Large-angle rotating direction-adjusting stoping method for upward mining working face
By using the large-angle rotation adjustment and return method of upward mining face in coal mining, the hydraulic support and chute are adjusted, and combined with various support methods, the downward stroke of the scraper conveyor and the crooked hydraulic support during rotary adjustment and return mining is solved. The problem has improved coal mining efficiency and support effect.
Patent Information
- Application Number
- CN202411188613.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-22
AI Technical Summary
During coal mining, the working face is prone to downward squeezing of the scraper conveyor, skewed hydraulic support and support problems at the turning point positions when the working face is rotated and adjusted, resulting in low coal mining efficiency and waste of resources.
The upward mining working face is adopted to adjust the directional and directional recovery method. By adjusting the directional and directional recovery range of the material tunnel and the transportation tunnel, adjusting the rotational angle and column position of the hydraulic support using the ratio of the sliding head and tail, and setting chutes and multiple supports. The protection method ensures vertical support of the hydraulic support, and flexibly selects the support method to optimize according to the distance of the empty top.
It effectively avoids the problem of coal mining machine not being able to penetrate the coal wall, improves mining and transportation efficiency, ensures the stability of the hydraulic support and the integrity of the roof, and improves the support effect.
Smart Images

Figure CN118997760A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining, and in particular to a method for large-angle rotation and direction adjustment of an upward mining working face. Background Art
[0002] During the advancement of underground coal mining, the working face needs to avoid the surface village protection coal pillars to avoid damage to the protection coal pillars. At the same time, in order to achieve continuous mining, reduce the two-time moving work of the working face, better recover coal resources and reduce resource waste, the working face needs to be rotated 20° for mining during the advancement. During mining, since the working face is an upward mining working face, there are problems of crack development and poor roof stability during mining, and the roof needs to be repeatedly supported. In addition, due to the increase in the inclined length and inflection point of the working face, it is easy to cause the scraper to run down, the hydraulic support to be skewed, and the support section at the inflection point to be difficult to operate. Summary of the invention
[0003] When the above-mentioned working face is being rotated and adjusted for mining, there are problems such as the scraper conveyor sliding down, the hydraulic support tilting, and the difficulty in operating the support section at the turning point.
[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0005] The method for large-angle rotation and re-mining of an upward mining working face comprises a material tunnel (2) and a transport tunnel (1), and comprises the following steps: S1 after determining the required re-mining range of the material tunnel (2) and the transport tunnel (1) according to the on-site conditions, the starting point (3) of the material tunnel (2) is translated by 30m toward the working face to form a material tunnel re-mining starting point (5), and a vertical line is drawn from the material tunnel re-mining starting point (5) to the transport tunnel (1) to determine the transport tunnel re-mining starting point (6); S2 according to the material tunnel re-mining starting point (5) and the transport tunnel re-mining starting point (6), a vertical line is drawn from the material tunnel re-mining starting point (5) to the transport tunnel (1) to determine the transport tunnel re-mining starting point (6); A new range of direction adjustment and mining is formed, the ratio of the working face inclination is adjusted, and the coal mining machine adopts a long and short knife cutting method, and performs the direction adjustment and mining operation of the working face by advancing one knife at the head of the chute and three knives at the tail of the chute; S3 When the coal mining machine advances the working face to the turning point position adjacent to the material lane (2) and the transportation lane (1), a chute is set; S4 determines the empty top distance between the hydraulic support and the supporting π steel to support the roof of the material lane (2); S5 After the working face is advanced to the direction adjustment and mining end line (4) of the material lane (2) and the transportation lane (1), the rotation direction adjustment and mining process is completed.
[0006] Furthermore, in S1, the required range of direction adjustment and mining in the material tunnel (2) is at least 61.2 m, and the required range of direction adjustment and mining in the transport tunnel (1) is no more than 1 m.
[0007] Furthermore, in S2, when the working face advances to the material lane adjustment to mining starting point (5) and the transport lane adjustment to mining starting point (6), the working face adjustment to mining operation is started.
[0008] Furthermore, after entering the working face for the direction adjustment and mining operation, the inclination ratio is adjusted four times in total. The first time is when the chute head is located within the range of 0m to 9m from the starting point (6) of the direction adjustment and mining of the transport lane, and the chute tail is located within the range of 0m to 18m from the starting point (5) of the direction adjustment and mining of the material lane (2), the inclination ratio is adjusted to chute head:chute tail = 1:2, and the hydraulic support rotates 0.2° as a whole for each advance of the chute head, and the lower side column of each hydraulic support is 5.2mm ahead of the upper side column; the second time is when the chute head is located within the range of 9m to 24m from the starting point (6) of the direction adjustment and mining of the transport lane, and the chute tail is located within the range of 18m to 63m from the starting point (5) of the direction adjustment and mining of the material lane, the inclination ratio is adjusted to chute head:chute tail = 1:3, and the hydraulic support rotates 0.4° as a whole for each advance of the chute head, and the lower side column of each hydraulic support is 5.2mm ahead of the upper side column. The front upper side column is 10.4mm; the third time is when the chute head is within the range of 24m to 27m from the starting point (6) of the transport lane direction adjustment and mining, and the chute tail is within the range of 63m to 75m from the starting point (5) of the material lane direction adjustment and mining, the adjustment ratio is adjusted to chute head:chute tail = 1:4, the hydraulic support rotates 0.6° as a whole for each advance of the chute head, and the lower side column of each hydraulic support is 15.7mm ahead of the upper side column; the fourth time is when the chute head is within the range of 27m to 30m from the starting point (6) of the transport lane direction adjustment and mining, and the chute tail is within the range of 75m to 90m from the starting point (5) of the material lane direction adjustment and mining, the adjustment ratio is adjusted to chute head:chute tail = 1:5, the hydraulic support rotates 0.8° as a whole for each advance of the chute head, and the lower side column of each hydraulic support is 20.9mm ahead of the upper side column.
[0009] Furthermore, the hydraulic support includes a first support (7), a second support (8), a third support (9) and a fourth support (10), the first support (7) is adjacent to the transport tunnel (1), the fourth support (10) is adjacent to the material tunnel (2), and the working face is adjusted to perform the first cycle, the second cycle and the third cycle in sequence during the mining operation.
[0010] Furthermore, in the first cycle, the coal mining machine moves upward with no equipment, and cuts coal on the working face downward from the fourth support (10) to the third support (9), and returns to the position of the fourth support (10) after completion.
[0011] Furthermore, during the second cycle, the coal mining machine descends from the fourth support (10) to the second support (8) to cut coal on the working face, and returns to the position of the fourth support (10) after completion.
[0012] Furthermore, during the third cycle, the coal mining machine descends from the fourth support (10) to the first support (7) to cut coal on the working face, and returns to the position of the fourth support (10) after completion.
[0013] Furthermore, in S3, the chute is located at a distance of 30.6 m from the material lane transfer to the mining starting point (5) and the transport lane transfer to the mining starting point (6).
[0014] Further, in S4, when the void top between the fourth support (10) and the supporting π steel is less than 0.5m, support is provided by injecting capped point columns below the void top area; when the void top between the fourth support (10) and the supporting π steel is greater than or equal to 0.5m and less than or equal to 0.8m, support is provided by injecting capped point columns and anchor rods and hanging nets below the void top area; when the void top between the fourth support (10) and the supporting π steel is greater than 0.8m, support is provided by using a sheathing method.
[0015] The beneficial effects of the present invention are as follows: the present invention can continuously adjust the inclination ratio as the working face advances, so that the working face can smoothly complete the rotation and direction adjustment for mining, avoiding the problem of the coal mining machine not being able to cut through the coal wall, and setting a chute near the inflection point can effectively avoid the problem of the scraper conveyor running down, thereby improving mining and transportation efficiency. The present invention uses the side guard plate in conjunction with the anti-skid jack to adjust the hydraulic support, ensuring that the hydraulic support is as vertical as possible to the top and bottom plate supports, avoiding uneven force on the top plate caused by the tilting of the hydraulic support. According to the different empty top distances between the hydraulic support and the supporting π steel, the present invention flexibly uses a variety of support methods to support the support section at the inflection point, effectively improving the support effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 Shown is a schematic diagram of the structural principle of an embodiment of the present invention.
[0017] Figure 2 This is a cross-section of a coal seam, showing the order in which the coal mining machine cuts through it. DETAILED DESCRIPTION
[0018] The invention discloses a method for large-angle rotation and direction adjustment of an upward mining working face. An implementation mode of the invention is described in detail below in conjunction with the accompanying drawings.
[0019] Combination Figure 1 and Figure 2 As shown in the figure, the method for large-angle rotation and direction adjustment of the upward mining working face includes the following steps:
[0020] The first step is to determine, based on the on-site conditions, that the directional mining range of material tunnel 2 is at least 61.2m, and the directional mining range required for transport tunnel 1 is no more than 1m. Then, the starting point 3 of material tunnel 2 is translated 30m toward the working face to form the material tunnel directional mining starting point 5, and a vertical line is drawn from the material tunnel directional mining starting point 5 to the transport tunnel 1 to determine the transport tunnel directional mining starting point 6.
[0021] The second step is to form a new direction adjustment and mining range according to the starting point 5 of the material lane direction adjustment and mining and the starting point 6 of the transport lane direction adjustment and mining. When the working face advances to the starting point 5 of the material lane direction adjustment and mining and the starting point 6 of the transport lane direction adjustment and mining, the working face direction adjustment and mining operation is entered. After entering the working face direction adjustment and mining operation, the inclination ratio is adjusted four times. The first time is when the chute head is located within the range of 0m to 9m from the starting point 6 of the transport lane direction adjustment and mining, and the chute tail is located within the range of 0m to 18m from the starting point 5 of the material lane 2 direction adjustment and mining, the inclination ratio is adjusted to the chute head: chute tail = 1:2, and the hydraulic support rotates 0.2° as a whole for each advance of the chute head, and the lower side column of each hydraulic support is 5.2mm ahead of the upper side column. The second time is when the chute head is within the range of 9m to 24m from the starting point 6 of the transport lane adjustment and mining, and the chute tail is within the range of 18m to 63m from the starting point 5 of the material lane 2 adjustment and mining, the adjustment ratio is adjusted to chute head:chute tail = 1:3, and the hydraulic support rotates 0.4° as a whole for each advance of the chute head, and the lower side column of each hydraulic support is 10.4mm ahead of the upper side column. The third time is when the chute head is within the range of 24m to 27m from the starting point 6 of the transport lane adjustment and mining, and the chute tail is within the range of 63m to 75m from the starting point 5 of the material lane 2 adjustment and mining, the adjustment ratio is adjusted to chute head:chute tail = 1:4, and the hydraulic support rotates 0.6° as a whole for each advance of the chute head, and the lower side column of each hydraulic support is 15.7mm ahead of the upper side column. The fourth time is when the chute head is located within the range of 27m to 30m from the starting point 6 of the transport lane adjustment and mining, and the chute tail is located within the range of 75m to 90m from the starting point 5 of the material lane 2 adjustment and mining, the adjustment ratio is adjusted to the chute head:chute tail = 1:5, and the hydraulic support rotates 0.8° as a whole for each advance of the chute head, and the lower side column of each hydraulic support is 20.9mm ahead of the upper side column. When the coal mining machine is mining on the working face, the first support 7, the second support 8, the third support 9 and the fourth support 10 are set. The first support 7 is adjacent to the transport lane 1, and the fourth support 10 is adjacent to the material lane 2. The working face adjustment and mining operation is carried out in the first cycle, the second cycle and the third cycle in sequence. In the first cycle, the coal mining machine goes up empty, and cuts the working face from the fourth support 10 to the third support 9, and returns to the position of the fourth support 10 after completion. In the second cycle, the coal mining machine cuts the working face from the fourth support 10 to the second support 8, and returns to the position of the fourth support 10 after completion. In the third cycle, the coal mining machine cuts the coal from the fourth support 10 to the first support 7 on the working face, and returns to the position of the fourth support 10 after completion. The third cycle is a through cut, and the working face is fully cut into a straight line to complete a process.
[0022] In the third step, when the coal mining machine working face advances to the turning point of the adjacent material lane 2 and transport lane 1, a chute is set at a position 30.6m away from the starting point 5 of the material lane adjustment and mining, and the starting point 6 of the transport lane adjustment and mining. When the working face passes the turning point of the upper and lower chute during the rotation adjustment and mining process, the chute is set to ensure the subsequent normal advancement due to the long oblique side of the working face near the turning point.
[0023] In the fourth step, since the advancement speed of material tunnel 2 is too fast, it is easy to cause the scraper conveyor and hydraulic support to move toward the direction of transport tunnel 1. At the same time, due to the inclined length of the rotary mining working face, the width of the roof edge near material tunnel 2 is increased. It is necessary to select different support methods based on the determined empty top distance between the hydraulic support and the support π steel. When the void top between the fourth support 10 and the supporting π steel is less than 0.5, support is provided by injecting capped point columns below the void top area; when the void top between the fourth support 10 and the supporting π steel is greater than or equal to 0.5m and less than or equal to 0.8m, support is provided by injecting capped point columns and anchor rods and hanging nets below the void top area; when the void top between the fourth support 10 and the supporting π steel is greater than 0.8m, support is provided by using a sheathing shed, that is, on the basis of the regular support at the exit of the raw material lane 2, two single sheds are added with a shed distance of 500mm. The sheathing shed adopts one beam and two columns for support. The upper column of the sheathing shed support is aligned with the middle column or lower column of the lane support, and the lower column of the sheathing shed support is supported on the upper side of the support. The lower end of the sheathing π steel is supported above the support, and 2 to 3 layers of road timber are set on the sheathing π steel to prevent coal gangue from falling from the roof and injuring people, ensuring that there are no safety hazards in the upper end support.
[0024] In the fifth step, the working face is advanced to the direction adjustment and mining end line 4 between the material tunnel 2 and the transport tunnel 1, completing the rotation direction adjustment and mining process.
[0025] During the process of adjusting the working face to recover the mining area, for the support pulling and moving in the area where the mining head is advancing slowly, the method of injecting single pillars to assist in pulling and moving is adopted on site. The top is rubbed with pressure and the movement is fast with less lowering, which reduces the damage to the roof caused by repeated lifting and lowering of the support. The support status is adjusted during the support pulling and moving process to ensure that the initial support force of the support reaches the specified requirement of not less than 24Mpa, thereby ensuring the integrity and stability of the roof of the working face.
[0026] In the case of severe roof shattering and coal wall spalling during the working face adjustment and mining process, maintenance is carried out on site by injecting advance reinforcement anchors into the coal wall or roof. The advance reinforcement anchors are injected at an angle of 45° upward to the horizontal roof of the working face or vertically to the roof to control the roof shattering area.
[0027] Within the directional mining range of transport tunnel 1, roof anchor beams are constructed during excavation. In the early repair stage of mining, support is strengthened by additional anchor cables and anchor rods. During the advancement of the working face, the support method of this section of the area is adjusted from one beam and three columns to one beam and four columns, with the middle column being a double column. If the on-site pressure is obvious during rotary mining, the support of this section of the area will be changed to one beam and five columns, and the upper support column will also be changed to a double column to further improve the support strength of the tunnel.
[0028] During the process of rotary adjustment and mining, material lane 2 is about 38m higher than transport lane 1, material lane 2 has more cutting, while transport lane 1 has less cutting, which can easily cause the scraper conveyor on the working face to slide down. If no measures are taken, each cut will slide down by about 100mm to 200mm. Therefore, in order to prevent the scraper conveyor from sliding down, an anti-skid device is installed every seven or ten hydraulic supports, and the anti-skid jack is used during each hydraulic support movement. Each time the scraper conveyor is moved, the distance of the machine should not be less than 18m. When pushing the scraper conveyor, the machine must not be stopped when the scraper conveyor is running. The curvature of the scraper conveyor should not be greater than 1.9° to prevent the coal mining machine from derailing or getting stuck.
[0029] Since the average slope of the working face cut reaches 14°, in order to increase the stability of the hydraulic support during the rotary mining process, the side guard plate must be used to adjust the hydraulic support each time the hydraulic support is moved. At the same time, the anti-slip jack must be used to ensure that the hydraulic support is perpendicular to the top and bottom plate supports and the skew does not exceed 1.5°. If the hydraulic support is skewed by more than 1.5°, it must be adjusted.
[0030] During the rotation and adjustment mining period, if the local slope of the cutting eye reaches more than 15°, and the frame puller still cannot achieve the vertical top and bottom plate support state of the hydraulic support after adjusting the state of the hydraulic support as required, a single support column must be used on site to adjust the state of the hydraulic support, and personnel must stand in a safe position when moving and adjusting the frame.
[0031] After the coal mining machine cuts the coal, the frame is moved by following the machine. The mobile hydraulic support is 2 to 3 frames away from the rear drum of the coal mining machine. When moving the hydraulic support, the frame is moved by pressing the top, with less lowering and faster moving. When the roof is broken, it is necessary to pull the advance frame and maintain the roof.
[0032] During the coal cutting process on the working face, the hydraulic support guard plates are retracted from the position of 1 frame to 2 frames of the front roller of the advance coal mining machine. After the front roller of the unit passes, the telescopic beam is immediately extended to protect the top, and the front beam is tightened to ensure that the end face distance of the hydraulic support is no more than 340mm; after the frame is moved, the coal wall is promptly protected with the guard plates and the support is tightened to ensure that the initial support force of the support reaches more than 24MPa.
[0033] During the production process, the status of the hydraulic support should be adjusted in time. The hydraulic support should be supported vertically on the top and bottom plates. The center distance deviation should not exceed 100mm. The pitch angle of the hydraulic support should be less than 7°. The error between adjacent hydraulic supports should not exceed two-thirds of the height of the side guard plate. The gap between the hydraulic supports should not exceed 100mm. The hydraulic support should be tightly connected to the top.
[0034] The support of the working face transport tunnel 1 adopts DZ28-250 / 100 single hydraulic prop, 3m π steel, one beam and three columns, and the shelf distance is 500mm. The support section near the coal mining point is large and there are many equipment arrangements. It is necessary to replace the 3m π steel with 3.6m π steel.
[0035] The area near the coal mining point needs to add a cover shed support on the basis of the original support. The original support of transport tunnel 1 is adjusted upward, and the upper end of the π steel extends into the empty top area of the upper wall, no more than 500mm away from the upper wall. The lower wall column and the middle column are on both sides of the belt frame. Two single sheds are added to each group of sheds. The cover shed support is on the lower wall side, and 3.6m π steel, one beam and three columns, with a shed distance of 500mm are used. The upper wall column and the middle column of the cover shed support are on both sides of the belt frame, and 2 to 3 layers of road timber are set on the back above the lower end of the shed π steel to ensure that it is in the same plane as the original support.
[0036] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims
1. A method for large-angle rotation and direction adjustment of an upward mining face, comprising a material lane (2) and a transport lane (1), It is characterized in that The following steps are involved: S1 determines the required direction-shifting and mining range of the material tunnel (2) and the transport tunnel (1) according to the on-site conditions, and then moves the starting point (3) of the material tunnel (2) 30 meters toward the working face to form the starting point (5) of the direction-shifting and mining of the material tunnel, and draws a vertical line from the starting point (5) of the direction-shifting and mining of the material tunnel to the transport tunnel (1), and determines the starting point (6) of the direction-shifting and mining of the transport tunnel; S2 forms a new direction adjustment and mining range according to the starting point of direction adjustment and mining of the material lane (5) and the starting point of direction adjustment and mining of the transport lane (6), adjusts the ratio of the working face inclination, and the coal mining machine adopts a long and short knife cutting method, and performs the direction adjustment and mining operation of the working face by cutting one knife at the head of the chute and three knives at the tail of the chute; When the S3 coal mining machine pushes the working face to the turning point position adjacent to the material lane (2) and the transport lane (1), a chute is provided; S4 determines the empty top distance between the hydraulic support and the supporting π steel to support the top plate of the material lane (2); After the S5 working face is advanced to the direction adjustment and mining end line (4) of the material tunnel (2) and the transport tunnel (1), the rotation direction adjustment and mining process is completed.
2. The method for large-angle rotation and direction adjustment of the upward mining working face according to claim 1, It is characterized in that In S1, the required directional mining range of the material tunnel (2) is at least 61.2m, and the required directional mining range of the transport tunnel (1) is no more than 1m.
3. The method for large-angle rotation and direction adjustment of the upward mining working face according to claim 1, It is characterized in that In S2, when the working face advances to the material lane adjustment and mining starting point (5) and the transport lane adjustment and mining starting point (6), the working face adjustment and mining operation begins.
4. The method for recovering by large-angle rotation and direction adjustment of the upward mining working face according to claim 3, It is characterized in that After entering the working face, the tilting ratio is adjusted four times. The first time is when the chute head is within the range of 0m to 9m from the starting point (6) of the chute direction adjustment and mining, and the chute tail is within the range of 0m to 18m from the starting point (5) of the chute direction adjustment and mining of the material lane (2), the tilting ratio is adjusted to chute head:chute tail = 1:
2. For each advance of the chute head, the hydraulic support rotates 0.2° as a whole, and the lower side column of each hydraulic support is 5.2mm ahead of the upper side column. The second time is when the chute head is within the range of 9m to 24m from the starting point (6) of the transport lane diversion and mining, and the chute tail is within the range of 18m to 63m from the starting point (5) of the material lane diversion and mining, the adjustment ratio is adjusted to chute head:chute tail = 1:3, and the hydraulic support rotates 0.4° as the chute head advances one cut, and the lower side column of each hydraulic support is 10.4mm ahead of the upper side column; The third time is when the chute head is within the range of 24m to 27m from the starting point (6) of the transport lane diversion and mining, and the chute tail is within the range of 63m to 75m from the starting point (5) of the material lane diversion and mining, the adjustment ratio is adjusted to chute head:chute tail = 1:4, and the hydraulic support rotates 0.6° as the chute head advances one cut, and the lower side column of each hydraulic support is 15.7mm ahead of the upper side column; The fourth time is when the chute head is within the range of 27m to 30m from the starting point of the transport lane adjustment and mining (6), and the chute tail is within the range of 75m to 90m from the starting point of the material lane adjustment and mining (5), the adjustment ratio is adjusted to chute head: chute tail = 1:
5. For each advance of the chute head, the hydraulic support rotates 0.8° as a whole, and the lower side column of each hydraulic support is 20.9mm ahead of the upper side column.
5. The method for recovering by large-angle rotation and direction adjustment of the upward mining working face according to claim 4, It is characterized in that The hydraulic support comprises a first support (7), a second support (8), a third support (9) and a fourth support (10), wherein the first support (7) is adjacent to the transport lane (1), and the fourth support (10) is adjacent to the material lane (2), and the working face is adjusted to perform the first cycle, the second cycle and the third cycle in sequence.
6. The method for large-angle rotation and direction adjustment of the upward mining working face according to claim 5, It is characterized in that In the first cycle, the coal mining machine moves upward with no equipment, and cuts coal on the working face downward from the fourth support (10) to the third support (9), and returns to the position of the fourth support (10) after completion.
7. The method for recovering by large-angle rotation and direction adjustment of the upward mining working face according to claim 6, It is characterized in that In the second cycle, the coal mining machine descends from the fourth support (10) to the second support (8) to cut coal on the working face, and returns to the position of the fourth support (10) after completion.
8. The method for recovering by large-angle rotation and direction adjustment of the upward mining working face according to claim 7, It is characterized in that In the third cycle, the coal mining machine descends from the fourth support (10) to the first support (7) to cut coal on the working face, and returns to the position of the fourth support (10) after completion.
9. The method for recovering by large-angle rotation and direction adjustment of the upward mining working face according to claim 1, It is characterized in that In S3, the chute is located 30.6 m away from the starting point (5) of the material lane transfer to the mining start point and the transport lane transfer to the mining start point (6).
10. The method for recovering by rotating the upward mining face at a large angle according to claim 4, It is characterized in that In S4, when the empty top between the fourth support (10) and the supporting π steel is less than 0.5m, support is provided by injecting capped point columns below the empty top area; When the void top between the fourth support (10) and the supporting π steel is greater than or equal to 0.5m and less than or equal to 0.8m, support is provided by injecting capped point columns and anchor rods and hanging nets below the void top area; When the void space between the fourth support (10) and the supporting π steel is greater than 0.8 m, a sheathing method is used for support.
Citation Information
Cited By
Mining method and equipment for underground boundary irregular working face of coal mine
CN122589403A