Project management method and device

By obtaining structured data of project management and generating interactive views, traditional project management software is solved, and the efficiency and accuracy of project management is achieved.

CN118967058APending Publication Date: 2024-11-15ZHUHAI KINGSOFT ONLINE GAME TECH CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411301484.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Traditional project management software relies on table tools, which is difficult to meet the multi-dimensional task management needs of complex projects, resulting in low efficiency.

Method used

By obtaining structured data of project management, determining the structural data and display dimensions of task nodes, generating interactive views, and achieving flexible presentation and analysis of task information.

Benefits of technology

It improves the diversity and adaptability of data display, comprehensively examines project progress, and optimizes the efficiency and accuracy of project management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967058A_ABST
    Figure CN118967058A_ABST
Patent Text Reader

Abstract

Embodiments of the invention provide a project management method and apparatus. The project management method comprises the steps of obtaining project management structured data for a target project comprising at least one task node; task node structure data corresponding to each task node is determined based on the project management structured data, and the task node structure data comprises project attribute information corresponding to at least one display dimension; determining an interactive view type and at least one target display dimension; and generating a target interaction view corresponding to the target project according to the interaction view type, each target display dimension and the project attribute information corresponding to each target display dimension. By obtaining the project management structured data of the target project, determining the structured data of the task node and the corresponding display dimension, and generating the corresponding target interaction view based on the interaction view type and the target display dimension, the project progress is visualized from different dimensions, and then the efficiency and accuracy of target project decision making are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present specification relate to the field of computer technology, and in particular to a project management method. Background Art

[0002] As project management needs continue to evolve, more and more complex projects require more efficient management tools to support them. This development has brought about significant changes, especially in terms of goal decomposition and task management in projects. Traditional management methods are gradually unable to meet the growing needs.

[0003] At present, traditional project management software mainly relies on table tools to enter and display tasks. Although this method can display multiple task attributes, it is insufficient in structured data management and multi-dimensional view display when only using table tools to enter and display tasks, which leads to low efficiency of project management. In order to solve the above shortcomings, a project management method is needed to realize multi-dimensional project task management. Summary of the invention

[0004] In view of this, an embodiment of this specification provides a project management method. One or more embodiments of this specification also relate to a project management device, a computing device, a computer-readable storage medium and a computer program product to solve the technical defects existing in the prior art.

[0005] According to a first aspect of an embodiment of this specification, there is provided a project management method, including:

[0006] Acquire project management structured data for a target project, wherein the target project includes at least one task node;

[0007] Determining task node structure data corresponding to each task node based on the project management structured data, wherein the task node structure data includes project attribute information corresponding to at least one display dimension;

[0008] Determine the interactive view type and at least one target display dimension;

[0009] A target interactive view corresponding to the target project is generated according to the interactive view type, each target display dimension and project attribute information corresponding to each target display dimension.

[0010] According to a second aspect of the embodiments of this specification, there is provided a project management device, including:

[0011] An acquisition module is configured to acquire project management structured data for a target project, wherein the target project includes at least one task node;

[0012] A first confirmation module is configured to determine task node structure data corresponding to each task node based on the project management structured data, wherein the task node structure data includes project attribute information corresponding to at least one display dimension;

[0013] A second confirmation module is configured to determine an interactive view type and at least one target display dimension;

[0014] The generating module is configured to generate a target interactive view corresponding to the target project according to the interactive view type, each target display dimension and project attribute information corresponding to each target display dimension.

[0015] According to a third aspect of an embodiment of this specification, a computing device is provided, including:

[0016] Memory and processor;

[0017] The memory is used to store computer-executable instructions, and the processor is used to execute the computer-executable instructions. When the computer-executable instructions are executed by the processor, the steps of the above-mentioned project management method are implemented.

[0018] According to a fourth aspect of the embodiments of this specification, a computer-readable storage medium is provided, which stores computer-executable instructions, and when the instructions are executed by a processor, the steps of the above-mentioned project management method are implemented.

[0019] According to a fifth aspect of the embodiments of this specification, a computer program product is provided, including a computer program / instruction, which implements the steps of the above-mentioned project management method when executed by a processor.

[0020] An embodiment of the present specification implements the steps of obtaining project management structured data for a target project, wherein the target project includes at least one task node; determining task node structure data corresponding to each task node based on the project management structured data, wherein the task node structure data includes project attribute information corresponding to at least one display dimension; determining an interactive view type and at least one target display dimension; and generating a target interactive view corresponding to the target project according to the interactive view type, each target display dimension, and the project attribute information corresponding to each target display dimension.

[0021] By applying the solution of the embodiments of this specification, by obtaining the project management structured data of the target project, determining the structural data of the task node and its corresponding display dimension, and generating the corresponding target interactive view based on the interactive view type and the target display dimension, the task information can be flexibly presented and analyzed during the project management process, thereby improving the diversity and adaptability of data display while being able to comprehensively review the project progress from different angles, thereby optimizing the efficiency and accuracy of project management. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 is a flow chart of a project management method provided by an embodiment of this specification;

[0023] Figure 2 It is a schematic diagram of a fishbone diagram corresponding to a target project provided by an embodiment of this specification;

[0024] Figure 3 It is a schematic diagram of a mind map corresponding to a target project provided by an embodiment of this specification;

[0025] Figure 4 It is a process flow chart of a method for generating and applying a multi-dimensional mind map corresponding to a target project provided by an embodiment of this specification;

[0026] Figure 5 It is a process flow chart of a method for communicating table data corresponding to a target project with a mind map provided by an embodiment of this specification;

[0027] Figure 6 is a process flow chart of a game project management method provided by an embodiment of this specification;

[0028] Figure 7 It is a structural diagram of a project management device provided by an embodiment of this specification;

[0029] Figure 8 It is a structural block diagram of a computing device provided by an embodiment of this specification. DETAILED DESCRIPTION

[0030] Many specific details are described in the following description to facilitate a full understanding of this specification. However, this specification can be implemented in many other ways than those described herein, and those skilled in the art can make similar generalizations without violating the connotation of this specification, so this specification is not limited to the specific implementation disclosed below.

[0031] The terms used in one or more embodiments of this specification are only for the purpose of describing specific embodiments, and are not intended to limit one or more embodiments of this specification. The singular forms of "a", "said" and "the" used in one or more embodiments of this specification and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used in one or more embodiments of this specification refers to and includes any or all possible combinations of one or more associated listed items.

[0032] It should be understood that although the terms first, second, etc. may be used to describe various information in one or more embodiments of this specification, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of one or more embodiments of this specification, the first may also be referred to as the second, and similarly, the second may also be referred to as the first. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".

[0033] In addition, it should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in one or more embodiments of this specification are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with the relevant laws, regulations and standards of the relevant countries and regions, and provide corresponding operation entrances for users to choose to authorize or refuse.

[0034] In this specification, a project management method is provided. This specification also relates to a project management apparatus, a computing device, a computer-readable storage medium, and a computer program product, which are described in detail one by one in the following embodiments.

[0035] See also Figure 1 , Figure 1 A flowchart of a project management method provided according to an embodiment of the present specification is shown, which specifically includes the following steps.

[0036] Step 102: Acquire project management structured data for a target project, wherein the target project includes at least one task node.

[0037] In actual applications, the target project is a project used to complete the corresponding target, the project management structured data is structured data for managing the target project, and the task node is each node used to complete the target project.

[0038] Exemplarily, a target project can be understood as a collection of plans and tasks set up to achieve a specific goal, including multiple interrelated subtasks or stages, each of which is intended to promote the realization of the overall project goal. The target project not only covers the overall direction and purpose of the project, but also includes project management structured data consisting of specific implementation steps, resource allocation, time schedule, and clear division of responsibilities for each task node. For example, in a software development project, the target project includes the entire process from requirements analysis to design, development, testing, and final deployment, and each stage has its clear goals and expected results. In this structured way, the target project ensures that all participants can clearly understand all aspects of the project and work together effectively to achieve the ultimate goal.

[0039] It should be noted that project management structured data can be understood as the systematic organization and storage of each task node and its attribute information in the project. Task node can be understood as the smallest work unit or specific manifestation of task in project management, representing an independent task or subtask, usually with clear objectives, responsible persons, priorities, time schedules and other attributes. Project management structured data is any storage method that stores structured data, which can be data stored in the form of tables, or project tasks and their attribute information recorded in a database, etc. This manual does not impose any restrictions on this.

[0040] The specific method of obtaining project management structured data including multiple task nodes is to group them according to the corresponding functional modules, break down a large goal into small goals step by step until executable task nodes are formed; or to group the business according to the existing task items, abstract the tasks into small goals and gradually derive other related tasks; or to decompose and archive each task according to the time dimension based on the project timeline to ensure that the progress and priority of the project are effectively managed, etc. This manual does not impose any restrictions on this.

[0041] By acquiring structured project management data including multiple task nodes, it is possible to systematize the various tasks and attribute information of the project, thereby achieving clearer project planning and management, and enabling each stage and task of the project to have clear goals, responsibility allocations and time nodes, which helps to improve the efficiency and accuracy of project execution, so that subsequent interactive views for target projects can be smoothly generated, thereby visualizing project progress from different dimensions, thereby improving the efficiency and accuracy of target project decision-making.

[0042] Step 104: Determine task node structure data corresponding to each task node based on the project management structured data, wherein the task node structure data includes project attribute information corresponding to at least one display dimension.

[0043] In actual applications, the task node structure data is all the attribute information of the task node, the display dimension is the direction for classifying the task nodes, and the project attribute information is the attribute information of the task node.

[0044] For example, the display dimension can be understood as a data classification standard in project management, which is used to present the key attributes of tasks or projects from different perspectives. The display dimension helps users filter and view project data according to different needs. For example, the time dimension can be used to visually manage the target project according to the time order of each task node; the priority dimension can be used to display the urgency and importance of the task, so that users can manage the target project according to the importance of the task.

[0045] By utilizing the project attribute information corresponding to at least one display dimension stored in the structure data of each task node, multiple task nodes corresponding to the target project can be visualized using multiple display dimensions, thereby making project management more intuitive and flexible, meeting the needs of users in different scenarios, and effectively improving the efficiency of task management and decision-making.

[0046] Step 106: Determine an interactive view type and at least one target display dimension.

[0047] In actual applications, the interactive view type is the view type that the user needs to display, and the target display dimension is the display dimension selected by the user.

[0048] Exemplarily, the interactive view type can be understood as a visual data display method selected by the user according to specific needs during project management or data analysis, which has the characteristics of dynamic interaction. Different interactive view types can provide users with different perspectives to view and operate project data. For example, the Gantt chart type interactive view is suitable for task progress management on the timeline, the mind map type is suitable for displaying the hierarchical structure and logical relationship of tasks, the fishbone diagram type interactive view is suitable for analyzing the root causes or key factors of problems in the project, and the chart type interactive view is suitable for analyzing the resource allocation or priority distribution of the project.

[0049] By generating targeted interactive views for users through multiple view types and multiple display dimensions, data can be presented flexibly, allowing users to intuitively analyze key factors such as project progress, task priority, resource allocation, etc. from different angles, thereby improving the efficiency of project management and decision-making.

[0050] Further, determining an interactive view type and at least one target display dimension includes:

[0051] Receive project display instructions;

[0052] The project display instruction is parsed to obtain an interactive view type and at least one target display dimension.

[0053] In actual applications, the project display instruction is an instruction for determining the interactive view type and the target display dimension.

[0054] Exemplarily, the project display instruction can be understood as an instruction selected by the user or generated by the system for controlling the data display method. The specific method can be to generate instructions according to the default settings, and the system automatically selects the most commonly used interactive view type and display dimension, such as the default generation of Gantt charts for time management (that is, the interactive view type is Gantt charts, and the target display dimension is the time dimension), fishbone diagrams for managing the importance of task execution based on the time dimension (that is, the interactive view type is fishbone diagrams, and the target display dimensions are the time dimension and the task priority dimension), etc.; instructions can also be generated according to user selections, and users manually select the display method according to specific needs; instructions can also be generated according to preset conditions, and the system automatically recommends the best interactive view type and dimension display according to preset conditions such as project type, task complexity or team size, such as recommending the use of charts combined with timeline view display in large projects, etc. This manual does not impose any restrictions on this.

[0055] By receiving project display instructions to determine the interactive view type and target display dimension, it can flexibly meet project management needs in different scenarios, allowing users to analyze and present project data from multiple angles according to actual needs. This not only improves the visualization of project data, but also enhances users' control over project tasks, time schedules, resource allocation, etc., ensuring the flexibility and efficiency of project management.

[0056] Step 108: Generate a target interactive view corresponding to the target project according to the interactive view type, each target display dimension and project attribute information corresponding to each target display dimension.

[0057] In practical applications, the target interactive view is a visualization tool for dynamically presenting and interacting with project data.

[0058] Exemplarily, the target interactive view can be understood as a visual view generated according to project management needs, with which users can interact in real time and dynamically adjust, and is intended to intuitively present project data and task progress. For example, a Gantt chart suitable for time management and task progress tracking, a mind map suitable for task decomposition and hierarchical structure display, a fishbone diagram suitable for analyzing the root causes of problems and influencing factors, etc., and this specification does not impose any restrictions on this.

[0059] It should be noted that the target interactive view corresponding to the target project is generated according to the interactive view type, the target display dimension and the project attribute information corresponding to the target display dimension, which can be understood as dynamically generating a visual display of the project from different perspectives. Specifically, the time schedule of the project can be displayed through a Gantt chart, and the interactive view can be generated using the information of the time dimension and task priority; the tasks can also be decomposed into various levels through a mind map to display the structured relationship of the tasks and project attribute information such as the person in charge; the fishbone diagram can also be used to display the root causes of project problems and related dimensional information to help identify the key factors affecting the progress of the project, etc. This manual does not impose any restrictions on this.

[0060] By displaying the target interactive view corresponding to the target project, users can flexibly analyze the project status from multiple dimensions, such as time, priority, resource allocation, etc., and through real-time updates and interactive functions, users can make quick adjustments to tasks, progress and resources, thereby improving the efficiency and accuracy of project management.

[0061] Furthermore, generating a target interactive view corresponding to the target project according to the interactive view type, each target display dimension and project attribute information corresponding to each target display dimension includes:

[0062] Generate a project management tree corresponding to the target project according to the project attribute information corresponding to each task node;

[0063] A target interactive view is generated according to the project management tree and the interactive view type.

[0064] In actual applications, the project management tree includes a root node, at least two child nodes and at least two leaf nodes, wherein the root node of the project management tree is the starting node of the target project, the child nodes of the project management tree are nodes derived from the root node or other child nodes according to the project attribute information corresponding to each target display dimension, the leaf nodes of the project management tree are the task nodes included in the target project, and there are no derived nodes from the leaf nodes of the project management tree.

[0065] Exemplarily, the project management tree can be understood as a hierarchical diagram for representing the project structure, showing the decomposition process from the overall project goal to the specific tasks. Its root node represents the starting point or core goal of the project, and the child nodes derive more detailed tasks or stages from the root node according to different display dimensions, such as time, priority or person in charge. Each child node can further derive more child nodes to form a hierarchical structure that is decomposed step by step until the leaf node, which represents a specific task node and no longer has further branches. For example, in a software development project, the root node can be the overall goal of the development, the child nodes are the development tasks of each module, and the leaf nodes are specific code implementation or testing tasks.

[0066] It should be noted that the method of generating a project management tree can be to first generate an intermediate state logic tree based on the project attribute information corresponding to each task node of the target project, and then generate the project management tree based on the determined target display dimensions; it is also possible to directly determine the project attribute information corresponding to each target display dimension in the project attribute information corresponding to each task node, and then directly generate the project management tree based on the project attribute information of each target display dimension for each task node, and so on. This manual does not impose any restrictions on the method of generating a project management tree.

[0067] In one embodiment provided in the present specification, the data structure corresponding to each node in the project management tree corresponding to the target project is {ID,--unique identifier of the node; Parent ID,--parent node ID, if it is a root node, it is 0; Title,--title of the node; ServiceMode,--business module; Priority,--priority; DateTime,--time; ...--and other task attributes}.

[0068] By generating a target interactive view for managing target projects through the project management tree, the overall structure of the project and the hierarchical relationship of each task can be clearly displayed, helping managers understand the progress of the project from multiple levels of global and detailed information. At the same time, managers can flexibly switch views and interactively adjust tasks in real time according to different display dimensions, such as time, priority or resource allocation, making project management more intuitive and efficient. This method improves the visualization of project tasks, improves the transparency and collaboration efficiency of the project, and ensures that managers can make data-driven decisions in a timely manner to ensure the smooth progress of the project.

[0069] Furthermore, a project management tree corresponding to the target project is generated according to the project attribute information corresponding to each task node, including:

[0070] Acquire at least one display dimension interval corresponding to each target display dimension according to the project attribute information corresponding to each task node;

[0071] Determining the subnodes of the project management tree according to each display dimension interval;

[0072] Each task node is determined to be a leaf node of the project management tree.

[0073] In practical applications, the display dimension interval is used to define and divide the attribute value range or category of the corresponding display dimension.

[0074] Exemplarily, the display dimension interval can be understood as a range or segment used to classify and divide the attribute information corresponding to a specific display dimension, so as to help users view and analyze project data from different angles. The specific classifications under each display dimension are defined. For example, in the priority dimension, the display dimension interval can represent different ranges of high priority, medium priority, and low priority; in the time dimension, the display dimension interval can represent different time periods, such as daily, weekly or monthly task distribution; in the person in charge dimension, the display dimension interval corresponds to each specific person in charge.

[0075] By constructing a project management tree by displaying dimension intervals, the various tasks and attribute information of the project can be clearly classified and displayed in layers according to different dimensions, helping users to grasp the overall progress and specific details of the project from multiple angles, effectively improving the organization of the data, and enabling managers to quickly filter and view tasks based on dimensions such as priority, time period or person in charge, which helps to optimize the efficiency of resource allocation and task management.

[0076] Further, determining the sub-nodes of the project management tree according to each display dimension interval includes:

[0077] Get dimension display order information;

[0078] The child nodes of the project management tree are determined according to the dimension display order information and each display dimension interval.

[0079] In practical applications, dimension display order information is used to define the order of arrangement of various display dimensions in project management, so as to determine which dimensions should be presented first or given priority when displaying data and generating views.

[0080] For example, the dimension display order information can be understood as specifying the display order of different dimensions, so that users can follow a clear hierarchy when viewing project data. For example, in the display of project tasks, the dimension display order information can first be arranged by task priority, then by time progress, and finally by person in charge, to ensure the hierarchy and logic of the data.

[0081] Determining the project management tree used to generate interactive views through dimensional display information can help managers adjust the display order of each dimension according to actual needs and improve the efficiency and readability of project management.

[0082] Considering that in the process of project management, it is necessary to manage the importance of task execution by referring to a certain display dimension, the interactive view types include fishbone diagrams;

[0083] Further, generating a target interactive view according to the project management tree and the interactive view type includes:

[0084] Determine that the child node corresponding to the root node in the project management tree is the trunk node of the fishbone diagram;

[0085] Generate the trunk information of the fishbone diagram based on the display dimension interval corresponding to each trunk node of the fishbone diagram;

[0086] A fishbone diagram corresponding to the target project is generated according to the descendant nodes corresponding to the main nodes of the fishbone diagram in the project management tree and the main information of the fishbone diagram.

[0087] In practical applications, the trunk nodes of the fishbone diagram are key nodes located on the trunk during the generation process of the fishbone diagram, representing the main problems or influencing factors in this project management. The trunk information of the fishbone diagram is the core information generated based on the display dimension intervals corresponding to each trunk node of the fishbone diagram, reflecting the key data or attributes related to each trunk node.

[0088] Exemplarily, the trunk node of the fishbone diagram can be understood as a sub-node derived from the root node of the project management tree, which plays the role of decomposing large problems into smaller influencing factors. For example, in the analysis of project delays, the trunk node of the fishbone diagram may include the main aspects that affect the project progress, such as insufficient resources, communication problems, technical difficulties, etc. The trunk node of the fishbone diagram plays a core supporting role in the entire structure, providing a basis for subsequent detailed analysis. The trunk information of the fishbone diagram can be understood as being used to help users intuitively display the main influencing factors of each problem on the trunk of the fishbone diagram. For example, if the trunk node is insufficient resources, then the trunk information may include specific resource types, the number of shortages, the affected project stages, etc. This information enriches the analytical capabilities of the fishbone diagram, enabling users to understand the problems in the project at a deeper level.

[0089] like Figure 2 As shown, Figure 2 A schematic diagram of a target project corresponding to a fishbone diagram provided for an embodiment of the present specification, wherein the target project is the root node of the fishbone diagram, representing the overall goal or task of the project. Time A and time B are the main nodes of the fishbone diagram, which correspond to the time dimension display intervals in project management, respectively, and play the role of decomposing project tasks in chronological order. Task node A and task node C are derived from time A, and task node B, task node D and task node F are derived from time B. These child nodes represent specific work tasks in the project, respectively. The main information of the fishbone diagram is based on the dimensional intervals of time A and time B, reflecting the time period of each task node and its associated tasks, helping users understand the distribution and impact of tasks in different time stages.

[0090] The fishbone diagram generated by the above-mentioned trunk nodes and trunk information clearly shows the hierarchical structure and time relationship of each task node of the target project, which is helpful for task decomposition and problem analysis in project management.

[0091] Considering the need to display the hierarchical structure and logical relationship of tasks during project management, the interactive view types include mind maps;

[0092] Further, generating a target interactive view according to the project management tree and the interactive view type includes:

[0093] Generate mind map root node information according to the target project;

[0094] Based on each sub-node of the project management tree, generating at least one mind map sub-node information;

[0095] Generate mind map terminal node information corresponding to each task node according to the task node structure data corresponding to each task node and each leaf node in the project management tree;

[0096] The mind map corresponding to the target project is obtained according to the mind map root node information, each mind map sub-node information and each mind map terminal node information.

[0097] In actual applications, the mind map root node information is the node information representing the entire target project or core theme during the mind map generation process. The mind map sub-node information is generated based on each sub-node in the project management tree, representing the phased tasks or project modules in each display dimension interval derived from the root node.

[0098] Exemplarily, the mind map root node information can be understood as the starting point of the mind map. Around this root node, other tasks or goals in the project are gradually expanded and form a complete structure. For example, assuming that the target project is to develop a new software, the root node information of the mind map will be "Software Development Project". This node centrally represents the overall goal and main direction of the project, and all subsequent tasks or branches start from here. The mind map terminal node information is generated based on the leaf nodes in the project management tree, representing the specific executable tasks (i.e., task nodes) in the target project.

[0099] The sub-node information of the mind map can be understood as node information used to further refine the various tasks in the project and form a hierarchical structure. For example, in a software development project, the sub-node information under the root node "software development project" may include task modules such as "requirements analysis", "design", "development", and "testing", and the node information under each model may include time periods such as "time point segment A", "time segment B", etc.

[0100] These terminal node information can be understood as the final execution layer of the target project. For example, under the sub-node of the "Development" module, the terminal node information may include specific tasks such as "Front-end Development", "Back-end Development", "Interface Integration", etc. These tasks are the specific operations that are actually performed to ultimately achieve the core goals of the project. The terminal node information helps users understand the specific work details in the project and provides support for task allocation and progress management.

[0101] like Figure 3 As shown, Figure 3 A schematic diagram of a mind map corresponding to a target project provided for an embodiment of this specification, wherein the target project is the root node of the mind map, representing the core goal of the entire project. Business group A, business group B, and business group C are child nodes of the mind map, representing the main branches or modules of the project, which are divided according to different business needs. Time A and time B further refine the tasks under each business group, and they show the distribution of tasks in different time periods. Finally, task node A, task node B, task node C, task node D, and task node F are terminal nodes of the mind map, representing specific executable tasks, and these terminal nodes are the underlying work units in project management.

[0102] Through the gradual decomposition of root nodes, child nodes and terminal nodes, the mind map clearly shows the hierarchical structure and task distribution of the target project, helping users better understand the various components and execution processes of the project.

[0103] Further, after generating a target interactive view according to the project management tree and the interactive view type, the method further includes: receiving view adjustment information for the target interactive view;

[0104] The project management structured data is adjusted according to the view adjustment information.

[0105] In actual applications, the view adjustment information is the operation or input performed by the user in the interactive view, which is used to modify the project data or task attribute information displayed in the current view.

[0106] For example, the view adjustment information can be transmitted in various forms, such as interactive operations performed by users on the mind map or table interface, such as clicking a node, adjusting the priority of a task, changing the person in charge of a task, or modifying the time schedule. These user operations will be regarded as view adjustment information and transmitted to the system for processing. For example, a manager can modify the completion time of a task or add a new subtask by clicking a task node in a mind map, and these adjustments will be regarded as view adjustment information.

[0107] It should be noted that when the system receives these view adjustment information, it will update the project management structured data based on these inputs. For example, if the user modifies the information of the person in charge of a task in the table view, the view adjustment information will automatically trigger the update of the relevant fields in the project management database. Ultimately, these adjustments are not only reflected in the current view, but also synchronized to all related display views, such as mind maps and tables, to ensure data consistency and real-time.

[0108] By receiving view adjustment information for the target interactive view, the project management structured data can be adjusted, allowing users to intuitively modify the properties or progress of project tasks during the interaction process, improving the flexibility and real-time nature of data management. This not only simplifies the project update process, but also ensures that all adjustments are immediately reflected in the visual view, ensuring data consistency and accuracy, helping managers make decisions more efficiently and optimize resource allocation, thereby greatly improving the efficiency of project execution and the effectiveness of collaboration.

[0109] Further, receiving view adjustment information for the target interactive view includes:

[0110] receiving node update information for at least one target node in the target interactive view; and / or,

[0111] Node addition information for the target interactive view is received.

[0112] In actual applications, the target node is the basic unit that represents a specific task, event or operation in the target interactive view, the node update information is the modification or adjustment information made by the user to the existing target node, and the node addition information is the relevant information of the task or work item added by the user through the interactive view.

[0113] Exemplarily, a target node can be understood as a specific element in project management structured data, which is usually associated with the attributes and execution status of a task. Each target node can display key data in a project, such as task name, responsible person, priority, and completion progress, etc. This specification does not impose any restrictions on this. For example, in a mind map of project management, the target node can be "Task A", which represents the detailed information of the task.

[0114] Node update information can be understood as information used to update the properties or status of a node. The above node update information may include changing the priority of a task, modifying the completion date, reassigning the person in charge, or adjusting the progress of a task, etc. This manual does not impose any restrictions on this. For example, when a user finds that a task is delayed, the completion date of the target node can be modified through the view. The node update information will be transmitted and synchronized to the project management system to ensure that the latest status of the task is reflected in the view and data in a timely manner.

[0115] Node addition information can be understood as information used to add new nodes or tasks to the existing project structure, including the name, person in charge, deadline and other attributes of the newly added task, and this manual does not impose any restrictions on this. For example, when a manager finds that a new task "Task B" needs to be added to the project, the node addition information will be used to generate a new node in the target interactive view and synchronize the relevant data to the project management structured data to ensure that the newly added task is correctly recorded and tracked.

[0116] By receiving view adjustment information including node update information and / or node addition information, flexible management and real-time update of project management data are achieved, ensuring that each task or node in the project can be adjusted according to the latest needs or progress. This not only makes project management more dynamic, but also improves the accuracy and timeliness of data, allowing users to track task progress, allocate resources and adjust plans more effectively, thereby optimizing the overall execution of the project and improving the efficiency of team collaboration.

[0117] Considering that when updating data, it is necessary to determine the information to be updated in the original data, the view adjustment information includes the node update information;

[0118] Adjusting the project management structured data according to the view adjustment information includes:

[0119] Determine at least one target node corresponding to the node update information, and determine identification information corresponding to each target node;

[0120] Determine the data record to be updated corresponding to each target node in the structured data according to each identification information;

[0121] The project management structured data is updated according to the node update information.

[0122] In practical applications, the identification information corresponding to each target node is used to uniquely identify the specific data item of each target node in the project management structured data. The data record to be updated is a specific record related to the target node in the project management structured data, and contains the attribute information corresponding to the node that needs to be updated.

[0123] Exemplarily, identification information can be understood as a unique ID, task name, or other key attributes that can distinguish tasks, which is used to ensure that a target node is accurately located in the project management data. For example, each task in a project has a unique task ID, which is used as identification information to locate the task and perform operations on it. The role of identification information is to ensure that when adjusting data, the node to be updated is correctly found to avoid misoperation or updating of wrong data.

[0124] It should be noted that the data record to be updated can be understood as all data entries or fields related to the target node in the project management structured data, which are in a state of needing to be modified, replaced or updated. It contains key information related to the task or node, such as the name, schedule, priority, person in charge and other attributes of the task. When the user adjusts a node in the interactive view, the data record to be updated is the data item that is located and ready to be modified. For example, if the deadline or person in charge of the task changes, the data record to be updated will reflect these changes and be updated to the latest status by the system to ensure that the project data is consistent with the actual task progress.

[0125] By determining the target node corresponding to the node update information, the project management structured data can be updated, which can effectively ensure the accuracy and real-time nature of data modification and avoid data confusion caused by incorrect positioning or repeated operations. In this way, tasks or nodes that need to be adjusted can be accurately identified in complex project management, ensuring that the progress, resource allocation, priority and other information of each task are updated in a timely manner, thereby improving the efficiency and reliability of project management. At the same time, the dynamic data update method helps to keep project data synchronized with actual progress, supporting more flexible decision-making and more efficient task tracking.

[0126] Considering that data can be added to the structural data through node addition information, the view adjustment information includes the node addition information;

[0127] Further, adjusting the project management structured data according to the view adjustment information includes:

[0128] According to the node adding information, task node structure data corresponding to at least one task node is added to the project management structured data.

[0129] It should be noted that adding task node structure data corresponding to multiple task nodes in the project management structured data according to the node addition information can be understood as creating a new task node in the project management system through user input or system requirements and associating it with the existing data structure. The specific method is that the user can manually add a new task node in the interactive view and fill in relevant information such as the task name, person in charge and deadline; the new task node can also be automatically generated according to project requirements. For example, when additional resource allocation is required at a certain stage of the project, the system automatically adds a new task node for that stage; predefined task nodes can also be added through task templates, and standardized task structures can be generated according to existing project templates and filled into the project management structured data, etc. This manual does not impose any restrictions on this.

[0130] By adding task node structure data corresponding to multiple task nodes to the project management structured data based on node addition information, dynamic expansion and flexible management of project tasks are achieved, ensuring that the project can adapt to changing needs and progress in a timely manner. This enables new tasks and adjusted work items to be seamlessly integrated into the existing project framework, and through structured data storage, the properties, dependencies and progress information of all new tasks are accurately recorded and updated synchronously, improving the efficiency of project management and the integrity of data, and providing managers with more accurate task tracking and decision-making basis.

[0131] Considering that each subtask needs to be scheduled during the project management process, after generating the target interactive view according to the project management tree and the interactive view type, the method further includes:

[0132] Determining at least one to-be-performed subtask corresponding to the target project according to the target interactive view;

[0133] According to the project attribute information corresponding to the time dimension of each subtask to be executed, the task scheduling information corresponding to the target project is determined.

[0134] In practical applications, pending subtasks refer to specific tasks that have been determined but not yet started to be executed based on the current project progress and needs during the project management process. Task scheduling information refers to the execution schedule and plan set for each subtask based on the attribute information of the subtask in the time dimension.

[0135] Exemplarily, the subtask to be executed can be understood as the unfinished task node corresponding to the target project, with clear goals, allocated resources, responsible persons and expected completion time. For example, in a software development project, the subtask to be executed may be "user interface design" or "database optimization", which have been defined and assigned, but have not yet been officially started. The determination of the subtask to be executed is an important part of project management, ensuring that the task is executed at the right time to achieve the project goal. Task scheduling information includes the start time, deadline, duration, and dependency relationship of the task with other tasks. This information ensures that the various tasks of the project are carried out in an orderly manner within a reasonable time period to avoid conflicts and delays. For example, when it is determined that "user interface design" is a subtask to be executed, the task scheduling information may set the task to start on a certain date and be completed within two weeks. At the same time, according to the project requirements, the task may be carried out in parallel with "back-end development" or need to be completed first. Task scheduling information is crucial in project progress management, helping to ensure that the project is advanced on time and completed as planned.

[0136] It should be noted that determining the task scheduling information corresponding to the target project based on the project attribute information corresponding to the time dimension of each to-be-executed subtask can be understood as generating a detailed task execution plan through the time-related attributes of the subtask. The specific method can be to directly generate the corresponding task schedule based on the start time and end time information of each to-be-executed subtask; it can also automatically calculate a reasonable task scheduling order by analyzing the dependencies and priorities between subtasks; it can also adjust the time arrangement of each subtask based on the overall time frame and resource availability of the project to ensure the optimal use of resource allocation, etc. This manual does not impose any restrictions on this.

[0137] By determining task scheduling information through the target interactive view, the time schedule and dependencies of each project task can be intuitively displayed, helping managers to make project plans more flexibly and adjust the task sequence and schedule in real time. This approach makes project execution more transparent and orderly, ensuring that each task is completed within a reasonable time period, avoiding time conflicts and waste of resources, while also improving the efficiency and accuracy of project management, enabling teams to collaborate more efficiently and achieve project goals on time.

[0138] By applying the scheme of the embodiment of this specification, the efficient adjustment and optimization of project management is achieved through the coordinated work of various modules of the device. The acquisition module obtains the project management structured data of the target project to ensure that each task node in the project is accurately identified and managed. Based on these data, the first confirmation module accurately determines the task node structure information, including the display dimensions and key attributes of the task, so that the project data can be clearly classified and presented. The second confirmation module further determines the interactive view type and the target display dimension, so that the user can choose the most suitable view method to view the project data. The generation module generates an interactive view of the target project based on this information to ensure that the user can intuitively analyze project tasks and resources from different dimensions. Through the interactive view, the user can not only update the node information in real time, but also dynamically add new tasks. The system ensures that task scheduling and resource allocation are accurately adjusted. Ultimately, this modular design greatly improves the flexibility and accuracy of project management, ensures that all aspects of the project can be efficiently and accurately executed, and improves the overall management efficiency.

[0139] The following combination Figure 4 , taking the application of the project management method provided in this specification in the generation and application of multi-dimensional mind maps corresponding to the target project as an example, the project management method is further explained. Among them, Figure 4 A flowchart of a processing process of a method for generating and applying a multi-dimensional mind map corresponding to a target project provided by an embodiment of this specification is shown, which specifically includes the following steps.

[0140] Step 402: Acquire project management structured data corresponding to the target project.

[0141] Step 404: Determine the data of each task node in the priority dimension according to the parent-child relationship in the task node structure data corresponding to each task node in the project management structured data.

[0142] Step 406: Group the task nodes according to the dimension selected by the user (such as time, business module, priority, etc.).

[0143] Step 408: Generate a mind map view according to the set grouping dimension.

[0144] Step 410: Use the time dimension in the mind map to schedule and adjust the tasks.

[0145] Step 412: Use the mind map to assign responsible persons and resources to each task node.

[0146] Step 414: Generate a project progress and task management report based on the mind map.

[0147] By applying the solution of the embodiment of this specification, through a dynamic multi-dimensional grouping mind map, users can examine the same data from multiple angles. Whether it is based on business type, time scheduling, or other dimensions, the required views can be flexibly generated, thereby achieving efficient execution of projects and real-time synchronization of data, making the entire project management process more intuitive, flexible, and adaptable.

[0148] The following combination Figure 5 , taking the application of the project management method provided in this specification in the communication between table data and mind map as an example, the project management method is further explained. Figure 5 A flowchart of a processing process of a method for communicating table data corresponding to a target project with a mind map provided by an embodiment of the present specification is shown, which specifically includes the following steps.

[0149] Step 502: Obtain table data corresponding to the target item.

[0150] Step 504: Receive display dimension data selected by the user.

[0151] Step 506: Generate a mind map based on the above display dimension data and the above table data.

[0152] Step 508: Display the above mind map.

[0153] Step 510: receiving view adjustment information for the mind map, adjusting the table data corresponding to the target item according to the view adjustment information, and returning to execute step 504.

[0154] By applying the solution of the embodiment of this specification, through interactive data operations, users can directly add, delete, and modify task data in the mind map or table view, and these changes will be immediately synchronized to all relevant views of project management. This method ensures real-time update and consistency of data, greatly improves the efficiency of project management, makes task management and tracking more flexible and intuitive, and ultimately achieves efficient project execution and data synchronization, ensuring transparent and controllable project progress.

[0155] The following combination Figure 6 , taking the application of the project management method provided in this specification in game project management as an example, the project management method is further explained. Figure 6 A processing flow chart of a game project management method provided by an embodiment of the present specification is shown, which specifically includes the following steps.

[0156] Step 602: Obtain initial data corresponding to the game project.

[0157] Step 604: Split the initial data corresponding to the game project into multiple sub-goals or development tasks.

[0158] Step 606: According to the functional modules or task groups of the game development, the sub-goals are further decomposed into smaller task nodes, and each task node is used to form a multi-level logical tree structure.

[0159] Step 608: Obtain data of each task node in the time dimension, priority dimension and responsible person dimension.

[0160] Step 610: In the mind map, each target display dimension and the ranking of each dimension sent by the user are received to dynamically generate a mind map for display to the user.

[0161] Step 612: Schedule all development tasks according to the timeline and functional modules of game development, generate a visual project development schedule, assign the scheduled development tasks to specific development teams or persons in charge, and display this information synchronously in the mind map.

[0162] Step 614: Track the execution progress of the development task in real time, receive adjustment information for the mind map in real time, and update the data corresponding to the game project according to the execution progress of the development task and the above adjustment information.

[0163] Step 616: Generate a progress report and task breakdown report for the game project based on the mind map.

[0164] Applying the solution of the embodiment of this specification, first of all, the structured display method makes the entire project plan clearer and more organized, which is conducive to communication and thinking between teams and ensures that all members have a consistent understanding of the project goals. Secondly, this structured way of thinking helps managers to propose and decompose goals more effectively, making the task decomposition process more scientific and reasonable. In addition, through a variety of display forms, the solution can adapt to different business scenarios and meet various project management needs. Finally, managers can comprehensively review the project plan from multiple dimensions such as the overall plan, scheduling, priority, and person in charge, making the plan more thorough, thereby significantly improving the efficiency and success rate of project execution.

[0165] Corresponding to the above method embodiment, this specification also provides a project management device embodiment, Figure 7 FIG. 1 is a schematic diagram showing the structure of a project management device provided by an embodiment of the present specification. Figure 7 As shown, the device comprises:

[0166] The acquisition module 702 is configured to acquire project management structured data for a target project, wherein the target project includes at least one task node;

[0167] A first confirmation module 704 is configured to determine task node structure data corresponding to each task node based on the project management structured data, wherein the task node structure data includes project attribute information corresponding to at least one display dimension;

[0168] A second confirmation module 706 is configured to determine an interactive view type and at least one target display dimension;

[0169] The generating module 708 is configured to generate a target interactive view corresponding to the target project according to the interactive view type, each target display dimension and project attribute information corresponding to each target display dimension.

[0170] Optionally, the second confirmation module 706 is further configured to:

[0171] Receive project display instructions;

[0172] The project display instruction is parsed to obtain an interactive view type and at least one target display dimension.

[0173] Optionally, the generating module 708 is further configured to:

[0174] Generate a project management tree corresponding to the target project according to the project attribute information corresponding to each task node;

[0175] A target interactive view is generated according to the project management tree and the interactive view type.

[0176] Optionally, the generating module 708 is further configured to:

[0177] Acquire at least one display dimension interval corresponding to each target display dimension according to the project attribute information corresponding to each task node;

[0178] Determining the subnodes of the project management tree according to each display dimension interval;

[0179] Each task node is determined to be a leaf node of the project management tree.

[0180] Optionally, the generating module 708 is further configured to:

[0181] Get dimension display order information;

[0182] The child nodes of the project management tree are determined according to the dimension display order information and each display dimension interval.

[0183] Optionally, the interactive view type includes a fishbone diagram;

[0184] The generating module 708 is further configured to:

[0185] Determine that the child node corresponding to the root node in the project management tree is the trunk node of the fishbone diagram;

[0186] Generate the trunk information of the fishbone diagram based on the display dimension interval corresponding to each trunk node of the fishbone diagram;

[0187] A fishbone diagram corresponding to the target project is generated according to the descendant nodes corresponding to the project management tree of each fishbone diagram trunk node and the fishbone diagram trunk information.

[0188] Optionally, the interactive view type includes a mind map;

[0189] The generating module 708 is further configured to:

[0190] Generate mind map root node information according to the target project;

[0191] Based on each sub-node of the project management tree, generating at least one mind map sub-node information;

[0192] Generate mind map terminal node information corresponding to each task node according to the task node structure data corresponding to each task node and each leaf node in the project management tree;

[0193] The mind map corresponding to the target project is obtained according to the mind map root node information, each mind map sub-node information and each mind map terminal node information.

[0194] Optionally, the project management device further includes a data adjustment module configured to:

[0195] receiving view adjustment information for the target interactive view;

[0196] The project management structured data is adjusted according to the view adjustment information.

[0197] Optionally, the data adjustment module is further configured to:

[0198] receiving node update information for at least one target node in the target interactive view; and / or,

[0199] Node addition information for the target interactive view is received.

[0200] Optionally, the view adjustment information includes node update information;

[0201] The data adjustment module is further configured to:

[0202] Determine at least one target node corresponding to the node update information, and determine identification information corresponding to each target node;

[0203] Determine the data record to be updated corresponding to each target node in the structured data according to each identification information;

[0204] The project management structured data is updated according to the node update information.

[0205] Optionally, the view adjustment information includes node addition information;

[0206] The data adjustment module is further configured to:

[0207] According to the node adding information, task node structure data corresponding to at least one task node is added to the project management structured data.

[0208] Optionally, the project management device further includes a task scheduling module configured to:

[0209] Determining at least one to-be-performed subtask corresponding to the target project according to the target interactive view;

[0210] According to the project attribute information corresponding to the time dimension of each subtask to be executed, the task scheduling information corresponding to the target project is determined.

[0211] By applying the solution of the embodiments of this specification, by receiving and processing the view adjustment information in the target interactive view, it is possible to achieve real-time adjustment of project management structured data, ensure the accuracy of data modification, and avoid confusion caused by misoperation or repeated updates. After determining the node update information, the system can accurately locate and update the data of the relevant task nodes to ensure that key information such as task progress, resource allocation and priority is maintained in a timely manner. At the same time, receiving node added information enables the project task structure to be dynamically expanded, and new tasks are smoothly integrated into the existing project framework, ensuring that the project can flexibly respond to changing needs. In addition, the interactive view intuitively displays task scheduling information, clarifies the time arrangement and dependencies of tasks, facilitates flexible adjustment of plans, avoids waste of resources, and thus greatly improves the efficiency and accuracy of project management.

[0212] The above is a schematic scheme of a project management device of this embodiment. It should be noted that the technical scheme of the project management device and the technical scheme of the above project management method belong to the same concept, and the details not described in detail in the technical scheme of the project management device can be referred to the description of the technical scheme of the above project management method.

[0213] Figure 8 The block diagram of a computing device 800 according to an embodiment of the present specification is shown. The components of the computing device 800 include but are not limited to a memory 810 and a processor 820. The processor 820 is connected to the memory 810 via a bus 830, and a database 850 is used to store data.

[0214] The computing device 800 also includes an access device 840 that enables the computing device 800 to communicate via one or more networks 860. Examples of these networks include a public switched telephone network (PSTN), a local area network (LAN), a wide area network (WAN), a personal area network (PAN), or a combination of communication networks such as the Internet. The access device 840 may include one or more of any type of network interface (e.g., a network interface card (NIC)) that is wired or wireless, such as an IEEE 802.11 wireless local area network (WLAN) wireless interface, a world-wide interoperability for microwave access (Wi-MAX) interface, an Ethernet interface, a universal serial bus (USB) interface, a cellular network interface, a Bluetooth interface, and a near field communication (NFC).

[0215] In one embodiment of the present specification, the above components of the computing device 800 and Figure 8 Other components not shown in the figure may also be connected to each other, for example, via a bus. It should be understood that Figure 8 The computing device structure block diagram shown is only for the purpose of illustration, and is not intended to limit the scope of this specification. Those skilled in the art can add or replace other components as needed.

[0216] The computing device 800 may be any type of stationary or mobile computing device, including a mobile computer or mobile computing device (e.g., a tablet computer, a personal digital assistant, a laptop computer, a notebook computer, a netbook, etc.), a mobile phone (e.g., a smart phone), a wearable computing device (e.g., a smart watch, smart glasses, etc.), or other types of mobile devices, or a stationary computing device such as a desktop computer or a personal computer (PC). The computing device 800 may also be a mobile or stationary server.

[0217] The processor 820 is used to execute the following computer executable instructions, which, when executed by the processor, implement the steps of the above-mentioned project management method.

[0218] The above is a schematic scheme of a computing device of this embodiment. It should be noted that the technical scheme of the computing device and the technical scheme of the above project management method belong to the same concept, and the details not described in detail in the technical scheme of the computing device can be referred to the description of the technical scheme of the above project management method.

[0219] An embodiment of the present specification also provides a computer-readable storage medium storing computer-executable instructions, which can implement the steps of the above-mentioned project management method when executed by a processor.

[0220] The above is a schematic scheme of a computer-readable storage medium of this embodiment. It should be noted that the technical scheme of the storage medium and the technical scheme of the project management method described above are of the same concept, and the details not described in detail in the technical scheme of the storage medium can be found in the description of the technical scheme of the project management method described above.

[0221] An embodiment of the present specification also provides a computer program product, including a computer program / instruction, which implements the steps of the above-mentioned project management method when executed by a processor.

[0222] The above is a schematic scheme of a computer program of this embodiment. It should be noted that the technical scheme of the computer program and the technical scheme of the project management method described above are of the same concept, and the details not described in detail in the technical scheme of the computer program can be found in the description of the technical scheme of the project management method described above.

[0223] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0224] The computer instructions include computer program codes, which may be in source code form, object code form, executable files or some intermediate forms, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer-readable medium may be appropriately increased or decreased according to the requirements of patent practice. For example, in some regions, according to patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.

[0225] It should be noted that, for the above-mentioned method embodiments, for the sake of simplicity of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the embodiments of this specification are not limited by the order of the actions described, because according to the embodiments of this specification, some steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the embodiments of this specification.

[0226] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0227] The preferred embodiments of this specification disclosed above are only used to help explain this specification. The optional embodiments do not describe all the details in detail, nor do they limit the invention to only the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of the embodiments of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the embodiments of this specification, so that technicians in the relevant technical field can well understand and use this specification. This specification is only limited by the claims and their full scope and equivalents.

Claims

1. A project management method, characterized in that: include: Acquire project management structured data for a target project, wherein the target project includes at least one task node; Determining task node structure data corresponding to each task node based on the project management structured data, wherein the task node structure data includes project attribute information corresponding to at least one display dimension; Determine the interactive view type and at least one target display dimension; A target interactive view corresponding to the target project is generated according to the interactive view type, each target display dimension and project attribute information corresponding to each target display dimension.

2. The method according to claim 1, characterized in that Identify the interaction view type and at least one target impression dimension, including: Receive project display instructions; The project display instruction is parsed to obtain an interactive view type and at least one target display dimension.

3. The method according to claim 1, characterized in that Generating a target interactive view corresponding to the target project according to the interactive view type, each target display dimension and project attribute information corresponding to each target display dimension includes: Generate a project management tree corresponding to the target project according to the project attribute information corresponding to each task node; A target interactive view is generated according to the project management tree and the interactive view type.

4. The method according to claim 3, characterized in that Generate a project management tree corresponding to the target project according to the project attribute information corresponding to each task node, including: Acquire at least one display dimension interval corresponding to each target display dimension according to the project attribute information corresponding to each task node; Determining the subnodes of the project management tree according to each display dimension interval; Each task node is determined to be a leaf node of the project management tree.

5. The method according to claim 4, characterized in that Determining the sub-nodes of the project management tree according to each display dimension interval includes: Get dimension display order information; The child nodes of the project management tree are determined according to the dimension display order information and each display dimension interval.

6. The method according to claim 3, characterized in that The interactive view types include fishbone diagrams; Generating a target interactive view according to the project management tree and the interactive view type includes: Determine that the child node corresponding to the root node in the project management tree is the trunk node of the fishbone diagram; Generate the trunk information of the fishbone diagram based on the display dimension interval corresponding to each trunk node of the fishbone diagram; A fishbone diagram corresponding to the target project is generated according to the descendant nodes corresponding to the main nodes of the fishbone diagram in the project management tree and the main information of the fishbone diagram.

7. The method according to claim 3, characterized in that The interactive view types include mind maps; Generating a target interactive view according to the project management tree and the interactive view type includes: Generate mind map root node information according to the target project; Based on each sub-node of the project management tree, generating at least one mind map sub-node information; Generate mind map terminal node information corresponding to each task node according to the task node structure data corresponding to each task node and each leaf node in the project management tree; The mind map corresponding to the target project is obtained according to the mind map root node information, each mind map sub-node information and each mind map terminal node information.

8. The method according to claim 1, characterized in that After generating the target interactive view according to the project management tree and the interactive view type, the method further includes: receiving view adjustment information for the target interactive view; The project management structured data is adjusted according to the view adjustment information.

9. The method according to claim 8, characterized in that Receiving view adjustment information for the target interactive view, including: receiving node update information for at least one target node in the target interactive view; and / or, Node addition information for the target interactive view is received.

10. The method according to claim 8, characterized in that The view adjustment information includes node update information; Adjusting the project management structured data according to the view adjustment information includes: Determine at least one target node corresponding to the node update information, and determine identification information corresponding to each target node; Determine the data record to be updated corresponding to each target node in the structured data according to each identification information; The project management structured data is updated according to the node update information.

11. The method according to claim 8, characterized in that The view adjustment information includes node addition information; Adjusting the project management structured data according to the view adjustment information includes: According to the node adding information, task node structure data corresponding to at least one task node is added to the project management structured data.

12. The method according to claim 1, characterized in that After generating the target interactive view according to the project management tree and the interactive view type, the method further includes: Determining at least one to-be-performed subtask corresponding to the target project according to the target interactive view; According to the project attribute information corresponding to the time dimension of each subtask to be executed, the task scheduling information corresponding to the target project is determined.

13. A project management device, characterized in that: include: An acquisition module is configured to acquire project management structured data for a target project, wherein the target project includes at least one task node; A first confirmation module is configured to determine task node structure data corresponding to each task node based on the project management structured data, wherein the task node structure data includes project attribute information corresponding to at least one display dimension; A second confirmation module is configured to determine an interactive view type and at least one target display dimension; The generating module is configured to generate a target interactive view corresponding to the target project according to the interactive view type, each target display dimension and project attribute information corresponding to each target display dimension.

14. A computing device, characterized in that include: Memory and processor; The memory is used to store computer programs / instructions, and the processor is used to execute the computer programs / instructions. When the computer program / instructions are executed by the processor, the steps of the method according to any one of claims 1 to 12 are implemented.

15. A computer-readable storage medium storing a computer program / instruction, characterized in that: When the computer program / instructions are executed by a processor, the steps of the method according to any one of claims 1 to 12 are implemented.

16. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instructions are executed by a processor, the steps of the method according to any one of claims 1 to 12 are implemented.

Citation Information

Cited By

  • Graph structure manufacturing method and device for project management

    CN119398142A

  • Project management system, method and device

    CN121146707A

  • Data processing system and method

    CN121146709A