Building thermal performance intelligent energy-saving analysis method based on BIM

Through intelligent energy-saving analysis methods based on BIM, detailed building models and integrated thermal performance parameters are constructed, intelligent simulation algorithms and optimization strategies are developed, multidisciplinary collaborative platform and energy management system are established, and the refined and refined methods of traditional building energy-saving analysis methods are solved. Personalized problems have achieved efficient improvement in building energy efficiency and reduction in energy costs.

CN118981816APending Publication Date: 2024-11-19BEIJING NO 5 CONSTR ENG GRP
View PDF 0 Cites 5 Cited by

Patent Information

Application Number
CN202410976751.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-21
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

Traditional building energy-saving analysis methods are difficult to fully consider the complexity and variability of buildings, and cannot achieve refined and personalized energy-saving designs. The existing BIM applications are not in-depth and extensive enough in building energy-saving analysis.

Method used

Using BIM-based intelligent energy-saving analysis method for building thermal performance, a detailed BIM model is constructed through three-dimensional laser scanning and parameterized modeling, integrating thermal performance parameters, developing intelligent simulation algorithms, combining machine learning and optimization algorithms to generate energy-saving optimization strategies, and Establish a multidisciplinary collaborative work platform and a full-life cycle energy management system.

Benefits of technology

It significantly improves the accuracy of building thermal performance analysis, improves the efficiency and quality of energy-saving design, reduces design and construction costs, promotes project team collaboration, and realizes building energy efficiency optimization and continuous monitoring and optimization of long-term energy use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118981816A_ABST
    Figure CN118981816A_ABST
Patent Text Reader

Abstract

The invention discloses a BIM-based building thermal performance intelligent energy-saving analysis method, which comprises the following steps of S1, constructing a BIM model containing detailed information such as building geometric shapes, material attributes and component connection relationships by utilizing a three-dimensional laser scanning technology and parametric modeling software; s2, integrating thermal performance parameters of the building envelope in the BIM model, wherein the thermal performance parameters comprise a heat conduction coefficient, heat capacity, a heat bridge effect coefficient and the like; s3, developing an intelligent simulation algorithm based on a physical law for simulating heat conduction, a heat bridge effect and a solar heat gaining condition of the building; s4, automatically generating an energy-saving optimization strategy according to a simulation result by utilizing machine learning and an optimization algorithm; s5, establishing a multidisciplinary cooperative working platform, and realizing real-time cooperation and decision-making of architects, engineers, contractor and facility management personnel; and S6, combining the BIM model with an energy management system to realize continuous tracking, analysis and optimization of energy use and maintenance conditions in the whole life cycle of the building.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of building construction, and in particular to a BIM-based intelligent energy-saving analysis method for building thermal performance. Background Art

[0002] With the continuous growth of global energy consumption and the increasingly serious environmental problems, building energy conservation has become an important issue that cannot be ignored in building design, construction and operation. Buildings account for a considerable proportion of energy consumption during their life cycle. Therefore, improving building energy efficiency and reducing building energy consumption have significant economic and environmental value.

[0003] Traditional building energy-saving analysis mainly relies on empirical estimation and simplified calculations. These methods often fail to fully consider the complexity and variability of buildings, making it difficult to achieve refined and personalized energy-saving design.

[0004] In recent years, the development of Building Information Modeling (BIM) technology has brought revolutionary changes to the construction field. BIM technology creates and manages digital information of buildings, realizing 3D visualization and data integration throughout the life cycle of construction projects.

[0005] However, existing BIM applications are mostly focused on building design and construction management, while their application in building energy-saving analysis is not deep and extensive enough. Summary of the invention

[0006] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a BIM-based intelligent energy-saving analysis method for building thermal performance, which can realize accurate analysis and optimization of building thermal performance to improve building energy efficiency and reduce energy consumption.

[0007] The above technical objectives of the present invention are achieved through the following technical solutions: A BIM-based building thermal performance intelligent energy-saving analysis method, comprising the following steps: S1, using 3D laser scanning technology and parametric modeling software to build a BIM model containing detailed information such as building geometry, material properties, and component connection relationships; S2, integrating the thermal performance parameters of the building envelope into the BIM model, including thermal conductivity, heat capacity, thermal bridge effect coefficient, etc.; S3, develops intelligent simulation algorithms based on physical laws to simulate heat conduction, thermal bridge effects and solar heat gain in buildings; S4, using machine learning and optimization algorithms to automatically generate energy-saving optimization strategies based on simulation results; S5, establish a multidisciplinary collaborative work platform to achieve real-time collaboration and decision-making among architects, engineers, contractors and facility managers; S6 combines BIM models with energy management systems to achieve continuous tracking, analysis and optimization of energy use and maintenance throughout the life cycle of a building.

[0008] In a preferred example, the present invention can be further configured as follows: In step S1, the BIM model construction steps are as follows: S11, using drones and ground-based photogrammetry to collect high-precision data on construction sites; S12, through the parametric design function of BIM software, the building model can be automatically updated; S13, integrates detailed fabrication and installation information of building components to support material and cost management during the construction phase.

[0009] In a preferred example, the present invention can be further configured as follows: In step S3, the intelligent simulation algorithm steps are as follows: S31, heat conduction simulation algorithm based on finite element analysis (FEA): This algorithm discretizes building components into a finite number of elements and nodes, establishes a mathematical model of heat conduction, and uses material property data in the BIM model, such as thermal conductivity, specific heat capacity, etc., to provide necessary input parameters for FEA. The algorithm can accurately calculate the heat transfer path and temperature distribution under different materials and structural configurations. The expected result is to generate a detailed heat conduction report, including heat loss, thermal bridge effect, and internal temperature field distribution; S32, a simulation algorithm combining building information modeling and computational fluid dynamics (CFD) technology: This algorithm integrates the three-dimensional geometric information of the BIM model and is used to set the calculation domain of the CFD simulation. The CFD technology is used to simulate the air flow, temperature distribution and humidity changes inside the building, taking into account the influence of natural ventilation and mechanical ventilation. The algorithm can evaluate the impact of different ventilation strategies on the indoor thermal environment and provide suggestions for optimizing the design of the ventilation system for building design. The expected result is to provide an indoor thermal comfort analysis report, including air velocity, temperature distribution and humidity level; S33, Solar energy utilization simulation algorithm using solar radiation model and geographic information system (GIS) data: This algorithm combines solar radiation model to calculate the impact of solar radiation on buildings according to the building's geographical location, orientation and seasonal changes. It uses GIS data, including terrain, building shading and climate conditions, to adjust the input parameters of the solar radiation model to improve the accuracy of the simulation. The algorithm can evaluate the efficiency of the building's use of solar energy, including the potential for solar heating, natural lighting and solar power generation. The expected result is to generate a solar energy utilization analysis report and provide solar energy integration solutions for building design, such as solar panel layout and window design; Through the combined use of these three simulation algorithms, the thermal performance of the building can be comprehensively evaluated, scientific decision-making support can be provided for building design and operation, and the building energy efficiency can be optimized and improved.

[0010] In a preferred example, the present invention can be further configured as follows: In step S4, the energy-saving optimization strategy steps are as follows: S41, using a multi-objective optimization algorithm, automatically calculates the optimal building design solution by considering the building's aesthetics, practicality, economy, and energy efficiency; S42, develop a user interaction interface to allow users to adjust energy-saving optimization strategies according to actual needs and preferences; S43, combined with building life cycle cost analysis (LCCA), evaluates the economic benefits of energy-saving optimization strategies.

[0011] In a preferred example, the present invention can be further configured as follows: In step S5, the multidisciplinary collaborative work platform steps are as follows: S51, an integrated project management tool for tracking project progress and coordinating the work of various parties involved; S52, a shared BIM model viewing and editing platform that allows people from different disciplines to access, comment on and modify models; S53, a communication and collaboration tool, supports instant messaging, video conferencing, and document sharing among team members.

[0012] In a preferred example, the present invention can be further configured as follows: In step S6, the steps of the building life cycle are as follows: S61, establish a database of energy usage of buildings, record the energy consumption of buildings, and conduct trend analysis; S62, using data analytics and machine learning techniques to predict energy demand and energy saving potential in buildings; S63, Implement energy audit and maintenance programs to optimize the energy efficiency of buildings and regularly evaluate the effectiveness of energy-saving measures.

[0013] In a preferred example, the present invention can be further configured to include the following steps: S7, Energy-saving analysis and scheme design in the building design stage: Use BIM models to conduct preliminary energy-saving analysis and evaluate the impact of different design schemes on building energy consumption; apply intelligent simulation algorithms, such as FEA and CFD, to predict the thermal comfort and energy demand of the building under different design schemes. According to the simulation results, conduct scheme design and select the optimal building layout, materials and component configuration to achieve the expected energy-saving goals. The expected result of the design stage is to form a set of energy-saving and functional-compliant building design schemes and generate corresponding BIM models. S8, Construction simulation and material management in the building construction phase: Use BIM models to perform three-dimensional simulation of the construction process, optimize construction plans and construction sequences, apply BIM models to manage materials, including material procurement plans, inventory control, and on-site logistics arrangements, integrate construction simulation through BIM models, identify conflicts and problems that may arise during the construction process, and develop solutions in advance. The expected results of the construction phase are to improve construction efficiency, reduce material waste, and ensure construction quality and safety; S9, Energy management and maintenance in the building operation phase: Use BIM models to integrate building operation data, including energy consumption, equipment status, and maintenance records, apply intelligent algorithms, such as predictive maintenance based on machine learning, to monitor the condition and diagnose faults of building equipment, and implement energy management strategies, such as optimizing energy usage patterns, regular maintenance, and equipment upgrades to extend equipment life and reduce energy consumption. The expected results of the operation phase are to achieve efficient energy use in buildings, reduce operating costs, and improve the sustainable performance of buildings. Through continuous application in the three stages of building design, construction and operation, the BIM model can provide support for energy-saving management and optimization throughout the entire life cycle of the building. This not only helps to improve the quality and efficiency of building design, but also ensures the smooth progress of the construction process and achieves continuous energy optimization and cost savings in the building operation stage.

[0014] In a preferred example, the present invention can be further configured to include the following steps: S10, using virtual reality (VR) and augmented reality (AR) technology to provide users with intuitive display and interactive experience of energy-saving analysis results; S11, using mobile devices and cloud technology to achieve anytime, anywhere access to BIM models and energy management; S12, using blockchain technology to ensure the security and traceability of BIM model data.

[0015] In a preferred example, the present invention can be further configured to include the following steps: S13, integrates with existing building design software and energy simulation software to achieve seamless data exchange and sharing; S14, develop a user-friendly interface, simplify the user operation process, and improve the user experience; S15 provides customized services and offers personalized energy-saving analysis and optimization solutions based on users’ specific needs.

[0016] In a preferred example, the present invention can be further configured to include the following steps: S16, integrate real-time meteorological data and indoor and outdoor environmental monitoring data into the BIM model to improve the accuracy and real-time performance of the simulation; S17, Develop intelligent diagnostic and predictive maintenance systems that use machine learning techniques to predict failures and maintenance needs of building equipment; S18, combined with user behavior analysis, optimizes the building's energy usage pattern to improve energy efficiency and user satisfaction.

[0017] In summary, the present invention has the following beneficial effects: First, by constructing a sophisticated BIM model and integrating thermal performance parameters, the accuracy of building thermal performance analysis has been greatly improved, enabling building design to achieve energy efficiency optimization at an early stage; Secondly, the developed intelligent simulation algorithm combines machine learning technology to automatically generate energy-saving optimization strategies, significantly improving the efficiency and quality of energy-saving design while reducing design and construction costs; Thirdly, the establishment of a multidisciplinary collaborative work platform has broken down information silos, promoted effective communication and collaboration among project team members, shortened the engineering cycle, and improved the coordination and success rate of project execution; In addition, the full life cycle energy management system realizes continuous monitoring and optimization of energy use during the building operation phase, which helps to reduce long-term operating costs and improve the sustainable performance of buildings. Finally, through the integration of user-friendly interface and mobile cloud technology, building energy-saving analysis and energy management are more convenient and intuitive, enhancing user participation and satisfaction.

[0018] In general, the present invention provides a comprehensive, efficient and precise solution for the field of building energy conservation through a series of innovative technologies, and has important practical application value for promoting green buildings and sustainable development. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a flow chart of steps 1-8 of the intelligent energy-saving analysis method of the present invention; Figure 2 This is a flow chart of steps 9-16 of the intelligent energy-saving analysis method of the present invention. DETAILED DESCRIPTION

[0020] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0021] Reference Figure 1 and Figure 2 The technical solution of the present invention is a BIM-based intelligent energy-saving analysis method for building thermal performance, which aims to achieve accurate analysis and optimization of building thermal performance through a series of highly integrated steps to improve building energy efficiency and reduce energy consumption.

[0022] The following is the specific process of this technical solution: 1. BIM model construction: Preferably, high-precision three-dimensional laser scanning technology is used to scan the building in all directions to obtain the precise geometric data of the building, including size, shape and spatial layout.

[0023] Preferably, photogrammetry technology is used to collect texture and color information of the building surface to enhance the realism and visual effect of the model.

[0024] Preferably, advanced parametric modeling software is used to construct a detailed three-dimensional BIM model based on the collected data, including the geometry and spatial layout of components such as walls, roofs, floors, windows, etc.

[0025] Preferably, the material properties of building components, such as thermal conductivity, density, specific heat capacity, etc., are input into the BIM model to provide basic data for subsequent thermal performance analysis.

[0026] Preferably, the parametric function of BIM software is used to dynamically update the building model to adapt to design changes and material replacements.

[0027] 2. Integration of thermal performance parameters: Preferably, the thermal performance parameters of the building envelope structure, including but not limited to thermal conductivity, heat capacity, thermal resistance, etc., are integrated into the BIM model to provide key input for thermal performance simulation.

[0028] Preferably, for complex building components, such as double-glazed windows, composite walls, etc., detailed thermal performance analysis is performed to ensure the accuracy of the model and the reliability of the simulation results.

[0029] Preferably, the database function of the BIM software is used to store and manage thermal performance parameters to facilitate parameter query, update and maintenance.

[0030] 3. Intelligent simulation algorithm development: Preferably, an intelligent simulation algorithm based on physical laws is developed to simulate the heat conduction, thermal bridge effect and solar heat gain of the building, and provide accurate thermal performance prediction.

[0031] Preferably, the algorithm considers environmental factors such as indoor and outdoor temperature difference, solar radiation, wind speed, humidity, etc., and dynamically analyzes the temperature field inside the building to evaluate thermal comfort and energy consumption under different design conditions.

[0032] Preferably, finite element analysis (FEA) and computational fluid dynamics (CFD) techniques are combined to improve the accuracy and efficiency of simulation and achieve efficient simulation of complex building systems.

[0033] 4. Energy saving optimization strategy generation: Preferably, machine learning and multi-objective optimization algorithms are used to automatically generate energy-saving optimization strategies based on simulation results to achieve optimization of building energy efficiency.

[0034] Preferably, the optimal building design scheme is automatically calculated taking into account the aesthetics, practicality, economy and energy efficiency of the building, including the thickness of insulation layers of walls and roofs, window size and location, material selection and replacement, etc.

[0035] Preferably, a user interaction interface is developed to allow users to adjust the energy-saving optimization strategy according to actual needs and preferences, and to display the energy-saving effect and economic benefits in real time through visualization tools.

[0036] 5. Multidisciplinary collaborative work platform: Preferably, a multidisciplinary collaborative work platform is established to allow architects, engineers, contractors, and facility managers to collaborate and make decisions in real time on the same BIM model, thereby improving the efficiency of design and construction.

[0037] Preferably, the platform provides real-time data sharing, communication, and project management tools to improve the efficiency of team collaboration and the success rate of projects.

[0038] Preferably, personnel from different disciplines are supported to access, comment on and modify the model to achieve design integration and optimization and reduce design conflicts and construction errors.

[0039] 6. Full life cycle energy management: Preferably, the BIM model is combined with an advanced energy management system to achieve continuous tracking, analysis and optimization of energy use and maintenance throughout the life cycle of a building.

[0040] Preferably, an energy usage database is established to record the energy consumption of the building and perform trend analysis to identify energy saving opportunities and develop improvement measures.

[0041] Use data analysis and machine learning techniques to predict a building’s energy demand and energy-saving potential, and develop corresponding energy-saving measures, such as equipment upgrades, behavioral adjustments, etc.

[0042] 7. Real-time Data Integration: Preferably, real-time meteorological data and indoor and outdoor environmental monitoring data are integrated into the BIM model to improve the accuracy and real-time performance of the simulation and realize dynamic thermal performance analysis.

[0043] Preferably, sensors and IoT technologies are used to collect environmental data inside and outside the building in real time and integrate them with the BIM model to provide real-time input for thermal performance analysis and energy management.

[0044] 8. Intelligent diagnosis and predictive maintenance: Preferably, develop intelligent diagnostic and predictive maintenance systems that use machine learning techniques to predict failures and maintenance needs of construction equipment, reducing unexpected downtime and repair costs.

[0045] Preferably, by analyzing the operating data and maintenance history of the equipment, potential failures and performance degradation are predicted to achieve preventive maintenance and optimize maintenance plans.

[0046] 9. User behavior analysis: Preferably, user behavior analysis is combined to optimize the building's energy usage pattern, improve energy efficiency and user satisfaction.

[0047] Preferably, sensors and data analysis technologies are used to collect user behavior data, such as indoor activities, energy usage habits, etc., to evaluate user responses and preferences to the building environment.

[0048] Preferably, energy usage strategies, such as lighting control, temperature regulation, etc., are adjusted based on user behavior data to meet user needs and reduce energy consumption.

[0049] 10. Virtual Reality and Augmented Reality Technology Applications: Preferably, virtual reality (VR) and augmented reality (AR) technologies are used to provide users with an intuitive display and interactive experience of energy-saving analysis results, thereby enhancing users' understanding of energy-saving design and optimization effects.

[0050] Preferably, VR / AR applications are developed to allow users to view building models and energy-saving optimization solutions in a virtual environment for immersive design evaluation and decision-making.

[0051] Mobile devices and cloud technology applications: Preferably, mobile devices and cloud technology are used to achieve anytime and anywhere access and energy management of BIM models, improving user convenience and flexibility.

[0052] Preferably, a mobile application is developed to allow users to access the BIM model and energy management data via a smartphone or tablet for remote monitoring and control.

[0053] 12. Blockchain technology applications: Preferably, blockchain technology is used to ensure the security, integrity and traceability of BIM model data and enhance the reliability and trust of the data.

[0054] Preferably, blockchain technology is used to achieve distributed storage and encryption protection of data, prevent data tampering and unauthorized access, and ensure long-term preservation and use of data.

[0055] 13. Customized services: Preferably, customized services are provided to provide personalized energy-saving analysis and optimization solutions based on the specific needs of users to meet the specific requirements of different users.

[0056] Preferably, energy-saving analysis and optimization strategies are customized according to the user's geographical location, climate conditions, building type and usage requirements to achieve the best energy-saving effect and return on investment.

[0057] 14. Integrate existing software: Preferably, it is integrated with existing building design software and energy simulation software to achieve seamless exchange and sharing of data, and improve work efficiency and data consistency.

[0058] Preferably, interoperability with mainstream building design and energy simulation software is achieved through open APIs and data exchange formats, making it convenient for users to migrate and integrate existing data and tools.

[0059] 15. User-friendly interface: Preferably, a user-friendly interface is developed to simplify the user operation process, improve the user experience, lower the usage threshold, and attract more users to use the energy-saving analysis method.

[0060] Preferably, the interface design takes into account the needs of users with different professional backgrounds, provides intuitive operation instructions and feedback information, and helps users quickly understand and master the energy-saving analysis and optimization process.

[0061] Preferably, a multi-language interface is supported to meet the usage requirements of users in different countries and regions and promote the international application of the energy-saving analysis method.

[0062] By implementing the above technical solutions, the present invention can provide a comprehensive, accurate and automated analysis and optimization tool for the field of building energy conservation, which will help to significantly improve building energy efficiency and effectively reduce energy costs, while providing users with a convenient, efficient and personalized service experience.

[0063] The present invention proposes a series of innovative solutions to the various technical problems existing in the field of building energy-saving analysis, including how to achieve efficient integration of building data, improve the accuracy of thermal performance simulation, promote real-time collaboration between multidisciplinary teams, achieve energy management throughout the life cycle of buildings, conduct real-time performance monitoring and response, predictively maintain building equipment, match user behavior with energy usage patterns, provide intuitive technical display and interactive experience, achieve integration of mobile access and cloud technology, ensure data security and integrity, provide services that meet personalized needs, achieve seamless integration with existing building design and energy simulation software, and develop a user-friendly operating interface. By constructing a detailed BIM model, developing intelligent simulation algorithms, establishing a multidisciplinary collaborative work platform, integrating real-time monitoring data, applying machine learning for predictive maintenance, analyzing user behavior to optimize energy use, using VR / AR technology to enhance experience, developing mobile applications for cloud access, using blockchain technology to ensure data security, providing customized services to meet different user needs, and designing an easy-to-use multilingual user interface, the present invention significantly improves the accuracy, efficiency and user interaction experience of building energy-saving analysis, while ensuring data security and software compatibility. Example

[0064] In order to implement the BIM-based intelligent energy-saving analysis method of building thermal performance of the present invention, we will follow the following detailed steps, which contain key parameters and expected results to ensure the clarity of the process and the logic of the steps.

[0065] S1. Data collection phase: 3D laser scanning technology is used to collect building dimension data with an accuracy of ±2mm.

[0066] Photogrammetry was used to capture building surface textures at 1080p resolution.

[0067] Collect material property data of building components, including thermal conductivity (λ), density (ρ), specific heat capacity (c), etc.

[0068] S2. BIM model construction phase: The 3D model is constructed based on the collected data using BIM software. The model construction time is expected to be completed within 3 working days after data collection.

[0069] After the model is built, an accuracy check is performed to ensure that the error between the model and the actual building does not exceed 5mm.

[0070] Thermal performance parameter integration stage: Enter the thermal conductivity of the wall material λ=0.4W / m·K and the thermal conductivity of the roof material λ=0.3W / m·K in the BIM model. The U value (thermal conductivity) of the integrated window is 1.5W / m²·K, which is determined based on the window material and airtightness.

[0071] S3. Environmental factors analysis phase: Collect climate data for the building location over the past year, including average temperature, humidity, wind speed, and solar radiation intensity. Analyze climate data to determine the environmental factors that have the greatest impact on the building's thermal performance, such as solar radiation intensity.

[0072] S4. Intelligent simulation algorithm development phase: Develop a heat conduction simulation algorithm based on finite element analysis, with an estimated development cycle of 2 months. After the algorithm is completed, a simulation test will be conducted to simulate the internal temperature distribution of the building in summer and winter, with an expected error of no more than 2°C.

[0073] S5. Energy-saving optimization strategy generation phase: Use machine learning algorithms to analyze simulation results and automatically generate energy-saving optimization strategies. The development cycle is expected to be 3 months. The expected result is to reduce building energy consumption by at least 10% and improve energy efficiency.

[0074] S6. Multidisciplinary collaborative work platform establishment phase: Establish a collaborative work platform, integrate project management tools, and realize real-time collaboration among different professional teams. After the platform is established, it is expected to reduce the rework time caused by design changes by 30%.

[0075] S7. Full life cycle energy management stage: Combine BIM model and energy management system to track and manage the energy use of the building from design to demolition. It is expected that through the optimization of energy management system, the long-term operating cost can be reduced by 15%.

[0076] S8. Real-time monitoring and dynamic response stage: Integrate indoor and outdoor environmental sensors to monitor temperature, humidity and other data in real time, with an update frequency of once per minute. Adjust the building energy use strategy based on real-time data, and it is expected to increase energy response speed by 50%.

[0077] S9. Predictive maintenance and intelligent diagnosis phase: Develop a predictive maintenance system with an estimated development cycle of 4 months. Reduce unexpected downtime through intelligent diagnosis and reduce maintenance costs by 20%.

[0078] S10. User behavior analysis and personalized optimization stage: Analyze user behavior data, such as indoor activity patterns, and adjust energy usage strategies. It is expected that through personalized optimization, user satisfaction will be improved by 30%.

[0079] S11. Virtual reality and augmented reality application stage: Develop VR / AR applications to demonstrate energy-saving optimization solutions. The estimated development cycle is 5 months. Through immersive experience, enhance the understanding of energy-saving design for non-professionals.

[0080] S12. Mobile access and cloud technology integration phase: Develop mobile applications to achieve cloud access to BIM models and energy management. The estimated development cycle is 6 months. Through mobile access, the user access frequency is increased, and user participation is expected to increase by 40%.

[0081] S13. Blockchain technology application stage: Apply blockchain technology to ensure data security, and the development cycle is expected to be 3 months. Through blockchain technology, ensure that data cannot be tampered with, and improve data security by 100%.

[0082] S14. Customized service and personalized solution stage: Provide customized services based on user specific needs, and the development cycle is determined by user needs. It is expected that at least 95% of user specific needs can be met through customized services.

[0083] S15. Existing software integration and data exchange phase: Integration with existing building design and energy simulation software is expected to take 4 months. Through integration, seamless data exchange is achieved and data consistency is improved by 100%.

[0084] S16. User-friendly interface design phase: Design an intuitive and easy-to-use user interface that supports multiple languages. The estimated design period is 2 months. Through the user-friendly interface, the operation complexity is reduced and user satisfaction is increased by 50%.

[0085] Through the above steps, the intelligent energy-saving analysis method of the present invention can not only provide a comprehensive, accurate, and automated analysis and optimization tool for the field of building energy conservation, but also significantly improve building energy efficiency, reduce energy consumption, and achieve sustainable development goals. At the same time, it provides users with a convenient, efficient, and personalized service experience. Example

[0086] In order to further illustrate the implementation of the present invention, another possible implementation method will be described in detail through the following steps, in which parameter selection and expected results will be detailed to ensure the logic and clarity of the entire process.

[0087] S1. Project initiation and demand analysis: Establish a project team and assign roles, including BIM modelers, energy analysts, software engineers, etc. Conduct demand analysis to determine project goals, schedules, and budgets. The estimated demand analysis cycle is 1 week.

[0088] On-site data collection: Use a high-precision laser scanner to scan the existing building in all directions and collect point cloud data, which is expected to take 2 days. Use drone photogrammetry to obtain building appearance images, which is expected to take 1 day.

[0089] S2. Preliminary construction of BIM model: Based on the point cloud data and images, a preliminary building model is constructed in the BIM software. The estimated preliminary modeling cycle is 2 weeks. The accuracy of the preliminary model is checked to ensure consistency with the on-site data.

[0090] Detailed component property input: Input the physical properties of building components in detail, such as the thermal conductivity of wall materials λ=0.6W / m·K, and the expected input cycle is 1 week. Input the U value of the building exterior windows as 1.8W / m²·K, which is determined based on the characteristics of double-layer insulating glass.

[0091] S3. Environmental parameters and simulation condition settings: According to the climate data of the building location, set the simulation conditions, including an annual average temperature of 15°C, humidity of 65%, wind speed of 2.5m / s, and solar radiation of 1100W / m². The estimated condition setting period is 1 week.

[0092] S4. Thermal performance simulation: Develop and run a thermal performance simulation algorithm to simulate the temperature changes of the building on a typical summer and winter day. The simulation period is expected to be 3 weeks. The simulation results are expected to show that the maximum temperature inside the building does not exceed 28°C and the minimum temperature is not less than 18°C.

[0093] S5. Automatic generation of energy-saving optimization strategies: Analyze simulation results using optimization algorithms and automatically generate energy-saving measures, such as increasing insulation thickness, adjusting window sizes, etc. The estimated strategy generation cycle is 4 weeks. It is expected that through optimization measures, building energy consumption will be reduced by 15%.

[0094] S6. Deployment and testing of collaborative work platform: Deploy a multidisciplinary collaborative work platform that integrates real-time communication and data sharing functions. The estimated deployment period is 1 month. Test the platform to ensure that different professional teams can collaborate without obstacles.

[0095] S7. Integration of energy management system: Integrate the BIM model with the energy management system to achieve real-time monitoring and analysis of energy use. The integration period is expected to be 2 months. It is expected that the energy management system will achieve real-time optimization of energy consumption.

[0096] S8. Installation and commissioning of real-time monitoring system: Install sensors at key locations of the building to monitor indoor and outdoor temperature, humidity, etc. The estimated installation period is 2 weeks. Commission the monitoring system to ensure the accuracy and real-time nature of the data.

[0097] S9. Development of predictive maintenance system: Develop a predictive maintenance system based on machine learning, with an estimated development cycle of 3 months. It is expected that predictive maintenance will reduce the accidental failure rate by 50%.

[0098] S10. Collection and analysis of user behavior data: Collect user activity data in the building, such as lighting and air conditioning usage. The collection period is expected to be 1 month. Analyze user behavior data and optimize energy usage patterns.

[0099] S11. Development of VR / AR applications: Develop VR / AR applications to display energy-saving optimization solutions and simulation results. The estimated development period is 4 months. Through VR / AR technology, users’ awareness and participation in energy-saving design will be improved.

[0100] S12. Design and implementation of mobile applications: Design and implement mobile applications that allow users to remotely access BIM models and energy data. The estimated development period is 5 months. It is expected that the mobile application will increase user access frequency and engagement.

[0101] S13. Integration of blockchain technology: Integrate blockchain technology to ensure data security and immutability. The integration period is expected to be 3 months. It is expected that blockchain technology will improve data transparency and trust.

[0102] S14. Development of customized services: Develop customized services based on specific user needs, and the development cycle is determined according to the needs. It is expected that customized services will meet the personalized needs of users and improve user satisfaction.

[0103] S15. Existing software integration and data exchange phase: Integration with existing building design and energy simulation software is expected to take 4 months. Through integration, seamless data exchange is achieved and data consistency is improved by 100%.

[0104] S16. User interface optimization: Optimize the user interface to improve usability and accessibility and support multiple languages. The optimization cycle is expected to be 2 months.

[0105] It is expected that through user interface optimization, user operation difficulty will be reduced and user experience will be improved.

[0106] Through the above specific implementation methods, the intelligent energy-saving analysis method of the present invention will be able to provide a comprehensive, accurate, and automated analysis and optimization tool for the field of building energy conservation, which will help to significantly improve building energy efficiency and effectively reduce energy costs. At the same time, it will provide users with a convenient, efficient, and personalized service experience.

[0107] The specific embodiments are merely explanations of the present invention and are not limitations of the present invention. After reading this specification, those skilled in the art may make modifications to the embodiments without any creative contribution as needed. However, such modifications are protected by the patent law as long as they are within the scope of the claims of the present invention.

Claims

1. A BIM-based intelligent energy-saving analysis method for building thermal performance, characterized by: The steps include: S1, using 3D laser scanning technology and parametric modeling software to build a BIM model containing detailed information such as building geometry, material properties, and component connection relationships; S2, integrating the thermal performance parameters of the building envelope into the BIM model, including thermal conductivity, heat capacity, thermal bridge effect coefficient, etc.; S3, develops intelligent simulation algorithms based on physical laws to simulate heat conduction, thermal bridge effects and solar heat gain in buildings; S4, using machine learning and optimization algorithms to automatically generate energy-saving optimization strategies based on simulation results; S5, establish a multidisciplinary collaborative work platform to achieve real-time collaboration and decision-making among architects, engineers, contractors and facility managers; S6 combines BIM models with energy management systems to achieve continuous tracking, analysis and optimization of energy use and maintenance throughout the life cycle of a building.

2. According to claim 1, a BIM-based building thermal performance intelligent energy-saving analysis method is characterized by: In step S1, the BIM model construction steps are as follows: S11, using drones and ground-based photogrammetry to collect high-precision data on construction sites; S12, through the parametric design function of BIM software, the building model can be automatically updated; S13, integrates detailed fabrication and installation information of building components to support material and cost management during the construction phase.

3. The intelligent energy-saving analysis method for building thermal performance based on BIM according to claim 1 is characterized by: In step S3, the intelligent simulation algorithm steps are as follows: S31, heat conduction simulation algorithm based on finite element analysis (FEA): This algorithm discretizes building components into a finite number of elements and nodes, establishes a mathematical model of heat conduction, and uses material property data in the BIM model, such as thermal conductivity, specific heat capacity, etc., to provide necessary input parameters for FEA. The algorithm can accurately calculate the heat transfer path and temperature distribution under different materials and structural configurations. The expected result is to generate a detailed heat conduction report, including heat loss, thermal bridge effect, and internal temperature field distribution; S32, a simulation algorithm combining building information modeling and computational fluid dynamics (CFD) technology: This algorithm integrates the three-dimensional geometric information of the BIM model and is used to set the calculation domain of the CFD simulation. The CFD technology is used to simulate the air flow, temperature distribution and humidity changes inside the building, taking into account the influence of natural ventilation and mechanical ventilation. The algorithm can evaluate the impact of different ventilation strategies on the indoor thermal environment and provide suggestions for optimizing the design of the ventilation system for building design. The expected result is to provide an indoor thermal comfort analysis report, including air velocity, temperature distribution and humidity level; S33, Solar energy utilization simulation algorithm using solar radiation model and geographic information system (GIS) data: This algorithm combines solar radiation model to calculate the impact of solar radiation on buildings according to the building's geographical location, orientation and seasonal changes. It uses GIS data, including terrain, building shading and climate conditions, to adjust the input parameters of the solar radiation model to improve the accuracy of the simulation. The algorithm can evaluate the efficiency of the building's use of solar energy, including the potential for solar heating, natural lighting and solar power generation. The expected result is to generate a solar energy utilization analysis report and provide solar energy integration solutions for building design, such as solar panel layout and window design; Through the combined use of these three simulation algorithms, the thermal performance of the building can be comprehensively evaluated, scientific decision-making support can be provided for building design and operation, and the building energy efficiency can be optimized and improved.

4. The intelligent energy-saving analysis method for building thermal performance based on BIM according to claim 1 is characterized by: In step S4, the energy-saving optimization strategy steps are as follows: S41, using a multi-objective optimization algorithm, automatically calculates the optimal building design solution by considering the building's aesthetics, practicality, economy, and energy efficiency; S42, develop a user interaction interface to allow users to adjust energy-saving optimization strategies according to actual needs and preferences; S43, combined with building life cycle cost analysis (LCCA), evaluates the economic benefits of energy-saving optimization strategies.

5. The intelligent energy-saving analysis method for building thermal performance based on BIM according to claim 1 is characterized by: In step S5, the multidisciplinary collaborative work platform steps are as follows: S51, an integrated project management tool for tracking project progress and coordinating the work of various parties involved; S52, a shared BIM model viewing and editing platform that allows people from different disciplines to access, comment on and modify models; S53, a communication and collaboration tool, supports instant messaging, video conferencing, and document sharing among team members.

6. The intelligent energy-saving analysis method for building thermal performance based on BIM according to claim 1 is characterized by: In step S6, the steps of the building life cycle are as follows: S61, establish a building energy usage database, record the building's energy consumption, and conduct trend analysis; S62, using data analytics and machine learning techniques to predict energy demand and energy saving potential in buildings; S63, Implement energy audit and maintenance programs to optimize the energy efficiency of buildings and regularly evaluate the effectiveness of energy-saving measures.

7. The intelligent energy-saving analysis method for building thermal performance based on BIM according to claim 1 is characterized by: The following steps are also included: S7, Energy-saving analysis and scheme design in the building design stage: Use the BIM model to conduct preliminary energy-saving analysis and evaluate the impact of different design schemes on building energy consumption; Apply intelligent simulation algorithms, such as FEA and CFD, to predict the thermal comfort and energy demand of buildings under different design schemes. According to the simulation results, design schemes are carried out to select the optimal building layout, materials and component configurations to achieve the expected energy-saving goals. The expected result of the design stage is to form a set of energy-saving and functional building design schemes and generate corresponding BIM models. S8, Construction simulation and material management in the building construction phase: Use BIM models to perform three-dimensional simulation of the construction process, optimize construction plans and construction sequences, apply BIM models to manage materials, including material procurement plans, inventory control, and on-site logistics arrangements, integrate construction simulation through BIM models, identify conflicts and problems that may arise during the construction process, and develop solutions in advance. The expected results of the construction phase are to improve construction efficiency, reduce material waste, and ensure construction quality and safety; S9, Energy management and maintenance in the building operation phase: Use BIM models to integrate building operation data, including energy consumption, equipment status, and maintenance records, apply intelligent algorithms, such as predictive maintenance based on machine learning, to monitor the condition and diagnose faults of building equipment, and implement energy management strategies, such as optimizing energy usage patterns, regular maintenance, and equipment upgrades to extend equipment life and reduce energy consumption. The expected results of the operation phase are to achieve efficient energy use in buildings, reduce operating costs, and improve the sustainable performance of buildings. Through continuous application in the three stages of building design, construction and operation, the BIM model can provide support for energy-saving management and optimization throughout the entire life cycle of the building. This not only helps to improve the quality and efficiency of building design, but also ensures the smooth progress of the construction process and achieves continuous energy optimization and cost savings in the building operation stage.

8. The intelligent energy-saving analysis method for building thermal performance based on BIM according to claim 7 is characterized by: The following steps are also included: S10, using virtual reality (VR) and augmented reality (AR) technology to provide users with intuitive display and interactive experience of energy-saving analysis results; S11, using mobile devices and cloud technology to achieve anytime, anywhere access to BIM models and energy management; S12, using blockchain technology to ensure the security and traceability of BIM model data.

9. The intelligent energy-saving analysis method for building thermal performance based on BIM according to claim 8 is characterized by: The following steps are also included: S13, integrates with existing building design software and energy simulation software to achieve seamless data exchange and sharing; S14, develop a user-friendly interface, simplify the user operation process, and improve the user experience; S15 provides customized services and offers personalized energy-saving analysis and optimization solutions based on users’ specific needs.

10. The intelligent energy-saving analysis method for building thermal performance based on BIM according to claim 9 is characterized by: The following steps are also included: S16, integrate real-time meteorological data and indoor and outdoor environmental monitoring data into the BIM model to improve the accuracy and real-time performance of the simulation; S17, Develop intelligent diagnostic and predictive maintenance systems that use machine learning techniques to predict failures and maintenance needs of building equipment; S18, combined with user behavior analysis, optimizes the building's energy usage pattern to improve energy efficiency and user satisfaction.

Citation Information

Cited By

  • Basement design method and system based on BIM technology

    CN119557958A

  • Building energy consumption dynamic optimization method and system based on BIM and reinforcement learning

    CN120145880A

  • Building Energy Consumption Dynamic Optimization Method and System Based on BIM and Reinforcement Learning

    CN120145880B

  • BIM-based building design process dynamic management method

    CN120524581A

  • Green building energy-saving design optimization method and system based on BIM

    CN120874173A