Lateral wall auxiliary net hanging device and digging and anchoring all-in-one machine

By designing a side-mounted auxiliary netting device and an integrated excavation and anchoring machine, and using drive components to drive the lifting frame and sliding mechanism, the automated lifting and laying of the anchor netting is achieved, solving the problem of high labor intensity in manual operation and improving efficiency and automation.

CN121897378APending Publication Date: 2026-04-21CHINA RAILWAY CONSTR HEAVY IND
0 Cites 0 Cited by

Patent Information

Application Number
CN202511812858.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-12-04
Publication Date
2026-04-21

AI Technical Summary

Technical Problem

The current installation of anchor mesh on the side of the wall still relies on manual operation, which is labor-intensive and affects work efficiency.

Method used

Design a side-mounted auxiliary netting device and an integrated excavation and anchoring machine. The device uses a first driving component to drive the first and second lifting frames to lift and lay the anchor netting. Combined with a sliding mechanism and a push rod, it improves the movement and bonding efficiency of the anchor netting.

Benefits of technology

It significantly improves the efficiency of anchor net laying, reduces the labor intensity of operators, has a compact structure, reduces the size of the device, and improves the level of automated production.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention provides a lateral wall auxiliary net hanging device and a digging and anchoring all-in-one machine, and relates to the technical field of underground mining anchor net laying. The side wall auxiliary net hanging device comprises a fixing frame, a first driving piece, a first lifting frame, a second lifting frame and a lifting piece. The first driving piece is installed on the fixing frame, and the first lifting frame is connected with the first driving piece and movably connected with the fixing frame. The second lifting frame is movably connected to the first lifting frame. One end of the lifting part is connected with the fixing frame, and the other end bypasses one end, away from the fixing frame, of the first lifting frame and is connected with the second lifting frame. The anchor net can be effectively lifted and laid, the working efficiency is improved, and the labor intensity of workers is reduced.
Need to check novelty before this filing date? Find Prior Art