Engineering construction site risk area management and control system

By designing the risk area control system of the engineering construction site and using multiple modules to work together, the screen and equipment of the construction site are monitored and risk-evaluated, the problem of high safety risks on the construction site is solved, and the safety and management efficiency of the construction site is improved.

CN119831318APending Publication Date: 2025-04-15ZHONGCHUAN NO 9 DESIGN & RES INST
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411628243.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-14
Publication Date
2025-04-15

AI Technical Summary

Technical Problem

During the construction process, the construction site is complex and there are various stacked objects, resulting in high safety risks and it is difficult to effectively control the existing technology to ensure the safety and quality of construction personnel.

Method used

A risk area control system for engineering construction sites is designed, including on-site control data processing center, risk evaluation module, visual picture acquisition module, area management module and area equipment monitoring module. Through the electrical connection and coordinated work of these modules, the screen and equipment monitoring of the construction site are monitored and risk status is judged.

Benefits of technology

The system can effectively monitor the screen and equipment status of the construction site, judge risks, improve the monitoring and management effect of the construction site, ensure safety, and reduce the frequency of accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119831318A_ABST
    Figure CN119831318A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of engineering construction, and discloses an engineering construction site risk area management and control system, which comprises an on-site management and control data processing center, a risk evaluation module, a visual picture acquisition module, an area management module and an in-area equipment monitoring module, the field management and control data processing center is electrically connected with a risk evaluation module, a visual picture acquisition module, a region management module and an intra-region equipment monitoring module; the visual picture module and the intra-region equipment monitoring module are used for monitoring picture information and equipment states in a construction site, and the risk evaluation module is used for acquiring the picture information and the equipment states, analyzing the picture information and the equipment states and judging risk states; the area management module is used for dividing a construction site; according to the management and control system provided by the invention, pictures and equipment of a construction site can be monitored, and the effect of evaluating risks is achieved by using monitoring information.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering construction, and more specifically, to a risk area management and control system for an engineering construction site. Background Art

[0002] During the construction process, the construction site is usually complicated, and there are inevitably various stacked objects on site. During the construction process, various safety situations may occur. Therefore, how to effectively control the construction site and ensure the safety of on-site construction workers and the quality of construction is an urgent problem to be solved. Summary of the invention

[0003] In order to overcome the shortcomings of the prior art, the present invention provides a risk area management and control system for a construction site, which has the advantage of more precise operation.

[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a risk area management and control system for a construction site, comprising: a site management and control data processing center, a risk assessment module, a visual image acquisition module, an area management module and an equipment monitoring module within the area, wherein the site management and control data processing center is electrically connected to the risk assessment module, the visual image acquisition module, the area management module and the equipment monitoring module within the area respectively; the visual image acquisition module and the equipment monitoring module within the area are used to monitor the image information and equipment status at the construction site, the risk assessment module is used to acquire the image information and equipment status, and analyze them to determine the risk status; the area management module is used to divide and process the construction site.

[0005] As a preferred technical solution of the present invention, the visual image acquisition module is provided with a monitor management unit, and the monitor management unit is provided with several groups of digital cameras, and the digital cameras are arranged in the construction area to fully cover the construction area.

[0006] As a preferred technical solution of the present invention, the digital camera is installed through a bracket, the bracket is connected to the digital camera through a motor, and is electrically connected to the motor through a monitor management unit to control the rotation and telescopic adjustment position of the digital camera.

[0007] As a preferred technical solution of the present invention, the visual picture acquisition module is further provided with an image analysis unit, and the image analysis unit is used to extract features from the acquired picture information and analyze the features to acquire the behaviors of the construction workers in the picture.

[0008] As a preferred technical solution of the present invention, the equipment monitoring module in the area sets a sensor for each equipment in the construction area, and obtains the operating status of the equipment through the sensor. The operating status includes but is not limited to the continuous operating time of the equipment and the cumulative operating time of the equipment.

[0009] As a preferred technical solution of the present invention, the risk assessment module is provided with a dangerous action recognition unit. The dangerous action recognition unit identifies and distinguishes the dangerous actions of the staff in the picture information obtained by the visual picture acquisition module, and uses it as a standard for risk level assessment.

[0010] As a preferred technical solution of the present invention, the risk assessment module is provided with an equipment risk assessment unit, which analyzes the operating status of the equipment in the area obtained by the equipment monitoring module in the area and uses it as a criterion for risk level assessment.

[0011] As a preferred technical solution of the present invention, the risk assessment module is provided with a risk level assessment unit, and the risk level assessment unit makes a risk level judgment by analyzing the dangerous action and the equipment status.

[0012] As a preferred technical solution of the present invention, the area management module is provided with an area division unit, and the area division unit divides the construction area into a plurality of groups of areas, and judges the risk level of each area as an independent unit.

[0013] As a preferred technical solution of the present invention, the on-site management and control data processing center is further provided with a data interaction module, and the data interaction module is connected to a remote user terminal.

[0014] As a preferred technical solution of the present invention, the remote user terminal is any one of a smart phone, a laptop computer, a desktop computer, a tablet computer, and a smart screen, and the connection method between the data interaction module and the remote user terminal includes but is not limited to wireless connection, wired connection, Bluetooth connection, and zigbee connection.

[0015] Compared with the prior art, the beneficial effects of the present invention are as follows: the management and control system provided by the present invention can monitor the images and equipment at the construction site, and use the monitoring information to achieve the effect of risk assessment; effectively improve the monitoring and management effect of the construction site, ensure the safety of the construction site, and reduce the frequency of accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the present invention;

[0017] In the figure: 1. On-site control data processing center; 2. Risk assessment module; 3. Visual image acquisition module; 4. Area management module; 5. Equipment monitoring module in the area; 6. Data interaction module; 7. Dangerous action identification unit; 8. Equipment risk assessment unit; 9. Risk level assessment unit; 10. Monitor management unit; 11. Image analysis unit; 12. Area division unit; 13. Remote user terminal. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] like Figure 1 As shown, the present invention provides a risk area management and control system for a construction site, comprising: a site management and control data processing center 1, a risk assessment module 2, a visual image acquisition module 3, an area management module 4 and an equipment monitoring module 5 within the area, wherein the site management and control data processing center 1 is electrically connected to the risk assessment module 2, the visual image acquisition module 3, the area management module 4 and the equipment monitoring module 5 within the area respectively; the visual image acquisition module 3 and the equipment monitoring module 5 within the area are used to monitor the image information and the equipment status in the construction site, the risk assessment module 2 is used to obtain the image information and the equipment status, and analyze them to determine the risk status; the area management module 4 is used to divide and process the construction site.

[0020] The on-site control data processing center 1 is connected to each module for interactive data processing; the visual image acquisition module 3 and the equipment monitoring module 5 in the area are used to monitor the image information and equipment status in the construction site, and this is used as a basis for risk assessment through the risk assessment module 2; the construction site is divided into several areas through the area management module 4, and different areas are monitored to obtain the risk level of the corresponding area.

[0021] Among them, the visual picture acquisition module 3 is provided with a monitor management unit 10, and the monitor management unit 10 is provided with several groups of digital cameras. The digital cameras are arranged in the construction area to completely cover the construction area; the digital cameras are installed through a bracket, and the bracket is connected to the digital cameras through a motor, and is electrically connected to the motor through the monitor management unit 10 to control the rotation and telescopic adjustment position of the digital cameras; the visual picture acquisition module 3 is also provided with an image analysis unit 11, and the image analysis unit 11 is used to extract features of the acquired picture information, and analyze the features to obtain the behavior of the construction personnel in the picture.

[0022] The visual image acquisition module 3 acquires the monitoring image through the monitor management unit 10 and the image analysis unit 11, and can adjust the digital camera according to the usage requirements to improve the monitoring effect; the image analysis unit 11 is used to analyze the image to facilitate the dangerous action recognition unit 7 to identify dangerous actions.

[0023] The equipment monitoring module 5 in the area sets a sensor for each equipment in the construction area, and obtains the operating status of the equipment through the sensor. The operating status includes but is not limited to the continuous operating time of the equipment and the accumulated operating time of the equipment.

[0024] By obtaining the operating data of each device, the status of the device can be determined as a criterion for judging risks.

[0025] Among them, the risk assessment module 2 is provided with a dangerous action recognition unit 7, which identifies and distinguishes the dangerous actions of the staff in the picture information obtained by the visual picture acquisition module 3, and uses it as a standard for risk level assessment; the risk assessment module 2 is provided with an equipment risk assessment unit 8, and the equipment risk assessment unit 8 analyzes the operating status of the equipment in the area obtained by the equipment monitoring module 5 in the area, and uses it as a standard for risk level assessment; the risk assessment module 2 is provided with a risk level assessment unit 9, and the risk level assessment unit 9 makes a risk level judgment based on the analysis of the dangerous actions and equipment status.

[0026] The dangerous action recognition unit 7 and the equipment risk assessment unit 8 are used in conjunction with the visual image acquisition module 3 and the equipment monitoring module 5 in the area respectively, and the two factors of the acquired image and the equipment status are used as the criteria for risk assessment.

[0027] The area management module 4 is provided with an area division unit 12, which divides the construction area into a plurality of groups of areas and uses each area as an independent unit to determine the risk level.

[0028] By dividing the area into small areas, it is possible to locate the risk areas and facilitate rapid management.

[0029] The field control data processing center 1 is further provided with a data interaction module 6, and the data interaction module 6 is connected to a remote user terminal 13. The remote user terminal 13 is any one of a smart phone, a laptop computer, a desktop computer, a tablet computer, and a smart screen, and the connection method between the data interaction module 6 and the remote user terminal 13 includes but is not limited to wireless connection, wired connection, Bluetooth connection, and zigbee connection.

[0030] It is convenient for users to manage remotely and improve the convenience and efficiency of management.

[0031] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A risk area management and control system for a construction site, characterized in that: The invention comprises: a site control data processing center (1), a risk assessment module (2), a visual picture acquisition module (3), a regional management module (4) and an in-region equipment monitoring module (5); the site control data processing center (1) is electrically connected to the risk assessment module (2), the visual picture acquisition module (3), the regional management module (4) and the in-region equipment monitoring module (5); the visual picture acquisition module (3) and the in-region equipment monitoring module (5) are used to monitor the picture information and equipment status at the construction site; the risk assessment module (2) is used to acquire the picture information and equipment status, and analyze them to determine the risk status; The area management module (4) is used to divide the construction site.

2. The risk area management and control system for a construction site according to claim 1 is characterized by: The visual picture acquisition module (3) is provided with a monitor management unit (10), and the monitor management unit (10) is provided with a plurality of groups of digital cameras, which are arranged in the construction area to completely cover the construction area.

3. A construction site risk area management and control system according to claim 2, characterized in that: The digital camera is installed via a bracket, which is connected to the digital camera via a motor and electrically connected to the motor via a monitor management unit (10) to control the rotation and telescopic adjustment position of the digital camera.

4. The risk area management and control system for a construction site according to claim 1 is characterized by: The visual picture acquisition module (3) is further provided with an image analysis unit (11), and the image analysis unit (11) is used to extract features from the acquired picture information and analyze the features to acquire the behavior of the construction personnel in the picture.

5. The risk area management and control system for a construction site according to claim 1 is characterized by: The equipment monitoring module (5) in the area sets a sensor for each equipment in the construction area, and obtains the operating status of the equipment through the sensor. The operating status includes but is not limited to the continuous operating time of the equipment and the accumulated operating time of the equipment.

6. The risk area management and control system for a construction site according to claim 1 is characterized by: The risk assessment module (2) is provided with a dangerous action recognition unit (7) and an equipment risk assessment unit (8); the dangerous action recognition unit (7) identifies and distinguishes dangerous actions of workers in the picture information obtained by the visual picture acquisition module (3), and uses this as a criterion for risk level assessment; the equipment risk assessment unit (8) analyzes the operating status of equipment in the area obtained by the equipment monitoring module (5) in the area, and uses this as a criterion for risk level assessment.

7. The risk area management and control system for a construction site according to claim 1 is characterized by: The risk assessment module (2) is provided with a risk level assessment unit (9), and the risk level assessment unit (9) performs analysis based on dangerous actions and equipment status to make a risk level judgment.

8. The risk area management and control system for a construction site according to claim 1 is characterized by: The area management module (4) is provided with an area division unit (12), and the area division unit (12) divides the construction area into a plurality of groups of areas, and uses each area as an independent unit to perform risk level judgment.

9. The risk area management and control system for a construction site according to claim 1 is characterized by: The on-site control data processing center (1) is also provided with a data interaction module (6), and the data interaction module (6) is connected to a remote user terminal (13).

10. A construction site risk area management and control system according to claim 9, characterized in that: The remote user terminal (13) is any one of a smart phone, a laptop computer, a desktop computer, a tablet computer, and a smart screen. The connection method between the data interaction module (6) and the remote user terminal (13) includes but is not limited to wireless connection, wired connection, Bluetooth connection, and Zigbee connection.

Citation Information

Cited By

  • Safety management method and system for cross operation of large machinery

    CN120807387A

  • A safety management method and system for large mechanical cross operation

    CN120807387B