Mining method and apparatus, electronic device and storage medium
By obtaining the height of the water-conducting fracture zone and surface subsidence data of the coal-bearing strata, the top boundary of the water-conducting fracture during mining is determined and pre-cracked, combined with coal-based solid waste grouting and filling, to solve the high cost and problem of existing low-loss mining methods. The problem of insufficient gangue processing capacity has been solved, and low-cost, high recovery rate and green and safe mining have been achieved.
Patent Information
- Application Number
- PCT/CN2023/140269
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-04
- Filing Date
- 2023-12-20
- Publication Date
- 2024-10-10
AI Technical Summary
Existing low-loss mining methods increase mining costs while sacrificing extraction rate and mining efficiency. They cannot take into account both green and safe mining and efficient and economical mining. Moreover, the production capacity of waste stone processing technology is insufficient and the cost is high.
By obtaining the height of the water-conducting fracture zone and surface subsidence data of the coal-bearing strata, the top boundary of the water-conducting fracture during mining is determined, and the pre-splitting method is determined based on the preset threshold and rock layer thickness, and the pre-cracked weakened layer is pre-cracked to complete coal seam mining. Afterwards, the coal-based solid waste grouting filling is carried out, and the porosity and strain strengthening characteristics of the crushed and expanded accumulation are used to improve the gangue processing capacity.
It realizes coal seam mining with low cost and high recovery rate, controls overlying rock damage and surface subsidence, improves gangue processing capacity and rock layer control effect, reduces mining costs, and takes into account green safety and efficient and economical mining.
Smart Images

Figure CN2023140269_10102024_PF_FP_ABST
Abstract
Description
Mining method, device, electronic device and storage medium
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application claims priority to Chinese patent application number 202310357900.0, filed on April 4, 2023, entitled “Green Mining Method, Device, Electronic Device and Storage Medium,” which is incorporated herein by reference in its entirety. Technical Field
[0003] The present application relates to the technical field of safe coal mining, and in particular to a green mining method, device, electronic equipment and storage medium. Background Art
[0004] After coal seam mining, the overlying rock strata will fracture and sink under the influence of gravity. With the further development of coal mining technology in my country, the mining intensity of new mines in western mining areas has become extremely high. Mining in western mining areas is characterized by large mining heights, extremely long working faces, and rapid advances. Under this high-intensity mining, the overlying rock sinks rapidly and extensively, causing severe damage to the overlying rock. The rock strata are highly susceptible to fracture, water diversion, and significant subsidence, which in turn leads to a series of safety and environmental problems such as mine flooding accidents and surface subsidence.
[0005] In the existing technology, the low-loss mining methods mainly include limited thickness mining, strip mining, layered mining, filling mining, overburden separation grouting technology, etc. The existing waste rock treatment methods mainly include underground solid filling, crushing grouting filling and industrial utilization.
[0006] However, the existing low-loss mining methods sacrifice the recovery rate, mining efficiency and increase the mining cost, and cannot take into account both green and safe mining and efficient and economical mining. The existing gangue processing technology has insufficient production capacity and high processing costs.
[0007] Summary of the Invention
[0008] The present application provides a mining method, device, electronic equipment and storage medium to solve the defects of the existing low-loss mining method in the prior art, which sacrifices the recovery rate, mining efficiency and increases the mining cost, and cannot take into account both safe mining and efficient and economical mining, while the existing gangue processing technology has insufficient production capacity and high processing costs.
[0009] The present application provides a mining method, comprising:
[0010] Obtaining data on the height of a water-conducting fracture zone and surface subsidence in a coal-bearing stratum, and determining the top boundary of a mining-induced water-conducting fracture based on the height of the water-conducting fracture zone;
[0011] When the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing formation is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold, determining a pre-splitting mode based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing formation and the coal seam and the thickness of the pre-splitting weakened layer;
[0012] Pre-splitting the pre-splitting weakened layer based on the pre-splitting method, and mining the coal seam after the pre-splitting is completed;
[0013] After the coal seam mining is completed, coal-based solid waste grouting filling is carried out.
[0014] According to a mining method provided by the present application, determining the pre-splitting mode based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-splitting weakened layer includes:
[0015] Determining the pre-splitting engineering quantity based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing stratum and the coal seam, the thickness of the pre-splitting weakened layer, and the coal seam mining thickness;
[0016] The pre-cracking method is determined based on the pre-cracking engineering quantity.
[0017] According to a mining method provided in this application, after the coal seam mining is completed, coal-based solid waste grouting filling is performed, comprising:
[0018] Based on the seepage law and diffusion radius of the slurry caving zone in coal-based solid waste grouting, the layout of the grouting drilling holes is determined;
[0019] After the coal seam mining is completed, coal-based solid waste grouting filling is carried out based on the grouting filling drilling hole arrangement position.
[0020] According to a mining method provided in the present application, grouting filling of coal-based solid waste is performed based on the arrangement position of the grouting filling drilling hole, including:
[0021] Based on the grouting filling drilling arrangement position, as well as the water-conducting fracture zone height control target and / or the surface subsidence reduction target, coal-based solid waste grouting filling is carried out.
[0022] According to a mining method provided in the present application, the height of the water-conducting fracture zone in the coal-bearing formation is determined based on any one of the observation data of the first mine, the observation data of similar mines to the first mine, and the predicted height of the water-conducting fracture zone, and the predicted height of the water-conducting fracture zone is determined based on the overburden type in the coal-bearing formation.
[0023] According to a mining method provided in the present application, the pre-cracked weakened layer of the coal-bearing formation is determined based on the overburden strength of the coal-bearing formation and the mining-induced overburden damage characteristics of the coal-bearing formation.
[0024] The present application also provides a mining device, comprising:
[0025] an acquisition unit, configured to acquire the height of the water-conducting fracture zone and surface subsidence data of the coal-bearing stratum, and determine the top boundary of the mining-induced water-conducting fracture based on the height of the water-conducting fracture zone;
[0026] a pre-splitting mode determining unit, configured to determine a pre-splitting mode based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing formation and the coal seam and the thickness of the pre-splitting weakened layer, when the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing formation is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold;
[0027] a mining unit, configured to pre-split the pre-splitting weakened layer based on the pre-splitting method, and mine the coal seam after the pre-splitting is completed;
[0028] The filling unit is used for grouting and filling coal-based solid waste after the coal seam mining is completed.
[0029] The present application also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, any one of the above-described mining methods is implemented.
[0030] The present application also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which implements any of the mining methods described above when executed by a processor.
[0031] The present application also provides a computer program product, comprising a computer program, which implements any of the above-described mining methods when executed by a processor.
[0032] The mining method, device, electronic device, and storage medium provided in the present application pre-crack the pre-cracked weakened layer based on a pre-crack method, mine the coal seam after the pre-crack is completed, and perform coal-based solid waste grouting after the coal seam mining is completed. The pre-crack method is determined based on the thickness of the rock layer between the pre-cracked weakened layer of the coal-bearing stratum and the coal seam when the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing stratum is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold. Thus, comprehensive control of overburden damage and surface subsidence is achieved by pre-cracked hard rock strata, which has outstanding advantages such as low cost, high recovery rate, and no impact on production compared to traditional low-loss mining methods. In addition, by injecting waste rock slurry into the crushed and expanded pile after pre-cracked damage, the large porosity and strain strengthening characteristics of the crushed and expanded pile are utilized to allow the injection of larger waste rock particles, extend the grouting time, and increase the grouting volume, thereby improving the waste rock processing capacity and rock formation control effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the technical solutions in the present application or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.
[0034] FIG1 is a schematic flow chart of the green mining method provided by the present application;
[0035] FIG2 is a schematic structural diagram of the green mining device provided by the present application;
[0036] FIG3 is a schematic structural diagram of the electronic device provided in this application. DETAILED DESCRIPTION
[0037] To make the objectives, technical solutions, and advantages of this application more clear, the technical solutions of this application will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the embodiments described are only part of the embodiments of this application, not all of them. Based on the embodiments of this application, all other embodiments obtained by ordinary technicians in this field without making any creative efforts are within the scope of protection of this application.
[0038] The terms "first," "second," and the like in the specification and claims of this application are used to distinguish similar objects, and are not used to describe a particular order or precedence. It should be understood that the terms used in this manner are interchangeable where appropriate, so that the embodiments of this application can be implemented in orders other than those illustrated or described herein, and that the objects distinguished by "first," "second," and the like are generally of the same type.
[0039] In related technologies, after coal seam mining, the overlying rock strata will fracture and sink under the action of gravity. When the mining-induced fracture zone develops into the aquifer, it will cause large amounts of water to gush out of the mine, water loss from the aquifer, and even lead to water disasters such as sudden water and sand bursts. Surface subsidence will damage surface buildings and structures, as well as the surface soil. Mining-induced overburden damage poses a significant threat to mine safety and the ecological environment of the mining area. Controlling the height of the water-conducting fracture zone and the movement of the mining-induced rock strata to reduce surface subsidence and achieve low-loss mining is extremely important for ensuring mine safety and protecting the ecological environment of the mining area.
[0040] At the same time, coal mining will produce a large amount of solid waste such as gangue. The open-air stacking of solid waste such as gangue will cause pollution of air, water and soil. The treatment and efficient and rational utilization of a large amount of coal-based solid waste has huge economic and environmental value.
[0041] Existing low-loss mining methods mainly include limited thickness mining, strip mining, layered interval mining, backfill mining, and overburden separation grouting technology. Limited thickness mining reduces the mining thickness of the coal seam and only mines part of the coal seam to reduce mining disturbance. Strip mining, also known as partial mining, is to divide the coal seam into several zones, mine part of the strip, and leave some strip coal pillars to support the roof. Layered interval mining uses the principle that the increased height of the water-conducting fracture zone caused by the lower layer mining in thick coal seams is significantly lower than the height of the water-conducting fracture zone in the upper layer, and the cumulative height of the water-conducting fracture zone in the layered interval mining is significantly lower than the height of the full-height water-conducting fracture zone in fully mechanized caving and fully mechanized mining. Backfill mining supports the roof by filling filling materials into the goaf to reduce mining disturbance. Overburden separation grouting controls surface subsidence by injecting filling slurry into the separation space caused by the uncoordinated deformation of the overburden.
[0042] Existing methods for handling waste rock include underground solid filling, crushing and grouting, and industrial utilization. Underground solid filling uses specialized filling supports, which promptly inject crushed waste rock into the goaf to support the roof. Slurry filling involves fully crushing the waste rock into a slurry that is then transported through pipelines to the overburden separation space or the goaf to fill the mined space. Industrial utilization of waste rock involves using the waste rock to produce industrial products such as building materials, fertilizers, and power generation fuel.
[0043] However, limited thickness mining and partial mining will significantly reduce the recovery rate; layered interval mining will reduce coal mining efficiency, and the coal roadway floor is difficult to maintain during layered mining in deep and impact-hazardous mines, and is not conducive to coal seam fire prevention; backfill mining requires a large amount of easily transportable materials to reach a certain strength in a short period of time to support the roof in time. At the same time, the backfill operation will interfere with the coal mining operation, which will significantly increase costs and reduce production efficiency.
[0044] Solid filling of gangue requires special filling equipment and technology, which is complex, has low production efficiency and high production cost; gangue slurry grouting filling is significantly affected by the size of the voids, and at the same time, the overburden destruction and compaction cycle is short, and the voids in the goaf close as the overburden sinks. The general method of grouting filling of gangue is insufficient in processing capacity; the industrial utilization of gangue is constrained by transportation costs and productivity and it is difficult to process large amounts of gangue.
[0045] In short, existing low-loss mining methods sacrifice recovery rate and efficiency, increasing mining costs and failing to balance environmentally friendly, safe, and efficient mining. Existing waste rock processing and utilization technologies have insufficient production capacity and are costly to process.
[0046] Based on the above problems, the present application provides a green mining method. FIG1 is a flow chart of the green mining method provided by the present application. As shown in FIG1 , the method includes:
[0047] Step 110: Acquire the height of the water-conducting fracture zone and surface subsidence data of the coal-bearing stratum, and determine the top boundary of the mining-induced water-conducting fracture based on the height of the water-conducting fracture zone.
[0048] Specifically, given the irreversibility of rock mass failure, any rock mass destruction will result in volume expansion, consuming a portion of the mined space. Under the action of mining stress, rock masses that are closer to the coal seam and have lower strength will be fully destroyed. The resulting blocks are smaller and can be randomly accumulated in the goaf, resulting in a larger amount of mining-induced expansion. When the rock mass is strong and structurally intact, larger blocks are more likely to form after mining. After the working face is pushed a certain distance, a large area of the blocks will break and sink, and they will be neatly accumulated in the goaf, resulting in a smaller amount of mining-induced expansion.
[0049] The fundamental reason for the rock movement and development of water-conducting fracture zones caused by coal seam mining is the existence of subsidence space in the overlying rock strata after coal seam mining. Low-loss mining should fundamentally start from controlling the mining space.
[0050] Statistics show that when the roof strength is high and the structure is intact, the height of the mining-induced water-conducting fracture zone is significantly greater than the height of the water-conducting fracture zone when the roof strength is low.
[0051] Hydraulic fracturing creates a network of fractures in rock formations. Simultaneously, the interaction between the fractured rock and water significantly reduces its strength, significantly reducing the integrity and overall strength of the rock formation. Using hydraulic fracturing to treat the roof rock formation, and then using mining pressure to further degrade the rock mass, reduces the size of the damaged roof, causing it to accumulate chaotically in the goaf. This increases the amount of roof rock expansion caused by damage, reducing the space for the overlying rock to move downward.
[0052] It is also noted that the crushed rock mass produced by fracturing and mining has a large porosity, making it a typical strain-hardened material, but its initial stiffness is relatively low. In the initial stages of overburden action, the crushed rock mass provides little support for the overburden, limiting its effectiveness in controlling overburden subsidence and failure.
[0053] Furthermore, it was noted that the large porosity and strain-hardening properties of the shattered rock mass produced by fracturing and mining provide ample space and time for the injection of waste rock slurry. This allows for the injection of larger waste rock particles, reducing waste rock crushing costs, while also extending the grouting time and increasing the amount of waste rock slurry injected. The injection of waste rock slurry can, on the one hand, fill the voids in the shattered mass, increase the stiffness of the shattered mass, and reduce the extent of overburden damage and surface subsidence; on the other hand, it can increase the amount of waste rock processed and avoid environmental pollution caused by waste rock discharge.
[0054] Fracturing treatment of hard overburden combined with grouting of crushed gangue can significantly reduce the height of mining-induced water-conducting fracture zones and surface subsidence.
[0055] Therefore, the height of the water-conducting fracture zone and surface subsidence data of the coal-bearing strata can be obtained. The height of the water-conducting fracture zone of the coal-bearing strata here refers to the maximum height of the overlying rock strata caused by mining to fracture and conduct water. When the overlying aquifer is touched, it will cause the loss of aquifer water resources, increase the mine water inflow and even mine water disasters. Generally, the height of the water-conducting fracture zone is calculated from the coal seam roof.
[0056] It also provides data on the mine's hydrogeological conditions, stratigraphic structural characteristics, stratigraphic rock mechanical parameters, and measured data on surface subsidence and water-conducting fracture heights for the mine and nearby mines with similar geological conditions. The mine's hydrogeological conditions reflect the hydrogeological conditions surrounding the mine, while the stratigraphic structural characteristics reveal the structural characteristics of the coal-bearing strata. The stratigraphic rock mechanical parameters reflect both rock fragmentation and stability, and can also reveal the deformation parameters and failure patterns of rocks under various stress states in different physical environments.
[0057] The measured data on surface subsidence and water-conducting fracture zone height in this mine and nearby mines with similar geological conditions can be used to determine the height of the water-conducting fracture zone.
[0058] It is understandable that the mine's hydrogeological conditions, stratum structural characteristics, stratum rock mechanics parameters, and measured data on surface subsidence and water-conducting fracture zone heights in this mine and nearby mines with similar geological conditions will have an impact on coal seam mining. Therefore, it is also necessary to refer to the impact of these factors on coal seam mining.
[0059] The height of the water-conducting fracture zone here can be determined based on the observation data of the first mine in the coal-bearing stratum, the observation data of mines similar to the first mine, and the predicted height of the water-conducting fracture zone.
[0060] The top boundary of the mining-induced water-conducting fracture here refers to the elevation of the coal seam floor minus the height of the water-conducting fracture zone.
[0061] Surface subsidence refers to ground deformation caused by the collapse of the roof of an underground goaf. The surface subsidence data can be determined based on the overburden type. The surface subsidence data here may include a surface subsidence coefficient and a horizontal movement coefficient, and may also include the tangent of the main influencing angle, the propagation angle of the mining impact, and the inflection point offset distance. It may also include a surface subsidence coefficient, a horizontal movement coefficient, the tangent of the main influencing angle, the propagation angle of the mining impact, and the inflection point offset distance, etc. The embodiments of this application do not make specific limitations on this.
[0062] Table 1. Surface subsidence data
[0063] Step 120: When the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing formation is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold, determine the pre-cracking mode based on the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing formation and the coal seam and the thickness of the pre-cracking weakened layer.
[0064] Specifically, after determining the top boundary of the mining-induced water-conducting fracture, the pre-cracking mode can be determined based on the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing formation and the coal seam and the thickness of the pre-cracking weakened layer when the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing formation is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold.
[0065] The aquifer in the coal-bearing stratum here refers to an aquifer mainly containing fissure water. The aquifer in the coal-bearing stratum is mainly composed of rocks with relatively developed pores and fissures.
[0066] The first preset threshold here is the height value of the water-insulating rock pillar. The height value of the water-insulating rock pillar here is determined based on the overburden type. The requirements for the height value of the water-insulating rock pillar are shown in Table 2.
[0067] Table 2. Requirements for the height of water-blocking rock pillars
[0068] Table 2 ∑M is the cumulative mining thickness, n is the number of layers, and Table 2 is applicable to gently inclined (0°~35°) and moderately inclined (36°~54°) coal seams.
[0069] The second preset threshold here may include a preset threshold for the surface subsidence coefficient, a preset threshold for the horizontal movement coefficient, a preset threshold for the tangent of the main impact angle, a preset threshold for the mining impact propagation angle, a preset threshold for the inflection point offset distance, etc. The embodiments of the present application do not make specific limitations on this.
[0070] For example, in Table 1, when the overburden type is hard, the preset threshold value of the surface subsidence coefficient in the surface subsidence data is 0.54, and the preset threshold value of the horizontal movement coefficient in the surface subsidence data is 0.3; for another example, when the overburden type is medium-hard, the preset threshold value of the main influence angle tangent in the surface subsidence data is 2.40, and the preset threshold value of the surface subsidence coefficient in the surface subsidence data is 0.84, etc.
[0071] That is, when the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing stratum is less than a first preset threshold, the pre-cracking mode can be determined based on the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracking weakened layer; or when the surface subsidence data is greater than a second preset threshold, the pre-cracking mode can be determined based on the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam.
[0072] Here, the pre-cracking amount can be determined based on the thickness of the pre-cracking weakened layer, and then the pre-cracking method can be determined based on the pre-cracking amount.
[0073] The pre-cracked weakened layer here refers to the layer in the coal-bearing stratum that needs to be pre-cracked. The pre-cracked method here can include underground directional horizontal drilling hydraulic fracturing technology and surface directional long drilling segmented hydraulic fracturing technology, etc., which is not specifically limited in the embodiments of this application.
[0074] For example, if the thickness of the rock layer between the pre-cracked weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracked weakened layer are relatively thin, the pre-cracked method can be the underground directional horizontal drilling segmented hydraulic fracturing technology. If the thickness of the rock layer between the pre-cracked weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracked weakened layer are relatively thick, the pre-cracked method can be the surface directional long drilling segmented hydraulic fracturing technology.
[0075] The hydraulic fracturing technology here refers to the use of a ground fracturing vehicle group to inject a liquid of a certain viscosity into the well along the wellbore at a sufficiently high pressure and a sufficiently large displacement to destroy the intact rock formation and produce a network of cracks.
[0076] Step 130: pre-splitting the pre-splitting weakened layer based on the pre-splitting method, and mining the coal seam after the pre-splitting is completed.
[0077] Specifically, after determining the pre-splitting method, the pre-splitting weakened layer can be pre-splitting based on the pre-splitting method. For example, the pre-splitting weakened layer can be pre-splitting by using directional downhole horizontal drilling segmented hydraulic fracturing technology, or by using surface directional long drilling segmented hydraulic fracturing technology. The embodiments of the present application do not specifically limit this.
[0078] After pre-splitting is completed, coal seam mining is carried out. Here, the pre-splitting construction plan can be determined based on factors such as the thickness, strength, and working face size of the pre-splitting weakened layer with the goal of fully pre-splitting the rock layer and changing the form of rock mining damage.
[0079] After the pre-splitting plan is determined, pre-splitting can be carried out before coal mining. During the pre-splitting process, microseismic monitoring technology can be used to monitor the development of pre-splitting cracks to ensure that the hard rock formation is fully weakened by fracturing.
[0080] The microseismic monitoring technology here is a real-time, dynamic, and continuous geophysical monitoring method that uses microseismic information generated by coal and rock fractures to determine the development of hydraulic fractures.
[0081] The pre-fracture development characteristics here characterize the pre-fracture development situation of the target formation.
[0082] Step 140: After the coal seam is mined, coal-based solid waste grouting is performed.
[0083] Specifically, after the coal seam is mined, grouting of coal-based solid waste can be performed. For example, the grouting drilling hole layout location can be determined first, and then grouting of coal-based solid waste can be performed based on the grouting drilling hole layout location.
[0084] For example, coal-based solid waste such as crushed coal gangue can be mixed with fly ash, cement and corresponding additives in a certain proportion to form a coal-based solid waste grouting filling slurry that is convenient for efficient pipeline transportation.
[0085] It is understandable that the coal-based solid waste grouting filling slurry should be easy to transport under the condition of reasonable cost control and have certain cementing properties, and can form a combined carrier that supports the overlying rock strata with the broken rock mass that is randomly piled up in the goaf after pre-cracking and mine pressure.
[0086] Grouting can fully utilize existing fractured wells and other boreholes to reduce drilling costs. The grouting volume for each borehole is determined based on the controlled area of the grouting borehole, the total amount of voids in the post-fracture caving zone, and the void structure, allowing for the preparation of fill materials in advance. The final grouting hole should be located above the fractured zone to ensure that the grout can flow into the chaotic accumulation and fill the voids.
[0087] Coal-based solid waste slurry is injected into the caving zone after fracturing treatment through the designed and constructed grouting boreholes. During the grouting process, the grouting situation is judged through downhole monitoring and grouting pressure monitoring.
[0088] In addition, it is also necessary to test the effectiveness of fracturing-grouting filling, that is, to comprehensively judge the effectiveness of fracturing-grouting filling in controlling surface subsidence and the height of mining-induced water-conducting fracture zones through data such as underground and ground drilling, mine pressure display, rock movement monitoring, surface subsidence measurement, mine water-conducting fracture zone height detection, and mine water inflow changes.
[0089] It is understood that the present embodiment utilizes hydraulic fracturing to transform the thick, hard rock formation near the coal seam, allowing it to be fully destroyed under the action of mining pressure, resulting in a chaotic accumulation in the goaf after mining. This increases the mining-induced expansion of the thick, hard rock formation, and the high porosity and strain-hardening properties of the fully destroyed formation provide space and time for grouting of coal-based solid waste slurry.
[0090] The combined bearing body formed by filling the gaps with gangue slurry is used to limit the sinking movement and destruction of the overlying rock strata, which can achieve the control of the height of the water-conducting fracture zone and the control of surface subsidence without affecting the recovery rate and mining efficiency.
[0091] This can not only reduce mining disturbances, but also process large amounts of solid waste discharged from coal mining and utilization. Compared with traditional low-loss mining methods, it has outstanding advantages such as low cost, high recovery rate, and no impact on production. It also provides a solution for large-scale treatment of coal-based solid waste and is suitable for mining thick coal seams with thick hard rock layers on the roof. In other words, the embodiments of the present application provide a new, efficient and low-cost approach to achieve water-saving mining, coal mine roof water hazard prevention and control, surface subsidence control, and waste rock treatment.
[0092] It can be understood that the green mining method in this application reduces mining costs and can take into account the requirements of green and safe mining and efficient and economical mining.
[0093] The method provided in the embodiment of the present application is to pre-crack the hard rock stratum based on a pre-crack method, and then carry out coal seam mining after the pre-crack is completed. After the coal seam mining is completed, coal-based solid waste grouting is carried out in the goaf. The pre-crack method is determined based on the thickness of the rock stratum between the pre-cracked weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracked weakened layer when the distance between the top boundary of the water-conducting fracture and the aquifer of the coal-bearing stratum is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold. Thus, by pre-cracked hard rock strata, comprehensive control of overburden damage and surface subsidence is achieved. Compared with traditional low-loss mining methods, it has outstanding advantages such as low cost, high recovery rate, and no impact on production. In addition, by injecting waste rock slurry into the crushed and expanded pile after pre-cracked damage, the large porosity and strain strengthening characteristics of the crushed and expanded pile are utilized to allow the injection of larger waste rock particles, extend the grouting time, and increase the grouting volume, thereby improving the waste rock processing capacity and rock stratum control effect.
[0094] Based on the above embodiment, step 120 includes:
[0095] Step 121, determining the pre-splitting engineering quantity based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing stratum and the coal seam, the thickness of the pre-splitting weakened layer, and the coal seam mining thickness;
[0096] Step 122: Determine the pre-splitting method based on the pre-splitting engineering quantity.
[0097] Specifically, considering that the thickness of the coal seam also affects the choice of pre-splitting method, the pre-splitting workload can be determined based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing stratum and the coal seam, the thickness of the pre-splitting weakened layer, and the coal seam mining thickness. Here, the coal seam mining thickness refers to the mineable thickness of the coal seam, and the pre-splitting workload refers to the workload required for hydraulic fracturing.
[0098] It can be understood that the thicker the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam, and the thicker the thickness of the pre-cracking weakened layer, and the thicker the coal seam is mined, the greater the pre-cracking project volume; the thinner the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam, and the thinner the thickness of the coal seam is mined, the smaller the pre-cracking project volume.
[0099] After the pre-splitting engineering quantity is determined, the pre-splitting method can be determined based on the pre-splitting engineering quantity.
[0100] For example, when the pre-cracking project volume is small, that is, when the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracking weakened layer are thin and the coal seam mining thickness is smaller, downhole directional horizontal drilling hydraulic fracturing technology can be adopted as the pre-cracking method.
[0101] For example, when the pre-cracking project volume is large, that is, when the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracking weakened layer are thicker and the thicker the coal seam is mined, surface directional long drilling segmented hydraulic fracturing technology can be adopted as the pre-cracking method.
[0102] The method provided in the embodiments of the present application determines the pre-splitting engineering quantity based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing stratum and the coal seam, the thickness of the pre-splitting weakened layer, and the coal seam mining thickness, and then determines the pre-splitting method based on the pre-splitting engineering quantity, thereby improving the accuracy and reliability of the determination of the pre-splitting method.
[0103] Based on the above embodiment, step 140 includes:
[0104] Step 141, determining the arrangement position of the grouting filling drilling holes based on the seepage law and diffusion radius inside the slurry caving zone of the coal-based solid waste grouting filling;
[0105] Step 142, after the coal seam mining is completed, coal-based solid waste grouting filling is performed based on the grouting filling drilling hole arrangement position.
[0106] Specifically, before carrying out coal-based solid waste grouting filling, it is necessary to first determine the layout position of the grouting filling drilling holes. Therefore, the layout position of the grouting filling drilling holes can be determined based on the seepage law and diffusion radius inside the slurry caving zone of the coal-based solid waste grouting filling.
[0107] The grouting filling drilling arrangement here reflects the drilling location information used for grouting filling of coal-based solid waste.
[0108] The seepage law here refers to the evolution of voids in the roof destruction accumulation body under the deposition of slurry particles and the migration of slurry as the main line, reflecting the law of the diffusion of grouting slurry in the broken roof accumulation body and the characteristics of particle deposition.
[0109] In conventional grouting, the slurry is pressed out of the grouting hole and diffused into the formation. The plane range of diffusion is assumed to be a circle, and the radius of the circle is the slurry diffusion radius.
[0110] After the coal seam mining is completed, coal-based solid waste grouting can be carried out based on the grouting filling drilling hole layout.
[0111] The method provided in the embodiment of the present application determines the layout position of the grouting and filling drilling holes based on the seepage law and diffusion radius inside the slurry fall zone of the coal-based solid waste grouting and filling, thereby improving the accuracy and reliability of the determination of the layout position of the grouting and filling drilling holes. After the coal seam mining is completed, the coal-based solid waste grouting and filling is carried out based on the layout position of the grouting and filling drilling holes, thereby improving the efficiency and rationality of the coal-based solid waste grouting and filling, and being able to process the large amount of solid waste discharged from coal mining and utilization.
[0112] Based on the above embodiment, step 142 includes:
[0113] Based on the grouting filling drilling arrangement position, as well as the water-conducting fracture zone height control target and / or the surface subsidence reduction target, coal-based solid waste grouting filling is carried out.
[0114] Specifically, when performing coal-based solid waste grouting filling, the water-conducting fracture zone height control target and the surface subsidence reduction target can also be combined.
[0115] That is, coal-based solid waste grouting filling can be carried out based on the grouting filling drilling arrangement position, as well as the water-conducting fracture zone height control target and / or the surface subsidence reduction target.
[0116] The height control targets of the water-conducting fracture zone here can refer to the various height control targets in the water-blocking rock column height requirements in Table 2, and the surface subsidence reduction targets here can refer to the various surface subsidence reduction targets in the surface subsidence data in Table 1.
[0117] It can be understood that, while meeting the water-conducting fracture zone height control target and / or the surface subsidence reduction target, coal-based solid waste grouting filling is carried out based on the grouting filling drilling hole layout position, which further improves the accuracy and reliability of coal-based solid waste grouting filling.
[0118] Based on the above embodiment, the height of the water-conducting fracture zone in the coal-bearing formation is determined based on any one of the observation data of the first mine, the observation data of similar mines to the first mine, and the predicted height of the water-conducting fracture zone, and the predicted height of the water-conducting fracture zone is determined based on the overburden type in the coal-bearing formation.
[0119] Specifically, the height of the water-conducting fracture zone in the coal-bearing stratum can be determined based on any one of the observation data of the first mine, the observation data of similar mines to the first mine, and the predicted height of the water-conducting fracture zone. When the height data of both zones are lacking, the height of the water-conducting fracture zone can be determined based on empirical formulas and other methods. The height of the water-conducting fracture zone based on statistical laws is shown in Table 3:
[0120] Table 3. Formula for predicting the height of water-conducting fracture zones
[0121] In Table 3, ∑M represents the cumulative mining thickness. The formula for predicting the height of a water-conducting fracture zone applies to single-layer mining thicknesses of 1 to 3 meters, with cumulative mining thicknesses not exceeding 15 meters. The ± in the calculation formula represents the mean error.
[0122] In addition, the predicted height of the water-conducting fracture zone can also be determined based on the key layer theory: when the key layer is located within the range of 7-10 times the mining height, the mining-induced water-conducting fracture zone develops to the top of the rock layer controlled by the key layer.
[0123] The predicted height of the water-conducting fracture zone can also be determined based on the deformation analysis method: when the inter-layer tensile deformation rate of the rock layer is greater than a critical value, the rock layer tensile failure will produce longitudinal cracks that conduct water.
[0124] The formula for the layer-wise tensile deformation rate is as follows:
[0125] Where ε is the tensile deformation rate of the rock layer; h is the height of the rock layer from the coal seam roof, m; w k is the subsidence of the k+1th rock layer above the coal seam, m; μ=cotδ0+cotψ3, δ0 is the coal seam mining boundary angle, ψ3 is the full mining angle.
[0126] Fracture water conductivity limits of various rock formations: (1) For soft rock formations, the fracture-mining ratio is 7.8-8.3, and the critical tensile rate of the rock layers is greater than 0.40%; (2) For medium-hard rock formations, the fracture-mining ratio is 10.0-15.88, and the critical tensile rate of the rock layers is 0.1%-0.24%; (3) For hard rock formations, the fracture-mining ratio is 19.2, and the critical tensile rate of the rock layers is 0.04%.
[0127] After determining the predicted height of the water-conducting fracture zone based on the overburden type in the coal-bearing stratum, determining the predicted height of the water-conducting fracture zone based on the key layer theory, and determining the predicted height of the water-conducting fracture zone based on the deformation analysis method, the maximum value obtained by the three calculation methods can be taken as the predicted height of the water-conducting fracture zone. This embodiment of the present application does not make specific limitations on this.
[0128] The observation data for the first mine here refers to the fracture-to-mining ratio data obtained from observations made through boreholes within the same mine when two observation boreholes are present. The observation data for the first mine can also be used as the basis for calculating the height of the water-conducting fracture zone in the unmined working face.
[0129] The observation data from similar mines to the first mine refers to the preference for using observation data from adjacent mines with similar overburden structures and mining parameters when two observation records are unavailable within the same mine. Observation data from similar mines to the first mine can also be used to predict the height of the water-conducting fracture zone in the current working face.
[0130] According to the method provided in the embodiment of the present application, the height of the water-conducting fracture zone in the coal-bearing formation is determined based on the observation data of the first mine, the observation data of similar mines to the first mine, and the predicted height of the water-conducting fracture zone, thereby improving the accuracy and reliability of the determination of the height of the water-conducting fracture zone in the coal-bearing formation.
[0131] Based on the above embodiment, the pre-cracked weakened layer of the coal-bearing formation is determined based on the overburden strength of the coal-bearing formation and the mining-induced overburden damage characteristics of the coal-bearing formation.
[0132] Specifically, the pre-cracked weakened layer of the coal-bearing formation can be determined based on the overburden strength of the coal-bearing formation and the overburden failure characteristics of the coal-bearing formation caused by mining. The overburden strength of the coal-bearing formation here reflects the compressive strength of the overburden, and the overburden failure characteristics of the coal-bearing formation here reflect the damage status of the overburden.
[0133] For example, the rock column diagram and rock mechanical parameters of the mine can be collected, and the hard main rock layer can be comprehensively determined based on the rock structure and strength parameters. The principles for determining the position of the pre-cracking weakened layer are:
[0134] (1) The rock structure is dense, has good integrity, high strength and good compressibility.
[0135] (2) It has a major controlling effect on the activity of mining-induced strata. Thin hard rock layers have little effect on the development of mining-induced cracks. When the thickness of the hard rock layer in the overburden reaches more than twice the mining thickness of the coal seam, its controlling effect on the overburden activity is significant. The thicker the hard rock layer, the more significant its controlling effect on the activity of the overburden. Pre-cracking and weakening it to control the height of the water-conducting fracture zone and the activity of the overburden is more effective.
[0136] (3) The rock strata are stable throughout the entire working face, mining area, and even the mine. Pre-cracking and weakening of hard rock strata to control rock movement is a comprehensive control of rock movement throughout the working face, mining area, and even the entire mine. Therefore, rock strata that are stable and relatively uniform in thickness within the mining area or even the mine can serve as ideal pre-cracking and weakening layers.
[0137] (4) According to the characteristics of overburden damage caused by mining, the rock strata that are close to the coal seam and can be fully destroyed by mining are called small-block damage zones, and the rock strata that have high overburden strength and show large-block fractures under mining are called large-block damage zones. The rock strata in the large-block damage zone are selected as the pre-cracking weakened layer.
[0138] Based on any of the above embodiments, a green mining method comprises the following steps: First, obtaining data on the height of the water-conducting fracture zone and surface subsidence in the coal-bearing stratum, and determining the top boundary of the mining-induced water-conducting fracture based on the water-conducting fracture zone height. Alternatively, data on mine hydrogeological conditions, stratum structural characteristics, stratum rock mechanical parameters, and measured surface subsidence and water-conducting fracture zone height data for the current mine and adjacent mines with similar geological conditions may be obtained.
[0139] The height of the water-conducting fracture zone in the coal-bearing stratum here is determined based on any one of the observation data of the first mine, the observation data of similar mines to the first mine, and the predicted height of the water-conducting fracture zone. The predicted height of the water-conducting fracture zone here is determined based on the overburden type in the coal-bearing stratum.
[0140] In the second step, when the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing stratum is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold, the pre-cracking engineering quantity is determined based on the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam, the thickness of the pre-cracking weakened layer, and the mining thickness of the coal seam.
[0141] The third step is to determine the pre-cracking method based on the pre-cracking engineering quantity.
[0142] The fourth step is to pre-crack the pre-cracked weakened layer based on the pre-crack method, and then mine the coal seam after the pre-crack is completed.
[0143] The pre-cracked weakened layer of the coal-bearing stratum here is determined based on the overburden strength of the coal-bearing stratum and the mining-induced overburden damage characteristics of the coal-bearing stratum.
[0144] The fifth step is to determine the layout location of the grouting filling drilling holes based on the seepage law and diffusion radius inside the slurry caving zone of coal-based solid waste grouting filling.
[0145] The sixth step is to carry out coal-based solid waste grouting filling after the coal seam mining is completed based on the grouting filling drilling layout position, as well as the water-conducting fracture zone height control target and / or surface subsidence reduction target.
[0146] The green mining device provided in the present application is described below. The green mining device described below and the green mining method described above can be referenced to each other.
[0147] Based on any of the above embodiments, the present application provides a green mining device. FIG2 is a schematic structural diagram of the green mining device provided by the present application. As shown in FIG2 , the device includes:
[0148] An acquisition unit 210 is configured to acquire the height of a water-conducting fracture zone and surface subsidence data of the coal-bearing stratum, and determine the top boundary of the mining-induced water-conducting fracture based on the height of the water-conducting fracture zone;
[0149] a pre-splitting mode determining unit 220 configured to determine a pre-splitting mode based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing formation and the coal seam and the thickness of the pre-splitting weakened layer, when the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing formation is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold;
[0150] A mining unit 230 is configured to pre-split the pre-splitting weakened layer based on the pre-splitting method, and mine the coal seam after the pre-splitting is completed;
[0151] The filling unit 240 is used to perform coal-based solid waste grouting filling after the coal seam mining is completed.
[0152] The device provided in the embodiment of the present application pre-cracks the pre-cracked weakened layer based on a pre-crack method, mines the coal seam after the pre-crack is completed, and performs coal-based solid waste grouting after the coal seam mining is completed. The pre-crack method is determined based on the thickness of the rock layer between the pre-cracked weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracked weakened layer when the distance between the top boundary of the water-conducting fracture and the aquifer of the coal-bearing stratum is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold. Thus, by pre-cracked hard rock strata, comprehensive control of overburden damage and surface subsidence is achieved, which has outstanding advantages over traditional low-loss mining methods, such as low cost, high recovery rate, and no impact on production. In addition, by injecting waste rock slurry into the crushed and expanded pile after pre-cracked damage, the large porosity and strain strengthening characteristics of the crushed and expanded pile are utilized to allow the injection of larger waste rock particles, extend the grouting time, and increase the grouting volume, thereby improving the waste rock processing capacity and rock formation control effect.
[0153] Based on any of the above embodiments, the pre-splitting mode determining unit 220 is specifically configured to:
[0154] Determining the pre-splitting engineering quantity based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing stratum and the coal seam, the thickness of the pre-splitting weakened layer, and the coal seam mining thickness;
[0155] The pre-cracking method is determined based on the pre-cracking engineering quantity.
[0156] Based on any of the above embodiments, the filling unit 240 is specifically used to:
[0157] A unit for determining the layout position of grouting and filling drilling holes is used to determine the layout position of grouting and filling drilling holes based on the seepage law and diffusion radius of the slurry caving zone in coal-based solid waste grouting and filling;
[0158] The coal-based solid waste grouting and filling unit is used to carry out coal-based solid waste grouting and filling based on the arrangement position of the grouting and filling drilling holes after the coal seam mining is completed.
[0159] Based on any of the above embodiments, the coal-based solid waste grouting filling unit is specifically used for:
[0160] Based on the grouting filling drilling arrangement position, as well as the water-conducting fracture zone height control target and / or the surface subsidence reduction target, coal-based solid waste grouting filling is carried out.
[0161] Based on any of the above embodiments, the height of the water-conducting fracture zone in the coal-bearing formation is determined based on any one of the observation data of the first mine, the observation data of similar mines to the first mine, and the predicted height of the water-conducting fracture zone, and the predicted height of the water-conducting fracture zone is determined based on the overburden type in the coal-bearing formation.
[0162] Based on any of the above embodiments, the pre-cracked weakened layer of the coal-bearing formation is determined based on the overburden strength of the coal-bearing formation and the mining-induced overburden damage characteristics of the coal-bearing formation.
[0163] Figure 3 illustrates a schematic diagram of the physical structure of an electronic device. As shown in Figure 3, the electronic device may include: a processor 310, a communication interface 320, a memory 330 and a communication bus 340, wherein the processor 310, the communication interface 320, and the memory 330 communicate with each other through the communication bus 340. The processor 310 can call the logic instructions in the memory 330 to execute a green mining method, which includes: obtaining the height of the water-conducting fracture zone and surface subsidence data of the coal-bearing stratum, and determining the top boundary of the mining-induced water-conducting fracture based on the height of the water-conducting fracture zone; when the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing stratum is less than a first preset threshold, or, when the surface subsidence data is greater than a second preset threshold, determining the pre-cracking method based on the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracking weakened layer; pre-cracking the pre-cracking weakened layer based on the pre-cracking method, and mining the coal seam after the pre-cracking is completed; and performing coal-based solid waste grouting and filling after the coal seam mining is completed.
[0164] In addition, the logic instructions in the above-mentioned memory 330 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0165] On the other hand, the present application also provides a computer program product, which includes a computer program, which can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the green mining method provided by the above methods, which includes: obtaining the height of the water-conducting fracture zone and surface subsidence data of the coal-bearing stratum, and determining the top boundary of the mining-induced water-conducting fracture based on the height of the water-conducting fracture zone; when the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing stratum is less than a first preset threshold, or, when the surface subsidence data is greater than a second preset threshold, determining the pre-cracking method based on the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracking weakened layer; pre-cracking the pre-cracking weakened layer based on the pre-cracking method, and mining the coal seam after the pre-cracking is completed; and performing coal-based solid waste grouting and filling after the coal seam mining is completed.
[0166] On the other hand, the present application also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the green mining method provided by the above-mentioned methods, the method comprising: obtaining the height of the water-conducting fracture zone and surface subsidence data of the coal-bearing stratum, and determining the top boundary of the mining-induced water-conducting fracture based on the height of the water-conducting fracture zone; determining the pre-cracking method based on the thickness of the rock layer between the pre-cracking weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-cracking weakened layer when the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing stratum is less than a first preset threshold, or when the surface subsidence data is greater than a second preset threshold; pre-cracking the pre-cracking weakened layer based on the pre-cracking method, and mining the coal seam after the pre-cracking is completed; and performing coal-based solid waste grouting and filling after the mining of the coal seam is completed.
[0167] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate, and the components shown as units may or may not be physical units, i.e., they may be located in one location or distributed across multiple network units. Some or all of the modules may be selected based on actual needs to achieve the objectives of the present embodiment. Persons of ordinary skill in the art will be able to understand and implement the present invention without inventive effort.
[0168] Through the description of the above embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus a necessary general hardware platform, or of course, by hardware. Based on this understanding, the essence of the above technical solution or the part that contributes to the existing technology can be embodied in the form of a software product. The computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a magnetic disk, an optical disk, etc., and includes a number of instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or certain parts of the embodiments.
[0169] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A mining method comprising: Acquire the height of the water-conducting fracture zone and the surface subsidence data of the coal-bearing stratum, and determine the top boundary of the mining-induced water-conducting fracture based on the height of the water-conducting fracture zone; When the distance between the top boundary of the mining-induced water-conducting fracture and the aquifer of the coal-bearing stratum is less than a first preset threshold value, or when the surface subsidence data is greater than a second preset threshold value, the pre-splitting mode is determined based on the thickness of the pre-splitting weakened layer of the coal-bearing stratum and the rock stratum between the coal seam and the thickness of the pre-splitting weakened layer; Pre-splitting the pre-splitting weakened layer based on the pre-splitting method, and mining the coal seam after the pre-splitting is completed; After the coal seam mining is completed, coal-based solid waste grouting filling is carried out.
2. The mining method according to claim 1, wherein: The determining of the pre-splitting mode based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing stratum and the coal seam and the thickness of the pre-splitting weakened layer comprises: Determine the pre-splitting engineering quantity based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing stratum and the coal seam, the thickness of the pre-splitting weakened layer, and the coal seam mining thickness; Based on the pre-splitting engineering quantity, the pre-splitting method is determined.
3. The mining method according to claim 1, wherein: After the coal seam mining is completed, coal-based solid waste grouting filling is performed, including: Based on the seepage law and diffusion radius of the slurry caving zone in coal-based solid waste grouting, the layout of the grouting drilling holes is determined; After the coal seam mining is completed, coal-based solid waste grouting filling is carried out based on the grouting filling drilling hole arrangement position.
4. The mining method according to claim 3, wherein: The method of performing grouting filling of coal-based solid waste based on the grouting filling drilling hole arrangement position includes: Based on the grouting filling drilling arrangement position, as well as the water-conducting fracture zone height control target and / or the surface subsidence reduction target, coal-based solid waste grouting filling is carried out.
5. The mining method according to claim 1, wherein: The height of the water-conducting fracture zone in the coal-bearing formation is determined based on any one of the observation data of the first mine, the observation data of similar mines to the first mine, and the predicted height of the water-conducting fracture zone, and the predicted height of the water-conducting fracture zone is determined based on the type of overburden in the coal-bearing formation.
6. The mining method according to claim 1, wherein: The pre-cracked weakened layer of the coal-bearing formation is determined based on the overburden strength of the coal-bearing formation and the overburden damage characteristics of the coal-bearing formation caused by mining.
7. A mining device comprising: An acquisition unit, used to acquire the height of the water-conducting fracture zone and surface subsidence data of the coal-bearing stratum, and determine the top boundary of the mining-induced water-conducting fracture based on the height of the water-conducting fracture zone; A pre-splitting mode determination unit is used to determine the pre-splitting mode based on the thickness of the rock layer between the pre-splitting weakened layer of the coal-bearing formation and the coal seam and the thickness of the pre-splitting weakened layer when the distance between the top boundary of the mining-induced water-conducting fracture and the water-bearing layer of the coal-bearing formation is less than a first preset threshold value, or when the surface subsidence data is greater than a second preset threshold value; A mining unit, used for pre-splitting the pre-splitting weakened layer based on the pre-splitting method, and mining the coal seam after the pre-splitting is completed; The filling unit is used for grouting and filling of coal-based solid waste after the coal seam mining is completed.
8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the mining method according to any one of claims 1 to 6 is implemented.
9. A non-transitory computer-readable storage medium having a computer program stored thereon, wherein: When the computer program is executed by a processor, the mining method according to any one of claims 1 to 6 is implemented.
10. A computer program product comprising a computer program, wherein: When the computer program is executed by a processor, the mining method according to any one of claims 1 to 6 is implemented.
Citation Information
Patent Citations
Method for repeated mining of extra-thick coal seam stop line coal pillar by means of paste filling in conjunction with roof pre-splitting
CN108518222A
Method for controlling height of water-conducting fissure zone through presplitting weakening of hard overlying strata under water-bearing stratum
CN112879011A
Coal seam roof water burst control method based on multi-sequence and multi-layer presplitting
CN115013053A
Goaf lag filling efficient water-preserved coal mining method
CN115030722A
Green mining method and device, electronic equipment and storage medium
CN116446880A
Cited By
Intelligent control and evaluation method for weakening coal seam of coal face
CN118499083A
Method for predicting damage height of mining overburden strata under high-water-pressure loose aquifer of deep well
CN119338627A
Method and device for resolving three-dimensional deformation of single-rail InSAR in subsidence area
CN119374530A
Hydrofracture optimization design method for controlling fracture height of deep coal bed gas reservoir and related device
CN119664308A
Roof water inrush risk identification method under mining influence of adjacent working faces
CN119809856A