Program

A game engine-based program enhances scaffolding design operability and responsiveness by enabling intuitive three-dimensional scaffolding construction and collision management, addressing the limitations of existing CAD software.

JP2024154369AActive Publication Date: 2024-10-30KAJIMA CORP

Patent Information

Application Number
JP2024023705
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-13
Filing Date
2024-02-20
Publication Date
2024-10-30
Estimated Expiration
2044-02-20

AI Technical Summary

Technical Problem

Existing scaffolding design software, such as CAD software, faces issues with increased processing load and decreased responsiveness as the number of parts increases, requiring improved operability and responsiveness for efficient scaffolding design.

Method used

A computer-based program utilizing a game engine for designing temporary scaffolding, enabling intuitive three-dimensional object placement, collision detection, and collision avoidance, with features like expansion, contraction, and automatic connection of scaffolding components.

Benefits of technology

The program ensures excellent operability and responsiveness, allowing efficient and accurate scaffolding design with reduced processing load, even with complex designs, and supports integration with CAD software for further utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024154369000001_ABST
    Figure 2024154369000001_ABST
Patent Text Reader

Abstract

To provide a program for temporary scaffold design excellent in operability and responsiveness.SOLUTION: A program executed by a computer of a temporary scaffold design system includes a game engine for drawing a temporary scaffold object representing a temporary scaffold in a three dimensional space according to an operation input that is input from an input device and displaying the temporary scaffold object on a display device.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a program for designing temporary scaffolding at a construction site or the like. [Background technology]

[0002] Patent document 1 discloses a support system used for creating preliminary design drawings, which includes a control device on which drawing program software is installed, a storage device that stores component data input and output to and from the control device, a display device connected to the control device, and an input device connected to the control device. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-18247 A Summary of the Invention [Problem to be solved by the invention]

[0004] The invention described in Patent Document 1 is a technology that expands the functions of drawing program software such as CAD software. Therefore, it cannot be used without drawing program software such as CAD software, and at the same time, it is necessary to understand how to operate the software. In addition, with the invention described in Patent Document 1, as the number of parts increases, the processing load on the drawing program software increases, and the responsiveness of the system decreases.

[0005] An object of the present invention is to provide a program for designing temporary scaffolding that is excellent in operability and responsiveness. [Means for solving the problem]

[0006] The present invention is a program executed by a computer of a temporary scaffolding design system that includes an input device for receiving operational input from a worker, a display device for displaying information, and a computer connected to the input device and the display device, and includes a game engine that draws a temporary scaffolding object representing the temporary scaffolding in three-dimensional space in response to operational input received from the input device and displays it on the display device. Effect of the Invention

[0007] According to the present invention, a program for designing temporary scaffolding that is excellent in operability and responsiveness is provided. [Brief description of the drawings]

[0008] [Figure 1] 1 is a block diagram showing a configuration of a design system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic diagram showing a design screen according to an embodiment of the present invention. [Diagram 3] FIG. 2 is a perspective view showing an example of a temporary scaffolding object in an embodiment of the present invention. [Figure 4] FIG. 13 is a schematic diagram showing a process of longitudinally extending a temporary scaffold in an application according to an embodiment of the present invention. [Diagram 5] 11 is a schematic diagram showing a process of arranging and connecting temporary scaffolding objects with uniform height in an application according to an embodiment of the present invention. FIG. [Figure 6] 10A to 10C are schematic diagrams showing a process of placing and connecting different types of temporary scaffolding objects in an application according to an embodiment of the present invention. [Figure 7] FIG. 13 is a schematic diagram showing a process of placing a temporary scaffolding object on a three-dimensional site object in an application according to an embodiment of the present invention. [Figure 8] FIG. 2 is a schematic diagram showing a process of placing a temporary scaffolding object relative to a two-dimensional site object in an application according to an embodiment of the present invention. [Figure 9]11A to 11C are schematic diagrams showing an example of a flow of deleting an overlapping portion of a temporary scaffolding object in an application according to an embodiment of the present invention. [Figure 10] 13A to 13C are schematic diagrams showing another example of the flow of deleting overlapping portions of temporary scaffolding objects in an application according to an embodiment of the present invention. [Figure 11] FIG. 11 is a schematic diagram showing an example of a change in members associated with joining of a temporary scaffolding object in an application according to an embodiment of the present invention, and is a cross-sectional end view of the joining surface of the joined body shown in FIG. [Figure 12] FIG. 11 is a schematic diagram showing an example of adding a member in conjunction with joining of a temporary scaffolding object in an application according to an embodiment of the present invention, and is a plan view of the joined body shown in FIG. [Figure 13] FIG. 13 is a schematic diagram showing a process of arranging lifting equipment in an application according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, a temporary scaffolding design program 100 and a temporary scaffolding design system 101 according to an embodiment of the present invention will be described with reference to the drawings.

[0010] A temporary scaffolding design system 101 (hereinafter simply referred to as "design system 101") of this embodiment is a system used for making a scaffolding plan for designing a temporary scaffolding to be installed at a construction site, etc. The design system 101 provides a function for designing a temporary scaffolding by arranging objects representing the temporary scaffolding, etc., in a three-dimensional virtual space.

[0011] As shown in FIG. 1, the design system 101 includes an input device 15 to which an operator inputs operations, a display device 16 to display information, and an information processing device 10 (computer) connected to the input device 15 and the display device 16.

[0012] The input device 15 is electrically connected to the information processing device 10 by wire or wirelessly, and is composed of one or more devices operated by an operator. The input device 15 is composed of, for example, a touch sensor, a keyboard, a mouse, etc. The input device 15 transmits an input signal corresponding to an operation input by the operator to the information processing device 10.

[0013] The display device 16 is a display that is electrically connected to the information processing device 10 by wire or wirelessly. The display device 16 performs display based on a signal received from the information processing device 10.

[0014] The information processing device 10 is configured by a computer including a CPU (Central Processing Unit) that executes programs, etc., a ROM (Read-Only Memory) that stores the programs executed by the CPU, a RAM (Random Access Memory) that stores the results of CPU calculations, etc., a GPU (Graphics Processing Unit), a communication device, etc. The information processing device 10 includes a plurality of processors such as a CPU and a GPU. The information processing device 10 executes various functions of the information processing device 10 described in this specification by loading a program stored in the ROM into the RAM and executing the program on the RAM by the CPU. The information processing device 10 may be configured by one computer, or may be configured by a plurality of microcomputers and configured to distribute the various controls among the plurality of computers.

[0015] In this embodiment, the information processing device 10 is a so-called personal computer (PC), and is connected to an external input device 15 and display device 16. The design system 101 may be provided by a mobile terminal such as a smartphone or a tablet terminal in which the input device 15, the display device 16, and the information processing device 10 are integrated. In this case, the design system 101 includes, for example, a touch panel that functions as both the input device 15 and the display device 16.

[0016] The information processing device 10 includes a memory unit 11 that stores a temporary scaffolding design program 100 (hereinafter simply referred to as “design program 100”), and a processing unit 12 that calls and executes the design program 100 stored in the memory unit 11.

[0017] In addition to the design program 100, the storage unit 11 stores information necessary for processing executed by the design program 100 described in this specification. For example, the storage unit 11 stores, as information on objects to be placed in a three-dimensional space in a design screen W described later, a temporary scaffolding object which is a unit object constituting a temporary scaffolding, a site object which represents a site where the temporary scaffolding is to be installed, and a virtual object which is virtually installed. The information on each object is information on the shape (dimensions) of the object.

[0018] Information on a plurality of types of temporary scaffolding objects is stored in the storage unit 11. The information on the temporary scaffolding objects stored in the storage unit 11 includes information on the shape of each temporary scaffolding object as well as information on the types and quantities of members used in the temporary scaffolding object.

[0019] The site object is an object including two-dimensional or three-dimensional information that represents the state (spatial shape, arranged equipment, materials, etc.) of the site where the temporary scaffolding is to be installed. The site where the temporary scaffolding is to be installed includes, for example, information on existing buildings or buildings to be constructed. The storage unit 11 stores the site objects in a file format corresponding to each object.

[0020] A 2D site object is, for example, a 2D drawing, such as a plan or elevation of a site. 2D drawings include 2D drawings created by CAD software, images of the site, and images obtained by scanning hand-drawn or other drawings. A 2D site object is an object that does not have thickness.

[0021] Three-dimensional site objects include, for example, three-dimensional drawings (3D models) created using CAD software or 3D modeling software (CG software), and three-dimensional data composed of point clouds and mesh data obtained by scanning the site with a 3D scanner.

[0022] The design program 100 includes a game engine and is provided to a worker as an application for designing a temporary scaffolding. In general, a game engine is software in which programs required for creating a computer game are integrated (packaged). The game engine of this embodiment is capable of executing parallel processing by a plurality of processors (CPUs and GPUs), and can execute drawing (rendering) of an object (or model) in a three-dimensional space and physical calculations for the object. The game engine includes, for example, an audio engine, a logic engine, a rule engine, an animation engine, a graphic engine, a user interface engine, a physics engine, and the like. The game engine may also include a navigation engine, and the like.

[0023] Next, the information processing executed by the design program 100 will be described.

[0024] The design program 100 is programmed to receive an input signal from the input device 15 and execute a process of drawing a temporary scaffolding object 20 representing the temporary scaffolding in three-dimensional space in accordance with the received input signal and displaying it on the display device 16.

[0025] A specific description will be given below of the functions of the application realized by the information processing executed by the design program 100. In other words, the design program 100 is programmed to cause the design system 101 to realize the following functions.

[0026] [Design screen display and basic functions] When the design program 100 is executed, a design screen W for designing scaffolding is displayed on the display device 16 as shown in Fig. 2. On the design screen W, a virtual three-dimensional space in which objects are drawn, a cursor C operated on the design screen W by a worker via the input device 15, and a plurality of buttons (icons) selectable by the worker's operation are displayed. The three-dimensional space is a space represented by, for example, mutually orthogonal X, Y, and Z axes. The three-dimensional space includes a reference plane P on which objects are placed. By selecting and operating each button on the design screen W with the cursor C, a corresponding function is executed.

[0027] Like 3D CAD software or 3D modeling software, the design program 100 has basic functions such as saving and loading data files containing designed data, changing the viewpoint (view) in 3D space, redoing (REDO) and undoing (UNDO) operations, and moving and rotating objects.

[0028] In this embodiment, the design screen W displays operation buttons B for executing basic functions, etc., a scaffolding creation button B1 for placing a temporary scaffolding object, a lifting equipment button B2 for placing lifting equipment such as stairs, a component list button B3 listing the quantities of components to be used in the designed temporary scaffolding, a model placement button B4 for placing site objects, a size change button B5 for changing the dimensions (size) of the temporary scaffolding, a separation button B6 for displaying a separation panel 40 as a virtual object described below, and a dimension display button B7 for displaying the dimensions of the temporary scaffolding object.

[0029] [Placing temporary scaffolding objects] When the scaffolding creation button B1 is selected, an object window W1 is displayed showing candidates for temporary scaffolding objects to be placed. When one of the displayed candidates is selected, the corresponding one unit of temporary scaffolding object is displayed in three-dimensional space.

[0030] In the following, an example will be described in which a temporary scaffolding is designed by arranging a temporary scaffolding object 20 having a substantially cubic shape as shown in FIG. 3 in a three-dimensional space.

[0031] As shown in FIG. 3, the temporary scaffolding object 20 has, as its basic structural units, a work floor 21 serving as a work location, a frame body 22 constituted by pillars, braces, handrails, etc., and a height adjustment unit 23 for adjusting the height. The work floor 21 is substantially rectangular in plan view (XY plan view). Hereinafter, the longitudinal direction of the work floor 21 will be referred to as the "longitudinal direction", the lateral direction as the "gable side direction", and the direction perpendicular to the work floor 21 as the "height direction". The height direction is the direction along the Z-axis direction in three-dimensional space. The height adjustment unit 23 has a jack 24 that can be extended and contracted so that the length changes continuously, and a height adjustment member 25 that is supported by the jack 24 and can be changed to a different height depending on the height of the entire temporary scaffolding object 20 (the length of the jack 24).

[0032] A worker can design a temporary scaffolding by connecting any number of temporary scaffolding objects 20 in each of the longitudinal direction, the gable side direction, and the height direction.

[0033] A temporary scaffolding object 20 is selected from the object window W1, and a cursor C is moved on the design screen W to select an arbitrary position, whereby one unit of the temporary scaffolding object 20 is placed at the selected position.

[0034] As shown in FIG. 2, when the size change button B5 is pressed, a setting window W2 for setting the dimensions of one unit of the temporary scaffolding object 20 is displayed. The dimensions set for the temporary scaffolding object 20 are, for example, the height, the work floor height, the longitudinal length, and the length in the gable direction. The height and the longitudinal length can be set to any value within a predetermined range that is predefined for each temporary scaffolding object 20. The work floor height can be set to any value. The length in the gable direction can be set by selecting from a plurality of dimension values ​​that are predefined.

[0035] The temporary scaffolding object 20 is connected to the temporary scaffolding object 20 already placed in the three-dimensional space so that their faces automatically join together when the temporary scaffolding object 20 is placed adjacent to the temporary scaffolding object 20 already placed in the three-dimensional space so that their faces automatically join together.

[0036] 3, a height adjustment unit 23 (a jack 24 and a height adjustment member 25) for adjusting the height is provided at the lowest stage of the temporary scaffolding object 20 (in other words, placed on the reference plane). The height adjustment unit 23 is automatically added to the temporary scaffolding object 20 when the temporary scaffolding object 20 is to be placed on the reference plane P.

[0037] [Extending and retracting temporary scaffolding] The temporary scaffolding object 20 can be continuously placed or deleted in a predetermined direction by selecting each face of the cubic shape and moving the face in a vertical direction. In short, the temporary scaffolding formed by the temporary scaffolding object 20 can be expanded or contracted by clicking and dragging each face of the temporary scaffolding object 20 in the vertical direction.

[0038] Specifically, as shown in Fig. 4(a), for example, one side surface perpendicular to the longitudinal direction of a certain temporary scaffolding object 20 is selected, and the temporary scaffolding object 20 is moved in the longitudinal direction (in the direction of the arrow in the figure) away from the selected side surface by the longitudinal dimension of the temporary scaffolding object 20. As a result, as shown in Fig. 5(b), a new temporary scaffolding object 20 having the same shape as the selected temporary scaffolding object 20 is automatically placed adjacent (contiguous) in the longitudinal direction. In this way, the temporary scaffolding is extended in the longitudinal direction.

[0039] Conversely, when one side of a temporary scaffolding object 20 at an end of a plurality of temporary scaffolding objects 20 that are continuously lined up in the longitudinal direction is selected and moved longitudinally toward that temporary scaffolding object 20 by a unit dimension in the longitudinal direction, the temporary scaffolding object 20 at the end is automatically deleted. This causes the temporary scaffolding to shrink in the longitudinal direction. These expansion and contraction operations can also be performed in the gable side direction.

[0040] Note that even if a face of a temporary scaffolding object 20 is selected and dragged, a new temporary scaffolding object 20 is not placed if the length of the drag in the three-dimensional space is less than the dimension of one unit of the temporary scaffolding object 20. In other words, in this embodiment, even if a face of a temporary scaffolding object 20 is dragged, an object having dimensions smaller than one unit of the temporary scaffolding object 20 is not placed, and the temporary scaffolding is designed by combining only one unit of the temporary scaffolding object 20.

[0041] When placing a temporary scaffolding object 20 smaller than the temporary scaffolding object 20 currently being placed, it is sufficient to select and change from the scaffolding candidates in the object window W1 (see FIG. 2). In this way, by allowing the temporary scaffolding object 20 to be placed to be freely selected and fixing the dimensions of the temporary scaffolding object 20 to be automatically placed when expanding or contracting to correspond to the selected temporary scaffolding object 20, it is possible to prevent the temporary scaffolding object 20 from being placed in a shape that is not intended by the worker. This makes it easier to design the temporary scaffolding.

[0042] Although not shown, even in the case of a temporary scaffolding object 20 in which a plurality of frame bodies 22 are stacked in the height direction, by selecting and dragging a side surface, a plurality of adjacent temporary scaffolding objects 20 can be automatically arranged in a batch in the stretched direction in a continuous manner. For example, by dragging a side surface in the longitudinal direction of three temporary scaffolding objects 20 (frame bodies 22) arranged in the height direction in the longitudinal direction, new three-tiered temporary scaffolding objects 20 can be arranged adjacent to each of the temporary scaffolding objects 20 in which three tiers of frame bodies 22 are arranged in the height direction. In other words, even if the frame bodies 22 are stacked in multiple tiers, they can be stretched and contracted in a predetermined direction as a whole.

[0043] In this way, by selecting and dragging each face of the temporary scaffolding object 20 (in other words, by moving the face as if pushing it out), the temporary scaffolding can be intuitively expanded or contracted in any direction.

[0044] [Expansion and contraction of temporary scaffolding in the height direction] When the temporary scaffolding object 20 is dragged in a direction to increase in height, first, the height of the height adjustment unit 23 is adjusted. The height adjustment unit 23 is set with a height upper limit (threshold) that can be expanded or contracted in stages within a range equal to or less than the unit height (standard height) of the frame body 22. When the temporary scaffolding object 20 is dragged in the height direction and exceeds the threshold, the height adjustment unit 23 is changed to a new height adjustment unit 23 with a higher height threshold. When this is repeated and the height of the height adjustment unit 23 that has been dragged and extended reaches the unit height of the frame body 22, a new frame body 22 is added to the upper part. Accordingly, the height adjustment unit 23 is changed to one with a lower threshold so that the overall height changes continuously. In this way, the height adjustment unit 23 is automatically adjusted so that the height can be changed continuously, so that the scaffolding can be designed to any height.

[0045] When the temporary scaffolding object 20 is dragged in a direction decreasing the height, the object behaves in the opposite manner to when the object is dragged in a direction increasing the height. The temporary scaffolding object 20 is thus expanded or contracted in the height direction. This adjustment of the height is not limited to a single temporary scaffolding object 20, but can also be made collectively for a plurality of temporary scaffolding objects 20 as a group.

[0046] Furthermore, the temporary scaffolding objects 20 can be joined together so that the heights (working floor levels) of the work floors 21 from the reference plane P are aligned. A method for joining temporary scaffolding objects 20 with aligned work floor levels will be described with reference to Figs. 5 and 6. The temporary scaffolding objects 20 can be joined by closely contacting their sides, edges, and vertices. The temporary scaffolding objects 20 are designed so that if they are joined with the heights of their top surfaces aligned, the work floor levels will naturally be continuous.

[0047] For example, as a method of joining temporary scaffolding objects 20 together, a new temporary scaffolding object 20 is joined to an existing one by aligning the work floor level (height) (FIG. 5(a)), and then the lower surface of the temporary scaffolding object 20 placed thereafter is dragged downward as shown by the arrow in FIG. 4(b) (FIG. 4(b)), and the height is changed so that the temporary scaffolding object 20 is placed on the reference plane P (FIG. 4(c)). Although not shown, it is also possible to align the work floor levels of different temporary scaffolding objects 20 before joining them. In addition, as shown in FIGS. 6(a) and 6(b), when designing a temporary scaffolding with steps by combining different types of temporary scaffolding objects 20, a temporary scaffolding with an aligned work floor level can be created by arranging each temporary scaffolding object 20 by specifying the work floor level, for example, using the setting window W2.

[0048] [Create parts list] When the component list button B3 (see FIG. 2) is operated, the types and quantities of components used in the temporary scaffolding are tallied based on the temporary scaffolding object 20 arranged in the three-dimensional space. The types and quantities of components tallied in this way can also be output in a prescribed format as an order form based on a predefined template.

[0049] [Dimension Display] When the temporary scaffolding object 20 is placed in three-dimensional space, the dimensions of its shape are automatically displayed. The automatic dimension display function can be turned ON / OFF by operating the dimension display button B7 (see FIG. 2).

[0050] [Import and output of objects] When the model placement button B4 (see FIG. 2) on the design screen W is selected, a file selection screen (not shown) is displayed for selecting a file of the site object stored in the storage unit 11, and by selecting a file, the site object contained in the file is imported into the three-dimensional space. The position of the site object in the three-dimensional space can be changed in the same way as the temporary scaffolding object 20.

[0051] For example, as shown in FIG. 7, by capturing a three-dimensional site object 30 in a three-dimensional space, a worker can place the temporary scaffolding object 20 while taking into consideration the relative positional relationship with the site object 30.

[0052] Also, as shown in Fig. 8, the temporary scaffolding may be designed by reading in a plan view 31 and an elevation view 32 of a building on which the temporary scaffolding is to be installed as a site object and aligning the positions of the two to form the background. The height direction of the temporary scaffolding can be adjusted by referring to the ceiling surface of the building in the background, or by creating a temporary ceiling surface at an arbitrary height and referring to this. This makes the design work easier. Note that in Figs. 7 and 8, the temporary scaffolding object 20 is shown simplified as a cube.

[0053] In addition, the designed temporary scaffolding can be output to the outside in, for example, a 3D data format (obj file, etc.) or component information of the scaffolding can be output to the outside. This makes it possible to import the temporary scaffolding designed by the design system 101 of this embodiment into conventionally used CAD software or BIM (Building Information Modeling) and use it for scaffolding planning.

[0054] [Collision detection function] The design program 100 has a collision determination function that determines collision (contact) between objects by performing physical calculations using a physics engine included in a game engine, etc. A method of collision determination can employ known techniques, and therefore detailed description thereof will be omitted.

[0055] The design program 100 performs collision determination between objects every time a new object is placed in a three-dimensional space or an object is moved.

[0056] When the temporary scaffolding object 20 and the site object 30 collide, a display is made in a manner that allows the collision to be recognized. Specifically, as shown in Fig. 7, the color of the temporary scaffolding object 20 to be operated that has been placed or moved and collided with another object is changed (illustrated by hatching in Fig. 7). This allows the worker to recognize the collision between the temporary scaffolding object 20 and the site object 30 from the change in display color, and makes it possible to suppress overlooking the collision.

[0057] In addition, when the distance button B6 (see FIG. 2) on the design screen W is operated with the temporary scaffolding object 20 selected in the three-dimensional space, a distance panel 40 is set as a virtual object with a defined relative positional relationship with respect to the selected temporary scaffolding object 20, as shown in FIG. 7. The distance panel 40 is set for each face of the cubic-shaped temporary scaffolding object 20, except for the bottom face (a face parallel to the XY plane and relatively lower in the Z-axis direction). The distance panel 40 is a virtual plane parallel to each face of the temporary scaffolding object 20, except for the bottom face, and has the same size as each face, and is set at a predetermined distance from each face of the temporary scaffolding object 20. The distance between the distance panel 40 and the virtual object can be set individually and arbitrarily for each face. In addition, the distance panel 40 is not limited to one temporary scaffolding object 20, and can also be set for the entire temporary scaffolding including a plurality of temporary scaffolding objects 20.

[0058] The design program 100 also performs collision judgment on the distance panel 40. Therefore, when the temporary scaffolding object 20 on which the distance panel 40 is set is arranged around the site object 30, if the distance panel 40 collides (comes into contact) with the site object 30, the color of the collided distance panel 40 changes.

[0059] In general, in designing a temporary scaffold, it is required to maintain a predetermined distance between the temporary scaffold and buildings and equipment at the site. Therefore, by setting the distance panel 40 and arranging the temporary scaffold object 20 while checking for collision between the distance panel 40 and the site object 30, it is possible to design a temporary scaffold that maintains an appropriate distance from the buildings and equipment at the site.

[0060] In addition, when temporary scaffolding objects 20 are placed in a state in which they collide with each other (when the placed temporary scaffolding objects 20 overlap each other), the excess portions of the overlapping surfaces are deleted, and the temporary scaffolding objects 20 change into an appropriate shape for connecting with each other.

[0061] The deletion of the overlapping portion of the temporary scaffolding object 20 will be described with reference to Figs. 9 and 10. Fig. 9 shows an example in which a new temporary scaffolding object 20 is arranged adjacent to one temporary scaffolding object 20 in the longitudinal direction. As described above, when a new temporary scaffolding object 20 is arranged adjacent to one temporary scaffolding object 20, the opposing surfaces of the two adjacent scaffolding objects are joined (Fig. 9(a)). At this time, parts of the frame bodies 22 (handrails) at the joint surfaces of the respective temporary scaffolding objects 20 overlap each other (hatched parts in Fig. 9(b)). In this embodiment, the collision determination function determines whether such an overlap of the frame bodies 22, which are parts of the temporary scaffolding object 20, exists, and if an overlapping portion (handrail portion) exists, the overlapping portion (both of the overlapping portions of the two temporary scaffolding objects 20) is automatically deleted (Fig. 9(c)). This makes it possible to easily design a temporary scaffolding in which the work floors 21 of adjacent temporary scaffolding objects 20 are continuous, without leaving behind any unnecessary parts.

[0062] FIG. 10 shows an example in which a joint body in which three temporary scaffolding objects 20 joined in the longitudinal direction are stacked in two layers in the height direction is regarded as one unit U, and a new unit U is arranged adjacent to one unit U from the gable side direction. In such an example, similar to the example shown in FIG. 9, the overlap of the frame bodies 22 at the joint surface is determined by the collision determination function, and the overlapping portion is automatically deleted. At this time, the portion of the overlapping portion that is above the top surface of the floor surface (the surface of the uppermost work floor 21) (the portion shown by cross-hatching in FIG. 10(b)) is deleted similar to the example shown in FIG. 9 (see FIG. 10(c)). As a result, the top surface is configured as a floor surface to which the work floor 21 is continuous.

[0063] On the other hand, in the configuration below the top surface (first level), only the overlapping portions (redundant portions) of the handrails and supports are deleted. In other words, in the overlapping portions below the top surface (overlapping portions in the first level), only one unit U of the two units U is deleted, and the other unit U remains without being deleted. In this way, since only the redundant portions of the overlapping portions equivalent to one unit U of the handrails and supports in the first level are deleted, it is possible to accurately count the components when creating a components list.

[0064] In the example of Fig. 10, the removal of overlapping portions is performed for each component constituting the temporary scaffolding object 20. Therefore, when the support 22a in the next step below the top step (the first step in the example of Fig. 10) has a length that protrudes upward from the top surface (see Fig. 11(a)), as shown in Fig. 11(b), the support 22a is automatically changed to a support 22b of a length that does not protrude from the top surface as it is joined. The length of the support 22b to be changed is selected, for example, from the length of a support set as a standard product. This allows the construction of a work floor 21 in which the support does not protrude upward from the top surface and the top surface is continuous.

[0065] Furthermore, in the example of Fig. 10, as shown in Fig. 12, a closing plate 21a for filling the gap between the work floor 21 of one unit U constituting the top surface and the work floor 21 of the other unit U is automatically added as they are joined. The closing plate 21a is placed on the work floor 21 so as to cover the gap between the work floors 21. This fills the gap that is generated by removing the overlapping parts (specifically, the supports) of the frame body 22 when the temporary scaffolding object 20 (unit U) is joined, making it possible to form a top surface without any gaps. Also, the closing plate 21a can be included in the list and count when creating a parts list.

[0066] Contrary to deleting the overlapping parts, when two temporary scaffolding objects 20 are connected, a reinforcing material can be automatically added between them. Specifically, when it is determined that two temporary scaffolding objects 20 collide (contact) on the opposing surfaces, a reinforcing material can be automatically added across the two temporary scaffolding objects 20.

[0067] For example, in the example of FIG. 10, in the unit U, the diagonal brace 22c is provided on one side surface (the side surface on the front side in the figure of each unit U) that is perpendicular to the gable side direction and parallel to the longitudinal direction, and the handrail 22d is provided on the remaining three side surfaces. In such a case, when two units U are joined, as shown in FIG. 10(c), the configuration of the other side surface (the side surface on the rear side in the figure of each unit U) that is parallel to the longitudinal direction and does not have the diagonal brace 22c before joining in each unit U, and the side surface that is adjacent to the one side surface on which the diagonal brace 22c is provided before joining and is parallel to the gable side direction (perpendicular to the longitudinal direction) is automatically changed from the handrail 22d (see FIG. 10(b)) to the diagonal brace 22c (see FIG. 10(c)). In other words, when two units U are joined, the diagonal brace 22c is provided on each of the four side surfaces around the vertical axis of each temporary scaffolding object 20 that constitutes the unit U, except for the part that is deleted as an overlapping part. In other words, when the collision determination function determines that the temporary scaffolding object 20 is joined (contacts) in the gable side direction, the configuration of the side side parallel to the longitudinal direction and the side side parallel to the gable side direction, where the handrail 22d was provided in the unit U alone, is automatically changed to the diagonal brace 22c. In this way, when the collision determination function determines that a predetermined condition is satisfied (or that a predetermined structural condition is deviated), the configuration corresponding to the condition can be automatically added or changed. The conditions to be determined and the configuration to be added or changed when the conditions are satisfied are set in advance and stored in the information processing device 10.

[0068] [Location of lifting equipment] When the lifting equipment button B2 (see FIG. 2) is selected on the design screen W, a lifting equipment 50 (such as a staircase 50a or a ladder-like equipment 50b) can be placed on the temporary scaffolding as shown in FIG. 13. When any temporary scaffolding object 20 constituting the temporary scaffolding is selected after operating the lifting equipment button B2, the lifting equipment 50 is placed facing the upper stage. At this time, a part of the work floor 21 of the temporary scaffolding object 20 at a relatively higher stage is deleted according to the size of the lifting equipment 50 so as to allow people to pass through. The deletion of the work floor 21 of the temporary scaffolding object 20 at the upper stage can also be executed by determining a collision between the lifting equipment 50 and the temporary scaffolding object 20 by a collision determination function or the like.

[0069] According to the above embodiment, the following advantageous effects are achieved.

[0070] In this embodiment, a game engine is used for the design program 100 included in the design system 101, so that it is possible to construct a design system 101 that can design temporary scaffolding by arranging objects in a three-dimensional space through intuitive operations like a game. In addition, since the game engine has high performance in simultaneously processing (drawing, rendering) multiple three-dimensional models, it is possible to ensure responsiveness even if the number of components increases. Therefore, according to this embodiment, it is possible to realize a design program 100 and a design system 101 for designing temporary scaffolding that are excellent in operability and responsiveness.

[0071] In this embodiment, two-dimensional or three-dimensional site objects 30, 31, 32 are imported and drawn in a three-dimensional space together with the temporary scaffolding object 20. Therefore, the scaffolding can be planned in accordance with information on the actual site where the temporary scaffolding is to be installed, and the scaffolding can be planned efficiently.

[0072] In this embodiment, a collision determination function is used to determine whether or not a collision has occurred between the temporary scaffolding object 20 and the site objects 30, 31, and 32, and the display color of the temporary scaffolding object 20 changes in the event of a collision. This makes it possible to prevent interference between the temporary scaffolding object 20 and the site objects 30, 31, and 32 from being overlooked, and makes it easy to carry out appropriate scaffolding planning.

[0073] In this embodiment, a remote panel 40 (virtual object) can be placed in a three-dimensional space at a predetermined distance from the temporary scaffolding object 20. A collision determination function is also used to determine whether the remote panel 40 will collide with the site objects 30, 31, and 32, and the display color of the remote panel 40 changes if there is a collision. This allows the temporary scaffolding object 20 to be placed while maintaining an appropriate distance between the temporary scaffolding object 20 and the site objects 30, 31, and 32, making it easy to perform an appropriate scaffolding plan.

[0074] Although the embodiments of the present invention have been described above, the above-mentioned embodiments merely show some of the application examples of the present invention, and it is not intended that the technical scope of the present invention be limited to the specific configurations of the above-mentioned embodiments.

[0075] The design program 100 according to this embodiment may be provided by a storage medium readable by the information processing device 10, or may be provided via a network line. [Explanation of symbols]

[0076] 100 Temporary scaffolding design program (program) 101 Temporary scaffolding design system 10 Information processing equipment (computers) 15 Input Devices 16 Display device 20 Temporary scaffolding object 30 Site Objects 31 Floor Plan (Site Object) 32 Elevation (site object) 40 Distant Panel (Virtual Object) .

Claims

1. an input device to which an operation input by an operator is input; A display device for displaying information; A program executed by a computer of a temporary scaffolding design system comprising: a computer connected to the input device and the display device, a game engine that renders a temporary scaffolding object representing a temporary scaffolding in a three-dimensional space in response to the operation input input from the input device and displays the temporary scaffolding on the display device; program.

2. The program according to claim 1, Importing a two-dimensional or three-dimensional site object representing the site where the scaffolding is to be installed; drawing the site object together with the temporary scaffolding object in a three-dimensional space; program.

3. The program according to claim 2, capturing the scene object in three dimensions; performing a collision determination between the temporary scaffolding object and the site object, and, when a collision occurs between the temporary scaffolding object and the site object, displaying on the display device a display that allows a worker to grasp the collision; program.

4. The program according to claim 3, Drawing a virtual object in a three-dimensional space, the virtual object being defined as having a relative positional relationship with the scene object; performing a collision determination between the temporary scaffolding object and the virtual object, and, when the temporary scaffolding object and the virtual object collide, displaying on the display device a display that allows a worker to grasp the collision; program.

Citation Information

Patent Citations

  • Temporary scaffolding elevation preparing device

    JP1997114872A

  • Design support method for scaffold and computer program

    JP2010257151A

  • Design support program and design support apparatus for additional structure

    JP2011221618A

  • Temporary scaffold planning support system

    JP2016177466A

  • Assumption planning drawing support system

    JP2018018247A

Cited By

  • program

    JP7912703B1