Standard detection processing method and device for informatization research and development project and electronic equipment

By periodically implementing standardized testing processes, obtaining project content and level, determining whether the project meets the standards, and determining the causes and updates in the event of failure, the problem of low monitoring efficiency of project specification level is solved, and efficient project monitoring and intuitiveness is achieved The standard display.

CN119477071APending Publication Date: 2025-02-18PEOPLE'S INSURANCE COMPANY OF CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411565086.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-04
Publication Date
2025-02-18

AI Technical Summary

Technical Problem

The current project specification level monitoring efficiency is low, and relying on manual data processing leads to inefficiency.

Method used

By periodically implementing standardized testing processes, obtain project content and project level, determine project requirements based on project level, judge whether project content meets the standards, and determine the reasons and personnel information if the standards are not met, update the number of times the standards are not met, and send the data Go to the monitoring terminal.

Benefits of technology

It realizes efficient and intuitive project standardized inspection, reduces inspection time, improves project monitoring efficiency, and promptly demonstrates the project's compliance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119477071A_ABST
    Figure CN119477071A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a standard detection processing method and device for an informatization research and development project and electronic equipment, and belongs to the technical field of data processing and project management. Comprising the steps of obtaining a project level and at least one project content corresponding to a target project identifier; obtaining a previous period standard reaching condition, a previous period non-standard reaching frequency and a total non-standard reaching frequency corresponding to the project content; determining at least one project requirement according to the project level; according to the project content and the target project requirement, determining the standard reaching condition of the period; if not, determining a corresponding substandard reason, a required name and personnel information; according to the standard reaching condition of the current period, the standard reaching condition of the previous period, the substandard frequency of the previous period and the total substandard frequency, determining the substandard frequency of the current period and the new total substandard frequency corresponding to the target project requirement; and sending the relevant information of the substandard project to a monitoring terminal. The problem that the project specification degree monitoring efficiency is low is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of data processing and project management, and in particular to a method, device and electronic equipment for standardizing detection and processing of information technology research and development projects. Background Art

[0002] With the continuous development of the economy and society, many companies need to manage a large number of projects at the same time. Whether the project is handled in a standardized manner is an important part of project processing monitoring.

[0003] At present, in related technologies, project management is usually performed manually, and the staff processes the project data to determine whether the project meets the specifications.

[0004] However, the inventors have discovered that the related technology has at least the following technical problems: the efficiency of current project standardization monitoring is low. Summary of the invention

[0005] The embodiments of the present application provide a method, device and electronic equipment for standard detection and processing of an information-based R&D project, so as to solve the problem of low efficiency in monitoring the standardization level of current projects.

[0006] In a first aspect, the present application provides a method for standard detection and processing of information technology research and development projects, including: when monitoring that the standard detection process of this cycle is triggered, obtaining the project level and at least one project content corresponding to the target project identifier; obtaining the compliance status of the previous cycle, the number of non-compliance times of the previous cycle and the total number of non-compliance times corresponding to the project content; determining at least one project requirement according to the project level; determining the compliance status of the target project content and the target project requirements corresponding to the current cycle according to the project content and the target project requirements, wherein the target project content is any project content and the target project requirement is any project requirement; if the compliance status of the current cycle corresponding to the target project content and the target project requirements is non-compliance, determining the corresponding non-compliance reasons, requirement names and personnel information; determining the number of non-compliance times of the current cycle corresponding to the target project requirements and the new total number of non-compliance times according to the compliance status of the current cycle, the compliance status of the previous cycle, the number of non-compliance times of the previous cycle and the total number of non-compliance times; sending the requirement name, target project identifier, personnel information, non-compliance reasons and the number of non-compliance times of the current cycle corresponding to each project requirement and the new total number of non-compliance times to the monitoring terminal.

[0007] In one possible implementation, the number of non-compliance times in this cycle and the new total number of non-compliance times corresponding to the target project requirements are determined based on the compliance status of this cycle, the compliance status of the previous cycle, the number of non-compliance times in the previous cycle and the total number of non-compliance times, including: if the compliance status of the target project content and the target project requirements corresponding to this cycle is non-compliance, and the compliance status of the target project content and the target project requirements corresponding to the previous cycle was also non-compliance, then the total number of non-compliance times is increased by 1 to obtain the new total number of non-compliance times corresponding to the target project requirements; the number of target project contents whose compliance status in this cycle is non-compliance is determined as the number of non-compliance times in this cycle corresponding to the target project requirements.

[0008] In one possible implementation, the target project requirements include at least one process link requirement, and the process link requirement includes a link type; accordingly, based on the project content and the target project requirements, the target project content and the target project requirements corresponding to the current cycle's compliance status are determined, including: if the project content includes the target link type corresponding to the target process link requirement, then the target project content and the target process link requirement corresponding to the current cycle's compliance status is determined to be compliance; otherwise, the target project content and the target process link requirement corresponding to the current cycle's compliance status is determined to be non-compliance, wherein the target process link requirement is any process link requirement.

[0009] In one possible implementation, if the target project content and the target project requirements do not meet the standards for this period, the corresponding reasons for non-compliance, requirement names and personnel information are determined, including: if the target project content and the target process link requirements do not meet the standards for this period, then the failure to meet the target process link requirements is determined as the reason for non-compliance, and the target process link requirements are determined as the requirement names; and the personnel information corresponding to the target project content is obtained.

[0010] In one possible implementation, the target project requirements include secondary demand splitting requirements; accordingly, based on the project content and the target project requirements, the target project content and the target project requirements corresponding to the current cycle are determined, including: obtaining the demand level corresponding to the project content; if the demand level is secondary demand, and the project content includes tertiary demand project content, then the target project content and the secondary demand splitting requirements corresponding to the cycle compliance status are determined to be met, otherwise the target project content and the secondary demand splitting requirements corresponding to the cycle compliance status are determined to be unmet.

[0011] In one possible implementation, the target project requirements include project level requirements; the project content includes at least one sub-project content; accordingly, based on the project content and the target project requirements, the target project content and the target project requirements corresponding to the current period's compliance status are determined, including: obtaining the project level of the project content and the sub-project level of the sub-project content; if the project level is the same as any sub-project level, then the target project content and the project level requirements corresponding to the period's compliance status are determined to be non-compliant; otherwise, the target project content and the project level requirements corresponding to the period's compliance status are determined to be compliant.

[0012] In one possible implementation, the target project requirements include output document type requirements, and the document type requirements correspond to at least one target document type; the project content includes at least one output document; accordingly, based on the project content and the target project requirements, the target project content and the target project requirements corresponding to the current cycle compliance status are determined, including: obtaining the document type of the output document; if the document type includes the target document type, then determining that the target project content and the output document type requirements correspond to the cycle compliance status as being met, otherwise determining that the target project content and the output document type requirements correspond to the cycle compliance status as being not met.

[0013] In a possible implementation, if the target project content and the target project requirements corresponding to the current period's compliance status are not up to standard, then after determining the corresponding reasons for non-compliance, requirement name and personnel information, it also includes: obtaining the preset score corresponding to the target project requirement and the project number corresponding to the target project content; determining the prompt level according to each preset score; determining the terminal address of the person in charge according to the project number; generating alarm information corresponding to the prompt level; and sending the alarm information to the terminal address of the person in charge.

[0014] In a second aspect, the present application provides a standardized detection and processing device for an information-based R&D project, including: a first acquisition module, which is used to acquire the project level and at least one project content corresponding to the target project identifier when monitoring that the standardized detection process of the current cycle is triggered; a second acquisition module, which is used to acquire the compliance status of the previous cycle, the number of non-compliance times in the previous cycle, and the total number of non-compliance times corresponding to the project content; a requirement determination module, which is used to determine at least one project requirement based on the project level; a compliance determination module, which is used to determine the compliance status of the current cycle corresponding to the target project content and the target project requirements based on the project content and the target project requirements, wherein the target project content is any one of The target project requirement is any project requirement; the data determination module is used to determine the corresponding reasons for non-compliance, requirement name and personnel information if the target project content and the target project requirements do not meet the standards in this period; the number of times determination module is used to determine the number of non-compliance in this period and the new total number of non-compliance corresponding to the target project requirements according to the compliance status of this period, the compliance status of the previous period, the number of non-compliance in the previous period and the total number of non-compliance; the data sending module is used to send the requirement name, target project identification, personnel information, reasons for non-compliance and the number of non-compliance in this period and the new total number of non-compliance corresponding to each project requirement to the monitoring terminal.

[0015] In a third aspect, the present application provides an electronic device comprising: a processor, and a memory connected to the processor for communication; the memory stores computer execution instructions; the processor executes the computer execution instructions stored in the memory, so that the processor executes the standardized detection and processing method for information technology R&D projects as described in the first aspect.

[0016] In a fourth aspect, the present application provides a computer-readable storage medium, which stores computer execution instructions. When the computer execution instructions are executed by a processor, they are used to implement the standardized detection and processing method for information technology research and development projects as described in the first aspect.

[0017] In a fifth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the standardized detection and processing method for information technology R&D projects as described in the first aspect.

[0018] The standardized detection and processing method, device and electronic equipment for information technology research and development projects provided in this application obtain the project content and project level of the detected project, use the project requirements corresponding to the project level to judge the compliance of the project content, realize graded project standardization detection, use lower detection standards for lower-level projects, reduce detection time, and determine the corresponding reasons for non-compliance, requirement name, personnel information, the number of non-compliance times in this cycle corresponding to the target project requirements, and the new total number of non-compliance times when the project content does not meet the standards, and send the obtained data to the monitoring terminal to achieve efficient and intuitive display of the project's compliance status. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0020] Figure 1 A schematic diagram of an application scenario of a standardized detection and processing method for an information-based R&D project provided in an embodiment of the present application;

[0021] Figure 2 A flowchart of a standardized detection and processing method for an information-based R&D project provided in an embodiment of the present application;

[0022] Figure 3 A schematic diagram of the structure of a standard detection and processing device for an information-based R&D project provided in an embodiment of the present application;

[0023] Figure 4 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.

[0024] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0025] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0026] As the scale of enterprises continues to expand, the number of various projects is also increasing. The handling of projects needs to be controlled.

[0027] One of the current directions of project management and control is the standardized management of projects, which usually relies on manual management. In this mode, staff need to spend a lot of time and energy to collect, organize and analyze various project-related data, which is inefficient.

[0028] In response to the above technical problems, the inventors proposed the following technical conception: by periodically executing the standardized inspection process, the project level and project content corresponding to the project content, the compliance status of the previous cycle, the number of non-compliance times in the previous cycle and the total number of non-compliance times corresponding to the project content are obtained; according to the project level, the project requirements are determined, the compliance status is determined by the project content and project requirements, the number of non-compliance times and the total number of non-compliance times are updated, and the relevant information of the non-compliant projects is sent to the monitoring terminal.

[0029] This application is used in the scenario of standardized detection and processing of information technology research and development projects. It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant laws, regulations and standards, and provide corresponding operation portals for users to choose to authorize or refuse.

[0030] Figure 1 A schematic diagram of an application scenario of a standardized detection and processing method for an information-based R&D project provided in an embodiment of the present application. Figure 1 In this scenario, it includes: a monitoring terminal 101 and a server 102.

[0031] In a specific implementation process, the monitoring terminal 101 may include a computer, a server, a tablet, a mobile phone, a PDA (Personal Digital Assistant), a notebook, etc., which can input data.

[0032] The server 102 can be implemented using a server or a cluster of multiple servers with more powerful processing capabilities and higher security. If possible, it can also be replaced by a computer, laptop, etc. with stronger computing power.

[0033] The connection between the server 102 and the monitoring terminal 101 can be a wired connection or a wireless connection.

[0034] Server 102 is used to periodically execute the standard detection process, obtain the project level, project content, compliance status of the previous cycle, number of non-compliance times of the previous cycle and the total number of non-compliance times corresponding to the target project identification, use the obtained data to determine the compliance status of this cycle, and obtain relevant data of the project content and send it to the monitoring terminal 101 if the standards are not met. Server 101 is also used to update the number of compliance times and the total number of non-compliance times of this cycle.

[0035] It is understandable that the scenarios illustrated in the embodiments of the present application do not constitute a specific limitation on the standardized detection and processing methods for information-based R&D projects. In other feasible implementations of the present application, the above scenarios may include more or fewer components than shown in the figure, or combine certain components, or split certain components, or arrange the components differently, which can be determined according to the actual application scenario and is not limited here. Figure 1 The scenarios shown can be implemented by hardware, software, or a combination of software and hardware.

[0036] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.

[0037] Figure 2 A flow chart of a standardized detection and processing method for an information-based R&D project provided in an embodiment of the present application. The execution subject of the embodiment of the present application may be Figure 1 The server 102 in the embodiment may also be a computer and / or a mobile phone, etc., which is not particularly limited in this embodiment. Figure 2 As shown, the method includes:

[0038] S201: When it is monitored that the standard detection process of this cycle is triggered, the project level and at least one project content corresponding to the target project identifier are obtained.

[0039] In this step, monitoring that the standard detection process of this cycle is triggered can be to obtain a timestamp to obtain the current time, and when the current time reaches the preset time, it is determined that the standard detection process of this cycle is triggered. The target project identifier can be the project identifier of any project. The project level can be obtained by finding the corresponding relationship between the project identifier and the project level according to the target project identifier, and can also be obtained by finding the corresponding project attribute according to the project identifier. The project content may include at least one of the project processing process, the project output data, the project processing output, etc.

[0040] S202: Obtain the compliance status of the previous period, the number of non-compliance times in the previous period, and the total number of non-compliance times corresponding to the project content.

[0041] In this step, it can include reading the historical data of the project content to obtain the compliance status of the previous period, the number of non-compliance times in the previous period and the total number of non-compliance times corresponding to the project content and each project requirement; it can also include using the project content identifier and the target project identifier to search for historical data to obtain the compliance status of the previous period, the number of non-compliance times in the previous period and the total number of non-compliance times.

[0042] S203: Determine at least one project requirement according to the project level.

[0043] In this step, according to the project level, the corresponding relationship between the project level and the project requirement is searched to obtain at least one project requirement. The project level may be, for example, a basic level project, a standard level project, a perfect level project, an emergency level project, etc.

[0044] Among them, the correspondence between project levels and project requirements can be preset by staff and stored in the format of tables, key-value pairs, files, etc.

[0045] Project requirements vary according to the project level and may include at least one of the following requirements: if the requirement level of the project content is level three, check whether the preset fields are filled in; if the requirement level of the project content is level three, obtain the requirement type of the project content and determine whether the requirement type includes daily requirements and project requirements; if the requirement level of the project content is level three, whether the sum of the time required for each task under the project content is less than the preset duration; if the requirement level of the project content is level three, whether there is a corresponding requirement analysis document in the project content; whether the business requirement analysis document in the project content has a corresponding document type; if the requirement level of the project content is level three, whether there is a corresponding detailed design specification document in the project content; whether the task type under the project content is the preset task type; whether the project content has a meeting type corresponding to the record; whether the corresponding meeting type recorded has a corresponding meeting document; obtain the requirement type of the project content and determine whether there is a preset type subtask corresponding to the requirement type under the project content; whether the iteration ends normally, etc. project requirements.

[0046] Among the above project requirements, if the result is "yes", it meets the project requirements, otherwise it does not meet the project requirements.

[0047] S204: Determine the target project content and the target project requirements according to the current cycle's achievement of the target project content and the target project requirements, wherein the target project content is any project content and the target project requirements is any project requirements.

[0048] In this step, it may include running the audit procedures corresponding to the target project requirements using the project content to obtain the target project content and the target project requirements corresponding to the current cycle's compliance status.

[0049] S205: If the target project content and the target project requirements corresponding to the current period's compliance status are not up to standard, then the corresponding reasons for not meeting the standards, the name of the requirement and the personnel information are determined.

[0050] In this step, the preset non-conformance reason corresponding to the target project requirement may be used as the non-conformance reason, or the preset field of the target project content may be written into the non-conformance reason template corresponding to the target project requirement to obtain the non-conformance reason. The requirement name may be the name of the target project requirement. The personnel information may include the personnel information in the target project content, or the personnel information corresponding to the target project content may be obtained by searching for a corresponding relationship based on the identifier of the target project content.

[0051] S206: Determine the number of non-compliance times in this cycle and the new total number of non-compliance times corresponding to the target project requirements based on the compliance status of this cycle, the compliance status of the previous cycle, the number of non-compliance times in the previous cycle and the total number of non-compliance times.

[0052] In this step, if the target project requirements and the target project content are not up to standard, the number of times the target is not up to standard in this cycle is increased by one, and after traversing each project content, the number of times the target is not up to standard in this cycle is obtained. If the target project content and the target project requirements corresponding to the current cycle and the target situation in the previous cycle are both not up to standard, the total number of times the target is not up to standard is increased by one, and after traversing all project contents, a new total number of times the target is not up to standard is obtained.

[0053] S207: Send the requirement name, target project ID, personnel information, reasons for non-compliance, the number of non-compliance times in this cycle corresponding to each project requirement, and the new total number of non-compliance times to the monitoring terminal.

[0054] In this step, the data in this step may be sent to the monitoring terminal in the format of a data packet, a message, application information, a web page information, or the like.

[0055] From the description of the above embodiments, it can be seen that the embodiments of the present disclosure obtain the project content and project level of the inspected project, and use the project requirements corresponding to the project level to judge the compliance of the project content, thereby realizing graded project standardization inspection, adopting lower inspection standards for lower-level projects, reducing inspection time, and in the event that the project content does not meet the standards, determining the corresponding reasons for non-compliance, requirement name, personnel information, the number of non-compliance times in this cycle corresponding to the target project requirements, and the new total number of non-compliance times, and sending the obtained data to the monitoring terminal to realize efficient and intuitive display of the project's compliance status.

[0056] In a possible implementation, in the above step S206, according to the compliance status of the current cycle, the compliance status of the previous cycle, the number of non-compliance times of the previous cycle and the total number of non-compliance times, the number of non-compliance times of the current cycle corresponding to the target project requirements and the new total number of non-compliance times are determined, including:

[0057] S206A1: If the target project content and target project requirements corresponding to the current period's standard-reaching situation are not up to standard, and the target project content and target project requirements corresponding to the previous period's standard-reaching situation are also not up to standard, then the total number of non-compliance times is increased by 1 to obtain a new total number of non-compliance times corresponding to the target project requirements.

[0058] In this step, for example, if the total number of non-compliances obtained in the previous cycle is 10, and the compliance status of project requirement a of project content A in this cycle and the compliance status of the previous cycle are both non-compliance, then the total number of non-compliances is increased by 1, and the new total number of non-compliances is 11. For another example, if the total number of non-compliances obtained in the previous cycle is 5, and the compliance status of project content B and project requirement b in this cycle and the compliance status of the previous cycle are both non-compliance, then the total number of non-compliances is increased by 1, and the new total number of non-compliances is 6.

[0059] S206A2: Determine the number of target project contents that do not meet the target in this period as the number of times the target project requirements do not meet the target in this period.

[0060] In this step, the number of all project contents that do not meet the target project requirements in this cycle is determined as the number of times that the target project requirements do not meet the target in this cycle.

[0061] For example, if 5 items corresponding to project requirement a fail to meet the standard in this cycle, 5 is determined as the number of failures in this cycle. For another example, if 2 items corresponding to project requirement b fail to meet the standard in this cycle, 2 is determined as the number of failures in this cycle corresponding to project requirement b.

[0062] From the description of the above embodiments, it can be seen that the embodiments of the present disclosure increase the total number of non-compliance times when the compliance status of both the current cycle and the previous cycle is non-compliant, so as to avoid the accumulation of non-compliance numbers when the problems are corrected in a timely manner, and obtain the number of non-compliance times in this cycle by counting the number of project contents that do not meet the standards in this cycle, so as to timely display the problems encountered in the project processing process.

[0063] In a possible implementation, the target project requirement includes at least one process link requirement, and the process link requirement includes a link type.

[0064] Among them, the process link requirement is to require that the project content includes the corresponding link type.

[0065] Accordingly, in the above step S204, according to the project content and the target project requirements, the target project content and the target project requirements corresponding to the current period's compliance status are determined, including:

[0066] S204A: If the project content includes the target link type corresponding to the target process link requirement, then the target project content and the target process link requirement corresponding to the current period's standard-reaching status are determined to be met; otherwise, the target project content and the target process link requirement corresponding to the current period's standard-reaching status are determined to be unmet, where the target process link requirement is any process link requirement.

[0067] In this step, for example, if the target link types include link types A, B, and C, and project content a includes link types A, B, and C, then the compliance status of project content a and the target link types for this period is determined to be compliance. For another example, if the target link types include link types D and F, and project content b includes link type D but does not include link type F, then the compliance status of project content b and the target link types for this period is determined to be non-compliance.

[0068] From the description of the above embodiments, it can be seen that the embodiments of the present disclosure determine whether the project content contains the link type corresponding to the process link requirements, and obtain whether the target project content meets the requirements of the target project in this cycle, thereby automatically detecting whether there are required link types in the project content, reducing project detection time, and increasing the efficiency of standardized project detection.

[0069] In a possible implementation, in the above step S205, if the target project content and the target project requirements corresponding to the current period's compliance status are not up to standard, then the corresponding non-compliance reasons, requirement names and personnel information are determined, including:

[0070] S205A: If the target project content and the target process link requirements are not up to standard in this cycle, then the failure to meet the target process link requirements is determined as the reason for the failure to meet the standard, and the target process link requirements are determined as the requirement name. The personnel information corresponding to the target project content is obtained.

[0071] In this step, for example, if the target project content and process link A requirements corresponding to this cycle are not up to standard, then non-compliance with process link A requirements will be determined as the reason for non-compliance, process link A will be determined as the requirement name, and the personnel information in the target project content will be read.

[0072] The personnel information can also be obtained by searching the corresponding relationship between the identification and the personnel information through the identification of the target project content to obtain the corresponding personnel information. The personnel information can include the personnel who created the target project content, the personnel who processed the target project content, etc.

[0073] From the description of the above embodiments, it can be seen that the embodiments of the present disclosure determine the failure to meet the target process link requirements as the reason for non-compliance, determine the target process link requirements as the requirement name, and determine the corresponding personnel information, so as to facilitate the subsequent notification of the specific reasons for non-compliance.

[0074] In a possible implementation, the target project requirements include secondary demand splitting requirements.

[0075] Accordingly, in the above step S204, according to the project content and the target project requirements, the target project content and the target project requirements corresponding to the current period's compliance status are determined, including:

[0076] S204B1: Obtain the requirement level corresponding to the project content.

[0077] In this step, the requirement level attribute of the project content may be read to obtain the requirement level, or the requirement level may be obtained by searching for a preset corresponding relationship according to an identifier corresponding to the project content.

[0078] S204B2: If the demand level is a secondary demand and the project content includes a tertiary demand project, then the target project content and the periodic compliance status corresponding to the secondary demand splitting requirements are determined to be met; otherwise, the target project content and the periodic compliance status corresponding to the secondary demand splitting requirements are determined to be unmet.

[0079] In this step, the third-level demand project content may be the project content with the third-level demand level. Whether the third-level demand project is included can be determined by reading the demand level of the sub-project in the project content. If the demand level of the sub-project includes the third-level demand, the corresponding period compliance is determined to be met, otherwise it is determined to be not met.

[0080] For example, if project content A includes sub-projects a, b, and c, and sub-projects a, b, and c are all third-level demand projects, then the target project content and the cycle compliance corresponding to the second-level demand split requirements are determined to be met. For another example, if project content B includes sub-project e, and sub-project e is not a third-level demand project, then the target project content and the cycle compliance corresponding to the second-level demand split requirements are determined to be unmet.

[0081] Similarly, if the target project content and target project requirements corresponding to the current period's compliance status are not up to standard, the non-compliance reasons, requirement names and personnel information corresponding to the target project content are determined, including:

[0082] If the target project content and the secondary demand splitting requirements corresponding to the current period's compliance status are not up to standard, then the non-compliance with the secondary demand splitting requirements will be determined as the reason for non-compliance, and the secondary demand splitting requirements will be determined as the requirement name; the personnel information corresponding to the target project content is obtained.

[0083] From the description of the above embodiments, it can be seen that the embodiments of the present disclosure obtain the demand level corresponding to the project content, and when the project level is a secondary demand project, it includes a tertiary demand project, then determines whether the target project content and the period corresponding to the secondary demand splitting requirements meet the standards, otherwise it does not meet the standards, thereby realizing automatic detection of the project splitting situation and increasing the efficiency of project specification detection.

[0084] In a possible implementation, the target project requirement includes a project level requirement. The project content includes at least one sub-project content.

[0085] Accordingly, in the above step S204, according to the project content and the target project requirements, the target project content and the target project requirements corresponding to the current period's compliance status are determined, including:

[0086] S204C1: Obtain the project level of the project content and the sub-project level of the sub-project content.

[0087] In this step, the project level and sub-project level may be obtained by reading the project content and sub-project attributes, or by searching for a corresponding relationship based on the project content identifier and sub-project identifier to obtain the project level and sub-project level.

[0088] S204C2: If the project level is the same as any sub-project level, the target project content and the periodic compliance status corresponding to the project level requirements are determined to be unsatisfactory; otherwise, the target project content and the periodic compliance status corresponding to the project level requirements are determined to be satisfactory.

[0089] In this step, for example, if the project level is level 2, and the sub-project level includes 1 level 2 and 2 levels 3, the target project content and the periodic compliance corresponding to the project level requirements are determined to be unsatisfactory. For another example, if the project level is level 2, and the sub-project level includes 3 levels 3, the target project content and the periodic compliance corresponding to the project level requirements are determined to be satisfactory.

[0090] Similarly, if the project level requirements are not met, the Non-compliance with Project Level Requirements field is added to the Non-compliance Reason.

[0091] From the description of the above embodiments, it can be seen that the embodiments of the present disclosure obtain the project level of the project content and the sub-project level of the sub-project content, and determine whether it is substandard or met according to whether there is a sub-project level that is the same as the project level, thereby automatically determining whether the project level of the sub-project is wrong and increasing the efficiency of project specification detection.

[0092] In a possible implementation, the target project requirement includes an output document type requirement, and the document type requirement corresponds to at least one target document type. The project content includes at least one output document.

[0093] Accordingly, in the above step S204, according to the project content and the target project requirements, the target project content and the target project requirements corresponding to the current period's compliance status are determined, including:

[0094] S204D1: Get the document type of the output document.

[0095] In this step, the attributes, document type fields, and labels of the output document may be read to obtain the document type of the output document.

[0096] S204D2: If the document type includes the target document type, then the target project content and the output document type requirements corresponding to the period compliance status are determined to be met; otherwise, the target project content and the output document type requirements corresponding to the period compliance status are determined to be unmet.

[0097] In this step, for example, the document types of the current output documents include A, B, and C, and the target document type is C, then the target project content and the periodic compliance status corresponding to the output document type requirements are determined to be met; for example, the document types of the current output documents include D, E, and F, and the target document types include A and B, then because the document types do not include the target document type, the target project content and the periodic compliance status corresponding to the output document type requirements are determined to be unmet.

[0098] From the description of the above embodiments, it can be seen that the embodiments of the present disclosure determine whether the document type of the output document contains the target document type corresponding to the document type requirement, and determine whether the target project content and the period compliance status corresponding to the output document type requirement are met or not, thereby automatically determining whether the output document complies with the specification, thereby increasing the accuracy and efficiency of the specification detection process.

[0099] In a possible implementation, in the above step S205, if the target project content and the target project requirement corresponding to the current period's compliance status are not up to standard, after determining the corresponding non-compliance reason, requirement name and personnel information, it also includes:

[0100] S220: Obtain a preset score corresponding to the target project requirement and a project number corresponding to the target project content.

[0101] In this step, the corresponding relationship between the project requirements and the scores is searched according to the target project requirements to obtain the preset scores corresponding to the target project requirements; and the project serial number is obtained by reading the attributes of the target project content.

[0102] S221: Determine the prompt level according to each preset score.

[0103] In this step, each preset score is added to obtain a comprehensive score, and according to the comprehensive score, a corresponding relationship between the score and the prompt level is found to obtain the prompt level.

[0104] The correspondence between the score and the prompt level may be preset by the staff.

[0105] S222: Determine the terminal address of the person in charge according to the project serial number.

[0106] In this step, the corresponding relationship between the project number and the person in charge identification is searched according to the project number to obtain the target person in charge identification; and the corresponding relationship between the person in charge identification and the terminal address is searched according to the target person in charge identification to obtain the person in charge terminal address.

[0107] S223: Generate warning information corresponding to the prompt level.

[0108] In this step, the alarm information corresponding to the prompt level is read, or the data in the above step S207 is written into the alarm information template corresponding to the prompt level to obtain the alarm information.

[0109] S224: Send the alarm information to the terminal address of the person in charge.

[0110] In this step, the alarm information may be sent to the terminal address of the person in charge in the format of email, application message, web page data, etc.

[0111] From the description of the above embodiments, it can be seen that the embodiments of the present disclosure obtain the preset scores required for the target items that do not meet the standards, determine the corresponding prompt levels, and use the warning information corresponding to the prompt levels to issue warnings, thereby increasing the intuitiveness of the warning information.

[0112] Figure 3 This is a schematic diagram of the structure of the standard detection and processing device for the information technology research and development project provided in the embodiment of the present application. Figure 3 As shown, the standard detection and processing device 300 for an information-based R&D project includes: a first acquisition module 301, a second acquisition module 302, a requirement determination module 303, a standard determination module 304, a data determination module 305, a number determination module 306 and a data sending module 307.

[0113] The first acquisition module 301 is used to acquire the project level and at least one project content corresponding to the target project identifier when monitoring that the standard detection process of this cycle is triggered;

[0114] The second acquisition module 302 is used to obtain the compliance status of the previous period, the number of non-compliance times in the previous period and the total number of non-compliance times corresponding to the project content;

[0115] A requirement determination module 303, for determining at least one project requirement according to the project level;

[0116] A target achievement determination module 304 is used to determine the target achievement status of the target project content and the target project requirement in this cycle according to the project content and the target project requirement, wherein the target project content is any project content and the target project requirement is any project requirement;

[0117] The data determination module 305 is used to determine the corresponding reasons for non-compliance, requirement name and personnel information if the target project content and target project requirements corresponding to the current period's compliance status are non-compliance;

[0118] The number determination module 306 is used to determine the number of non-compliance times in this cycle and the new total number of non-compliance times corresponding to the target project requirements according to the compliance status of this cycle, the compliance status of the previous cycle, the number of non-compliance times in the previous cycle and the total number of non-compliance times;

[0119] The data sending module 307 is used to send the requirement name, target project identifier, personnel information, reasons for non-compliance, the number of non-compliance times in this cycle corresponding to each project requirement, and the new total number of non-compliance times to the monitoring terminal.

[0120] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0121] In one possible implementation, the number determination module 306 is specifically used to increase the total number of non-compliance times by 1 to obtain a new total number of non-compliance times corresponding to the target project requirements if the target project content and the target project requirements corresponding to the current period's compliance status are not up to standard, and the target project content and the target project requirements corresponding to the previous period's compliance status are also not up to standard; and the number of target project contents whose compliance status in the current period is not up to standard is determined as the number of non-compliance times in the current period corresponding to the target project requirements.

[0122] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0123] In one possible implementation, the target project requirements include at least one process link requirement, and the process link requirement includes a link type; accordingly, the compliance determination module 304 is specifically used to determine that the compliance status of the target project content and the target process link requirement in this cycle is met if the project content includes a target link type corresponding to the target process link requirement, otherwise determine that the compliance status of the target project content and the target process link requirement in this cycle is not met, wherein the target process link requirement is any process link requirement.

[0124] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0125] In one possible implementation, the data determination module 305 is specifically used to determine the non-compliance with the target process link requirements as the reason for non-compliance, and determine the target process link requirements as the requirement name if the target project content and the target process link requirements do not meet the standards in this cycle; and obtain the personnel information corresponding to the target project content.

[0126] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0127] In one possible implementation, the target project requirements include secondary demand splitting requirements;

[0128] Correspondingly, the compliance determination module 304 is specifically used to obtain the demand level corresponding to the project content; if the demand level is a secondary demand, and the project content includes a tertiary demand project, then the period compliance status corresponding to the target project content and the secondary demand splitting requirements is determined to be met, otherwise the period compliance status corresponding to the target project content and the secondary demand splitting requirements is determined to be unmet.

[0129] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0130] In a possible implementation, the target project requirements include project-level requirements; the project content includes at least one sub-project content;

[0131] Correspondingly, the compliance determination module 304 is specifically used to obtain the project level of the project content and the sub-project level of the sub-project content; if the project level is the same as any sub-project level, then the period compliance status corresponding to the target project content and the project level requirements is determined to be uncompliant; otherwise, the period compliance status corresponding to the target project content and the project level requirements is determined to be compliant.

[0132] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0133] In a possible implementation, the target project requirements include output document type requirements, and the document type requirements correspond to at least one target document type; the project content includes at least one output document;

[0134] Correspondingly, the compliance determination module 304 is specifically used to obtain the document type of the output document; if the document type includes the target document type, then the period compliance status corresponding to the target project content and the output document type requirements is determined to be met; otherwise, the period compliance status corresponding to the target project content and the output document type requirements is determined to be unmet.

[0135] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0136] In a possible implementation, the standard detection and processing device 300 for an information-based R&D project further includes: an information sending module 308 .

[0137] The information sending module 308 is used to obtain the preset score corresponding to the target project requirement and the project number corresponding to the target project content; determine the prompt level according to each preset score; determine the terminal address of the person in charge according to the project number; generate alarm information corresponding to the prompt level; and send the alarm information to the terminal address of the person in charge.

[0138] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0139] In order to implement the above embodiment, the embodiment of the present application also provides an electronic device.

[0140] refer to Figure 4 , which shows a schematic diagram of the structure of an electronic device 400 suitable for implementing the embodiment of the present application, and the electronic device 400 may be a terminal device or a server. The terminal device may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, personal digital assistants (PDAs), tablet computers (Portable Android Devices, PADs), portable multimedia players (Portable Media Players, PMPs), vehicle terminals (such as vehicle navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 4 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0141] like Figure 4As shown, the electronic device 400 may include a processor (such as a central processing unit, a graphics processing unit, etc.) 401, and a memory 402 connected to the processor in communication, which can perform various appropriate actions and processes according to the program stored in the memory 402, the computer execution instruction, or the program loaded from the storage device 408 to the random access memory (Random Access Memory, referred to as RAM) 403, to implement the standardized detection and processing method of the information research and development project in any of the above embodiments, wherein the memory may be a read-only memory (Read Only Memory, referred to as ROM). In the RAM 403, various programs and data required for the operation of the electronic device 400 are also stored. The processing device 401, the memory 402, and the RAM 403 are connected to each other through the bus 404. The input / output (I / O) interface 405 is also connected to the bus 404.

[0142] Typically, the following devices may be connected to the I / O interface 405: an input device 406 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 407 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 408 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 409. The communication device 409 may allow the electronic device 400 to communicate with other devices wirelessly or by wire to exchange data. Figure 4 The electronic device 400 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead.

[0143] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable storage medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from the network through the communication device 409, or installed from the storage device 408, or installed from the memory 402. When the computer program is executed by the processing device 401, the above-mentioned functions defined in the method of the embodiment of the present application are executed.

[0144] It should be noted that the computer-readable storage medium mentioned above in the present application may be a computer-readable signal medium or a computer storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable storage medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable storage medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0145] The computer-readable storage medium may be included in the electronic device, or may exist independently without being installed in the electronic device.

[0146] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device executes the method shown in the above embodiment.

[0147] The computer program code for performing the operation of the present application can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0148] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0149] The modules involved in the embodiments of the present application may be implemented by software or hardware. The name of a unit does not limit the module itself in some cases. For example, a compliance determination module may also be described as a "compliance status determination module".

[0150] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0151] The present application also provides a computer-readable storage medium, which stores computer execution instructions. When the processor executes the computer execution instructions, the technical solution of the standardized detection and processing method for the information-based R&D project in any of the above-mentioned embodiments is implemented. The implementation principle and beneficial effects are similar to the implementation principle and beneficial effects of the standardized detection and processing method for the information-based R&D project. Please refer to the implementation principle and beneficial effects of the standardized detection and processing method for the information-based R&D project, which will not be repeated here.

[0152] In the context of the present application, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or device, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0153] The present application also provides a computer program product, including a computer program. When the computer program is executed by a processor, it implements the technical solution of the standardized detection and processing method for information-based research and development projects in any of the above-mentioned embodiments. Its implementation principle and beneficial effects are similar to the implementation principle and beneficial effects of the standardized detection and processing method for information-based research and development projects. Please refer to the implementation principle and beneficial effects of the standardized detection and processing method for information-based research and development projects, and no further details will be given here.

[0154] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other to form a technical solution.

[0155] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the invention disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the following claims.

[0156] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.

Claims

1. A standardized detection and processing method for an information-based R&D project, characterized in that: Applicable to servers, including: When it is detected that the standard detection process of this cycle is triggered, the project level and at least one project content corresponding to the target project identifier are obtained; Obtain the compliance status of the previous period, the number of non-compliance times in the previous period, and the total number of non-compliance times corresponding to the project content; determining at least one project requirement based on the project level; According to the project content and target project requirements, determine the target project content and the target project requirements corresponding to the current period's compliance status, wherein the target project content is any project content, and the target project requirements are any project requirements; If the target project content and the target project requirements corresponding to the current period's compliance status are not up to standard, then determine the corresponding reasons for non-compliance, requirement name and personnel information; Determine the number of non-compliance times in this cycle and the new total number of non-compliance times corresponding to the target project requirements according to the compliance status of the current cycle, the compliance status of the previous cycle, the number of non-compliance times in the previous cycle and the total number of non-compliance times; The requirement name, the target project identifier, the personnel information, the reasons for non-compliance, the number of non-compliance times in this cycle corresponding to each project requirement, and the new total number of non-compliance times are sent to the monitoring terminal.

2. The method according to claim 1, characterized in that: Determining the number of non-compliance times in this cycle and the new total number of non-compliance times corresponding to the target project requirements according to the compliance status in this cycle, the compliance status in the previous cycle, the number of non-compliance times in the previous cycle, and the total number of non-compliance times includes: If the target project content and the target project requirements corresponding to the current period's standard-reaching situation are not up to standard, and the target project content and the target project requirements corresponding to the previous period's standard-reaching situation are also not up to standard, then the total number of non-compliance times is increased by 1 to obtain a new total number of non-compliance times corresponding to the target project requirements; The number of target project contents that do not meet the standards for this period is determined as the number of non-compliance times for this period corresponding to the target project requirements.

3. The method according to claim 1, characterized in that The target project requirement includes at least one process link requirement, and the process link requirement includes a link type; Accordingly, the determination of the target project content and the target project requirements in this cycle corresponding to the target project content and the target project requirements includes: If the project content includes the target link type corresponding to the target process link requirement, then the target project content and the target process link requirement corresponding to the current period's standard-reaching status are determined to be met; otherwise, the target project content and the target process link requirement corresponding to the current period's standard-reaching status are determined to be unmet, wherein the target process link requirement is any process link requirement.

4. The method according to claim 3, characterized in that If the target project content and the target project requirements corresponding to the current period's compliance status are not up to standard, the corresponding reasons for non-compliance, requirement names and personnel information are determined, including: If the target project content and the target process link requirements corresponding to the current cycle's compliance status are not up to standard, then the non-compliance with the target process link requirements will be determined as the reason for non-compliance, and the target process link requirements will be determined as the requirement name; and the personnel information corresponding to the target project content will be obtained.

5. The method according to claim 1, characterized in that The target project requirements include secondary demand splitting requirements; Accordingly, the determination of the target project content and the target project requirements in this cycle corresponding to the target project content and the target project requirements includes: Get the demand level corresponding to the project content; If the demand level is a secondary demand and the project content includes a tertiary demand project, then the target project content and the periodic compliance status corresponding to the secondary demand splitting requirements are determined to be met; otherwise, the target project content and the periodic compliance status corresponding to the secondary demand splitting requirements are determined to be unmet.

6. The method according to claim 1, characterized in that The target project requirements include project level requirements; the project content includes at least one sub-project content; Accordingly, the determination of the target project content and the target project requirements in this cycle corresponding to the target project content and the target project requirements includes: Obtaining the project level of the project content and the sub-project level of the sub-project content; If the project level is the same as any sub-project level, the target project content and the periodic compliance status corresponding to the project level requirements are determined to be unsatisfactory; otherwise, the target project content and the periodic compliance status corresponding to the project level requirements are determined to be satisfactory.

7. The method according to claim 1, characterized in that The target project requirements include output document type requirements, and the document type requirements correspond to at least one target document type; the project content includes at least one output document; Accordingly, the determination of the target project content and the target project requirements in this cycle corresponding to the target project content and the target project requirements includes: Obtaining the document type of the output document; If the document type includes the target document type, the target project content and the output document type requirements corresponding to the period compliance status are determined to be met; otherwise, the target project content and the output document type requirements corresponding to the period compliance status are determined to be unmet.

8. The method according to any one of claims 1 to 7, characterized in that If the target project content and the target project requirements corresponding to the target project requirements in the current period are not up to standard, after determining the corresponding reasons for not meeting the standards, the name of the requirements and the personnel information, it also includes: Obtaining the preset score corresponding to the target project requirement and the project serial number corresponding to the target project content; Determine the prompt level according to each preset score; Determine the terminal address of the person in charge according to the project serial number; Generate warning information corresponding to the prompt level; The alarm information is sent to the terminal address of the person in charge.

9. A standardized detection and processing device for an information-based R&D project, characterized in that: include: A first acquisition module is used to acquire a project level and at least one project content corresponding to a target project identifier when monitoring that a standard detection process of this cycle is triggered; The second acquisition module is used to obtain the compliance status of the previous period, the number of non-compliance times in the previous period and the total number of non-compliance times corresponding to the project content; A requirement determination module, configured to determine at least one project requirement based on the project level; A compliance determination module, used to determine the compliance status of the target project content and the target project requirements in this cycle according to the project content and the target project requirements, wherein the target project content is any project content and the target project requirements are any project requirements; A data determination module is used to determine the corresponding reasons for non-compliance, requirement name and personnel information if the target project content and the target project requirements corresponding to the current period's compliance status are non-compliance; A number determination module, used to determine the number of non-compliance times in this cycle and a new total number of non-compliance times corresponding to the target project requirements according to the compliance status of the current cycle, the compliance status of the previous cycle, the number of non-compliance times in the previous cycle and the total number of non-compliance times; The data sending module is used to send the requirement name, the target project identifier, the personnel information, the reason for non-compliance, the number of non-compliance times in this cycle corresponding to each project requirement, and the new total number of non-compliance times to the monitoring terminal.

10. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer execution instructions stored in the memory, so that the processor executes the standard detection and processing method for an information-based R&D project according to any one of claims 1 to 8.

11. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which, when executed by a processor, are used to implement the standard detection and processing method for an information-based R&D project according to any one of claims 1 to 7.

12. A computer program product, characterized in that It comprises a computer program, which, when executed by a processor, implements the standard detection and processing method for an information-based R&D project as described in any one of claims 1 to 7.