Coal mine equipment network operation and maintenance management system and method based on 3DMineGlS
By adopting a coal mine equipment network operation and maintenance management system based on 3DMineGlS in the coal mine network system, and using 3DMineGIS technology and digital twin technology for three-dimensional network topology visualization and real-time monitoring, the problems of original equipment access methods, inaccurate fault positioning and insufficient visualization are solved, and the operation and maintenance management efficiency and security are improved.
Patent Information
- Application Number
- CN202510319300.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-18
- Publication Date
- 2025-05-09
AI Technical Summary
There are problems in the operation and maintenance management of coal mine network systems, such as the equipment access method, inaccurate fault location and insufficient visualization, resulting in low efficiency, high cost and safety hazards of operation and maintenance management.
The coal mine equipment network operation and maintenance management system is adopted based on 3DMineGlS. The system includes a data access module, a network topology visualization module, a device status monitoring module, a traffic monitoring and analysis module, and an alarm and fault recording module. The three-dimensional network topology visualization and real-time monitoring are used for 3DMineGIS technology and digital twin technology.
It improves the efficiency and accuracy of coal mine network system operation and maintenance management, reduces operation and maintenance costs and difficulty, and enhances the visualization and security of the system.
Smart Images

Figure CN119966843A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of coal mine network operation and maintenance management, and in particular to a coal mine equipment network operation and maintenance management system and method based on 3D Mining GIS. Background Art
[0002] With the acceleration of the process of coal mine informatization, the development of coal mine network system operation and maintenance management platform has received increasing attention. However, in the operation and maintenance management of coal mine network systems, the industry faces many challenges. The large number of underground network equipment and primitive access methods increase the complexity and difficulty of operation and maintenance. At the same time, excessive reliance on manufacturers for network maintenance not only affects the timeliness of maintenance, but also poses safety hazards, further pushing up the operation and maintenance investment and production costs of mine informatization. In addition, problems such as inaccurate fault location, insufficient visualization, and lack of professional talents have also seriously restricted the development and application of coal mine network system operation and maintenance management platform.
[0003] In response to the above problems, some information technology companies have conducted relevant research and development, and proposed solutions such as topology visualization technology, active monitoring and alarm technology, and unified operation and maintenance platform technology. These technologies integrate network devices inside and outside the mine to form a clear topology map, which improves the efficiency of locating problematic equipment; by actively capturing the initial information of network devices, displaying the network status of the equipment, and promptly alarming when abnormalities are detected, the monitoring capability of the platform is enhanced; through a unified operation and maintenance platform based on cloud network data infrastructure, automated monitoring and management of cloud operation and maintenance of mining enterprises is realized. However, although these technologies have alleviated the pressure of operation and maintenance management to a certain extent, problems such as primitive equipment access methods, inaccurate fault location, and insufficient visualization have not been completely solved, and further optimization and improvement are still needed.
[0004] To sum up, how to solve the technical problems existing in the coal mine network system operation and maintenance management platform, such as primitive equipment access methods, inaccurate fault location and insufficient visualization, is an urgent problem to be solved. Summary of the invention
[0005] The main purpose of the present invention is to provide a coal mine equipment network operation and maintenance management system and method based on 3DMineGLS to solve the technical problems of primitive equipment access mode, inaccurate fault location and insufficient visualization existing in the coal mine network system operation and maintenance management platform, thereby improving the efficiency, accuracy and safety of coal mine network system operation and maintenance management, reducing operation and maintenance costs and difficulty, and promoting the in-depth development of coal mine informatization process.
[0006] In order to achieve the above objectives, the present invention provides a coal mine equipment network operation and maintenance management system and method based on 3DMineGIS.
[0007] In a first aspect, the present invention provides a coal mine equipment network operation and maintenance management system based on 3DMineGIS, the system comprising:
[0008] A data access module, the data access module is connected to the coal mine equipment data collector, the data access module is used to access the basic information collected by the coal mine equipment data collector to the operation and maintenance management system, the basic information is used to indicate the basic information of the network equipment, sensors, industrial televisions, electronic fences and UPS underground and above the well;
[0009] A network topology visualization module, the network topology visualization module is connected to the data access module, the network topology visualization module is used to receive the basic information provided by the data access module, and use 3DMineGIS technology and digital twin technology to visualize the network topology structure of the coal mine equipment in a three-dimensional form;
[0010] An equipment status monitoring module, the equipment status monitoring module is connected to the network topology visualization module, the equipment status monitoring module is used to monitor the operating status of the coal mine equipment in real time, and feed the operating status back to the network topology visualization module for display, wherein the operating status is used to indicate the online status and performance parameter information of the coal mine equipment;
[0011] A flow monitoring and analysis module, the flow monitoring and analysis module is connected to the data access module, and is used to monitor the flow data of the coal mine equipment in real time during operation, and to display the flow of the flow through three-dimensional visualization technology, while supporting the collection and analysis of historical flow data, wherein the flow data is used to indicate the real-time flow size and flow rate of the coal mine equipment;
[0012] An alarm and fault recording module, wherein the alarm and fault recording module is connected to the equipment status monitoring module and the flow monitoring and analysis module. The alarm and fault recording module is used to promptly trigger an alarm notification when a fault or flow abnormality is detected in the coal mine equipment, and record the alarm information, fault information and flow abnormality data in the operation and maintenance management system for subsequent query and analysis by the operation and maintenance personnel.
[0013] Optionally, the network topology visualization module includes a three-dimensional space path planning unit, and the three-dimensional space path planning unit is used to view the network layout and topology structure of the coal mine equipment in three-dimensional space and plan the transmission path of the basic information.
[0014] Optionally, the system also includes an optimization suggestion module, which is connected to the traffic monitoring and analysis module. The optimization suggestion module is used to monitor and analyze the network performance of the coal mine equipment based on the traffic data, and provide network configuration adjustment and traffic control strategy optimization measures for the coal mine equipment.
[0015] Optionally, the system also includes a three-dimensional data analysis and decision support module, which is connected to the data access module, the equipment status monitoring module and the flow monitoring and analysis module. The three-dimensional data analysis and decision support module is used to analyze and evaluate the operating data of the coal mine equipment to provide data support for decision-making.
[0016] Optionally, the system also includes a three-dimensional scene roaming and interaction module, which is connected to the network topology visualization module and is used to allow the user to roam and interact in the three-dimensional scene of the coal mine equipment.
[0017] In a second aspect, the present invention provides a coal mine equipment network operation and maintenance management method based on 3DMineG1S, the method is applied to the coal mine equipment network operation and maintenance management system based on 3DMineG1S described in the first aspect, the operation and maintenance management method comprises:
[0018] The basic information collected by the coal mine equipment data collector is connected to the operation and maintenance management system, and the basic information is used to indicate the basic information of the network equipment, sensors, industrial televisions, electronic fences and UPS underground and above the well;
[0019] Receive the basic information, and use 3DMineGIS technology and digital twin technology to visualize the network topology of the coal mine equipment in three-dimensional form;
[0020] Monitor the operating status of the coal mine equipment in real time, and feed back the operating status to the network topology visualization module for display, wherein the operating status is used to indicate the online status and performance parameter information of the coal mine equipment;
[0021] Monitor the flow data of the coal mine equipment in real time during operation, and display the flow of the flow through three-dimensional visualization technology, while supporting the collection and analysis of historical flow data, wherein the flow data is used to indicate the real-time flow size and flow rate of the coal mine equipment;
[0022] When a failure or abnormal flow of the coal mine equipment is detected, an alarm notification is triggered in time, and the alarm information, failure information and abnormal flow data are recorded in the operation and maintenance management system for subsequent query and analysis by the operation and maintenance personnel.
[0023] Optionally, after receiving the basic information and using 3DMineGIS technology and digital twin technology to visualize the network topology structure of the coal mine equipment in three-dimensional form, it also includes: viewing the network layout and topology structure of the coal mine equipment in three-dimensional space through a three-dimensional space path planning unit, and planning the transmission path of the basic information.
[0024] Optionally, after real-time monitoring of the flow data of the coal mine equipment during operation and displaying the flow of traffic through three-dimensional visualization technology, while supporting the collection and analysis of historical flow data, it also includes: based on the flow data, monitoring and analyzing the network performance of the coal mine equipment through an optimization suggestion module, and providing network configuration adjustment and flow control strategy optimization measures for the coal mine equipment.
[0025] The present application provides a coal mine equipment network operation and maintenance management system and method based on 3DMineGIS, which includes a data access module, a network topology visualization module, an equipment status monitoring module, a flow monitoring and analysis module, and an alarm and fault recording module. The data access module is responsible for collecting basic information of coal mine equipment and accessing it to the operation and maintenance management system. The network topology visualization module uses 3DMineGIS technology and digital twin technology to display the network topology structure of coal mine equipment in three-dimensional form. The equipment status monitoring module monitors the operating status of the equipment in real time and feeds back to the network topology visualization module for display. The flow monitoring and analysis module monitors the flow data of the equipment in real time, and displays the flow flow through three-dimensional visualization technology, while supporting historical data analysis. The alarm and fault recording module triggers an alarm when the equipment fails or the flow is abnormal, and records relevant information for subsequent query and analysis. It solves the technical problems of primitive equipment access mode, inaccurate fault location and insufficient visualization in the coal mine network system operation and maintenance management platform, improves the efficiency of coal mine network system operation and maintenance management, and reduces the operation and maintenance cost and difficulty. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0027] Figure 1 A schematic diagram of a coal mine equipment network operation and maintenance management system based on 3DMineGIS provided in this application;
[0028] Figure 2 A flow chart of the coal mine equipment network operation and maintenance management method based on 3DMineGlS provided in this application.
[0029] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0031] The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of the present invention and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in sequences other than those illustrated or described herein.
[0032] In the present invention, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in this application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.
[0033] The present application provides a coal mine equipment network operation and maintenance management system and method based on 3DMineGIS, which includes data access, network topology visualization, equipment status monitoring, flow monitoring and analysis, and alarm and fault recording modules. The system collects basic equipment information through the data access module and uses 3DMineGIS and digital twin technology to achieve three-dimensional visualization of network topology. At the same time, it monitors the equipment status and flow data in real time, and triggers alarms and records information in the event of a fault or anomaly. It solves the technical problems of primitive equipment access methods, inaccurate fault location, and insufficient visualization in the coal mine network system operation and maintenance management platform, improves the efficiency of coal mine network system operation and maintenance management, and reduces the cost and difficulty of operation and maintenance.
[0034] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.
[0035] Figure 1 A schematic diagram of a coal mine equipment network operation and maintenance management system based on 3DMineGIS provided in this application is shown in FIG. Figure 1 As shown, the coal mine equipment network operation and maintenance management system based on 3DMineGIS provided in this embodiment includes:
[0036] A data access module, the data access module is connected to the coal mine equipment data collector, the data access module is used to access the basic information collected by the coal mine equipment data collector to the operation and maintenance management system, the basic information is used to indicate the basic information of the network equipment, sensors, industrial televisions, electronic fences and UPS underground and above the well;
[0037] A network topology visualization module, the network topology visualization module is connected to the data access module, the network topology visualization module is used to receive the basic information provided by the data access module, and use 3DMineGIS technology and digital twin technology to visualize the network topology structure of the coal mine equipment in a three-dimensional form;
[0038] An equipment status monitoring module, the equipment status monitoring module is connected to the network topology visualization module, the equipment status monitoring module is used to monitor the operating status of the coal mine equipment in real time, and feed the operating status back to the network topology visualization module for display, wherein the operating status is used to indicate the online status and performance parameter information of the coal mine equipment;
[0039] A flow monitoring and analysis module, the flow monitoring and analysis module is connected to the data access module, and is used to monitor the flow data of the coal mine equipment in real time during operation, and to display the flow of the flow through three-dimensional visualization technology, while supporting the collection and analysis of historical flow data, wherein the flow data is used to indicate the real-time flow size and flow rate of the coal mine equipment;
[0040] An alarm and fault recording module, wherein the alarm and fault recording module is connected to the equipment status monitoring module and the flow monitoring and analysis module. The alarm and fault recording module is used to promptly trigger an alarm notification when a fault or flow abnormality is detected in the coal mine equipment, and record the alarm information, fault information and flow abnormality data in the operation and maintenance management system for subsequent query and analysis by the operation and maintenance personnel.
[0041] Optionally, the network topology visualization module includes a three-dimensional space path planning unit, and the three-dimensional space path planning unit is used to view the network layout and topology structure of the coal mine equipment in three-dimensional space and plan the transmission path of the basic information.
[0042] Optionally, the system also includes an optimization suggestion module, which is connected to the traffic monitoring and analysis module. The optimization suggestion module is used to monitor and analyze the network performance of the coal mine equipment based on the traffic data, and provide network configuration adjustment and traffic control strategy optimization measures for the coal mine equipment.
[0043] Optionally, the system also includes a three-dimensional data analysis and decision support module, which is connected to the data access module, the equipment status monitoring module and the flow monitoring and analysis module. The three-dimensional data analysis and decision support module is used to analyze and evaluate the operating data of the coal mine equipment to provide data support for decision-making.
[0044] Optionally, the system also includes a three-dimensional scene roaming and interaction module, which is connected to the network topology visualization module and is used to allow the user to roam and interact in the three-dimensional scene of the coal mine equipment.
[0045] The following is a detailed description of the specific implementation methods of each functional module of the system.
[0046] 1. System Architecture
[0047] The coal mine equipment network operation and maintenance management system of the embodiment of the present invention includes a data access module, a network topology visualization module, an equipment status monitoring module, a flow monitoring and analysis module, an alarm and fault recording module, and an optional optimization suggestion module, a three-dimensional data analysis and decision support module, and a three-dimensional scene roaming and interaction module. The modules are connected directly or indirectly to realize information transmission and interaction.
[0048] 2. Functional Module Implementation
[0049] Data access module:
[0050] The data access module is directly connected to the coal mine equipment data collector, responsible for receiving and processing the basic information uploaded by the collector about the network equipment, sensors, industrial televisions, electronic fences and UPS in the mine and above the mine. This information is transmitted to the data access module by wired or wireless means, and the module performs data analysis, format conversion and verification to ensure the accuracy and integrity of the data. The processed data is stored in the system database for other modules to call.
[0051] Network topology visualization module:
[0052] The network topology visualization module obtains basic information from the data access module and uses 3DMineGIS technology and digital twin technology to build a three-dimensional network topology structure for coal mine equipment. This module includes a three-dimensional space path planning unit, which allows users to view the network layout and topology structure in three-dimensional space and plan the transmission path of basic information as needed. Through the intuitive three-dimensional visualization interface, users can clearly understand the connection relationship, location distribution and flow of network traffic of network devices.
[0053] Equipment status monitoring module:
[0054] The equipment status monitoring module is connected to the network topology visualization module, and monitors the operating status of coal mine equipment by reading the equipment status data in the system database in real time. These status data include the online status and performance parameters of the equipment. The module feeds this information back to the network topology visualization module for display, so that users can intuitively understand the real-time status of the equipment.
[0055] Traffic monitoring and analysis module:
[0056] The traffic monitoring and analysis module obtains real-time traffic data from the data access module, including the real-time traffic size and velocity of coal mine equipment. The module displays the flow of traffic through 3D visualization technology, allowing users to intuitively see the distribution and changes of network traffic. At the same time, the module also supports the collection and analysis of historical traffic data, generates traffic analysis reports, and provides data support for network optimization and troubleshooting.
[0057] Alarm and fault recording module:
[0058] The alarm and fault recording module is connected to the equipment status monitoring module and the flow monitoring and analysis module. When a fault or abnormal flow is detected in the coal mine equipment, the module will trigger an alarm notification in time and record the alarm information, fault information and abnormal flow data into the system database. This information can be used for subsequent query and analysis by operation and maintenance personnel to help quickly locate and solve problems.
[0059] Optimization suggestion module (optional):
[0060] The optimization suggestion module is connected to the traffic monitoring and analysis module to monitor and analyze the network performance of coal mine equipment based on traffic data. The module uses algorithms and models to evaluate network performance and provides network configuration adjustments and traffic control strategy optimization measures based on the evaluation results. These suggestions are presented to users in an intuitive and easy-to-understand way to help users optimize network performance.
[0061] 3D data analysis and decision support module (optional):
[0062] The three-dimensional data analysis and decision support module is connected to the data access module, equipment status monitoring module and flow monitoring and analysis module to analyze and evaluate the operation data of coal mine equipment. The module provides a wealth of data analysis tools and methods to help users gain an in-depth understanding of the operation status and performance bottlenecks of the network system and provide data support for decision-making.
[0063] 3D scene roaming and interaction module (optional):
[0064] The 3D scene roaming and interaction module is connected to the network topology visualization module, allowing users to roam and interact in the 3D scene of coal mine equipment. Users can control the movement and rotation of the view through the mouse or keyboard to view the detailed information and status of network devices. At the same time, the module also supports the interaction between users and network devices, such as clicking on the device to view detailed information, dragging the device to adjust the position, etc., which improves the interactivity and user experience of the system.
[0065] 3. Connection method and data interaction
[0066] The connection mode and data interaction between modules are realized through the data bus or API interface inside the system. The data bus is responsible for transmitting data between modules to ensure the real-time and accuracy of data. The API interface provides a data interaction interface between modules, allowing modules to request and respond to data.
[0067] In summary, the coal mine equipment network operation and maintenance management system based on 3DMineGlS of the embodiment of the present invention realizes efficient and intelligent operation and maintenance management of the coal mine equipment network by integrating multiple functional modules. The connection mode and data interaction between the modules are clear and unambiguous, ensuring the stability and reliability of the system. The technical personnel can implement the invention content according to the above implementation mode to realize comprehensive monitoring and management of the coal mine equipment network. The technical problems of primitive equipment access mode, inaccurate fault location and insufficient visualization in the coal mine network system operation and maintenance management platform are solved, the efficiency of coal mine network system operation and maintenance management is improved, and the operation and maintenance cost and difficulty are reduced.
[0068] Figure 2 The flowchart of the coal mine equipment network operation and maintenance management method based on 3DMineGlS provided in this application is described in detail, such as Figure 2 As shown, the coal mine equipment network operation and maintenance management method based on 3DMineGIS provided in this embodiment includes:
[0069] S201: Connecting the basic information collected by the coal mine equipment data collector to the operation and maintenance management system.
[0070] The basic information is used to indicate the basic information of network equipment, sensors, industrial televisions, electronic fences and UPS underground and above the well.
[0071] The following is a specific implementation method for step S201 "connecting the basic information collected by the coal mine equipment data collector to the operation and maintenance management system".
[0072] In this embodiment, the coal mine equipment data collector is deployed at various key locations in the coal mine to collect real-time basic information such as network equipment, sensors, industrial televisions, electronic fences, and uninterruptible power supplies (UPS) underground and above the mine. This information includes but is not limited to the model, serial number, installation location, working status, performance parameters, etc. of the equipment.
[0073] The implementation details are as follows:
[0074] Data collector configuration: The data collector needs to be configured first to ensure that it can correctly collect the required basic information. This includes setting the collection frequency, data type, data format, etc.
[0075] After the configuration is completed, the data collector begins to collect basic information of coal mine equipment in real time.
[0076] Data transmission: The collected basic information is transmitted to the data access module of the operation and maintenance management system via wired or wireless methods. Wired methods may include Ethernet, optical fiber, etc., and wireless methods may include Wi-Fi, 4G / 5G and other communication technologies.
[0077] In order to ensure the accuracy and integrity of data, data compression, encryption and other technologies may be used during the transmission process.
[0078] Data access module processing: After receiving the basic information, the data access module first performs data analysis and format conversion to ensure that the data is compatible with other modules of the operation and maintenance management system.
[0079] The parsed data is stored in the system database for subsequent module calls and analysis.
[0080] Data verification and validation: During the data access process, data verification and validation may also be performed to ensure the accuracy and reliability of the data. This may include data integrity verification, data range verification, etc.
[0081] If data anomalies or errors are found, the system will issue an alarm or prompt so that the operation and maintenance personnel can handle it in time.
[0082] Basic information display: Although step S201 mainly focuses on the data access process, the basic information after access will be used by subsequent network topology visualization modules, device status monitoring modules, etc.
[0083] In particular, the network topology visualization module will use this information to construct the three-dimensional network topology structure of coal mine equipment, providing an intuitive visual display for operation and maintenance personnel.
[0084] Technical details and algorithms:
[0085] During data transmission, existing data compression algorithms (such as Huffman coding, LZW algorithm, etc.) are used to reduce the amount of data and improve transmission efficiency.
[0086] Data encryption technology (such as AES, RSA, etc.) is used to protect the security of data transmission.
[0087] Data checksum verification uses CRC (cyclic redundancy check) or hash algorithms such as MD5 to ensure data integrity.
[0088] In summary, step S201 of the embodiment of the present invention realizes the process of connecting the basic information collected by the coal mine equipment data collector to the operation and maintenance management system through the steps of configuring the data collector, transmitting basic information, data access module processing, data verification and validation, etc. These basic information provide important data support for subsequent network topology visualization, equipment status monitoring and flow monitoring.
[0089] S202: Receive the basic information, and use 3DMineGIS technology and digital twin technology to visualize the network topology structure of the coal mine equipment in three-dimensional form.
[0090] The following is a specific implementation method for step S202 "receiving the basic information, and using 3DMineGIS technology and digital twin technology to visualize the network topology structure of the coal mine equipment in three-dimensional form."
[0091] Receiving basic information: The operation and maintenance management system first receives basic information from the coal mine equipment data collector. This information includes detailed parameters and location information of underground and above-ground network equipment, sensors, industrial televisions, electronic fences and UPS.
[0092] The system performs preliminary processing on this information to ensure the accuracy and completeness of the data.
[0093] Utilize 3DMineGIS technology to construct 3D model: 3DMineGIS technology is a 3D modeling and visualization technology specially used for Geographic Information System (GIS). In this embodiment, this technology is used to construct a 3D model of coal mine equipment network.
[0094] The system creates a corresponding equipment model in three-dimensional space based on parameters such as equipment position, size, and shape in the basic information.
[0095] By adjusting the transparency, color and other properties of the model, the connection relationship and spatial layout between devices can be clearly displayed.
[0096] Application of digital twin technology: Digital twin technology is a technology that simulates the operating status and performance of a physical entity by building a virtual copy of it. In this embodiment, this technology is used to enhance the realism and interactivity of the 3D model.
[0097] The system associates the real-time operating status of each device (such as online / offline, performance parameters, etc.) with the corresponding device in the 3D model.
[0098] When the operating status of the equipment changes, the corresponding equipment in the 3D model will also update its display status in real time, thereby realizing real-time monitoring and visual display of the equipment status.
[0099] 3D visualization display: The system uses professional 3D visualization engines (such as Unity, Unreal Engine, etc.) to render and display 3D models.
[0100] Users can interact with the 3D model through devices such as mouse, keyboard or touch screen, such as rotation, zooming, translation and other operations, to gain a more comprehensive understanding of the network topology of coal mine equipment.
[0101] In addition, the system can also provide multiple view modes (such as top view, side view, perspective view, etc.) to meet the needs and preferences of different users.
[0102] Optimization and verification: In the process of building and displaying 3D models, the system may encounter performance bottlenecks or visual problems. Therefore, the model needs to be optimized and adjusted to ensure its smoothness and accuracy.
[0103] This may include reducing the complexity of the model, optimizing the rendering algorithm, adjusting lighting and shadow effects, etc.
[0104] At the same time, the system also needs to be verified and tested to ensure that the 3D model can accurately reflect the network topology and operating status of coal mine equipment.
[0105] Technical details and algorithms:
[0106] When constructing a three-dimensional model, the system uses data structures such as polygonal meshes (Mesh) or voxels (Voxel) to represent the shape and volume of the device.
[0107] When rendering a three-dimensional model, the system uses algorithms such as ray tracing or global illumination to simulate the propagation and reflection effects of light.
[0108] In order to achieve real-time update and interactive functions, the system uses event-driven or data binding technologies to synchronize the real-time status of the device with the display status in the 3D model.
[0109] In summary, step S202 of the embodiment of the present invention realizes an intuitive and visual display of the network topology of coal mine equipment by receiving basic information, using 3DMineGIS technology and digital twin technology to build and display a three-dimensional model. This provides users with a more comprehensive and in-depth means of understanding the equipment status and operating status, which helps to improve the efficiency and accuracy of operation and maintenance management.
[0110] Optionally, after receiving the basic information and using 3DMineGIS technology and digital twin technology to visualize the network topology structure of the coal mine equipment in three-dimensional form, it also includes: viewing the network layout and topology structure of the coal mine equipment in three-dimensional space through a three-dimensional space path planning unit, and planning the transmission path of the basic information.
[0111] After completing the steps of receiving basic information and visually displaying the network topology of coal mine equipment in three-dimensional form using 3DMineGIS technology and digital twin technology, the embodiment of the present invention also includes an optional subsequent step, namely, viewing the network layout and topology of coal mine equipment in three-dimensional space through a three-dimensional space path planning unit, and planning the transmission path of basic information.
[0112] The following are the specific implementation details of this step:
[0113] 1. 3D space viewing and analysis
[0114] Tools used: The system integrates 3D space viewing tools, such as the built-in navigation function of Unity or Unreal Engine, allowing users to freely move and rotate the perspective in a 3D environment through a mouse, keyboard or virtual reality device (such as a VR helmet) to comprehensively view the network layout and topology of coal mine equipment.
[0115] Interactive operation: Users can observe the specific location, connection method and surrounding physical environment of each device in detail by clicking, dragging and zooming. The system provides labeling and annotation functions to help users quickly identify and understand the function and status of the device.
[0116] 2. Path planning unit integration
[0117] Algorithm selection: For path planning, the system integrates the A (A-star) algorithm, which is a widely used heuristic search algorithm, especially suitable for finding the shortest path in a graph. The A algorithm combines the efficiency of the Dijkstra algorithm with the goal-oriented nature of breadth-first search, and can quickly find the optimal path in a complex three-dimensional environment.
[0118] Path planning process:
[0119] Input data: The path planning unit receives data from the 3D model, including the location coordinates of the device, connection relationships, and any obstacle information that may affect path planning.
[0120] Build a graph structure: Abstract the device network in three-dimensional space into a graph structure, where nodes represent devices and edges represent connections or possible transmission channels between devices.
[0121] Apply the A* algorithm: Run the A* algorithm on the constructed graph structure to find the shortest path from the source device to the target device. The algorithm takes into account the length of the path, obstacles, and possible priority factors (such as the reliability or bandwidth requirements of the path). Among them, the A* algorithm is a heuristic search algorithm, which was first proposed in the paper "A Formal Basis for the Heuristic Determination of Minimum Cost Paths" in 1964 in IEEE Transactions on Systems Science and Cybernetics. It combines the advantages of the greedy algorithm (depth first) and the Dijkstra algorithm (breadth first), and is a most effective direct search method for solving the shortest path in a static road network.
[0122] Output path: The algorithm outputs the optimal path, which is represented by three-dimensional coordinate points and can be directly visualized in the three-dimensional model.
[0123] 3. Path verification and optimization
[0124] Path verification: The system verifies the planned path to ensure that the path is feasible in the actual environment, does not encounter insurmountable obstacles, and meets the transmission performance requirements.
[0125] Path optimization: If the path planning result does not meet expectations (such as the path is too long or there are too many detours), the system provides a path optimization function to find a better solution by adjusting algorithm parameters or introducing additional constraints.
[0126] 4. Visualization and interaction
[0127] Path visualization: The planned paths are displayed in the 3D model in a highlighted or color-coded manner, helping users to intuitively understand the information transmission path and possible bottlenecks.
[0128] Interactive feedback: Users can click on nodes or edges on the path to obtain detailed path information, such as path length, estimated transmission time, device status on the path, etc. The system also provides editing functions, allowing users to manually adjust the path or add new path points.
[0129] In summary, the embodiment of the present invention further provides a path planning function based on the three-dimensional visualization display by integrating a three-dimensional space path planning unit, providing users with a more comprehensive and in-depth network management and optimization means. This helps to improve the operation and maintenance efficiency of coal mine equipment, reduce the delay and failure rate of information transmission, and thus ensure the safe and efficient operation of coal mine production.
[0130] S203: monitor the operating status of the coal mine equipment in real time, and feed back the operating status to the network topology visualization module for display.
[0131] The operating status is used to indicate the online status and performance parameter information of the coal mine equipment.
[0132] The following is a specific implementation method for step S203 "monitoring the operating status of the coal mine equipment in real time, and feeding back the operating status to the network topology visualization module for display, wherein the operating status is used to indicate the online status and performance parameter information of the coal mine equipment".
[0133] Data collection and preprocessing: The coal mine equipment data collector continuously collects the operating status data of underground and surface equipment, including but not limited to the equipment's online status, operating voltage, current, temperature, humidity, vibration and other performance parameters.
[0134] The collected data is transmitted to the data receiving module of the operation and maintenance management system via wired or wireless means, and preliminary data cleaning and format conversion are performed to ensure the accuracy and consistency of the data.
[0135] Real-time monitoring module: The operation and maintenance management system includes a real-time monitoring module, which is responsible for receiving and processing the operation status data from the data collector.
[0136] The real-time monitoring module uses efficient data processing algorithms (such as data stream processing algorithms, event-driven models, etc.) to analyze and process the received data in real time to extract the online status and performance parameter information of the equipment.
[0137] Status feedback and visualization: The real-time monitoring module feeds back the processed operation status data to the network topology visualization module.
[0138] The network topology visualization module dynamically updates the device status icons or colors in the three-dimensional network topology structure based on the received data to intuitively display the online status and performance parameter information of the device.
[0139] For example, when a device is online, its corresponding icon or color may be displayed as green; when a device fails or has performance abnormalities, it may be displayed as red or yellow with corresponding alarm information.
[0140] Performance parameter display: In addition to the online status of the device, the network topology visualization module can also display the performance parameter information of the device.
[0141] This can be achieved by embedding data labels, charts or dashboards in the 3D model so that operation and maintenance personnel can intuitively understand the performance status of the equipment.
[0142] Performance parameter information may include the real-time operating voltage, current, temperature, etc. of the equipment, as well as the historical change trends and threshold alarm information of these parameters.
[0143] Alarm and Notification: The real-time monitoring module is also responsible for detecting equipment failures or performance anomalies, and triggering alarm notifications in a timely manner when problems are detected.
[0144] Alarm notifications can be sent to operation and maintenance personnel through the system interface, SMS, email or sound, so that they can respond and handle the fault in a timely manner.
[0145] At the same time, alarm information, fault information and related operating status data will also be recorded in the operation and maintenance management system for subsequent query and analysis by operation and maintenance personnel.
[0146] Technical details and algorithms:
[0147] In the real-time monitoring module, the data stream processing algorithms used include Apache Flink, Apache Storm, etc. These algorithms can efficiently process real-time data streams and extract useful information.
[0148] The event-driven model is a programming model based on event triggering and response. It allows the system to perform corresponding operations according to the occurrence of events, thereby realizing real-time monitoring of device status.
[0149] In terms of performance parameter display, data visualization technologies that may be used include ECharts, D3.js, etc. These technologies can generate various types of data charts and dashboards to intuitively display the performance parameter information of the device.
[0150] In summary, step S203 of the embodiment of the present invention realizes intuitive monitoring and visual management of equipment status by real-time monitoring of the operating status of coal mine equipment and feeding back this information to the network topology visualization module for display. This helps operation and maintenance personnel to promptly discover and handle equipment failures or performance anomalies, thereby improving the efficiency and accuracy of coal mine equipment network operation and maintenance.
[0151] S204: Monitor the flow data of the coal mine equipment in real time during operation, and display the flow of the flow through three-dimensional visualization technology, while supporting the collection and analysis of historical flow data.
[0152] The flow data is used to indicate the real-time flow size and flow rate of the coal mine equipment.
[0153] The following is a specific implementation method for step S204 "real-time monitoring of the flow data of the coal mine equipment during operation, and displaying the flow of flow through three-dimensional visualization technology, while supporting the collection and analysis of historical flow data."
[0154] Data collection and preprocessing: The coal mine equipment data collector is equipped with a flow sensor to monitor the flow data of underground and surface equipment in real time, including real-time flow size and flow rate.
[0155] The collected traffic data is transmitted to the data receiving module of the operation and maintenance management system via wired or wireless means.
[0156] The data receiving module preprocesses the received traffic data, including data cleaning, format conversion and outlier detection, to ensure the accuracy and integrity of the data.
[0157] Real-time monitoring and visualization: The operation and maintenance management system includes a real-time monitoring module, which is responsible for receiving pre-processed traffic data and performing real-time analysis.
[0158] The real-time monitoring module uses efficient data processing algorithms (such as sliding window algorithm, Kalman filter algorithm, etc.) to smooth and predict the trend of traffic data in order to reduce noise interference and extract useful information.
[0159] At the same time, the real-time monitoring module sends the processed traffic data to the 3D visualization module.
[0160] The 3D visualization module uses 3DMineGIS technology and 3D rendering technology to visualize the flow data in 3D. Specifically, flow effects such as dynamic arrows and streamlines can be added to the 3D network topology to intuitively display the flow direction and size of the flow.
[0161] In addition, the 3D visualization module can also provide interactive functions, allowing operation and maintenance personnel to interact with the 3D model through devices such as mouse, keyboard or touch screen, such as zooming, rotating, panning and other operations, so as to have a more comprehensive understanding of the distribution of traffic data.
[0162] Historical data collection and analysis: The operation and maintenance management system also includes a historical data module for collecting, storing and analyzing historical traffic data.
[0163] The historical data module periodically obtains traffic data from the real-time monitoring module and stores it in the database.
[0164] Operation and maintenance personnel can query and analyze historical traffic data through the historical data module, such as generating statistical charts of traffic data, trend analysis, anomaly detection, etc.
[0165] By analyzing historical traffic data, operations and maintenance personnel can understand the traffic characteristics of the equipment, identify potential failure modes, and provide decision support for equipment maintenance and optimization.
[0166] Alarm and notification: The real-time monitoring module is also responsible for detecting abnormal conditions in flow data, such as sudden increases, decreases or abnormal fluctuations in flow.
[0167] When an abnormal situation is detected, the real-time monitoring module triggers an alarm notification in time and sends the alarm information to the operation and maintenance personnel.
[0168] Alarm notifications can be sent through the system interface, SMS, email or sound, so that operation and maintenance personnel can respond and handle abnormal traffic situations in a timely manner.
[0169] Technical details and algorithms:
[0170] The sliding window algorithm is a commonly used data processing algorithm, which is used to perform smoothing and trend prediction on time series data. In this embodiment, the sliding window algorithm can be used to reduce noise interference in flow data and extract the change trend of flow.
[0171] The Kalman filter algorithm is a recursive algorithm used to estimate the state of a linear dynamic system. In this embodiment, the Kalman filter algorithm can be used to filter the flow data to improve the accuracy and reliability of the data.
[0172] 3D rendering technology is a technology used to generate 3D images, including lighting models, texture mapping, shadow generation, etc. In this embodiment, 3D rendering technology is used to visualize traffic data in 3D form to intuitively display the flow and distribution characteristics of traffic.
[0173] In summary, step S204 of the embodiment of the present invention realizes intuitive monitoring and visual management of flow data by real-time monitoring of flow data of coal mine equipment and displaying and analyzing it using three-dimensional visualization technology. This helps operation and maintenance personnel to promptly discover and handle abnormal flow conditions, thereby improving the efficiency and accuracy of coal mine equipment network operation and maintenance.
[0174] Optionally, after real-time monitoring of the flow data of the coal mine equipment during operation and displaying the flow of traffic through three-dimensional visualization technology, while supporting the collection and analysis of historical flow data, it also includes: based on the flow data, monitoring and analyzing the network performance of the coal mine equipment through an optimization suggestion module, and providing network configuration adjustment and flow control strategy optimization measures for the coal mine equipment.
[0175] After completing the steps of real-time monitoring of the flow data of coal mine equipment, displaying the flow of flow through three-dimensional visualization technology, and supporting the collection and analysis of historical flow data, the embodiment of the present invention also includes an optional subsequent step, that is, monitoring and analyzing the network performance of coal mine equipment through an optimization suggestion module based on the flow data, and providing network configuration adjustment and flow control strategy optimization measures for coal mine equipment. The following are the specific implementation details of this step:
[0176] 1. Traffic data monitoring and analysis
[0177] Monitoring module: The optimization suggestion module first receives the flow data from the real-time monitoring module, which includes the real-time flow size, flow rate and historical flow data of coal mine equipment.
[0178] Performance evaluation: Use specific performance evaluation algorithms (such as network throughput evaluation algorithm, delay evaluation algorithm, etc.) to conduct in-depth analysis of the received traffic data to evaluate the network performance of coal mine equipment. These algorithms can calculate key performance indicators such as network throughput, delay, jitter, etc. based on traffic data.
[0179] Anomaly detection: By comparing real-time traffic data with historical traffic data, anomaly detection algorithms (such as statistical anomaly detection algorithms, machine learning-based anomaly detection algorithms, etc.) are used to identify abnormal changes in traffic data, such as sudden traffic surges, sustained low traffic conditions, or significant changes in traffic patterns.
[0180] 2. Network configuration adjustment suggestions
[0181] Configuration analysis: Based on the results of performance evaluation and anomaly detection, the optimization suggestion module analyzes the current network configuration and identifies configuration issues that may cause performance bottlenecks or anomalies.
[0182] Adjustment suggestions: Based on the analysis results, the optimization suggestion module generates specific network configuration adjustment suggestions, such as adjusting the device's IP address, subnet mask, gateway and other network parameters, optimizing routing strategies, adjusting the bandwidth allocation of network devices, etc.
[0183] Implementation guidance: The optimization recommendation module also provides implementation guidance, detailing how to perform these configuration adjustments, including the required steps, tools, commands, etc., to ensure the safety and effectiveness of the adjustment process.
[0184] 3. Flow control strategy optimization
[0185] Policy analysis: Analyze current traffic control policies, such as traffic shaping, traffic classification, and traffic prioritization, and evaluate the effectiveness of these policies in controlling traffic and optimizing network performance.
[0186] Optimization measures: Based on the analysis results, the optimization suggestion module proposes optimization measures for the traffic control strategy, such as adjusting traffic shaping parameters to better match the network traffic pattern, optimizing traffic classification rules to improve the accuracy of traffic processing, and adjusting traffic priority settings to optimize the performance of key businesses.
[0187] Effect prediction: Use simulation tools or simulation algorithms (such as network simulation software OPNET, MATLAB, etc.) to simulate and test the optimized traffic control strategy to predict its effect in the actual network environment, including improvement in network throughput, reduction in latency, reduction in jitter, etc.
[0188] 4. Report and Feedback
[0189] Generate report: The optimization suggestion module integrates the above analysis results, adjustment suggestions, optimization measures, effect prediction and other information into a detailed report for reference by operation and maintenance personnel.
[0190] Feedback mechanism: Operation and maintenance personnel can implement network configuration adjustments and traffic control strategy optimization according to the recommendations in the report, and feedback the implementation results and optimization effects to the optimization suggestion module through the feedback mechanism. The optimization suggestion module can make further adjustments and optimizations based on these feedbacks to continuously improve network performance and traffic control capabilities.
[0191] In summary, the embodiment of the present invention monitors and analyzes the network performance of coal mine equipment according to traffic data by introducing an optimization suggestion module, and provides specific network configuration adjustment and traffic control strategy optimization measures. This helps operation and maintenance personnel to promptly discover and solve network performance problems, optimize network configuration and traffic control strategies, and thus improve the network operation and maintenance efficiency and accuracy of coal mine equipment.
[0192] S205: When a failure or flow abnormality is detected in the coal mine equipment, an alarm notification is triggered in time, and the alarm information, failure information and flow abnormality data are recorded in the operation and maintenance management system for subsequent query and analysis by the operation and maintenance personnel.
[0193] The following is a specific implementation method for step S205 "When a fault or flow abnormality is detected in the coal mine equipment, an alarm notification is triggered in a timely manner, and the alarm information, fault information and flow abnormality data are recorded in the operation and maintenance management system for subsequent query and analysis by the operation and maintenance personnel."
[0194] Fault and traffic anomaly detection: The operation and maintenance management system includes a fault detection module and a traffic anomaly detection module.
[0195] The fault detection module monitors the operating status data of coal mine equipment (such as operating voltage, current, temperature, vibration, etc.) in real time and compares it with the preset fault threshold. When the data exceeds the threshold, it is judged as an equipment failure.
[0196] The flow anomaly detection module monitors the flow data of coal mine equipment in real time (such as real-time flow size, flow rate, etc.), and compares and analyzes it with the preset flow threshold or historical flow data. When the data shows significant deviation or abnormal fluctuation, it is judged as flow anomaly.
[0197] Alarm notification triggering: Once the fault detection module or traffic anomaly detection module detects a problem, the system will immediately trigger an alarm notification.
[0198] Alarm notifications can be sent in a variety of ways, including but not limited to popping up an alarm window on the system interface, sending text messages or emails to the operation and maintenance personnel's mobile phones or mailboxes, and emitting sound or light signals, etc., to ensure that the operation and maintenance personnel can receive the alarm information in a timely manner.
[0199] Alarm information recording: The operation and maintenance management system includes an alarm recording module, which is used to record all triggered alarm information.
[0200] The alarm record module will record in detail the alarm time, alarm type (fault or flow abnormality), alarm device, alarm reason (such as specific fault type, flow abnormality description, etc.) and alarm status (such as processed, pending, etc.).
[0201] Fault and flow abnormality data recording: In addition to alarm information, the operation and maintenance management system will also record detailed data related to faults or flow abnormalities.
[0202] This includes the operating status data of faulty equipment, flow data of equipment with abnormal flow, and related log information.
[0203] These data will be stored in the database of the operation and maintenance management system for subsequent query and analysis by operation and maintenance personnel.
[0204] Subsequent query and analysis: Operation and maintenance personnel can quickly retrieve relevant alarm information and fault / flow anomaly data through the query interface of the operation and maintenance management system based on conditions such as alarm time, equipment type, and alarm type.
[0205] The operation and maintenance management system also provides data analysis functions, which can perform statistical analysis on historical alarm data and fault / flow anomaly data, such as generating fault distribution maps, flow anomaly trend maps, etc., to help operation and maintenance personnel identify fault modes and optimize operation and maintenance strategies.
[0206] Technical details:
[0207] In the process of fault and traffic anomaly detection, the system will use some existing algorithms or models to improve the accuracy and efficiency of detection. For example, for fault detection, the system may use machine learning algorithms (such as support vector machines, random forests, etc.) to train the equipment operation status data to establish a fault prediction model; for traffic anomaly detection, the system may use statistical methods (such as Z-score, IQR, etc.) or machine learning algorithms (such as isolation forests, clustering algorithms, etc.) to detect anomalies in traffic data.
[0208] The trigger mechanism of alarm notification will be customized according to the actual needs of the system and the preferences of the operation and maintenance personnel. For example, for different types of alarms (such as serious faults, minor faults, traffic anomalies, etc.), the system may set different alarm levels and notification methods to ensure that the operation and maintenance personnel can respond promptly according to the actual situation.
[0209] In summary, step S205 of the embodiment of the present invention realizes timely discovery, rapid response and effective management of faults and abnormalities in the operation and maintenance of coal mine equipment network through the detection of faults and abnormal flow, the triggering of alarm notifications, and the recording and analysis of alarm information and fault / abnormal flow data. This helps to improve the efficiency and accuracy of coal mine equipment network operation and maintenance, and reduce the impact of faults and abnormalities on coal mine production.
[0210] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.
[0211] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the invention disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the following claims.
[0212] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.
Claims
1. A coal mine equipment network operation and maintenance management system based on 3DMineGIS, characterized in that: The system comprises: A data access module, the data access module is connected to the coal mine equipment data collector, the data access module is used to access the basic information collected by the coal mine equipment data collector to the operation and maintenance management system, the basic information is used to indicate the basic information of the network equipment, sensors, industrial televisions, electronic fences and UPS underground and above the well; A network topology visualization module, the network topology visualization module is connected to the data access module, the network topology visualization module is used to receive the basic information provided by the data access module, and use 3DMineGIS technology and digital twin technology to visualize the network topology structure of the coal mine equipment in a three-dimensional form, the network topology visualization module includes a three-dimensional space path planning unit, the three-dimensional space path planning unit is used to view the network layout and topology structure of the coal mine equipment in three-dimensional space, and plan the transmission path of the basic information; An equipment status monitoring module, the equipment status monitoring module is connected to the network topology visualization module, the equipment status monitoring module is used to monitor the operating status of the coal mine equipment in real time, and feed the operating status back to the network topology visualization module for display, wherein the operating status is used to indicate the online status and performance parameter information of the coal mine equipment; A flow monitoring and analysis module, the flow monitoring and analysis module is connected to the data access module, and is used to monitor the flow data of the coal mine equipment in real time during operation, and to display the flow of the flow through three-dimensional visualization technology, while supporting the collection and analysis of historical flow data, wherein the flow data is used to indicate the real-time flow size and flow rate of the coal mine equipment; An alarm and fault recording module, wherein the alarm and fault recording module is connected to the equipment status monitoring module and the flow monitoring and analysis module. The alarm and fault recording module is used to promptly trigger an alarm notification when a fault or flow abnormality is detected in the coal mine equipment, and record the alarm information, fault information and flow abnormality data in the operation and maintenance management system for subsequent query and analysis by the operation and maintenance personnel.
2. The system according to claim 1, characterized in that The system also includes an optimization suggestion module, which is connected to the traffic monitoring and analysis module. The optimization suggestion module is used to monitor and analyze the network performance of the coal mine equipment based on the traffic data, and provide network configuration adjustment and traffic control strategy optimization measures for the coal mine equipment.
3. The system according to claim 1, characterized in that The system also includes a three-dimensional data analysis and decision support module, which is connected to the data access module, the equipment status monitoring module and the flow monitoring and analysis module. The three-dimensional data analysis and decision support module is used to analyze and evaluate the operating data of the coal mine equipment to provide data support for decision-making.
4. The system according to claim 1, characterized in that The system also includes a three-dimensional scene roaming and interaction module, which is connected to the network topology visualization module and is used to allow a user to roam and interact in the three-dimensional scene of the coal mine equipment.
5. A coal mine equipment network operation and maintenance management method based on 3DMineGIS, characterized in that: The operation and maintenance management method is applied to the operation and maintenance management system according to any one of claims 1 to 4, and the operation and maintenance management method includes: The basic information collected by the coal mine equipment data collector is connected to the operation and maintenance management system, and the basic information is used to indicate the basic information of the network equipment, sensors, industrial televisions, electronic fences and UPS underground and above the well; Receive the basic information, and use 3DMineGIS technology and digital twin technology to visualize the network topology of the coal mine equipment in three-dimensional form; Monitor the operating status of the coal mine equipment in real time, and feed back the operating status to the network topology visualization module for display, wherein the operating status is used to indicate the online status and performance parameter information of the coal mine equipment; Monitor the flow data of the coal mine equipment in real time during operation, and display the flow of the flow through three-dimensional visualization technology, while supporting the collection and analysis of historical flow data, wherein the flow data is used to indicate the real-time flow size and flow rate of the coal mine equipment; When a failure or abnormal flow of the coal mine equipment is detected, an alarm notification is triggered in time, and the alarm information, failure information and abnormal flow data are recorded in the operation and maintenance management system for subsequent query and analysis by the operation and maintenance personnel.
6. The method according to claim 5, characterized in that After receiving the basic information and using 3DMineGIS technology and digital twin technology to visualize the network topology structure of the coal mine equipment in three-dimensional form, it also includes: viewing the network layout and topology structure of the coal mine equipment in three-dimensional space through a three-dimensional space path planning unit, and planning the transmission path of the basic information.
7. The method according to claim 5, characterized in that After real-time monitoring of the flow data of the coal mine equipment during operation, displaying the flow of traffic through three-dimensional visualization technology, and supporting the collection and analysis of historical flow data, it also includes: based on the flow data, monitoring and analyzing the network performance of the coal mine equipment through an optimization suggestion module, and providing network configuration adjustment and flow control strategy optimization measures for the coal mine equipment.
Citation Information
Cited By
Mine network operation and maintenance management system and method for coal mine development
CN120146530A
Mine network operation and maintenance management system and method for coal mine development
CN120146530B