Water jet cutting path planning method and system

Through the waterjet cutting path planning method, a rock breaking database was constructed and the motion posture of the boring machine and cantilever was optimized, which solved the problem of low cutting efficiency of the cantilever boring machine in high-strength rock mass and the difficulty of the double cantilever coordinated cooperation, achieving efficient breaking Rock and tunnel excavation.

CN118958973AActive Publication Date: 2024-11-15SHANDONG UNIV

Patent Information

Application Number
CN202411023265.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-15
Estimated Expiration
2044-07-29

AI Technical Summary

Technical Problem

When facing high-strength and highly abrasive rocks, the cutting efficiency is low, the tool wear is severe, and the construction progress is slow. In addition, the dual-cantilever high-pressure water jet boom machine has difficulty in cooperating, the optimal cutting order and path. Problems of difficulty in planning and complex real-time regulation of cutting parameters.

Method used

The waterjet cutting path planning method is adopted to construct a rock breaking database, screen the optimal cutting path, and combine environmental maps and cantilever action posture planning to optimize the action posture of the boring machine and cantilever to achieve high-efficiency rock breaking in the coordinated and efficient rock breaking in the double cantilever.

Benefits of technology

It improves rock breaking efficiency, shortens construction period, reduces construction costs, ensures no interference between the coordinated operations of double cantilevers, and achieves efficient rock mass breaking and efficient tunnel excavation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958973A_ABST
    Figure CN118958973A_ABST
Patent Text Reader

Abstract

The invention discloses a water jet cutting path planning method and system. The method comprises the steps that a rock breaking database is constructed according to historical water jet cutting data; rock mass information in the pre-cutting process of the rock mass is obtained, and an optimal cutting path is screened in the rock breaking database according to the rock mass information; in the cutting process with the optimal cutting path, an environment map is generated according to the obtained environment data, the target position and the obstacle position are determined in the environment map, and the heading machine is controlled to execute the machine body action before cutting by combining the current machine body pose of the heading machine and planning the machine body action path; and according to the current pose of the cantilever, the target position, the obstacle position and the cantilever movement parameters, the cantilever action posture is planned, and according to the set cantilever safety distance during double-cantilever cross cooperative operation, the cantilever action posture is fed back and optimized. The optimal cutting path of the high-pressure water jet is planned, and the action postures of the heading machine and the cantilevers are planned, so that efficient rock breaking through cooperation of the double cantilevers is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunneling devices, and in particular to a water jet cutting path planning method and system. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] At present, most of the coal, rock and coal-rock tunnel boring machines in use are cantilever type tunnel boring machines, which integrate cutting, walking, transportation, dust reduction and other functions, and have high tunneling efficiency. However, when facing high-strength and highly abrasive rock masses, cantilever tunnel boring machines have problems such as low cutting efficiency, severe tool wear, and slow construction progress, which increase the cost of tunnel construction. To solve the above problems, the abrasive water jet-assisted tunnel boring machine double cantilever tunneling solution can improve excavation efficiency, reduce construction costs, and shorten construction period.

[0004] High-pressure abrasive water jet accelerates abrasive particles by ultra-high-speed water flow, and cuts and crushes rocks by the impact of abrasive particles. It has the advantages of low cost, good environmental applicability, high efficiency and dust-free. However, the current new technology of dual-cantilever high-pressure water jet tunnel boring machine also has many unresolved control problems, such as the difficulty of dual-cantilever coordination, the difficulty of optimal cutting order and path planning, and the complexity of real-time control of cutting parameters. Summary of the invention

[0005] In order to solve the above problems, the present invention proposes a water jet cutting path planning method and system to realize the planning of the optimal cutting path of the high-pressure water jet. At the same time, through the planning of the action posture of the tunnel boring machine and the cantilever, the dual cantilever coordinated and efficient rock breaking is achieved, thereby improving the rock breaking efficiency.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] In a first aspect, the present invention provides a water jet cutting path planning method, comprising:

[0008] A rock breaking database is constructed based on historical water jet cutting data; the rock breaking database includes cutting strategies for multiple jet parameter combinations under different rock mass conditions;

[0009] Obtain rock mass information during pre-cutting of the rock mass, and select the optimal cutting path in the rock breaking database based on the rock mass information;

[0010] During the cutting process with the optimal cutting path, an environmental map is generated based on the acquired environmental data, and the target position and obstacle position are determined in the environmental map. Combined with the current body posture of the tunnel boring machine, the body movement path is planned to control the body movement of the tunnel boring machine before cutting. The cantilever movement posture is planned according to the current cantilever posture, the target position and obstacle position in the environmental map, and the cantilever movement parameters, and the cantilever movement posture is optimized based on the set cantilever safety spacing when the double cantilevers work in cross-cooperation.

[0011] As an optional embodiment, the jet parameters include pump pressure, target distance, abrasive concentration, nozzle parameters and traverse speed.

[0012] As an optional implementation method, the cutting strategy includes a cutting mode and an optimal cutting path; the cutting mode includes: when the strength and hardness of the rock mass are within a set range, linear, curved or point cutting is selected; when the strength and hardness of the rock mass exceed the set limit, grid cutting is used.

[0013] As an optional implementation, the environmental data includes object images, obstacle data and three-dimensional environmental data, the target object is obtained based on object image recognition, an environmental map is generated based on the three-dimensional environmental data, and the position of the target object and the obstacle are determined based on the environmental map.

[0014] As an optional implementation, the process of acquiring the posture of the tunnel boring machine body and the cantilever includes: constructing a spatial posture detection coordinate system, measuring the posture of the body or the cantilever, and describing the posture with offset angle, pitch angle, roll angle, horizontal offset displacement and vertical offset displacement.

[0015] As an optional implementation, the cantilever movement parameters are determined from the optimal cutting path obtained by screening, and the cantilever movement parameters include the cantilever movement path and movement speed.

[0016] As an optional implementation, a cantilever safety spacing is set when dual cantilever cross-cooperation is carried out. According to the feedback of dual cantilever spacing and moving speed, if it is judged that the dual cantilever spacing exceeds the cantilever safety spacing or the moving speed exceeds the set threshold, the cantilever movement posture is adjusted.

[0017] In a second aspect, the present invention provides a water jet cutting path planning system, comprising:

[0018] A database construction module is configured to construct a rock breaking database based on historical water jet cutting data; the rock breaking database includes cutting strategies of multiple jet parameter combinations under different rock mass conditions;

[0019] A path screening module is configured to obtain rock mass information during the pre-cutting process of the rock mass, and screen an optimal cutting path in the rock breaking database according to the rock mass information;

[0020] The motion planning module is configured to generate an environmental map based on the acquired environmental data during the cutting process with the optimal cutting path, and determine the target position and obstacle position in the environmental map, so as to plan the body movement path in combination with the current body posture of the tunnel boring machine, and control the body movement of the tunnel boring machine before cutting; plan the cantilever movement posture according to the current cantilever posture, the target position and obstacle position in the environmental map and the cantilever movement parameters, and feedback and optimize the cantilever movement posture according to the set cantilever safety spacing when the double cantilever is cross-cooperatively operated.

[0021] In a third aspect, the present invention provides an electronic device comprising a memory and a processor, and computer instructions stored in the memory and executed on the processor, wherein when the computer instructions are executed by the processor, the method described in the first aspect is performed.

[0022] In a fourth aspect, the present invention provides a computer-readable storage medium for storing computer instructions, wherein when the computer instructions are executed by a processor, the method described in the first aspect is performed.

[0023] In a fifth aspect, the present invention provides a computer program product, comprising a computer program, which, when executed by a processor, implements the method described in the first aspect.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] The present invention proposes a water jet cutting path planning method and system. By constructing a rock breaking database containing multi-jet parameter combination cutting strategies under different rock conditions, the optimal cutting path and the corresponding optimal parameter combination can be directly called according to the rock information fed back from the pre-cutting process. The optimal cutting path also includes the optimal cutting order, thereby realizing the regulation of jet cutting parameters and completing the planning of the optimal path of the high-pressure water jet.

[0026] The present invention proposes a water jet cutting path planning method and system. In the process of cutting with the optimal cutting path, by planning the body movement path and cantilever action posture of the tunnel boring machine, and according to the set cantilever safety spacing when the double cantilevers work in cross-cooperation, feedback is given to optimize the cantilever action posture, so as to realize the double cantilever collaborative and efficient rock breaking, ensure that the double cantilever collaborative operation does not interfere with each other, realize efficient rock crushing and efficient tunnel excavation, improve rock breaking efficiency, and shorten construction period.

[0027] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0029] Figure 1 A schematic diagram of a double-cantilever high-pressure water jet tunnel boring machine provided in Example 1 of the present invention;

[0030] Figure 2 A schematic diagram of a nozzle installation slot provided in Example 1 of the present invention;

[0031] Figure 3 A flow chart of a water jet cutting path planning method provided in Example 1 of the present invention;

[0032] Figure 4 This is a schematic diagram of the tunnel face construction provided in Example 1 of the present invention. DETAILED DESCRIPTION

[0033] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0034] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0035] It should be noted that the terms used herein are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that the terms "include" and "comprise" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0036] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.

[0037] Example 1

[0038] The high-pressure water jet assisted cantilever roadheader used in this embodiment has two cantilever structures, namely a mechanical cutting head cantilever equipped with a cutting head and a high-pressure water jet cantilever equipped with a high-pressure water jet operating mechanism. The water jet is located at the nozzle mounting groove of the high-pressure water jet cantilever. The working position of the water jet is controlled by controlling the high-pressure water jet cantilever. Figure 1-Figure 2 shown.

[0039] The principle of the combined construction is: first, a high-pressure water jet cantilever is used to cut at the face and crack the rock mass to reduce its compressive strength; then the cutting head penetrates into the fractured rock mass, the slag falls off, and the rock excavation is completed.

[0040] Among them, the cantilever structure that controls the movement of the high-pressure water jet can move around the cutting head and its cutting arm, so that the water jet and the cutting head can work synchronously, that is, after the water jet finishes cutting the rock mass, the cutting head immediately penetrates the rock mass, greatly improving construction efficiency.

[0041] Therefore, if Figure 3 As shown, this embodiment provides a water jet cutting path planning method, including:

[0042] A rock breaking database is constructed based on historical water jet cutting data; the rock breaking database includes cutting strategies for multiple jet parameter combinations under different rock mass conditions;

[0043] Obtain rock mass information during pre-cutting of the rock mass, and select the optimal cutting path in the rock breaking database based on the rock mass information;

[0044] During the cutting process with the optimal cutting path, an environmental map is generated based on the acquired environmental data, and the target position and obstacle position are determined in the environmental map. Combined with the current body posture of the tunnel boring machine, the body movement path is planned to control the body movement of the tunnel boring machine before cutting. The cantilever movement posture is planned according to the current cantilever posture, the target position and obstacle position in the environmental map, and the cantilever movement parameters, and the cantilever movement posture is optimized based on the set cantilever safety spacing when the double cantilevers work in cross-cooperation.

[0045] Specifically, in this embodiment, first, a rock breaking database of high-pressure abrasive water jet is established based on a large number of indoor experiments; then, after adjusting the posture of the double-cantilever tunnel boring machine, pre-cutting of the heading face is carried out; and then, the rock information fed back during the pre-cutting process is combined with the rock breaking database to obtain the optimal cutting path of the double-cantilever tunnel boring machine; in the process of cutting with the optimal cutting path, the posture and cutting of the double cantilever are controlled in real time through the intelligent collaborative control system, so as to realize efficient collaborative control of the double cantilever and real-time intelligent regulation of water jet cutting parameters, and provide basic support for the automation, intelligence, informatization and unmanned development of the double-cantilever tunnel boring machine.

[0046] The method of this embodiment is described in detail below.

[0047] In this embodiment, the rock breaking database is: through a lot of preliminary work, the lithology and other physical parameters of various rocks are collected as comprehensively as possible and water jet cutting tests are carried out, including but not limited to rock color, texture, strength, hardness and rock breaking effects under different jet parameters. The data is then input into an artificial neural network for training, so as to derive cutting strategies under multiple jet parameter combinations under various typical rock conditions, including cutting patterns and optimal cutting paths, and the optimal cutting path includes the optimal cutting order.

[0048] The jet parameters include but are not limited to: pump pressure, target distance, abrasive concentration, nozzle parameters, traverse speed, etc.

[0049] Among them, the cutting modes include: when the strength and hardness of the rock mass are within the set range, linear, curved or point cutting is selected; when the strength and hardness exceed the set limit, grid cutting is adopted, such as Figure 4 shown.

[0050] In this embodiment, the pre-cutting is: using conventional jet parameters to perform abrasive water jet pre-cutting, and using a camera to capture the distribution characteristics of rock samples on the face, and comparing them with the rock information in the rock breaking database, and based on the comparison results between the pre-cutting results and the rock breaking database, the optimal cutting path of the cantilever on the face is intelligently selected.

[0051] The following is an introduction to the tunnel boring machine's body motion planning and cantilever motion planning.

[0052] In this embodiment, environmental data is acquired through an environmental perception component, the environmental data includes object images, obstacle data and three-dimensional environmental data, and the environmental perception component includes a pan-tilt camera, a three-dimensional laser radar and a solid-state laser radar;

[0053] Among them, the gimbal camera is used to capture object images and send the object images to the processor; the three-dimensional laser radar is used to obtain three-dimensional environmental data and send the three-dimensional environmental data to the processor; the solid-state laser radar is used to obtain obstacle data and send the obstacle data to the processor.

[0054] The processor obtains the target object based on the object image recognition; generates an environmental map based on the three-dimensional environmental data, and determines the position of the target object based on the environmental map; plans the body movement path of the double-cantilever tunneling machine based on the environmental map, the position of the target object and the position of the obstacle, combined with the current body posture of the double-cantilever tunneling machine, and generates control instructions according to the body movement path of the double-cantilever tunneling machine after planning and zoning the tunnel face, so as to control the double-cantilever tunneling machine to execute the body movement before cutting, so as to control the double-cantilever tunneling machine to reach the target position and effectively avoid obstacles.

[0055] It can be understood that the conventional path planning algorithm can be used for the planning algorithm of the body movement path of the dual-cantilever tunnel boring machine, and no further details will be given here.

[0056] In this embodiment, the process of acquiring the body posture of the dual-cantilever tunnel boring machine includes: constructing a spatial posture detection coordinate system, measuring the body posture based on a double-cross laser instrument, and describing the body posture in the tunnel with five parameters: offset angle α, pitch angle β, roll angle γ, horizontal offset displacement Δx, and vertical offset displacement Δz. Therefore, based on the acquired body posture, the planning of the body movement path of the tunnel boring machine in the tunnel is completed based on the environmental data collected by the environmental perception component.

[0057] In this embodiment, after the optimal cutting path is screened, the cantilever movement parameters can be determined, including the cantilever movement path and movement speed, that is, the water jet and cutting head cutting path and traverse speed. The data comes from the rock breaking database, which contains the experimental advantage parameter combination for specific rocks.

[0058] Therefore, the cantilever motion posture is planned according to the cantilever's current posture, the target object position and obstacle position in the environment map, and the cantilever movement parameters.

[0059] Among them, the movement postures of the mechanical cutting head cantilever and the high-pressure water jet cantilever are planned separately here to control the movement of the two cantilevers.

[0060] Among them, the acquisition process of the position and posture of the mechanical cutting head cantilever and the high-pressure water jet cantilever is consistent with the acquisition process of the fuselage position and posture of the double-cantilever tunneling machine, which will not be repeated here.

[0061] At the same time, the safe distance between the cantilevers during cross-cooperative operation of the dual cantilevers is defined, and the distance between the dual cantilevers and the moving speed are fed back in real time. If it is judged that the distance between the dual cantilevers exceeds the safe distance between the cantilevers or the moving speed exceeds the set threshold, the cantilever movement posture is adjusted in time to achieve efficient cutting and ensure that the dual cantilever collaborative operation does not interfere with each other.

[0062] In this embodiment, the cutter head position of the high-pressure water jet cantilever can also be equipped with a particle jet nozzle, a laser head, a slurry jet nozzle, a microwave generator, etc. according to actual needs, and the control system reserves a corresponding multi-functional control module to achieve a combination of multiple new technologies to meet the needs of efficient rock breaking.

[0063] In this embodiment, the method also includes fault diagnosis of the double cantilever action posture, and can monitor the abnormal state of the equipment in real time. Based on the jet flowmeter pressure sensor, it can monitor sand blockage, water leakage, machine jamming and other fault problems in real time; based on the stress state of the double cantilever, it can judge in real time whether the cantilever operation is abnormal. When the force direction deviates from the normal stress state, the emergency stop alarm state is turned on. After the fault is eliminated, the emergency stop state is manually released to continue operation; the joint state information of the double cantilever is obtained through the encoder, and the virtual reality posture image of the double cantilever is generated and displayed according to the received joint state information and the preset three-dimensional model of the double cantilever tunneling machine through the virtual reality component, thereby controlling the cantilever movement and providing support for cantilever fault detection.

[0064] In this embodiment, the method also has functional modules such as lighting, gas detection, and early warning. Signal processing is performed in a programmable computer controller through bus control, and then key information is fed back in the human interaction interface. At the same time, instructions are sent to the tunnel boring machine execution device to achieve efficient rock breaking.

[0065] The present embodiment relates to a water jet cutting path planning method for a double-cantilever high-pressure water jet tunnel boring machine. Based on an intelligent control system, a high-pressure water jet is used to cut the rock surface from bottom to top, so that an air surface is produced on the rock surface and the rock strength is reduced. After the pre-cutting is completed in an area, the cutting head immediately penetrates the rock after the cutting, and the high-pressure jet system simultaneously cuts the rock at other positions of the tunnel face, which can improve the control accuracy of the double-cantilever tunnel boring machine and the efficiency of cutting.

[0066] Example 2

[0067] This embodiment provides a water jet cutting path planning system, including:

[0068] A database construction module is configured to construct a rock breaking database based on historical water jet cutting data; the rock breaking database includes cutting strategies of multiple jet parameter combinations under different rock mass conditions;

[0069] A path screening module is configured to obtain rock mass information during the pre-cutting process of the rock mass, and screen an optimal cutting path in the rock breaking database according to the rock mass information;

[0070] The motion planning module is configured to generate an environmental map based on the acquired environmental data during the cutting process with the optimal cutting path, and determine the target position and obstacle position in the environmental map, so as to plan the body movement path in combination with the current body posture of the tunnel boring machine, and control the body movement of the tunnel boring machine before cutting; plan the cantilever movement posture according to the current cantilever posture, the target position and obstacle position in the environmental map and the cantilever movement parameters, and feedback and optimize the cantilever movement posture according to the set cantilever safety spacing when the double cantilever is cross-cooperatively operated.

[0071] As an optional embodiment, the jet parameters include pump pressure, target distance, abrasive concentration, nozzle parameters and traverse speed.

[0072] As an optional implementation method, the cutting strategy includes a cutting mode and an optimal cutting path; the cutting mode includes: when the strength and hardness of the rock mass are within a set range, linear, curved or point cutting is selected; when the strength and hardness of the rock mass exceed the set limit, grid cutting is used.

[0073] As an optional implementation, the environmental data includes object images, obstacle data and three-dimensional environmental data, the target object is obtained based on object image recognition, an environmental map is generated based on the three-dimensional environmental data, and the position of the target object and the obstacle are determined based on the environmental map.

[0074] As an optional implementation, the process of acquiring the posture of the tunnel boring machine body and the cantilever includes: constructing a spatial posture detection coordinate system, measuring the posture of the body or the cantilever, and describing the posture with offset angle, pitch angle, roll angle, horizontal offset displacement and vertical offset displacement.

[0075] As an optional implementation, the cantilever movement parameters are determined from the optimal cutting path obtained by screening, and the cantilever movement parameters include the cantilever movement path and movement speed.

[0076] As an optional implementation, a cantilever safety spacing is set when dual cantilever cross-cooperation is carried out. According to the feedback of dual cantilever spacing and moving speed, if it is judged that the dual cantilever spacing exceeds the cantilever safety spacing or the moving speed exceeds the set threshold, the cantilever movement posture is adjusted.

[0077] It should be noted that the above modules correspond to the steps described in Example 1, and the examples and application scenarios implemented by the above modules and the corresponding steps are the same, but are not limited to the contents disclosed in the above Example 1. It should be noted that the above modules, as part of the system, can be executed in a computer system such as a set of computer executable instructions.

[0078] In further embodiments, there is also provided:

[0079] An electronic device includes a memory and a processor, and computer instructions stored in the memory and executed on the processor, wherein when the computer instructions are executed by the processor, the method described in Embodiment 1 is performed. For the sake of brevity, it will not be described in detail here.

[0080] It should be understood that in this embodiment, the processor may be a central processing unit CPU, and the processor may also be other general-purpose processors, digital signal processors DSP, application-specific integrated circuits ASIC, off-the-shelf programmable gate arrays FPGA or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.

[0081] The memory may include a read-only memory and a random access memory, and provide instructions and data to the processor. A portion of the memory may also include a non-volatile random access memory. For example, the memory may also store information about the device type.

[0082] A computer-readable storage medium is used to store computer instructions, and when the computer instructions are executed by a processor, the method described in Example 1 is completed.

[0083] The method in Example 1 can be directly embodied as a hardware processor, or a combination of hardware and software modules in the processor. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory, and the processor reads the information in the memory and completes the steps of the above method in combination with its hardware. To avoid repetition, it is not described in detail here.

[0084] A computer program product includes a computer program, and when the computer program is executed by a processor, the method described in embodiment 1 is implemented.

[0085] The present invention also provides at least one computer program product tangibly stored on a non-transitory computer-readable storage medium. The computer program product includes computer executable instructions, such as instructions included in a program module, which are executed in a device on a real or virtual processor of the target to perform the process / method as described above. Typically, program modules include routines, programs, libraries, objects, classes, components, data structures, etc. that perform specific tasks or implement specific abstract data types. In various embodiments, the functions of program modules can be combined or divided between program modules as needed. Machine executable instructions for program modules can be executed in local or distributed devices. In distributed devices, program modules can be located in local and remote storage media.

[0086] The computer program code for implementing the method of the present invention can be written in one or more programming languages. These computer program codes can be provided to the processor of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the computer or other programmable data processing device, causes the function / operation specified in the flow chart and / or block diagram to be implemented. The program code can be executed completely on a computer, partially on a computer, as an independent software package, partially on a computer and partially on a remote computer or completely on a remote computer or server.

[0087] In the context of the present invention, computer program codes or related data may be carried by any appropriate carrier to enable a device, apparatus or processor to perform the various processes and operations described above. Examples of carriers include signals, computer readable media, etc. Examples of signals may include electrical, optical, radio, acoustic or other forms of propagation signals, such as carrier waves, infrared signals, etc.

[0088] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with this embodiment can be implemented in electronic hardware or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0089] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A water jet cutting path planning method, characterized in that: include: Building a rock breaking database based on historical water jet cutting data; The rock breaking database includes cutting strategies for multiple jet parameter combinations under different rock mass conditions; Obtain rock mass information during pre-cutting of the rock mass, and select the optimal cutting path in the rock breaking database based on the rock mass information; During the cutting process with the optimal cutting path, an environmental map is generated based on the acquired environmental data, and the target position and obstacle position are determined in the environmental map. Combined with the current body posture of the tunnel boring machine, the body movement path is planned to control the body movement of the tunnel boring machine before cutting. The cantilever movement posture is planned according to the current cantilever posture, the target position and obstacle position in the environmental map, and the cantilever movement parameters, and the cantilever movement posture is optimized based on the set cantilever safety spacing when the double cantilevers work in cross-cooperation.

2. A water jet cutting path planning method as claimed in claim 1, characterized in that: The jet parameters include pump pressure, target distance, abrasive concentration, nozzle parameters and traverse speed; The cutting strategy includes cutting mode and optimal cutting path; the cutting mode includes: when the strength and hardness of the rock mass are within the set range, straight line, curve or point cutting is selected; when the strength and hardness of the rock mass exceed the set limit, grid cutting is adopted.

3. A water jet cutting path planning method as claimed in claim 1, characterized in that: The environmental data includes object images, obstacle data and three-dimensional environmental data. The target object is obtained according to the object image recognition, the environmental map is generated according to the three-dimensional environmental data, and the position of the target object and the obstacle position are determined according to the environmental map.

4. A water jet cutting path planning method as claimed in claim 1, characterized in that: The process of acquiring the posture of the machine body and cantilever includes: constructing a spatial posture detection coordinate system, measuring the posture of the machine body or cantilever, and describing the posture with offset angle, pitch angle, roll angle, horizontal offset displacement and vertical offset displacement.

5. A water jet cutting path planning method as claimed in claim 1, characterized in that: The cantilever movement parameters are determined from the optimal cutting path obtained by screening, and the cantilever movement parameters include the cantilever movement path and movement speed.

6. A water jet cutting path planning method as claimed in claim 1, characterized in that: Set the cantilever safety distance when the double cantilever crosses and works together. According to the feedback of the double cantilever distance and moving speed, if it is judged that the double cantilever distance exceeds the cantilever safety distance or the moving speed exceeds the set threshold, adjust the cantilever action posture.

7. A water jet cutting path planning system, characterized in that: include: A database construction module is configured to construct a rock breaking database based on historical water jet cutting data; The rock breaking database includes cutting strategies for multiple jet parameter combinations under different rock mass conditions; A path screening module is configured to obtain rock mass information during the pre-cutting process of the rock mass, and screen an optimal cutting path in the rock breaking database according to the rock mass information; The motion planning module is configured to generate an environmental map based on the acquired environmental data during the cutting process with the optimal cutting path, and determine the target position and obstacle position in the environmental map, so as to plan the body movement path in combination with the current body posture of the tunnel boring machine, and control the body movement of the tunnel boring machine before cutting; plan the cantilever movement posture according to the current cantilever posture, the target position and obstacle position in the environmental map and the cantilever movement parameters, and feedback and optimize the cantilever movement posture according to the set cantilever safety spacing when the double cantilever is cross-cooperatively operated.

8. An electronic device, characterized in that: The method comprises a memory and a processor and computer instructions stored in the memory and executed on the processor, wherein when the computer instructions are executed by the processor, the method according to any one of claims 1 to 6 is completed.

9. A computer-readable storage medium, characterized in that: Used to store computer instructions, which, when executed by a processor, complete the method described in any one of claims 1 to 6.

10. A computer program product, characterized in that The invention comprises a computer program, which, when executed by a processor, implements the method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Cutting path planning method, device and cutting control system of tunneling machine

    CN109386291A

  • Abrasive water jet-hob combined rock breaking cutting performance prediction method and system

    CN116451418A

  • Mine water jet anchor withdrawing water circulation robot

    CN118049258A

  • System and method for tool testing and alignment

    US20120065769A1

  • Robotic saw and water jet control

    US20200139546A1

Cited By

  • Novel cutting and sawing combined cantilever tunneling device and method

    CN119308688A

  • Earth excavation method for tunnel constructed by pipe-roofing method

    CN119352981A