Municipal construction fence

By introducing connecting components and fixed components into municipal construction fences, the problem of inconvenience in installation of traditional fences under different terrain conditions is solved, flexible angle adjustment and stable installation are achieved, and construction efficiency and safety are improved.

CN223256610UActive Publication Date: 2025-08-22HUNAN NO 2 ENG
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202423062054.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-12
Publication Date
2025-08-22
Estimated Expiration
2034-12-12

AI Technical Summary

Technical Problem

It is difficult to achieve stable and appropriate angle installation under different terrain conditions, and the connection structure is inflexible, which increases construction difficulty and affects stability and protective effects.

Method used

A municipal construction fence is designed, and flexible installation is achieved by setting connecting components and fixing components on both sides of the guardrail, using the first bolt and the second bolt to adjust the angle of the guardrail and the connecting rod, and adjusting the vertical angle and horizontal height through the fixing plate and the adjustment block on uneven ground.

Benefits of technology

It improves the convenience and applicability of guardrail installation, can be installed stably under different terrain conditions, and reduces construction time and manpower and material consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223256610U_ABST
    Figure CN223256610U_ABST
Patent Text Reader

Abstract

A municipal construction fence belongs to the technical field of municipal construction and comprises a guardrail, connecting assemblies are arranged on two sides of the guardrail, and fixing assemblies are arranged at the bottoms of the connecting assemblies. The connecting assembly comprises a connecting rod, first side plates which are arranged in pairs are fixedly mounted on the two sides of the connecting rod, mounting blocks are fixedly mounted on the two sides of the guardrail, the mounting blocks are inserted between the corresponding first side plates, and first bolts are fixedly mounted between the first side plates and the mounting blocks; and the fixing assembly comprises a fixing plate and an adjusting block, second side plates arranged in pairs are fixedly installed at the top of the fixing plate, the adjusting block is inserted between the second side plates arranged in pairs, second bolts are fixedly installed between the second side plates and the adjusting block, a screw rod is fixedly installed at the top of the adjusting block, and the screw rod is rotationally connected to the bottom of the connecting rod. The utility model has the advantages that the connecting angle between the guardrails and the angle relation between the guardrails and a ground fixing part can be flexibly adjusted, the installation is more convenient, the applicability is stronger, and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of municipal construction, in particular to a municipal construction enclosure. Background Art

[0002] During municipal construction, construction fencing plays a vital role. It can effectively isolate the construction area from the outside world, ensure construction safety and the safe passage of pedestrians and vehicles. Traditional municipal construction fencing often has many inconveniences during the installation process.

[0003] For example, under different terrain conditions, especially uneven or sloping ground, it is difficult to achieve stable and appropriate angle installation. The connection structure of some fences is relatively fixed, and the connection angle between the guardrails and the angle relationship with the ground fixed parts cannot be flexibly adjusted. This not only increases the difficulty of construction and prolongs the construction time, but also may affect the overall stability and protection effect of the fence. In addition, the maintenance and adjustment of traditional fences after installation are also relatively cumbersome. Once the installation is completed, if the installation angle or position needs to be changed due to changes in terrain or other reasons, it often takes a lot of manpower and material resources to disassemble and reinstall. To this end, the utility model provides a new municipal construction fence to solve the above problems. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a municipal construction fence that can flexibly adjust the connection angles between guardrails and the angle relationship with ground fixed components, and is more convenient to install and more applicable, in response to the shortcomings of the existing technology.

[0005] The technical solution adopted by the utility model to solve the technical problem is: a municipal construction fence, comprising a guardrail, connecting components are provided on both sides of the guardrail, and a fixing component is provided at the bottom of the connecting component;

[0006] The connecting assembly includes a connecting rod, with first side panels arranged in pairs fixedly mounted on both sides of the connecting rod, and mounting blocks fixedly mounted on both sides of the guardrail, the mounting blocks being inserted between the corresponding first side panels, and first bolts being fixedly mounted between the first side panels and the mounting blocks;

[0007] The fixing assembly includes a fixing plate and an adjusting block, the top of the fixing plate is fixedly installed with a second side plate arranged in a pair, the adjusting block is inserted between the second side plates arranged in a pair, a second bolt is fixedly installed between the second side plate and the adjusting block, and a screw is fixedly installed on the top of the adjusting block, and the screw is rotatably connected to the bottom of the connecting rod.

[0008] Furthermore, two groups of first side panels arranged in pairs are fixedly mounted on one side of each connecting rod, and two mounting blocks are fixedly mounted on both sides of the guardrail, and the two mounting blocks are respectively inserted between the two groups of first side panels arranged in pairs.

[0009] Furthermore, fixing holes are provided at the four corners of the fixing plate, and the second side plate is fixedly installed at the center of the top of the fixing plate.

[0010] Furthermore, the bottom of the connecting rod is a solid structure, a groove is opened inside the bottom of the connecting rod, the screw is located inside the groove, the top of the screw is rotatably connected to the top of the groove, and a nut is connected to the outside of the screw, and the nut fits into the bottom of the groove.

[0011] Furthermore, the guardrail includes a frame, a mesh plate is fixedly installed inside the frame, and reflective stickers are fixedly installed on both sides of the bottom of the frame, and the reflective stickers are located below the mesh plate.

[0012] Compared with the prior art, the present invention has the following beneficial effects:

[0013] 1. In the connection design between the guardrail and the connecting rod of the municipal construction fence, a first side plate is set on both sides of the connecting rod, and a mounting block is set on both sides of the guardrail. The connection is achieved by a first bolt. When necessary, the first bolt can be loosened to allow the mounting block to rotate around it, so that the angle between the guardrail and the connecting rod can be easily adjusted, which greatly improves the convenience of guardrail installation and enables it to better adapt to the layout requirements of different construction scenarios.

[0014] 2. The municipal construction fence has fixing holes on the fixing plate, which can be fixed to the ground by inserting nails. At the same time, the screw, nut, adjustment block, second side plate and second bolt are used to cooperate. When the ground is uneven and inclined, the vertical angle between the fixing plate and the adjustment block and the horizontal height of the adjustment block and the fixing plate can be adjusted respectively, ensuring that the connecting rod and guardrail can be installed vertically under various complex terrain conditions, greatly enhancing the applicability of guardrail installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the implementation scheme of the present invention or the technical scheme in the prior art, the drawings required for use in the implementation scheme or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some implementation schemes of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0016] Figure 1 It is a structural schematic diagram of an embodiment of the utility model;

[0017] Figure 2yes Figure 1 An enlarged view of the structure at point A in the embodiment shown;

[0018] Figure 3 yes Figure 1 An enlarged view of the structure at point B in the embodiment shown;

[0019] Figure 4 yes Figure 1 A schematic structural diagram of the guardrail of the illustrated embodiment.

[0020] Description of reference numerals in the figures:

[0021] 1. Guardrail; 11. Frame; 12. Mesh; 13. Reflective tape; 2. Connecting assembly; 21. Connecting rod; 22. First side panel; 23. Mounting block; 24. First bolt; 3. Fixing assembly; 31. Fixing plate; 32. Fixing hole; 33. Second side panel; 34. Second bolt; 35. Groove; 36. Screw; 37. Nut; 38. Adjusting block. DETAILED DESCRIPTION

[0022] It should be noted that in the description of the embodiments of the present application, the terms "front, rear", "left, right", "up, down", etc. indicating directions or positional relationships are all based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present application and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present application. The terms "install", "connect", and "connected" should be understood in a broad sense. For example, they can be fixedly connected, detachably connected, or integrally connected; they can be directly connected, or indirectly connected through an intermediate medium, or they can be internal connections between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0023] The present application will be further described in detail below through the accompanying drawings and examples.

[0024] Reference Figures 1 to 4 A municipal construction fence comprises a guardrail 1, connecting components 2 are provided on both sides of the guardrail 1, and a fixing component 3 is provided at the bottom of the connecting component 2;

[0025] The connecting assembly 2 includes a connecting rod 21, and a pair of first side plates 22 are fixedly installed on both sides of the connecting rod 21. A mounting block 23 is fixedly installed on both sides of the guardrail 1. The mounting block 23 is inserted between the corresponding first side plates 22. A first bolt 24 is fixedly installed between the first side plates 22 and the mounting block 23.

[0026] The fixing assembly 3 includes a fixing plate 31 and an adjusting block 38. The top of the fixing plate 31 is fixedly installed with a second side plate 33 arranged in a pair. The adjusting block 38 is inserted between the second side plates 33 arranged in a pair. A second bolt 34 is fixedly installed between the second side plates 33 and the adjusting block 38. The top of the adjusting block 38 is fixedly installed with a screw rod 36, and the screw rod 36 is rotatably connected to the bottom of the connecting rod 21.

[0027] In this embodiment, two groups of first side panels 22 arranged in pairs are fixedly installed on one side of each connecting rod 21, and two mounting blocks 23 are fixedly installed on both sides of the guardrail 1. The two mounting blocks 23 are respectively inserted between the two groups of first side panels 22 arranged in pairs.

[0028] In this embodiment, fixing holes 32 are formed at the four corners of the fixing plate 31 , and the second side plate 33 is fixedly installed at the center of the top of the fixing plate 31 .

[0029] In this embodiment, the bottom of the connecting rod 21 is a solid structure, and a groove 35 is opened inside the bottom of the connecting rod 21. The screw 36 is located inside the groove 35. The top of the screw 36 is rotatably connected to the top of the groove 35. The outside of the screw 36 is connected to a nut 37, and the nut 37 is fitted to the bottom of the groove 35.

[0030] In this embodiment, the guardrail 1 includes a frame 11 , a mesh plate 12 is fixedly installed inside the frame 11 , and reflective stickers 13 are fixedly installed on both sides of the bottom of the frame 11 , and the reflective stickers 13 are located below the mesh plate 12 .

[0031] The contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0032] Working principle: When installing the guardrail, place the connecting rod 21 between the two guardrails, and install the guardrails 1 on both sides through the connecting rod 21. When installing, insert the mounting block 23 between the corresponding first side panels 22, and then install the first bolt 24 between the first side panel 22 and the mounting block 23, so as to complete the fixation between the connecting rod 21 and the guardrail 1. After fixing, loosen the first bolt 24. After loosening, the mounting block 23 can be rotated around the first bolt 24 between the first side panel 22, so that the angle between the guardrail 1 and the connecting rod 21 can be adjusted. By adjusting the installation angle of the guardrail 1, the guardrail 1 is more convenient to install; when fixing the connecting rod 21, fit the fixing plate 31 to the guardrail 1. On the ground, the fixing plate 31 is fixed by inserting a nail through the fixing hole 32 and plugging it into the soil below, thereby fixing the connecting rod 21 and ensuring that the guardrail 1 can be fixed normally. When installing on an uneven and inclined ground, the second bolt 34 can be loosened to adjust the vertical angle between the fixing plate 31 and the adjusting block 38. The nut 37 can be loosened to rotate the screw 36 to change the horizontal height of the adjusting block 38 and the fixing plate 31. By adjusting the horizontal height and vertical angle of the fixing plate 31, it is ensured that the connecting rod 21 and the guardrail 1 can be installed vertically on the inclined ground, thereby ensuring the applicability of the installation of the guardrail 1.

[0033] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.

[0034] Although the embodiments of the present application have been shown and described above, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present application, and the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A municipal construction enclosure, comprising a guardrail, with connecting assemblies provided on both sides of the guardrail and a fixing assembly provided at the bottom of the connecting assembly; characterized in that: The connecting assembly includes a connecting rod, with first side panels arranged in pairs fixedly mounted on both sides of the connecting rod, and mounting blocks fixedly mounted on both sides of the guardrail, the mounting blocks being inserted between the corresponding first side panels, and first bolts being fixedly mounted between the first side panels and the mounting blocks; The fixing assembly includes a fixing plate and an adjusting block, the top of the fixing plate is fixedly installed with a second side plate arranged in a pair, the adjusting block is inserted between the second side plates arranged in a pair, a second bolt is fixedly installed between the second side plate and the adjusting block, and a screw is fixedly installed on the top of the adjusting block, and the screw is rotatably connected to the bottom of the connecting rod.

2. The municipal construction enclosure according to claim 1 is characterized by: Two sets of first side plates arranged in pairs are fixedly installed on one side of each connecting rod, and two mounting blocks are fixedly installed on both sides of the guardrail, and the two mounting blocks are respectively inserted between the two sets of first side plates arranged in pairs.

3. The municipal construction enclosure according to claim 1 or 2, characterized in that: The four corners of the fixing plate are each provided with fixing holes, and the second side plate is fixedly installed at the center of the top of the fixing plate.

4. The municipal construction enclosure according to claim 1 or 2, characterized in that: The bottom of the connecting rod is a solid structure, a groove is opened inside the bottom of the connecting rod, the screw is located inside the groove, the top of the screw is rotatably connected to the top of the groove, a nut is connected to the outside of the screw, and the nut fits into the bottom of the groove.

5. The municipal construction enclosure according to claim 1 or 2, characterized in that: The guardrail comprises a frame, a mesh plate is fixedly installed inside the frame, and reflective stickers are fixedly installed on both sides of the bottom of the frame, and the reflective stickers are located below the mesh plate.

Citation Information

Cited By

  • Pavement protection device for construction site

    CN120906023A

  • A pavement protection device for a construction site

    CN120906023B