Low-influence construction treatment method suitable for gobi power transmission line construction

By constructing a noise propagation model in the construction of transmission lines in the Gobi area, evaluating the impact of construction noise on the ecological environment, and adjusting the construction time or method based on real-time meteorological data, the impact of construction noise on the ecological environment is solved and the protection of the ecological environment is achieved.

CN119691846APending Publication Date: 2025-03-25CONSTR BRANCH OF STATE GRID XINJIANG ELECTRIC POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411569544.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

During the construction of transmission lines in the Gobi area, construction noise affects the ecological environment, especially in areas with complex or soft geological conditions, pile driving and drilling will produce strong impact noise, interfering with the ecological behavior of wild animals.

Method used

By obtaining the basic topographic data and real-time meteorological data of the construction area, a noise propagation model is constructed and the intensity of the impact of construction noise on the preset ecological area is calculated. If the noise intensity exceeds the preset threshold, the construction time or method is adjusted to reduce the impact of noise on the ecological environment.

Benefits of technology

In the construction of transmission lines in the Gobi area, through scientific noise evaluation and adjustment, the impact of construction noise on the ecological environment is reduced and the ecological behavior of wild animals is protected.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119691846A_ABST
    Figure CN119691846A_ABST
Patent Text Reader

Abstract

The invention provides a low-influence construction processing method suitable for gobi power transmission line construction, and relates to the technical field of power transmission, and the method comprises the steps: obtaining the basic topographic data of a construction region; constructing a noise propagation model according to the actual construction condition of the project and the basic topographic data; acquiring first meteorological data of the construction area in a first construction period; inputting the first meteorological data to a noise propagation model, and obtaining first noise intensity for the preset ecological region calculated by the noise propagation model; if it is determined that the first noise intensity is larger than or equal to the preset threshold value, the first construction period of the construction area is adjusted according to the first meteorological data, so that the influence of construction noise on the preset ecological area is reduced. According to the invention, the influence of transmission line construction noise on ecological links can be reduced according to actual construction conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of electric power transportation, and in particular to a low-impact construction treatment method suitable for Gobi power transmission line construction. Background Art

[0002] When constructing power transmission lines in the Gobi Desert, the foundation construction of the transmission tower requires piles to be driven into the ground, especially in Gobi Deserts with complex or soft geological conditions, which usually require piling or drilling. Pile drivers will produce strong impact noise when working, especially hammer pile drivers, whose impact sound has strong penetration and can be transmitted over long distances. Drilling construction will also produce a large continuous noise.

[0003] Although the Gobi region has low species diversity, it is still home to some unique species that are drought- and cold-resistant, such as Gobi dryland animals, desert reptiles, and migratory birds. Continuous noise can interfere with wildlife foraging, reproduction, and rest. Many animals rely on hearing to sense danger or find prey, and noise can interfere with their hearing acuity, affecting their ability to hunt or avoid predators.

[0004] Since the ecological balance in the neighboring areas is relatively fragile, human activities can easily affect the ecological balance, especially the impact of construction on the environment is unique. In urban environments, noise propagation will be blocked and reflected by structures such as buildings and trees, so the propagation distance is short. Buildings, roads, greenery, etc. will produce multiple reflections, resulting in rapid attenuation of noise energy. The terrain in the Gobi region is usually relatively flat and open, lacking tall buildings or dense vegetation as barriers, so noise can be transmitted over longer distances in an open environment. In addition, the air density in the Gobi region is low, especially under high temperature and dry weather conditions, the sound decays more slowly in the air and the propagation range is wider. Especially at night or when the weather is calm and the wind speed is low, the propagation distance of noise will be further increased. Summary of the invention

[0005] The present application provides a low-impact construction treatment method suitable for Gobi power transmission line construction, which can reduce the impact of power transmission line construction noise on the ecological aspects according to actual construction conditions.

[0006] In a first aspect of the present application, a low-impact construction treatment method applicable to Gobi power transmission line construction is provided, the method comprising:

[0007] Obtain basic terrain data of the construction area;

[0008] Construct a noise propagation model based on the actual construction situation of the project and the basic terrain data;

[0009] Acquire first meteorological data of the construction area during a first construction period;

[0010] Inputting the first meteorological data into the noise propagation model to obtain a first noise intensity for a preset ecological area calculated by the noise propagation model;

[0011] If it is determined that the first noise intensity is greater than or equal to a preset threshold, the first construction period of the construction area is adjusted according to the first meteorological data to reduce the impact of construction noise on the preset ecological area.

[0012] Optionally, constructing a noise propagation model according to the actual construction situation of the project and the basic terrain data specifically includes:

[0013] Determine the construction machinery and equipment and operation links according to the actual construction situation of the project;

[0014] Based on the construction machinery and equipment and the operation links corresponding to the construction machinery and equipment, determining the noise source characteristics of the noise source, wherein the noise source characteristics include a sound power level;

[0015] Determining, based on the basic terrain data, the influencing parameters of the terrain on noise propagation, wherein the influencing parameters include reflection parameters, absorption parameters, and shielding parameters;

[0016] Calculating the intensity of noise propagating from the noise source to different areas according to the noise source characteristics and the influencing parameters;

[0017] According to the calculation results, the noise propagation model is constructed.

[0018] Optionally, the intensity of noise propagating from the noise source to different areas is calculated according to the noise source characteristics and the influencing parameters, specifically by the following formula:

[0019]

[0020] Among them, L final (r, f) is the intensity of noise propagating from the construction area to the preset ecological area, L source (r0) is the initial sound pressure level, L multi-reflection is the reflection parameter, ΔL air (f,r) is the absorption parameter, ΔL shielding is the shielding parameter, L w is the sound power level, r is the distance between the construction area and the preset ecological area, r0 is the initial reference distance, α i is the reflection coefficient of the i-th reflecting surface, r i is the distance the sound wave travels after each reflection, β iis the attenuation coefficient of each reflection, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, λ is the wavelength of the sound wave, and H is the height of the obstacle.

[0021] Optionally, the inputting the first meteorological data into the noise propagation model to obtain a first noise intensity for a preset ecological area calculated by the noise propagation model specifically includes:

[0022] Acquire a first direction in which noise propagates from the construction area to the preset ecological area;

[0023] Determine the wind direction of the construction area during the first construction period, marked as a second direction, and determine the wind speed of the construction area during the first construction period;

[0024] Determining the relative direction of the wind direction with respect to the noise propagation direction according to the first direction and the second direction;

[0025] Calculating environmental parameters of the environment for noise propagation according to the relative direction and the wind speed;

[0026] Based on the environmental parameters, a first noise intensity of noise propagating from the construction area to the preset ecological area is calculated.

[0027] Optionally, the environmental parameter of the environment for noise propagation is calculated according to the relative direction and the wind speed, specifically by the following formula:

[0028]

[0029] Where, ΔL air '(f,r) is the environmental parameter, r is the distance between the construction area and the preset ecological area, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, V w is the wind speed, θ is the relative direction, and c is the speed of sound.

[0030] Optionally, adjusting the first construction period of the construction area according to the first meteorological data specifically includes:

[0031] Acquiring second meteorological data of the construction area during a second construction period;

[0032] Inputting the second meteorological data into the noise propagation model to obtain a second noise intensity for a preset ecological area calculated by the noise propagation model;

[0033] If it is determined that the second noise intensity is less than a preset threshold, the construction time of the construction area is determined to be the second construction period.

[0034] Optionally, determining the noise source characteristics of the noise source based on the construction machinery and equipment and the operation links corresponding to the construction machinery and equipment specifically includes:

[0035] Obtain the sound pressure level of each construction machinery and equipment in the corresponding operation link measured in stages;

[0036] According to the time proportion of each stage, the average sound power level of the entire operation cycle is calculated to obtain the sound power level, which is specifically calculated by the following formula:

[0037]

[0038] Among them, L w is the sound power level, L w i is the sound power level converted from the sound pressure level of the i-th operation stage, t i is the duration of the ith operation stage, and T is the total time of the entire operation cycle.

[0039] In a second aspect of the present application, a low-impact construction processing device suitable for Gobi power transmission line construction is provided, the device comprising an acquisition module, a construction module and a processing module, wherein:

[0040] The acquisition module is used to acquire basic terrain data of the construction area;

[0041] The construction module is used to construct a noise propagation model according to the actual construction situation of the project and the basic terrain data;

[0042] The acquisition module is used to acquire first meteorological data of the construction area during a first construction period;

[0043] The acquisition module is used to input the first meteorological data into the noise propagation model to acquire a first noise intensity for a preset ecological area calculated by the noise propagation model;

[0044] The processing module is used to adjust the first construction period of the construction area according to the first meteorological data if it is determined that the first noise intensity is greater than or equal to a preset threshold, so as to reduce the impact of construction noise on the preset ecological area.

[0045] Optionally, the processing module is used to determine the construction machinery and equipment and operation links according to the actual construction situation of the project;

[0046] The processing module is used to determine the noise source characteristics of the noise source based on the construction machinery and equipment and the operation link corresponding to the construction machinery and equipment, wherein the noise source characteristics include the sound power level;

[0047] The processing module is used to determine the influencing parameters of the terrain on the noise propagation according to the basic terrain data, wherein the influencing parameters include reflection parameters, absorption parameters and shielding parameters;

[0048] The processing module is used to calculate the intensity of noise propagating from the noise source to different areas according to the noise source characteristics and the influencing parameters;

[0049] The construction module is used to construct the noise propagation model according to the calculation results.

[0050] Optionally, the processing module is used to calculate the intensity of noise propagating from the noise source to different areas according to the noise source characteristics and the influencing parameters, specifically by the following formula:

[0051]

[0052] Among them, L final (r, f) is the intensity of noise propagating from the construction area to the preset ecological area, L source (r0) is the initial sound pressure level, L multi-reflection is the reflection parameter, ΔL air (f,r) is the absorption parameter, ΔL shielding is the shielding parameter, L w is the sound power level, r is the distance between the construction area and the preset ecological area, r0 is the initial reference distance, α i is the reflection coefficient of the i-th reflection surface, r i is the distance the sound wave travels after each reflection, β i is the attenuation coefficient of each reflection, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, λ is the wavelength of the sound wave, and H is the height of the obstacle.

[0053] Optionally, the acquisition module is used to acquire a first direction in which the noise propagates from the construction area to the preset ecological area;

[0054] The processing module is used to determine the wind direction of the construction area during the first construction period, marked as a second direction, and determine the wind speed of the construction area during the first construction period;

[0055] The processing module is used to determine the relative direction of the wind direction with respect to the noise propagation direction according to the first direction and the second direction;

[0056] The processing module is used to calculate the environmental parameters of the environment for noise propagation according to the relative direction and the wind speed;

[0057] The processing module is used to calculate a first noise intensity of noise propagating from the construction area to the preset ecological area based on the environmental parameters.

[0058] Optionally, the processing module is used to calculate the environmental parameters of the environment for noise propagation according to the relative direction and the wind speed, specifically by the following formula:

[0059]

[0060] Where, ΔL air '(f,r) is the environmental parameter, r is the distance between the construction area and the preset ecological area, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, V w is the wind speed, θ is the relative direction, and c is the speed of sound.

[0061] Optionally, the acquisition module is used to acquire second meteorological data of the construction area during a second construction period;

[0062] The acquisition module is used to input the second meteorological data into the noise propagation model to obtain the second noise intensity for the preset ecological area calculated by the noise propagation model;

[0063] The processing module is used to determine that the construction time of the construction area is the second construction period if it is determined that the second noise intensity is less than a preset threshold.

[0064] Optionally, the acquisition module is used to acquire the sound pressure level of each construction machinery and equipment in the corresponding operation link measured in stages;

[0065] The processing module is used to calculate the average sound power level of the entire operation cycle according to the time proportion of each stage to obtain the sound power level, which is specifically calculated by the following formula:

[0066]

[0067] Among them, L w is the sound power level, L w i is the sound power level converted from the sound pressure level of the i-th operation stage, t i is the duration of the ith operation stage, and T is the total time of the entire operation cycle.

[0068] In the third aspect of the present application, an electronic device is provided, including a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are both used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes any one of the methods described above.

[0069] In a fourth aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores instructions, and when the instructions are executed, any of the methods described above is executed.

[0070] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:

[0071] 1. This application systematically obtains and analyzes the basic terrain data, actual construction conditions and real-time meteorological data of the construction area to construct a noise propagation model, thereby accurately calculating the noise impact of construction activities on the preset ecological area. By monitoring and evaluating the noise intensity during the first construction period and comparing it with the preset noise threshold, the scheme can promptly identify the adverse effects that construction noise may have on the ecological environment. If the noise intensity exceeds the threshold, the construction time or method will be dynamically adjusted to effectively reduce noise propagation, thereby protecting the ecological environment in the Gobi region.

[0072] 2. Through systematic analysis of construction machinery and equipment and their operation links, the noise source and its sound power level are accurately identified, laying the foundation for the construction of the subsequent noise propagation model. After combining with basic terrain data, the parameters affecting the terrain on noise propagation can be effectively determined, including reflection, absorption and shielding effects, so as to comprehensively evaluate the propagation intensity of noise in different areas. Through this meticulous analysis and calculation, the construction party can accurately predict the noise impact of construction activities on the surrounding environment, and then take corresponding measures to reduce noise and ensure that construction activities proceed smoothly without significantly disturbing the ecological environment.

[0073] 3. By inputting the first meteorological data into the noise propagation model, the potential impact of the noise in the construction area on the preset ecological area is effectively evaluated. By determining the first direction, wind direction and wind speed of noise propagation, and combining the calculation of relative direction, the scheme can comprehensively analyze the effect of environmental conditions on noise propagation, and then calculate the first noise intensity. This process not only improves the accuracy of noise propagation prediction, but also can promptly identify construction activities that may have an impact on the ecological area. When the calculation results show that the noise intensity reaches or exceeds the preset threshold, the construction party can quickly take corresponding adjustment measures, such as changing the construction time or method, to reduce the interference of noise on the surrounding ecological environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] Figure 1 It is a flow chart of a low-impact construction treatment method applicable to Gobi power transmission line construction disclosed in an embodiment of the present application;

[0075] Figure 2 It is a module schematic diagram of a low-impact construction treatment device suitable for Gobi power transmission line construction disclosed in an embodiment of the present application;

[0076] Figure 3 It is a structural schematic diagram of an electronic device disclosed in an embodiment of the present application.

[0077] Explanation of the reference numerals: 201, acquisition module; 202, construction module; 203, processing module; 301, processor; 302, communication bus; 303, user interface; 304, network interface; 305, memory. DETAILED DESCRIPTION

[0078] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0079] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.

[0080] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0081] When constructing power transmission line foundations in the Gobi region, piling and drilling operations will generate strong and continuous noise, especially the impact sound of hammer pile drivers, which can travel a long distance and have a significant impact on the ecological environment. Although the Gobi has low species diversity, it is still a habitat for drought-resistant and cold-resistant animals. Continuous noise may interfere with the foraging, reproduction and risk avoidance of wild animals. Compared with cities, the Gobi has an open terrain and lacks noise barriers, which causes the noise to travel farther. Especially when it is hot, dry or windy, the noise propagation range is further expanded, posing a threat to the fragile ecosystem.

[0082] This embodiment discloses a low-impact construction treatment method suitable for Gobi power transmission line construction, referring to Figure 1 , including the following steps S110-S150:

[0083] S110, obtaining basic terrain data of the construction area.

[0084] The low-impact construction processing method for Gobi power transmission line construction disclosed in the embodiment of the present application is applied to a server, and the server includes but is not limited to electronic devices such as mobile phones, tablet computers, wearable devices, PCs (Personal Computers), etc., and can also be a background server running the low-impact construction processing method for Gobi power transmission line construction. The server can be implemented as an independent server or a server cluster composed of multiple servers.

[0085] Using remote sensing technology to obtain terrain data for a large area can provide fast and comprehensive basic information. Alternatively, drones equipped with high-resolution cameras can be used for aerial photography, and existing topographic maps and literature can be used to supplement basic terrain data.

[0086] S120, build a noise propagation model based on the actual construction situation of the project and basic terrain data.

[0087] In one possible implementation, a noise propagation model is constructed according to the actual construction conditions of the project and basic terrain data, specifically including: determining the construction machinery and equipment and the operation links according to the actual construction conditions of the project; determining the noise source characteristics of the noise source based on the construction machinery and equipment and the operation links corresponding to the construction machinery and equipment, the noise source characteristics including the sound power level; determining the influencing parameters of the terrain on noise propagation according to the basic terrain data, the influencing parameters including reflection parameters, absorption parameters and shielding parameters; calculating the intensity of noise propagating from the noise source to different areas according to the noise source characteristics and the influencing parameters; and constructing a noise propagation model according to the calculation results.

[0088] Specifically, list all the main mechanical equipment used in the construction process, such as pile drivers, excavators, concrete pump trucks, etc. Divide the construction process into different operation phases, and the equipment working mode in each phase may be different, such as startup, full load operation, no-load operation, shutdown, etc. Use an accurate sound level meter (Sound Level Meter) or recording equipment to measure the sound pressure level at specific measurement points around each mechanical equipment in accordance with international standards such as ISO 3744 or ISO 9614. For each operation phase, select multiple measurement points and record the sound pressure level at each point. The measurement points can be laid out according to the type of equipment, the height of the noise source, and the characteristics of the construction area.

[0089] The measured sound pressure level L p Converted to sound power level L w :

[0090] L w =L p +10log 10 (S)+10log 10 (Q)

[0091] Where S is the surface area of ​​the measurement area (in square meters), usually the area of ​​a sphere or hemisphere, and Q is the directivity factor of the noise source. Select an appropriate value based on the noise directivity of the mechanical equipment.

[0092] Among them, the sound power level represents the total energy emitted by the noise source per unit time. It is the basic value of mechanical equipment noise. The power of sound usually spans a very large range, and the use of logarithms can compress the large range of values ​​into a manageable range. 10 is one of the commonly used logarithmic bases, which converts physical values ​​into logarithmic values ​​that are easier to handle and compare. The calculation of power level and sound pressure level usually involves square relationships. For example, the intensity of sound pressure is related to the square of sound power, so the constant 10 is used in the conversion to handle this relationship. For the calculation of sound pressure level, the constant 10 corresponds to the logarithmic relationship of power. And the definition of decibel has been standardized in acoustics, using a logarithmic function with a base of 10. The use of 10 as the base of the logarithmic calculation in the formula ensures that the results are consistent with international acoustic standards.

[0093] For each operation link i, the measured sound pressure level L p i Converted to sound power level L w i , and then sort out the sound power level L of each stage w i . Record the duration of each operation link t i, to ensure that you know exactly how long the equipment is operating in different states. For example, a pile driver may be operating at full power for longer than when it is starting and stopping. Then calculate the average sound power level for the entire operating cycle using the given formula:

[0094]

[0095] Among them, L w is the sound power level, L w i is the sound power level converted from the sound pressure level of the i-th operation stage, t i is the duration of the ith operation stage, and T is the total time of the entire operation cycle.

[0096] The essence of this formula is to weight the sound power level of each operation stage according to its time proportion to obtain the overall sound power level of the entire construction cycle.

[0097] Furthermore, based on the acquired basic terrain data, the influencing parameters, including reflection parameters, absorption parameters, and shielding parameters, are calculated, and the reflectivity of the sound waves is calculated based on the ground characteristics (such as sand, hard ground, and grass) in the construction area. Generally, the reflectivity of sound waves on hard surfaces (such as concrete) is higher, while on soft surfaces (such as sand), it is lower. The reflection parameters are specifically calculated using the following formula:

[0098]

[0099] Among them, L multi-reflection is the reflection parameter, L source (r0) is the initial sound pressure level, r is the distance between the construction area and the preset ecological area, r0 is the initial reference distance, which is the propagation distance calculated from the noise source, α i is the reflection coefficient of the i-th reflection surface, r i is the distance the sound wave travels after each reflection, β i is the attenuation coefficient of each reflection.

[0100] In the formula -20log 10 (r / r0) represents the free field propagation loss, which indicates the attenuation of noise when it propagates from the reference distance r0 to the actual distance r. The 20 here is still related to the square relationship of the sound pressure. During the propagation process, the sound pressure will decrease as the distance increases. Since the sound pressure level is inversely proportional to the square of the distance, 20 is used instead of 10 in the logarithmic formula. It is based on the energy attenuation caused by the increase in distance when the sound wave propagates in free space, which is called "distance attenuation". α iis the reflection coefficient of the i-th reflecting surface, which indicates the proportion of energy reflected back when the sound wave hits the surface. Different ground surfaces or obstacles have different reflection coefficients. Hard ground surfaces (such as concrete) have high reflectivity, while soft ground surfaces (such as sand) have low reflectivity. i is the attenuation coefficient after the i-th reflection, taking into account the absorption and loss of sound wave energy during reflection, and is usually related to the sound absorption properties of the material. i is the distance the sound wave propagates after the i-th reflection. Each reflection will change the propagation path of the sound wave, affecting the further attenuation of the sound wave energy.

[0101] The summation part of the formula is a correction term for multiple reflections. After each reflection, the reflection coefficient of the reflecting surface affects the energy reflectivity of the sound wave. When the reflection coefficient is high, the surface will reflect more energy, and the noise will propagate over a longer distance. After reflection, the sound wave energy will continue to decay as the propagation distance increases. The attenuation coefficient is used to represent the energy loss of the sound wave after each reflection. This part of the formula takes into account that in a complex environment, the sound wave may reflect multiple times from different surfaces, and each reflection will affect the propagation path and intensity of the sound wave.

[0102] This is particularly important for evaluating the propagation of sound waves in open environments with no obvious obstacles, such as the Gobi Desert.

[0103]

[0104] Among them, L source (r0) is the initial sound pressure level, L w is the sound power level, r0 is the initial reference distance. 2πr0 2 It is the area of ​​the sphere starting from the sound source, which is used to reflect the increase in area when the sound wave propagates spherically in free space. The function of this part is to consider the diffusion effect of sound in space, that is, as the distance increases, the energy density of sound in spherical space will gradually decrease.

[0105] Calculate the sound absorption characteristics of air according to the ground type and climatic conditions. Especially in hot and dry weather, the sound absorption capacity is relatively weak. The absorption parameter can be calculated by the following formula:

[0106]

[0107] Where, ΔL air (f,r) is the absorption parameter, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, and r is the distance between the construction area and the preset ecological area.

[0108] Among them, 1.84×10-11 is a physical constant used to adjust the proportional relationship in the air absorption formula. When sound waves propagate in the air, they encounter the viscous resistance and thermal conduction effect of air molecules. Both effects consume the energy of the sound waves, causing the noise to gradually attenuate during propagation. 1.84×10-11 is the result of combining multiple physical constants such as the thermal conductivity and viscosity coefficient of air. It is a correction factor that combines theoretical formulas with experimental data.

[0109] f is the frequency of the noise, measured in Hertz (Hz). The higher the frequency, the stronger the absorption of the noise in the air. High-frequency sound waves (such as sharp sounds) are more easily absorbed in the air, so the square of the frequency is proportional to the absorption of the noise. T is the temperature of the air, measured in Kelvin (K). Temperature affects the speed of movement of air molecules and the speed of sound wave propagation. The higher the temperature, the smaller the absorption loss when the sound wave propagates, so the absorption loss is inversely proportional to the square of the temperature. P is the pressure of the air, measured in Pascals (Pa). Air pressure affects the molecular density and collision frequency, so at high pressures, the sound wave energy loss will be greater. The higher the atmospheric pressure, the greater the absorption loss of sound waves propagating in the air.

[0110] Identify natural barriers (such as hills, trees, etc.) within the construction area and evaluate their shielding effect on noise propagation, determine the attenuation of the shielding effect, and the shielding parameters are calculated using the following formula:

[0111] ΔL shielding =10log 10 (1+10·e -λH )

[0112] Where, ΔL shielding is the shielding parameter, λ is the wavelength of the sound wave, and H is the height of the obstacle.

[0113] When noise encounters obstacles (such as buildings, mountains, sand dunes, etc.) during propagation, the obstacles will block or reflect the sound waves, resulting in a reduction in the energy of the sound waves. Generally, high-frequency sound waves are easier to shield than low-frequency sound waves because high-frequency sound waves have shorter wavelengths and are difficult to bypass obstacles.

[0114] Based on the environmental characteristics and noise source characteristics, select a suitable noise propagation model, such as ISO 9613-2, USEPA model or other models suitable for the Gobi region. Input the sound power level, reflection parameters, absorption parameters, shielding parameters, etc. into the model. Use the noise propagation formula to calculate the intensity of noise propagating from the noise source to different areas, usually in the following form:

[0115] L final (r,f)=L multi-reflection -ΔL air (f,r)-ΔL shielding

[0116] Among them, L final (r, f) is the intensity of noise propagating from the construction area to the preset ecological area, L source (r0) is the initial sound pressure level, L multi-reflection is the reflection parameter, ΔL air (f,r) is the absorption parameter, ΔL shielding is the shielding parameter.

[0117] S130, obtaining first meteorological data of the construction area during a first construction period.

[0118] First of all, it is necessary to clarify the first construction period, that is, the specific time period of construction activities (such as specific start and end dates, daytime or nighttime construction time). This period will affect the collection and analysis of meteorological data. Meteorological stations near the construction area provide accurate historical and real-time meteorological data. These meteorological stations are usually operated by government meteorological departments or specialized meteorological service agencies and can provide long-term meteorological observation data. Regional meteorological data collected by meteorological satellites can cover remote areas that cannot be covered by ground meteorological stations, especially for more remote areas such as the Gobi Desert. In remote or special terrain conditions, drones can be used to carry meteorological equipment, or mobile meteorological stations can be directly deployed at the construction site to collect real-time meteorological data.

[0119] For noise propagation, the key meteorological data that need to be obtained include: wind direction. The direction of wind flow has a significant impact on the path of noise propagation, especially in open areas. Wind speed. The greater the wind speed, the direction and speed of sound wave propagation will change. Wind speed can accelerate or slow down the propagation of sound waves. Temperature. The air temperature has an impact on the speed of sound propagation. Generally, the higher the temperature, the faster the sound propagates, but its attenuation rate will also decrease accordingly. Humidity. The humidity in the air affects the degree of absorption of sound waves in the air. The higher the humidity, the stronger the air's sound absorption capacity. Air pressure. Atmospheric pressure has a slight effect on the attenuation and speed of sound waves, especially at high altitudes or in low pressure environments.

[0120] S140, inputting first meteorological data into a noise propagation model to obtain a first noise intensity for a preset ecological area calculated by the noise propagation model.

[0121] First, determine the direction in which the noise propagates from the construction area to the preset ecological area, which is called the first direction. This direction can be determined by mapping the geographical distance and orientation between the construction area and the ecological area, usually using a two-dimensional or three-dimensional map system to confirm the propagation path. During the first construction period, obtain the wind direction (second direction) and wind speed in the construction area. Wind direction and wind speed are collected through meteorological data. Wind direction affects the direction of noise propagation, while wind speed directly affects the speed and distance of sound propagation.

[0122] By comparing the first direction of noise propagation with the wind direction (second direction), the relative direction of the two is determined. This means calculating the angle between the noise propagation direction and the wind direction, which is marked as θ. When the wind direction is the same as or opposite to the noise propagation direction, θ is 0 degrees or 180 degrees, respectively. Based on the relative direction of the noise propagation direction and the wind direction, as well as the wind speed, the impact of the environment on noise propagation is calculated using the following formula:

[0123]

[0124] Where, ΔL air '(f,r) is the environmental parameter, r is the distance between the construction area and the preset ecological area, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, V w is the wind speed, θ is the relative direction, and c is the speed of sound.

[0125] Wind speed and direction have an important impact on noise propagation. If the wind direction is the same as the noise propagation direction, the wind speed will enhance the propagation effect of the sound waves, causing the noise energy to propagate further; if the wind direction is opposite, the wind speed will weaken the propagation of the sound waves, causing the noise energy to decay faster.

[0126] After substituting environmental parameters into the noise propagation formula, the final noise propagation intensity can be obtained. The noise emitted by construction equipment will gradually decay with increasing distance, and the decay rate is affected by factors such as wind speed, wind direction, temperature, and air density. Through the environmentally corrected noise propagation model, the noise intensity of the preset ecological area can be obtained, and then its potential impact on the local environment and ecology can be evaluated.

[0127] S150: If it is determined that the first noise intensity is greater than or equal to a preset threshold, adjusting a first construction period of the construction area according to the first meteorological data.

[0128] In one possible implementation, the first construction period of the construction area is adjusted according to the first meteorological data, specifically including: obtaining the second construction period and the second meteorological data of the construction area; inputting the second meteorological data into the noise propagation model to obtain the second noise intensity for the preset ecological area calculated by the noise propagation model; if it is determined that the second noise intensity is less than a preset threshold, then determining that the construction time of the construction area is the second construction period.

[0129] Specifically, according to the project schedule and construction plan, select a new construction period as the second construction period. This may be a different time period of the day or a period a few days later, depending on the changes in meteorological conditions. Use meteorological monitoring equipment or services to collect meteorological data for the second construction period, including wind speed, wind direction, temperature, humidity, and air pressure. Ensure that the data obtained is accurate and timely.

[0130] Ensure that the established noise propagation model can handle the newly acquired meteorological data. The model should be able to handle different input variables (such as wind speed, wind direction, etc.) to calculate the noise intensity. Input the second meteorological data into the noise propagation model and update the model parameters to ensure that the model can accurately calculate according to the latest meteorological conditions.

[0131] After inputting the second meteorological data, run the noise propagation model to calculate the second noise intensity for the preset ecological area. The model will re-evaluate the impact of noise propagation based on the new data, including noise attenuation, wind impact, etc. Record the second noise intensity value output by the model for subsequent comparison and judgment. Set a noise intensity threshold in advance, usually based on the noise tolerance level or ecological protection requirements of the ecological area. This threshold is used to judge the impact of construction noise on the ecological area. Compare the calculated second noise intensity with the preset threshold. If the second noise intensity is less than the threshold, it means that construction in the second construction period will not have a significant impact on the ecological area. If the second noise intensity is lower than the preset threshold, determine to carry out construction in the second construction period. Notify the construction team to arrange the work according to the new construction schedule to ensure compliance with the construction time and plan. If the second noise intensity is higher than the preset threshold, consider continuing to monitor the meteorological conditions and find other suitable construction time periods for adjustment. The construction team should have the ability to respond flexibly and formulate construction plans based on real-time meteorological conditions.

[0132] This embodiment also discloses a low-impact construction treatment device suitable for Gobi power transmission line construction, referring to Figure 2 The device includes an acquisition module 201, a construction module 202 and a processing module 203, wherein:

[0133] The acquisition module 201 is used to acquire basic terrain data of the construction area.

[0134] The construction module 202 is used to construct a noise propagation model according to the actual construction situation of the project and basic terrain data.

[0135] The acquisition module 201 is used to acquire first meteorological data of a construction area during a first construction period.

[0136] The acquisition module 201 is used to input first meteorological data into the noise propagation model to obtain a first noise intensity for a preset ecological area calculated by the noise propagation model.

[0137] The processing module 203 is used to adjust the first construction period of the construction area according to the first meteorological data if it is determined that the first noise intensity is greater than or equal to the preset threshold, so as to reduce the impact of the construction noise on the preset ecological area.

[0138] In a possible implementation, the processing module 203 is used to determine the construction machinery and equipment and operation links according to the actual construction situation of the project.

[0139] The processing module 203 is used to determine the noise source characteristics of the noise source based on the construction machinery and equipment and the operation links corresponding to the construction machinery and equipment. The noise source characteristics include the sound power level.

[0140] The processing module 203 is used to determine the influencing parameters of the terrain on the noise propagation according to the basic terrain data, and the influencing parameters include reflection parameters, absorption parameters and shielding parameters.

[0141] The processing module 203 is used to calculate the intensity of noise propagating from the noise source to different areas according to the noise source characteristics and the influencing parameters.

[0142] The construction module 202 is used to construct a noise propagation model according to the calculation results.

[0143] In a possible implementation, the processing module 203 is used to calculate the intensity of noise propagating from the noise source to different areas according to the noise source characteristics and the influencing parameters, specifically by the following formula:

[0144]

[0145] Among them, L final (r, f) is the intensity of noise propagating from the construction area to the preset ecological area, L source (r0) is the initial sound pressure level, L multi-reflection is the reflection parameter, ΔL air (f,r) is the absorption parameter, ΔL shielding is the shielding parameter, L w is the sound power level, r is the distance between the construction area and the preset ecological area, r0 is the initial reference distance, α i is the reflection coefficient of the i-th reflecting surface, r i is the distance the sound wave travels after each reflection, β i is the attenuation coefficient of each reflection, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, λ is the wavelength of the sound wave, and H is the height of the obstacle.

[0146] In a possible implementation, the acquisition module 201 is used to acquire a first direction in which noise propagates from the construction area to the preset ecological area.

[0147] The processing module 203 is used to determine the wind direction of the construction area during the first construction period, marked as the second direction, and determine the wind speed of the construction area during the first construction period.

[0148] The processing module 203 is used to determine the relative direction of the wind direction with respect to the noise propagation direction according to the first direction and the second direction.

[0149] The processing module 203 is used to calculate the environmental parameters of the environment for noise propagation according to the relative direction and wind speed.

[0150] The processing module 203 is used to calculate the first noise intensity of the noise propagating from the construction area to the preset ecological area based on the environmental parameters.

[0151] In a possible implementation, the processing module 203 is used to calculate the environmental parameters of the environment for noise propagation according to the relative direction and the wind speed, specifically by the following formula:

[0152]

[0153] Where, ΔL air '(f,r) is the environmental parameter, r is the distance between the construction area and the preset ecological area, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, V w is the wind speed, θ is the relative direction, and c is the speed of sound.

[0154] In a possible implementation, the acquisition module 201 is used to acquire second meteorological data of the construction area during the second construction period.

[0155] The acquisition module 201 is used to input the second meteorological data into the noise propagation model to obtain the second noise intensity for the preset ecological area calculated by the noise propagation model.

[0156] The processing module 203 is used to determine that the construction time of the construction area is a second construction period if it is determined that the second noise intensity is less than a preset threshold.

[0157] In a possible implementation, the acquisition module 201 is used to acquire the sound pressure level of each construction machine equipment in the corresponding operation link measured in stages.

[0158] The processing module 203 is used to calculate the average sound power level of the entire operation cycle according to the time proportion of each stage to obtain the sound power level, which is specifically calculated by the following formula:

[0159]

[0160] Among them, L w is the sound power level, L w i is the sound power level converted from the sound pressure level of the i-th operation stage, t i is the duration of the ith operation stage, and T is the total time of the entire operation cycle.

[0161] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0162] This embodiment also discloses an electronic device, referring to Figure 3 The electronic device may include: at least one processor 301 , at least one communication bus 302 , a user interface 303 , a network interface 304 , and at least one memory 305 .

[0163] The communication bus 302 is used to realize the connection and communication between these components.

[0164] The user interface 303 may include a display screen (Display) and a camera (Camera). The optional user interface 303 may also include a standard wired interface and a wireless interface.

[0165] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0166] Among them, the processor 301 may include one or more processing cores. The processor 301 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the processor 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 301, and it can be implemented separately through a chip.

[0167] Among them, the memory 305 may include a random access memory (RAM) or a read-only memory (Read-Only Memory). Optionally, the memory includes a non-transitory computer-readable storage medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 305 may also be at least one storage device located away from the aforementioned processor 301. The memory 305 as a computer storage medium may include an operating system, a network communication module, a user interface 303 module, and an application program for a low-impact construction treatment method for Gobi power transmission line construction.

[0168] exist Figure 3 In the electronic device shown, the user interface 303 is mainly used to provide an input interface for the user and obtain data input by the user; and the processor 301 can be used to call the application program of the low-impact construction treatment method suitable for Gobi power transmission line construction stored in the memory 305. When executed by one or more processors 301, the electronic device executes one or more methods in the above-mentioned embodiments.

[0169] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the order of the actions described, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0170] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0171] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0172] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0173] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0174] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory 305 and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned memory 305 includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk.

[0175] The present application also discloses a computer-readable storage medium, wherein the computer-readable storage medium stores instructions. When executed by one or more processors 301, the electronic device executes one or more of the methods described in the above embodiments.

[0176] The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited thereto. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, it will be easy for those skilled in the art to think of other embodiments of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field that are not recorded in the present disclosure. The description and examples are regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.

Claims

1. A low-impact construction treatment method suitable for Gobi power transmission line construction, characterized in that: The method comprises: Obtain basic terrain data of the construction area; Construct a noise propagation model based on the actual construction situation of the project and the basic terrain data; Acquire first meteorological data of the construction area during a first construction period; Inputting the first meteorological data into the noise propagation model to obtain a first noise intensity for a preset ecological area calculated by the noise propagation model; If it is determined that the first noise intensity is greater than or equal to a preset threshold, the first construction period of the construction area is adjusted according to the first meteorological data to reduce the impact of construction noise on the preset ecological area.

2. The low-impact construction treatment method suitable for Gobi power transmission line construction according to claim 1 is characterized in that: The noise propagation model is constructed according to the actual construction situation of the project and the basic terrain data, specifically including: Determine the construction machinery and equipment and operation links according to the actual construction situation of the project; Based on the construction machinery and equipment and the operation links corresponding to the construction machinery and equipment, determining the noise source characteristics of the noise source, wherein the noise source characteristics include a sound power level; Determining, based on the basic terrain data, the influencing parameters of the terrain on noise propagation, wherein the influencing parameters include reflection parameters, absorption parameters, and shielding parameters; Calculating the intensity of noise propagating from the noise source to different areas according to the noise source characteristics and the influencing parameters; According to the calculation results, the noise propagation model is constructed.

3. The low-impact construction treatment method suitable for Gobi power transmission line construction according to claim 2 is characterized in that: The intensity of the noise propagating from the noise source to different areas is calculated according to the noise source characteristics and the influencing parameters, specifically by the following formula: Among them, L final (r, f) is the intensity of noise propagating from the construction area to the preset ecological area, L source (r0) is the initial sound pressure level, L multi-reflection is the reflection parameter, ΔL air (f,r) is the absorption parameter, ΔL shielding is the shielding parameter, L w is the sound power level, r is the distance between the construction area and the preset ecological area, r0 is the initial reference distance, α i is the reflection coefficient of the i-th reflection surface, r i is the distance the sound wave travels after each reflection, β i is the attenuation coefficient of each reflection, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, λ is the wavelength of the sound wave, and H is the height of the obstacle.

4. The low-impact construction treatment method applicable to Gobi power transmission line construction according to claim 1 is characterized in that: The step of inputting the first meteorological data into the noise propagation model to obtain a first noise intensity for a preset ecological area calculated by the noise propagation model specifically includes: Acquire a first direction in which noise propagates from the construction area to the preset ecological area; Determine the wind direction of the construction area during the first construction period, marked as a second direction, and determine the wind speed of the construction area during the first construction period; Determining the relative direction of the wind direction with respect to the noise propagation direction according to the first direction and the second direction; Calculating environmental parameters of the environment for noise propagation according to the relative direction and the wind speed; Based on the environmental parameters, a first noise intensity of noise propagating from the construction area to the preset ecological area is calculated.

5. The low-impact construction treatment method applicable to Gobi power transmission line construction according to claim 4 is characterized in that: The environmental parameters of the environment for noise propagation are calculated according to the relative direction and the wind speed, specifically by the following formula: Where, ΔL air '(f,r) is the environmental parameter, r is the distance between the construction area and the preset ecological area, f is the frequency of the sound wave, T is the ambient temperature, P is the air pressure, ρ is the air density, V w is the wind speed, θ is the relative direction, and c is the speed of sound.

6. The low-impact construction treatment method applicable to Gobi power transmission line construction according to claim 1, characterized in that: The adjusting the first construction period of the construction area according to the first meteorological data specifically includes: Acquiring second meteorological data of the construction area during a second construction period; Inputting the second meteorological data into the noise propagation model to obtain a second noise intensity for a preset ecological area calculated by the noise propagation model; If it is determined that the second noise intensity is less than a preset threshold, the construction time of the construction area is determined to be the second construction period.

7. The low-impact construction treatment method applicable to Gobi power transmission line construction according to claim 2 is characterized in that: The determining of the noise source characteristics of the noise source based on the construction machinery and equipment and the operation links corresponding to the construction machinery and equipment specifically includes: Obtain the sound pressure level of each construction machinery and equipment in the corresponding operation link measured in stages; According to the time proportion of each stage, the average sound power level of the entire operation cycle is calculated to obtain the sound power level, which is specifically calculated by the following formula: Among them, L w is the sound power level, L w i is the sound power level converted from the sound pressure level of the i-th operation stage, t i is the duration of the ith operation stage, and T is the total time of the entire operation cycle.

8. A low-impact construction treatment device suitable for Gobi power transmission line construction, characterized in that: The device comprises an acquisition module (201), a construction module (202) and a processing module (203), wherein: The acquisition module (201) is used to acquire basic terrain data of the construction area; The construction module (202) is used to construct a noise propagation model according to the actual construction situation of the project and the basic terrain data; The acquisition module (201) is used to acquire first meteorological data of the construction area during a first construction period; The acquisition module (201) is used to input the first meteorological data into the noise propagation model to obtain a first noise intensity for a preset ecological area calculated by the noise propagation model; The processing module (203) is used to adjust the first construction period of the construction area according to the first meteorological data if it is determined that the first noise intensity is greater than or equal to a preset threshold, so as to reduce the impact of construction noise on the preset ecological area.

9. An electronic device, characterized in that: The electronic device comprises a processor (301), a communication bus (302), a memory (305), a user interface (303), a network interface (304) and a memory (305), wherein the memory (305) is used to store instructions, the user interface (303) and the network interface (304) are both used to communicate with other devices, and the processor (301) is used to execute the instructions stored in the memory (305) so that the electronic device executes the method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores instructions, and when the instructions are executed, the method according to any one of claims 1 to 7 is executed.