Construction method of deep foundation pit narrow space outer wall waterproof structure based on integrated waterproof formwork
By using integrated waterproof formwork and embedded joints in narrow spaces of deep foundation pits, combined with waterproof rolls and adhesive layer designs, the problems of waterproofing construction of exterior walls in narrow spaces of deep foundation pits are solved, and high efficiency is achieved , good quality waterproof construction.
Patent Information
- Application Number
- CN202411241753.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-11-15
AI Technical Summary
Waterproofing construction of the exterior wall of narrow space of deep foundation pit is difficult and inefficient, and the construction quality is difficult to ensure. Traditional methods have problems such as difficult formwork support and low waterproof laying efficiency.
The construction method based on integrated waterproof formwork is adopted, including the base plate cushion layer, exterior wall leveling layer and waterproof integrated construction. The integrated waterproof formwork, embossed joints and waterproof coils are used to design the connection and adhesive layer. Rapid and integrated waterproof construction.
It significantly reduces the construction difficulty, improves construction efficiency, ensures the quality of the exterior wall waterproof layer, avoids secondary construction, reduces labor and time expenditure, and improves overall construction efficiency.
Smart Images

Figure CN118958382A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of underground waterproof construction, relates to the waterproof construction technology of the outer wall of the narrow space of a deep foundation pit, and specifically relates to a construction method of the outer wall waterproof structure of the narrow space of a deep foundation pit based on an integrated waterproof template. Background Art
[0002] In urban central areas and areas with dense buildings, the foundation pit area occupies a large area of the available construction area on site. This situation is often accompanied by the existence of deep foundation pits. The construction deviation of cast-in-place piles and the narrow design construction surface make the waterproof construction of the exterior wall of the underground main structure very difficult.
[0003] After the bored pile construction is completed, according to the traditional waterproof construction process, the main structure is usually constructed first and then the exterior wall waterproofing is laid. This process often has problems such as the construction workers cannot reach the operating surface for formwork support and waterproofing, the construction period is long and the efficiency is low, and the overall construction quality of the exterior wall waterproofing and leveling layer cannot be guaranteed.
[0004] Based on this, providing a construction method for the exterior wall waterproof structure in the narrow space of a deep foundation pit, which can reduce the construction difficulty, improve the construction efficiency, and ensure the construction quality, is a technical problem that needs to be solved urgently. Summary of the invention
[0005] The purpose of the present invention is to address the shortcomings of the prior art and provide a construction method for a deep foundation pit narrow space exterior wall waterproof structure based on an integrated waterproof template, which can significantly reduce the construction difficulty of the deep foundation pit narrow space exterior wall waterproof structure, improve construction efficiency, and ensure construction quality.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solution: a construction method of a deep foundation pit narrow space exterior wall waterproof structure based on an integrated waterproof template is provided, comprising the following steps: S1. Pour concrete on the bottom slab cushion to complete the construction of the bottom slab cushion; S2. An integrated waterproof formwork is supported at the lower section of the exterior wall, wherein the integrated waterproof formwork includes a foundation formwork, a waterproof connection layer and a wedge-shaped embedded joint; the waterproof connection layer includes a vertical waterproof membrane and a horizontal waterproof layer, the vertical waterproof membrane and the foundation formwork are detachably connected, and the vertical waterproof membrane and the wedge-shaped embedded joint are fixedly connected; a leveling layer of concrete is poured in the gap between the wedge-shaped embedded joint and the exterior wall support pile, and the foundation formwork is removed to form an integrated waterproof leveling layer at the lower section; S3. Install waterproof reinforcement layers at the corners of the lower section of the exterior wall; S4, tie the steel bars and support the formwork for the leveling layer of the lower section of the exterior wall, and then pour the concrete of the bottom plate and the lower section of the exterior wall; make the vertical waterproof membrane and the wedge-shaped embedded joint extend a certain distance from the top of the concrete of the lower section of the exterior wall to form the upper embedded area; S5. Add a pad strip at the position where the top of the lower concrete section of the exterior wall contacts the upper embedded area, support an integrated waterproof formwork above the pad strip, pour the upper leveling layer concrete of the exterior wall, remove the foundation formwork and pad strip, and form an upper integrated waterproof leveling layer; S6. Carry out steel bar binding, formwork support and concrete pouring for the upper leveling layer of the outer wall, thus completing the integrated construction of the outer wall waterproof structure in the narrow space of the deep foundation pit.
[0007] The general idea of the present invention is as follows: The construction method of the exterior wall waterproof structure provided by the present invention mainly consists of two stages: the first stage mainly constructs the bottom plate and the lower section of the exterior wall, which includes the steps of bottom plate cushion construction, exterior wall leveling layer and waterproofing integrated construction, bottom plate and exterior wall lower section steel bars, formwork, concrete construction, etc.; the second stage mainly constructs the upper section of the exterior wall, which includes the steps of exterior wall leveling layer and waterproofing integrated construction, exterior wall upper section steel bars, formwork, concrete construction, etc. Aiming at the problems of difficulty, low efficiency and difficult quality guarantee in the construction of exterior wall waterproof structure in narrow space of deep foundation pit: On the one hand, the present invention introduces an integrated waterproof formwork in the two-stage construction. The integrated waterproof formwork includes a base formwork, a waterproof connection layer and a wedge-shaped embedded joint. The waterproof connection layer includes a vertical waterproof membrane and a horizontal waterproof layer. The vertical waterproof membrane and the base formwork are detachably connected, and the vertical waterproof membrane and the wedge-shaped embedded joint are fixedly connected. During the construction process, the vertical waterproof membrane and the leveling layer are formed into an integrated structure by pouring the leveling layer concrete in the gap between the wedge-shaped embedded joint and the outer wall support pile, and then the base formwork is removed, so that the integrated waterproof leveling layer can be quickly constructed.
[0008] On the other hand, the present invention optimizes and improves many details of the construction process. Among them, during the pouring construction of the concrete of the lower section of the exterior wall, the vertical waterproof membrane and the wedge-shaped embedded joint are extended out of the top of the concrete of the lower section of the exterior wall by a certain distance to form an upper embedded area, and the vertical waterproof membranes of the lower section and the upper section are overlapped in the upper embedded area, thereby strengthening the waterproof structure of the construction node and improving the overall waterproof effect; a waterproof reinforcement layer is added at the corners to improve the overall construction quality of the waterproof layer of the base plate exterior wall; a pad is added at the position where the top of the lower section of the exterior wall contacts the upper embedded area, and an integrated waterproof formwork is supported above the pad, and the deformation of the pad is used to level the waterproof nodes of the upper and lower sections of the exterior wall, which not only ensures the flatness and verticality of the integrated waterproof formwork, but also prevents the waterproof membrane from leaking from the root of the formwork during concrete construction and contaminating it.
[0009] Based on the above-mentioned construction method, the present invention reduces the construction difficulty of waterproofing the basement floor and exterior wall in the narrow space of a deep foundation pit through the integrated construction of the basement floor and exterior wall, the use of an integrated waterproof template, and the optimization and adjustment of multiple construction details, effectively ensuring the construction quality of the exterior wall waterproof layer, avoiding secondary construction, reducing manpower and time costs, and significantly improving the overall construction efficiency, providing an effective solution for construction in the narrow space of a deep foundation pit.
[0010] Furthermore, for the construction in the narrow space of deep foundation pit, by pouring concrete in the gap between the outer wall and the supporting piles, compared with the traditional spray anchor method, its strength can be greatly increased, and the process can be reduced, the construction process is simplified, and only one-side formwork needs to be supported during the outer wall construction. The whole construction process is intuitive and highly operational, which can greatly shorten the construction time and effectively reduce the waste of resources.
[0011] Furthermore, in the integrated waterproof formwork, the base formwork is made of wood material, and preferably, the base formwork has a length of 1500-2000 mm, a width of 800-1000 mm, and a thickness of 10-15 mm. The base formwork made of wood material has the advantages of light weight, easy use, and multiple turnover, which is conducive to the rapid construction of the exterior wall waterproof structure.
[0012] Furthermore, in the integrated waterproof template, the wedge-shaped embedded joint is made of heat-resistant silicone material, with a length of 3-5 cm, a front end radius of 7-8 mm, and a rear end radius of 4-5 mm. Preferably, the wedge-shaped embedded joint is fixedly connected to the vertical waterproof coiled material by hot melting. The wedge-shaped embedded joint made of heat-resistant silicone material has the advantages of being light in weight and not easy to fall off.
[0013] Furthermore, the waterproof connection layer and the waterproof reinforcement layer of the integrated waterproof formwork are both made of SBS waterproof membrane. SBS waterproof membrane has good advantages such as high temperature resistance, puncture resistance, and tear resistance. The common SBS waterproof membrane has a length of 10m or 15m, a width of 1m, and a thickness of 3-5mm. Specifically, it is cut or customized according to the size required for construction.
[0014] Furthermore, a first adhesive layer is provided at the part where the waterproof connection layer contacts the foundation formwork; the viscosity of the first adhesive layer is reduced or loses its viscosity under the action of the hydration heat of pouring the leveling layer concrete. Preferably, the first adhesive layer uses glue that easily loses its viscosity at high temperatures, including: thermosensitive glue, polymer adhesive, latex, etc. After pouring the leveling layer concrete, the hydration heat generated by the concrete is used to make the glue lose its viscosity, thereby facilitating the removal of the foundation formwork.
[0015] Furthermore, a second adhesive layer is provided on the surface of the waterproof connection layer at the corners, and a third adhesive layer matching the second adhesive layer is provided on the back of the corner reinforcement layer. During the construction of the corner waterproof reinforcement layer, the double-layer adhesive structure formed by the second adhesive layer and the third adhesive layer is used to achieve a firm adhesion of the corner waterproof reinforcement layer, thereby ensuring the waterproof effect at the corners.
[0016] Preferably, the second adhesive layer and the third adhesive layer can use double-sided tape that is not sensitive to temperature. During the construction of the waterproof reinforcement layer at the corners, the protective layer on the surface of the adhesive layer can be torn off to paste the waterproof reinforcement layer. This is convenient and quick. This method can ensure the flatness and straightness of the waterproof reinforcement layer and improve the overall construction quality of the base plate exterior wall waterproof layer.
[0017] Furthermore, in step S4, the height of the upper pre-embedded area is 50-100 mm.
[0018] Furthermore, in step S5, in the integrated waterproof formwork, an overlap area is provided at the bottom of the vertical waterproof membrane, which is highly matched with the upper embedded area, and the back of the overlap area is sticky and no wedge-shaped embedded joint is provided.
[0019] Preferably, the thickness of the lower section vertical waterproof membrane located in the upper embedded area is 1 / 2-2 / 3 of the total thickness of the vertical waterproof membrane, and the thickness of the upper section vertical waterproof membrane located in the overlapping area is 1 / 3-1 / 2 of the total thickness of the vertical waterproof membrane. The total thickness after overlapping is consistent with the vertical waterproof membrane.
[0020] Furthermore, in step S5, the pad is made of sponge rubber material. Sponge rubber material is a porous elastic body, which is placed in the connection gap between the upper integrated waterproof formwork of the exterior wall and the lower exterior wall. It is squeezed and deformed under the action of the gravity of the foundation formwork, which can not only achieve leveling at the waterproof node of the upper and lower sections of the exterior wall, but also seal the connection gap between the upper and lower sections of the exterior wall. It prevents the concrete from leaking from the base of the formwork and contaminating the waterproof membrane during the pouring of the leveling layer concrete, thereby improving the construction quality.
[0021] Compared with the prior art, the present invention has the following beneficial effects: (1) The present invention provides a construction method for an external wall waterproof structure in a narrow space of a deep foundation pit based on an integrated waterproof template. The integrated waterproof template is used. Through the one-time molding process of the waterproof layer and the leveling layer, the cumbersome working procedures can be effectively reduced, and the problems of low efficiency in the connection process between the leveling layer and the waterproof layer and difficulty in protecting the waterproof layer during construction in the traditional construction process are solved. The method effectively ensures the integrity of the construction of the external wall waterproof layer and the leveling layer, solves the problem of insufficient working surface in the narrow space of the deep foundation pit, and the construction is efficient and the overall construction quality is guaranteed.
[0022] (2) The present invention provides a construction method for a deep foundation pit narrow space exterior wall waterproof structure based on an integrated waterproof formwork. In the construction of the exterior wall lower section waterproof structure, the vertical waterproof membrane and the wedge-shaped embedded joint are extended a certain distance from the top of the lower section exterior wall to form an upper section embedded area. The waterproof structure of the construction node is strengthened by overlapping the waterproof membrane of the lower section and the upper section, thereby improving the overall waterproof effect.
[0023] (3) The present invention provides a construction method for a deep foundation pit narrow space exterior wall waterproof structure based on an integrated waterproof formwork. Pads are used for leveling at the waterproof nodes of the upper and lower sections of the exterior wall. This not only ensures the flatness and verticality of the integrated waterproof formwork, but the pads also play a certain protective role, which can prevent the waterproof membrane from leaking from the root of the formwork during concrete construction. By adopting this integrated leveling layer and waterproof layer approach, the construction quality of the exterior wall waterproofing is effectively guaranteed, secondary construction is avoided, the cost of manpower and time is reduced, and the overall construction efficiency is greatly improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 A schematic flow chart of a construction method of an external wall waterproof structure in a narrow space of a deep foundation pit based on an integrated waterproof template provided in Example 1 of the present invention; Figure 2 This is a structural schematic diagram of the construction of the waterproof structure of the lower section of the exterior wall in Example 1 of the present invention; Figure 3 This is a schematic diagram of the structure of the external wall and the supporting piles in Example 1 of the present invention; Figure 4 This is a schematic diagram of the structure of the integrated waterproof template in Example 1 of the present invention; Figure 5 This is a schematic diagram of the waterproof structure at the corners in Example 1 of the present invention; Figure 6 This is a structural schematic diagram of the construction at the upper and lower waterproof nodes of the exterior wall in Example 1 of the present invention; Figure 7 This is a structural schematic diagram of the construction of the upper waterproof structure of the exterior wall in Example 1 of the present invention; Figure 8 A cross-sectional view of the outer wall waterproof structure of a narrow space in a deep foundation pit provided in Example 1 of the present invention; Among them, 1-exterior wall; 2-support piles; 3-integrated waterproof formwork; 31-foundation formwork; 32-waterproof connection layer; 321-vertical waterproof membrane; 322-horizontal waterproof layer; 33-wedge-shaped embedded joints; 4-support members; 5-integrated waterproof leveling layer; 6-corner waterproof reinforcement layer; 7-bottom plate cushion layer; 8-rebar; 9-casting formwork; 10-waterstop steel plate; 11-cushion strips; 12-lower section vertical waterproof membrane; 13-upper section vertical waterproof membrane. DETAILED DESCRIPTION
[0025] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0026] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0027] The present invention will be further described below in conjunction with specific embodiments, but the present invention is not limited thereto.
[0028] Example 1 This embodiment provides a construction method for a deep foundation pit narrow space exterior wall waterproof structure based on an integrated waterproof template, and its flow chart is as follows: Figure 1 As shown, the construction method comprises the following steps: Step 1: After the foundation pit site is leveled, concrete is poured on the bottom slab cushion according to the design requirements to complete the construction of the bottom slab cushion; Step 2: If Figure 2 As shown, an integrated waterproof formwork 3 is supported at the lower section of the exterior wall, a leveling layer of concrete is poured between the gap between the wedge-shaped embedded joint and the exterior wall support pile, and the foundation formwork is removed to form an integrated waterproof leveling layer at the lower section; Among them, the structure of the outer wall 1 and the supporting pile 2 is as follows Figure 3 As shown, the structure of the integrated waterproof template 3 is as follows Figure 4 The integrated waterproof template includes a base template 31, a waterproof connection layer 32 and a wedge-shaped embedded joint 33; the waterproof connection layer 32 includes a vertical waterproof coiled material 321 and a horizontal waterproof layer 322, the vertical waterproof coiled material 321 and the base template 31 are detachably connected, and the vertical waterproof coiled material 321 and the wedge-shaped embedded joint 33 are fixedly connected; Step 3: After the integrated waterproof leveling layer 5 is constructed, a Yin-Yang corner waterproof reinforcement layer 6 is set at the Yin-Yang corners of the lower section of the exterior wall. Figure 5 As shown; Step 4: Tie the steel bars and support the formwork for the leveling layer of the lower section of the exterior wall, and then pour the concrete of the bottom plate and the lower section of the exterior wall; make the vertical waterproofing membrane and the wedge-shaped embedded joint extend a certain distance from the top of the concrete of the lower section of the exterior wall to form the upper embedded area; Step 5: Add a pad 11 at the position where the top of the lower concrete of the exterior wall contacts the upper embedded area, support an integrated waterproof formwork above the pad 11, pour the upper leveling layer concrete of the exterior wall, remove the basic formwork and pads, and form an integrated waterproof leveling layer of the upper section; the partial enlarged picture of the waterproof node is shown in the figure below. Figure 6As shown in the figure, the construction diagram of the integrated waterproof leveling layer on the upper part of the exterior wall is as follows Figure 7 As shown; Step 6: Tie the steel bars, support the formwork and pour the concrete for the upper leveling layer of the outer wall, thus completing the integrated construction of the outer wall waterproof structure in the narrow space of the deep foundation pit. The cross-section of the outer wall waterproof structure is shown in the figure below. Figure 8 shown.
[0029] Example 2 This embodiment provides a construction method for a waterproof structure of an outer wall in a narrow space of a deep foundation pit based on an integrated waterproof formwork, and the construction process is basically the same as that of Embodiment 1. Specifically, the relevant information of the integrated formwork and the waterproof reinforcement layer at the corners used in this embodiment is as follows: The foundation formwork is made of wood material, with a length of 1830 mm, a width of 915 mm and a thickness of 13 mm. The foundation formwork made of wood material has the advantages of light weight, easy use, and multiple turnover, which is conducive to the rapid construction of the exterior wall waterproof structure.
[0030] The wedge-shaped embedded joint is made of high temperature resistant silicone material, with a length of 4cm, a front radius of 7.5mm, and a rear radius of 4.5mm. The wedge-shaped embedded joint is fixedly connected to the vertical waterproof membrane by hot melting.
[0031] The waterproof connection layer is made of 3mm thick SBS waterproof membrane, which has the advantages of good high temperature resistance, puncture resistance, tear resistance, etc. In this embodiment, according to the reserved dimensions of the foundation template, the base plate and the upper embedded area, the SBS waterproof membrane of appropriate size is cut for construction.
[0032] In the integrated waterproof formwork, the first adhesive layer is provided at the part where the waterproof connection layer contacts the base formwork. The first adhesive layer uses glue that easily loses its viscosity at high temperatures, including: thermosensitive glue, polymer adhesive, latex, etc. After pouring the leveling layer concrete, the hydration heat generated by the concrete is used to make the glue lose its viscosity or reduce its viscosity, thereby facilitating the removal of the base formwork.
[0033] The waterproof reinforcement layer at the corners is made of the same SBS waterproof membrane as the waterproof connecting layer. A second adhesive layer is provided on the surface of the waterproof connecting layer at the corners, and a third adhesive layer is provided on the back of the corner reinforcement layer. Both the second adhesive layer and the third adhesive layer adopt a double-sided adhesive structure that is not sensitive to temperature. During the construction of the waterproof reinforcement layer at the corners, the protective layer on the surface of the adhesive layer is torn off, so that the second adhesive layer and the third adhesive layer form a double-layer adhesive structure, thereby achieving firm adhesion of the waterproof reinforcement layer at the corners and improving the waterproof effect at the corners.
[0034] In this embodiment, by optimizing and adjusting the materials, connection relationships, and waterproof reinforcement layers at the corners of the integrated formwork during the construction process, the operability and convenience of the construction process are improved, the construction efficiency is improved, and the waterproof performance at the corners is improved, thereby better meeting the needs of rapid construction of exterior wall waterproof structures in narrow spaces of deep foundation pits.
[0035] Example 3 This embodiment provides a construction method for a waterproof structure of an outer wall in a narrow space of a deep foundation pit based on an integrated waterproof template. The construction process and the structure of the integrated waterproof template are basically the same as those in Example 2. Specifically, based on Example 2, this embodiment optimizes and adjusts the construction details at the waterproof node between the lower section and the upper section as follows: In step 4, after the concrete pouring of the lower section of the exterior wall is completed, the height of the vertical waterproofing membrane 12 in the upper embedded area exceeds the concrete of the lower section of the exterior wall by 80 mm, and the thickness of the lower section vertical waterproofing membrane 12 located in the upper embedded area is 2 mm. Accordingly, in the integrated waterproof formwork used in the construction of the upper waterproof structure of the exterior wall in step 5, there is an overlapping area with a height of 80 mm at the bottom of the upper section vertical waterproofing membrane 13 (with a thickness of 1 mm and a sticky back surface and no wedge-shaped embedded joint), which is used to overlap with the embedded area of the lower section vertical waterproofing membrane 12, realize the overall connection of the vertical waterproofing membrane, and maintain the consistency of the thickness of the waterproof layer of the upper and lower sections of the wall.
[0036] In step 5, the cushion strip 11 is made of sponge rubber material, such as Figure 6 As shown, a pad 11 made of sponge rubber material is placed in the connecting gap between the cast concrete of the lower section of the exterior wall and the bottom of the integrated waterproof formwork of the upper section of the exterior wall. The pad is squeezed and deformed under the action of the gravity of the foundation formwork, which can not only achieve leveling at the waterproof nodes of the upper and lower sections of the exterior wall, but also fill and seal the connecting gaps of the upper and lower sections of the exterior wall, preventing the concrete from leaking from the root of the formwork and contaminating the waterproof membrane during the pouring of the concrete of the leveling layer of the upper section of the exterior wall.
[0037] In this embodiment, by reserving a certain height of vertical waterproofing coiled material and a wedge-shaped embedded joint in the construction of the lower waterproof structure of the exterior wall, and overlapping with the vertical waterproofing coiled material in the subsequent exterior wall upper waterproof structure, the continuity and integrity of the vertical waterproof material are ensured, and the waterproof performance of the upper and lower construction nodes is improved. The pads made of porous elastomer play the role of leveling, filling gaps and protecting waterproofing coiled materials during the construction of the upper exterior wall. After the upper leveling layer is poured, it is removed together with the foundation template, which is simple and quick to operate. This method effectively ensures the integrity of the construction of the exterior wall waterproof layer and the leveling layer, solves the problem of insufficient working surface in the narrow space of the deep foundation pit, and has efficient construction and guaranteed overall construction quality.
[0038] The above are only preferred embodiments of the present invention, and are not intended to limit the implementation methods and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the contents of the specification of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction method for a waterproof structure of an exterior wall in a narrow space of a deep foundation pit based on an integrated waterproof formwork, characterized in that: The following steps are involved: S1. Pour concrete on the bottom slab cushion to complete the construction of the bottom slab cushion; S2. An integrated waterproof formwork is provided at the lower section of the exterior wall, wherein the integrated waterproof formwork comprises a base formwork, a waterproof connection layer and a wedge-shaped embedded joint; The waterproof connection layer includes a vertical waterproof membrane and a horizontal waterproof layer. The vertical waterproof membrane and the foundation formwork are detachably connected, and the vertical waterproof membrane and the wedge-shaped embedded joint are fixedly connected. The leveling layer concrete is poured in the gap between the wedge-shaped embedded joint and the external wall support pile, and the foundation formwork is removed to form an integrated waterproof leveling layer in the lower section. S3. Install waterproof reinforcement layers at the corners of the lower section of the exterior wall; S4, tie the steel bars and support the formwork for the leveling layer of the lower section of the exterior wall, and then pour the concrete of the bottom plate and the lower section of the exterior wall, so that the vertical waterproof membrane and the wedge-shaped embedded joint extend a certain distance from the top of the concrete of the lower section of the exterior wall to form the upper embedded area; S5. Add a pad strip at the position where the top of the lower concrete section of the exterior wall contacts the upper embedded area, support an integrated waterproof formwork above the pad strip, pour the upper leveling layer concrete of the exterior wall, remove the foundation formwork and pad strip, and form an upper integrated waterproof leveling layer; S6. Carry out steel bar binding, formwork support and concrete pouring for the upper leveling layer of the outer wall, thus completing the integrated construction of the outer wall waterproof structure in the narrow space of the deep foundation pit.
2. The construction method according to claim 1, characterized in that: In the integrated waterproof formwork, the base formwork is made of wood material, and has a length of 1500-2000 mm, a width of 800-1000 mm, and a thickness of 10-15 mm.
3. The construction method according to claim 1, characterized in that: In the integrated waterproof template, the wedge-shaped embedded joint is made of high-temperature resistant silicone material, with a length of 3-5 cm, a front end radius of 7-8 mm, and a rear end radius of 4-5 mm.
4. The construction method according to claim 3, characterized in that: The wedge-shaped embedded joint is fixedly connected to the vertical waterproof coiled material by hot melting.
5. The construction method according to claim 1, characterized in that: The waterproof connection layer and the waterproof reinforcement layer of the integrated waterproof template are made of SBS waterproof membrane.
6. The construction method according to claim 1, characterized in that: In the integrated waterproof formwork, a first adhesive layer is provided at a portion where the waterproof connection layer contacts the base formwork; the viscosity of the first adhesive layer is reduced or loses its viscosity under the action of hydration heat during pouring of the leveling layer concrete.
7. The construction method according to claim 1, characterized in that: A second adhesive layer is arranged on the surface of the waterproof connection layer arranged at the corners, and a third adhesive layer matching the second adhesive layer is arranged on the back of the corner waterproof reinforcement layer.
8. The construction method according to claim 1, characterized in that: In step S4, the height of the upper pre-embedded area is 50-100 mm.
9. The construction method according to claim 1, characterized in that: In step S5, in the integrated waterproof formwork, an overlap area is provided at the bottom of the vertical waterproof membrane, which is highly matched with the upper embedded area, and the back of the overlap area is sticky and no wedge-shaped embedded joint is provided.
10. The construction method according to claim 1, characterized in that: In step S5, the cushion strip is made of sponge rubber material.