are judged based on the prediction results 2 The concentration level of CO and O at the outlet pipe 11 after the injection of inert gas (i.e., diluent gas, as mentioned above, including but not limited to inert gas) is continuously monitored and predicted, and the injection strategy is given in real time through the control unit 53, and the injection strategy is executed through the control cabinet 6 to determine the number and order of the pulse valves in the front pulse valve group 8. 2 concentration, decide whether to open the post-pulse valve group 9 according to the injection effect to ensure that the CO or O in the gas 2 Always below the explosion limit.

[0068] Furthermore, when the prediction unit 52 calls the data in the data storage unit 51, it always adds the latest data and removes the oldest data. The prediction unit 52 uses at least two algorithms for fitting each time, compares and uses the fitting equation with the smallest variance for prediction. Each time the data is updated, the latest fitting prediction result is given and the result is passed to the control unit 53. The prediction interval of the prediction unit 52 is less than 1s.

[0069] In a more specific embodiment, taking the front pulse valve group 8 and the rear pulse valve group 9 each consisting of four pulse valves as an example, the control unit 53 calculates the CO and O according to the predicted values. 2 The concentration classification level is implemented. When the predicted concentration is low, one pulse valve is opened; when the predicted concentration is medium, any two pulse valves are opened; when the predicted concentration is slightly higher, three pulse valves are opened randomly; when the predicted concentration is high, four pulse valves are opened.

[0070] The following is further explained in combination with gas concentration:

[0071] Step 1: During the pre-burning period of converter steelmaking, the prediction unit 52 predicts the CO and O in real time after 1-5 seconds. 2 When the predicted CO concentration rises to 10%, if O 2 The predicted concentration is lower than 3%, and the control unit 53 does not issue a spray instruction. 2 If the predicted concentration is > 3%, open the pre-pulse valve group 8 until O 2 The actual concentration is less than 3% or the actual CO concentration is less than 10%.

[0072] Step 2: When oxygen blowing is stopped during the post-burning period, the prediction unit 52 predicts the CO and O in real time 1-5 seconds based on the data of the inlet pipeline 10. 2 When O 2 Concentration levels below 2%, O 2 When the predicted concentration rises to 3%, if the predicted CO concentration is lower than 10%, the control unit 53 does not issue a blow command. If the predicted CO concentration is higher than 10%, the control unit 53 decides to open the pre-pulse valve group until the CO concentration reaches 3%. 2 The actual concentration is less than 2% or the actual CO concentration is less than 10%.

[0073] Further, the opening sequence and number of the pre-pulse valve group 8 are based on 2 The predicted concentration level is calculated and determined by the control unit 53, and the injection target is 0 2 The actual concentration is less than 2% or the actual CO concentration is less than 10%.

[0074] Furthermore, the post-CO concentration monitor 3 and the post-O 2The concentration monitor 4 monitors the injection target result of the front pulse valve group 8. When the target requirement is not met, such as air leakage in the waste heat recovery device, the control unit 53 decides to open the rear pulse valve group 9.

[0075] The converter explosion-proof method of the present invention is described in detail below through specific embodiments. The diluent gas used here is nitrogen.

[0076] The nitrogen pressure in the dilution gas storage tank 7 is 0.3 MPa. During the pre-burning period of converter steelmaking, the pre-CO concentration monitor 1 (which can be a laser monitor, and all the following gas concentration monitors can be laser monitors) and the pre-O 2 Concentration monitor 2 monitors the CO concentration and O in the gas in real time 2 Concentration. During the pre-burning period, CO concentration starts to increase from 0%, O 2 The concentration starts to decrease from about 20%. The computer module 5 uses the data storage unit 51 to save the monitoring data and uses the prediction unit 52 to call and analyze the monitoring data. When the CO concentration starts to increase, the CO concentration and O concentration in the next 1-5 seconds are predicted in real time. 2 concentration.

[0077] The following is a further explanation through the acquisition and application of a specific prediction formula.

[0078] Step 1: Get the raw data

[0079] Assume real-time monitoring to time t. Take at least 5 sets of data as an example, which are: (t-4, C t-4 )、(t-3,C t-3 )、(t-2,C t-2 )、(t-1,C t-1 )、(t,C t ), where t-4, t-3, t-2, t-1 and t are the corresponding moments, and C t-4 , C t-3 , C t-2 , C t-1 and C t They are respectively the real-time combustible gases (i.e. CO or O) monitored in one-to-one correspondence with the aforementioned moments. 2 )concentration.

[0080] Step 2: Use ordinary least squares method to solve the optimal straight line

[0081] According to the above multiple sets of time and real-time combustible gas concentration data sets, the target straight line equation is obtained with the time as the X-axis and the real-time combustible gas concentration as the Y-axis. It should be noted that the target straight line equation here needs to satisfy the minimum vertical distance from all points (i.e., all points on the plane coordinate graph corresponding to the time and real-time combustible gas concentration data sets) to the target straight line, i.e., the minimum error. The obtained target straight line equation is as follows:

[0082] Where: b is the intercept and a is the slope.

[0083] The error from the corresponding point of each data set on the plane coordinate graph to the target straight line in the above steps is recorded as:

[0084] The sum of the variances of multiple data sets is:

[0085] Find the minimum value of E and obtain the corresponding values ​​of a and b to determine the optimal straight line equation. Let: Right now: Solving the system of equations yields:

[0086] Step 3: Prediction

[0087] Since the prediction operation time is much less than 1 second, we can predict at least 3 seconds backward, that is, t+3. Substituting it into the fitting equation, we get: Find C t+3 , that is, CO or O 2 Real-time prediction value at time t+3. Similarly, as long as the specific time to be predicted is substituted into the above fitting equation, the real-time prediction value at the corresponding time can be obtained.

[0088] When the predicted CO concentration rises to 10%, if O 2 The predicted concentration is lower than 3%, and the control unit 53 does not issue a spray instruction. 2 The predicted concentration is greater than 3%, and the pre-pulse valve group 8 is opened. The specific strategy is: if O 2 If the predicted concentration is between 3% and 4%, only the first pulse valve 81 is opened; 2 If the predicted concentration is between 4% and 5%, the first pulse valve 81 and the second pulse valve 82 are opened; 2 If the predicted concentration is between 5% and 6%, the first pulse valve 81, the second pulse valve 82, and the third pulse valve 83 are opened; 2 If the predicted concentration is greater than 6%, the first pulse valve 81, the second pulse valve 82, the third pulse valve 83, and the fourth pulse valve 84 are opened;

[0089] Post-CO concentration monitor 3 and post-O2 The concentration monitor 4 monitors and feeds back the injection results to determine whether 2 The actual concentration is lower than 3% or the actual CO concentration is lower than 10%. As long as any one of the above is not satisfied, the post-pulse valve group 9 is opened according to the opening strategy of the pre-pulse valve group 8 to perform supplementary blowing. The opening strategy of the pre-pulse valve group 8 mentioned here refers to the corresponding relationship between the gas concentration and the number of pulse valves opened when the pre-pulse valve group 8 is opened. Those skilled in the art can adopt and adjust accordingly according to the actual situation, and no further details will be given here.

[0090] That is, during the pre-burning period of converter steelmaking, the opening of the front pulse valve group 8 is based on the gas parameters collected at the inlet pipeline 10 and is opened according to the predicted concentration; and the rear pulse valve group 9 is opened specifically according to the gas parameters collected at the outlet pipeline 11.

[0091] When oxygen blowing is stopped during the post-burning period of converter steelmaking, CO concentration begins to decrease from about 50%, and O 2 The concentration started to rise from a level below 2%. 2 When the concentration starts to rise, take three sets of real-time data to start predicting whether the CO concentration will be lower than 10% in 3 seconds. 2 Is the concentration less than 3%? 2 When the predicted concentration is greater than 3%, if the predicted CO concentration is lower than 10%, the control unit 53 does not issue a blow command; if the predicted CO concentration is higher than 10%, the control unit 53 decides to open the pre-pulse valve group 8 until the CO concentration reaches 10%. 2 The actual concentration is lower than 2% or the actual concentration of CO is lower than 10%. The specific strategy is: if the predicted concentration of CO is between 10% and 11%, the first pulse valve 81 is opened; if the predicted concentration of CO is between 11% and 12%, the first pulse valve 81 and the second pulse valve 82 are opened; if the predicted concentration of CO is between 12% and 13%, the first pulse valve 81, the second pulse valve 82 and the third pulse valve 83 are opened; if the predicted concentration of CO is greater than 13%, the first pulse valve 81, the second pulse valve 82, the third pulse valve 83 and the fourth pulse valve 84 are opened;

[0092] Further, the opening sequence and number of the pre-pulse valve group 8 are based on 2 The predicted concentration level is calculated and determined by the control unit 53, and the injection target is 0 2 The actual concentration is less than 2% or the actual CO concentration is less than 10%.

[0093] Similar to the pre-burn period, the post-CO concentration monitor 3 and post-O 2 The concentration monitor 4 monitors and feeds back the injection results to determine whether 2The actual concentration is lower than 3% or the actual CO concentration is lower than 10%. As long as one of the conditions is not met, the post-pulse valve group 9 is opened according to the opening strategy of the pre-pulse valve group 8 to perform supplementary blowing.

[0094] Similarly, during the post-burning period of converter steelmaking, the opening of the front pulse valve group 8 is based on the gas parameters collected at the inlet pipeline 10 and is opened according to the predicted concentration; while the rear pulse valve group 9 is opened specifically according to the gas parameters collected at the outlet pipeline 11.

[0095] Although the present invention has been described in detail above by general description and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the present invention. Therefore, these modifications or improvements made without departing from the spirit of the present invention all belong to the scope of protection claimed by the present invention.

Claims

1. A converter explosion-proof method based on gas pulse, wherein a converter gas waste heat recovery device is formed with an inlet pipe (10) and an outlet pipe (11), characterized in that: The converter explosion-proof system used includes: A front monitoring unit connected to the inlet pipe (10) and used for monitoring real-time combustible gas parameters near one end of the inlet pipe (10); A post-monitoring unit connected to the outlet pipe (11) and used for monitoring real-time combustible gas parameters near one end of the outlet pipe (11); A prediction unit (52), used for obtaining predicted combustible gas parameters according to the monitored real-time combustible gas parameters; a dilution gas supply unit, which is in communication with the inlet pipe (10) and / or the outlet pipe (11) and is used to supply dilution gas to the inlet pipe (10) and / or the outlet pipe (11); A control unit (53) is used to control the dilution gas providing unit to provide dilution gas according to the real-time combustible gas parameter and / or the predicted combustible gas parameter; According to the prediction result of the prediction unit (52), the concentration levels of CO and O2 are judged, and the injection strategy is given and executed through the control unit (53); the concentrations of CO and O2 at the outlet pipe (11) after the injection of the dilution gas are continuously monitored and predicted, and the control unit (53) gives and executes the injection strategy again according to the injection effect to ensure that the CO or O2 in the coal gas is always below the explosion limit; The converter explosion-proof method comprises: S100, monitoring the real-time combustible gas parameters of the inlet pipeline and the outlet pipeline; S200, predicting CO and O2 concentrations according to the real-time combustible gas parameters of the inlet pipeline to obtain predicted combustible gas parameters; S300, selectively introducing dilution gas into the inlet pipe according to the obtained predicted combustible gas parameters; S400, selectively introducing dilution gas into the outlet pipeline according to the real-time combustible gas parameters of the outlet pipeline fed back; In step S300, the flow rate of the dilution gas introduced into the inlet pipe is different according to the different numerical ranges of the predicted combustible gas parameters; In step S400, the flow rate of the dilution gas introduced into the outlet pipeline is different according to different real-time combustible gas parameters of the outlet pipeline; The specific process of predicting combustible gas parameters includes: Set multiple monitoring times t, and obtain the real-time combustible gas concentration C at each monitoring time; According to the above multiple groups of monitoring time and real-time combustible gas concentration data groups, the target straight line equation is obtained with the monitoring time as the X-axis and the real-time combustible gas concentration as the Y-axis. Among them, b is the intercept and a is the slope. After fitting, we get: Set the prediction time, substitute it into the fitting equation, and obtain the real-time prediction value at the corresponding time.

2. A converter explosion-proof method according to claim 1, characterized in that: Combustible gases include oxygen and carbon monoxide.

3. A converter explosion-proof method according to claim 2, characterized in that: The front monitoring unit comprises a front CO concentration monitor (1) for monitoring carbon monoxide near one end of the inlet pipe (10), and a front O2 concentration monitor (2) for monitoring oxygen near one end of the inlet pipe (10); The post-monitoring unit comprises a post-CO concentration monitor (3) for monitoring the concentration of oxygen near one end of the outlet pipe (11), and a post-O2 concentration monitor (4) for monitoring the concentration of oxygen near one end of the outlet pipe (11).

4. A converter explosion-proof method according to any one of claims 1 to 3, characterized in that: The prediction unit (52) uses the least square method to perform linear fitting on the real-time combustible gas parameters and estimate the regression coefficients so as to minimize the residual square sum between the observed value and the fitted value, thereby obtaining a prediction equation, and predicting the combustible gas parameters according to the obtained prediction equation.

5. A converter explosion-proof method according to any one of claims 1 to 3, characterized in that: The dilution gas supply unit is in communication with the inlet pipe (10) and the outlet pipe (11), respectively; and The dilution gas supply unit at least comprises a dilution gas storage tank (7), a front pipe connected between the dilution gas storage tank (7) and the inlet pipe (10), a front pulse valve group (8) for opening or closing the front pipe, a rear pipe connected between the dilution gas storage tank (7) and the outlet pipe (11), and a rear pulse valve group (9) for opening or closing the rear pipe; The control unit (53) controls the front pulse valve group (8) and the rear pulse valve group (9) to open or close.

6. A converter explosion-proof method according to claim 5, characterized in that: The front pulse valve group (8) and / or the rear pulse valve group (9) each include a plurality of pulse valves, and each of the plurality of pulse valves can be set to be open or closed.

7. A converter explosion-proof method according to claim 6, characterized in that: When the pipe body of the inlet pipe (10) and / or the outlet pipe (11) extends in the vertical direction, the plurality of pulse valves are arranged in a circumferential direction; When the pipe body of the inlet pipe (10) and / or the outlet pipe (11) extends in the horizontal direction, the plurality of pulse valves are located on a side close to the top of the pipe body.

8. A converter explosion-proof method according to claim 7, characterized in that: The control unit (53) can adjustably open one or more of the pulse valves according to the predicted changes in the combustible gas parameters.

9. The converter explosion-proof method according to claim 1, characterized in that: In step S300, when the predicted concentration of CO is not less than 10%, if: When the predicted concentration of O2 is less than 3%, no dilution gas is introduced; When the predicted concentration of O2 is not less than 3% and less than 4%, the dilution gas is introduced at a first flow rate; When the predicted concentration of O2 is not less than 4% and less than 5%, the dilution gas is introduced at a second flow rate; When the predicted concentration of O2 is not less than 5% and less than 6%, the dilution gas is introduced at a third flow rate; When the predicted concentration of O2 is not less than 6%, the dilution gas is introduced at a fourth flow rate; and, The first flow rate, the second flow rate, the third flow rate, and the fourth flow rate increase sequentially.

10. The converter explosion-proof method according to claim 1, characterized in that: In step S300, when the predicted concentration of O2 is not less than 3%, if: If the predicted concentration of CO is less than 10%, no dilution gas is introduced; When the predicted concentration of CO is not less than 10% and less than 11%, the dilution gas is introduced at the fifth flow rate; When the predicted concentration of CO is not less than 11% and less than 12%, the dilution gas is introduced at the sixth flow rate; When the predicted concentration of CO is not less than 12% and less than 13%, the dilution gas is introduced at the seventh flow rate; When the predicted concentration of CO is not less than 13%, the dilution gas is introduced at the eighth flow rate; and, The fifth flow rate, the sixth flow rate, the seventh flow rate, and the eighth flow rate increase sequentially.

11. A converter explosion-proof method according to claim 1, characterized in that: In step S400, if the actual concentration of O2 is not less than 3% or the actual concentration of CO is not less than 10%, dilution gas is introduced.

Citation Information

Patent Citations

  • Automatic control system for preventing vented explosion of converter smelting gas

    CN108265154A

  • Waste gas recovery

    CA705720A

  • Nitrogen dilution anti-explosion system in dry-method cooling and purifying recovery system for converter gas

    CN103276139A

  • Converter smoke gas purification and afterheat recovery system and method

    CN108624736A

  • Converter smoke treatment method and system

    CN108660280A