Automatic design method and system based on BIM software
By building an automated design system within BIM software and utilizing the adapter layer dynamic link library to exchange data with the BIM software interface, the problem of low efficiency in BIM design is solved, intelligent automated design is achieved, and design quality and efficiency are improved.
Patent Information
- Application Number
- CN202511937484.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-22
- Publication Date
- 2026-01-20
- Estimated Expiration
- 2045-12-22
AI Technical Summary
Existing BIM software design processes suffer from inefficiency, repetitive work, and a high risk of errors. In particular, frequent design adjustments are required when external conditions change, resulting in slow project response and inconsistent quality.
By parsing the configuration file to initialize the adapter layer dynamic link library, establishing a parameter transmission channel, defining standardized interfaces, and exchanging parameters with BIM software or its internal modules, an automated modeling environment is built to achieve intelligent task execution and unmanned process operation.
It achieves intelligent automation of BIM design, improves design efficiency, ensures consistency and accuracy of output results, reduces manual intervention, and supports cross-platform compatibility and version management.
Smart Images

Figure CN121365453A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application belongs to the technical field of computer automated office operation, and particularly relates to a method and system for automatic design based on BIM software. BACKGROUND
[0002] In the field of engineering design, designers often use BIM software to complete complex engineering design processes, but in actual operation, a large amount of manpower is still required for repetitive operations, and the overall efficiency is low. Taking road design as an example, although design units have generally adopted professional application modules for road design within BIM software, and have solidified the design process into a series of standardized steps such as roadbed pavement modeling, slope excavation and filling, retaining wall design, and road intersection processing, such solidified processes still heavily rely on manual step-by-step execution and have not yet achieved effective automation, resulting in a huge time consumption for BIM modeling.
[0003] Further, in actual engineering, route schemes often need to be frequently adjusted due to external condition changes or design input updates (such as an increase in the number of lanes, widening of sidewalks, etc.). Once such changes occur, designers must re-execute the entire BIM modeling process, not only causing a lot of repetitive labor, but also significantly reducing project response speed and design efficiency.
[0004] More importantly, manual execution of repetitive operations has inherent drawbacks. In addition to low efficiency, it is also prone to operational errors, and due to individual operational differences and subjective judgments, the design results that should be standardized may not be consistent, affecting the reliability and standardization of engineering quality.
[0005] To address the efficiency and quality difficulties caused by manual operation of BIM software, the use of robotic process automation (RPA) technology is often considered a direct solution. However, the current mainstream robotic process automation (RPA) technology essentially simulates keyboard and mouse operations, and therefore cannot directly call the interfaces (APIs) of BIM software or professional application modules within BIM software, nor can it understand and execute complex design logic. More importantly, it lacks intelligent judgment and verification capabilities for operational results. Therefore, such surface simulation-based technology has fundamental limitations in addressing the automation needs of professional BIM design processes and cannot break through the technical bottleneck of manual operation mode. SUMMARY
[0006] To solve the technical bottleneck caused by the manual operation of BIM software and the deficiency of existing RPA technology, the application constructs a method and system for automatic design based on BIM software, aiming to integrate and call the interface of BIM software or professional application modules inside BIM software, realize the intelligent execution of the whole process by solidifying the engineering design rules into precise task sequences, and finally endow BIM software with the automatic design capability to handle complex tasks in the engineering design process.
[0007] To this end, the first object of the application is to provide a method for automatic design based on BIM software, which comprises the following steps: initializing the adaptation layer dynamic link library by analyzing the configuration file to establish a parameter transmission channel, and interchanging parameters with BIM software or professional application modules inside BIM software through a set of standardized interfaces defined by the adaptation layer dynamic link library and the parameter transmission channel, which are independent of the type of BIM software; preparing BIM design materials, registering basic tasks in BIM software based on the BIM design materials and defining their input and output parameters, and establishing a standardized BIM engineering directory to build an automatic modeling environment; establishing a set of parameterized tasks that can be automatically modeled based on the basic tasks; serially arranging the set of tasks into a task list according to the design logic and business process of the BIM model, and generating a project engineering recording the task list; analyzing the task list in the project engineering, calling the adaptation layer interface, and automatically running the tasks in the task list by the target BIM software or professional application modules inside BIM software driven by the adaptation layer interface through the parameter transmission channel to complete the automatic modeling.
[0008] As a preferred embodiment, after analyzing the task list in the project engineering, calling the adaptation layer interface, and automatically running the tasks in the task list by the target BIM software or professional application modules inside BIM software driven by the adaptation layer interface through the parameter transmission channel to complete the automatic modeling, the method further comprises: establishing a system change maintenance mechanism, re-executing the whole process after the change, and re-outputting the complete road BIM model and related result files.
[0009] As a preferred embodiment, the step of initializing the adaptation layer dynamic link library by analyzing the configuration file to establish a parameter transmission channel, and interchanging parameters with BIM software or professional application modules inside BIM software through a set of standardized interfaces defined by the adaptation layer dynamic link library and the parameter transmission channel, which are independent of the type of BIM software, comprises: The connection mapping rule is defined by analyzing a configuration file, and a secondary development dynamic link library of a corresponding BIM software is loaded based on the connection mapping rule to establish a parameter transmission channel with the corresponding BIM software. Through the standardized interface defined by the adaptive layer dynamic link library and independent of the type of BIM software, unified parameter inter-transmission of various BIM software or professional application modules inside the BIM software is realized via the parameter transmission channel.
[0010] Preferably, the BIM design data is prepared, the input and output parameters of the basic task are defined in the BIM software based on the BIM design data, and a standardized BIM engineering directory is established to build an automated modeling environment, including: A BIM model file is newly created and the BIM design data is imported; The basic task for automated modeling is constructed in the BIM software; The standardized BIM engineering directory structure is established to build the automated modeling environment.
[0011] Preferably, the parameterized automated modeling task set is established based on the basic task, including: The BIM task editor is called to create a task; The parameter system of the task is defined and the parameter dependency relationship between tasks is established; The key parameters and non-key parameters of the task are set; The input parameters before the execution of the task are configured, and a verification mechanism for matching the input parameters with the BIM design data is established; The output parameters after the execution of the task are configured, and the task that can be automatically executed is generated; A plurality of independent tasks that can be automatically executed are created to form a set of tasks that can be automatically executed for modeling.
[0012] The second object of the application is to provide a system for automated design based on BIM software, which comprises: A communication adaptive module is configured to initialize the adaptive layer dynamic link library by analyzing a configuration file to establish a parameter transmission channel, and to perform parameter inter-transmission with the BIM software or professional application modules inside the BIM software via a set of standardized interfaces defined by the adaptive layer dynamic link library and independent of the type of BIM software and the parameter transmission channel; An environment construction module is configured to prepare BIM design data, register a basic task in the BIM software based on the BIM design data and define the input and output parameters of the basic task, and establish a standardized BIM engineering directory to build an automated modeling environment; An engineering management module is configured to manage all project engineering and provide functions such as creation, opening, saving, deletion, list display and version control of the project engineering. a task editing module, configured to establish a set of parameterized tasks for automatic modeling based on the basic tasks, and to arrange the set of tasks in series according to the design logic of the BIM model and the business process to form a task list, and to generate a project engineering record of the task list; a task playing module, configured to parse the task list in the project engineering, and to call the adaptation layer interface, and to drive the target BIM software or the professional application module inside the BIM software to automatically run the tasks in the task list through the parameter passing channel to complete the automatic modeling.
[0013] Preferably, the communication adaptation module comprises: a configuration file, configured to read the BIM software connection mapping rule through the configuration file; a dynamic loading module, configured to dynamically load the secondary development dynamic link library provided by the BIM software; a format conversion module, configured to construct a standardized interface to form a unified interaction channel.
[0014] Preferably, the task editing module comprises: a task definition submodule, configured to create a basic task instance according to the project requirements; a parameter management submodule, configured to define the task parameter system and establish the parameter dependency relationship between the tasks; a parameter verification rule configuration submodule, configured to set the key parameters and the non-key parameters of the tasks, and to set strict verification rules for the key parameters and reasonable default values for the non-key parameters; a design material matching submodule, configured to establish a verification mechanism for the matching of the input parameters and the BIM design materials; a process arrangement submodule, configured to connect and arrange all the tasks into an ordered executable task list, and to record the task list to the project engineering; a rule construction submodule, configured to define the execution rules of each task in the task list.
[0015] The third object of the present application is to provide an electronic device comprising: a memory, configured to store a computer program; a processor, configured to execute the program stored on the memory to realize the method steps of any one of the above automatic design methods based on the BIM software.
[0016] The fourth object of the present application is to provide a computer readable storage medium, wherein the computer readable storage medium stores a computer program, and the computer program is executed by a processor to realize the method steps of any one of the above automatic design methods based on the BIM software.
[0017] The beneficial effects of the present application are that, through systematic task planning and execution, the BIM design is realized from manual operation to intelligent automation, which is embodied in:
[0018] 1) The present application is constructed on the basis of the calling of the core function interface of BIM software, rather than relying on the surface interface simulation, so it is not limited by specific file format, version or running platform, has good universality and cross-platform compatibility, and can be widely applied to various BIM automatic design scenes in engineering design industry.
[0019] 2) By automatically executing the solidified task flow by computer, the inherent problems of manual operation such as low efficiency, repetitive labor and error-prone are fundamentally avoided, the design cycle is significantly shortened, and the consistency and accuracy of the output results are ensured by the standardization of the process.
[0020] 3) By adopting the organization paradigm of "one project task corresponding to one independent folder", and maintaining constant original data input path and parameterized interface, the data source relied on by the task in automatic execution is ensured to be unique and accurate, thereby ensuring the high consistency and correctness of the execution effect each time, and facilitating process tracing and version management.
[0021] 4) A large number of design steps relying on manual discrimination and execution are converted into automatic judgment and execution by computer according to preset logic, greatly reducing the frequency and workload of manual intervention. BRIEF DESCRIPTION OF DRAWINGS
[0022] The accompanying drawings, which are incorporated into and form part of the specification, illustrate embodiments consistent with the present disclosure and, together with the specification, serve to explain the principles of the present disclosure.
[0023] Figure 1 A method flow diagram for automatic design based on BIM software is provided for the embodiments of the present application; Figure 2 A system structure diagram for automatic design based on BIM software is provided for the embodiments of the present application.
[0024] Through the above drawings, the specific embodiments of the present disclosure have been shown, and more detailed descriptions will be given hereinafter. These drawings and textual descriptions are not intended to limit the scope of the concept of the present disclosure by any means, but to illustrate the concept of the present disclosure to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0025] The application will be described in further detail below with reference to the drawings and specific embodiments. Obviously, the described embodiments are only a part of the embodiments of the application, rather than all the embodiments. Based on the described embodiments of the application, all other embodiments obtained by those of ordinary skill in the art without creative effort belong to the scope of protection of the application. Unless otherwise defined, the technical terms or scientific terms used herein should be understood as the usual meanings understood by those of ordinary skill in the art.
[0026] Term explanation
[0027] BIM: Building Information Modeling, also refers to the design, construction, operation and maintenance in the field of engineering construction by information means, and the corresponding BIM software or professional application module in BIM software. The BIM software as a basic platform for design display and viewing provides basic point-line-surface modeling, display, attribute mounting and other functions; the professional application module in BIM software runs on BIM software to provide a series of BIM tools for a specific professional.
[0028] Terrain file: a digital file containing three-dimensional geographic information of the project site. It accurately describes the ground elevation, topography, and ground objects (such as rivers, buildings, etc.) in the project area, and is the base map and foundation of three-dimensional design. Its core content is as follows:
[0029] 1) Elevation points: a large number of point data with X, Y, Z coordinates.
[0030] 2) Contour lines: lines connecting points of the same elevation, used to visually represent the terrain undulations.
[0031] 3) Break lines: describe the location of terrain mutations, such as embankment, curb, ridge line, valley line, etc.
[0032] 4) Boundary: defines the effective range of the terrain model.
[0033] 5) Triangulation network: based on the above constraints, a triangulation network covering the entire range is established to accurately describe and visualize the terrain undulations in the computer, i.e. the digital terrain model, which is represented as a DTM type graphic element in BIM, serving as an intuitive basis for subsequent BIM design.
[0034] The main role of the terrain file is:
[0035] 1) As a design basis: all building, road, and pipeline layouts must be based on the actual terrain.
[0036] 2) Earthwork calculation: by comparing the design model and the original terrain model, the engineering quantities of excavation and filling can be accurately calculated.
[0037] 3) Visualization and Analysis: Used for solar analysis, sight line analysis, flood simulation, etc.
[0038] 4) Coordination and Clash Detection: Ensures that the design model aligns with the field conditions, avoiding issues such as structures hanging in the air or being buried too deep.
[0039] Route File: A digital file that defines the spatial position of the centerline or baseline of a project. It is a three-dimensional spatial curve and the design reference for linear projects. Its core content is as follows:
[0040] 1) Plan Alignment: The projection of the route on the horizontal plane, composed of straight lines, circular curves, and clothoid curves, etc. The scale on it is called the stake number, i.e. the mileage.
[0041] 2) Vertical Alignment: The projection of the route on the vertical plane, indicating the elevation change along the centerline, composed of grade lines and vertical curves.
[0042] 3) Superelevation and Widening: To meet the safety of driving, the information of transverse slope change and road width change at bends.
[0043] The main role of the route file is:
[0044] 1) As a design reference: The route is the positioning reference for all subsequent designs (such as road model, bridge layout, pipeline laying). The cross section, slope, and structures of the road are all laid out according to the route.
[0045] 2) Drive parameterized model: In BIM, the route is a key parameterized driving element. After modifying the route, all models that depend on it (such as road surface, bridge) will be automatically updated.
[0046] 3) Ensure design accuracy: Accurate three-dimensional route ensures the correctness of the project in geometry.
[0047] Design Parameter File: Refers to the collection of key data and information used to drive or constrain BIM models between different disciplines or design stages. It is a digital expression of design intent and rules. Its core content is as follows:
[0048] 1) Geometric parameters: such as the span of the beam, the cross-sectional size of the column, the diameter of the pipeline, the installation coordinates and elevation of the equipment.
[0049] 2) Performance parameters: such as the strength grade of the material, the capacity of the equipment, the flow and pressure requirements of the pipeline.
[0050] 3) Logical relationship parameters: such as the relationship between components (for example, the floor elevation changes with the beam top elevation).
[0051] 4) Non-geometric information: such as manufacturer, model, cost, maintenance information, etc.
[0052] The main role of the design parameter is:
[0053] 1) Collaborative design foundation: Ensure that building, structure, mechanical and electrical, and other professionals work based on unified and accurate data during the design process to avoid conflicts.
[0054] 2) Ensure design consistency: When the upstream design changes, the downstream model can quickly respond and adjust by updating the design parameter.
[0055] 3) Improve efficiency and quality: Parameterize repetitive and regular design conditions to reduce human error and improve design automation.
[0056] RPA: Robotic Process Automation, which simulates human behavior through automation technology to perform repetitive and standardized operations on computers.
[0057] BIM task editor: Provides a graphical interface for designers to create and configure tasks that can be automatically executed, and defines the input and output parameters and execution logic of each task. Each task created will be stored as a separate file (such as RPA format) in the project engineering directory; at the same time, the information of all tasks is summarized in a unified task list, which is finally recorded and managed by the project engineering.
[0058] BIM task player: The system loads the tasks in the task list recorded in the project engineering through the automatic execution engine, and monitors the real-time state and handles exceptions to ensure the integrity and accuracy of the entire process execution.
[0059] Example 1
[0060] In order to better understand the improvements made by the present application relative to the prior art, the present application embodiment takes the "Fengxin Road Approach Automation Modeling" project as an example to describe in detail the whole process of a method for automatic design based on BIM software.
[0061] The present application embodiment takes MicroStation as the basic platform, and the MicroStation platform already has a professional application module specially used for road BIM model design, which has the function of creating a road BIM model.
[0062] The terrain relied on by the road BIM model design is fixed, and the route and design parameter relied on may change, but generally fine-tuning, and the BIM model can be reconstructed by using a new route and design parameter on the basis of the original road BIM design. The embodiment of the application refines requirements and summarizes an automatic design operation process including a plurality of basic tasks such as road modeling, retaining wall layout, creation of a cross along a line, protection layout, engineering quantity statistics, creation of a plan, creation of a longitudinal section, and creation of a transverse section. It should be noted that all the tasks in the automatic design process are extended from the basic tasks.
[0063] The embodiment provides a method for automatic design based on BIM software, as shown in Figure 1 The method comprises the following steps:
[0064] In step S1, the adaptive layer dynamic link library is initialized by analyzing a configuration file to establish a parameter transmission channel, a set of standardized interfaces independent of the type of BIM software is defined by the adaptive layer dynamic link library, and parameter inter-transmission is performed with the BIM software or a professional application module inside the BIM software via the parameter transmission channel.
[0065] In the embodiment, the adaptive layer dynamic link library calls secondary development dynamic link libraries of different BIM software through standardized interfaces and parameter conversion logic, establishes a parameter transmission channel with corresponding BIM software, and realizes deep integration with and cross-platform compatibility of multiple BIM software. Exemplarily, if the BIM software is MicroStation, the dynamic link library MicroStationRoadAdapter.dll of MicroStation needs to be called. The system structure diagram is as shown in Figure 2 .
[0066] In a specific application, when automatic modeling needs to be performed, the BIM software is first started. After the BIM software is started, the system and the adaptive layer dynamic link library are started, and the name, version, and other characteristics of the current BIM software are obtained in the loading process. According to the definition of the configuration file, the parameter transmission channel with the BIM software is established.
[0067] In an optional embodiment, step S1 comprises:
[0068] In step S11, a connection mapping rule is defined by analyzing a configuration file, and a secondary development dynamic link library of corresponding BIM software is loaded based on the connection mapping rule to establish a parameter transmission channel with the corresponding BIM software.
[0069] The system relies on a structured configuration file to configure the BIM software connection environment. The core role of the configuration file is to decouple and map the target BIM software that needs to be connected with the system, thereby realizing the configurability and automation of the connection process.
[0070] The configuration file can be stored in any structured data format, including but not limited to XML, JSON, YAML, or standard INI files. Preferably, the present application uses the JSON format, which has good readability and machine parsability.
[0071] The configuration file is stored in the root directory of the system installation path and is read by the adaptive layer dynamic link library during the system initialization phase.
[0072] The configuration file contains multiple application configuration items, each defining a target BIM software and the dynamic link library information of the BIM software, which together constitute a "BIM software-dynamic library" connection mapping rule. The following is an example of a typical configuration item to illustrate its internal fields: [{ "AppIdentifier": "MicroStation", "AssociatedDllPath": "C:\\BIM\\MicroStationRoadAdapter.dll", "OptionalParameters": "Configuration Data 1", }, { "AppIdentifier": "Revit", "AssociatedDllPath": "C:\\BIM\\RevitRoadAdapter.dll", "OptionalParameters": "Configuration Data 2", }]
[0073] Where:
[0074] AppIdentifier: Application identifier, used to uniquely identify the target application in the system process list. The application identifier is usually the executable file name of the target application (e.g., MicroStation.exe).
[0075] AssociatedDllPath: Associated dynamic library path, specifies the absolute path in the file system or the relative path to the system root directory of the specific dynamic link library that the system needs to load after the BIM software is successfully matched. The associated dynamic library path is the key input of the dynamic binding step.
[0076] OptionalParameters: Optional parameters, an optional field, used to pass specific configuration parameters or commands to the initialization interface of the dynamic link library. Optional parameters enhance the flexibility and configurability of the connection. For example, it can be used to specify connection mode, debug level, or authentication key, etc.
[0077] The system obtains the current dependent running BIM software name (such as MicroStation), and matches the corresponding AssociatedDllPath and OptionalParameters in the configuration file. The AssociatedDll is loaded through dynamic loading to establish a parameter transmission channel and transmit data.
[0078] S12, through the standardized interface defined by the adaptation layer dynamic link library, which is independent of the type of BIM software, via the parameter transmission channel, realizes the unified parameter inter-transmission of various BIM software or professional application modules inside the BIM software.
[0079] The adaptation layer dynamic link library is used to establish a standard interaction channel with various BIM software, realizing the deep integration of the system of the application with different BIM software (such as MicroStation, Revit), rather than binding with a single software.
[0080] The adaptation layer dynamic link library defines a set of standardized interfaces independent of the type of BIM software as a unified entrance for all automated operations, such as "creating roads" and "laying retaining walls".
[0081] When the system of the application starts, the adaptation layer first parses the connection mapping rules in the configuration file, identifies the current target BIM software, and establishes a standard interaction channel with the BIM software by dynamically referencing the secondary development dynamic link library provided by the target BIM software (such as MicroStationRoadAdapter.dll of MicroStation and RevitRoadAdapter.dll of Revit), thereby obtaining the access ability of the interface of the BIM software or professional application module inside the BIM software. At the same time, the adaptation module specially implemented for the BIM software is dynamically loaded, and the adaptation module realizes the calling logic of the proprietary interface of the BIM software or professional application module inside the BIM software.
[0082] When initiating a request through the standardized interface, the adaptation module assumes the responsibility of converting parameter formats and driving the BIM software or professional application modules inside the BIM software to perform specified automated operations, including:
[0083] 1) Before calling the BIM software or professional application modules inside the BIM software, convert the system-standard input parameter format into the specific input parameter format required by the target BIM software or professional application modules inside the BIM software.
[0084] 2) Drive the target BIM software or professional application modules inside the BIM software to perform specified automated operations and receive the return execution results of the automated operations.
[0085] 3) Convert the return execution results of the automated operations into system-standard return execution results.
[0086] The standardized interface in the adaptation layer dynamic link library, through the mechanism of calling the BIM software secondary development dynamic link library by the adaptation module, masks the implementation differences of different BIM software at the bottom layer, thereby achieving non-discriminatory compatible support for multiple BIM software platforms at the architecture level.
[0087] The interface list of the adaptation layer dynamic link library, wherein the modeling interface is defined as an operation interface for implementing specific modeling functions, which covers road, slope, intersection, and drawing generation functions, and can specifically include a series of interfaces such as CreateRoad, CreateRetainingWall, CreatePlanDrawings, etc. The interface example list is shown in Table 1:
[0088] Table 1: Interface example list of adaptation layer dynamic link library
[0089] Step S2, prepare BIM design data, register the basic task in the BIM software based on the BIM design data and define the input and output parameters thereof, and establish a standardized BIM engineering directory to build an automated modeling environment.
[0090] In an optional embodiment, step S2 is specifically performed by the following steps:
[0091] S21, create a BIM model file and import BIM design data.
[0092] BIM designers and developers need to prepare BIM design data in advance based on project requirements, including but not limited to topographic files, route files, and design data parameter files. Then, a new BIM model file is created in the BIM software, automatically integrating and referencing the aforementioned BIM design data. The BIM design data recorded in the model file is the foundation for subsequent registration and definition of basic tasks. When BIM design data changes, the model file automatically updates the integration and referencing of the BIM design data, ensuring that the BIM design data relied upon by the basic tasks is up-to-date.
[0093] S22, build the foundational tasks for automated modeling within BIM software.
[0094] Based on the BIM design data integrated and referenced by model files, several basic tasks required for automated modeling are registered in the BIM software. The registration parameters of the basic tasks include the name of the basic task, the definition of the input parameter group and the definition of the output parameter group, and the default value of the input parameters of the basic tasks is modified according to the design data parameters.
[0095] Among them, the key parameter group in the input parameters is required, while the optional parameter group in the input parameters can be left blank. If the optional parameter group is not filled in, the default value will be used automatically.
[0096] Basic tasks are basic design capabilities that are customized by designers and BIM developers according to the needs of the project. The name of the basic task is the same as the corresponding interface in the dynamic link library of the adaptation layer. The parameters of the basic task are recorded in the form of a configuration file, which can be in JSON format.
[0097] After a basic task is successfully registered in the BIM software, the list of basic tasks and their input / output parameters will be read by the BIM Task Manager during the initialization of the adaptation layer dynamic link library. This information will be used to create and manage tasks in the project's task list for automatic execution.
[0098] The BIM Task Manager includes a built-in BIM Task Editor and BIM Task Player. When task editing is required, the BIM Task Manager launches the BIM Task Editor and passes the list of basic tasks and their input / output parameters to it. Subsequent steps S3 to S6 are all completed within the BIM Task Editor.
[0099] This example uses the basic task of "creating roads" as an example, and the JSON format is as follows. It should be noted that there is actually no " / / " or anything following it; it is added here for explanation purposes: { "toolName": "Create Road", / / Basic Task Name "desc": "Create a section of road within the route start and end station", / / Basic task description "keyInputParameters": { / / Basic task input parameter group (mandatory) definition "routeName":"Fengxin Pumped Storage Power Plant Access Road", / / Route name "startStation": "Starting Station", / / Example K0+500 "endStation": "Ending Station", / / Example K1+200 "crossSection": "Two-way two-lane 3m", / / Cross-section name }, optionalInputParameters": { / / Basic task input parameter group (optional) definition "startRotationAngle": "0", / / Starting rotation angle (degrees), default value is 0 degrees "endRotationAngle": "0", / / Ending rotation angle (degrees), default value is 0 degrees "superelevationWidening": "false", / / Whether to super-elevate and widen, default is false }, "outputParameters": { / / Output parameter group definition "roadId": "", / / Road unique identifier "wallStart": "", / / Retaining wall start station "wallEnd": "", / / Retaining wall end station }, }
[0100] The format of the parameters of other basic tasks is consistent with that of the "Create Road" basic task, except for the basic task name, basic task description, input parameter group (mandatory) parameter item name, and default value of each parameter item, input parameter group (optional) parameter item name, and default value of each parameter item, and output parameter group parameter item name and default value of each parameter item, which differ for different basic tasks. As shown in Table 2, a partial list of basic task parameters is presented:
[0101] Table 2. Basic task parameter list
[0102] S23, establish a standardized BIM project directory structure, and build an automated modeling environment.
[0103] This embodiment adopts a project engineering folder organization method, and strictly limits all relevant task configuration files (such as RPA format), task lists, BIM design materials (terrain, route, etc.), and output results of the project engineering in the folder.
[0104] This embodiment creates a project engineering folder named “Fengxin Road Approach Automated Modeling” and its sub-folders, which are used to store all project-related files belonging to the “Fengxin Road Approach Automated Modeling” project engineering. The project engineering directory is as follows:
[0105] Fengxin Road Automated Modeling / ├── Fengxin Road Approach Automated Modeling.dgn # Project engineering file ├── Input / # Input file directory │ ├── Terrain / # Terrain data file │ ├── Alignment / # Route file │ └── Parameters / # Design parameter file ├── Tasks / # Task configuration file (RPA file), task list ├── Output / # Output results │ ├── Models / # BIM model file │ ├── Drawings / # Drawing file │ └── Reports / # Statistical report └── Temp / # Temporary file
[0106] Then start the MicroStation software, and create a project engineering file named “Fengxin Road Approach Automated Modeling” in the corresponding project folder. The project engineering file records the global information of the project engineering, including the directory structure of the project engineering, the file list under each directory, and the task list recording the task execution order; each task is saved as an RPA format task configuration file.
[0107] Import the BIM design materials such as terrain file, route file, and design parameter file that have been designed into the MicroStation software as the basis for subsequent automated modeling.
[0108] Step S3, based on the basic task, a set of parameterized automatable modeling tasks are established.
[0109] Based on the basic task, a plurality of parameterized automatable modeling tasks are instantiated by configuring their input, output parameters and execution logic. All these tasks are saved in the project engineering directory in the form of independent configuration files (such as RPA files) and collectively constitute the set of parameterized automatable modeling tasks, which provide basic execution units for subsequent task scheduling.
[0110] In an optional embodiment, step S3 comprises:
[0111] S31, calling the BIM task editor to create a task.
[0112] A project engineering that can be automatically executed is created through the BIM task manager.
[0113] In this embodiment, the designer creates a project engineering named “Fengxin Road Approach Automation Modeling” through the “New” submenu in the “File” menu of the BIM task manager. Then the project engineering is opened and started to be edited through the BIM task editor in the BIM task manager.
[0114] The designer establishes a plurality of tasks in sequence according to his design experience, that is, by clicking the “Add” button in the BIM task editor, the system will add a default task in the task list. When adding the task, a basic task (such as “Create Road”) needs to be selected as the template of the added task. The added task instantiates the selected basic task when running, inherits all parameters of the selected basic task and the default values of the parameters, and uses the interface of the inherited basic task when interacting through the adaptation layer dynamic link library and the BIM software or the professional application module inside the BIM software.
[0115] The task is established in the form of a task configuration file under the Tasks directory of the project engineering folder. The task configuration file can be in RPA format.
[0116] S32, defining the parameter system of the task and establishing the parameter dependency relationship between tasks.
[0117] The input and output parameter system of the task is defined by the BIM task editor. In the automatic modeling process, the type of input and output parameters of each task is defined by the type of input and output parameters of the corresponding basic task, and the types of input and output parameters of different basic tasks are different. The input parameters of the subsequent task can refer to the input and output parameters of the previous task, such as the input parameter "WallStart" of the task 2 "block wall layout" with the value "[1][out][WallStart]", which indicates that the value corresponding to the output parameter "WallStart" of the task 1 "create road" is referred to.
[0118] When the system calls the BIM software or the professional application module inside the BIM software to automatically execute the task, the input parameters are transmitted to the BIM software or the professional application module inside the BIM software in the JSON format. The BIM software or the professional application module inside the BIM software transmits the output parameters in the form of a JSON format string, which contains the output parameter type agreed upon by the task and the current task execution status.
[0119] S33, setting the key parameters and non-key parameters of the task.
[0120] The key parameters and non-key parameters of the task are set to ensure the stability of automatic execution. The specific execution process includes: analyzing the parameter requirements of each design action, distinguishing the key parameters and non-key parameters; setting strict verification rules for the key parameters; setting reasonable default values for the non-key parameters.
[0121] In the embodiment, the key parameters of the "create road" task include the route name, the starting stake number, the ending stake number, and the cross-section type, which must be accurately transmitted. The non-key parameters include the starting corner, the ending corner, and whether to widen the superhighway, and the default values are 0, 0, and false respectively.
[0122] The parameters are transmitted in the JSON format data, the incoming JSON format data is parsed and displayed in the "create road" dialog box of MicroStation. Finally, the instruction is sent to MicroStation by the adaptive layer dynamic link library to execute the "modeling" button in MicroStation to realize the execution process.
[0123] S34, configuring the input parameters before the task execution, and establishing a verification mechanism for the matching of the input parameters and the BIM design data.
[0124] Before the execution of the task, since the input parameters can be directly input or referenced to the input and output parameters of the previous task, it is necessary to convert the current task input parameter value into the real parameter value. At the same time, it is necessary to check whether the required BIM design data exists, and whether the parameters of the task match the definition in the BIM design data, otherwise the task will not be automatically executed.
[0125] In this embodiment, taking the "create road" task as an example, the "create road" task requires the existence of a terrain model in the current BIM design file and a route corresponding to the "route name" in the input parameters in the "create road" task, otherwise the "create road" task will report an error and cannot be executed. The terrain model is a unique DTM type graphic element, and the system can determine whether the unique terrain exists by calling the scanning interface of the BIM software; the route model is a line-shaped graphic element with a specific attribute name, and the system can also determine whether the corresponding route exists by calling the scanning interface.
[0126] S35, configuring the output parameters after the execution of the task, and generating a task that can be automatically run.
[0127] The output parameters after the execution of the task are defined, that is, the result parameters that need to be transmitted to the system after the completion of the task. After step S35 is executed, a task that can be automatically run is generated.
[0128] In this embodiment, taking the "create road" task as an example, it inherits the same-named basic task "create road". After the execution of the "create road" task is completed, according to the output interface list configured by the task "create road", the RoadId is returned, and the WallStart and WallEnd of the subsequent task "create retaining wall" are returned, and finally a task named "create road" is generated.
[0129] S36, creating a plurality of independent automatically executable tasks to form a collection of automatically modelable tasks.
[0130] The steps S31 to S35 are repeated to complete the creation of a plurality of independent automatically executable tasks, form a collection of automatically modelable tasks, and generate a task configuration file of each task.
[0131] S4, the collection of tasks is connected and arranged into a task list according to the design logic and business process of the BIM model, and a project engineering recording the task list is generated.
[0132] First, the project requirements are analyzed, the task execution order is determined, and a task list is generated according to the task execution order. Then, the key tasks are set, the dependency relationship between the tasks is configured, and the process control rules are formulated, and finally a project engineering capable of executing the automatic modeling logic and recording the task list is constructed.
[0133] In the process of arranging the task list in series, recording to the project engineering, the BIM task editor supports adding tasks, copying tasks, deleting tasks, and adjusting the execution order of tasks by moving up and down.
[0134] Among them, the key task is a task that must be executed, and when the key task fails, the entire process of the project task will be terminated.
[0135] In this embodiment, according to the demand of "Fengxin Road Approach Automation Modeling", a project engineering containing 10 tasks is created, which are 1) creating a road, 2) setting up a retaining wall, 3) creating a road, 4) setting up a retaining wall, 5) creating a roadside intersection, 6) setting up a protection, 7) counting engineering quantity, 8) creating a plan, 9) creating a longitudinal section, and 10) creating a cross section, as follows: 1) "Create Road" task: inherits the same name of the basic task "Create Road", executes the BIM modeling task of the main road, and is set as a key task, that is, a task that must be run successfully. The key parameters in the input parameters are required, including route name, starting stake number, ending stake number, cross section name, wherein "route name: main road" indicates that this task is an automatic modeling of the route named "main road", and according to the definition of the "create road" task, the BIM modeling task of the main road will be executed.
[0136] The output parameters are similar to "RoadId:12345", "WallStart:K0+000", and "WallEnd:K0+500", saved as a JSON format file. Among them, WallStart and WallEnd can have no return value, which means that no retaining wall needs to be established.
[0137] Set the judgment rule, that is, if there is no retaining wall information, jump to execute the third task;
[0138] 2) "Retaining Wall Layout" task: inherits the same name of the basic task "Retaining Wall Layout", and sets up the retaining wall belonging to the main road, which is set as a non-key task. If the previous task "1) Create Road" task is executed without returning WallStart and WallEnd, this task will not be executed. The input parameters RoadId, WallStart and WallEnd of the "retaining wall layout" task refer to the output parameters RoadId, WallStart and WallEnd of the "create road" task respectively;
[0139] 3) "Create Road" task: inherits from the base task of the same name "Create Road", performs the task of BIM modeling of the branch road, and is set as a key task, where "Route Name: Branch Road" indicates that this task is automatically modeling the road named "Branch Road", and according to the definition of the "Create Road" task, the task of BIM modeling of the branch road will be performed;
[0140] The output parameters are similar: "RoadId:23456", "WallStart:K1+000", "WallEnd:K1+500", saved as a JSON format file. Among them, WallStart and WallEnd can have no return value, which means that no retaining wall needs to be built, and the setting rule directly jumps to the "Create Along Cross" task;
[0141] 4) "Retaining Wall Layout" task: inherits from the base task of the same name "Retaining Wall Layout", and lays out the retaining wall belonging to the branch road, which is set as a non-key task. If the previous task "3) Create Road" task does not return WallStart, WallEnd after execution, this task will not be executed. The input parameters RoadId, WallStart, WallEnd of this task refer to the output parameters RoadId, WallStart, WallEnd of the "3) Create Road" task respectively;
[0142] 5) "Create Along Cross" task: inherits from the base task of the same name "Create Along Cross", performs the task of BIM modeling of the road along the cross, and is set as a key task, with input parameters including route name, starting stake number, and ending stake number;
[0143] 6) "Protection Layout" task: inherits from the base task of the same name "Protection Layout", and performs the task of BIM modeling of the road slope protection, which is set as a key task, with input parameters including route name, first-level slope protection type, second-level slope protection type, and third-level slope protection type. The actual fourth-level and further level slope protection types are according to the third-level slope protection type parameter;
[0144] 7) "Statistical Engineering Quantity" task: inherits from the base task of the same name "Statistical Engineering Quantity", and calculates the road BIM model engineering quantity data in the stake number interval of the route, and exports and saves to the given path, which is set as a key task, with input parameters including route name, starting stake number, and ending stake number;
[0145] 8) "Create Plan" task: inherits from the base task of the same name "Create Plan", and creates a "plan" file according to the coverage method, and outputs the road BIM model of the route stake number interval according to the plan method, which is set as a key task, with input parameters including route name, starting stake number, and ending stake number, and the rest of the parameters are default.
[0146] 9) "Create Longitudinal Section" task: inherits from the base task of the same name "Create Longitudinal Section", creates a new "Longitudinal Section" file in the overlay mode, and outputs the road BIM model in the route stake interval according to the creation of the longitudinal section. Set as a key task, input parameters include route name, starting stake number, ending stake number, and the rest of the parameters are default.
[0147] 10) "Create Cross Section" task: inherits from the base task of the same name "Create Cross Section", creates a new "Cross Section" file in the overlay mode, and outputs the road BIM model in the route stake interval according to the cross section. Set as a key task, input parameters include route name, starting stake number, ending stake number, and the rest of the parameters are default.
[0148] S5, parse the task list in the project engineering, call the adaptation layer interface, and the adaptation layer interface drives the target BIM software or the professional application module inside the BIM software to automatically run the tasks in the task list through the parameter transmission channel to complete automatic modeling.
[0149] The "Operation" menu in the BIM task manager or the "Operation" menu in the BIM task editor in the BIM task manager can drive the BIM task player to follow the task arrangement order defined in the task list in the project engineering, the dependency relationship between tasks, the key task setting, and the task flow control rules. Through the parameter transmission channel, call the interfaces corresponding to each task in the adaptation layer dynamic link library in turn, and access the secondary development dynamic link library provided by the target BIM software through the interface; based on the input and output parameter configuration of the base task in step S3, transmit task parameters, monitor execution progress, and finally call the BIM software or the professional application module inside the BIM software to complete automatic modeling.
[0150] In this embodiment, task 1) calls the road creation interface to generate a road model; determines whether to perform task 2) according to the output result; and sequentially performs until task 10) completes the cross section creation. Output complete road BIM model and related achievement files.
[0151] It can be understood that the BIM task player transmits parameters through the parameter transmission channel established in step S1, calls the interfaces corresponding to each task in the adaptation layer dynamic link library (for example, the road creation interface), and obtains the API access capability of the secondary development dynamic link library provided by the target BIM software (such as MicroStationRoadAdpter.dll of MicroStation and RevitRoadAdpter.dll of Revit) through dynamic reference, to realize the calling logic of the interface of the BIM software or the professional application module inside the BIM software.
[0152] In an optional embodiment, after step S5, further comprising: step S6, establishing a system change maintenance mechanism, re-executing the entire process after the change, and re-outputting the complete road BIM model and related achievement files.
[0153] Specifically includes:
[0154] 1) When the BIM design data changes, update the corresponding task parameters in the BIM task editor.
[0155] 2) When the project requirements change, add, delete or modify tasks; maintain the dependency relationship between tasks and the parameter transmission link.
[0156] 3) Re-execute the entire process after the change, and re-output the complete road BIM model and related achievement files.
[0157] Embodiment 2
[0158] The embodiment provides a system for automatic design based on BIM software, which is used for collaborative work with specific BIM software such as MicroStation and Revit, and realizes automatic design, drawing and quantity statistics of BIM models of roads, slopes and intersections. The core of the system consists of two components: BIM task editor and BIM task player, and interacts with BIM software through a communication adaptation layer. It includes:
[0159] 1. The communication adaptation module is used to initialize the adaptation layer dynamic link library by analyzing the configuration file to establish a parameter transmission channel, and to transmit parameters with the BIM software or the professional application module inside the BIM software through a set of standardized interfaces defined by the adaptation layer dynamic link library, which are independent of the type of BIM software.
[0160] The communication adaptation module is loaded when the system starts, and includes:
[0161] 1) Configuration file: read the BIM software connection mapping rules through the configuration file.
[0162] The configuration file defines at least one application program identifier of the target BIM software and the corresponding secondary development dynamic link library path.
[0163] 2) Dynamic loading module: used for dynamically loading the secondary development dynamic link library provided by the BIM software.
[0164] Based on the definition of the configuration file, the target BIM software is located and connected by searching the operating system process list; the secondary development dynamic link library corresponding to the BIM software is dynamically loaded; and a set of standardized interfaces is constructed to shield the implementation differences between different BIM software and form a unified standard interaction channel.
[0165] 3) Format conversion module: for constructing standardized interfaces and forming a unified interaction channel.
[0166] When calling the BIM software, the communication adaptation module converts the standardized parameter format inside the system into the specific parameter format required by the target BIM software; when receiving the returned result, it converts the specific result format of the BIM software into the standardized format inside the system.
[0167] 2. Environment construction module, for preparing BIM design materials, registering basic tasks in BIM software based on the BIM design materials and defining their input and output parameters, and establishing a standardized BIM engineering directory to build an automated modeling environment. Including:
[0168] 1) Material management unit, for creating a new BIM model file, and importing or referencing terrain files, route files, design parameter files, etc.
[0169] 2) Task registration unit, for registering a number of basic tasks in the BIM software. Each basic task is declared through a predefined data structure (such as a JSON format configuration file), which includes at least the basic task name, input parameter group definition and output parameter group definition. The input parameter group definition is divided into mandatory key parameters and optional parameters with default values.
[0170] 3) Directory management unit, for establishing and managing a standardized BIM engineering directory structure, which includes at least an Input subdirectory for storing input design materials, a Tasks subdirectory for storing task configuration files and task lists, and an Output subdirectory for storing output results.
[0171] 3. Engineering management module, for managing all project engineering, providing functions such as project engineering creation, opening, saving, deleting, list display and version control. Including:
[0172] 1) Project creation submodule: for creating a new project engineering, including setting the project name, storage path, initializing the project directory structure (such as Input, Tasks, Output subdirectories), and generating the project engineering file (such as.dgn file), recording the project metadata (such as creation time, creator, description, etc.).
[0173] 2) Project Open Submodule: Used to open existing project engineering, load project engineering files, task files (RPA files), task lists and BIM design materials, restore project status, and display task flow in task editor.
[0174] 3) Project Save Unit: Used to save all configurations and task changes of the current project engineering, including task parameter adjustment, process arrangement modification, etc., to ensure the consistency of project data. Supports automatic saving and manual saving modes.
[0175] 4) Project List Submodule: Used to display all created project engineering lists, providing project name, path, last modification time and other basic information, facilitating user quick selection and management. Supports sorting and filtering by name, time, etc.
[0176] 5) Project Delete Submodule: Used to delete no longer needed project engineering, including deleting project directory and all related files (such as BIM design materials, task engineering files, output results, etc.), and providing a confirmation mechanism to prevent accidental deletion.
[0177] 6) Project Version Control Submodule: Used to manage version history of project engineering, supporting version snapshot, version rollback and version comparison. When a project undergoes major changes, a version backup is automatically created, change notes are recorded, and traceability is ensured.
[0178] Through the engineering management module, users can efficiently organize and manage multiple project engineering, ensuring the independence and maintainability of each project, while improving team collaboration efficiency.
[0179] 4. Task editing module, for establishing a set of parameterized tasks that can be automatically modeled based on the basic tasks; and connecting and arranging the set of tasks into a task list according to the design logic of the BIM model and the business process, and generating a project engineering recording the task list.
[0180] The task editing module includes a BIM task editor, which is an integrated development environment integrating task design, process arrangement and change maintenance functions, for designers to visually create, configure and arrange tasks that can be automatically modeled and generate a task list recording the tasks. It includes the following submodules:
[0181] 1) Task Definition Submodule: Provides a graphical interface for creating basic task instances according to project requirements.
[0182] Users can inherit and instantiate specific tasks from registered basic tasks (such as "create road") through the "add" button. The new task will inherit all parameters and default values of the template.
[0183] 2) Parameter management submodule, used to define the task parameter system and establish parameter dependencies between tasks.
[0184] The parameter management submodule allows users to configure the input and output parameters of a task, and supports the input parameters of subsequent tasks referencing the input or output parameters of previous tasks (for example, setting the input parameter "WallStart" value of task 2 "Retaining Wall Deployment" to [1][Out][WallStart] to reference the output of task 1).
[0185] 3) Parameter validation rule configuration submodule, used to set key and non-key parameters of the task, set strict validation rules for key parameters, and set reasonable default values for non-key parameters.
[0186] 4) Design data matching submodule, used to establish a verification mechanism for the matching of input parameters and BIM design data.
[0187] Before the task is executed, the design data matching submodule will verify whether the required BIM design data (such as terrain model and route model) exists and whether the task parameters match the definitions in the data.
[0188] 5) Process orchestration submodule: This module is used to connect and orchestrate all tasks into an ordered list of executable tasks, and record the task list in the project.
[0189] 6) Rule building submodule: Used to define the execution rules for each task in the task list.
[0190] The execution rules for a task are implemented by modifying its existing RPA configuration file. Taking the "Retaining Wall Deployment" task as an example, the following rule can be configured: its execution depends on the retaining wall stake information returned by the "Create Road" task. If this information is empty, the "Retaining Wall Deployment" task is skipped and the subsequent "Create Intersection Along the Route" task is executed directly. Finally, the execution rules will be updated in the corresponding task list in the Tasks folder under the project directory.
[0191] 5. Task playback module, used to parse the task list in the project, call the adaptation layer interface, the adaptation layer interface drives the target BIM software or the professional application module inside the BIM software to automatically run the tasks in the task list to complete automated modeling through the parameter transmission channel.
[0192] The core of the task playing module is the BIM task player, which is an execution engine dedicated to automatic modeling. At runtime, the player first loads and parses the task list in the project engineering to obtain the complete execution logic, including task order, dependency relationship, and flow control rules. Subsequently, it strictly follows this logic and sequentially calls the standardized interfaces corresponding to each task through the communication adaptation layer to drive execution.
[0193] For each task, the task playing module passes the converted real parameter values based on the configuration of the task and monitors the execution progress. It drives the BIM software or professional application modules inside the BIM software to perform specific operations through the communication adaptation layer and receives the returned execution results.
[0194] The module strictly executes the flow control rules, dynamically decides the subsequent execution path based on the execution state and output results of the previous tasks, and finally completes the entire automatic modeling process, outputting a complete BIM model and related achievement files.
[0195] In an optional embodiment, a system for automatic design based on BIM software further comprises: A change maintenance module is used to establish a system change maintenance mechanism, re-execute the entire process after changes, and re-output a complete road BIM model and related achievement files. When BIM design data or project requirements change, users can update the corresponding task parameters, add, delete, or modify tasks through this module, and maintain the parameter transmission link between tasks. After changes, this module ensures that the content in the BIM task editor is consistent with the latest requirements and can trigger the regeneration of the task configuration file (RPA file) and the task list to prepare for the re-execution of the entire project engineering.
[0196] Embodiment 3
[0197] This embodiment proposes an electronic device, comprising: a memory for storing a computer program; a processor for executing the program stored on the memory to implement each step of the above method embodiment for automatic design based on BIM software.
[0198] For specific implementation of each step and related explanation, please refer to the aforementioned method embodiment for automatic design based on BIM software, which will not be repeated here.
[0199] The memory of the electronic device mentioned in this embodiment can include a random access memory (RAM) and can also include a non-volatile memory (NVM), such as at least one disk memory.
[0200] The processor described above can be a general processor, including a central processing unit (CPU), a network processor (NP), etc.; can also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic device, a discrete gate or transistor logic device, a discrete hardware component.
[0201] Embodiment 4
[0202] The embodiment of the present application further provides a computer readable storage medium, and the computer readable storage medium stores a computer program. The computer program is executed by a processor to implement each step of the above method embodiment for automatic design based on BIM software. The specific implementation of each step of the method and the related explanation can be referred to the aforementioned method embodiment for automatic design based on BIM software, and will not be repeated here.
[0203] It should be noted that each embodiment in the present specification is described in a relevant manner, and the same and similar parts of each embodiment can be referred to each other. Each embodiment mainly describes the difference from other embodiments.
[0204] Especially, the device, electronic equipment and computer readable storage medium embodiments are basically similar to the method embodiments, so the description is relatively simple, and the related parts can be referred to the part of the method embodiment.
[0205] The above only describes the embodiments of the present application and is not used to limit the present application. The present application can be variously changed and modified by those skilled in the art. Any modification, equivalent replacement, improvement, etc. within the spirit and principle of the present application shall be included in the scope of claims of the present application.
Claims
1. A method for automated design based on BIM software, characterized by, The method comprises the following steps: initializing an adaptation layer dynamic link library by analyzing a configuration file to establish a parameter transmission channel, defining a set of standardized interfaces irrelevant to the type of BIM software through the adaptation layer dynamic link library, and interchanging parameters with BIM software or professional application modules inside BIM software via the parameter transmission channel; preparing BIM design data, registering basic tasks in BIM software based on the BIM design data and defining the input and output parameters thereof, and establishing a standardized BIM engineering directory to build an automated modeling environment; establishing a set of parameterized tasks that can be automatically modeled based on the basic tasks; serially arranging the set of tasks into a task list according to the design logic and business process of the BIM model, and generating a project engineering recording the task list; analyzing the task list in the project engineering, calling the adaptation layer interface, and driving the target BIM software or professional application modules inside BIM software to automatically run the tasks in the task list to complete automated modeling through the parameter transmission channel.
2. The method of claim 1, wherein, After the step of analyzing the task list in the project engineering, calling the adaptation layer interface, and driving the target BIM software or professional application modules inside BIM software to automatically run the tasks in the task list to complete automated modeling, the method further comprises the following steps: establishing a system change and maintenance mechanism, and re-executing the entire process after the change to re-output a complete road BIM model and related result files.
3. The method of claim 1, wherein, The step of initializing an adaptation layer dynamic link library by analyzing a configuration file to establish a parameter transmission channel, defining a set of standardized interfaces irrelevant to the type of BIM software through the adaptation layer dynamic link library, and interchanging parameters with BIM software or professional application modules inside BIM software via the parameter transmission channel comprises the following steps: defining connection mapping rules by analyzing a configuration file, loading a secondary development dynamic link library of corresponding BIM software based on the connection mapping rules to establish a parameter transmission channel with the corresponding BIM software; realizing unified parameter interchanging with multiple BIM software or professional application modules inside BIM software via the parameter transmission channel through the standardized interfaces irrelevant to the type of BIM software defined by the adaptation layer dynamic link library.
4. The method of claim 1, wherein, The step of preparing BIM design data, registering basic tasks in BIM software based on the BIM design data and defining the input and output parameters thereof, and establishing a standardized BIM engineering directory to build an automated modeling environment comprises the following steps: creating a BIM model file and importing BIM design data; building basic tasks for automated modeling in BIM software; establishing a standardized BIM engineering directory structure to build an automated modeling environment.
5. The method of claim 1, wherein, The step of establishing a set of parameterized automated modeling tasks based on the basic tasks comprises the following steps: calling a BIM task editor to create a task; defining a parameter system of the task and establishing a parameter dependency relationship between tasks; setting key parameters and non-key parameters of the task; configuring input parameters before the execution of the task, and establishing a verification mechanism for the matching of input parameters and BIM design data; The output parameters after the configuration task is executed are generated to form a task that can be automatically run; A plurality of independent tasks that can be automatically executed are created to form a set of tasks that can be automatically run.
6. A system for automated design based on BIM software, characterized by, The method comprises the following steps: A communication adaptation module is configured to initialize an adaptation layer dynamic link library by parsing a configuration file to establish a parameter transmission channel, and to define a set of standardized interfaces irrelevant to the type of BIM software through the adaptation layer dynamic link library, and to exchange parameters with the BIM software or professional application modules inside the BIM software through the parameter transmission channel; An environment construction module is configured to prepare BIM design data, create a model file in the BIM software based on the BIM design data, register a basic task in the BIM software based on the model file and define the input and output parameters of the basic task, and establish a standardized BIM engineering directory to construct an automatic modeling environment; An engineering management module is configured to manage all project engineering, and provide functions of creating, opening, saving, deleting, listing and version controlling the project engineering; A task editing module is configured to establish a set of parameterized tasks that can be automatically modeled based on the basic task; The set of tasks is arranged in a task list according to the design logic and business process of the BIM model, and a project engineering recording the task list is generated; A task playing module is configured to parse the task list in the project engineering, call the adaptation layer interface, and drive the target BIM software or professional application modules inside the BIM software to automatically run the tasks in the task list through the parameter transmission channel to complete the automatic modeling.
7. The system of claim 6, wherein, The communication adaptation module comprises: A configuration file is configured to read the BIM software connection mapping rules through the configuration file; A dynamic loading module is configured to dynamically load the secondary development dynamic link library provided by the BIM software; A format conversion module is configured to construct the standardized interface to form a unified interaction channel.
8. The system of claim 6, wherein, The task editing module comprises: A task definition submodule is configured to create a basic task instance according to the project requirements; A parameter management submodule is configured to define the task parameter system and establish the parameter dependency relationship between tasks; A parameter verification rule configuration submodule is configured to set the key parameters and non-key parameters of the task, and set strict verification rules for the key parameters and reasonable default values for the non-key parameters; A design data matching submodule is configured to establish a verification mechanism for the matching of the input parameters and the BIM design data; A process arrangement submodule is configured to concatenate and arrange all the tasks into an ordered executable task list, and record the task list to the project engineering; A rule construction submodule is configured to define the execution rules of each task in the task list. 9.An electronic device comprising: a memory configured to store a computer program; a processor configured to execute the program stored on the memory to implement the method steps of any one of claims 1-5.
10. A computer-readable storage medium, characterized in that, The computer readable storage medium stores a computer program, and the computer program is executed by the processor to implement the method steps of any one of claims 1-5.
Citation Information
Patent Citations
Automatic design method of digital spatial derivative structure
CN111143921A
Intelligent working model creating method and system based on BIM (Building Information Modeling) design platform
CN117371114A
Drainage pipe network data transmission and rapid modeling method and system based on BIM
CN117593461A
BIM (Building Information Modeling)-based dike design, calculation and plotting integrated collaborative method
CN118313050A
Method and system for automatically hooking BIM (Building Information Modeling) model and planned task
CN118364783A
Cited By
Non-standard embedded part structured data information providing method
CN121859421A