Distributed integration task execution method and device, equipment and storage medium

By identifying the pre-dependencies of distributed integration tasks and generating a component allocation table, task nodes of the same task type are assigned to the same executor, which solves the problem of low task allocation efficiency in traditional continuous integration systems and improves parallel execution efficiency and stability. sex.

CN118733221APending Publication Date: 2024-10-01数字郑州科技有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410793813.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Traditional continuous integration systems lack a solution to allocate subtasks of the same task type to the same executor during task allocation, resulting in low efficiency in processing tasks with strong time correlation and affecting the effect of parallel execution.

Method used

By defining the workflow diagram of distributed integration tasks, identify the pre-dependencies of each component, and generate a component allocation table, allocate components of the same task type to the same executor, form a sequence to be executed, and push it into the scheduling queue based on allocation rules. Schedule the task to the corresponding executor.

Benefits of technology

It improves the parallel efficiency of distributed integration tasks, reduces costs and resource consumption, ensures that tasks are executed in order, avoids additional data acquisition, and improves task stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118733221A_ABST
    Figure CN118733221A_ABST
Patent Text Reader

Abstract

The invention provides a distributed integration task execution method and device, equipment and a storage medium, and the method comprises the steps: 1, defining a distributed integration task, abstracting each task node in the distributed integration task into a component, and generating a complete workflow graph; step 2, identifying preposition dependency of each component of the workflow graph through a scheduler, and generating a component allocation table for allocating the components of the same task type to the same actuator; step 3, in the current execution batch, obtaining all components which are processed by the preposition dependence or have no preposition dependence through a scheduler to form a sequence to be executed, and pushing the sequence to be executed into a scheduling queue; step 4, scheduling each component in the to-be-executed sequence from the scheduling queue to the corresponding executor based on an allocation rule in the component allocation table; 5, executing tasks corresponding to the components through the actuators; and step 6, repeatedly executing the step 3 to the step 5 until all the task nodes are executed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of distributed scheduling technology, and in particular to a distributed integrated task execution method, device, equipment and storage medium. Background Art

[0002] In the field of software development, continuous integration is a practice of frequently integrating code into a shared repository, and its execution strategy affects the efficiency of software development.

[0003] In the related technology, traditional continuous integration systems often trigger executors at a fixed time, and the distribution of tasks between executors is random. In this case, some tasks with strong time correlation are processed inefficiently. For example, git tasks are used to pull codes to the executor, and maven tasks are used to package the codes. If two executors are assigned to these two types of tasks respectively, the maven tasks will be inefficient in the process of searching for codes, resulting in poor parallel execution effects.

[0004] Based on the above analysis of the development status of this technical field, the existing technical solutions lack a solution for splitting the complete distributed integration task and assigning subtasks of the same task type to the same executor. Summary of the invention

[0005] The purpose of the present invention is to provide a distributed integrated task execution method, device, equipment and storage medium, aiming to solve the above-mentioned problems in the prior art.

[0006] According to a first aspect of an embodiment of the present invention, a method for executing a distributed integration task is provided, comprising:

[0007] Step 1: define the distributed integration task, abstract each task node in the distributed integration task into a component, and generate a complete workflow diagram based on the component;

[0008] Step 2: The scheduler identifies the pre-dependencies of each component in the workflow graph and generates a component allocation table that allocates components of the same task type to the same executor;

[0009] Step 3: In the current execution batch, all components whose pre-dependencies have been processed or have no pre-dependencies are obtained through the scheduler to form a sequence to be executed, and the sequence to be executed is pushed into the scheduling queue;

[0010] Step 4: Based on the allocation rules in the component allocation table, each component in the to-be-executed sequence is dispatched from the dispatch queue to the corresponding executor;

[0011] Step 5, executing the tasks corresponding to the components through each executor;

[0012] Step 6: Repeat steps 3 to 5 until all task nodes are executed.

[0013] According to a second aspect of an embodiment of the present invention, there is provided a distributed integrated task execution device, comprising:

[0014] The preprocessing module is used to define distributed integration tasks, abstract each task node in the distributed integration task into components, and generate a complete workflow diagram based on the components;

[0015] The scheduler is used to identify the pre-dependencies of each component in the workflow graph and generate a component allocation table that allocates components of the same task type to the same executor; in the current execution batch, all components whose pre-dependencies have been processed or have no pre-dependencies are obtained to form a sequence to be executed, and the sequence to be executed is pushed into the scheduling queue;

[0016] An allocation module, used to dispatch each component in the to-be-executed sequence to a corresponding executor based on the allocation rules in the component allocation table;

[0017] Executor, used to execute the tasks corresponding to the component.

[0018] According to a third aspect of an embodiment of the present invention, there is provided an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the computer program is executed by the processor, the steps of the method for executing a distributed integrated task as provided in the first aspect of the present disclosure are implemented.

[0019] According to a fourth aspect of an embodiment of the present invention, a computer-readable storage medium is provided, on which a program for implementing information transmission is stored. When the program is executed by a processor, the steps of the method for executing a distributed integration task provided in the first aspect of the present disclosure are implemented.

[0020] The technical solution provided by the embodiment of the present invention includes the following beneficial effects: the distributed basic task is divided into various task nodes, the task nodes of the same task type are assigned to the same executor, and the correlation between the various task nodes assigned to the same executor is strong. The later execution node can directly execute the task based on the result of the previous execution without the need to obtain additional data from other executors, thereby improving the parallel efficiency of the distributed integrated tasks.

[0021] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate one or more embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this specification. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0023] Figure 1 is a flow chart of a method for executing a distributed integration task according to an embodiment of the present invention;

[0024] Figure 2 is a schematic diagram of a workflow diagram of an embodiment of the present invention;

[0025] Figure 3 is a schematic diagram of an execution framework of an embodiment of the present invention;

[0026] Figure 4 is a schematic diagram of an execution device for a distributed integrated task according to an embodiment of the present invention;

[0027] Figure 5 is a schematic diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0028] In order to enable those skilled in the art to better understand the technical solutions in one or more embodiments of this specification, the following will be combined with the drawings in one or more embodiments of this specification to clearly and completely describe the technical solutions in one or more embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on one or more embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this document.

[0029] Method Embodiment

[0030] According to an embodiment of the present invention, a method for executing a distributed integration task is provided. Figure 1 is a flow chart of a method for executing a distributed integration task according to an embodiment of the present invention. Figure 1 As shown, the execution method of the distributed integration task according to the embodiment of the present invention specifically includes:

[0031] In step S110, a distributed integration task is defined, each task node in the distributed integration task is abstracted into a component, and a complete workflow diagram is generated based on the component, specifically including:

[0032] Define distributed integration tasks according to software development requirements. In fact, it is to divide large integration tasks into various task processing nodes and design the definition of each task processing node. The definition includes but is not limited to: task attributes, such as name, description, input and output parameters, resource requirements, etc. In addition, it is important to define the task type of software development to facilitate subsequent task allocation;

[0033] The tasks are abstracted into components. The components encapsulate complete services or functions for direct calling. A complete workflow diagram is generated based on the components. The connection relationship in the workflow diagram represents the order of task execution. The graph nodes represent components. The execution order of the graph node at the end pointed by the arrow is after the graph node at the starting end of the arrow.

[0034] Figure 2 Schematic diagram of a workflow diagram of an embodiment of the present invention, such as Figure 2 As shown, the functional components used in the embodiment of the present invention and their sequential connection relationships are displayed, and the construction, testing and deployment process of the entire project is planned to form a complete directed acyclic graph;

[0035] exist Figure 2 In the distributed integration task, the git component, maven component, shell component, docker component and K8s component are all commonly used functions in the field of software development. For the convenience of the subsequent examples, the concepts of several components are listed. Among them, the function of the git component is to pull the code repository to the executor, and the task type is the build creation type. The function of the maven component is to package the code pulled from the executor, and the task type is also the build creation type. The task type of the shell component is the cmd interpretation type, which is inconsistent with the task types of the git component and the maven component.

[0036] In terms of execution order, the Maven component and the shell component can be executed only after the git component is executed; there is no order relationship between the Maven component and the shell component, and they can be executed in parallel; the docker component needs to wait until the Maven component and the shell component are both executed before it can be executed; the K8s component needs to wait until the docker component is executed before it can be executed.

[0037] In step S120, the scheduler identifies the pre-dependencies of the components in the workflow graph and generates a component allocation table for allocating components of the same task type to the same executor, specifically including:

[0038] Obtain the workflow diagram through the scheduler, from which you can see the functions and requirements of each task node, identify all the connection relationships and graph nodes in the workflow diagram, and ensure that the tasks are executed in the correct order. The connection relationship indicates the order in which the tasks are executed, and the graph nodes indicate the components.

[0039] The graph node that has a direct connection relationship with the node to be judged and whose execution order is earlier than the node to be judged is used as the pre-dependency of the graph node to be judged, and the pre-dependencies of all components are identified. In this embodiment, the git component has no pre-dependency, the pre-dependency of the maven component is the git component, the pre-dependency of the shell component is the git component, the pre-dependency of the docker component is the maven component and the shell component, and the pre-dependency of K8s is the docker component;

[0040] Preferably, the preceding dependency and the following dependency can be identified at the same time, that is, the preceding and following dependencies are determined simultaneously in combination with the preceding dependency and the following dependency.

[0041] Some allocation rules in the component allocation table defined in the embodiment of the present invention are: assigning the git component and the maven component to executor 1, and assigning the shell component to executor 2; in this case, the maven component can be executed based on the execution result of the git component. If the git component and the maven component are assigned to different executors, the maven component may fail to build because it cannot find the code.

[0042] In step S130, in the current execution batch, all components whose pre-dependencies have been processed or have no pre-dependencies are obtained through the scheduler to form a sequence to be executed, and the sequence to be executed is pushed into the scheduling queue, which specifically includes:

[0043] In the first execution batch, all components without pre-dependencies are obtained as the set to be executed. In other execution batches, all components whose pre-dependencies have been processed are obtained as the set to be executed. That is to say, the git component is a task without any pre-dependencies, and it will be scheduled first in the first batch. If the task is not completed, the maven component and the shell component will not be included in the set to be executed. The maven component and the shell component must be completed before the docker component will be included in the set to be executed.

[0044] Sort the components in the to-be-executed set according to the importance of execution to form a to-be-executed sequence. In the embodiment of the present invention, only the to-be-executed set consisting of Maven components and shell components contains more than one component, and the rest do not need to be sorted;

[0045] When ranking the importance, the paired comparison method is used. That is, by constructing a judgment matrix, the relative importance of different components is quantified, and then combined with the actual situation of the project, for example, the execution components that are prone to errors are prioritized;

[0046] Push the sequence to be executed from the scheduler into the scheduling queue.

[0047] In step S140, based on the allocation rules in the component allocation table, each component in the to-be-executed sequence is dispatched from the dispatch queue to the corresponding executor, specifically including:

[0048] The polling executor method is used to dispatch each component in the sequence to be executed from the scheduling queue to the corresponding executor, including:

[0049] According to the FIFO principle, all components in the sequence to be executed are sent to the current polling executor in turn. Based on the component allocation table, if the component matches the current polling executor correctly, the component is dispatched to the current polling executor, otherwise the component is pushed back into the sequence to be executed;

[0050] When all components are matched with the current round executor, the updated sequence to be executed is sent to the next polling executor, and the next polling executor is used as the new current polling executor until all components are scheduled to the corresponding executors;

[0051] Take the sequence to be executed including Maven components and shell components as an example. If the Maven component is more important than the shell component, the Maven component is first sent to executor 1. During the process of sending it to executor 1, the Maven component is deleted from the sequence to be executed. Executor 1 receives the Maven component.

[0052] The shell component is sent to executor 1. During the process of sending it to executor 1, the shell component is deleted from the sequence to be executed. Executor 1 rejects the shell component, so the shell component is returned to the scheduling queue. The next polling executor is executor 2. Executor 2 serves as the new executor for the current round. The sequence to be executed containing only the shell component is sent to executor 2. Executor 2 receives the shell component and notifies the scheduler that the scheduling of the current batch has ended.

[0053] Since the component allocation table is predefined, all components of the current batch can be allocated to the corresponding actuators.

[0054] In step S150, each executor executes the tasks corresponding to the components, specifically including:

[0055] When the executor obtains the corresponding component, it executes the task corresponding to the component, and stores the execution result in the executor after the execution is completed; that is, when the executor obtains the corresponding component, it can start execution immediately. When multiple executors obtain their corresponding tasks and start execution, an efficient parallel execution effect is formed.

[0056] In step S160, steps S130 to S150 are repeatedly executed until all task nodes are executed. In each execution batch, there are only components that can be executed in the sequence to be executed, that is, the prerequisite dependencies are completed. Therefore, the embodiment of the present invention repeats steps S130 to S150 four times in total, and the tasks completed in each round are: 1. git component; 2. maven component and shell component; 3. docker component; 4. K8s component.

[0057] When the distributed integration task is completed, the execution results on each executor are collected and summarized and analyzed to evaluate the execution status of the entire workflow.

[0058] The above technical solutions of the embodiments of the present invention are illustrated with reference to the following drawings.

[0059] Figure 3 is a schematic diagram of an execution framework of an embodiment of the present invention, such as Figure 3 As shown, a schematic diagram of distributed integrated task execution is shown. The present invention involves three roles, namely a scheduler, a scheduling queue, and an executor, wherein the scheduler and the executor can be understood as physical devices, and the scheduling queue can be a physical storage space or a virtual storage space.

[0060] To sum up, in response to the existing problems, the execution method of distributed integrated tasks invented in this invention divides large tasks into various task nodes, and determines the execution order through the connection relationship between each graph node in the workflow diagram to avoid confusion in the execution order; when each batch is executed, only all components whose predecessor dependencies have been processed or have no predecessor dependencies in the current situation are processed, and a decoupling relationship is formed between each batch to ensure that the subsequent tasks are executed only after the predecessor dependencies are executed; with the task type as the main label, the task nodes of the same task type are assigned to the same executor, and the correlation between the task nodes assigned to the same executor is strong. The later execution node can directly execute the task based on the result of the previous execution, without the need to obtain additional data from other executors, thereby improving the parallel efficiency of distributed integrated tasks and reducing costs and resource consumption; overall, through the mutual cooperation between the scheduler, scheduling queue and executor, refined management of tasks is achieved and the stability of task execution is improved.

[0061] Device Embodiment

[0062] According to an embodiment of the present invention, a distributed integrated task execution device is provided. Figure 4 Schematic diagram of a distributed integrated task execution device according to an embodiment of the present invention. Figure 4 As shown, the execution device of the distributed integration task according to the embodiment of the present invention specifically includes:

[0063] A preprocessing module 40 is used to define a distributed integration task, abstract each task node in the distributed integration task into a component, and generate a complete workflow diagram based on the component;

[0064] The scheduler 42 is used to identify the pre-dependencies of each component of the workflow diagram and generate a component allocation table for allocating components of the same task type to the same executor; in the current execution batch, all components whose pre-dependencies have been processed or have no pre-dependencies are obtained to form a sequence to be executed, and the sequence to be executed is pushed into the scheduling queue;

[0065] An allocation module 44 is used to dispatch each component in the to-be-executed sequence to a corresponding executor based on the allocation rules in the component allocation table;

[0066] The executor 46 is used to execute the tasks corresponding to the components.

[0067] The device further comprises:

[0068] The multi-batch execution module is used to repeatedly call the scheduler, allocation module and executor until all task nodes are executed. The repeated calling of the executor does not include the generation of the component allocation table.

[0069] In summary, in response to the existing problems, the distributed integrated task execution device of this invention divides the large task into various task nodes, determines the execution order through the connection relationship between the various graph nodes in the workflow diagram, and avoids the disorder of the execution order; when each batch is executed, only all components whose pre-dependencies have been processed or have no pre-dependencies in the current situation are processed, and a decoupling relationship is formed between each batch to ensure that the post-task is executed only after the pre-dependencies are executed; with the task type as the main label, the task nodes of the same task type are assigned to the same executor, and the correlation between the task nodes assigned to the same executor is strong. The post-execution node can directly execute the task based on the result of the previous execution, without the need to obtain data from other executors, which improves the parallel efficiency of the distributed integrated task and reduces the cost and resource consumption; overall, through the cooperation between the scheduler, the scheduling queue and the executor, the refined management of the task is realized, and the stability of the execution of the task is improved. .

[0070] Electronic device embodiment

[0071] Figure 5 Schematic diagram of an electronic device according to an embodiment of the present invention. The electronic device 500 may include at least one processor 510 and a memory 520. The processor 510 may execute instructions stored in the memory 520. The processor 510 is connected to the memory 520 through a data bus. In addition to the memory 520, the processor 510 may also be connected to an input device 530, an output device 540, and a communication device 550 through a data bus.

[0072] The processor 510 may be any conventional processor, such as a commercially available CPU. The processor may also include a graphics processor (Graphic Process Unit, GPU), a field programmable gate array (Field Programmable Gate Array, FPGA), a system on chip (System on Chip, SOC), an application specific integrated circuit (Application Specific Integrated Circuit, ASIC) or a combination thereof.

[0073] The memory 520 may be implemented by any type of volatile or nonvolatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk.

[0074] In the embodiment of the present disclosure, executable instructions are stored in the memory 520, and the processor 510 can read the executable instructions from the memory 520 and execute the instructions to implement all or part of the steps of the execution method of any distributed integration task in the above exemplary embodiments.

[0075] Computer Readable Storage Medium Embodiments

[0076] In addition to the above-mentioned methods and apparatus, an exemplary embodiment of the present disclosure may also be a computer program product or a computer-readable storage medium storing the computer program product, wherein the computer product includes computer program instructions that can be executed by a processor to implement all or part of the steps described in the method for executing a distributed integration task in any of the above-mentioned exemplary embodiments.

[0077] The computer program product may be written in any combination of one or more programming languages ​​to write program codes for performing the operations of the embodiments of the present application, including object-oriented programming languages ​​such as Java, C++, etc., and also conventional procedural programming languages ​​such as "C" language or similar programming languages ​​and scripting languages ​​(e.g., Python). The program code may be executed entirely on the user computing device, partially on the user computing device, as an independent software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.

[0078] Computer readable storage media can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples of readable storage media include: a static random access memory (SRAM) with one or more wires electrically connected, an electrically erasable programmable read-only memory (EEPROM), an erasable programmable read-only memory (EPROM), a programmable read-only memory (PROM), a read-only memory (ROM), a magnetic memory, a flash memory, a magnetic disk or an optical disk, or any suitable combination of the above.

[0079] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for executing a distributed integration task, characterized in that: include: Step 1: define a distributed integration task, abstract each task node in the distributed integration task into a component, and generate a complete workflow diagram based on the component; Step 2, identifying the pre-dependencies of the components of the workflow graph through a scheduler, and generating a component allocation table for allocating components of the same task type to the same executor; Step 3: In the current execution batch, all components whose pre-dependencies have been processed or have no pre-dependencies are obtained through the scheduler to form a sequence to be executed, and the sequence to be executed is pushed into the scheduling queue; Step 4, based on the allocation rules in the component allocation table, dispatch each component in the to-be-executed sequence from the dispatch queue to the corresponding executor; Step 5, executing the tasks corresponding to the components through each executor; Step 6: Repeat step 3 to step 5 until all task nodes are executed.

2. The method according to claim 1, characterized in that The identifying the pre-dependencies of the components of the workflow graph by the scheduler specifically includes: Obtaining the workflow graph through a scheduler, and identifying all connection relationships and graph nodes in the workflow graph, wherein the connection relationships represent the order of task execution, and the graph nodes represent components; A graph node that has a direct connection relationship with the node to be judged and whose execution order is earlier than the node to be judged is used as a pre-dependency of the graph node to be judged, and the pre-dependencies of all components are identified.

3. The method according to claim 1, characterized in that The step of obtaining all components whose pre-dependencies have been processed or have no pre-dependencies through the scheduler to form a sequence to be executed specifically includes: In the first execution batch, all components without pre-dependencies are obtained as the set to be executed. In other execution batches, all components whose pre-dependencies have been processed are obtained as the set to be executed. The components in the to-be-executed set are sorted according to the importance of execution to form a to-be-executed sequence.

4. The method according to claim 1, characterized in that: The step of dispatching each component in the sequence to be executed from the dispatch queue to the corresponding executor specifically includes: dispatching each component in the sequence to be executed from the dispatch queue to the corresponding executor in a polling executor manner.

5. The method according to claim 4, characterized in that The method of using the polling executor method to dispatch each component in the to-be-executed sequence from the dispatch queue to the corresponding executor specifically includes: According to the first-in-first-out principle of the sequence, all components in the to-be-executed sequence are sent to the currently polled executor in sequence, and it is judged based on the component allocation table: if the component matches the currently polled executor correctly, the component is dispatched to the currently polled executor, otherwise the component is pushed back into the to-be-executed sequence; When all components are matched with the current round executor, the updated sequence to be executed is sent to the next polling executor, and the next polling executor is used as the new current polling executor until all components are scheduled to the corresponding executors.

6. The method according to claim 1, characterized in that The executing of the tasks corresponding to the components by each executor specifically includes: when the executor obtains the corresponding component, executing the task corresponding to the component, and storing the execution result in the executor after the execution is completed.

7. A distributed integrated task execution device, characterized in that: include: A preprocessing module is used to define a distributed integration task, abstract each task node in the distributed integration task into a component, and generate a complete workflow diagram based on the component; A scheduler, for identifying the pre-dependencies of the components of the workflow graph and generating a component allocation table for allocating components of the same task type to the same executor; In the current execution batch, all components whose pre-dependencies have been processed or have no pre-dependencies are obtained to form a sequence to be executed, and the sequence to be executed is pushed into the scheduling queue; An allocation module, configured to dispatch each component in the to-be-executed sequence to a corresponding executor based on an allocation rule in the component allocation table; Executor, used to execute the tasks corresponding to the component.

8. The device according to claim 7, characterized in that The device further comprises: The multi-batch execution module is used to repeatedly call the scheduler, the allocation module and the executor until all task nodes are executed.

9. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program, when executed by the processor, implements the steps of the method for executing a distributed integration task as described in any one of claims 1 to 6.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores an implementation program for information transmission, and when the program is executed by a processor, the steps of the method for executing a distributed integration task as described in any one of claims 1 to 6 are implemented.

Citation Information

Cited By

  • Double-decoupling parallel random number generator and random computing system