Power grid section limit adjustment method considering different installation scales and related device
By adjusting the power grid section limit, the insufficient reflection of supply and demand relationships in the power market simulation system in the existing technology under the expansion of new energy installed capacity and load changes, and the accuracy of grid simulation and support for multi-cycle simulation are achieved.
Patent Information
- Application Number
- CN202411153174.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-08-21
AI Technical Summary
With the expansion of new energy installed capacity and the change in load, the existing power market simulation system is difficult to accurately reflect the supply and demand relationship of future power systems, resulting in distortion of simulation results and unable to effectively support the deduction and verification of market models under new power systems.
By obtaining the security and stable cross-sectional sensitivity of the existing power grid network model and the installed capacity difference of the future power grid network model, adjust the cross-sectional limit in the existing power grid network model, generate network constraints that are suitable for the newly installed airport landscape, and provide multi-cycle for the simulation system. , Multi-resource simulation basics.
It realizes accurate mapping and adjustment of cross-section limits of various power generation nodes and their installed capacity changes in the power grid, ensures the accuracy of simulation results and the infinity of the cross-section trend of the entire network, and supports the deduction and verification of market models under new power systems.
Smart Images

Figure CN119051001A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of power grid simulation, and in particular relates to a power grid section limit adjustment method considering different installed capacity scales and a related device. Background Art
[0002] With the requirements for the construction of new power systems, new energy will gradually replace traditional power generation and become the main power source of the power system. The construction of the future power market needs to be combined with the progress of the construction of new power systems and fully consider the need to improve the level of energy structure transformation.
[0003] However, the future-oriented and overall planning characteristics have significantly increased the complexity of the construction of the power market under the new power system. The core feature of the new power system is that new energy sources dominate the power supply side. As the scale of new energy installed capacity continues to expand, the power balance characteristics continue to evolve, and the uncertainty and variability of the power system will increase significantly. With the development of social and economic levels, the load level and composition will also undergo profound changes, which requires the grid structure connected to it to be continuously adjusted and corrected dynamically, and the layout of the power market simulation model in advance is conducive to exploring market laws and reducing trial and error costs.
[0004] The operation of the power market is a long-term dynamic evolution process, which is jointly affected by multiple factors such as the power grid structure, supply and demand situation, and external environment. It is difficult to predict the operation effect of the market through theoretical analysis alone. Therefore, it is necessary to deduce and verify the operation effect of the market through experimental simulation before the market is officially operated. The power grid model is the basis for the experimental simulation of power market operation. However, the power grid model with new energy as the main body in the experimental simulation has no actual data source. Therefore, the simulation system needs to support the scientific modeling and system construction of the future state and dynamic evolution of the power grid, power source, and load.
[0005] To simulate the power market situation under the new power system, the installed capacity ratio of new energy units must be changed first. In the context of the continuous expansion of the scale of new energy installed capacity and the continuous increase in user load levels, the power circulating in the network will also change significantly. Therefore, the network constraints also need to be adaptively corrected. Otherwise, the newly installed capacity may be constrained by the network section limit and cannot be delivered, which will affect the normal operation of the power market and the consumption of new energy power generation. The correction of network constraints must not violate the existing supply and demand system of the power grid. If the correction is excessive, it will cause serious distortion of the simulation scenario of the target power grid, and then make the simulation results lose value.
[0006] The above-mentioned power market simulation system lacks the ability to conduct multi-period, multi-market, and multi-energy coupled power market operation experiments from the perspective of economic operation and physical operation in the power market environment. Most of the existing power market simulation systems only conduct scenario simulation experiments on the physical model of the existing power grid, and do not consider the adaptive correction of network security constraints after large-scale access of new energy units. Therefore, subject to the above constraints, the existing simulation system is difficult to effectively reflect the supply and demand relationship of the future power system, and it is difficult to support new demands such as market model deduction and verification evaluation under the new power system. Summary of the invention
[0007] The purpose of the present invention is to provide a method and related device for adjusting the section limit of a power grid taking into account different installed capacity scales, so as to solve the technical problem that the existing power market simulation system has poor accuracy in simulating future power grids.
[0008] In order to achieve the above purpose, the present invention adopts the following technical solutions
[0009] In a first aspect, the present invention provides a method for adjusting a power grid section limit considering different installed capacity scales, comprising:
[0010] Obtaining the existing power grid network model, and calculating the sensitivity of the safety and stability section in the existing power grid network model to each network node;
[0011] Obtain a future power grid network model, and calculate the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model;
[0012] Based on the sensitivity of the safe and stable section to each network node and the difference in installed capacity of each power generation node, the limit of the safe and stable section under the existing power grid network model is revised to obtain the limit of the safe and stable section under the future power grid network model.
[0013] The present invention is further improved in that: in the step of obtaining the existing power grid network model and calculating the sensitivity of the safe and stable section in the existing power grid network model to each network node, the safe and stable section L is composed of l L The output of unit i is composed of lines, and the sensitivity S of the active power flow of the safe and stable section L is Li for:
[0014]
[0015] Among them, S li is the sensitivity of the output of unit i to the active power flow of line l.
[0016] The present invention is further improved in that: the step of obtaining the future power grid network model and calculating the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model specifically includes:
[0017] Calculate the power generation capacity of the power generation nodes of the existing power grid network model;
[0018] Calculate the power generation capacity of power generation nodes in the future power grid network model;
[0019] The power generation nodes of the existing power grid network model are mapped with the power generation nodes of the future power grid network model;
[0020] According to the mapping results, the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model is calculated.
[0021] The present invention is further improved in that: the step of obtaining the future power grid network model and calculating the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model specifically includes:
[0022] According to the existing power grid network model, the installed capacity of each power generation node is calculated; the existing power grid network model has n a power generation nodes, the corresponding power generation node set is:
[0023]
[0024] The installed capacity set P corresponding to the power generation node Ga for:
[0025]
[0026] Where P Ni is the power generation node N i Rated capacity of the mounted unit;
[0027] After the future grid network model changes, the installed capacity information of the future grid network model is screened to calculate the installed capacity of each power generation node; the future grid network model has n b power generation nodes, then the set of power generation nodes corresponding to the future power grid network model is:
[0028]
[0029] The installed capacity set P corresponding to the power generation node Gb for:
[0030]
[0031] The power generation nodes in the power generation node set of the existing power grid network model are mapped to the power generation nodes in the power generation node set of the future power grid network model. After the mapping is completed, a complete power generation node set is obtained:
[0032] NG ={N1,…,N n} (17)
[0033] Where n is the number of power generation nodes after the mapping is completed, satisfying the following constraints:
[0034]
[0035] Under the complete power generation node set of formula (17), the installed capacity set corresponding to the power generation nodes of the two-stage power grid is:
[0036]
[0037] According to formula (19), the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model is calculated:
[0038]
[0039] Among them, ΔP G The difference set of installed capacity of power generation nodes, ΔP Nn is the installed capacity difference of the nth power generation node after mapping.
[0040] The present invention is further improved in that: based on the sensitivity of the safe and stable section to each network node and the difference in installed capacity of each power generation node, the limit of the safe and stable section under the existing power grid network model is revised to obtain the limit of the safe and stable section under the future power grid network model, which specifically includes:
[0041] The safe and stable section L is related to the power grid generation node set N G The sensitivity is:
[0042]
[0043] The sensitivity value is between [-1,1]. represents the sensitivity of the safe and stable section L to the nth generation node after mapping; after the installed capacity of the future power grid network model changes, according to formula (20), the generation node N i Contribution value of limit modification to safe and stable section L for:
[0044]
[0045] According to formula (22), the grid generation node set N is obtained G The total value of the limit modification contribution of all power generation nodes to the safe and stable section L is:
[0046]
[0047] The limit of the safe and stable section L under the future power grid network model is obtained as follows:
[0048] P L1 =P L0 +ΔP L (twenty four)
[0049] Among them, P L0 It is the limit of safe and stable section L under the existing power grid network model.
[0050] The present invention is further improved in that:
[0051] Based on the limit of safe and stable sections under the future power grid network model, the future power grid network model is used for power simulation.
[0052] In a second aspect, the present invention provides a power grid section limit adjustment device considering different installed capacity scales, comprising:
[0053] A sensitivity calculation module is used to obtain the existing power grid network model and calculate the sensitivity of the safety and stability section in the existing power grid network model to each network node;
[0054] The installed capacity difference calculation module is used to obtain the future power grid network model and calculate the installed capacity difference between the future power grid network model and the existing power grid network model at each power generation node;
[0055] The limit adjustment module is used to revise the limits of safe and stable sections under the existing power grid network model based on the sensitivity of the safe and stable sections to each network node and the difference in installed capacity of each power generation node, and obtain the limits of safe and stable sections under the future power grid network model.
[0056] The present invention is further improved in that: in the step where the sensitivity calculation module obtains the existing power grid network model and calculates the sensitivity of the safety and stability section in the existing power grid network model to each network node, the safety and stability section L is composed of l L The output of unit i is composed of lines, and the sensitivity S of the active power flow of the safe and stable section L is Li for:
[0057]
[0058] Among them, S li is the sensitivity of the output of unit i to the active power flow of line l.
[0059] The present invention is further improved in that: the installed capacity difference calculation module obtains the future power grid network model, and calculates the installed capacity difference of the future power grid network model at each power generation node compared with the existing power grid network model, specifically including:
[0060] Calculate the power generation capacity of the power generation nodes of the existing power grid network model;
[0061] Calculate the power generation capacity of power generation nodes in the future power grid network model;
[0062] The power generation nodes of the existing power grid network model are mapped with the power generation nodes of the future power grid network model;
[0063] According to the mapping results, the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model is calculated.
[0064] The present invention is further improved in that: the installed capacity difference calculation module obtains the future power grid network model, and calculates the installed capacity difference of the future power grid network model at each power generation node compared with the existing power grid network model, specifically including:
[0065] According to the existing power grid network model, the installed capacity of each power generation node is calculated; the existing power grid network model has n a power generation nodes, the corresponding power generation node set is:
[0066]
[0067] The installed capacity set P corresponding to the power generation node Ga for:
[0068]
[0069] Where P Ni is the power generation node N i Rated capacity of the mounted unit;
[0070] After the future grid network model changes, the installed capacity information of the future grid network model is screened and the installed capacity of each power generation node is calculated; the future grid network model has n b power generation nodes, then the set of power generation nodes corresponding to the future power grid network model is:
[0071]
[0072] The installed capacity set P corresponding to the power generation node Gb for:
[0073]
[0074] The power generation nodes in the power generation node set of the existing power grid network model are mapped to the power generation nodes in the power generation node set of the future power grid network model. After the mapping is completed, a complete power generation node set is obtained:
[0075] N G={N1,…,N n} (17)
[0076] Where n is the number of power generation nodes after the mapping is completed, satisfying the following constraints:
[0077]
[0078] Under the complete power generation node set of formula (17), the installed capacity set corresponding to the power generation nodes of the two-stage power grid is:
[0079]
[0080] According to formula (19), the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model is calculated:
[0081]
[0082] Among them, ΔP G The difference set of installed capacity of power generation nodes, ΔP Nn is the installed capacity difference of the nth power generation node after mapping.
[0083] The present invention is further improved in that: the limit adjustment module revises the limit of the safe and stable section under the existing power grid network model based on the sensitivity of the safe and stable section to each network node and the difference in installed capacity of each power generation node, and obtains the limit of the safe and stable section under the future power grid network model, which specifically includes:
[0084] The safe and stable section L is related to the power grid generation node set N G The sensitivity is:
[0085]
[0086] The sensitivity value is between [-1,1]. represents the sensitivity of the safe and stable section L to the nth generation node after mapping; after the installed capacity of the future power grid network model changes, according to formula (20), the generation node N i Contribution value of limit modification to safe and stable section L for:
[0087]
[0088] According to formula (22), the grid generation node set N is obtained G The total value of the limit modification contribution of all power generation nodes to the safe and stable section L is:
[0089]
[0090] The limit of the safe and stable section L under the future power grid network model is obtained as follows:
[0091] P L1 =P L0 +ΔP L (twenty four)
[0092] Among them, P L0 It is the limit of safe and stable section L under the existing power grid network model.
[0093] The present invention is further improved in that:
[0094] The simulation module is used to perform power simulation based on the limit of the safe and stable section under the future power grid network model.
[0095] In a third aspect, the present invention provides an electronic device including a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement the method for adjusting the section limit of a power grid considering different installed capacity sizes.
[0096] In a fourth aspect, the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by a processor, the method for adjusting the section limit of a power grid considering different installed capacity is implemented.
[0097] In a fifth aspect, the present invention provides a computer program product, which includes a computer program / instructions, and when the computer program / instructions are executed by a processor, the method for adjusting the section limit of a power grid considering different installed capacity is implemented.
[0098] Compared with the prior art, the present invention has the following unexpected beneficial effects:
[0099] The present invention provides a method for adjusting the limit of a power grid section considering different installed capacity scales, including: obtaining an existing power grid network model, calculating the sensitivity of a safe and stable section in the existing power grid network model to each network node; obtaining a future power grid network model, calculating the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model; based on the sensitivity of the safe and stable section to each network node and the difference in installed capacity of each power generation node, revising the limit of the safe and stable section under the existing power grid network model, and obtaining the limit of the safe and stable section under the future power grid network model. The method of the present invention can map and calculate the changes in each power generation node and its installed capacity in the power grid under the simulation deduction environment, and based on the sensitivity of the section to the unit, calculate the contribution value of the installed capacity change of each power generation node to the section of the entire network, and finally generate network constraints that adapt to the new installed capacity scenario, laying a good foundation for the simulation system to perform multi-cycle and multi-resource simulation.
[0100] Furthermore, the present invention integrates all the power generation nodes of the existing power grid and the future power grid to generate the total power generation node set. The purpose of this approach is to quickly screen out the nodes that may have installed capacity changes under the two forms of power grids. All nodes of the power grid can also be directly used as a set, regardless of whether they have power generation attributes. This method will not affect the accuracy of the final result.
[0101] Furthermore, the present invention adjusts the section limit based on the sensitivity of the section to the node. The purpose of this approach is to closely combine the network properties of the existing power grid and consider the impact of all power generation nodes on each section. The obtained adjustment result reflects the coupling characteristics of the power grid structure. The adjustment of the section limit can also be batch assigned to the sections of the entire network. This method can ensure that the flow of all sections is not restricted. BRIEF DESCRIPTION OF THE DRAWINGS
[0102] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0103] Figure 1 A schematic flow chart of a method for adjusting a power grid section limit considering different installed capacity scales is provided for an embodiment of the present invention;
[0104] Figure 2 A schematic flow chart of a method for adjusting power grid section limits taking into account different installed capacity scales is provided for another embodiment of the present invention;
[0105] Figure 3 A schematic diagram of the structure of a power grid section limit adjustment device considering different installed capacity scales is provided for an embodiment of the present invention;
[0106] Figure 4 The figure is a schematic diagram of the structure of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0107] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.
[0108] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present invention belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit the exemplary embodiments according to the present invention.
[0109] Aiming at the demand for building a power grid model with the increasing proportion of new energy in the current power market development, the present invention proposes a network security and stability section limit adjustment method that takes into account the rapid growth of installed capacity of new energy units in a simulation and deduction scenario of a new power system. The method calculates the sensitivity of the network interruption to the node, calculates the change in the installed capacity of each generator node under different installed capacity, and superimposes the contribution of each generator node to the section limit to generate the final limit of the safe and stable section.
[0110] Explanation of relevant terms:
[0111] Grid model: A data set that meets the application requirements of grid operation monitoring, control, analysis and calculation, and expresses the attributes and connection relationships of grid equipment. Grid equipment includes generators, transformers, loads, lines, switches, circuit breakers, capacitors, etc.
[0112] New power system: The new power system is a power system with ensuring energy and power security as the basic premise, meeting the power demand of economic and social development as the primary goal, maximizing the consumption of new energy as the main task, a strong smart grid as the hub platform, and source-grid-load-storage interaction and multi-energy complementarity as the support. It has the basic characteristics of clean and low-carbon, safe and controllable, flexible and efficient, intelligent and friendly, and open and interactive.
[0113] Stable section: a collection of power flow channels under the constraints of the power grid network. A stable section is composed of a number of transmission lines specified in the network, which are also called section members of the stable section; the power flowing through a stable section refers to the directed sum of the power flowing through the section members, and the power flowing through the section members is selected in the positive direction, which is clear when the section is defined; the limit of a stable section refers to the maximum power value flowing through the stable section, which is directional. It is generally believed that the absolute value of the reverse stability limit is equal to the forward stability limit.
[0114] Network constraints: that is, the flow power of each network's safe and stable sections must be within the range of the stable section limit.
[0115] See also Figure 1 As shown, an embodiment of the present invention provides a method for adjusting a power grid section limit considering different installed capacity scales, including:
[0116] (1) Under the existing power grid installed system, calculate the sensitivity of the safety and stability section to each network node;
[0117] (2) Calculate the difference in installed capacity at each power generation node after the change in the installed capacity system of the power grid compared with the existing installed capacity system of the power grid;
[0118] (3) Based on the sensitivity of the safe and stable section to each node and the difference in installed capacity of each node, the adjusted safe and stable section limit is obtained.
[0119] Furthermore, step (1) specifically includes:
[0120] For a power flow line, set the nodes at both ends of the line to be i and j respectively, and the active power flowing through the line is P ij , V i 、V j is the bus voltage amplitude at both ends of line i and j, θ ij is the bus voltage phase difference between lines i and j, θ i With θ j is the phase angle of the bus voltage at the nodes i and j; g ij 、b ij is the conductance and susceptance of line ij, then the active power flowing through the line is:
[0121] P ij =V i 2 g ij -V i V j g ij cosθ ij -V i V j b ij sinθ ij (1)
[0122] When using the DC power flow method, the following conditions hold:
[0123] 1)|g ij |<<|b ij |, and have x ij is the reactance of line ij.
[0124] 2)θ i With θ j The difference is very small, so:
[0125]
[0126] 3) The voltage amplitude of each node is equal and equal to the per-unit value of 1.
[0127] Under the premise that the above conditions are met, formula (1) can be written as:
[0128]
[0129] Among them, B ij For x ij The reciprocal of B ij =-b ij ;
[0130] For node i in the network, there is a node power balance equation:
[0131]
[0132] In the formula, n is the number of network power generation nodes. From formula (4) and formula (5), we can get:
[0133]
[0134] Except for the reference node, the above equation is valid for the other n-1 nodes. Therefore, the power system with n nodes has the following set of equations expressed in matrix form:
[0135] [P]=[B'][θ] (7)
[0136] Among them, P and θ are the n-1 order active power injection and voltage phase angle vectors, respectively, excluding the relevant quantities of the balance node as the angle reference point; [B'] is an n*1 matrix.
[0137] According to the formula of branch active power, its incremental form can be written as:
[0138]
[0139] Considering the conditions of the DC power flow method mentioned above, equation (8) can be simplified to:
[0140] ΔP ij =B ij Δθ i -B ij Δθ j =H ij,i Δθ i +H ij,j Δθ j (9)
[0141] Among them, define H ij,i =B ij , H ij,j =-B ij All branches have power increment equations in the form of equation (9), which can be expressed in matrix form as follows:
[0142] [ΔP l ]=[H][Δθ] (10)
[0143] Among them, [ΔP l ] is the active power increment vector of line l, and the elements of matrix [H] are calculated according to formula (9). Considering that the increment of node voltage phase angle is relative to the balance node, the balance node is not included in the formula, and its dimension is n-1. The number of equations contained in formula (10) is equal to the number of branches N l Substituting formula (7) into formula (10), we can get:
[0144] [ΔP l ]=[H][B'] -1 [ΔP]=[S][ΔP] (11)
[0145] Among them, the dimension of matrix [S] is N l ×(n-1), called the branch active power sensitivity matrix, reflects the impact of the increase in node active power injection on the branch active power. The corresponding element S in [S] li is the sensitivity of the output of unit i to the active power flow of line l.
[0146] Assume that the safe and stable section L is L The sensitivity of the unit output to the active power flow of the safe and stable section L is:
[0147]
[0148] The sensitivity value is determined based on the line composition and direction of the safe and stable section.
[0149] Furthermore, step (2) specifically includes:
[0150] 1) Calculate the power generation capacity of existing grid nodes
[0151] Filter the installed capacity information of the existing power grid and calculate the installed capacity of each power generation node. Assume that the existing power grid has n a power generation nodes, then the set of power generation nodes corresponding to the existing power grid is:
[0152]
[0153] The installed capacity set P corresponding to the power generation node Ga for:
[0154]
[0155] Where P Ni is the power generation node N i Rated capacity of the mounted unit.
[0156] 2) Calculate the power generation capacity of future grid nodes
[0157] After the installed capacity system of the future power grid changes, the installed capacity information of the future power grid is screened and the installed capacity of each power generation node is calculated. b power generation nodes, then the set of power generation nodes corresponding to the future power grid is:
[0158]
[0159] The installed capacity set P corresponding to the power generation node Gb for:
[0160]
[0161] 3) Grid node mapping
[0162] In the set of formula (13) and formula (15), each element does not completely correspond, that is, the elements in the set of power generation nodes in the existing power grid may not exist in the set of power generation nodes in the future power grid. Similarly, the power generation nodes of the future power grid may be newly added compared to the existing power grid. Therefore, it is necessary to map the power generation nodes of the power grid in the two stages and construct a complete set of power generation nodes that can uniformly represent the power generation nodes of the two-stage power grid, that is, to select the power generation nodes with the same connection point number in each stage of the power grid and merge them into the same node, and the power generation nodes that only exist in the single-stage power grid are regarded as a single node. After the mapping is completed, there is a complete set of power generation nodes for the two-stage power grid:
[0163] N G ={N1,…,N n} (17)
[0164] Where n is the number of power generation nodes in the grid after mapping, which satisfies the following constraints:
[0165]
[0166] Then, under the complete set of power generation nodes in formula (17), the set of installed capacity corresponding to the power grid power generation nodes in each stage is:
[0167]
[0168] In formula (19), if there is a new element compared to the original installed capacity set of a certain stage, the element is set to 0.
[0169] 4) Calculate the difference in installed capacity of power generation nodes under each stage of the power grid
[0170] According to formula (19), the load capacity difference of each power generation node in the two-stage power grid is calculated as follows:
[0171]
[0172] ΔP G That is, the difference set of installed capacity of power generation nodes under the two-stage power grid.
[0173] Furthermore, step (3) specifically includes:
[0174] For the safe and stable section L in the power grid, let its stability limit under the existing power grid installed capacity be P L0, and the absolute values of the forward limit and the reverse limit are the same. The section obtained in step (1) is the set of power grid generation nodes N G The sensitivity is:
[0175]
[0176] The sensitivity value is between [-1,1]. represents the sensitivity of the safe and stable section L to the nth generation node after mapping. Then, after the installed capacity of the power grid changes, according to formula (20), the generation node N i Contribution value of limit modification to safe and stable section L for:
[0177]
[0178] According to formula (22), the grid generation node set N is obtained G The total value of the limit modification contribution of all power generation nodes to the safe and stable section L is:
[0179]
[0180] Finally, the limit of the safe and stable section L under the future power grid is obtained as follows:
[0181] P L1 =P L0 +ΔP L (twenty four)
[0182] According to the above description of the changes in sensitivity and installed capacity, the sensitivity of the section to the power generation node and the difference in the mounted capacity of the power generation node in the two stages may be negative. Therefore, under the future power grid, the stability limit of the safe and stable section L may become larger or smaller.
[0183] See also Figure 2 As shown, an embodiment of the present invention provides a method for adjusting a power grid section limit considering different installed capacity scales, including:
[0184] S1. Obtain an existing power grid network model and calculate the sensitivity of the safety and stability section in the existing power grid network model to each network node;
[0185] S2. Obtain a future power grid network model, and calculate the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model;
[0186] S3. Based on the sensitivity of the safe and stable sections to each network node and the difference in installed capacity of each power generation node, the limits of the safe and stable sections under the existing power grid network model are revised to obtain the limits of the safe and stable sections under the future power grid network model.
[0187] In a specific implementation manner, in the step of obtaining the existing power grid network model and calculating the sensitivity of the safe and stable section in the existing power grid network model to each network node, the safe and stable section L is composed of l L The output of unit i is composed of lines, and the sensitivity S of the active power flow of the safe and stable section L is Li for:
[0188]
[0189] Among them, S li is the sensitivity of the output of unit i to the active power flow of line l.
[0190] In a specific implementation, the step of obtaining the future power grid network model and calculating the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model specifically includes:
[0191] Calculate the power generation capacity of the power generation nodes of the existing power grid network model;
[0192] Calculate the power generation capacity of power generation nodes in the future power grid network model;
[0193] The power generation nodes of the existing power grid network model are mapped with the power generation nodes of the future power grid network model;
[0194] According to the mapping results, the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model is calculated.
[0195] In a specific implementation, the step of obtaining the future power grid network model and calculating the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model specifically includes:
[0196] According to the existing power grid network model, the installed capacity of each power generation node is calculated; the existing power grid network model has n a power generation nodes, the corresponding power generation node set is:
[0197]
[0198] The installed capacity set P corresponding to the power generation node Ga for:
[0199]
[0200] Where P Ni is the power generation node N i Rated capacity of the mounted unit;
[0201] After the future grid network model changes, the installed capacity information of the future grid network model is screened and the installed capacity of each power generation node is calculated; the future grid network model has n b power generation nodes, then the set of power generation nodes corresponding to the future power grid network model is:
[0202]
[0203] The installed capacity set P corresponding to the power generation node Gb for:
[0204]
[0205] The power generation nodes in the power generation node set of the existing power grid network model are mapped to the power generation nodes in the power generation node set of the future power grid network model. After the mapping is completed, a complete power generation node set is obtained:
[0206] N G ={N1,…,N n} (17)
[0207] Where n is the number of power generation nodes after the mapping is completed, satisfying the following constraints:
[0208]
[0209] Under the complete power generation node set of formula (17), the installed capacity set corresponding to the power generation nodes of the two-stage power grid is:
[0210]
[0211] According to formula (19), the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model is calculated:
[0212]
[0213] Among them, ΔP G The difference set of installed capacity of power generation nodes, ΔP Nn is the installed capacity difference of the nth power generation node after mapping.
[0214] In a specific implementation, the step of revising the limit of the safe and stable section under the existing power grid network model based on the sensitivity of the safe and stable section to each network node and the difference in installed capacity of each power generation node to obtain the limit of the safe and stable section under the future power grid network model specifically includes:
[0215] The safe and stable section L is related to the power grid generation node set N G The sensitivity is:
[0216]
[0217] The sensitivity value is between [-1,1]. represents the sensitivity of the safe and stable section L to the nth generation node after mapping; after the installed capacity of the future power grid network model changes, according to formula (20), the generation node N i Contribution value of limit modification to safe and stable section L for:
[0218]
[0219] According to formula (22), the grid generation node set N is obtained G The total value of the limit modification contribution of all power generation nodes to the safe and stable section L is:
[0220]
[0221] The limit of the safe and stable section L under the future power grid network model is obtained as follows:
[0222] P L1 =P L0 +ΔP L (twenty four)
[0223] Among them, P L0 It is the limit of safe and stable section L under the existing power grid network model.
[0224] In a specific implementation manner, the embodiment of the present invention further includes the following steps:
[0225] S4. Based on the limit of safe and stable sections under the future power grid network model, the future power grid network model is used to perform power simulation.
[0226] The method of the present invention can map and calculate the changes in each power generation node and its installed capacity in the power grid under the simulation environment, and based on the sensitivity of the section to the unit, calculate the contribution of the installed capacity change of each power generation node to the section of the entire network, and finally generate network constraints that adapt to the new installation scenario, laying a good foundation for the simulation system to perform multi-cycle and multi-resource simulation.
[0227] See also Figure 3 As shown, an embodiment of the present invention provides a power grid section limit adjustment device considering different installed capacity scales, including:
[0228] A sensitivity calculation module is used to obtain the existing power grid network model and calculate the sensitivity of the safety and stability section in the existing power grid network model to each network node;
[0229] The installed capacity difference calculation module is used to obtain the future power grid network model and calculate the installed capacity difference between the future power grid network model and the existing power grid network model at each power generation node;
[0230] The limit adjustment module is used to revise the limits of safe and stable sections under the existing power grid network model based on the sensitivity of the safe and stable sections to each network node and the difference in installed capacity of each power generation node, and obtain the limits of safe and stable sections under the future power grid network model.
[0231] See also Figure 4 As shown, an embodiment of the present invention provides an electronic device 100 for implementing a method for adjusting a power grid section limit taking into account different installed capacity sizes; the electronic device 100 includes a memory 101, at least one processor 102, a computer program 103 stored in the memory 101 and executable on the at least one processor 102, and at least one communication bus 104.
[0232] The memory 101 can be used to store the computer program 103, and the processor 102 implements the steps of the power grid section limit adjustment method considering different installed capacity by running or executing the computer program stored in the memory 101 and calling the data stored in the memory 101. The memory 101 can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data (such as audio data) created according to the use of the electronic device 100, etc. In addition, the memory 101 can include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.
[0233] The at least one processor 102 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The processor 102 may be a microprocessor or any conventional processor, etc. The processor 102 is the control center of the electronic device 100, and uses various interfaces and lines to connect various parts of the entire electronic device 100.
[0234] The memory 101 in the electronic device 100 stores a plurality of instructions to implement the adjustment of the power grid section limit considering different installed capacity scales, and the processor 102 can execute the plurality of instructions to implement:
[0235] Obtaining the existing power grid network model, and calculating the sensitivity of the safety and stability section in the existing power grid network model to each network node;
[0236] Obtain a future power grid network model, and calculate the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model;
[0237] Based on the sensitivity of the safe and stable section to each network node and the difference in installed capacity of each power generation node, the limit of the safe and stable section under the existing power grid network model is revised to obtain the limit of the safe and stable section under the future power grid network model.
[0238] If the module / unit integrated in the electronic device 100 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the process in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device that can carry the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory and read-only memory (ROM, Read-Only Memory).
[0239] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0240] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0241] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0242] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0243] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for adjusting the section limit of a power grid considering different installed capacity, characterized in that: include: Obtaining the existing power grid network model, and calculating the sensitivity of the safety and stability section in the existing power grid network model to each network node; Obtain a future power grid network model, and calculate the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model; Based on the sensitivity of the safe and stable section to each network node and the difference in installed capacity of each power generation node, the limit of the safe and stable section under the existing power grid network model is revised to obtain the limit of the safe and stable section under the future power grid network model.
2. The method for adjusting the power grid section limit considering different installed capacity scales according to claim 1 is characterized in that: In the step of obtaining the existing power grid network model and calculating the sensitivity of the safe and stable section in the existing power grid network model to each network node, the safe and stable section L is composed of l L The output of unit i is composed of lines, and the sensitivity S of the active power flow of the safe and stable section L is Li for: Among them, S li is the sensitivity of the output of unit i to the active power flow of line l.
3. The method for adjusting the power grid section limit considering different installed capacity scales according to claim 1, characterized in that: The step of obtaining the future power grid network model and calculating the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model specifically includes: Calculate the power generation capacity of the power generation nodes of the existing power grid network model; Calculate the power generation capacity of power generation nodes in the future power grid network model; The power generation nodes of the existing power grid network model are mapped with the power generation nodes of the future power grid network model; According to the mapping results, the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model is calculated.
4. The method for adjusting the power grid section limit considering different installed capacity scales according to claim 1, characterized in that: The step of obtaining the future power grid network model and calculating the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model specifically includes: According to the existing power grid network model, the installed capacity of each power generation node is calculated; the existing power grid network model has n a power generation nodes, the corresponding power generation node set is: The installed capacity set P corresponding to the power generation node Ga for: Where P Ni is the power generation node N i Rated capacity of the mounted unit; After the future grid network model changes, the installed capacity information of the future grid network model is screened to calculate the installed capacity of each power generation node; the future grid network model has n b power generation nodes, then the set of power generation nodes corresponding to the future power grid network model is: The installed capacity set P corresponding to the power generation node Gb for: The power generation nodes in the power generation node set of the existing power grid network model are mapped to the power generation nodes in the power generation node set of the future power grid network model. After the mapping is completed, a complete power generation node set is obtained: N G ={N1,…,N n } (17) Where n is the number of power generation nodes after the mapping is completed, satisfying the following constraints: Under the complete power generation node set of formula (17), the installed capacity set corresponding to the power generation nodes of the two-stage power grid is: According to formula (19), the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model is calculated: Among them, ΔP G The difference set of installed capacity of power generation nodes, ΔP Nn is the installed capacity difference of the nth power generation node after mapping.
5. The method for adjusting the power grid section limit considering different installed capacity scales according to claim 4 is characterized in that: The step of revising the limit of the safe and stable section under the existing power grid network model based on the sensitivity of the safe and stable section to each network node and the difference in installed capacity of each power generation node to obtain the limit of the safe and stable section under the future power grid network model specifically includes: The safe and stable section L is related to the power grid generation node set N G The sensitivity is: The sensitivity value is between [-1,1]. represents the sensitivity of the safe and stable section L to the nth generation node after mapping; after the installed capacity of the future power grid network model changes, according to formula (20), the generation node N i Contribution value of limit modification to safe and stable section L for: According to formula (22), the grid generation node set N is obtained G The total value of the limit modification contribution of all power generation nodes to the safe and stable section L is: The limit of the safe and stable section L under the future power grid network model is obtained as follows: P L1 =P L0 +ΔP L (24) Among them, P L0 It is the limit of safe and stable section L under the existing power grid network model.
6. The method for adjusting the power grid section limit considering different installed capacity scales according to any one of claims 1 to 5, characterized in that: Also includes: Based on the limit of safe and stable sections under the future power grid network model, the future power grid network model is used for power simulation.
7. A power grid section limit adjustment device considering different installed capacity, characterized in that: include: A sensitivity calculation module is used to obtain the existing power grid network model and calculate the sensitivity of the safety and stability section in the existing power grid network model to each network node; The installed capacity difference calculation module is used to obtain the future power grid network model and calculate the installed capacity difference between the future power grid network model and the existing power grid network model at each power generation node; The limit adjustment module is used to revise the limits of safe and stable sections under the existing power grid network model based on the sensitivity of the safe and stable sections to each network node and the difference in installed capacity of each power generation node, and obtain the limits of safe and stable sections under the future power grid network model.
8. The power grid section limit adjustment device considering different installed capacity scales according to claim 7 is characterized in that: The sensitivity calculation module obtains the existing power grid network model, and in the step of calculating the sensitivity of the safety and stability section in the existing power grid network model to each network node, the safety and stability section L is composed of l L The output of unit i is composed of lines, and the sensitivity S of the active power flow of the safe and stable section L is Li for: Among them, S li is the sensitivity of the output of unit i to the active power flow of line l.
9. The method for adjusting the power grid section limit considering different installed capacity scales according to claim 7, characterized in that: The installed capacity difference calculation module obtains the future power grid network model, and calculates the installed capacity difference of the future power grid network model at each power generation node compared with the existing power grid network model, specifically including: Calculate the power generation capacity of the power generation nodes of the existing power grid network model; Calculate the power generation capacity of power generation nodes in the future power grid network model; The power generation nodes of the existing power grid network model are mapped with the power generation nodes of the future power grid network model; According to the mapping results, the difference in installed capacity of each power generation node between the future power grid network model and the existing power grid network model is calculated.
10. The method for adjusting power grid section limits considering different installed capacity scales according to claim 7, characterized in that: The installed capacity difference calculation module obtains the future power grid network model, and calculates the installed capacity difference of the future power grid network model at each power generation node compared with the existing power grid network model, specifically including: According to the existing power grid network model, the installed capacity of each power generation node is calculated; the existing power grid network model has n a power generation nodes, the corresponding power generation node set is: The installed capacity set P corresponding to the power generation node Ga for: Where P Ni is the power generation node N i Rated capacity of the mounted unit; After the future grid network model changes, the installed capacity information of the future grid network model is screened and the installed capacity of each power generation node is calculated; the future grid network model has n b power generation nodes, then the set of power generation nodes corresponding to the future power grid network model is: The installed capacity set P corresponding to the power generation node Gb for: The power generation nodes in the power generation node set of the existing power grid network model are mapped to the power generation nodes in the power generation node set of the future power grid network model. After the mapping is completed, a complete power generation node set is obtained: N G ={N1,…,N n } (17) Where n is the number of power generation nodes after the mapping is completed, satisfying the following constraints: Under the complete power generation node set of formula (17), the installed capacity set corresponding to the power generation nodes of the two-stage power grid is: According to formula (19), the difference in installed capacity at each power generation node between the future power grid network model and the existing power grid network model is calculated: Among them, ΔP G The difference set of installed capacity of power generation nodes, ΔP Nn is the installed capacity difference of the nth power generation node after mapping.
11. The method for adjusting power grid section limits considering different installed capacity scales according to claim 10, characterized in that: The limit adjustment module amends the limit of the safe and stable section under the existing power grid network model based on the sensitivity of the safe and stable section to each network node and the difference in installed capacity of each power generation node, and obtains the limit of the safe and stable section under the future power grid network model, specifically including: The safe and stable section L is related to the power grid generation node set N G The sensitivity is: The sensitivity value is between [-1,1]. represents the sensitivity of the safe and stable section L to the nth generation node after mapping; after the installed capacity of the future power grid network model changes, according to formula (20), the generation node N i Contribution value of limit modification to safe and stable section L for: According to formula (22), the grid generation node set N is obtained G The total value of the limit modification contribution of all power generation nodes to the safe and stable section L is: The limit of the safe and stable section L under the future power grid network model is obtained as follows: P L1 =P L0 +ΔP L (24) Among them, P L0 It is the limit of safe and stable section L under the existing power grid network model.
12. The power grid section limit adjustment device considering different installed capacity scales according to any one of claims 7 to 11, characterized in that: Also includes: The simulation module is used to perform power simulation based on the limit of the safe and stable section under the future power grid network model.
13. An electronic device, characterized in that: It comprises a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement a method for adjusting power grid section limits taking into account different installed capacity sizes as described in any one of claims 1 to 6.
14. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by the processor, the method for adjusting the section limit of a power grid considering different installed capacity scales as described in any one of claims 1 to 6 is implemented.
15. A computer program product, characterized in that The computer program product includes a computer program / instruction, and when the computer program / instruction is executed by a processor, the method for adjusting the power grid section limit considering different installed capacity scales as described in any one of claims 1 to 6 is implemented.
Citation Information
Patent Citations
Security-constrained unit commitment method and system
CN111463833A
Electric power spot market clearing method, system, device and readable storage medium
CN111950800A
Section interaction day-ahead market clearing method, system, device and storage medium
CN111950801A
Method, system and equipment for balancing future tidal current power of regional power grid and storage medium
CN114156892A
Power transmission section power adjustment method based on SAC deep reinforcement learning
CN118137457A
Cited By
Intelligent formulation method, device and equipment for power grid section limit description
CN122287612A