A high jet haze removal tower heat pump valley electricity storage cabin system
Through the high-jet haze removal tower heat pump valley electric energy storage compartment system, combined with the high-jet greenhouse haze absorption tower and large low-heat source heat pump, the problem of traditional small air source heat pumps being unable to disturb the atmospheric inversion layer and having high noise and heat loss is solved. It has achieved efficient haze purification and high-energy-efficient heating, reduced the area and cold island effect, and provided economic and social benefits.
Patent Information
- Application Number
- CN201711288119.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2017-12-07
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2037-12-07
AI Technical Summary
The jet of traditional small coal-to-electric air source heat pump is less than 10 meters high and cannot disturb the atmospheric inversion layer, resulting in continuous haze weather. The outdoor heat pump unit is noisy and has serious heat loss, making it impossible to effectively remove greenhouse haze and achieve efficient heating.
Design a high-jet haze removal tower heat pump valley electric energy storage compartment system, combining high-jet greenhouse haze absorption tower and high-efficiency large low-heat source heat pump, use the building space at the bottom of the tower to achieve noise isolation, and pass through the hollow cold and heat source absorption layer and suspension The phase change module realizes efficient cold and heat exchange and haze purification, and provides high energy-efficient heating.
Effectively reduce the floor area and cold island effect of traditional small air source heat pumps, improve the performance of heat pumps, realize the negative pressure evaporating water cooler with high efficiency in winter and high energy efficiency in summer, and solve the problem of heat loss of heat supply for outdoor heat pump units. , achieving economic and social benefits of haze control.
Smart Images

Figure CN107747782B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to new energy and energy-saving technologies, environmental protection and resource fields, and in particular to a high-jet haze removal tower heat pump valley electricity storage cabin system. Background Art
[0002] Greenhouse smog weather contains infinite potential heat of water vapor. At the same time, greenhouse gases emitted by cogeneration, power exhaust, and industrial and agricultural production lead to a long duration of the atmospheric inversion layer and are the main cause of smog weather. The jet of traditional small-scale coal-to-electricity air source heat pump is less than 10 meters high and cannot disturb the circulation of the atmospheric inversion layer. At the same time, the outdoor heat pump unit is noisy and suffers serious heat loss. Therefore, there is an urgent need for a high-jet greenhouse smog absorption tower to cooperate with the heat pump lifting heating device to achieve vibration and noise source separation, and at the same time, deliver low-temperature cold air flow to the atmosphere, which can achieve the economic and social benefits of removing smog for heating, inducing wind to drive smog, and artificially controlling smog. Summary of the invention
[0003] The invention discloses a high-jet haze removal tower heat pump valley power energy storage cabin system, which can economically and reasonably apply the combination of a high-jet greenhouse haze absorption tower and a high-efficiency large-scale low-heat source heat pump, utilize the building space at the bottom of the tower body to achieve noise isolation between the heat pump room and the living environment space, solve the problem of the valley power energy storage cabin needing a larger heat storage capacity, realize a coal-to-electricity replacement device of tens of megawatts, and can provide a certain number of commercial and residential houses.
[0004] It can effectively reduce the floor space occupied by traditional small air source heat pumps converted from coal to electricity, solve the problem of low heat pump performance and easy frost formation caused by the cold island effect of large-scale traditional small air source heat pumps, solve the problem of heat loss in outdoor heat pump units, and achieve efficient heating of phase change suspended snow in winter, and a high energy efficiency negative pressure evaporative water cooler in summer.
[0005] The technical solution of the present invention is a high-jet haze removal tower heat pump valley electricity energy storage cabin system, which includes a heat pump valley electricity thermal storage cabin, a multi-layer commercial and residential integrated layer, a hollow cold and heat source absorption layer, and a high-jet greenhouse haze absorption tower building and equipment complex. The heat pump valley electricity thermal storage cabin is located below the bottom layer of the multi-layer commercial and residential integrated layer, the multi-layer commercial and residential integrated layer is located above the top of the heat pump valley electricity thermal storage cabin, the hollow cold and heat source absorption layer is located above the top layer of the multi-layer commercial and residential integrated layer, and the high-jet greenhouse haze absorption tower is located above the top layer of the hollow cold and heat source absorption layer.
[0006] The heat pump valley electricity thermal storage tank is located below the bottom floor of the multi-story commercial and residential complex, and includes an underground frame maintenance structure group; a fire staircase and a pipe well on the bottom floor; an elevator and a ventilation well on the bottom floor; a valley electricity thermal storage tank module; a low heat source heat pump unit; a heat source liquid header on the heat source side; a refrigeration liquid header on the heat source side; a return water header on the load side; and a water supply header on the load side. The fire staircase and the pipe well on the bottom floor, the elevator and the ventilation well on the bottom floor are arranged in the middle of the heat pump valley electricity thermal storage tank; the valley electricity thermal storage tank module is arranged on both sides of the heat pump valley electricity thermal storage tank Side; the low heat source heat pump unit is arranged in the central area of the heat pump valley electricity thermal storage tank; the heating return water end (F) of the valley electricity thermal storage tank module is connected to the load side return water header through a pipeline; the heating circulation pump (E) of the valley electricity thermal storage tank module is connected to the load side water supply header through a pipeline; the heating return water end (F) of the valley electricity thermal storage tank module is connected to the load side return water header through a pipeline; the heating circulation pump (E) of the valley electricity thermal storage tank module is connected to the load side water supply header through a pipeline; the heat source inlet (A) of the low heat source heat pump unit is connected to the heat source liquid header on the heat source side through a pipeline; the refrigerant outlet (B) of the low heat source heat pump unit is connected to the refrigerant liquid header on the heat source side through a pipeline; the heating return water inlet (C) of the low heat source heat pump unit is connected to the load side return water header through a pipeline; the heating water outlet (D) of the low heat source heat pump unit is connected to the load side water supply header through a pipeline.
[0007] The multi-story commercial and residential complex is located above the top of the heat pump valley electricity storage tank, and includes a multi-story frame maintenance structure group; a multi-story fire staircase and pipe shaft; a multi-story elevator and ventilation shaft; and a pipe shaft riser group. The multi-story frame maintenance structure group is located above the top of the heat pump valley electricity storage tank; the multi-story fire staircase and pipe shaft, the multi-story elevator and ventilation shaft are located in the central area of the multi-story frame maintenance structure group; the pipe shaft riser group is installed inside the multi-story fire staircase and pipe shaft; the upper interface of the pipe shaft riser group riser (X) is connected to the hollow cold and heat source absorption layer header; the upper interface of the pipe shaft riser group riser (S) is connected to the hollow cold and heat source absorption layer header; the lower interface of the pipe shaft riser group riser (X) is connected to the heat pump valley electricity storage tank header; the lower interface of the pipe shaft riser group riser (S) is connected to the heat pump valley electricity storage tank header.
[0008] The hollow cold and heat source absorption layer is located above the top layer of the multi-story commercial and residential complex, and includes a double absorption layer frame maintenance structure group; a suspended phase change module surface cooler; a module washing spray cooler; a module washing sump; a surface cooler outlet manifold; and a surface cooler inlet manifold. The double absorption layer frame maintenance structure group is provided with a greenhouse haze module treatment layer and a suspended phase change module surface cooler from the outside to the inside; the greenhouse haze module treatment layer and the suspended phase change module surface cooler are provided with a module washing spray cooler on the top; the greenhouse haze module treatment layer and the suspended phase change module surface cooler are provided with a module washing sump on the bottom; the surface cooler outlet manifold is connected to the upper interface of the riser (X) of the pipeline well riser group; the surface cooler inlet manifold is connected to the upper interface of the riser (S) of the pipeline well riser group.
[0009] The high jet greenhouse haze absorption tower is located above the top layer of the hollow cold and heat source absorption layer, and includes a tower body maintenance structure frame group; an air inlet silencer layer; a fan speed changer; an air outlet silencer guide layer; and an air outlet silencer guide layer. The air inlet silencer layer is located in the middle of the top layer of the multi-story commercial and residential complex; the fan speed changer is located at the top of the air inlet silencer layer; and the air outlet silencer guide layer is located at the top of the fan speed changer.
[0010] Beneficial effects: It is possible to economically and reasonably apply a high-jet greenhouse haze absorption tower in combination with a high-efficiency large-scale low-heat source heat pump, use the building space at the bottom of the tower to achieve noise isolation between the heat pump room and the living environment, solve the problem of valley power energy storage cabins requiring a large heat storage volume, and achieve tens of megawatts of coal-to-electricity replacement devices. It can also provide a certain number of commercial and residential buildings, effectively reduce the floor space occupied by traditional small air source heat pumps for coal-to-electricity conversion, solve the problem of low heat pump performance and easy frost caused by the cold island effect of large-scale traditional small air source heat pumps, solve the problem of heat loss from outdoor heat pump units, and achieve efficient heating of phase-change suspended snow for heating in winter, and a high energy efficiency negative pressure evaporative water chiller in summer.
[0011] Figure 1 Structural schematic diagram of the present invention
[0012] Figure 2 Heat source heat pump unit
[0013] Figure 3 Valley power thermal storage module
[0014] Figure 4 It is a hollow cold and heat source absorption layer. DETAILED DESCRIPTION
[0015] The following is combined with the attached drawings: Figure 1 , 2 , 3, 4 further illustrate the connection structure schematic diagram of the "a high jet haze removal tower heat pump valley electricity storage cabin system" of the present invention.
[0016] Referring to the accompanying drawings, this embodiment shows a high jet haze removal tower heat pump valley electricity storage cabin system.
[0017] Note: The hollow arrows in the figure indicate the direction of air flow, and the solid arrows indicate the direction of circulating medium and water circulation.
[0018] like Figures 1 to 4 As shown, a high-jet haze removal tower heat pump valley electricity storage cabin system comprises a heat pump valley electricity storage cabin (100), a multi-layer commercial and residential complex (200), a hollow cold and heat source absorption layer (300), and a high-jet greenhouse haze absorption tower (400) as a building equipment complex.
[0019] The heat pump valley electricity thermal storage chamber (100) is located below the bottom floor of the multi-story commercial and residential complex (200), and comprises an underground frame maintenance structure group (110); a fire staircase and pipe well (111) on the bottom floor; an elevator and ventilation well (112) on the bottom floor; a valley electricity thermal storage chamber module (120); a low heat source heat pump unit (130); a heat source side heat source liquid header (131); a heat source side refrigeration liquid header (132); a load side return water header (133); and a load side water supply header (134). The well (112) is arranged in the middle of the heat pump valley electricity thermal storage chamber (100); the valley electricity thermal storage chamber module (120) is arranged on both sides of the heat pump valley electricity thermal storage chamber (100); the low heat source heat pump unit (130) is arranged in the central area of the heat pump valley electricity thermal storage chamber (100); the heat supply return water end (F) of the valley electricity thermal storage chamber module (120) is connected to the load side return water header (133) through a pipeline; the heat supply circulation pump (E) of the valley electricity thermal storage chamber module (120) is connected to the load side water supply header (134) through a pipeline; the heat source liquid inlet (A) of the low heat source heat pump unit (130) The low heat source heat pump unit (130) is connected to the heat source liquid header (131) via a pipeline; the low heat source heat pump unit (130) refrigerant liquid outlet (B) is connected to the heat source liquid header (132) via a pipeline; the low heat source heat pump unit (130) heat supply return water port (C) is connected to the load side return water header (133) via a pipeline; the low heat source heat pump unit (130) heat supply water outlet (D) is connected to the load side water supply header (134) via a pipeline.
[0020] The multi-storey commercial and residential complex (200) is located above the top of the heat pump valley electric thermal storage chamber (100), and comprises a multi-storey frame maintenance structure group (210); a multi-storey fire staircase and pipe shaft (220); a multi-storey elevator and ventilation shaft (230); and a pipe shaft riser group (240). The multi-storey frame maintenance structure group (210) is located above the top of the heat pump valley electric thermal storage chamber (100); the multi-storey fire staircase and pipe shaft (220), the multi-storey elevator and ventilation shaft (230) are located in the center area of the multi-storey frame maintenance structure group (210); the pipe shaft riser group (240) Installed inside a multi-layer fire-fighting staircase and a pipe well (220); the upper interface of the pipe well riser (X) of the pipe well riser group (240) is connected to the header (325) of the hollow cold and heat source absorption layer (300); the upper interface of the pipe well riser (S) of the pipe well riser group (240) is connected to the header (326) of the hollow cold and heat source absorption layer (300); the lower interface of the pipe well riser (X) of the pipe well riser group (240) is connected to the header (131) of the heat pump valley electricity thermal storage chamber (100); and the lower interface of the pipe well riser (S) of the pipe well riser group (240) is connected to the header (132) of the heat pump valley electricity thermal storage chamber (100).
[0021] The hollow cold and heat source absorption layer (300) is located above the top layer of the multi-layer commercial and residential complex layer (200), and comprises a double absorption layer frame maintenance structure group (310); a suspended phase change module surface cooler (322); a module washing spray cooler (323); a module washing water collection tank (324); a surface cooler liquid outlet manifold (325); and a surface cooler liquid inlet manifold (326). The double absorption layer frame maintenance structure group (310) is arranged from outside to inside with a greenhouse haze module treatment layer (321), a suspended phase change module surface cooler, and a surface cooler. a module washing spray cooler (323) is arranged on the upper part of the greenhouse haze module processing layer (321) and the suspended phase change module surface cooler (322); a module washing water collecting tank (324) is arranged on the lower part of the greenhouse haze module processing layer (321) and the suspended phase change module surface cooler (322); a surface cooler liquid outlet header (325) is connected to an upper interface of a riser (X) of a pipeline well riser group (240); and a surface cooler liquid inlet header (326) is connected to an upper interface of a riser (S) of a pipeline well riser group (240).
[0022] The high jet greenhouse haze absorption tower (400) is located above the top layer of the hollow cold and heat source absorption layer (300), and comprises a tower body maintenance structure frame group (410); an air inlet silencer layer (420); a fan speed changer (430); an air outlet silencer guide layer (430); and an air outlet silencer guide layer (440), wherein the air inlet silencer layer (420) is located in the middle of the top layer of the multi-story commercial and residential complex (200); the fan speed changer (430) is located at the top of the air inlet silencer layer (420); and the air outlet silencer guide layer (440) is located at the top of the fan speed changer (430).
[0023] Working principle of high jet haze removal tower heat pump valley power storage cabin
[0024] A high-jet haze removal tower heat pump valley electricity energy storage cabin system comprises a heat pump valley electricity thermal storage cabin (100), a multi-layer commercial and residential complex (200), a hollow cold and heat source absorption layer (300), and a high-jet greenhouse haze absorption tower (400) as a building equipment complex.
[0025] Working principles of the hollow cold and heat source absorption layer (300) and the high jet greenhouse haze absorption tower (400)
[0026] The fan speed change device (430) drives the cold air in the tower that is lower than the atmospheric temperature to be ejected to the sky, and the heat exchange process is carried out while disturbing the stable inversion layer atmospheric circulation at an altitude of more than 100 meters. The circulating air temperature rises and the enthalpy value increases. The circulating air passes through the greenhouse haze module processing layer (321) and the suspended phase change module surface cooler (322) to purify and absorb the haze wet cold heat source. The circulating air temperature drops and the enthalpy value drops to become low-temperature cold air. The low-temperature cold air passes through the air inlet silencer layer (420), enters the fan speed change device (430), is pressurized and sent to the air outlet silencer guide layer (440), and the cold air that is lower than the atmospheric temperature is ejected to the sky to complete the heat exchange process. When the outdoor air temperature is higher than zero degrees, the module washing spray cooler (323) and the module washing sump (324) can regularly clean the greenhouse haze module processing layer (321) and the suspended phase change module surface cooler (322) to form a summer evaporative cooling device.
[0027] Working principle of heat pump valley electricity storage chamber (100) to hollow cold and heat source absorption layer (300)
[0028] The low-enthalpy refrigerant built into the finned tubes of the suspended phase-change module surface cooler (322) circulates and absorbs the low-temperature heat source (smog water vapor energy) in the air to become a high-enthalpy heat source liquid. After being pressurized through the surface cooler outlet manifold (325), the riser (X) of the pipeline well riser group (240), the heat source side heat source liquid manifold (131), and the heat source liquid inlet (A) of the low heat source heat pump unit (130), the low-temperature heat source is released to the evaporator to become a low-enthalpy refrigerant. The liquid enters the suspended phase-change module surface cooler (322) through the refrigerant outlet (B) of the low heat source heat pump unit (130), the refrigerant liquid manifold (132) on the heat source side, the riser (S) of the pipeline well riser group (240), and the surface cooler liquid inlet manifold (326) to circulate and absorb the low-temperature heat source of the inversion layer. The low heat source heat pump unit (130) elevates the low temperature heat source from the unit evaporator to high temperature heat energy, which enters the unit condenser and releases the high temperature heat energy to the heating circulation water. The high temperature heat energy is sent to the heating place through the load side water supply header (134) from the heating outlet (D) of the low heat source heat pump unit (130) to release the high temperature heat energy. The temperature decreases and the enthalpy value decreases. The high temperature heat energy is then sent to the heating return water outlet (C) of the low heat source heat pump unit (130) through the load side water return header (133) to be pressurized and circulated to complete the heat energy transfer process.
[0029] Working principle of heat pump valley electricity heat storage chamber (100) and valley electricity to valley electricity heat storage chamber module (120)
[0030] The valley electricity at night is used to heat the heat transfer medium of the valley electricity heat storage tank module (120) by storing energy. During the daytime off-peak electricity period, the heating circulating water enters the valley electricity heat storage tank through the heating return water port (F) of the valley electricity heat storage tank module (120) for heat exchange. The heating circulating water is pressurized by the heating circulating pump (E) of the valley electricity heat storage tank module (120) and sent to the heating place through the load-side water supply header (134) to release high-temperature potential heat, thereby reducing the temperature and enthalpy value. The water returns to the heating return water port (F) of the valley electricity heat storage tank module (120) through the load-side return water header (133) to circulate and complete the process of heat energy transfer.
[0031] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0032] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. High jet haze removal tower heat pump valley electricity storage cabin, characterized in that: It includes a heat pump valley electricity thermal storage cabin, a multi-story commercial and residential complex, a hollow cold and heat source absorption layer, and a high-jet greenhouse haze absorption tower. The heat pump valley electricity thermal storage cabin is located below the bottom floor of the multi-story commercial and residential complex and includes an underground frame maintenance structure group, a bottom-floor fire-fighting staircase and pipe well, a bottom-floor elevator and ventilation well, a valley electricity thermal storage cabin module, a low-heat source heat pump unit, a heat source side heat source liquid header, a heat source side refrigerant liquid header, a load side return water header, a load side water supply header, a bottom-floor fire-fighting staircase and pipe well. The underground frame maintenance structure group is internally distributed with bottom-floor elevators and ventilation wells arranged in the middle of the valley electricity thermal storage cabin module. The valley electricity thermal storage cabin modules are arranged on both sides of the low-heat source heat pump unit. The heating return water end (F) of the valley electricity thermal storage cabin module is connected to the load side return water header through a pipeline. The valley electricity thermal storage cabin module The block heating circulation pump (E) is connected to the water supply header on the load side through a pipeline, the heat source inlet (A) of the low heat source heat pump unit is connected to the heat source liquid header on the heat source side through a pipeline, the refrigerant outlet (B) of the low heat source heat pump unit is connected to the refrigerant header on the heat source side through a pipeline, the heating return water port (C) of the low heat source heat pump unit is connected to the load side return water header through a pipeline, and the heating outlet (D) of the low heat source heat pump unit is connected to the load side water supply header through a pipeline. The multi-story commercial and residential complex is located above the top of the heat pump valley electric thermal storage tank and includes a multi-story frame maintenance structure group, a multi-story fire-fighting staircase and pipe well, a multi-story elevator and ventilation well, and a pipe well riser group. The multi-story frame maintenance structure group is located above the top of the heat pump valley electric thermal storage tank and is internally arranged with multi-story fire-fighting staircases and pipe wells , multi-story elevators and ventilation shafts are located in the central area of the multi-story frame maintenance structure group, the pipe shaft riser group is installed inside the multi-story fire stairs and pipe shafts, the pipe shaft riser group riser X upper interface is connected to the hollow cold and heat source absorption layer header, the pipe shaft riser group riser S upper interface is connected to the hollow cold and heat source absorption layer header, the pipe shaft riser group riser X lower interface is connected to the heat pump valley electricity storage tank header, the pipe shaft riser group riser S lower interface is connected to the heat pump valley electricity storage tank header, the hollow cold and heat source absorption layer, located above the top floor of the multi-story commercial and residential complex, includes a double absorption layer frame maintenance structure group, a suspended phase change module surface cooler, a module washing spray cooler, a module washing sump, a surface cooler outlet header, and a surface cooler inlet header. The double absorption layer frame maintenance structure group is from the outside to the outside. A greenhouse haze module treatment layer and a suspended phase change module surface cooler are arranged inside. A module washing spray cooler is arranged on the upper part of the greenhouse haze module treatment layer and the suspended phase change module surface cooler. A module washing water collecting tank is arranged on the lower part of the greenhouse haze module treatment layer and the suspended phase change module surface cooler. The surface cooler liquid outlet manifold is connected to the upper interface of the riser X of the pipeline well riser group, and the surface cooler liquid inlet manifold is connected to the upper interface of the riser S of the pipeline well riser group. The high jet greenhouse haze absorption tower is located above the top layer of the hollow cold and heat source absorption layer. The interior of the tower body maintenance structure frame group is composed of an air inlet silencing layer, a fan speed change device, an air outlet silencing guide layer, and an air outlet silencing guide layer. The air inlet silencing layer is located in the middle of the top layer of the multi-story commercial and residential complex, and the fan speed change device is located at the top of the air inlet silencing layer.The air outlet silencer and guide layer is located on the top of the fan speed change device.