Hazardous chemical substance production workshop moving method based on Beidou grid position code
By using BeiDou grid location codes to divide the old and new workshops into grids and match equipment locations, the problems of equipment misdirection, loss, and damage in traditional relocation schemes have been solved, enabling the rapid, accurate, and low-cost relocation and normal operation of hazardous chemical production workshops.
Patent Information
- Application Number
- CN202411303661.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2025-01-07
AI Technical Summary
Traditional relocation solutions for hazardous chemical production workshops carry a high risk of equipment mis-delivery, loss, and damage, and also increase additional labor costs and installation complexity.
A method for relocating hazardous chemical production workshops based on BeiDou grid location codes is adopted. By dividing the old and new workshops into grids, the corresponding relationship between the equipment and the new workshop is established, ensuring that the target location of the equipment is known before the relocation, thus achieving precise disassembly and installation.
It enabled the rapid, precise, and low-cost relocation of hazardous chemical production workshops, reducing the risk of equipment damage and loss and ensuring the normal operation of the new workshops.
Smart Images

Figure CN119272986A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present application relate to the technical field of hazardous chemical production, and in particular to a method for relocating a hazardous chemical production workshop based on Beidou grid location code. Background Art
[0002] With the continuous development of my country's economy, the demand and consumption of hazardous chemicals are also increasing. In the future, the hazardous chemicals industry is bound to continue to develop rapidly. With the rapid development of the hazardous chemicals industry, regulatory authorities and enterprises pay more and more attention to the safe production of hazardous chemicals, and the site selection and planning issues of hazardous chemicals production workshops are becoming increasingly prominent. With the introduction of new guidelines, the site selection of hazardous chemicals production plants needs to be far away from densely populated urban areas, and the impact of hazardous chemicals production on the surrounding environment needs to be considered. It is also necessary to ensure that the factory location has good traffic conditions to facilitate the transportation and sales of hazardous chemicals. In addition to the site selection of the factory, the new guidelines also put forward new requirements for hazardous chemicals production workshops. The original hazardous chemicals production workshops can no longer meet the new safety standards. It is necessary to renovate and upgrade the original hazardous chemicals production workshops, or build new hazardous chemicals production workshops, and relocate the equipment in the old hazardous chemicals production workshops to the new hazardous chemicals production workshops.
[0003] However, traditional relocation plans often only specify which equipment needs to be relocated and which equipment needs certain protective measures during relocation. After moving the equipment to the new workshop, the movers simply unload the equipment in the new workshop or outside the door of the new workshop. Later, the installers are still required to move the equipment to the target location in the new workshop for unpacking and installation. Such a relocation plan is too chaotic and can easily cause equipment to be mislocated or lost. In addition, a lot of unnecessary moving work is done during installation, which incurs additional labor costs and increases the risk of equipment damage. Summary of the invention
[0004] In order to solve the above-mentioned technical problems, the embodiment of the present application proposes a method for relocating a hazardous chemical production workshop based on the Beidou grid location code, which can realize the fast, accurate, low-cost and planned relocation of the hazardous chemical production workshop, greatly reducing the risk of equipment damage and loss, ensuring that the new hazardous chemical production workshop can operate normally, and facilitating enterprises to carry out hazardous chemical production work quickly and orderly.
[0005] To achieve the above-mentioned purpose, an embodiment of the present application proposes a method for relocating a hazardous chemical production workshop based on a Beidou grid location code, comprising the following steps: gridding the old hazardous chemical production workshop based on the Beidou grid location code standard to obtain the old grid map of the old hazardous chemical production workshop, and assigning a unique old Beidou grid location code to each old grid unit in the old grid map; determining the old grid unit into which each device falls, and marking the old Beidou grid location code of the old grid unit into which it falls to the corresponding device; wherein, if a device falls into multiple old grid units, the old Beidou grid location codes of each old grid unit into which it falls are all marked to the device; marking the new hazardous chemical production workshop based on the Beidou grid location code standard The workshop is gridded with the same accuracy level to obtain a new grid map of the new hazardous chemicals production workshop, and each new grid unit in the new grid map is assigned a unique new Beidou grid location code; based on the layout of each device in the old grid map, the layout of each device in the new grid map is determined, and based on the old Beidou grid location code marked on each device, the new Beidou grid location code corresponding to each device is determined and marked; based on the new Beidou grid location code marked on each device, each device is disassembled, packed and moved to the corresponding position of the new hazardous chemicals production workshop for unpacking and installation, and the installed equipment is tested for operation. When all equipment passes the operation test, the relocation of the hazardous chemicals production workshop is confirmed to be completed.
[0006] To achieve the above-mentioned purpose, the embodiment of the present application also proposes a hazardous chemical production workshop relocation system based on the Beidou grid location code, including: an old Beidou grid code management module, a first marking module, a new Beidou grid code management module, a second marking module, a relocation execution module and an operation test module; the old Beidou grid code management module is used to grid the old hazardous chemical production workshop based on the Beidou grid location code standard, obtain the old grid map of the old hazardous chemical production workshop, and assign a unique old Beidou grid location code to each old grid unit in the old grid map; the first marking module is used to determine the old grid unit into which each device falls, and mark the old Beidou grid location code of the old grid unit into which it falls to the corresponding device, wherein, if a device falls into multiple old grid units, the old Beidou grid location codes of each old grid unit into which it falls are all marked to the device; the new Beidou The grid code management module is used to grid the new hazardous chemicals production workshop with the same accuracy level based on the Beidou grid location code standard, obtain a new grid map of the new hazardous chemicals production workshop, and assign a unique new Beidou grid location code to each new grid unit in the new grid map; the second marking module is used to determine the layout of each device in the new grid map based on the layout of each device in the old grid map, and determine and mark the new Beidou grid location code corresponding to each device based on the old Beidou grid location code marked on each device; the relocation execution module is used to disassemble and pack each device based on the new Beidou grid location code marked on each device, and then move it to the corresponding position of the new hazardous chemicals production workshop for unpacking and installation; the operation test module is used to perform operation tests on the installed equipment, and confirm the completion of the relocation of the hazardous chemicals production workshop when all equipment have passed the operation test.
[0007] To achieve the above-mentioned purpose, an embodiment of the present application also proposes an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute a method for relocating a hazardous chemical production workshop based on a Beidou grid location code as described above.
[0008] To achieve the above-mentioned purpose, an embodiment of the present application also proposes a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, it implements a method for relocating a hazardous chemical production workshop based on the Beidou grid location code as described above.
[0009] The embodiment of the present application proposes a method for relocating a hazardous chemical production workshop based on a Beidou grid location code, which divides the old hazardous chemical production workshop and the new hazardous chemical production workshop into Beidou grids respectively, and uses the equipment in the old hazardous chemical production workshop as a bridge to establish a correspondence between the old Beidou grid location code and the new Beidou grid location code. Before the equipment is moved, the location where the equipment should be placed in the new hazardous chemical production workshop has been determined. The movers will directly move the packaged equipment to the corresponding location in the new hazardous chemical production workshop, and the installation workers will unpack and install it on the spot. The hazardous chemical production workshop can be relocated quickly, accurately, at low cost, and in an organized manner, greatly reducing the risk of equipment damage and loss, ensuring that the new hazardous chemical production workshop can operate normally, and facilitating the company to carry out hazardous chemical production work quickly and orderly.
[0010] Optionally, based on the layout of each device in the old grid map, the layout of each device in the new grid map is determined, and based on the old Beidou grid location code marked on each device, the new Beidou grid location code corresponding to each device is determined and marked, including: judging whether the specifications of the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are the same; if the specifications of the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are the same, then copying the layout of each device in the old grid map as the layout of each device in the new grid map, and taking the old grid unit in the upper left corner of the old hazardous chemicals production workshop and the new grid unit in the upper left corner of the planned production area of the new hazardous chemicals production workshop as the basis, establish the correspondence between the old Beidou grid location code and the new Beidou grid location code, so as to determine the new Beidou grid corresponding to each device. location code and mark them; if the specifications of the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are different, continue to judge whether the production area of the old hazardous chemicals production workshop can be completely covered by the planned production area of the new hazardous chemicals production workshop; if the production area of the old hazardous chemicals production workshop can be completely covered by the planned production area of the new hazardous chemicals production workshop, then based on the old grid unit in the upper left corner of the old hazardous chemicals production workshop and the selected new grid unit, establish the correspondence between the old Beidou grid location code and the new Beidou grid location code, and then based on the layout of each device in the old grid map and the correspondence between the old Beidou grid location code and the new Beidou grid location code, determine the layout of each device in the new grid map, and finally determine the new Beidou grid location code corresponding to each device and mark them. If the specifications of the new hazardous chemicals production workshop have not changed compared to the old hazardous chemicals production workshop, or the production area of the old hazardous chemicals production workshop can be completely covered by the planned production area of the new hazardous chemicals production workshop, then the layout of each device in the old grid map can be simply used as the layout of each device in the new grid map, or the layout of each device in the old grid map can be simply scaled, so as to quickly determine the layout of each device in the new grid map and quickly complete the marking of the new Beidou grid location code, thereby improving the relocation efficiency of the hazardous chemicals production workshop.
[0011] Optionally, if the production area of the old hazardous chemicals production workshop cannot be completely covered by the planned production area of the new hazardous chemicals production workshop, then traverse each device, establish a virtual model of the current device and project it into the new grid map, refer to the position of the current device in the old grid map, determine the position of the current device in the new grid map, and annotate the new Beidou grid location code of the new grid unit where the virtual model of the current device falls to the current device; after completing the virtual model projection of all devices and the annotation of the new Beidou grid location code, obtain the layout of each device in the new grid map. If the specifications of the new hazardous chemicals production workshop are changed compared to the old hazardous chemicals production workshop, and the production area of the old hazardous chemicals production workshop cannot be completely covered by the planned production area of the new hazardous chemicals production workshop, it is necessary to design the layout of each device in the new grid map, which is achieved by virtual model projection, which can ensure that all equipment can be reasonably arranged in the new hazardous chemicals production workshop.
[0012] Optionally, after determining the new Beidou grid location code corresponding to each device and marking it, and before disassembling, packaging and transporting each device to the corresponding position of the new hazardous chemicals production workshop for unpacking and installation based on the new Beidou grid location code marked on each device, the method also includes: determining the transportation order of each device based on the layout of each device in the new grid map, the volume and weight of each device, and the cooperative relationship and connection relationship between each device; based on the new Beidou grid location code marked on each device, disassembling, packaging and transporting each device to the corresponding position of the new hazardous chemicals production workshop for unpacking and installation, including: first disassembling, packaging and transporting each device to the outside of the new hazardous chemicals production workshop, and then transporting each device to the corresponding position of the new hazardous chemicals production workshop for unpacking and installation based on the transportation order of each device and the new Beidou grid location code marked on each device. Different equipment may have a hierarchical relationship between them, and some equipment is large in size. If such equipment is first moved to the new hazardous chemicals production workshop for unpacking and installation, it may hinder the movement of other equipment. Therefore, this application predetermines the transportation order and strictly follows the transportation order of each equipment and the new Beidou grid location code marked on each equipment to move each equipment to the corresponding position of the new hazardous chemicals production workshop for unpacking and installation, ensuring that all equipment can be quickly and correctly installed.
[0013] Optionally, before disassembling and packaging each device, assign disassembling personnel to each device, and mark the information of the assigned installation personnel on each device; after disassembling and packaging each device, assign transport personnel and transport vehicles to each device, and mark the information of the assigned transport personnel and transport vehicles on each device; after transporting each device to the corresponding position of the new hazardous chemicals production workshop, assign installation personnel to each device, and mark the information of the assigned installation personnel on each device. Pre-assigning disassembling and assembly personnel, transport personnel, and installation personnel makes the relocation process of the hazardous chemicals production workshop more organized, and can effectively prevent equipment from being disassembled, transported, or installed by mistake.
[0014] Optionally, after the operation test is performed on each installed device, the method further includes: troubleshooting and root cause analysis of all devices that have failed the operation test, and determining the devices that have failed the operation test due to disassembly, transportation, and installation; obtaining the information of the disassembly personnel, transportation personnel, transportation vehicle, and installation personnel corresponding to the devices that have failed the operation test due to disassembly, transportation, and installation, and holding accountable the disassembly personnel, transportation personnel, transportation vehicle, and installation personnel corresponding to the devices that have failed the operation test due to disassembly, transportation, and installation. For those devices that have failed the operation test due to disassembly, transportation, and installation, the corresponding disassembly personnel, transportation personnel, transportation vehicle, and installation personnel are found and held accountable, which effectively protects the interests of hazardous chemical production enterprises.
[0015] Optionally, after all equipment is moved away from the old hazardous chemicals production workshop, wastewater, waste materials, and wastes left in the old hazardous chemicals production workshop are collected and treated according to categories and corresponding treatment standards. Timely and safe treatment of wastewater, waste materials, and wastes can avoid environmental pollution at the site of the old hazardous chemicals production workshop. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the related technologies, the drawings required for use in the embodiments of the present application or the related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 It is a flowchart of a method for relocating a hazardous chemicals production workshop based on Beidou grid location code provided in one embodiment of the present application;
[0018] Figure 2 An old grid map of an old hazardous chemicals production workshop provided in one embodiment of the present application;
[0019] Figure 3 It is a new grid map of a new hazardous chemicals production workshop provided in one embodiment of the present application;
[0020] Figure 4 It is a structural schematic diagram of a hazardous chemicals production workshop relocation system based on Beidou grid location code provided in another embodiment of the present application;
[0021] Figure 5 It is a structural schematic diagram of an electronic device provided in another embodiment of the present application. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the embodiments of the present application will be described in detail below in conjunction with the accompanying drawings. In the various embodiments of the present application, many technical details are proposed in order to make the reader better understand the present application. However, even without these technical details and various changes and modifications based on the following embodiments, the technical scheme claimed in the present application can also be implemented. The division of the following embodiments is only for the convenience of description, and the specific implementation mode of the present application should not constitute any limitation. The various embodiments can be combined with each other and referenced to each other under the premise of no contradiction.
[0023] An embodiment of the present application proposes a relocation of a hazardous chemical production workshop based on a Beidou grid location code, which is applied to an electronic device, wherein the electronic device can be a terminal or a server. In this embodiment and the following embodiments, the electronic device is explained using a server (also called a command center) as an example. The implementation details of the relocation of a hazardous chemical production workshop based on a Beidou grid location code proposed in this embodiment are specifically described below. The following content is only the implementation details provided for ease of understanding and is not necessary for the implementation of this solution.
[0024] The specific process of relocating a hazardous chemicals production workshop based on Beidou grid location code proposed in this embodiment can be as follows: Figure 1 As shown, including:
[0025] Step 101, gridding the old hazardous chemicals production workshop based on the Beidou grid location code standard, obtaining an old grid map of the old hazardous chemicals production workshop, and assigning a unique old Beidou grid location code to each old grid unit in the old grid map.
[0026] In the specific implementation, when relocating a hazardous chemicals production workshop, the command center first divides the old hazardous chemicals production workshop into grids based on the Beidou grid location code standard, obtains the old grid map of the old hazardous chemicals production workshop, and assigns a unique old Beidou grid location code to each old grid unit in the old grid map.
[0027] In one example, an old grid map of an old hazardous chemicals production plant can be Figure 2 shown.
[0028] Step 102, determine the old grid unit that each device falls into, and mark the old Beidou grid location code of the old grid unit that the device falls into to the corresponding device. If a device falls into multiple old grid units, the old Beidou grid location codes of each old grid unit that the device falls into are all marked to the device.
[0029] In the specific implementation, after completing the Beidou grid division of the old hazardous chemicals production workshop, the command center can determine the old grid unit where each device falls, and mark the old Beidou grid location code of the old grid unit to the corresponding device. It is worth noting that if a device falls into multiple old grid units, the old Beidou grid location codes of each old grid unit it falls into will be marked to the device, and the marking order of multiple old Beidou grid location codes is counterclockwise from the first quadrant to the fourth quadrant.
[0030] Step 103, based on the Beidou grid location code standard, the new hazardous chemicals production workshop is gridded with the same accuracy level to obtain a new grid map of the new hazardous chemicals production workshop, and each new grid unit in the new grid map is assigned a unique new Beidou grid location code.
[0031] In the specific implementation, after the command center has completed the marking of the old Beidou grid location code of each device, it can divide the new hazardous chemicals production workshop into grids with the same accuracy level based on the Beidou grid location code standard, and obtain a new grid map of the new hazardous chemicals production workshop. Each new grid unit in the new grid map is assigned a unique new Beidou grid location code.
[0032] In one example, the old grid map of a new hazardous chemicals production plant can be Figure 3 shown.
[0033] Step 104, based on the layout of each device in the old grid map, determine the layout of each device in the new grid map, and based on the old Beidou grid location code marked on each device, determine the new Beidou grid location code corresponding to each device and mark it.
[0034] In the specific implementation, after completing the Beidou grid division of the new hazardous chemicals production workshop, the command center can determine the layout of each device in the new grid map based on the layout of each device in the old grid map, and based on the old Beidou grid location code marked on each device, determine the new Beidou grid location code corresponding to each device and mark it to prepare for relocation.
[0035] When the command center determines the layout of each device in the new grid map based on the layout of each device in the old grid map, and determines and marks the new Beidou grid location code corresponding to each device based on the old Beidou grid location code marked on each device, it first determines whether the specifications of the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are the same. If the specifications of the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are the same, the layout of each device in the old grid map is directly copied as the layout of each device in the new grid map, and the old grid unit in the upper left corner of the old hazardous chemicals production workshop and the new grid unit in the upper left corner of the planned production area of the new hazardous chemicals production workshop are used as the basis to establish the correspondence between the old Beidou grid location code and the new Beidou grid location code, thereby determining the new Beidou grid location code corresponding to each device and marking it.
[0036] It is understandable that for new and old hazardous chemicals production workshops of the same specifications, if there is no need to deliberately change the layout, the layout in the old grid map can be directly used to ensure that the relocation of the hazardous chemicals production workshop can be completed efficiently.
[0037] If the specifications of the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are different, then continue to judge whether the production area of the old hazardous chemicals production workshop can be completely covered by the planned production area of the new hazardous chemicals production workshop. If the production area of the old hazardous chemicals production workshop can be completely covered by the planned production area of the new hazardous chemicals production workshop, then take the old grid unit in the upper left corner of the old hazardous chemicals production workshop and the selected new grid unit as the basis to establish the correspondence between the old Beidou grid location code and the new Beidou grid location code. Then, based on the layout of each device in the old grid map and the correspondence between the old Beidou grid location code and the new Beidou grid location code, determine the layout of each device in the new grid map. Finally, determine the new Beidou grid location code corresponding to each device and mark it.
[0038] It is understandable that if the specifications of the new and old hazardous chemicals production workshops are different, but the production area of the old hazardous chemicals production workshop can be completely covered by the planned production area of the new hazardous chemicals production workshop, if there is no need to deliberately change the layout, then simply scale the layout of each device in the old grid map, so as to quickly determine the layout of each device in the new grid map, and quickly complete the marking of the new Beidou grid location code, thereby improving the relocation efficiency of the hazardous chemicals production workshop.
[0039] If the production area of the old hazardous chemicals production workshop cannot be completely covered by the planned production area of the new hazardous chemicals production workshop, then traverse each device, establish a virtual model of the current device and project it into the new grid map, refer to the position of the current device in the old grid map, determine the position of the current device in the new grid map, and mark the new Beidou grid location code of the new grid unit where the virtual model of the current device falls to the current device; after completing the projection of the virtual models of all devices and the marking of the new Beidou grid location codes, obtain the layout of each device in the new grid map.
[0040] It is understandable that when the specifications of the new hazardous chemicals production workshop are changed compared to the old hazardous chemicals production workshop, and the production area of the old hazardous chemicals production workshop cannot be completely covered by the planned production area of the new hazardous chemicals production workshop, the command center needs to design the layout of each equipment in the new grid map, which is achieved through virtual model projection, which can ensure that all equipment can be reasonably arranged in the new hazardous chemicals production workshop.
[0041] Step 105, based on the new Beidou grid location code marked on each device, each device is disassembled, packed and moved to the corresponding location of the new hazardous chemicals production workshop for unpacking and installation, and each installed device is tested for operation. When all devices pass the operation test, the relocation of the hazardous chemicals production workshop is confirmed to be completed.
[0042] In the specific implementation, after the command center completes the marking of the new Beidou grid location code of each device, it can disassemble and pack each device based on the new Beidou grid location code marked on each device, and then move it to the corresponding location of the new hazardous chemicals production workshop for unpacking and installation, and perform operation tests on the installed equipment. When all equipment passes the operation test, the relocation of the hazardous chemicals production workshop is confirmed to be completed.
[0043] In one example, after the command center determines the new Beidou grid location code corresponding to each device and marks it, it needs to disassemble and pack each device and move it to the corresponding location of the new hazardous chemicals production workshop for unpacking and installation based on the new Beidou grid location code marked on each device. In addition, it needs to determine the transportation order of each device based on the layout of each device in the new grid map, the volume and weight of each device, and the cooperative relationship and connection relationship between each device. Subsequently, when transporting, each device is first disassembled and packed and moved to the outside of the new hazardous chemicals production workshop, and then, based on the transportation order of each device and the new Beidou grid location code marked on each device, each device is moved to the corresponding location of the new hazardous chemicals production workshop for unpacking and installation.
[0044] It is understandable that different equipment may have a superior-subordinate relationship between them, and some equipment is large in size. If such equipment is first moved to the new hazardous chemicals production workshop for unpacking and installation, it may hinder the movement of other equipment. Therefore, this application predetermines the transportation order and strictly follows the transportation order of each equipment and the new Beidou grid location code marked on each equipment to move each equipment to the corresponding position of the new hazardous chemicals production workshop for unpacking and installation, ensuring that all equipment can be quickly and correctly installed.
[0045] In one example, before disassembling and packaging each device, the command center assigns disassembly personnel to each device, and marks the information of the assigned installation personnel to each device. After disassembling and packaging each device, the command center assigns handling personnel and handling vehicles to each device, and marks the information of the assigned handling personnel and handling vehicles to each device. After each device is transported to the corresponding location of the new hazardous chemicals production workshop, the command center assigns installation personnel to each device, and marks the information of the assigned installation personnel to each device. Pre-assignment of disassembly personnel, handling personnel, and installation personnel can make the relocation process of the hazardous chemicals production workshop more organized, and can effectively prevent equipment from being accidentally disassembled, transported, or installed.
[0046] In one example, after running tests on all installed equipment, the command center arranged for testers to troubleshoot and analyze the root causes of all equipment that failed the running tests, identify equipment that failed the running tests due to handling or installation, obtain information on the handlers, handling vehicles, and installers corresponding to the equipment that failed the running tests due to handling or installation, and hold accountable the handlers, handling vehicles, and installers corresponding to all equipment that failed the running tests due to handling or installation. For those equipment that failed the running tests due to handling or installation, the corresponding handlers, handling vehicles, and installers were found and held accountable, effectively protecting the interests of hazardous chemical manufacturers.
[0047] In one example, after all equipment was moved away from the old hazardous chemicals production workshop, the command center arranged for the finishing personnel to collect the wastewater, waste materials, and wastes left over from the old hazardous chemicals production workshop, and treated the wastewater, waste materials, and wastes left over from the old hazardous chemicals production workshop according to their categories and corresponding treatment standards. Timely and safe treatment of wastewater, waste materials, and wastes can avoid environmental pollution at the site of the old hazardous chemicals production workshop.
[0048] In this embodiment, the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are divided into Beidou grids respectively, and the equipment in the old hazardous chemicals production workshop is used as a bridge of correspondence to establish a correspondence between the old Beidou grid location code and the new Beidou grid location code. Before the equipment is moved, the positions where all equipment should be placed in the new hazardous chemicals production workshop have been determined. The movers will directly move the packaged equipment to the corresponding positions in the new hazardous chemicals production workshop, and the installation workers will unpack and install them on the spot. The hazardous chemicals production workshop can be relocated quickly, accurately, at low cost, and in an organized manner, greatly reducing the risk of equipment damage and loss, ensuring that the new hazardous chemicals production workshop can operate normally, and facilitating the company to carry out hazardous chemicals production work quickly and orderly.
[0049] The step division of the above methods is only for clear description. When implemented, they can be combined into one step or some steps can be split and decomposed into multiple steps. As long as they include the same logical relationship, they are all within the scope of protection of this application. Adding insignificant modifications or introducing insignificant designs to the algorithm or process without changing the core design of the algorithm and process are all within the scope of protection of this application.
[0050] Another embodiment of the present application proposes a hazardous chemicals production workshop relocation system based on Beidou grid location code. The implementation details of the hazardous chemicals production workshop relocation system based on Beidou grid location code proposed in this embodiment are described in detail below. The following content is only the implementation details provided for the convenience of understanding and is not necessary for the implementation of this example.
[0051] Figure 4 It is a structural diagram of a hazardous chemicals production workshop relocation system based on the Beidou grid location code proposed in this embodiment, including: an old Beidou grid code management module 201, a first marking module 202, a new Beidou grid code management module 203, a second marking module 204, a relocation execution module 205 and an operation test module 206.
[0052] The old Beidou grid code management module 201 is used to grid the old hazardous chemicals production workshop based on the Beidou grid location code standard, obtain the old grid map of the old hazardous chemicals production workshop, and assign a unique old Beidou grid location code to each old grid unit in the old grid map.
[0053] The first marking module 202 is used to determine the old grid unit that each device falls into, and mark the old Beidou grid location code of the old grid unit that the device falls into to the corresponding device. If a device falls into multiple old grid units, the old Beidou grid location codes of each old grid unit that the device falls into are all marked to the device.
[0054] The new Beidou grid code management module 203 is used to divide the new hazardous chemicals production workshop into grids of the same accuracy level based on the Beidou grid location code standard, obtain a new grid map of the new hazardous chemicals production workshop, and assign a unique new Beidou grid location code to each new grid unit in the new grid map.
[0055] The second marking module 204 is used to determine the layout of each device in the new grid map based on the layout of each device in the old grid map, and determine the new Beidou grid location code corresponding to each device based on the old Beidou grid location code marked by each device and mark it.
[0056] The relocation execution module 205 is used to disassemble and pack each device and transport it to the corresponding location of the new hazardous chemicals production workshop for unpacking and installation based on the new Beidou grid location code marked on each device.
[0057] The operation test module 206 is used to perform an operation test on each installed device. When all devices pass the operation test, it is confirmed that the relocation of the hazardous chemicals production workshop is completed.
[0058] It is not difficult to find that this embodiment is a system embodiment corresponding to the above method embodiment, and this embodiment can be implemented in conjunction with the above method embodiment. The relevant technical details and technical effects mentioned in the above embodiments are still valid in this embodiment, and in order to reduce repetition, they are not repeated here. Accordingly, the relevant technical details mentioned in this embodiment can also be applied in the above embodiments.
[0059] It is worth mentioning that all modules involved in this embodiment are logic modules. In practical applications, a logic unit can be a physical unit, a part of a physical unit, or a combination of multiple physical units. In addition, in order to highlight the innovative part of this application, this embodiment does not introduce units that are not closely related to solving the technical problems proposed by this application, but this does not mean that there are no other units in this embodiment.
[0060] Another embodiment of the present application provides an electronic device, whose specific structure is as follows: Figure 5 As shown, it includes: at least one processor 301; and a memory 302 that is communicatively connected to the at least one processor 301; wherein the memory 302 stores instructions that can be executed by the at least one processor 301, and the instructions are executed by the at least one processor 301 so that the at least one processor 301 can execute a method for relocating a hazardous chemical production workshop based on a Beidou grid location code as described in the above-mentioned method embodiments.
[0061] Among them, the memory and the processor are connected in a bus manner, and the bus may include any number of interconnected buses and bridges, and the bus connects various circuits of one or more processors and memories together. The bus can also connect various other circuits such as peripheral devices, voltage regulators and power management circuits together, which are all well known in the art and will not be further described in this article. The bus interface provides an interface between the bus and the transceiver. The transceiver can be one element or multiple elements, such as multiple receivers and transmitters, providing a unit for communicating with various other devices on a transmission medium. The data processed by the processor is transmitted on a wireless medium through an antenna, and further, the antenna also receives data and transmits the data to the processor.
[0062] The processor is responsible for managing the bus and general processing, and can also provide various functions, including timing, peripheral interfaces, voltage regulation, power management, and other control functions. Memory can be used to store data used by the processor when performing operations.
[0063] Another embodiment of the present application relates to a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, it can implement a method for relocating a hazardous chemical production workshop based on a Beidou grid location code as described in the above method embodiments.
[0064] That is, those skilled in the art can understand that all or part of the steps in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a program, and the program is stored in a storage medium, including a number of instructions to enable a device (which can be a single-chip microcomputer, chip, etc.) or a processor to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, ROM (Read-Only Memory), RAM (Random Access Memory), disk or optical disk and other media that can store program codes.
[0065] Those skilled in the art will appreciate that the above embodiments are specific embodiments for implementing the present application, and in actual applications, various changes may be made thereto in form and detail without departing from the spirit and scope of the present application.
Claims
1. A method for relocating a hazardous chemicals production workshop based on Beidou grid location code, characterized in that: include: The old hazardous chemicals production workshop is grid-divided based on the Beidou grid location code standard to obtain the old grid map of the old hazardous chemicals production workshop, and each old grid unit in the old grid map is assigned a unique old Beidou grid location code; Determine the old grid unit that each device falls into, and mark the old Beidou grid position code of the old grid unit that the device falls into to the corresponding device; wherein, if a device falls into multiple old grid units, the old Beidou grid position code of each old grid unit that the device falls into is marked to the device; Based on the Beidou grid location code standard, the new hazardous chemicals production workshop is divided into grids with the same accuracy level to obtain a new grid map of the new hazardous chemicals production workshop, and each new grid unit in the new grid map is assigned a unique new Beidou grid location code; Based on the layout of each device in the old grid map, determine the layout of each device in the new grid map, and based on the old Beidou grid location code marked on each device, determine the new Beidou grid location code corresponding to each device and mark it; Based on the new Beidou grid location code marked on each device, each device is disassembled, packed and moved to the corresponding location of the new hazardous chemicals production workshop for unpacking and installation, and the installed equipment is tested for operation. When all equipment passes the operation test, the relocation of the hazardous chemicals production workshop is confirmed to be completed.
2. The method for relocating a hazardous chemicals production workshop based on Beidou grid location code according to claim 1 is characterized in that: Based on the layout of each device in the old grid map, determine the layout of each device in the new grid map, and based on the old Beidou grid location code marked on each device, determine the new Beidou grid location code corresponding to each device and mark it, including: Determine whether the specifications of the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are the same; If the specifications of the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are the same, the layout of each device in the old grid map is copied as the layout of each device in the new grid map, and the old grid unit in the upper left corner of the old hazardous chemicals production workshop and the new grid unit in the upper left corner of the planned production area of the new hazardous chemicals production workshop are used as the basis to establish the correspondence between the old Beidou grid location code and the new Beidou grid location code, so as to determine the new Beidou grid location code corresponding to each device and mark it; If the specifications of the old hazardous chemicals production workshop and the new hazardous chemicals production workshop are different, continue to determine whether the production area of the old hazardous chemicals production workshop can be completely covered by the planned production area of the new hazardous chemicals production workshop; If the production area of the old hazardous chemicals production workshop can be completely covered by the planned production area of the new hazardous chemicals production workshop, the correspondence between the old Beidou grid location code and the new Beidou grid location code is established based on the old grid unit in the upper left corner of the old hazardous chemicals production workshop and the selected new grid unit. Based on the layout of each device in the old grid map and the correspondence between the old Beidou grid location code and the new Beidou grid location code, the layout of each device in the new grid map is determined. Finally, the new Beidou grid location code corresponding to each device is determined and marked.
3. The method for relocating a hazardous chemicals production workshop based on Beidou grid location code according to claim 2 is characterized in that: If the production area of the old hazardous chemicals production workshop cannot be completely covered by the planned production area of the new hazardous chemicals production workshop, then traverse each device, establish a virtual model of the current device and project it into the new grid map, refer to the position of the current device in the old grid map, determine the position of the current device in the new grid map, and annotate the new Beidou grid location code of the new grid unit where the virtual model of the current device falls to the current device; After completing the virtual model projection of all devices and marking the new Beidou grid location codes, the layout of each device in the new grid map is obtained.
4. The method for relocating a hazardous chemicals production workshop based on Beidou grid location code according to claim 1 is characterized in that: After determining and marking the new Beidou grid location code corresponding to each device, and before disassembling and packaging each device and transporting it to the corresponding position of the new hazardous chemicals production workshop for unpacking and installation based on the new Beidou grid location code marked on each device, the method further includes: Determine the order of transporting each device based on the layout of each device in the new grid map, the volume and weight of each device, and the cooperation and connection relationship between each device; Based on the new Beidou grid location code marked on each device, each device is disassembled, packed and transported to the corresponding location of the new hazardous chemicals production workshop for unpacking and installation, including: First, disassemble and pack each equipment and move it to the outside of the new hazardous chemicals production workshop. Then, based on the transportation sequence of each equipment and the new Beidou grid location code marked on each equipment, move each equipment to the corresponding location in the new hazardous chemicals production workshop for unpacking and installation.
5. The method for relocating a hazardous chemicals production workshop based on Beidou grid location code according to claim 1 is characterized in that: Before disassembling and packaging each device, assign disassembly and installation personnel to each device, and mark the information of the assigned installation personnel on each device; After each device is disassembled, assembled and packed, a transporter and a transport vehicle are assigned to each device, and the information of the assigned transporter and the transport vehicle are marked on each device respectively; After each device is moved to the corresponding location of the new hazardous chemicals production workshop, an installer is assigned to each device, and the information of the assigned installer is marked on each device.
6. The method for relocating a hazardous chemicals production workshop based on Beidou grid location code according to claim 5 is characterized in that: After the installed equipment is tested, it also includes: Conduct troubleshooting and root cause analysis on all equipment that failed the operation test, and determine the equipment that failed the operation test due to disassembly, transportation, or installation; Obtain the information of the disassembly and assembling personnel, the transport personnel, the transport vehicle and the installer corresponding to the equipment that fails the operation test due to disassembly, transportation and installation, and hold the disassembly and assembling personnel, the transport personnel, the transport vehicle and the installer corresponding to the equipment that fails the operation test due to disassembly, transportation and installation accountable.
7. The method for relocating a hazardous chemicals production workshop based on Beidou grid location code according to any one of claims 1 to 6, characterized in that: After all equipment is moved away from the old hazardous chemicals production workshop, the wastewater, waste materials and waste left over from the old hazardous chemicals production workshop are collected and treated according to their categories and corresponding treatment standards.
8. A hazardous chemicals production workshop relocation system based on Beidou grid location code, characterized in that: include: Old Beidou grid code management module, first annotation module, new Beidou grid code management module, second annotation module, relocation execution module and operation test module; The old Beidou grid code management module is used to grid the old hazardous chemicals production workshop based on the Beidou grid location code standard, obtain the old grid map of the old hazardous chemicals production workshop, and assign a unique old Beidou grid location code to each old grid unit in the old grid map; A first marking module is used to determine the old grid unit in which each device falls, and mark the old Beidou grid position code of the old grid unit in which the device falls to the corresponding device, wherein, if a device falls into multiple old grid units, the old Beidou grid position code of each old grid unit in which the device falls is marked to the device; The new Beidou grid code management module is used to divide the new hazardous chemicals production workshop into grids of the same accuracy level based on the Beidou grid location code standard, obtain a new grid map of the new hazardous chemicals production workshop, and assign a unique new Beidou grid location code to each new grid unit in the new grid map; The second marking module is used to determine the layout of each device in the new grid map based on the layout of each device in the old grid map, and determine the new Beidou grid location code corresponding to each device and mark it based on the old Beidou grid location code marked by each device; The relocation execution module is used to disassemble and pack each device and move it to the corresponding location of the new hazardous chemicals production workshop for unpacking and installation based on the new Beidou grid location code marked on each device; The operation test module is used to perform operation tests on the installed equipment. When all equipment passes the operation test, it is confirmed that the relocation of the hazardous chemicals production workshop is completed.
9. An electronic device, characterized in that: include: at least one processor; and, a memory communicatively coupled to the at least one processor; In which, the memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method for relocating a hazardous chemical production workshop based on the Beidou grid location code as described in any one of claims 1 to 7.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, it can implement the method for relocating a hazardous chemicals production workshop based on the Beidou grid location code as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Transplanting planning design method for trees with bird nests based on BIM technology
CN112868490A
Twin space positioning management method for Beidou grid position codes
CN114663620A
Cold-chain food transportation intelligent management system based on big data
CN116452099A
Move support program
JP2003288406A
Move supporting system and server
JP2004334666A