Asphalt road structure at joint of top plate and non-top plate of basement and construction method
By designing a multi-layer asphalt road structure and force transmission mechanism at the connection between the basement roof and non-top plates, the cracks and cracks caused by uneven settlement of the foundation are solved, which significantly improves the stability and durability of the road and ensures driving safety and comfort.
Patent Information
- Application Number
- CN202411911914.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-24
- Publication Date
- 2025-03-18
AI Technical Summary
The asphalt road structure at the connection between the basement roof and non-top plates causes cracks and cracks due to uneven settlement of the foundation, which affects the road's load-bearing capacity and durability.
An asphalt road structure including a stable base layer, a shear layer, a permeable asphalt, a load-bearing layer, a adhesive asphalt, a pavement particle layer, a first force transmission layer and a second force transmission layer are designed. The shear layer has steps, and the first and second force transmission layers are connected to the shear layer and the load-bearing layer through the force transmission rod to form an effective load transfer and dispersion mechanism.
Through reasonable hierarchical design and force transmission mechanism, the stability and durability of the road structure are significantly improved, the risk of damage caused by uneven settlement of the foundation or load changes is reduced, and driving safety and comfort are improved.
Smart Images

Figure CN119640647A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road engineering, in particular to an asphalt road structure at a junction of a basement top plate and a non-top plate and a construction method. Background Art
[0002] In the field of road engineering, especially the road construction involving the junction of the basement top slab and the non-top slab, there is often a thorny problem: cracks and cracks caused by uneven foundation settlement. This situation is particularly common in asphalt roads, whose width covers the junction of the basement top slab area and the natural foundation road surface (non-top slab area).
[0003] Specifically, the basement roof area is usually filled and reinforced with backfill soil to form a stable road foundation. However, the adjacent non-roof area, the natural foundation pavement, is built directly on natural soil, and its geological conditions and bearing capacity may be significantly different from the backfill soil. This inconsistency of materials on both sides can easily lead to uneven settlement of the foundation at the junction under the long-term vehicle load and natural environmental factors of the road.
[0004] Uneven settlement can cause a series of problems, the most notable of which is the appearance of cracks and fissures on asphalt road pavement. These cracks not only affect the appearance and driving comfort of the road, but more importantly, they reduce the road's bearing capacity and durability, and may even threaten driving safety. Therefore, how to solve the problem of uneven settlement of asphalt roads at the junction of the basement top plate and the non-top plate has become a technical problem that needs to be solved urgently in the current road engineering field.
[0005] Although some solutions have been proposed in the prior art to solve this problem, they often have the disadvantages of complex construction, high cost or poor effect. Therefore, the present invention aims to provide a more effective, economical and easy-to-implement road structure and construction method thereof to completely solve the above quality problems. Summary of the invention
[0006] In order to overcome the problems existing in the prior art, the purpose of the present invention is to provide an asphalt road structure and a construction method at the junction of a basement top plate and a non-top plate.
[0007] The technical solution adopted by the present invention to solve the technical problem is: the asphalt road structure at the junction of the basement top plate and the non-top plate includes:
[0008] Stabilized base layer, shear layer, penetration layer asphalt, load-bearing layer, tack layer asphalt, pavement granular layer, first force transmission layer, second force transmission layer;
[0009] The stable base is arranged above the junction of the basement roof and the non-roof; the shear-resistant layer covers the upper surface of the stable base, and the shear-resistant layer is provided with steps, and the steps are parallel to the length direction of the asphalt road; the penetration layer asphalt is flipped over the upper surface of the shear-resistant layer, the load-bearing layer covers the upper surface of the penetration layer asphalt, and the upper surface of the load-bearing layer remains horizontal; the first force transmission layer and the second force transmission layer are respectively arranged on both sides of the shear-resistant layer, the penetration layer asphalt and the load-bearing layer, and the first force transmission layer is arranged above the roof, the first force transmission layer is provided with multiple groups of first force transmission rods in the horizontal direction, and the first force transmission rods are inserted into the steps, and the second force transmission layer is provided with multiple groups of second force transmission rods in the horizontal direction, and the second force transmission rods are inserted into the load-bearing layer; the tack layer asphalt covers the upper surface of the load-bearing layer, and the pavement granular layer covers above the tack layer asphalt.
[0010] Main working principle: First, the stable base is set above the junction between the basement top plate and the non-top plate. The main function of this layer is to fill and support, ensuring that the foundation of the entire road structure is stable and can evenly distribute the weight and load of the upper structure. The shear layer covers the upper surface of the stable base, and its design has steps that are parallel to the length direction of the asphalt road. The main function of the shear layer is to enhance the shear resistance of the structure and prevent shear failure caused by uneven settlement of the foundation or load changes. The design of the steps helps to further increase the stability of the structure and provides a basis for the subsequent setting of the force transfer layer. The permeable asphalt covers the upper surface of the shear layer, and its main function is to penetrate and bond to the shear layer below to form a continuous and tight interface. This helps to enhance the integrity and durability of the road structure. The load-bearing layer covers the upper surface of the permeable asphalt and keeps its upper surface level. The load-bearing layer is the main load-bearing layer of the road structure, which can withstand vehicle loads and pedestrian loads and transfer them evenly to the shear layer below. The first force transfer layer and the second force transfer layer are respectively set on both sides of the shear layer, the permeable asphalt and the load-bearing layer. The first force-transfer layer is located above the top plate, and multiple groups of first force-transfer rods are arranged in the horizontal direction, and these force-transfer rods are inserted into the steps of the shear layer. The second force-transfer layer also has multiple groups of second force-transfer rods arranged in the horizontal direction, and these force-transfer rods are inserted into the load-bearing layer. The main function of the force-transfer layer is to transfer and disperse the load, ensuring that the load can be evenly and effectively transferred to the entire road structure, reducing the damage caused by excessive local load. The tack layer asphalt covers the upper surface of the load-bearing layer, and its main function is to bond and fix the pavement granular layer above. The pavement granular layer is the surface layer of the road structure, which directly bears the wear and impact of vehicles and pedestrians. The design of these two layers helps to enhance the wear resistance and skid resistance of the road, and improve driving safety and comfort.
[0011] In summary, the asphalt road structure at the junction of the basement top plate and the non-top plate ensures the stability and durability of the road structure through reasonable layer design and force transmission mechanism. The layers work closely together to jointly bear and disperse the load, reducing the risk of damage caused by uneven foundation settlement or load changes.
[0012] Preferably, the first force transmission layer further comprises a first sleeve, and the first sleeve is sleeved on one end of the first force transmission rod inserted into the shear resistance layer;
[0013] The second force transmission layer further comprises a second sleeve, and the second sleeve is sleeved on one end of the second force transmission rod inserted into the load-bearing layer.
[0014] Preferably, the first force transmission layer further comprises a first filling groove and a first plain concrete layer;
[0015] The first plain concrete is arranged outside the first force transmission layer, the first filling groove is arranged inside the first force transmission layer, and the first filling groove is in contact with the shear resistance layer; the first plain concrete layer is fixedly connected to one end of the first force transmission rod, and the other end of the first force transmission rod passes through the first filling groove and is inserted into the shear resistance layer;
[0016] The second force transmission layer also includes a second filling groove and a second plain concrete layer;
[0017] The second plain concrete is arranged on the outside of the second force transmission layer, the second filling groove is arranged on the inside of the second force transmission layer, and the second filling groove is in contact with the load-bearing layer; the second plain concrete layer is fixedly connected to one end of the second force transmission rod, and the other end of the second force transmission rod passes through the second filling groove and is inserted into the load-bearing layer.
[0018] Preferably, asphalt hemp fibers are provided in the first filling groove and the second filling groove, and the asphalt hemp fibers are padded under the first force transmission rod and the second force transmission rod.
[0019] Preferably, the first filling slot is further provided with a first foam rod, and the first foam rod is laid above the first force transmission rod along the length direction of the first filling slot;
[0020] The second filling slot is further provided with a second foam rod, and the second foam rod is laid above the second force transmission rod along the length direction of the second filling slot;
[0021] The first foam rod and the second foam rod are both filled with polyurethane foam plastic fillers.
[0022] Preferably, the height of the step is not less than 100 mm.
[0023] Preferably, the step extends along to the periphery of the top plate.
[0024] The construction method for the junction between the basement top plate and the non-top plate of the asphalt road structure based on any one of the above-mentioned junctions between the basement top plate and the non-top plate comprises the following steps:
[0025] S1. Clean the top plate, carefully inspect the soil quality, prepare the stable base filling, and spread the filling in layers; start filling until the area above the top plate of the stable base is flush with the area not above the top plate;
[0026] S2. Determine the position and height of the first force transmission layer and the second force transmission layer on both sides of the stable base by erecting molds, and fix one end of the first force transmission rod in the area of the first force transmission layer, and fix one end of the second force transmission rod in the area of the second force transmission layer. At the same time, fill the gap between the shear layer and the first force transmission layer and the second force transmission layer with asphalt hemp, and then use plain concrete to cast the first force transmission layer and the second force transmission layer respectively, and fix the first force transmission rod and the second force transmission rod at the same time;
[0027] S3, a shear layer is separated in the middle of the stable base, and a gap is formed between the shear layer and the first force transmission layer and the second force transmission layer, and then the shear layer is poured with reinforced concrete, wherein during the pouring process, an additional step is laid with reinforced concrete in the area where the shear layer is located above the top plate, wherein the step portion completely covers the extended end of the first force transmission rod; and at the same time, asphalt hemp is filled in the gap between the shear layer and the first force transmission layer and the second force transmission layer;
[0028] S4. Lay a penetration layer of asphalt on the shear resistance layer;
[0029] S5. A load-bearing layer is laid on the top of the penetration layer of asphalt using medium-grained (AC-20) modified asphalt concrete, and the load-bearing layer is completely flush with the first force-transfer layer and the second force-transfer layer, and completely covers the extended end of the second force-transfer rod;
[0030] S6. Lay a tack coat of asphalt on top of the load-bearing layer;
[0031] S7. Lay a pavement granular layer on top of the tack coat.
[0032] Preferably, in S3, a first sleeve is sleeved on the end of the first force transmission rod extending outward, and a second sleeve is sleeved on the end of the second force transmission rod extending outward.
[0033] Preferably, in S3, the first foam rod is covered above the gap between the first force transmission rod and the anti-shear layer; and the second foam rod is covered above the gap between the second force transmission rod and the anti-shear layer.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] The present invention effectively enhances the shear resistance and load transfer capacity of the road structure at the junction of the basement top plate and the non-top plate by providing a shear resistance layer and the steps thereon, and using the first force transmission layer and the second force transmission layer in conjunction with the force transmission rod. This helps to reduce the damage to the road structure caused by uneven foundation settlement or load changes, and significantly improves the overall stability of the road.
[0036] The first dowel rod is inserted into the step of the shear layer, and the second dowel rod is inserted into the load-bearing layer. This design allows the load to be more evenly distributed throughout the road structure. This helps reduce cracks and fissures caused by excessive local loads and improves the durability and service life of the road. In addition, the tight combination of the penetration layer asphalt, the tack layer asphalt and the layers makes the road structure form a continuous and tight whole. This helps to enhance the overall stiffness and bearing capacity of the road structure and improve its resistance to external loads and natural environmental factors. In addition, the setting of the pavement granular layer and the fixing effect of the tack layer asphalt on the pavement granular layer make the road surface smoother, more wear-resistant and more skid-resistant. This helps to improve driving safety and comfort and reduce traffic accidents caused by uneven or slippery roads.
[0037] In summary, the asphalt road structure at the junction of the basement top plate and the non-top plate has the beneficial effects of significantly improving road stability, optimizing load distribution, enhancing road integrity, and improving driving safety and comfort. These effects work together on the road structure, making it show better performance and longer service life in practical applications. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0039] Figure 1 This is a schematic diagram of the asphalt road structure at the junction of the basement top plate and the non-top plate;
[0040] 1. Stable base; 2. Shear layer; 20. Step; 3. Asphalt penetration layer; 4. Load-bearing layer; 5. Asphalt tack layer; 6. Pavement granular layer; 7. First force transmission layer; 70. First force transmission rod; 71. First sleeve; 72. First filling groove; 73. First plain concrete layer; 74. First foam rod; 8. Second force transmission layer; 80. Second force transmission rod; 81. Second sleeve; 82. Second filling groove; 83. Second plain concrete layer; 84. Second foam rod. DETAILED DESCRIPTION
[0041] In order to more clearly understand the above-mentioned objects, features and advantages of the present invention, the present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that, in the absence of conflict, the embodiments of the present application and the features in the embodiments can be combined with each other. In the following description, many specific details are set forth in order to fully understand the present invention, and the embodiments described are only a part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in the art without making creative work are within the scope of protection of the present invention.
[0042] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0043] Example 1
[0044] This embodiment discloses an asphalt road structure at the junction of a basement top plate and a non-top plate, such as Figure 1As shown, it includes a stable base 1, a shear layer 2, a permeable asphalt 3, a bearing layer 4, a tack layer 5, a pavement granular layer 6, a first force-transfer layer 7, and a second force-transfer layer 8. First, the stable base 1 is set above the junction between the basement top plate and the non-top plate. The main function of this layer is to fill and support, to ensure that the foundation of the entire road structure is stable, and to evenly distribute the weight and load of the upper structure. The shear layer 2 covers the upper surface of the stable base 1, and is designed with steps 20, which are parallel to the length direction of the asphalt road. The main function of the shear layer 2 is to enhance the shear resistance of the structure and prevent shear failure caused by uneven settlement of the foundation or load changes. The design of the steps 20 helps to further increase the stability of the structure and provides a basis for the subsequent setting of the force-transfer layer. The permeable asphalt 3 covers the upper surface of the shear layer 2, and its main function is to penetrate and bond to the shear layer 2 below to form a continuous and tight interface. This helps to enhance the integrity and durability of the road structure. The bearing layer 4 covers the upper surface of the permeable asphalt 3 and keeps its upper surface level. The load-bearing layer 4 is the main load-bearing layer of the road structure, which can bear vehicle loads and pedestrian loads and transfer them evenly to the shear layer 2 below. The first force-transfer layer 7 and the second force-transfer layer 8 are respectively arranged on both sides of the shear layer 2, the penetration layer asphalt 3 and the load-bearing layer 4. The first force-transfer layer 7 is located above the top plate, and multiple groups of first force-transfer rods 70 are arranged in the horizontal direction, and these force-transfer rods are inserted into the steps 20 of the shear layer 2. The second force-transfer layer 8 is also arranged in the horizontal direction. Multiple groups of second force-transfer rods 80 are inserted into the load-bearing layer 4. The main function of the force-transfer layer is to transfer and disperse the load, ensure that the load can be evenly and effectively transferred to the entire road structure, and reduce the damage caused by excessive local loads. The tack layer asphalt 5 covers the upper surface of the load-bearing layer 4, and its main function is to bond and fix the road granular layer 6 above. The road granular layer 6 is the surface layer of the road structure, which directly bears the wear and impact of vehicles and pedestrians. The design of these two layers helps to enhance the wear resistance and skid resistance of the road, and improve driving safety and comfort.
[0045] In summary, the asphalt road structure at the junction of the basement top plate and the non-top plate ensures the stability and durability of the road structure through reasonable layer design and force transmission mechanism. The layers work closely together to jointly bear and disperse the load, reducing the risk of damage caused by uneven foundation settlement or load changes.
[0046] In some optional embodiments, a first sleeve 71 and a second sleeve 81 are respectively provided in the first force transmission layer 7 and the second force transmission layer 8. These sleeves are provided at one end of the force transmission rod inserted into the shear layer 2, and play a role in fixing and protecting the force transmission rod, preventing the first force transmission rod 70 and the second force transmission rod 80 from being broken during deformation in the concrete, thereby further enhancing the stability and durability of the road structure, thereby improving the overall stability and shear resistance of the road structure at the joint.
[0047] In some optional embodiments, a first filling groove 72, a first plain concrete layer 73, a second filling groove 82, and a second plain concrete layer 83 are respectively provided in the first force transmission layer 7 and the second force transmission layer 8. The design of these filling grooves and plain concrete layers enables the force transmission rod to be better combined with the load-bearing layer 4, thereby improving the force transmission efficiency. At the same time, the plain concrete layer also plays a role in strengthening the connection between the force transmission rod and the load-bearing layer 4, further improving the overall stability of the road structure.
[0048] In some optional embodiments, asphalt hemp is provided in both the first filling groove 72 and the second filling groove 82. The asphalt hemp is provided under the force transmission rod, which plays the role of waterproofing, isolation and buffering, prevents the erosion and damage of the force transmission rod by moisture and impurities, and reduces the friction and wear of the force transmission rod during the force transmission process.
[0049] In some optional embodiments, a first foam rod 74 and a second foam rod 84 are respectively provided in the first filling groove 72 and the second filling groove 82, and polyurethane foam fillers are filled above the foam rods. The design of these foam rods and fillers plays a role in further fixing the force transmission rod, strengthening the connection between the force transmission layer and the load-bearing layer 4, and improving the overall rigidity and earthquake resistance of the road structure.
[0050] In some optional embodiments, the height of the step 20 is not less than 100 mm. This design ensures that the step 20 plays an effective anti-shear role in the anti-shear layer 2, while avoiding the adverse effects of the step 20 being too high or too low on the stability of the road structure.
[0051] In some optional embodiments, the step 20 extends along the periphery of the top plate. This design enables the step 20 to be better combined with the top plate, thereby enhancing the integrity and stability of the road structure at the joint.
[0052] In summary, this specific embodiment significantly improves the stability and durability of the asphalt road structure at the junction of the basement roof and the non-roof through multi-level and multi-faceted structural design, reduces cracks and fissures caused by uneven foundation settlement or load changes, optimizes load distribution, and extends the service life of the road. At the same time, these designs also improve the seismic resistance and waterproof performance of the road structure, providing a strong guarantee for its application in actual engineering.
[0053] Example 2
[0054] The construction method for the junction between the basement top plate and the non-top plate of the asphalt road structure at the junction between the basement top plate and the non-top plate as described in any one of the above items comprises the following steps:
[0055] S1. Clean the top plate, carefully inspect the soil quality, prepare the stable base 1 for filling, and spread the filling in layers; start filling until the area above the top plate of the stable base 1 is flush with the area above the top plate. The stable base 1 uses 20cm thick slag containing 6% cement stone powder;
[0056] S2. On the stable base 1, the positions and heights of the first force transmission layer 7 and the second force transmission layer 8 on both sides are determined by erecting a mold, and one end of the first force transmission rod 70 is fixed in the area of the first force transmission layer 7, and one end of the second force transmission rod 80 is fixed in the area of the second force transmission layer 8, and then the first force transmission layer 7 and the second force transmission layer 8 are respectively cast with plain concrete, and the first force transmission rod 70 and the second force transmission rod 80 are fixed at the same time, wherein the plain concrete has a thickness of 200 mm and a strength of C30, and the first force transmission rod 70 and the second force transmission rod 80 are plain round steel bars with a length of 500 mm and a diameter of 12 mm;
[0057] S3, a shear layer 2 is separated in the middle of the stable base 1, and a gap is formed between the shear layer 2 and the first force transmission layer 7 and the second force transmission layer 8, and then the shear layer 2 is poured with reinforced concrete, wherein during the pouring process, an additional step 20 is laid with reinforced concrete in the area above the top plate of the shear layer 2, wherein the step 20 part completely covers the protruding end of the first force transmission rod 70; at the same time, asphalt hemp is filled in the gap between the shear layer 2 and the first force transmission layer 7 and the second force transmission layer 8;
[0058] S4, laying a penetration layer of asphalt 3 on the shear resistance layer 2;
[0059] S5. A load-bearing layer 4 is laid on the top of the penetration layer asphalt 3 using medium-grained (AC-20) modified asphalt concrete. The load-bearing layer 4 is completely flush with the first force-transmitting layer 7 and the second force-transmitting layer 8, and completely covers the extended end of the second force-transmitting rod 80. The first step is 100 mm thick and half the length of the road; the second step is 200 mm thick.
[0060] S6, laying a tack layer of asphalt 5 on the load-bearing layer 4;
[0061] S7, laying a road granular layer 6 on the tack coat 5.
[0062] In some optional embodiments, in S3 , a first sleeve 71 is sleeved on the end of the first force transmission rod 70 that extends out, and a second sleeve 81 is sleeved on the end of the second force transmission rod 80 that extends out.
[0063] In some optional embodiments, in S3, the first force transmission rod 70 is located above the gap between the shear-resistant layer 2 and the first force transmission layer 7 and covered with the first foam rod 74; the second force transmission rod 80 is located above the gap between the shear-resistant layer 2 and the second force transmission layer 8 and covered with the second foam rod 84.
[0064] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Therefore, any modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the technical solution of the present invention shall still fall within the scope of the technical solution of the present invention.
Claims
1. The asphalt road structure at the junction of the basement top plate and the non-top plate is characterized by: include: Stabilized base layer, shear layer, penetration layer asphalt, load-bearing layer, tack layer asphalt, pavement granular layer, first force transmission layer, second force transmission layer; The stable base is arranged above the junction of the basement roof and the non-roof; the shear-resistant layer covers the upper surface of the stable base, and the shear-resistant layer is provided with steps, and the steps are parallel to the length direction of the asphalt road; the penetration layer asphalt is flipped over the upper surface of the shear-resistant layer, the load-bearing layer covers the upper surface of the penetration layer asphalt, and the upper surface of the load-bearing layer remains horizontal; the first force transmission layer and the second force transmission layer are respectively arranged on both sides of the shear-resistant layer, the penetration layer asphalt and the load-bearing layer, and the first force transmission layer is arranged above the roof, the first force transmission layer is provided with multiple groups of first force transmission rods in the horizontal direction, and the first force transmission rods are inserted into the steps, and the second force transmission layer is provided with multiple groups of second force transmission rods in the horizontal direction, and the second force transmission rods are inserted into the load-bearing layer; the tack layer asphalt covers the upper surface of the load-bearing layer, and the pavement granular layer covers above the tack layer asphalt.
2. The asphalt road structure at the junction of the basement top plate and the non-top plate according to claim 1 is characterized in that: The first force transmission layer further comprises a first sleeve, which is sleeved on one end of the first force transmission rod inserted into the shear resistance layer; The second force transmission layer further comprises a second sleeve, and the second sleeve is sleeved on one end of the second force transmission rod inserted into the load-bearing layer.
3. The asphalt road structure at the junction of the basement top plate and the non-top plate according to claim 2 is characterized in that: The first force transmission layer also includes a first filling groove and a first plain concrete layer; The first plain concrete is arranged outside the first force transmission layer, the first filling groove is arranged inside the first force transmission layer, and the first filling groove is in contact with the shear resistance layer; The first plain concrete layer is fixedly connected to one end of the first dowel rod, and the other end of the first dowel rod passes through the first filling groove and is inserted into the shear layer; The second force transmission layer also includes a second filling groove and a second plain concrete layer; The second plain concrete is arranged on the outside of the second force transmission layer, the second filling groove is arranged on the inside of the second force transmission layer, and the second filling groove is in contact with the load-bearing layer; the second plain concrete layer is fixedly connected to one end of the second force transmission rod, and the other end of the second force transmission rod passes through the second filling groove and is inserted into the load-bearing layer.
4. The asphalt road structure at the junction of the basement top plate and the non-top plate according to claim 3 is characterized in that: Asphalt hemp fibers are arranged in the first filling groove and the second filling groove, and the asphalt hemp fibers are arranged under the first force transmission rod and the second force transmission rod.
5. The asphalt road structure at the junction of the basement top plate and the non-top plate according to claim 4 is characterized in that: The first filling slot is further provided with a first foam rod, and the first foam rod is laid above the first force transmission rod along the length direction of the first filling slot; The second filling slot is further provided with a second foam rod, and the second foam rod is laid above the second force transmission rod along the length direction of the second filling slot; The first foam rod and the second foam rod are both filled with polyurethane foam plastic fillers.
6. The asphalt road structure at the junction of the basement top plate and the non-top plate according to claim 5 is characterized in that: The height of the step is not less than 100 mm.
7. The asphalt road structure at the junction of the basement top plate and the non-top plate according to claim 5 is characterized in that: The step extends to the periphery of the top plate.
8. A construction method for the junction between the basement top plate and the non-top plate of an asphalt road structure based on the junction between the basement top plate and the non-top plate according to any one of claims 5 to 7, characterized in that: The following steps are involved: S1. Clean the top plate, carefully inspect the soil quality, prepare the stable base filling, and spread the filling in layers; start filling until the area above the top plate of the stable base is flush with the area not above the top plate; S2. Determine the position and height of the first force transmission layer and the second force transmission layer on both sides of the stable base by erecting molds, and fix one end of the first force transmission rod in the area of the first force transmission layer, and fix one end of the second force transmission rod in the area of the second force transmission layer. At the same time, fill the gap between the shear layer and the first force transmission layer and the second force transmission layer with asphalt hemp, and then use plain concrete to cast the first force transmission layer and the second force transmission layer respectively, and fix the first force transmission rod and the second force transmission rod at the same time; S3, a shear layer is separated in the middle of the stable base, and a gap is formed between the shear layer and the first force transmission layer and the second force transmission layer, and then the shear layer is poured with reinforced concrete, wherein during the pouring process, an additional step is laid with reinforced concrete in the area where the shear layer is located above the top plate, wherein the step portion completely covers the extended end of the first force transmission rod; S4. Lay a penetration layer of asphalt on the shear resistance layer; S5. A load-bearing layer is laid on the top of the penetration layer of asphalt using medium-grained (AC-20) modified asphalt concrete, and the load-bearing layer is completely flush with the first force-transfer layer and the second force-transfer layer, and completely covers the extended end of the second force-transfer rod; S6. Lay a tack coat of asphalt on top of the load-bearing layer; S7. Lay a pavement granular layer on top of the tack coat.
9. The construction method for the joint between the basement top plate and the non-top plate according to claim 8 is characterized in that: In S3, a first sleeve is sleeved on the end of the first force transmission rod extending outward, and a second sleeve is sleeved on the end of the second force transmission rod extending outward.
10. The construction method for the joint between the basement top plate and the non-top plate according to claim 8, characterized in that: In S3, the first foam rod is covered above the gap between the first force transmission rod and the anti-shear layer; and the second foam rod is covered above the gap between the second force transmission rod and the anti-shear layer.