Coal mine three-dimensional geological modeling method under complex geological conditions

Through data collection and sedimentary evolution analysis in the coal mine area, combined with the TIN-GTP hybrid algorithm, a high-precision three-dimensional geological model of coal mines was constructed, which solved the problem of insufficient model accuracy under complex geological conditions and realized the need for intelligent mining of coal mines.

CN118916438APending Publication Date: 2024-11-08XIAN COAL SCI TRANSPARENT GEOLOGICAL TECH CO LTD +1
View PDF 0 Cites 16 Cited by

Patent Information

Application Number
CN202411092024.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-08

Smart Images

  • Figure CN118916438A_ABST
    Figure CN118916438A_ABST
Patent Text Reader

Abstract

The invention discloses a coal mine three-dimensional geological modeling method under a complex geological condition, and the method comprises the steps: collecting the geological data of a coal mine region, and constructing an original geological database; carrying out standardization, resampling and encryption processing on data required by geological modeling; for the modeling area, the stratum evolution process and rule are researched in the vertical direction and the transverse direction, and the thickness change and distribution rule of each stratum in the space range are reasonably deduced and determined; arranging the data into a data table supporting modeling; using a point-by-point insertion method and a smooth discrete interpolation algorithm to generate a ground plane and a fault plane represented by the triangulated irregular network; and constructing a three-dimensional geological model of the coal mine under a complex geological condition by adopting a TIN-GTP hybrid algorithm. According to the method, strata, rock strata, coal seams and structural spatial forms and distribution rules can be depicted finely, the constructed coal mine three-dimensional geologic model conforms to the geological development and evolution process, the model precision is high, mine geology transparency is better achieved, and the requirement for intelligent mining of a coal mine is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geological modeling and relates to a three-dimensional geological modeling method for coal mines under complex geological conditions. Background Art

[0002] Geological transparency is the basis and one of the key technologies for realizing intelligent coal mining. It is also an inevitable requirement for realizing precise coal mining and an important way to ensure safe and efficient geological protection for coal mines. Geological transparency is based on massive multi-source geological exploration data to establish a visual three-dimensional geological model to truly restore underground geological conditions, geological structures and other information. Under complex geological conditions, there is often a lack of research on the laws of sedimentary evolution, geological structure development and their coupling relationship with hidden disaster-causing factors, resulting in limited accuracy of three-dimensional geological modeling and insufficient reflection of geological processes and geological laws. How to overcome the difficulties in constructing three-dimensional geological models under complex geological conditions and improve model accuracy to meet the needs of intelligent coal mining is an urgent problem to be solved at this stage. Summary of the invention

[0003] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a three-dimensional geological modeling method for coal mines under complex geological conditions, overcome the difficulties in constructing three-dimensional geological models under complex geological conditions, and improve the model accuracy to meet the needs of intelligent coal mining.

[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions to achieve the above problems:

[0005] A three-dimensional geological modeling method for coal mines under complex geological conditions comprises the following steps:

[0006] Step 1: Collect and organize the geological survey data, drilling data, geophysical exploration results and mining data of the coal mining area, and build an original geological database;

[0007] Step 2: Preprocess the data to be used for geological modeling: digitization, data standardization, data resampling and point cloud data encryption;

[0008] Step 3: After processing the geological modeling data in step 2, analyze the sedimentary evolution process of the modeling area: rely on the encrypted stratigraphic point cloud data, combined with the digitized logging data and geological profile data, and reasonably infer the spatial distribution law of each stratum through geological interpretation. On the basis of stratigraphic sequence interface identification, system domain interface identification, parasequence division and comparison, and establishment of a sequence stratigraphic framework, obtain the plane distribution and vertical evolution characteristics of different sedimentary system types in the region;

[0009] Step 4: Establish a stratigraphic sequence using the stratigraphic sequence model map obtained in step 3, number all strata, and form a complete stratigraphic sequence table for the modeling area;

[0010] Step 5, loading the data obtained in step 4 into the modeling software to generate the stratigraphic plane and the fault plane, and manually processing the intersection relationship between the stratigraphic plane and the fault plane;

[0011] Step six, based on the stratigraphic plane and fault plane generated in step five, the geological body is generated based on the TIN-GTP hybrid algorithm, and finally a three-dimensional geological model of the coal mine under complex geological conditions is constructed.

[0012] The present invention also includes the following technical features:

[0013] Specifically, the step 1 includes:

[0014] Step 1.1, data collection: geological exploration data include geological profiles and mineral resource distribution maps; drilling data include drill core analysis, stratigraphic columnar diagrams and hydrological columnar diagrams; geophysical exploration results include electrical exploration, 3D seismic and well logging data; mining data include mining engineering plan drawings, tunnel sketches and mining exposure maps;

[0015] Step 1.2, organize the above data: clean, integrate and archive the data to ensure the accuracy and completeness of the data;

[0016] Step 1.3, construct the original geological database: use geographic information system software tools to spatially associate the data collected and organized above to achieve data visualization and spatial analysis.

[0017] Specifically, the step 2 includes:

[0018] Step 2.1, digitize the collected and organized data through GIS software tools, which is realized by scanning, vectorization, editing, and input; secondly, refer to the standard format of geological data to unify the data into coordinate system, units, and weights and measures;

[0019] Step 2.2, resample the digitized stratigraphic column data, adopt the non-uniform interval sampling method, adjust the sampling interval according to the thickness of different stratigraphic layers, ensure the balance of the sampling data, and convert the stratigraphic data into a series of points with specific spatial positions and stratigraphic attributes, namely stratigraphic point cloud data; the sampling interval H of the stratigraphic data layer i i The calculation formula is:

[0020] H i =(d i -d i-1 ) / n (1)

[0021] Where: d iis the depth of the bottom plate of the i-th layer, and n is the number of samples in each layer;

[0022] Step 2.3, encrypt the above stratum point cloud data, combine the actual geological conditions of the coal mine area, weight the surrounding known point cloud data values ​​to obtain the data value of the unknown position, and this method can predict and interpolate the surface data. The interpolation formula is:

[0023]

[0024] In the formula, and Z are the predicted value at the unknown point and the known value at the i-th position respectively; S0 is the position coordinates and attribute information of the unknown point; N is the number of points with obtained position coordinates and attribute information; S i is the coordinate and attribute information of the i-th position; i is the weight of the coordinates and attribute information at the ith position, that is, the lightweight spatial autocorrelation value.

[0025] Specifically, the step three includes:

[0026] Step 3.1, identification of stratigraphic sequence interfaces: Based on the three-dimensional seismic profiles, core samples and well logging curves in the geophysical exploration data, the stratigraphic sequence interfaces are determined by the discontinuous sedimentary types and characteristics of the strata, and the onlap, downlap, toplap and erosion phenomena on the stratigraphic discontinuity surfaces;

[0027] Step 3.2, identification of system tract interface: Based on the initial flooding surface and the maximum flooding surface, combined with the coal seam being the product between the initial flooding surface and the maximum flooding surface, the system tract interface is determined according to the characteristics and regularity of the sedimentary system tract;

[0028] Step 3.3, parasequence division and comparison: Parasequences are strata with similar sedimentary characteristics. Each coal-bearing cycle is regarded as a parasequence, and the top interface of the coal seam is regarded as the parasequence interface. By comparing the parasequence groups of different boreholes, the distribution and evolution law of the strata can be obtained.

[0029] Step 3.4, establish a sequence stratigraphic model: Based on the division and comparison of sequence interfaces, system tract interfaces and parasequences determined above, divide the strata into a complete third-order sequence and establish a sequence stratigraphic model.

[0030] Specifically, step four includes: assigning the latest stratum the number 1 according to the ascending order of stratigraphic age, and gradually increasing the number over time, and organizing the stratigraphic data required for modeling into a drilling hole position table and a stratigraphic sequence table, and organizing the fault information table according to the mining data and the stratigraphic sequence table.

[0031] Specifically, the step five includes:

[0032] Step 5.1, the stratigraphic point cloud data with the same number is interpolated point by point to generate the TIN surface of each layer, and the smooth discrete interpolation algorithm DSI is used to construct the stratigraphic layer and fault surface according to the spatial topological relationship of the grid nodes;

[0033] Step 5.2: Based on the intersection relationship between the fault plane and the stratigraphic plane, the stratigraphic planes on both sides of the fault plane are taken as a whole to construct a TIN surface, and the stratigraphic plane is generated using the Delaunay triangulation algorithm. Secondly, the intersection line between the stratigraphic TIN surface and the fault TIN surface is calculated, and the intersection line is the common quasi-edge line of the stratigraphic TIN surfaces on both sides of the fault TIN surface. Based on this intersection line, the quasi-edge lines of the stratigraphic TIN surfaces on both sides of the fault are adjusted according to the height of the fault to obtain their respective actual edge lines. Finally, the original triangulation is modified with the actual edge line as a constraint to generate a triangulated surface that meets the actual geological conditions.

[0034] Specifically, in step 5.1, the smooth discrete interpolation algorithm DSI regards the geological interface as a discretized discontinuous interface, and uses geological points and geological exploration data as constraints to solve the optimal solution of the objective function, i.e., the global roughness function, to obtain the optimal geological interface that meets the constraints, including:

[0035] Create a grid node Objective function of the optimal solution:

[0036]

[0037] In the formula, is the global roughness function, is the linear constraint violation function;

[0038] To make the objective function infinitely close to the minimum value, the following two conditions must be met:

[0039] Condition 1: Make the function value at any node close to the mean value of the nodes in the neighborhood of the point, that is, make the mesh nodes as smooth as possible by solving the global roughness function:

[0040]

[0041] Where μ(k) is the non-negative weight coefficient given on Ω, H(k) is the domain of node k, is the given weight coefficient, whose value is an integer; is the true value at node α;

[0042] Condition 2, maximize the degree of linear constraint compliance, that is, minimize the violation of linear constraints, and use the violation function to perform node constraints:

[0043]

[0044] In the formula, is a positive coefficient, A i is an n-dimensional matrix, b i is a constant;

[0045]

[0046] in, represent should be as small as possible so that the relevant nodes The value of is as close to the sampled data as possible.

[0047] Specifically, the step six includes:

[0048] Step 6.1, based on the TIN surface, search for stratigraphic information in a top-down order, and generate an initial generalized triangular prism model, namely, a GTP model, by comparing and connecting the stratigraphic information between each group of three point data;

[0049] Step 6.2, for areas with complex geological conditions, including stratigraphic unconformity, stratigraphic pinch-out, coal seam bifurcation, and fault cutting, the GTP model is decomposed into smaller GTP models, or degenerated into a tetrahedron TEN model and a pyramid model to ensure that the model is consistent with the actual geological phenomena;

[0050] Step 6.3, by matching and fusing the fault plane expressed by TIN with the geological body expressed by GTP, a three-dimensional geological model expressed by a TIN-GTP hybrid model is constructed;

[0051] Step 6.4, compare and check the constructed fault planes, geological bodies, and the cutting relationship between faults and geological bodies according to the sedimentary evolution analysis obtained in step 3, and correct and process them;

[0052] Step 6.5, through all the above steps, the three-dimensional geological model of the coal mine is finally constructed.

[0053] Compared with the prior art, the present invention has the following technical effects:

[0054] The present invention collects geological data of the coal mine area, constructs an original geological database, and processes and standardizes the data. The evolution law of the stratum is studied, the thickness and distribution law of the stratum are inferred, and the data are organized into a modeling data table. The stratigraphic surface and fault surface are generated by the step-by-step insertion method, and the TIN-GTP hybrid algorithm is used to construct a three-dimensional geological model of the coal mine. Using this method, the spatial morphology and distribution law of the stratum, rock stratum, coal seam and structure can be finely portrayed, which makes up for the shortcomings of a single model in modeling and solves the problem of coal mine geological modeling under data shortage and complex geological conditions. The constructed three-dimensional geological model of the coal mine not only conforms to the geological development and evolution process, but also has a high model accuracy, better realizes the transparency of mine geology, and helps to meet the needs of intelligent coal mining. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 is a flow chart of the method of the present invention.

[0056] Figure 2 This is a schematic diagram of data resampling.

[0057] Figure 3 This is a schematic diagram of the point cloud data encryption effect.

[0058] Figure 4 It is a schematic diagram of the three-level sequence stratigraphic model.

[0059] Figure 5 It is a schematic diagram of the stratigraphic sequence.

[0060] Figure 6 This is a schematic diagram of the irregular triangulated network and DSI interpolation generation layer.

[0061] Figure 7 This is a schematic diagram of the intersection of the fault plane and the stratigraphic plane.

[0062] Figure 8 It is a schematic diagram of geological body construction using the TIN-GTP hybrid model.

[0063] Fig. 9 It is a schematic diagram of the constructed three-dimensional geological model of the coal mine.

[0064] Fig.10 It is the error map between the geological model and the used data. DETAILED DESCRIPTION

[0065] Specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent changes made on the basis of the technical solution of this application fall within the protection scope of the present invention.

[0066] Example:

[0067] This embodiment provides a three-dimensional geological modeling method for coal mines under complex geological conditions. The original geological database is constructed by collecting geological data of the coal mine area; the data required for geological modeling is standardized, resampled and encrypted; for the modeling area, the stratigraphic evolution process and laws are studied vertically and horizontally, and the thickness changes and distribution laws of each stratum in the spatial range are reasonably inferred and determined; and the data are organized into a data table to support modeling; the stratigraphic surface and fault surface represented by an irregular triangulated network are generated by using a point-by-point insertion method and a smooth discrete interpolation algorithm; and the TIN-GTP hybrid model algorithm is used to finally construct a three-dimensional geological model of the coal mine under complex geological conditions.

[0068] like Figure 1 As shown, the following steps are included:

[0069] Step 1: Collect and organize the geological survey data, drilling data, geophysical exploration results and mining information of the coal mining area, and build an original geological database.

[0070] Step 1.1, collect data: geological survey data include: geological profiles and mineral resource distribution maps, etc.; drilling data include: drill core analysis, stratigraphic column and hydrological column, etc.; geophysical exploration results include: electrical prospecting, 3D seismic and well logging data, etc.; mining data include: mining engineering plan, tunnel sketch and mining exposure map, etc.

[0071] Step 1.2, organize the above data: clean, integrate and archive the data to ensure the accuracy and completeness of the data. In addition, standardize the naming of the data to facilitate subsequent data management and analysis.

[0072] Step 1.3, construct the original geological database: use geographic information system software (GIS) tools to spatially associate the data collected and organized above to achieve data visualization and spatial analysis.

[0073] Step 2: Preprocess the data to be used for geological modeling: digitization, data standardization, data resampling and point cloud data encryption.

[0074] Step 2.1, digitize the collected and organized data with the help of Geographic Information System software (GIS) tools, through scanning, vectorization, editing, input, etc. Secondly, refer to the standard format of geological data to unify the coordinate system, unit, and measurement of the data.

[0075] Step 2.2, resample the digitized stratigraphic column data, use a non-equal interval sampling method, adjust the sampling interval according to the thickness of different strata, ensure the balance of the sampling data, and convert the stratigraphic data into a series of points with specific spatial locations and stratigraphic attributes, namely, stratigraphic point cloud data. Figure 2 As shown in Figure 1, the stratigraphic data is displayed in strips and is continuously distributed in the vertical direction. The attributes of each stratigraphic layer are continuously unique within the depth range, and there is no data missing between the stratigraphic layers. The sampling interval H of the stratigraphic data layer i i The calculation formula is:

[0076] H i =(d i -d i-1 ) / n (1)

[0077] Where: d i is the depth of the bottom plate of the i-th layer, and n is the number of samples in each layer.

[0078] Step 2.3, usually, the above stratum point cloud data is discrete and limited. Therefore, encrypting the above point cloud data is the key method to solve this problem. Consider factors such as the spatial autocorrelation, accuracy and uncertainty of the encrypted results. Combined with the actual geological conditions of the coal mine area, the surrounding known point cloud data values ​​are weighted to obtain the data values ​​of the unknown position, and this method can predict and interpolate the surface data. The interpolation formula is:

[0079]

[0080] In the formula, and Z are the predicted value at the unknown point and the known value at the i-th position respectively; S0 is the position coordinates and attribute information of the unknown point; N is the number of points with obtained position coordinates and attribute information; S i is the coordinate and attribute information of the i-th position; i is the weight of the coordinates and attribute information at the ith position, that is, the lightweight spatial autocorrelation value.

[0081] Through the above calculations, the stratum point cloud data is encrypted, making the point cloud on the stratum surface more dense. Figure 3 As shown, this is the effect after point cloud data encryption.

[0082] Step 3: After processing the geological modeling data in steps 1 and 2, analyze the sedimentary evolution process of the modeling area. Mainly relying on the encrypted stratigraphic point cloud data, combined with digitized logging data and geological profiles, the spatial distribution law of each stratum is reasonably inferred through geological interpretation. On the basis of stratigraphic sequence interface identification, system domain interface identification, parasequence division and comparison, and the establishment of a sequence stratigraphic framework, the plane distribution and vertical evolution characteristics of different sedimentary system types in the region are obtained.

[0083] Step 3.1, identification of stratigraphic sequence interfaces: Based on the three-dimensional seismic profiles, core samples and well logging curves in the geophysical exploration data, the stratigraphic sequence interfaces are determined by the discontinuous sedimentary types and characteristics of the strata, and the onlap, downlap, toplap and erosion phenomena on the stratigraphic discontinuity surfaces;

[0084] Step 3.2, identification of system tract interface: Based on the initial flooding surface (fs) and the maximum flooding surface (mfs), the coal seam is the product between the initial flooding surface and the maximum flooding surface, and the system tract interface is determined according to the characteristics and regularity of the sedimentary system tract;

[0085] Step 3.3, parasequence division and comparison: Parasequences are strata with similar sedimentary characteristics. Each coal-bearing cycle is regarded as a parasequence, and the top interface of the coal seam is regarded as the parasequence interface. By comparing the parasequence groups of different boreholes, the distribution and evolution law of the strata can be obtained.

[0086] Step 3.4, establish a sequence stratigraphic model: Based on the division and comparison of sequence interfaces, system tract interfaces and parasequences determined in steps 3.2, 3.3 and 3.4, divide the strata into a complete third-order sequence and establish a sequence stratigraphic model, such as Figure 4 As shown;

[0087] Step 4: Use the stratigraphic sequence diagram obtained in step 3 to establish a stratigraphic sequence, number all strata, and form a complete stratigraphic sequence table for the modeling area. According to the ascending order of stratigraphic age, the latest stratum is assigned number 1, and the number is gradually increased as time goes by, such as Figure 5 The stratigraphic data required for modeling are organized into a drilling hole position table and a stratigraphic layer table, as shown in Tables 1 and 2. Based on the mining data and the stratigraphic sequence table, the well field fault information table is organized, as shown in Table 3.

[0088] Table 1 Drilling hole position table

[0089] Well X Y KB / m MD / m M01 36419925.32 4357241.62 1391.93 524.67 M02 36420438.17 4357668.36 1407.91 509.78 M03 36419447.58 4357798.61 1401.23 568.89 … … … … …

[0090] Table 2 Stratigraphic sequence

[0091] Well Year Stratum MD / m M01 Q topsoil 6.96 M01 N Conglomerate 210.28 M01 P1s Mudstone 482.56 M01 P1s 9# coal 487.05 M01 P1s Fine sandstone 498.56 M01 C2t Sandy mudstone 506.36 … … … …

[0092] Table 3 Fault information table

[0093] name nature Tendency / ° Inclination angle / ° Drop / m <![CDATA[F1]]> Normal fault 128 21 1.6 <![CDATA[F2]]> Reverse fault 285 65 3 … … … … …

[0094] Step 5: Load the data obtained in step 4 into the modeling software to generate stratigraphic planes and fault planes, and manually process the intersection relationship between the stratigraphic planes and the fault planes.

[0095] Step 5.1: The stratigraphic point cloud data with the same number is interpolated point by point to generate the irregular triangulated network (TIN surface) of each stratigraphic level, and the smooth discrete interpolation algorithm (DSI) is used to construct the stratigraphic level and fault level according to the spatial topological relationship of the grid nodes, such as Figure 6 DSI regards the geological interface as a discretized discontinuous interface, and uses geological points and geological exploration data as constraints. DSI solves the objective function - the optimal solution of the global roughness function under these constraints to obtain the optimal geological interface that meets the constraints.

[0096] First, create a grid node Objective function of the optimal solution:

[0097]

[0098] Where: is the global roughness function, is the linear constraint violation function.

[0099] To make the objective function infinitely close to the minimum value, the following two conditions need to be met:

[0100] ① Make the function value at any node close to the mean value of the nodes in the neighborhood of the point, that is, make the grid nodes as smooth as possible by solving the global roughness function:

[0101]

[0102] Where: μ(k) is the non-negative weight coefficient given on Ω, N(k) is the domain of node k, is the given weight coefficient, whose value is an integer. is the true value at node α.

[0103] ② Make the linear constraint compliance degree reach the maximum, that is, the violation degree of the linear constraint is minimized, and the node constraint is performed through the violation degree function:

[0104]

[0105] Where: is a positive coefficient, A i is an n-dimensional matrix, b i is a constant.

[0106]

[0107] in, represent should be as small as possible so that the relevant nodes The value of is as close to the sampled data as possible.

[0108] Step 5.2, regarding the intersection relationship between the fault plane and the stratigraphic plane, the stratigraphic planes on both sides of the fault plane are considered as a whole to construct a TIN surface, and the stratigraphic plane is generated using the Delaunay triangulation algorithm. Secondly, the intersection line of the stratigraphic TIN surface and the fault TIN surface is calculated. This intersection line is the common quasi-edge line of the stratigraphic TIN surfaces on both sides of the fault TIN surface. Based on this intersection line, the quasi-edge lines of the stratigraphic TIN surfaces on both sides of the fault are adjusted according to the height of the fault to obtain their respective actual edge lines. Finally, the original triangulation is modified with the actual edge line as a constraint, that is, a triangulated surface that meets the actual geological conditions is generated, such as Figure 7 shown.

[0109] Step six, based on the stratigraphic plane and fault plane generated in step five, the geological body is generated based on the TIN-GTP hybrid algorithm, and finally a three-dimensional geological model of the coal mine under complex geological conditions is constructed.

[0110] Step 6.1, based on the TIN surface, search for stratigraphic information in a top-down order, and generate an initial generalized triangular prism model (GTP body) by comparing and connecting the stratigraphic information between each group of three point data;

[0111] Step 6.2, for areas with complex geological conditions, such as stratigraphic unconformity, stratigraphic pinch-out, coal seam bifurcation, fault cutting, etc., the GTP model is decomposed into smaller GTP models, or degenerated into a tetrahedron (TEN) model and a pyramid (Pyramid) model to ensure that the model is consistent with the actual geological phenomena.

[0112] Step 6.3, by matching and fusing the fault plane expressed by TIN with the geological body expressed by GTP, a three-dimensional geological model expressed by the TIN-GTP hybrid model is constructed, such as Figure 8 shown.

[0113] Step 6.4, compare and check the constructed fault planes, geological bodies, and the cutting relationship between faults and geological bodies according to the sedimentary evolution analysis obtained in step 3, and correct and process them.

[0114] Step 6.5, through all the above steps, finally construct a three-dimensional geological model of the coal mine, such as Fig. 9 shown.

[0115] The constructed three-dimensional geological model of the coal mine is compared and analyzed with the data used, and the error scatter plot of the geological model and the data used and the statistical histogram of the error distribution between the geological model and the data used are obtained. Fig.10 As shown in the distribution diagram, it can be seen that the error values ​​of all constraint points are below 0.2m, of which 95% of the errors are within the range of 0 to 0.1m, meeting the model accuracy requirements under complex geological conditions.

Claims

1. A three-dimensional geological modeling method for coal mines under complex geological conditions, characterized in that: The following steps are involved: Step 1: Collect and organize the geological survey data, drilling data, geophysical exploration results and mining data of the coal mining area, and build an original geological database; Step 2: Preprocess the data to be used for geological modeling: digitization, data standardization, data resampling and point cloud data encryption; Step 3: After processing the geological modeling data in step 2, analyze the sedimentary evolution process of the modeling area: rely on the encrypted stratigraphic point cloud data, combined with the digitized logging data and geological profile data, and reasonably infer the spatial distribution law of each stratum through geological interpretation. On the basis of stratigraphic sequence interface identification, system domain interface identification, parasequence division and comparison, and establishment of a sequence stratigraphic framework, obtain the plane distribution and vertical evolution characteristics of different sedimentary system types in the region; Step 4: Establish a stratigraphic sequence using the stratigraphic sequence model map obtained in step 3, number all strata, and form a complete stratigraphic sequence table for the modeling area; Step 5, loading the data obtained in step 4 into the modeling software to generate the stratigraphic plane and the fault plane, and manually processing the intersection relationship between the stratigraphic plane and the fault plane; Step six, based on the stratigraphic plane and fault plane generated in step five, the geological body is generated based on the TIN-GTP hybrid algorithm, and finally a three-dimensional geological model of the coal mine under complex geological conditions is constructed.

2. The three-dimensional geological modeling method for coal mines under complex geological conditions according to claim 1, characterized in that: The step one comprises: Step 1.1, data collection: geological exploration data include geological profiles and mineral resource distribution maps; drilling data include drill core analysis, stratigraphic columnar diagrams and hydrological columnar diagrams; geophysical exploration results include electrical exploration, 3D seismic and well logging data; mining data include mining engineering plan drawings, tunnel sketches and mining exposure maps; Step 1.2, organize the above data: clean, integrate and archive the data to ensure the accuracy and completeness of the data; Step 1.3, construct the original geological database: use geographic information system software tools to spatially associate the data collected and organized above to achieve data visualization and spatial analysis.

3. The three-dimensional geological modeling method for coal mines under complex geological conditions according to claim 1, characterized in that: The second step comprises: Step 2.1, digitize the collected and organized data through GIS software tools, which is realized by scanning, vectorization, editing, and input; secondly, refer to the standard format of geological data to unify the data into coordinate system, units, and weights and measures; Step 2.2, resample the digitized stratigraphic column data, adopt the non-uniform interval sampling method, adjust the sampling interval according to the thickness of different stratigraphic layers, ensure the balance of the sampling data, and convert the stratigraphic data into a series of points with specific spatial positions and stratigraphic attributes, namely stratigraphic point cloud data; the sampling interval H of the stratigraphic data layer i i The calculation formula is: H i =(d i -d i-1 ) / n (1) Where: d i is the depth of the bottom plate of the i-th layer, and n is the number of samples in each layer; Step 2.3, encrypt the above stratum point cloud data, combine the actual geological conditions of the coal mine area, weight the surrounding known point cloud data values ​​to obtain the data value of the unknown position, and this method can predict and interpolate the surface data. The interpolation formula is: In the formula, and Z are the predicted value at the unknown point and the known value at the i-th position respectively; S0 is the position coordinates and attribute information of the unknown point; N is the number of points with obtained position coordinates and attribute information; S i is the coordinate and attribute information of the i-th position; i is the weight of the coordinates and attribute information at the ith position, that is, the lightweight spatial autocorrelation value.

4. The three-dimensional geological modeling method for coal mines under complex geological conditions according to claim 1, characterized in that: The step three comprises: Step 3.1, identification of stratigraphic sequence interfaces: Based on the three-dimensional seismic profiles, core samples and well logging curves in the geophysical exploration data, the stratigraphic sequence interfaces are determined by the discontinuous sedimentary types and characteristics of the strata, and the onlap, downlap, toplap and erosion phenomena on the stratigraphic discontinuity surfaces; Step 3.2, identification of system tract interface: Based on the initial flooding surface and the maximum flooding surface, combined with the coal seam being the product between the initial flooding surface and the maximum flooding surface, the system tract interface is determined according to the characteristics and regularity of the sedimentary system tract; Step 3.3, parasequence division and comparison: Parasequences are strata with similar sedimentary characteristics. Each coal-bearing cycle is regarded as a parasequence, and the top interface of the coal seam is regarded as the parasequence interface. By comparing the parasequence groups of different boreholes, the distribution and evolution law of the strata can be obtained. Step 3.4, establish a sequence stratigraphic model: Based on the division and comparison of sequence interfaces, system tract interfaces and parasequences determined above, divide the strata into a complete third-order sequence and establish a sequence stratigraphic model.

5. The three-dimensional geological modeling method for coal mines under complex geological conditions according to claim 1, characterized in that: The step four includes: assigning the latest stratum the number 1 according to the ascending order of stratigraphic age, and gradually increasing the number over time, and organizing the stratigraphic data required for modeling into a drilling hole position table and a stratigraphic sequence table, and organizing the fault information table according to the mining data and the stratigraphic sequence table.

6. The three-dimensional geological modeling method for coal mines under complex geological conditions as claimed in claim 5, characterized in that: The step five comprises: Step 5.1, the stratigraphic point cloud data with the same number is interpolated point by point to generate the TIN surface of each layer, and the smooth discrete interpolation algorithm DSI is used to construct the stratigraphic layer and fault surface according to the spatial topological relationship of the grid nodes; Step 5.2: Based on the intersection relationship between the fault plane and the stratigraphic plane, the stratigraphic planes on both sides of the fault plane are taken as a whole to construct a TIN surface, and the stratigraphic plane is generated using the Delaunay triangulation algorithm. Secondly, the intersection line between the stratigraphic TIN surface and the fault TIN surface is calculated, and the intersection line is the common quasi-edge line of the stratigraphic TIN surfaces on both sides of the fault TIN surface. Based on this intersection line, the quasi-edge lines of the stratigraphic TIN surfaces on both sides of the fault are adjusted according to the height of the fault to obtain their respective actual edge lines. Finally, the original triangulation is modified with the actual edge line as a constraint to generate a triangulated surface that meets the actual geological conditions.

7. The three-dimensional geological modeling method for coal mines under complex geological conditions according to claim 6, characterized in that: In step 5.1, the smooth discrete interpolation algorithm DSI regards the geological interface as a discretized discontinuous interface, and the geological points and geological exploration data are used as constraints to solve the optimal solution of the objective function, i.e., the global roughness function, to obtain the optimal geological interface that meets the constraints, including: Create a grid node Objective function of the optimal solution: In the formula, is the global roughness function, is the linear constraint violation function; To make the objective function infinitely close to the minimum value, the following two conditions must be met: Condition 1: Make the function value at any node close to the mean value of the nodes in the neighborhood of the point, that is, make the mesh nodes as smooth as possible by solving the global roughness function: Where μ(k) is the non-negative weight coefficient given on Ω, N(k) is the domain of node k, is a given weight coefficient, whose value is an integer; is the true value at node α; Condition 2, maximize the degree of linear constraint compliance, that is, minimize the violation of linear constraints, and use the violation function to perform node constraints: In the formula, is a positive coefficient, A i is an n-dimensional matrix, b i is a constant; in, represent should be as small as possible so that the relevant nodes The value of is as close to the sampled data as possible.

8. The three-dimensional geological modeling method for coal mines under complex geological conditions according to claim 1, characterized in that: The step six comprises: Step 6.1, based on the TIN surface, search for stratigraphic information in a top-down order, and generate an initial generalized triangular prism model, namely, a GTP model, by comparing and connecting the stratigraphic information between each group of three point data; Step 6.2, for areas with complex geological conditions, including stratigraphic unconformity, stratigraphic pinch-out, coal seam bifurcation, and fault cutting, the GTP model is decomposed into smaller GTP models, or degenerated into a tetrahedron TEN model and a pyramid model to ensure that the model is consistent with the actual geological phenomena; Step 6.3, by matching and fusing the fault plane expressed by TIN with the geological body expressed by GTP, a three-dimensional geological model expressed by a TIN-GTP hybrid model is constructed; Step 6.4, compare and check the constructed fault planes, geological bodies, and the cutting relationship between faults and geological bodies according to the sedimentary evolution analysis obtained in step 3, and correct and process them; Step 6.5, through all the above steps, the three-dimensional geological model of the coal mine is finally constructed.

Citation Information

Cited By

  • Method and device for realizing three-dimensional geological modeling by adopting point location layer thick grid model

    CN119152141A

  • Urban green infrastructure carbon reserve estimation method and system fused with multi-source data

    CN119624263A

  • Method and system for improving precision of transparent geologic model based on tunneling navigation data elements

    CN119832179A

  • Method and System for Improving the Accuracy of a Transparent Geological Model Based on Tunneling Navigation Data Elements

    CN119832179B

  • Entity three-dimensional geologic model creation and curve profile generation method

    CN119888106A