AI machine room system and intelligent operation and maintenance method thereof

By integrating civil engineering modules, power supply modules, electromechanical modules, and intelligent data center SU systems, the high energy consumption, high carbon emissions, and high operation and maintenance costs of traditional data centers have been solved, achieving high efficiency and energy saving and intelligent operation and maintenance, supporting rapid deployment and standardized construction, and improving the intelligence and greenness of data centers.

CN122373307APending Publication Date: 2026-07-10HUNAN PROVINCE KANGPU COMM EQUIP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
HUNAN PROVINCE KANGPU COMM EQUIP CO LTD
Filing Date
2026-04-03
Publication Date
2026-07-10

AI Technical Summary

Technical Problem

Traditional data centers suffer from high energy consumption, high carbon emissions, high operation and maintenance costs, and low elasticity and scalability, which limits their application and development in fields such as 5G, AI, and edge computing.

Method used

The AI ​​data center system includes civil engineering modules, power supply modules, electromechanical modules, a smart data center SU system, and an integrated data center management system. It is interconnected through a unified data interface and communication protocol, and integrates components such as aerogel walls, prefabricated modular buildings, smart PDUs, photovoltaic systems, and self-cleaning smart fresh air systems to achieve high efficiency, energy saving, and intelligent operation and maintenance.

Benefits of technology

Significantly reduces energy consumption and carbon emissions, improves operational efficiency and system reliability, supports rapid deployment and standardized construction, enhances the intelligence and greenness of data centers, and meets the needs of 5G and AI.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122373307A_ABST
    Figure CN122373307A_ABST
Patent Text Reader

Abstract

The application discloses an AI machine room system and an intelligent operation and maintenance method thereof, and the system comprises a civil engineering module, a power supply module, an electromechanical module, a smart machine room SU system and a machine room integrated management system; the civil engineering module comprises an aerogel wall body, a prefabricated assembly type room body and a base station tower pole integrated structure; the power supply module comprises an intelligent PDU, an intelligent small bus, a photovoltaic system and a light storage system; the electromechanical module comprises an elastic heat bin, a self-cleaning intelligent fresh air system, an evaporative cold water curtain fresh air system, a non-powered air cap, a direct current heat exhaust system and a heat energy inter-row air conditioner; the smart machine room SU system comprises a personnel management unit, a device management unit, an environment management unit and an intelligent maintenance unit; and the machine room integrated management system comprises a data acquisition and monitoring unit, a data analysis and decision support unit, a resource optimization and scheduling unit and a safety control and early warning unit. The application solves the bottleneck problems of a traditional data center in terms of high energy consumption, high carbon emission, high operation and maintenance cost and low elastic expansion capacity.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Operation and maintenance management and control system for data center machine room

    CN117677162A