A support frame and winch device for an immersed tunnel winch.
Patent Information
- Application Number
- CN202522304744.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-30
- Publication Date
- 2026-09-11
- Estimated Expiration
- 2035-10-30
AI Technical Summary
[0005]本实用新型的目的在于克服现有技术中所存在的在沉管漂浮于水面进行移动的过程中,会有浪涌涌上沉管的顶面,对布置在沉管顶面的绞车电路系统产生严重干扰的问题,提供一种用于沉管上绞车的支架及绞车装置
本实用新型提供一种用于沉管上绞车的支架,通过将所述绞车抬高安装在所述沉管结构体的顶面上。在沉管漂浮于水面移动的过程中,由于所述绞车的位置被抬高,能够有效减少涌浪对所述绞车的直接影响。涌浪通常会对位于较低位置的设备产生较大冲击力,而抬高的所述绞车避开了涌浪的主要作用范围,进而降低了涌浪对所述绞车的电路系统产生干扰的可能性,保障了所述绞车在复杂水域环境下的正常运行,提高了设备使用的可靠性和安全性;
Smart Images

Figure CN224740731U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of immersed tunnel construction technology, and in particular to a support and winch device for an immersed tunnel winch. Background Technology
[0002] In the field of underwater tunnel construction, immersed tube technology is a widely used and effective construction method. The construction process for underwater tunnels using immersed tube technology is typically as follows: first, tunnel segments are prefabricated on land. After prefabrication, both ends of the segments are sealed, and then the segments are transported to the water surface directly above the designed location using a floating method. Upon arrival at the designated location, the segments are sunk into pre-excavated underwater trenches using a precise positioning system. Adjacent segments are then connected, and finally, backfilling and interior finishing are carried out to form a complete tunnel structure.
[0003] During the floating operation, a winch needs to be installed on the top surface of the immersed tube. Using the traction of the cables on the winch, the immersed tube is dragged to the water surface directly above the designed position.
[0004] However, during the movement of the immersed tunnel while floating on the water surface, due to the complex and ever-changing water conditions, surges inevitably rise to the top of the tunnel. These surges can severely interfere with the winch circuit system located on the top of the tunnel, thereby affecting the normal operation of the winch circuit system and posing safety hazards to the floating operation of the tunnel. Utility Model Content
[0005] The purpose of this invention is to overcome the problem in the prior art that when a submerged pipe floats on the water surface and moves, waves surge up to the top of the pipe, causing serious interference to the winch circuit system arranged on the top of the pipe. This invention provides a support and winch device for a winch on a submerged pipe.
[0006] In a first aspect, the present invention provides a support for a winch on a immersed tunnel, comprising: Platform plate, the platform plate being used to fix the winch; A platform frame, which is connected below the platform plate; A first guide wheel is mounted on the edge of the platform plate; The second guide wheel is installed on the side of the platform frame and is located below the first guide wheel. The first guide wheel and the second guide wheel are aligned vertically. A fixing ring is mounted on the platform frame and arranged opposite to the second guide wheel.
[0007] This utility model provides a support for a winch on an immersed tunnel structure. The platform plate provides a position for the winch to be installed and fixed. The platform frame supports and elevates the platform plate, and also supports the entire support on the top surface of the immersed tunnel structure. The first guide wheel, mounted on the edge of the platform plate, guides the cable on the winch from a horizontal state to a vertical state along the side of the platform frame, achieving an initial change in the cable's direction. The second guide wheel is mounted on the side of the platform frame, and is located below the first guide wheel. The first and second guide wheels are vertically aligned so that the second guide wheel can further convert the vertical cable into a lower horizontal state, achieving the same traction effect as when the winch is directly mounted on the top surface of the immersed tunnel structure, ensuring smooth traction operations. A fixing ring is mounted on the platform frame and arranged opposite to the second guide wheel. The fixing ring is used to connect the fixing rope to the mooring piles on the immersed tunnel structure, providing horizontal tension for the entire support. Under the action of the fixing rope, the fixing ring position can generate a tensile force in the opposite direction to the force of the cable, ensuring that the entire support can be stabilized on the top surface of the immersed tube structure.
[0008] This invention provides a support for a winch on a submerged tunnel structure, which elevates the winch and mounts it on the top surface of the tunnel structure. During the movement of the submerged tunnel while floating on the water surface, the elevated position of the winch effectively reduces the direct impact of swells on it. Swells typically exert significant impact on equipment located at lower positions, but the elevated winch avoids the main impact range of the swells, thereby reducing the possibility of interference with the winch's electrical system. This ensures the normal operation of the winch in complex aquatic environments and improves the reliability and safety of the equipment.
[0009] Preferably, the first guide wheel can move in a direction parallel to the axis of the first guide wheel, and the second guide wheel can move in a direction parallel to the axis of the second guide wheel, wherein the axes of the first guide wheel and the axes of the second guide wheel are parallel to each other.
[0010] When the cable is pulled out or retracted from the winch drum, it tends to move back and forth along the drum's axial direction. In this design, the first guide wheel and the second guide wheel are designed to move parallel to each other's axes, allowing them to move synchronously with the cable's axial movement on the drum. This effectively reduces the likelihood of the cable detaching from either guide wheel during operation, minimizing cable slippage.
[0011] The first guide wheel and the second guide wheel can move in the following ways: either a slider and a slide rail are used, with the guide wheel fixed on the slider and the slider able to move along the slide rail, thereby driving the guide wheel to move along the slide rail, and the axial direction of the slide rail being consistent with the axial direction of the guide wheel; or the guide wheel and a roller are used, with the guide wheel sleeved on the roller and the guide wheel able to move along the axial direction of the roller.
[0012] Preferably, the first guide wheel includes a first roller and a first pulley, the first pulley being sleeved on the first roller and movable along the axial direction of the first roller; the second guide wheel includes a second roller and a second pulley, the second pulley being sleeved on the second roller and movable along the axial direction of the second roller; the axis of the first roller is parallel to the plane of the platform plate, and the axis of the second roller is parallel to the axis of the first roller.
[0013] In this design, the first and second pulleys directly guide the cable. Compared to using a slider and rail combination, this design uses pulleys and rollers, reducing the number of components and making the overall structure simpler and clearer. Furthermore, the coaxial arrangement of the pulleys and rollers effectively reduces the adverse effects of eccentric loads, ensuring the stability and reliability of the system.
[0014] Preferably, both ends of the first roller and both ends of the second roller are provided with limiting baffles. In this design, the main function of the limiting baffles is to limit the positions of the first pulley and the second pulley. Specifically, when the first pulley moves back and forth on the first roller, and when the second pulley moves back and forth on the second roller, the limiting baffles can effectively prevent the first pulley from slipping off the first roller, and at the same time prevent the second pulley from detaching from the second roller, thereby ensuring the stability and safety of the entire device operation.
[0015] Preferably, the platform plate is provided with bolt holes for connecting to the base of the winch. In this design, the bolt holes are used to engage bolts to securely connect the platform plate to the base of the winch.
[0016] Preferably, the platform frame includes pillars, a first crossbeam, and a second crossbeam. The first crossbeam is connected to the top of the pillar, the platform panel is connected to the top surface of the first crossbeam, and the second crossbeam is connected to the side of the pillar. In this design, the pillar provides vertical support for the entire platform frame, ensuring sufficient load-bearing capacity in the vertical direction. The first crossbeam connects laterally to the top of the pillar, linking the pillars horizontally into a unified structure, enhancing the overall integrity of the structure; simultaneously, the first crossbeam serves as the connecting foundation for the platform panel, providing a stable support surface. The second crossbeam connects laterally to the side of the pillar, further strengthening the lateral connection between the pillars. The pillar, the first crossbeam, and the second crossbeam form a stable frame structure. This frame structure makes the platform frame's structural system more robust, ensuring the safety and reliability of the platform frame during use.
[0017] The second guide wheel and the fixed ring can be connected at the same height as the second crossbeam, or they can be connected at a height offset from the second crossbeam.
[0018] Preferably, the second guide wheel and the fixing ring are respectively connected to the second crossbeams on opposite sides of the platform frame. This arrangement ensures that the second guide wheel and the fixing ring are at the same height as the second crossbeams on the platform frame. During the entire operation of the support, the second guide wheel and the fixing ring are simultaneously subjected to horizontal tensile forces in opposite directions. This preferred arrangement allows the tensile force to be quickly transmitted through the second crossbeams, reducing stress concentration within the platform frame due to force.
[0019] Preferably, the height of the platform frame is 1m-3m. In this design, the height of the platform frame allows the winch to be raised to a reasonable range.
[0020] The platform plate can be made of a single layer of steel plate or multiple layers of steel plate.
[0021] Preferably, the platform plate comprises two layers of steel plates, with a plurality of stiffening ribs between the two layers. In this design, the stiffening ribs connect the upper and lower steel plates into a single unit, ensuring that the two layers work together; simultaneously, the stiffening ribs enhance the overall rigidity of the platform plate. When the platform plate bears a load, it effectively reduces deformation caused by the load, ensuring the stability and safety of the platform plate during use.
[0022] In a second aspect, the present invention provides a winch device, comprising a winch, a cable, and a support for a winch on a submerged pipe as described in the first aspect, wherein the winch is fixed to a platform plate of the support, one end of the cable is connected to the drum of the winch, and the other end of the cable passes through a first guide wheel and a second guide wheel of the support.
[0023] This utility model provides a winch device, wherein the winch is used to wind up and unwind the cable. The bracket is used to raise and fix the winch. The first guide wheel and the second guide wheel on the bracket are used to lower the horizontal height after the cable is led out of the winch.
[0024] This utility model provides a winch device. By raising the winch through the bracket, the direct impact of swell on the winch can be effectively reduced, thereby reducing the possibility of swell interfering with the winch's circuit system, ensuring the normal operation of the winch in complex aquatic environments, and improving the reliability and safety of the equipment.
[0025] Compared with the prior art, the beneficial effects of this utility model are as follows: This invention provides a support for a winch on a submerged tunnel structure, which elevates the winch and mounts it on the top surface of the tunnel structure. During the movement of the submerged tunnel while floating on the water surface, the elevated position of the winch effectively reduces the direct impact of swells on it. Swells typically exert significant impact on equipment located at lower positions, but the elevated winch avoids the main impact range of the swells, thereby reducing the possibility of interference with the winch's electrical system. This ensures the normal operation of the winch in complex aquatic environments and improves the reliability and safety of the equipment. This utility model provides a winch device. By raising the winch through the bracket, the direct impact of swell on the winch can be effectively reduced, thereby reducing the possibility of swell interfering with the winch's circuit system, ensuring the normal operation of the winch in complex aquatic environments, and improving the reliability and safety of the equipment. Attached Figure Description
[0026] Figure 1This is a front view of a support for a winch used on a submerged tunnel in Example 1.
[0027] Figure 2 This is a top view of a support for a winch used on a submerged tunnel in Embodiment 1.
[0028] Figure 3 This is a schematic diagram of a winch device in Example 2.
[0029] Figure 4 This is a front view of a winch device arranged on a submerged tube in Example 2.
[0030] Figure 5 This is a top view of a winch device arranged on a submerged tube in Example 2.
[0031] Marked in the image: 1-Platform board, 2-Platform frame, 201 - Support column, 202 - First crossbeam, 203 - Second crossbeam 3-Fixing ring, 4-First guide wheel, 401 - First roller, 402 - First pulley 5-Second guide wheel, 501 - Second roller, 502 - Second pulley 6-Windmill 601-Drum, 602-Motor, 603-Brake, 604-Transmission mechanism, 605-Base, 7-Cable, 8-Fixing rope, 9-Mooring bollards, 10-Immersed tube structure. Detailed Implementation
[0032] The present invention will be further described in detail below with reference to specific embodiments. However, it should not be construed as limiting the scope of the present invention to the following embodiments; all technologies implemented based on the content of the present invention fall within the scope of the present invention.
[0033] Unless otherwise specified, the terms "upper," "lower," "left," "right," "center," "inner," and "outer" used in the description of specific embodiments of this utility model to indicate orientation or positional relationships are based on the orientation or positional relationships shown in the accompanying drawings, or the orientation or positional relationship in which the utility model product / equipment / device is usually placed during use. These terms are merely for the purpose of facilitating the description of the utility model solution or simplifying the description in specific embodiments, and for enabling those skilled in the art to quickly understand the solution, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific positional relationship. Therefore, they should not be construed as limitations on this utility model.
[0034] Furthermore, the use of terms such as "horizontal," "vertical," "suspended," "parallel," and "coaxial" does not imply that the corresponding device / component / element must be absolutely horizontal, vertical, suspended, parallel, or coaxial. Slight tilt or deviation is permissible, as long as it does not affect the normal function of the relevant component. For example, "horizontal" simply means that its direction is more horizontal relative to "vertical," not that the structure must be perfectly horizontal; a slight tilt is acceptable. "Coaxial" means that two components are arranged as coaxially as possible, allowing them to move coaxially or approximately coaxially when their relative positions change. Alternatively, it can be simplified to mean that the corresponding device / component / element, when arranged in "horizontal," "vertical," "suspended," "parallel," or "coaxial" directions, can have an error / deviation of ±10% relative to the corresponding direction, more preferably within ±8%, more preferably within ±6%, more preferably within ±5%, and more preferably within ±4%. For example, the deviation in the "coaxial" direction is controlled within 0.2-1mm, preferably within 0.2-0.5mm. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its function in the present invention.
[0035] Furthermore, the use of terms such as "first," "second," and "third" in terminology is merely for distinguishing descriptions of identical or similar components and should not be interpreted as emphasizing or implying the relative importance of a particular component.
[0036] Furthermore, in the description of the embodiments of this utility model, "several", "multiple", and "several" represent at least two. The number can be any number, such as two, three, four, five, six, seven, eight, or nine, and can even exceed nine.
[0037] Furthermore, in the description of the technical solution of this utility model, unless otherwise explicitly specified / limited / restricted, the terms "set up," "install," "connect," "link," "provided with," "laid out," and "arranged" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to common connection methods in the art, such as welding, riveting, bolting, and threaded connections. Such connections can be mechanical, electrical, or communication connections; they can be direct connections or indirect connections through an intermediate medium; and they can refer to the internal communication between two components.
[0038] Example 1 like Figures 1 to 2 As shown, a support for a winch on a submerged tunnel includes a platform plate 1, a platform frame 2, a first guide wheel 4, a second guide wheel 5, and a fixing ring 3.
[0039] Platform plate 1 is used to fix winch 6. Specifically, the planar shape of platform plate 1 can be rectangular, and the planar dimensions of platform plate 1 are larger than the planar projection dimensions of winch 6.
[0040] Platform frame 2 is connected below platform plate 1. Specifically, the horizontal projection outline shape and size of platform frame 2 are consistent with the planar dimensions and shape of platform plate 1.
[0041] The first guide wheel 4 is installed on the edge of the platform plate 1.
[0042] The second guide wheel 5 is installed on the side of the platform frame 2. The second guide wheel 5 is located below the first guide wheel 4. The first guide wheel 4 and the second guide wheel 5 are aligned in the vertical direction.
[0043] The fixing ring 3 is mounted on the platform frame 2 and arranged opposite to the second guide wheel 5. Specifically, there can be two fixing rings 3, which are arranged at intervals in the horizontal direction.
[0044] In an optional embodiment, the first guide wheel 4 can move in a direction parallel to the axis of the first guide wheel 4, and the second guide wheel 5 can move in a direction parallel to the axis of the second guide wheel 5, wherein the axes of the first guide wheel 4 and the axes of the second guide wheel 5 are parallel to each other.
[0045] In an optional embodiment, the first guide wheel 4 may include a first roller 401 and a first pulley 402, with the first pulley 402 sleeved on the first roller 401 and movable along the axial direction of the first roller 401. The second guide wheel 5 may include a second roller 501 and a second pulley 502, with the second pulley 502 sleeved on the second roller 501 and movable along the axial direction of the second roller 501. The axis of the first roller 401 is parallel to the plane of the platform plate 1, and the axis of the second roller 501 is parallel to the axis of the first roller 401. Specifically, the lengths of the first roller 401 and the second roller 501 are greater than or equal to the axial length of the drum 601 of the winch 6. Both ends of the first roller 401 are fixed to the platform plate 1 by a first support. Both ends of the second roller 501 are fixed to the side of the platform frame 2 by a second support.
[0046] In an optional embodiment, both ends of the first roller 401 and both ends of the second roller 501 may be provided with limiting baffles. Specifically, the limiting baffle of the first roller 401 may be provided on the first support; the limiting baffle of the second roller 501 may be provided on the second support.
[0047] In an optional embodiment, the platform plate 1 may be provided with bolt holes for connection with the base 605 of the winch 6. Specifically, the position of the bolt holes is adapted to the position of the screw holes on the base 605 of the winch 6.
[0048] In an optional embodiment, the platform frame 2 may include support columns 201, a first crossbeam 202, and a second crossbeam 203. The first crossbeam 202 is connected to the top of the support column 201, the platform plate 1 is connected to the top surface of the first crossbeam 202, and the second crossbeam 203 is connected to the side of the support column 201. Specifically, there are four support columns 201 arranged in two rows and two columns. The tops and sides of two support columns 201 in the same row are connected by the first crossbeam 202 and the second crossbeam 203, respectively. Similarly, the tops and sides of two support columns 201 in the same column are connected by the first crossbeam 202 and the second crossbeam 203, respectively. The support columns 201 are all connected to the first crossbeam 202 and the second crossbeam 203 by welding.
[0049] In an optional embodiment, the second guide wheel 5 and the fixing ring 3 can be connected to the second crossbeams 203 on opposite sides of the platform frame 2, respectively.
[0050] In an optional implementation, the height of the platform frame 2 can be 1m-3m, specifically 1m, 1.5m, 2m, 2.5m, or 3m.
[0051] In an optional embodiment, the platform plate 1 may include two layers of steel plates, with a plurality of stiffening ribs provided between the two layers of steel plates. Specifically, the thickness of the steel plates may be 8mm-15mm. The stiffening ribs may be angle steel, and the spacing between two adjacent stiffening ribs may be 100mm-300mm.
[0052] In an optional embodiment, the platform frame 2 can be made of galvanized steel pipe, angle steel or I-beam.
[0053] Platform frame 2 can preferably be constructed using I-beams. In this design, the cross-sectional dimensions of the I-beams are typically larger than those of galvanized steel pipes and angle steel. Using I-beams to construct platform frame 2 effectively reduces the number of component joints, thereby lowering the difficulty of the manufacturing process.
[0054] Example 2 like Figure 3 As shown, a winch device includes a winch 6, a cable 7, and a support for a winch on a submerged pipe as described in Embodiment 1. The winch 6 is fixed on the platform plate 1 of the support. One end of the cable 7 is connected to the drum 601 of the winch 6, and the other end of the cable 7 passes through the first guide wheel 4 and the second guide wheel 5 of the support.
[0055] Specifically, the winch 6 includes a drum 601, a motor 602, a brake 603, a transmission mechanism 604, and a base 605. The base 605 is connected to the top surface of the platform plate 1 of the support by bolts. The cable 7 may specifically be a steel wire rope.
[0056] Example 3 This embodiment describes the operation method of a winch device as described in Embodiment 2.
[0057] like Figure 4 and Figure 5 As shown, the winch device is moved to the upper surface of the immersed tunnel structure 10, and the fixing ring 3 of the winch device is connected to the mooring bollard 9 by the fixing rope 8. The mooring bollard 9 provides a fixing point for the fixing rope 8. The fixing rope 8 is connected to the mooring bollard 9 and the fixing ring 3 to provide a horizontal reaction force for the winch device. The fixing rope 8 can be a steel wire rope or a chain. The position of the winch device on the upper surface of the immersed tunnel structure 10 can be arranged according to the actual situation. For example, four winch devices can be arranged on the upper surface of one immersed tunnel structure 10. Two mooring bollards 9 can be arranged laterally at the center of the upper surface of the immersed tunnel structure 10. Each mooring bollard 9 is connected to two winch devices. The four winch devices are symmetrically arranged on the immersed tunnel structure 10 near the two mooring bollards 9. The four winch devices are respectively set towards the four corners of the immersed tunnel structure 10, and the cables 7 on the four winch devices are also respectively connected to the four corners of the immersed tunnel structure 10 and extend into the water.
[0058] When starting operation, turn on motor 602 to power winch 6, and at the same time check whether the connection of brake 603, transmission mechanism 604, first guide wheel 4 and second guide wheel 5 is secure, and ensure that the power supply is normal.
[0059] The operator starts motor 602 and lowers cable 7 to the predetermined position. At this time, the operator should check again to confirm whether the first guide wheel 4 and the second guide wheel 5 are aligned, and at the same time prevent cable 7 from jumping out of the groove. The operator should also observe whether the cable 7 is neatly arranged to prevent operational hazards.
[0060] Once the end of cable 7 is lowered to a suitable height, the operator controls motor 602 via the control console to gradually release power, keeping cable 7 taut.
[0061] When the cable 7 begins to bear the mooring load, the traction force of the winch 6 fixes the immersed tube structure 10. During this process, the brake 603 provides sufficient braking torque to keep the mooring cable stable and taut. At the same time, the transmission mechanism 604 rotates with the motor 602. When the mooring cable reaches the specified tension, the current mooring status of the device can be obtained by observing the tension display and position sensor on the control panel.
[0062] The operator controls the motor 602 to stop running and keeps the brake 603 in a closed state, and checks whether each component is working properly. If the cable tension is stable, the device maintains its current working state. If the cable tension is abnormal, the length and tension of the cable 7 need to be readjusted.
[0063] After completing a mooring task, the winch 6 stops operating, the operator conducts a comprehensive inspection, and at the same time loosens the connection between the bracket and the mooring pile 9 to ensure that all components of the device are undamaged and performs necessary maintenance. The bracket and winch 6 are then moved to the next mooring position or storage location.
[0064] Note: The first guide wheel 4 and the second guide wheel 5 must ensure that the pulley groove shape matches the diameter of the cable 7, and the installation position is kept on the same vertical plane to ensure that the cable 7 does not derail.
[0065] The connection between the bracket and the mooring bollard 9 should be checked regularly to ensure its tightness and prevent loosening due to vibration.
[0066] The rotating parts such as the transmission mechanism 604, the first guide wheel 4, and the second guide wheel 5 should be lubricated regularly to reduce wear and prevent mechanical jamming.
[0067] This invention elevates the winch 6 to a high position by mounting it on the support frame. This device effectively prevents water ingress, short circuits, and damage to the winch 6 caused by surge flooding, greatly improving the reliability and service life of the winch 6 under harsh hydrological conditions. The bottom of the support frame rests directly on the top surface of the immersed tunnel structure 10, eliminating the need for bolts or clamps for connection, allowing for rapid relocation to the next construction location after use. Simultaneously, the first guide wheel 4 and second guide wheel 5 on the support frame allow for cable 7 docking operations to be completed on the surface of the immersed tunnel structure 10, completely eliminating the need for high-altitude climbing and hooking operations, fundamentally eliminating the safety hazards such as personnel falls. Furthermore, this invention directly utilizes the existing mooring piles 9 on the immersed tunnel structure 10 for fixation. The mooring piles 9 are the original structure, without adding unnecessary workload, eliminating the need for additional concrete foundation pouring or large temporary work platforms for winch 6 installation, saving significant material costs and installation time. The support frame is reusable, enabling rapid deployment and relocation between different immersed tunnel sections or projects, significantly improving construction efficiency.
[0068] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A support for a winch used in immersed tunnel construction, characterized in that, include: Platform plate (1), the platform plate (1) is used to fix the winch (6); Platform frame (2), which is connected below the platform plate (1); The first guide wheel (4) is mounted on the edge of the platform plate (1); The second guide wheel (5) is installed on the side of the platform frame (2). The second guide wheel (5) is located below the first guide wheel (4). The first guide wheel (4) and the second guide wheel (5) are aligned in the vertical direction. A fixing ring (3) is mounted on the platform frame (2) and arranged opposite to the second guide wheel (5).
2. The support for a winch on a submerged tunnel as described in claim 1, characterized in that, The first guide wheel (4) can move in a direction parallel to the axis of the first guide wheel (4), and the second guide wheel (5) can move in a direction parallel to the axis of the second guide wheel (5). The axis of the first guide wheel (4) and the axis of the second guide wheel (5) are parallel to each other.
3. A support for a winch on a submerged tunnel as described in claim 1, characterized in that, The first guide wheel (4) includes a first roller (401) and a first pulley (402). The first pulley (402) is sleeved on the first roller (401) and can move along the axial direction of the first roller (401). The second guide wheel (5) includes a second roller (501) and a second pulley (502). The second pulley (502) is sleeved on the second roller (501) and can move along the axial direction of the second roller (501). The axis of the first roller (401) is parallel to the plane of the platform plate (1), and the axis of the second roller (501) is parallel to the axis of the first roller (401).
4. A support for a winch on a submerged tunnel as described in claim 3, characterized in that, Limiting baffles are provided at both ends of the first roller (401) and both ends of the second roller (501).
5. A support for a pipe-laying winch as claimed in claim 1, characterised in that, The platform plate (1) is provided with bolt holes for connecting to the base (605) of the winch (6).
6. A support for a winch on a submerged tunnel as described in any one of claims 1-5, characterized in that, The platform frame (2) includes a support column (201), a first crossbeam (202) and a second crossbeam (203). The first crossbeam (202) is connected to the top of the support column (201), the platform plate (1) is connected to the top surface of the first crossbeam (202), and the second crossbeam (203) is connected to the side of the support column (201).
7. A support for a winch on a submerged tunnel as described in claim 6, characterized in that, The second guide wheel (5) and the fixed ring (3) are respectively connected to the second crossbeam (203) on opposite sides of the platform frame (2).
8. A support for a winch on a submerged tunnel as described in claim 6, characterized in that, The height of the platform frame (2) is 1m-3m.
9. A support for a jacking-up winch of a immersed tube according to claim 6, characterized in that The platform plate (1) comprises two layers of steel plates, with several stiffening ribs provided between the two layers of steel plates.
10. A winch device, characterized in that, Includes a winch (6), a cable (7), and a support for a winch on a submerged tube as described in any one of claims 1-9, wherein the winch (6) is fixed on the platform plate (1) of the support, one end of the cable (7) is connected to the drum (601) of the winch (6), and the other end of the cable (7) passes through the first guide wheel (4) and the second guide wheel (5) of the support.