Ecological paving system for greening road and percolation drainage method

By introducing multi-stage salt interception, infiltration, and collection treatment into the ecological paving system, the problems of excessive soil salt content, metal corrosion, and structural instability caused by salt accumulation have been solved, achieving a synergistic effect of salt control and infiltration drainage.

CN121344991APending Publication Date: 2026-01-16HANGZHOU LUSHUN ENVIRONMENTAL CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511539028.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-10-27
Publication Date
2026-01-16

AI Technical Summary

Technical Problem

In northern regions, the use of chloride-based de-icing agents in existing ecological paving systems during winter leads to excessive soil salinity, corrosion of metal connectors, and unstable road structures, affecting vegetation growth and traffic safety.

Method used

The system employs a de-icing agent salt interception component, a salt-resistant percolation component, and a salt buffer collection component, including a cation exchange resin filter plate, a modified sodium-based bentonite waterproof blanket, a salt-resistant modified sand and gravel layer, a porous collection pipe, and a slow-release neutralizing agent storage silo. It treats salt through multi-stage desalination, percolation, and collection.

Benefits of technology

It effectively blocks and removes salt, protects soil structure and vegetation, prevents corrosion of metal connectors, ensures road structure stability and infiltration and drainage functions, and avoids salt pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121344991A_ABST
    Figure CN121344991A_ABST
Patent Text Reader

Abstract

The invention discloses an ecological pavement system for a green road and a percolation drainage method, and relates to the technical field of ecological pavement systems of roads, the ecological pavement system comprises a permeable pavement layer, a salt-resistant percolation assembly and a roadbed, the ecological paving system for the greening road further comprises a snow-melting agent salt intercepting assembly, a salt-resistant percolation assembly and a salt buffering and collecting assembly. The metal connecting piece salt corrosion prevention assembly is arranged, a polytetrafluoroethylene corrosion prevention sleeve physically isolates direct contact between a salt-containing water body and the metal clamping piece, a fluororubber sealing ring strengthens sealing of the connecting position, and meanwhile a zinc alloy sacrificial anode protection block is corroded preferentially due to lower electrode potential; cathode protection is provided for the metal clamping piece through the conductive copper sheet; therefore, electrochemical corrosion of a salt-containing water body to the metal connecting piece can be prevented, the service life of the metal connecting piece is greatly prolonged, loosening and displacement of the paving module caused by rusting failure of the connecting piece are avoided, and the stability of a road structure and the traffic safety are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of ecological paving systems for roads, and particularly to ecological paving systems and infiltration and drainage methods for green roads. Background Technology

[0002] Ecological paving systems, as a key component of green roads, achieve rapid rainwater infiltration and purification through the synergistic design of permeable pavement layers and infiltration layers, effectively compensating for the ecological shortcomings of traditional hardened pavements. They are widely used in urban greenways, sidewalks, and scenic walkways. However, in snowy northern regions during winter, the large-scale application of chloride-based de-icing agents has become routine to ensure road safety. Salt-containing snowmelt seeps into the ecological paving system during the infiltration process, posing a serious challenge to the applicability of existing ecological paving systems in this scenario, and still exhibiting the following drawbacks: The core deficiency of existing ecological paving systems lies in their lack of ability to control salt content from de-icing agents, and related improvement solutions have significant limitations, specifically manifested in three aspects: Firstly, the infiltration layer has inherently insufficient salt resistance. Existing systems often use traditional materials such as ordinary sand and gravel, and cement-stabilized layers. These materials lack both salt-barrier structures and ion exchange or degradation capabilities, making them incapable of handling the high-salt environment created by snow-melting agents. Sodium, calcium, and other cations in the snow-melting water accumulate continuously within the infiltration layer, subsequently seeping into the soil below with rainwater. This leads to severely excessive levels of water-soluble salts in the soil, damaging soil aggregates, inhibiting microbial activity, causing soil compaction and fertility decline. Ultimately, this results in root dehydration and nutrient imbalance in roadside vegetation, causing it to wither and even die. Secondly, the corrosion protection design of the metal connectors is lacking. Permeable pavement modules are usually fixed in the permeable layer by metal connectors such as carbon steel. However, water with high salt concentration has strong conductivity and will cause continuous electrochemical corrosion to the metal connectors, accelerating the corrosion failure of the connectors, which in turn causes the pavement modules to loosen and shift, seriously affecting the stability of the road structure and traffic safety. Summary of the Invention

[0003] The purpose of this application is to provide an ecological paving system and infiltration drainage method for green roads, which can effectively solve the problems mentioned in the background art.

[0004] To achieve the above objectives, this application provides the following technical solution: an ecological paving system for green roads, comprising a permeable paving layer, a salt-resistant infiltration component, and a roadbed arranged sequentially from top to bottom; the ecological paving system for green roads also includes a snow-melting agent salt interception component, a salt-resistant infiltration component, and a salt buffer collection component. The de-icing agent salt interception component is disposed between the permeable pavement layer and the salt-resistant infiltration component; the salt-resistant infiltration component is disposed within the de-icing agent salt interception component; the salt buffer collection component is disposed at the bottom of the salt-resistant infiltration component; The de-icing agent salt interception component includes an upper cation exchange resin filter plate and a lower modified sodium bentonite waterproof blanket; the salt-resistant infiltration component includes a lower salt-resistant modified sand and gravel layer, an upper zeolite and humus mixed layer, and a first permeable geotextile between the two layers; the salt buffer collection component includes a porous collection pipe and a slow-release neutralizing agent storage bin, one end of the porous collection pipe is connected to the slow-release neutralizing agent storage bin; and the porous collection pipe is connected to the rainwater purification tank through a connecting pipe.

[0005] Preferably, adjacent cation exchange resin filter plates are spliced ​​together by a tenon and mortise structure, and polyurethane sealant is applied to the joints; the cation exchange resin filter plates are fixed by stainless steel pressure strips along the four sides, and the stainless steel pressure strips are connected to the permeable pavement base layer by expansion bolts.

[0006] Preferably, the modified sodium-based bentonite waterproof blanket is bonded to the lower surface of the cation exchange resin filter plate and laid using an overlapping method, with modified sodium-based bentonite powder sprinkled and compacted at the overlapping points. The modified sodium-based bentonite waterproof blanket is a four-layer structure consisting of a first nonwoven geotextile, a plastic flat yarn woven geotextile, a modified sodium-based bentonite layer, and a second nonwoven geotextile layer.

[0007] Preferably, the salt-resistant modified sand and gravel layer is a granite sand and gravel layer, and the surface of the granite sand and gravel is coated with a silane coupling agent and an epoxy resin composite coating; the granite sand and gravel particles in the salt-resistant modified sand and gravel layer are filled with quartz sand.

[0008] Preferably, the zeolite and humus mixture layer comprises clinoptilolite particles and well-rotted humus; the edge of the zeolite and humus mixture layer is connected to the soil of the vegetation planting strip on both sides of the road.

[0009] Preferably, the porous collection pipe is connected to the slow-release neutralizer storage silo via a metal connector anti-salt corrosion assembly; the metal connector anti-salt corrosion assembly includes at least one pair of metal clips, a polytetrafluoroethylene (PTFE) anti-corrosion sleeve, a fluororubber sealing ring, and a metal pressure ring; adjacent PTFE anti-corrosion sleeves are connected by metal clips, and a pair of metal clips form a cylindrical structure; the metal pressure ring is disposed at both ends of the metal clips; the fluororubber sealing ring is embedded at both ends of the PTFE anti-corrosion sleeve, and the metal pressure ring presses against the fluororubber sealing ring and is fixed to the end of the PTFE anti-corrosion sleeve.

[0010] Preferably, the metal connector anti-salt corrosion assembly further includes multiple zinc alloy sacrificial anode protection blocks, conductive copper sheets, and an insulating anti-corrosion layer; the multiple zinc alloy sacrificial anode protection blocks are evenly arranged along the circumference of the polytetrafluoroethylene anti-corrosion sleeve; one end of the conductive copper sheet is connected to the zinc alloy sacrificial anode protection block, and the other end is connected to the metal clip; the insulating anti-corrosion layer is wrapped around the conductive copper sheet.

[0011] Preferably, the outer wall of the porous collection pipe is fitted with a second permeable geotextile, and the bottom of the salt-resistant infiltration component is provided with a V-shaped groove that is embedded in the V-shaped groove, which is filled with gravel for fixation.

[0012] Preferably, the slow-release neutralizer storage silo is filled with slow-release calcium hydroxide particles, and the top of the slow-release neutralizer storage silo is provided with a sealed maintenance cover.

[0013] The infiltration and drainage method for the ecological paving system of green roads, using the aforementioned ecological paving system for green roads, specifically includes the following steps: Step 1: Water Infiltration and Multi-Stage Salt Interception: Rainwater or water containing de-icing agents falls onto the permeable pavement layer and infiltrates into the de-icing agent salt interception components; it first flows through the cation exchange resin filter plate, where the strongly acidic cation exchange resin in the filter plate achieves preliminary desalination through the displacement reaction of hydrogen ions with sodium and calcium ions in the de-icing agent; then it permeates into the modified sodium-based bentonite waterproof blanket, where the waterproof blanket expands upon contact with water to block the migration of residual salts, and at the same time, the positively charged polymer on its surface adsorbs salt anions, completing secondary desalination; Step 2: Salt-resistant infiltration and drainage of water: Water that has undergone multi-stage desalination infiltrates into the salt-resistant infiltration module. It first passes through a zeolite and humus mixture layer to adsorb residual salts and adjust the pH value. Then, it passes through the first permeable geotextile and enters the salt-resistant modified sand and gravel layer. Normal drainage is achieved through the gaps between the sand and gravel particles, ensuring the infiltration function of the system. Step 3: Residual Salt Buffer Collection and Neutralization: The high-concentration salt solution deposited at the bottom of the salt-resistant modified sand and gravel layer is collected through a porous collection pipe and flows through a slow-release neutralizing agent storage silo to neutralize the salt. Finally, it is discharged into the rainwater purification pond through a connecting pipe.

[0014] In summary, the technical effects and advantages of this invention are as follows: 1. This invention incorporates a de-icing agent salt interception component. The upper cation exchange resin filter plate utilizes a highly acidic cation exchange resin to achieve initial desalination through a displacement reaction between hydrogen ions and sodium and calcium ions in the de-icing agent. The lower modified sodium-based bentonite waterproof blanket swells upon contact with water, blocking the migration of residual salts, and its positively charged polymer adsorbs salt anions, completing secondary desalination. This multi-stage desalination mechanism effectively solves the core problem of salt accumulation caused by the lack of salt barrier or degradation function in the infiltration layer of ecological paving systems. It prevents salt from infiltrating with rainwater, damaging soil aggregate structure, and reducing soil fertility. This also prevents damage to the roots and withering of roadside vegetation. Furthermore, it eliminates the need for an impermeable layer, ensuring the infiltration and drainage function of the ecological paving and mitigating the risk of road flooding.

[0015] 2. This invention incorporates a salt corrosion resistant component for the metal connectors. A PTFE (polytetrafluoroethylene) anti-corrosion sleeve physically isolates the metal connectors from direct contact with saline water. A fluororubber sealing ring strengthens the seal at the connection. Simultaneously, the zinc alloy sacrificial anode protection block, due to its lower electrode potential, preferentially corrodes, while a conductive copper sheet provides cathodic protection for the metal connectors. This prevents electrochemical corrosion of the metal connectors by saline water, significantly extending their service life and avoiding loosening and displacement of the pavement modules caused by connector corrosion failure, thus ensuring the stability of the road structure and traffic safety.

[0016] 3. This invention utilizes a salt-resistant infiltration component. The upper zeolite and humus mixture layer uses the porous structure of clinoptilolite particles to adsorb residual salts, while the decomposed humus regulates the pH of the water. The lower salt-resistant modified sand and gravel layer has a granite sand and gravel surface coated with a silane coupling agent and epoxy resin composite coating to resist salt erosion, and quartz sand filling ensures uniform pore size. This reduces the salt content in the water, maintains the pH of the water entering the soil within a suitable range, protects soil microbial activity, and prevents soil compaction. At the same time, the salt-resistant modified sand and gravel layer avoids weathering and damage caused by salt erosion of ordinary sand and gravel, ensuring the long-term unobstructed flow of the infiltration and drainage channel, and balancing the stability of salt removal and infiltration functions.

[0017] 4. This invention, by setting up a salt buffer collection component, uses V-shaped trenches to guide the high-concentration salt solution deposited at the bottom of the salt-resistant modified sand and gravel layer to converge into a porous collection pipe. Permeable geotextile filters impurities to prevent pipe blockage, and slow-release calcium hydroxide particles in the slow-release neutralizing agent storage silo react with the salt solution to neutralize the salt. This achieves the targeted collection and neutralization of residual high-concentration salt solution, avoiding environmental pollution caused by the continuous accumulation of high-concentration salt at the bottom of the infiltration layer or direct discharge. It further improves the thoroughness of salt treatment, is easy to maintain, and ensures the long-term stable salt control capability of the system. Attached Figure Description

[0018] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a schematic diagram of the overall three-dimensional structure of the present invention; Figure 2 For the present invention Figure 1 Enlarged structural diagram of region A in the middle; Figure 3 For the present invention Figure 1 A magnified structural diagram of region B in the middle; Figure 4 For the present invention Figure 1 A magnified structural diagram of region C in the middle; Figure 5 This is a schematic diagram showing the arrangement and connection structure of the salt buffer collection component of the present invention; Figure 6 This is a three-dimensional enlarged schematic diagram of a portion of the salt interception component of the snow melting agent of the present invention; Figure 7 This is a three-dimensional enlarged schematic diagram of the tenon and mortise structure in the de-icing agent salt interception component of the present invention; Figure 8 This is a three-dimensional enlarged schematic diagram of a portion of the salt-resistant percolation component of the present invention; Figure 9 This is a three-dimensional enlarged structural diagram of the salt corrosion resistant component for metal connectors of the present invention; Figure 10 This is a flowchart of the method of the present invention.

[0020] In the diagram: 1. Permeable pavement layer; 101. Permeable concrete precast module; 102. Permeable joints; 2. De-icing agent salt interception component; 201. Cation exchange resin filter plate; 202. Modified sodium-based bentonite waterproof blanket; 203. Mortise and tenon structure; 3. Salt-resistant infiltration component; 301. Salt-resistant modified sand and gravel layer; 302. Zeolite and humus mixed layer; 303. First permeable geotextile; 4. Metal connectors for salt corrosion prevention. Corrosion-resistant components; 401, metal clips; 402, PTFE anti-corrosion sleeves; 403, zinc alloy sacrificial anode protection blocks; 404, fluororubber sealing rings; 405, metal pressure rings; 406, conductive copper sheets; 407, insulating and anti-corrosion layers; 5, salt buffer collection components; 501, porous collection pipes; 502, slow-release neutralizer storage bins; 503, trenches; 504, slow-release calcium hydroxide granules; 505, sealed inspection covers. Detailed Implementation

[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0022] Example 1: Please refer to Figures 1-8 The ecological paving system for green roads shown includes a permeable paving layer 1, a salt-resistant infiltration component 3, and a roadbed arranged sequentially from top to bottom. Its key feature is that the ecological paving system for green roads further includes a snow-melting agent salt interception component 2, a salt-resistant infiltration component 3, and a salt buffer collection component 5; the snow-melting agent salt interception component 2 is disposed between the permeable paving layer 1 and the salt-resistant infiltration component 3; the salt-resistant infiltration component 3 is disposed above the snow-melting agent salt interception component 2; the salt buffer collection component 5 is disposed at the bottom of the salt-resistant infiltration component 3; the snow-melting agent salt interception component 2 includes an upper cation exchange resin filter plate 201 and a lower... The modified sodium-based bentonite waterproof blanket 202; the salt-resistant infiltration component 3 includes a lower salt-resistant modified sand and gravel layer 301, an upper zeolite and humus mixed layer 302, and a first permeable geotextile 303 between the two layers; the salt buffer collection component 5 includes a porous collection pipe 501 and a slow-release neutralizing agent storage bin 502, one end of the porous collection pipe 501 is connected to the slow-release neutralizing agent storage bin 502; and the porous collection pipe 501 is connected to the rainwater purification pool through a connecting pipe; the slow-release neutralizing agent storage bin 502 is filled with calcium hydroxide slow-release particles 504, and the top of the slow-release neutralizing agent storage bin 502 is provided with a sealed maintenance cover 505.

[0023] It should be noted that during application, water (rainwater or water containing de-icing agent) first falls onto the surface of the permeable pavement layer 1, which is arranged sequentially from top to bottom. It then infiltrates through the permeable structure of the permeable pavement layer 1 to the de-icing agent salt interception component 2, located between the permeable pavement layer 1 and the salt-resistant infiltration component 3. Upon entering the de-icing agent salt interception component 2, the water first flows through the cation exchange resin filter plate 201 on the upper layer of the component. The strongly acidic cation exchange resin in the filter plate achieves preliminary desalination through a displacement reaction between hydrogen ions and sodium and calcium ions in the de-icing agent. The water after preliminary desalination then permeates to the modified sodium-based bentonite waterproof blanket 202 on the lower layer of the de-icing agent salt interception component 2. The modified sodium-based bentonite waterproof blanket 202 expands upon contact with water to block the migration of residual salt, while the positively charged polymer on its surface adsorbs salt anions, completing secondary desalination. The water after secondary desalination continues to infiltrate to the de-icing agent salt interception component 2. The salt-resistant infiltration component 3 below component 2 first passes through the zeolite and humus mixture layer 302 on the upper layer of the salt-resistant infiltration component 3 to adsorb residual salt and adjust the pH value. Then it passes through the first permeable geotextile 303 between the two layers of the salt-resistant infiltration component 3 for filtration. The filtered water enters the salt-resistant modified sand and gravel layer 301 on the lower layer of the salt-resistant infiltration component 3. Normal drainage is achieved through the gaps between the granite sand and gravel particles in the salt-resistant modified sand and gravel layer 301. During this process, some of the high-concentration salt solution that is not completely removed settles at the bottom of the salt-resistant modified sand and gravel layer 301 due to its high density. Then it flows into the salt buffer collection component 5 set at the bottom of the salt-resistant infiltration component 3. It is first collected through the porous collection pipe 501 of the salt buffer collection component 5, and then transported by the porous collection pipe 501 to the slow-release neutralizing agent storage bin 502 connected to one end of it. Finally, it is discharged into the rainwater purification pond through the connecting pipe connected by the porous collection pipe 501. By integrating the permeable pavement layer 1, the de-icing agent salt interception component 2, the salt-resistant infiltration component 3, and the salt buffer collection component 5, a complete salt control system encompassing interception, infiltration, and collection is formed, effectively solving the problem of insufficient salt control capabilities of existing ecological pavement systems. The two-stage desalination structure of the de-icing agent salt interception component 2 significantly reduces the total amount of salt entering the salt-resistant infiltration component 3, preventing continuous salt accumulation within the infiltration layer. The layered design of the salt-resistant infiltration component 3 ensures normal water infiltration and drainage while further adsorbing residual salt, preventing salt from directly entering the underlying soil and damaging its aggregate structure. The salt buffer collection component 5 centrally treats and discharges the deposited high-concentration salt solution, preventing high-concentration salt pollution of the soil and its impact on vegetation growth on both sides of the road. Simultaneously, the entire system maintains excellent infiltration and drainage functions, preventing road surface flooding caused by the installation of an impermeable layer.

[0024] Please see Figures 1-2 and Figures 6-7Adjacent cation exchange resin filter plates 201 are spliced ​​together by a tenon and mortise structure 203, and polyurethane sealant is applied to the joints. The cation exchange resin filter plates 201 are fixed by pressing stainless steel strips along the four sides, and the stainless steel strips are connected to the base layer of the permeable pavement layer 1 by expansion bolts.

[0025] It should be noted that, firstly, adjacent cation exchange resin filter plates 201 are spliced ​​together using a tongue-and-groove structure 203 to form a tight connection between adjacent filter plates. After splicing, polyurethane sealant is applied to the joints to ensure there are no gaps. Then, stainless steel strips are used to press along the four sides of each cation exchange resin filter plate 201, and then the stainless steel strips are connected and fixed to the base layer of the permeable pavement layer 1 using expansion bolts. When water infiltrates into the de-icing agent salt interception component 2, the cation exchange resin filter plates 201, through the sealing effect of the tongue-and-groove structure 203 and polyurethane sealant, prevent water from directly infiltrating the filter plates through the joints of adjacent filter plates. At the same time, the fixing effect of the stainless steel strips and expansion bolts can prevent the cation exchange resin filter plates 201 from shifting during water impact or soil settlement, ensuring that the filter plates are always in the correct working position and continuously perform the ion exchange desalination function. The interlocking structure 203 and polyurethane sealant effectively improve the sealing between adjacent cation exchange resin filter plates 201, preventing water leakage from the joints and allowing unfiltered salt to directly enter subsequent components, thus ensuring the initial desalination effect of the de-icing agent salt interception component 2. The fixing method of stainless steel pressure strips and expansion bolts ensures a firm connection between the cation exchange resin filter plate 201 and the permeable pavement layer 1, resisting the external forces caused by water impact and soil settlement, preventing filter plate displacement from affecting desalination efficiency, further ensuring the stability and reliability of the entire de-icing agent salt interception component 2, and reducing the problem of salt control failure caused by poor filter plate sealing or displacement.

[0026] Please see Figures 1-2 and Figure 4 The modified sodium bentonite waterproof blanket 202 is bonded to the lower surface of the cation exchange resin filter plate 201 and laid using an overlapping method. Modified sodium bentonite powder is sprinkled and compacted at the overlapping points. The modified sodium bentonite waterproof blanket 202 is a four-layer structure consisting of a first nonwoven geotextile, a plastic flat yarn woven geotextile, a modified sodium bentonite layer, and a second nonwoven geotextile layer.

[0027] It should be noted that after the cation exchange resin filter plate 201 is installed and fixed, the modified sodium bentonite waterproof blanket 202 is laid on the lower surface of the cation exchange resin filter plate 201, ensuring a tight fit between the waterproof blanket and the filter plate without gaps. During the laying process, an overlapping method is used, where the edges of adjacent modified sodium bentonite waterproof blankets 202 overlap, and modified sodium bentonite powder is sprinkled at the overlap and then compacted to ensure a seal. When water passes through the cation exchange resin filter plate 201 for preliminary desalination and then permeates into the modified sodium bentonite waterproof blanket 202, the modified sodium bentonite layer in the waterproof blanket rapidly expands upon contact with water, filling the tiny gaps inside the waterproof blanket and at the overlaps, preventing residual salt from migrating downwards. Simultaneously, the first and second non-woven geotextiles protect the modified sodium bentonite layer, while the plastic flat yarn woven geotextile enhances the overall structural strength of the waterproof blanket, preventing damage under water infiltration or soil pressure. The modified sodium bentonite waterproof blanket 202 is tightly bonded to the cation exchange resin filter plate 201. The combination of overlapping and compaction of modified sodium bentonite powder improves the sealing between the waterproof blankets and between the waterproof blanket and the filter plate, preventing residual salt from leaking out from the bonding gaps or overlaps. In the four-layer structure design, the modified sodium bentonite layer can achieve secondary desalination by expanding to block salt and adsorbing salt anions. The other two layers of non-woven geotextile and plastic flat yarn woven geotextile respectively play the roles of protecting and enhancing the structural strength, preventing damage to the waterproof blanket from affecting the desalination effect.

[0028] Please see Figure 1 and Figure 8 The salt-resistant modified sand and gravel layer 301 is a granite sand and gravel layer, and the surface of the granite sand and gravel is coated with a silane coupling agent and an epoxy resin composite coating; the granite sand and gravel particles in the salt-resistant modified sand and gravel layer 301 are filled with quartz sand.

[0029] It should be noted that after the modified sodium bentonite waterproof blanket 202 is laid, the salt-resistant modified sand and gravel layer 301 is laid. The salt-resistant modified sand and gravel layer 301 uses granite sand and gravel as raw material, and the surface of the granite sand and gravel is pre-coated with a silane coupling agent and an epoxy resin composite coating. During the laying process, quartz sand is filled between the granite sand and gravel particles to form uniform pores between the granite sand and gravel particles. After the water undergoes secondary desalination through the modified sodium bentonite waterproof blanket 202, it permeates into the zeolite and humus mixture layer 302 of the salt-resistant infiltration component 3, further adsorbing residual salts and adjusting the pH value. After passing through the first permeable geotextile 303 to filter out impurities in the water, it enters the salt-resistant modified sand and gravel layer 301. At this point, the silane coupling agent and epoxy resin composite coating on the surface of the granite sand and gravel can resist the erosion of residual salts in the water, preventing the granite sand and gravel from weathering or structural damage. Meanwhile, the quartz sand filling between the granite sand and gravel particles can ensure the uniformity of the pores inside the sand and gravel layer, ensuring that the water can be smoothly discharged through the pores, while avoiding the soil particles from entering the sand and gravel layer and causing blockage due to excessively large pores. It is understandable that silane coupling agents and epoxy resin composite coatings are existing technologies and will not be elaborated further. The silane coupling agent and epoxy resin composite coating on the surface of granite sand and gravel effectively improves the salt erosion resistance of the salt-resistant modified sand and gravel layer 301, avoiding the weathering and damage caused by salt erosion of ordinary sand and gravel in the existing technology, and extending the service life of the salt-resistant infiltration component 3. The quartz sand filling makes the pores between granite sand and gravel particles uniform, which not only ensures the infiltration and drainage efficiency of the water body, but also prevents pore blockage from affecting the infiltration function.

[0030] Please see Figure 1 and Figure 8 The zeolite and humus mixture layer 302 includes clinoptilolite particles and decomposed humus; the edge of the zeolite and humus mixture layer 302 is connected to the soil of the vegetation planting strip on both sides of the road.

[0031] It should be noted that after the salt-resistant modified sand and gravel layer 301 is laid, a first permeable geotextile 303 is laid on top of it, and then a zeolite and humus mixture layer 302 is laid on top of the first permeable geotextile 303. The zeolite and humus mixture layer 302 is made of clinoptilolite particles mixed with decomposed humus, and the edges of the zeolite and humus mixture layer 302 are directly connected to the soil of the vegetation planting strip on both sides of the road during the laying process. After the water undergoes secondary desalination using the modified sodium-based bentonite waterproof blanket 202, it first enters the zeolite and humus mixed layer 302. The clinoptilolite particles in this layer adsorb residual salts in the water due to their porous structure, while the decomposed humus regulates the pH value of the water, maintaining it within a range suitable for soil and vegetation growth. At the same time, the connection between the edge of the zeolite and humus mixed layer 302 and the soil of the vegetation planting zone allows some of the treated water to slowly infiltrate into the soil of the vegetation planting zone, providing moisture for vegetation growth. Furthermore, since the salts in the water have been largely removed, it will not damage the plant roots. The clinoptilolite particles in the zeolite and humus mixed layer 302 can further adsorb residual salts in the water, and the decomposed humus regulates the pH value of the water, preventing water containing salt or with abnormal pH values ​​from entering the soil below and damaging the soil aggregate structure, protecting the activity of soil microorganisms, and preventing soil compaction and fertility decline. The connection between its edge and the soil of the vegetation planting zone allows the treated water to provide moisture to the vegetation, while avoiding damage to the vegetation roots by salts. This forms a complete chain from desalination and pH adjustment to water utilization, improving the ecological benefits of the ecological paving system.

[0032] Please see Figures 1-5 and Figure 9 The porous collection pipe 501 is connected to the slow-release neutralizer storage bin 502 via a metal connector anti-salt corrosion assembly 4. The metal connector anti-salt corrosion assembly 4 includes at least a pair of metal clips 401, a polytetrafluoroethylene (PTFE) anti-corrosion sleeve 402, a fluororubber sealing ring 404, and a metal pressure ring 405. Adjacent PTFE anti-corrosion sleeves 402 are connected by metal clips 401, and a pair of metal clips 401 form a cylindrical structure. The metal pressure ring 405 is disposed at both ends of the metal clips 401. The fluororubber sealing ring 404 is embedded at both ends of the PTFE anti-corrosion sleeve 402, and the metal pressure ring 405 presses the fluororubber sealing ring 404 and fixes it to the end of the PTFE anti-corrosion sleeve 402.

[0033] It should be noted that when installing the porous collection pipe 501 and the slow-release neutralizer storage silo 502, the connection between the two is achieved through the metal connector anti-salt corrosion component 4. When the high-concentration salt solution enters the porous collection pipe 501 and flows to the slow-release neutralizer storage silo 502, the PTFE anti-corrosion sleeve 402 isolates the salt solution from contact with the metal clamp 401, the fluororubber sealing ring 404 prevents the salt solution from leaking from the pipe connection, the metal pressure ring 405 ensures the sealing pressure of the fluororubber sealing ring 404, and the metal clamp 401 ensures a firm connection between the PTFE anti-corrosion sleeves 402. The PTFE anti-corrosion sleeve 402 has excellent salt corrosion resistance, effectively isolating high-concentration salt solutions from contact with the metal clamp 401, preventing electrochemical corrosion of the metal clamp 401, and preventing the metal connectors from failing due to salt corrosion. The combined use of the fluororubber sealing ring 404 and the metal pressure ring 405 ensures the sealing of the pipe connection, preventing high-concentration salt solutions from leaking and polluting the surrounding soil. The metal clamp 401 ensures the strong connection between the PTFE anti-corrosion sleeves 402, making the connection between the porous collection pipe 501 and the slow-release neutralizing agent storage bin 502 both strong and resistant to salt corrosion, ensuring the stability of the salt collection process and preventing salt control failure due to corrosion or leakage of the connectors.

[0034] Please see Figure 9 The metal connector anti-salt corrosion component 4 also includes multiple zinc alloy sacrificial anode protection blocks 403, conductive copper sheets 406, and an insulating and anti-corrosion layer 407; the multiple zinc alloy sacrificial anode protection blocks 403 are evenly arranged around the circumference of the polytetrafluoroethylene anti-corrosion sleeve 402; one end of the conductive copper sheet 406 is connected to the zinc alloy sacrificial anode protection block 403, and the other end is connected to the metal clip 401; the insulating and anti-corrosion layer 407 is wrapped around the conductive copper sheet 406.

[0035] It should be noted that when a high-concentration salt solution penetrates to the periphery of the anti-salt corrosion component 4 of the metal connector, even if the PTFE anti-corrosion sleeve 402 or the fluororubber sealing ring 404 is slightly damaged, after the salt solution comes into contact with the zinc alloy sacrificial anode protection block 403, because the electrode potential of the zinc alloy is lower than that of the metal card 401, the zinc alloy sacrificial anode protection block 403 will preferentially undergo oxidation corrosion. The protective current is transferred to the metal card 401 through the conductive copper sheet 401, so that the metal card 401 is in a cathodic protection state, avoiding corrosion of the metal card 401 by the salt solution; the insulating anti-corrosion layer 407 prevents the conductive copper sheet 401 from being corroded by the salt solution, ensuring the stability of the conductive path; The zinc alloy sacrificial anode protection block 403 is connected to the metal clip 401 via a conductive copper sheet 406, forming an electrochemical protection mechanism. This adds an extra layer of corrosion protection to the physical isolation provided by the PTFE anti-corrosion sleeve 402 and the fluororubber sealing ring 404. Even if the physical isolation structure is slightly damaged, the metal clip 401 can still be prevented from being corroded, significantly extending the service life of the metal connector. The insulating anti-corrosion layer 407 protects the conductive copper sheet 401 from corrosion by salt solution, ensuring the stability of the electrochemical protection path. This makes the metal connector anti-salt corrosion component 4 a dual anti-corrosion system of physical isolation and electrochemical protection, further enhancing the structural stability of the entire ecological paving system.

[0036] Please see Figure 5 The outer wall of the porous collection pipe 501 is fitted with a second permeable geotextile, and the bottom of the salt-resistant infiltration component 3 is provided with a V-shaped groove 503. The porous collection pipe 501 is embedded in the V-shaped groove 503, and the V-shaped groove 503 is filled with gravel for fixation.

[0037] It should be noted that when a high-concentration salt solution is deposited at the bottom of the salt-resistant modified sand and gravel layer 301, it flows towards the V-shaped trench 503 and enters the porous collection pipe 501. At this time, the second permeable geotextile on the outer wall of the porous collection pipe 501 can filter out impurities such as sand and gravel particles in the salt solution, preventing impurities from entering the interior of the porous collection pipe 501 and causing pipe blockage. The V-shaped trench 503 can guide the high-concentration salt solution to converge into the porous collection pipe 501, while the gravel firmly fixes the porous collection pipe 501, preventing the porous collection pipe 501 from shifting under soil pressure or water impact.

[0038] Please see Figures 1-2 The permeable pavement layer 1 is composed of multiple permeable concrete precast modules 101 spliced ​​together. Permeable gaps 102 are reserved between adjacent permeable concrete precast modules 101, and permeable asphalt sand is filled in the permeable gaps 102. It can be understood that by reserving permeable gaps 102 between adjacent permeable concrete precast modules 101, water infiltration is facilitated, which helps to keep the road dry. Furthermore, the permeable asphalt sand filled in the permeable gaps 102 ensures water infiltration while maintaining the structural stability of the permeable pavement layer 1.

[0039] Example 2: The technical solution in this example differs from that in Example 1 in that: Please refer to... Figures 1-10 The infiltration and drainage method for the ecological paving system of green roads, using the aforementioned ecological paving system for green roads, specifically includes the following steps: Step 1: Water Infiltration and Multi-Stage Salt Interception: Rainwater or water containing de-icing agents falls onto the permeable pavement layer 1 and infiltrates into the de-icing agent salt interception component 2. It first flows through the cation exchange resin filter plate 201, where the strongly acidic cation exchange resin reacts with sodium and calcium ions in the de-icing agent through a displacement reaction, achieving initial desalination. Then, it permeates into the modified sodium-based bentonite waterproof blanket 202. The waterproof blanket expands upon contact with water, blocking the migration of residual salts. Simultaneously, its positively charged polymer adsorbs salt anions, completing secondary desalination. The cation exchange resin filter plate 201 achieves a salt removal rate of no less than 65% for the de-icing agent; the modified sodium-based bentonite waterproof blanket 202 achieves an adsorption rate of no less than 20% for residual salts. Step 2: Salt-resistant infiltration and drainage of water: Water that has undergone multi-stage desalination infiltrates into the salt-resistant infiltration component 3. It first passes through the zeolite and humus mixed layer 302 to adsorb residual salt and adjust the pH value. Then, it passes through the first permeable geotextile 303 and enters the salt-resistant modified sand and gravel layer 301. Normal drainage is achieved through the gaps between the sand and gravel particles, ensuring the infiltration function of the system. Step 3: Residual Salt Buffer Collection and Neutralization: The high-concentration salt solution deposited at the bottom of the salt-resistant modified sand and gravel layer 301 is collected through the porous collection pipe 501 and flows through the slow-release neutralizing agent storage silo 502 to neutralize the salt. The salt solution concentration after neutralization by the slow-release neutralizing agent storage silo 502 is less than 0.5%. Finally, it is discharged into the rainwater purification pond through the connecting pipe. During the flow of the high-concentration salt solution, the PTFE anti-corrosion sleeve 402 isolates the salt water from the metal parts 401, and the zinc alloy sacrificial anode protection block 403 preferentially corrodes, providing cathodic protection for the metal parts 401.

[0040] This infiltration drainage method employs a three-step process to form a systematic treatment flow encompassing multi-stage desalination, salt-resistant infiltration, and residual collection and neutralization. Step one, multi-stage interception, utilizes cation exchange resin filter plates 201 and modified sodium-based bentonite waterproofing blankets 202 to significantly remove salt from the salt solution, reducing the processing pressure on subsequent components. Step two, salt-resistant infiltration, ensures normal drainage while further treating residual salt and adjusting pH through a zeolite and humus mixture layer 302, preventing salt from entering the soil. Step three, residual collection and neutralization, centrally treats the deposited high-concentration salt solution, ensuring complete salt removal. This method effectively solves multiple problems in existing ecological paving systems, including salt accumulation, soil degradation, corrosion of metal connectors, and loss of drainage function. It achieves synergy between salt control and infiltration drainage, with a seamless operation process requiring no complex additional equipment, facilitating practical engineering applications. Furthermore, it offers convenient long-term operation and maintenance, ensuring the stable operation of ecological paving systems for green roads in northern regions.

[0041] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. An ecological paving system for green roads, comprising, from top to bottom, a water-permeable paving layer (1), a salt-resistant filtration assembly (3) and a roadbed, characterized in that: The ecological paving system for the green road further comprises a snow-melting agent salt interception component (2), a salt-resistant infiltration component (3), and a salt buffer collection component (5). The snow-melting agent salt interception component (2) is arranged between the water-permeable paving layer (1) and the salt-resistant infiltration component (3); the salt-resistant infiltration component (3) is arranged on the snow-melting agent salt interception component (2); and the salt buffer collection component (5) is arranged at the bottom of the salt-resistant infiltration component (3). The snow-melting agent salt interception component (2) comprises an upper cation exchange resin filter plate (201) and a lower modified sodium-based bentonite waterproof blanket (202); the salt-resistant infiltration component (3) comprises a lower salt-resistant modified gravel layer (301), an upper zeolite and humus mixed layer (302), and a first water-permeable geotextile (303) between the two layers; and the salt buffer collection component (5) comprises a porous collection pipe (501) and a slow-release neutralizing agent storage bin (502), one end of the porous collection pipe (501) is connected with the slow-release neutralizing agent storage bin (502), and the porous collection pipe (501) is in communication with a rainwater purification tank through a connecting pipeline.

2. The ecological paving system for greened roads according to claim 1, characterized in that: The cation exchange resin filter plates (201) are spliced through a concave-convex mortise and tenon structure (203) between adjacent cation exchange resin filter plates (201), and polyurethane sealant is brushed at the joint; the cation exchange resin filter plates (201) are fixed by being pressed tightly along the four edges by stainless steel pressing strips, and the stainless steel pressing strips are connected with the base layer of the water-permeable paving layer (1) by expansion bolts.

3. The eco-paving system for greened roads according to claim 1, characterized in that: The modified sodium-based bentonite waterproof blanket (202) is attached to the lower surface of the cation exchange resin filter plate (201) and is laid by the lap joint method, and modified sodium-based bentonite powder is sprinkled and compacted at the lap joint. The modified sodium-based bentonite waterproof blanket (202) is a four-layer structure of a first non-woven geotextile, a plastic flat wire woven geotextile, a modified sodium-based bentonite layer, and a second non-woven geotextile.

4. The eco-paving system for greened roads according to claim 1, characterized in that: The salt-resistant modified gravel layer (301) is a granite gravel layer, and the surface of the granite gravel is coated with a silane coupling agent and an epoxy resin composite coating; the granite gravel particles in the salt-resistant modified gravel layer (301) are filled with quartz sand.

5. The eco-paving system for greened roads according to claim 1, characterized in that: The zeolite and humus mixed layer (302) comprises clinoptilolite particles and humic substances; and the edges of the zeolite and humus mixed layer (302) are connected with the soil of the vegetation planting belt on both sides of the road.

6. The eco-paving system for greened roads according to claim 1, characterized in that: The connection between the porous collection pipe (501) and the slow-release neutralizing agent storage bin (502) is connected through a metal connecting piece salt corrosion prevention assembly (4); the metal connecting piece salt corrosion prevention assembly (4) comprises at least one pair of metal clamps (401), a polytetrafluoroethylene corrosion-proof sleeve (402), a fluororubber sealing ring (404) and a metal pressing ring (405); adjacent polytetrafluoroethylene corrosion-proof sleeves (402) are connected through metal clamps (401), and a pair of metal clamps (401) form a cylindrical structure; the metal pressing ring (405) is arranged at both ends of the metal clamp (401); the fluororubber sealing ring (404) is embedded in both ends of the polytetrafluoroethylene corrosion-proof sleeve (402), and the metal pressing ring (405) presses the fluororubber sealing ring (404) and fixes the polytetrafluoroethylene corrosion-proof sleeve (402) end.

7. The ecological paving system for greened roads according to claim 6, characterized in that: The metal connecting piece salt corrosion prevention assembly (4) further comprises a plurality of zinc alloy sacrificial anode protection blocks (403), a conductive copper sheet (406) and an insulating corrosion-proof layer (407); the plurality of zinc alloy sacrificial anode protection blocks (403) are uniformly arranged along the circumference of the polytetrafluoroethylene corrosion-proof sleeve (402); one end of the conductive copper sheet (406) is connected with the zinc alloy sacrificial anode protection block (403), and the other end is connected with the metal clamp (401); the insulating corrosion-proof layer (407) is wrapped outside the conductive copper sheet (406).

8. The eco-paving system for greened roads according to claim 1, characterized in that: The outer wall of the porous collection pipe (501) is sleeved with a second water-permeable geotextile, and the bottom of the salt-resistant infiltration assembly (3) is provided with a V-shaped groove (503), the porous collection pipe (501) is embedded in the V-shaped groove (503), and the V-shaped groove (503) is filled with gravel.

9. The eco-paving system for greened roads according to claim 1, characterized in that: The slow-release neutralizing agent storage bin (502) is filled with calcium hydroxide slow-release particles (504), and the top of the slow-release neutralizing agent storage bin (502) is provided with a sealed maintenance cover (505).

10. A method for the infiltration drainage of an ecological paving system for greened roads, using an ecological paving system for greened roads according to any one of claims 1 to 9, characterized in that: Specifically comprising the following steps: Step one, water infiltration and multi-stage salt interception: rainwater or water containing snow-melting agent falls on the water-permeable pavement (1) and infiltrates into the snow-melting agent salt interception assembly (2); first flows through the cation exchange resin filter plate (201), the strong acid cation exchange resin in the filter plate realizes preliminary desalination by replacement reaction between hydrogen ions and sodium ions and calcium ions in the snow-melting agent; then penetrates into the modified sodium-based bentonite waterproof blanket (202), the waterproof blanket swells to block the migration of residual salt when encountering water, and the surface positive charge polymer adsorbs salt anions, completing secondary desalination; Step two, salt-resistant water infiltration drainage: the water body after multi-stage desalination penetrates into the salt-resistant infiltration assembly (3), first passes through the zeolite and humus mixed layer (302) to adsorb residual salt and adjust the pH value, then filters through the first water-permeable geotextile (303) and enters the salt-resistant modified sand and gravel layer (301), and normal drainage is realized through the gaps between sand and gravel particles, thereby guaranteeing the infiltration function of the system; Step three, residual salt buffer collection and neutralization: high-concentration salt solution deposited at the bottom of the salt-resistant modified sand and gravel layer (301) flows through the slow-release neutralizing agent storage bin (502) after being collected by the porous collection pipe (501), so as to neutralize the salt, and finally is discharged into the rainwater purification tank through the connecting pipeline.