Method for activating and modifying steel slag by residual heat of converter steel slag
A technology of converter steel slag and steel slag, which is applied in the field of utilization of converter steel slag, can solve the problems of little significance for large-scale application of steel slag, little space for performance improvement, and congenital deficiency of steel slag, so as to ensure gelling performance and avoid direct losses , to achieve the effect of reuse
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2011-04-27
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2
Abstract
Description
technical field
[0001] The invention relates to the technical field of utilization of converter steel slag, in particular to a method for activating and modifying steel slag by using the waste heat of converter steel slag. Background technique
[0002] Steel slag, as waste slag during steelmaking, generally accounts for about 20% of crude steel output. In recent years, with the rapid development of my country's iron and steel industry, the accumulation of steel slag has increased year by year, which not only occupies a large amount of land, but also causes serious environmental pollution. The mineral composition of converter steel slag is mainly composed of tricalcium silicate, dicalcium silicate, calcium ferrite, iron oxide, free calcium and RO, among which silicate minerals are gelling active minerals. Therefore, steel slag is used as cement admixture Or concrete admixtures and other aspects have good utilization potential. However, due to the presence of mineral phases ...
Examples
Embodiment 1
[0029] The slag discharge capacity of the converter steel slag is 3 tons, and the performance adjustment material is 10% of the steel slag weight.
[0030] Mix electric furnace reduction slag, coal slag, and additives according to the following parts by weight to prepare performance-adjusting materials:
[0031] Electric furnace reduced slag 70 parts (210 kg)
[0032] Cinder 25 parts (75 kg)
[0033] 5 parts plastic-retaining starch (15 kg)
[0034] After the performance adjustment material is granulated, it is placed in a steel slag ladle.
[0035] The property-adjusting material and steel slag are mixed by the impact force of molten steel slag pouring.
[0036] The mixed performance adjusting material and steel slag were heated in a slag ladle for 8 hours.
[0037] Under the action of waste heat of molten steel slag, chemical reaction occurs between steel slag and performance adjusting material.
Embodiment 2
[0039] The amount of slag discharged from the converter steel slag is 3 tons, and the performance adjustment material is 15% of the weight of the steel slag.
[0040] Mix electric furnace reduction slag, coal slag, and additives according to the following parts by weight to prepare performance-adjusting materials:
[0041] Electric furnace reduced slag 80 parts (360 kg)
[0042] 17 cinders (76.5 kg)
[0043] 3 parts thickening starch (13.5 kg)
[0044] After the performance adjustment material is granulated, it is placed in a steel slag ladle.
[0045] The property-adjusting material and steel slag are mixed by the impact force of molten steel slag pouring.
[0046] The mixed performance adjusting material and steel slag were hot stuffed in a slag ladle for 12 hours.
[0047] Under the action of waste heat of molten steel slag, chemical reaction occurs between steel slag and performance adjusting material.
Embodiment 3
[0049] The amount of slag discharged from the converter steel slag is 3 tons, and the performance adjustment material is 20% of the weight of the steel slag.
[0050] Mix electric furnace reduction slag, coal slag, and additives according to the following parts by weight to prepare performance-adjusting materials:
[0051] Electric furnace reduced slag 90 parts (540 kg)
[0052] Cinder 7 parts (42 kg)
[0053] 3 parts (18 kg) plastic-proof thickening starch
[0054] After the performance adjustment material is granulated, it is transported to the steel slag ladle by a screw conveyor.
[0055] The property-adjusting material and steel slag are mixed by the impact force of molten steel slag pouring.
[0056] The mixed performance adjusting material and steel slag were hot stuffed in a slag ladle for 18 hours.
[0057] Under the waste heat of the molten steel slag, the chemical reaction occurs between the steel slag and the performance adjusting material.