A light steel-ultra-high performance concrete rigid composite rib plate and construction method
By arranging stiffness reinforcement components and wedge-shaped opening structures at the bottom of the ribs of the bridge deck, combined with ultra-high-performance concrete, the problem of fatigue cracking of long-span bridge decks and easy pavement damage is solved, and the durability and crack resistance of the bridge are improved. performance, adapt to long-span requirements, and simplify the construction process.
Patent Information
- Application Number
- CN201811386556.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-11-20
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2038-11-20
AI Technical Summary
Existing bridge decks are prone to fatigue cracking and pavement damage in long-span bridges. Ordinary concrete bridge decks have low tensile strength and heavy weight, making it difficult to adapt to large-span requirements. Ultra-high-performance concrete bridge decks have limited rib widths and It is prone to fatigue cracking, and the risk of cracking at weak points caused by discontinuous steel fibers is high.
Light steel-UHP concrete stiff composite rib plates are used. Strengthening components and shear connectors are set at the bottom of the ribs, combined with a wedge-shaped opening structure to block the shrinkage stress of UHP concrete and reduce joint shrinkage cracks. Risks are eliminated, and steel fiber discontinuous stressed weak surfaces are set up in low tensile stress areas to improve shear and tensile bearing capacity and simplify the construction process.
Significantly improves the durability and crack resistance of bridge joints, reduces the structural weight, adapts to the needs of large-span bridges, avoids fatigue cracking and pavement fragility problems, simplifies the construction process, and realizes ultra-high-performance concrete structures rapid construction.
Smart Images

Figure CN109356016B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of bridge structure construction, and particularly relates to a light steel-ultra-high performance concrete rigid composite rib plate and a construction method. Background Art
[0002] The bridge deck directly bears vehicle loads and environmental effects, and is the component most directly affected by adverse factors such as overload, corrosion, and fatigue. Therefore, its working condition will directly affect the durability and driving comfort of the main structure of the inverted bridge. Orthotropic steel bridge decks and ordinary concrete bridge decks are the two main types of bridge decks currently used in bridge engineering. Ordinary concrete bridge decks can better adapt to asphalt concrete bridge deck paving or cement paving, and have better driving effects. However, due to the low tensile strength of ordinary concrete, its plate thickness is large and the structure has a large deadweight, which makes it difficult to adapt to the needs of large-span bridges, and it is easy to crack near wet joints, negative bending moment areas, and cable anchorage areas. Orthotropic steel bridge decks have the advantages of light deadweight, large ultimate bearing capacity, and short construction period. They are widely used in large-span bridges. However, due to the low stiffness of steel bridge decks, poor adhesion and deformation coordination with asphalt concrete, orthotropic steel bridge decks that have been in operation for many years are prone to fatigue cracking and pavement damage.
[0003] Ultra-high performance concrete (UHPC) has the advantages of high elastic modulus, high compressive and tensile strength, and good creep characteristics. It can reduce the size of the structure, reduce the deadweight of the structure, improve the effectiveness of the structure in resisting loads, and increase the ability to span. Therefore, the ultra-high performance concrete bridge deck developed based on the performance of ultra-high performance concrete can avoid the problems of fatigue cracking and easy damage to the pavement of orthotropic steel bridge decks, reduce the deadweight of the structure, and meet the needs of large-span bridges. At the same time, ultra-high performance concrete with excellent tensile properties can solve the problem of easy cracking of ordinary concrete bridge decks and has good durability.
[0004] The invention patent with publication number CN 106758813 A discloses an ultra-high performance concrete well-rib bridge deck for steel-concrete composite beam bridge and its construction method, including a prefabricated ultra-high performance concrete well-rib bridge deck, a rectangular columnar notch, an upper layer of steel bars, a lower layer of steel bars, a cluster of nails, a high-strength grouting material, a wet joint steel bar and a wet joint concrete. The bridge deck of the invention can give full play to the high mechanical properties of ultra-high performance concrete in terms of compressive and tensile strength, and effectively improve the stiffness, bearing capacity and reduce the thickness of the board by combining well-ribs and panels. However, the rib width of the well-rib bridge deck is only 10cm to 15cm. Under the premise of ensuring good construction performance, the number of ordinary steel bars configured in the tensile zone is limited. When the span of the bridge deck is large, fatigue cracking is easy to occur, and it is difficult to meet the requirements of high crack resistance. In addition, the configuration of ordinary steel bars in the ribs of the plate with a width of only 10cm to 15cm may have an adverse effect on the fiber distribution in the ultra-high performance concrete and affect the structural safety. In addition, the wet joint strips between the well-rib bridge decks adopt a conventional flat-end structure, which is prone to shrinkage cracks in the new and old concrete sections. The risk of cracking at the weak stress points caused by the discontinuity of steel fibers is high and the durability is poor.
[0005] The invention patent with publication number CN 107604815 A discloses a self-contained formwork ultra-high performance concrete composite bridge deck, which is mainly composed of several unit plates spliced together. The unit plates include a steel bottom plate and an ultra-high performance concrete panel arranged on the steel bottom plate. Shear connectors for connecting the ultra-high performance concrete panel are welded on the steel bottom plate. Each steel bottom plate is a flat quadrangular-shaped thin-walled steel member. Adjacent steel bottom plates are connected to the internal members of the main beam located below the bridge deck so that the steel bottom plates are connected as one. Above the shear connectors, steel bars connected as one are arranged along the longitudinal and transverse directions of the bridge to form a stress-bearing steel bar mesh at the upper edge of the bridge deck. The steel bottom plate and the shear connectors become stress-bearing steel bars and shear steel bars at the lower edge of the bridge deck respectively, and together serve as the bottom formwork of the bridge deck. The bridge deck of this invention adopts ultra-high performance concrete, which can effectively solve the problems of easy cracking and damaged bridge pavement in existing steel bridge decks. However, the entire bottom of this type of composite bridge deck is provided with steel plates. On the one hand, it will significantly increase the amount of steel used in the bridge structure, increase the dead weight and cost of the structure, and affect the spanning capacity of the bridge structure. On the other hand, the bottom plate steel plate will form a strong constraint boundary for the ultra-high performance concrete of the bridge deck. In actual bridge applications, on-site casting and normal temperature maintenance are prone to shrinkage cracking, which affects the safety and durability of the structure. Shrinkage cracking must be avoided through steam maintenance and other methods, which brings inconvenience to construction.
[0006] The invention patent with publication number CN 105780649 A discloses a composite bridge deck with concave ribs and weathering steel and concrete. The composite bridge deck unit includes a bottom steel plate and a cast-in-place concrete plate cast thereon, as well as a shear key that connects the bottom steel plate and the cast-in-place concrete plate as one. The perforated steel plates are welded at both ends of the bottom steel plate in the width direction to effectively reduce the amount of steel used in the bridge deck system, and the construction quality of the bridge deck is easily guaranteed, simplifying the construction process, thereby effectively saving engineering costs. However, this type of structure is only applicable to ordinary concrete composite bridge decks. When ultra-high performance concrete bridge decks are used, the steel plate set at the bottom will form a strong constraint boundary for the ultra-high performance concrete, which is easy to shrink and crack during maintenance and operation, affecting the structural safety. Moreover, the full-width steel plate at the bottom cannot exert the excellent compressive and tensile properties of ultra-high performance concrete. In addition, the perforated steel plates welded at both ends of the bottom steel plate in the width direction will also block the continuous and random distribution of steel fibers in the ultra-high performance concrete, which has an adverse effect on the structural safety. Summary of the invention
[0007] The technical problem to be solved by the present invention is to overcome the deficiencies and defects mentioned in the above background technology and provide a light steel-ultra-high performance concrete rigid composite rib plate and a construction method with light weight, high rigidity, convenient construction and good durability.
[0008] In order to solve the above technical problems, the technical solution proposed by the present invention is as follows: a light steel-ultra-high performance concrete rigid composite rib plate, comprising a panel, a plate rib, a rigid reinforcement component and a shear connector, wherein the plate rib is arranged at the bottom of the panel and cast as a whole with the panel, the plate rib is perpendicular to the panel, the panel and the rib plate are cast by ultra-high performance concrete, the rigid reinforcement component is arranged at the bottom of the plate rib and is equal in width to the bottom surface of the plate rib, the plate rib and the rigid reinforcement component are connected as a whole through a shear connector, a notch is arranged along the length direction of the side plate rib at the top joint of the side plate rib at the edge of the composite rib plate, and a plurality of wedge-shaped openings are arranged below the notch along the length direction of the side plate rib, and the cross section of the wedge-shaped opening along the plane direction where the panel is located is a wedge-shaped with a narrow outside and a wide inside. The notch constitutes the upper step of the T-joint.
[0009] Furthermore, the top of the wedge-shaped opening passes through the notch, and the total height of the notch and the wedge-shaped opening is equal to the height of the T-joint.
[0010] Furthermore, the width of the side plate rib is 0.20m to 0.60m, the depth of the notch is 0.03m to 0.10m, the width of the notch is 0.05m to 0.40m, the width of the wedge-shaped opening near the outer side of the plate is 0.05m to 0.30m, and the width of the wedge-shaped opening near the inner side of the plate is 0.10m to 0.40m. The notch is arranged on the top surface of the side plate rib, and the shrinkage of the cast-in-place ultra-high performance concrete can be blocked by the top surface of the notch, thereby reducing the shrinkage stress of the interface between the new and old ultra-high performance concrete before and after casting, avoiding shrinkage cracks in the joints, and significantly improving the durability of the bridge joints. On the other hand, the notch can be arranged to place the discontinuous force-bearing weak surface of the steel fiber in the low tensile stress area, greatly reducing its cracking risk. A wedge-shaped opening with a narrow outside and a wide inside is set at the bottom of the side plate rib, which can not only block the shrinkage of the cast-in-place ultra-high performance concrete, but also make the interfaces of the new and old ultra-high performance concrete at the wedge-shaped opening structure intertwine with each other, improve the stress of the weak link caused by fiber discontinuity, effectively improve the shear and tensile bearing capacity of the beam-slab joint, and eliminate the roughening process of the existing joint structure, which can simplify the construction. After the prefabricated panels are horizontally assembled and accurately positioned, no on-site reinforcement work is required, which is convenient for construction and conducive to the rapid construction of ultra-high performance concrete structures.
[0011] Furthermore, the panel has a thickness of 0.02m to 0.30m.
[0012] Preferably, when the thickness of the panel is greater than 0.06 m, a steel mesh composed of criss-crossed steel bars is provided inside the panel. This arrangement is beneficial to enhancing the strength and shear resistance of the panel.
[0013] Furthermore, the plate ribs include longitudinal bridge plate ribs and / or transverse bridge plate ribs, and the longitudinal bridge plate ribs and the transverse bridge plate ribs cross each other perpendicularly.
[0014] Furthermore, the height of the plate rib is 0.10m-0.60m, the panel and the plate rib are combined to form a rib plate structure, the cross section of the plate rib is an inverted trapezoid or rectangle, the upper edge width is 0.08m-0.30m, the lower edge width is 0.08m-0.30m, and the center distance between adjacent plate ribs is 0.30m-1.50m. This arrangement improves the overall rigidity and strength while ensuring the minimum use of materials.
[0015] Furthermore, the thickness of the stiffening component is not less than 0.006m. This arrangement can improve the stiffness, crack resistance and bearing capacity of the bridge deck, and at the same time, the longitudinal tensile reinforcement at the bottom of the rib plate can be eliminated to avoid the adverse effect of the reinforcement on the fiber distribution in the ultra-high performance concrete thin plate. On the other hand, only the stiffening component at the bottom of the rib will not form a strong constraint boundary for the ultra-high performance concrete bridge deck, and it is not easy to suffer from shrinkage cracking. It can adapt to the situation of on-site casting and normal temperature maintenance, and the construction is convenient.
[0016] Furthermore, the stiffening component is a channel steel, a unidirectional corrugated steel plate in the width direction of the plate rib, a patterned steel plate or a flat steel plate, wherein the height of the channel steel is 0.05m to 0.40m, and the two sides of the channel steel wrap the lower side of the plate rib. Effect of using channel steel: using channel steel as a stiffening component, on the one hand, the finished channel steel on the market is selected, which does not need to be processed, has the advantages of good fatigue performance and low cost, which can improve the fatigue performance of the structure and reduce the cost of the structure; on the other hand, the channel steel is selected, and the two sides of the channel steel wrap the lower side of the plate rib, which can increase the contact area between the steel plate and the plate rib, thereby enhancing the connection with the plate rib, eliminating the stirrups inside the plate rib, and simplifying the steel bar structure; and the edge steel plate part of the channel steel can increase the effective tensile area of the plate rib, thereby increasing the effective reinforcement ratio of the cross section, thereby significantly improving the crack resistance of the composite bridge deck. The effect of using unidirectional corrugated steel plates and patterned steel plates: By using stiffening components with unidirectional corrugations or patterns on the surface, the bonding and embedding effect of the corrugations, patterns and ultra-high performance concrete can be utilized to significantly enhance the anti-slip performance of the interface and strengthen the connection between the plate ribs and the steel plates.
[0017] Furthermore, the shear connector is in the form of a cylindrical head welded nail, an angle steel or a perforated ribbed form. The cylindrical head welded nail has a diameter of 0.006m to 0.019m and a length of 0.03m to 0.20m; the angle steel has a long angle leg width of 0.03m to 0.20m, a short angle leg width of 0.03m to 0.10m, and a length of 0.03m to 0.20m; the perforated steel strip has a height of 0.03m to 0.15m, a thickness of 0.006m to 0.01m, a hole diameter of 0.01m to 0.10m, and at least two steel strips are provided along the direction of the stiffening component.
[0018] Preferably, the shear connector is a cylindrical head weld nail, and the spacing of the cylindrical head weld nails in the longitudinal bridge direction is 0.08m to 0.40m. This setting can make the combination between the ultra-high performance concrete and the steel plate tighter, avoid delamination and slippage, avoid the formation of ultra-high performance concrete voids at the bottom of the cylindrical head weld nail, and avoid the influence of the shear connector on the fiber distribution of the ultra-high performance concrete.
[0019] Ultra-high performance concrete is a proprietary name in this field, generally referring to concrete with ultra-high compressive strength, high tensile strength, high ductility, high toughness, high durability, and good workability. It is another type of concrete material with better comprehensive mechanical properties relative to ordinary concrete and high-performance concrete. The panel and plate ribs described in the present invention are cast from ultra-high performance concrete, and the ultra-high performance concrete can be active powder concrete, ultra-high performance fiber reinforced concrete, grouting fiber concrete, dense reinforced composite material or engineering cementitious composite material. Preferably, the ultra-high performance concrete is active powder concrete or ultra-high performance fiber reinforced concrete or dense reinforced cement-based composite material with a compressive strength of not less than 100MPa. This kind of ultra-high performance concrete is easier to achieve lightweight, high strength and high stiffness of standard composite ribs.
[0020] To illustrate the advantages of the present invention, the following experimental results are given: Figure 4 , Figure 5 The cross-sectional views of reinforced UHPC components and steel-UHPC composite components with the same reinforcement ratio are given. Figure 4 , Figure 5 N1, N1a, N2, and N3 are HRB400 steel bars with diameters of 8mm, 16mm, 8mm, and 8mm respectively. The dimensions marked in the figure are in mm. After calculation, Figure 4 The converted section moment of inertia of the cross section shown is 0.000317m 4 , Figure 5 The converted section moment of inertia of the cross section shown is 0.000357m 4 ,and Figure 4 The reduced moment of inertia of the cross section shown increases by approximately 12.4%. Figure 6 The load-displacement curves of two UHPC components are given. Figure 6 It can be seen that under the same load, the displacement of the reinforced UHPC component is significantly greater than that of the steel-UHPC composite component. For example, when the load is about 210 kN, the displacement of the reinforced UHPC component is about 12 mm, while the displacement of the steel plate-UHPC composite component is about 9 mm, and the displacement is reduced by about 25%. This shows that setting the tensile reinforcement component at the bottom of the UHPC component can further increase the moment of inertia of the UHPC component section, thereby improving the initial stiffness and post-crack stiffness of the UHPC component.
[0021] Figure 7 The load-maximum crack width curves of two UHPC components are given. Figure 7It can be seen that when the load of the steel-UHPC composite component was 80kN, microcracks of 0.05mm were observed in the test beam. For the reinforced UHPC component, the load value corresponding to the crack width of 0.05mm was 60kN, and the steel-UHPC composite component was 1.33 times that of the reinforced UHPC component, indicating that the steel plate effectively limited the initiation and expansion of microcracks and improved the crack resistance of the UHPC component.
[0022] The above experimental results show that:
[0023] (1) Placing the tensile reinforcement component at the bottom of the ultra-high performance concrete (UHPC) slab rib can further increase the moment of inertia of the UHPC slab rib section, thereby increasing the stiffness of the UHPC slab rib;
[0024] (2) Setting the tensile reinforcement component at the bottom of the UHPC slab rib can offset the neutral axial tension zone of the UHPC bridge deck, thereby reducing the stress of the steel plate. On the other hand, setting the tensile reinforcement component at the bottom of the UHPC bridge deck is equivalent to the thickness of the steel bar protective layer being zero, which can reduce the crack spacing of the UHPC component and improve the efficiency of limiting the development of the crack width, thereby improving the crack resistance of the UHPC component.
[0025] The construction method of the lightweight steel-ultra-high performance concrete rigid composite rib slab comprises the following steps:
[0026] S1. Connect the stiffening components and shear connectors into a whole, pour ultra-high performance concrete in the formwork, and form a composite rib plate precast unit;
[0027] S2. The composite rib prefabricated unit is installed relatively to the top of the steel beam to form a wet joint area of the cast-in-place ultra-high performance concrete bridge deck;
[0028] S3. Cast UHPC in situ in the UHPC wet joint area.
[0029] Compared with the prior art, the advantages of the present invention are:
[0030] (1) The present invention only sets a steel plate (with the same width as the bottom surface of the rib) at the tensile bottom of the ultra-high performance concrete rib to form a combined rib, which can avoid the problem of strong constraint boundary formed by the bottom full-width steel plate (the steel plate covers the side of the rib and the bottom of the panel) on the ultra-high performance concrete, which leads to shrinkage and cracking during its maintenance and future use. The tensile properties of steel are fully utilized, the overall and local stiffness of the bridge deck is further improved, the crack resistance and overload resistance of the bridge deck are significantly improved, and the construction is convenient and the safety performance is better. The longitudinal tensile steel bars at the bottom of the rib are eliminated to avoid the adverse effects of the steel bars on the fiber distribution in the ultra-high performance concrete thin plate.
[0031] (2) The present invention can give full play to the excellent compressive and tensile properties of ultra-high performance concrete, improve the utilization efficiency of the cross section, increase the overall and local stiffness of the bridge deck, reduce the thickness and structural deadweight of the bridge deck, and can meet the needs of large-span bridges and large spans, avoiding the problems of easy fatigue cracking of orthotropic steel bridge decks and heavy and easy cracking of concrete bridge decks.
[0032] (3) The side plate ribs of the present invention are provided with notches on the top surface and multiple wedge-shaped openings on the bottom, so that the interfaces of the new and old ultra-high performance concrete at the notch structures and the wedge-shaped opening structures are interlaced with each other, thereby improving the stress of the weak links caused by fiber discontinuity, effectively improving the shear and tensile bearing capacity at the beam-slab joints, reducing the shrinkage stress at the interface of the new and old ultra-high performance concrete before and after casting, avoiding shrinkage cracks at the joints, and significantly improving the durability of the joints of the composite rib plates. The construction can be simplified, and the roughening process of the existing joint structure can be eliminated. After the prefabricated panels are horizontally assembled and accurately positioned, no on-site reinforcement work is required, which is convenient for construction and conducive to the rapid construction of ultra-high performance concrete structures. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0034] Figure 1 It is a cross-sectional schematic diagram of a lightweight steel-ultra-high performance concrete rigid composite rib slab according to an embodiment of the present invention;
[0035] Figure 2 for Figure 1 AA section diagram of ;
[0036] Figure 3 for Figure 1 BB section diagram;
[0037] Figure 4 It is the cross-section diagram of reinforced UHPC component;
[0038] Figure 5 It is the cross-section diagram of the steel plate-UHPC composite component;
[0039] Figure 6 are the load-displacement curves of two UHPC components;
[0040] Figure 7 are the load-maximum crack width curves of two UHPC components;
[0041] Figure 8A schematic cross-sectional view of a wet joint of a lightweight steel-ultra-high performance concrete rigid composite rib slab according to an embodiment of the present invention;
[0042] Fig. 9 for Figure 8 BB cross-sectional view.
[0043] Legend:
[0044] 1. Panel; 21. Longitudinal bridge plate rib; 22. Transverse bridge plate rib; 3. Stiffness reinforcement component; 4. Shear connector; 5. Notch; 6. Wedge-shaped mouth. DETAILED DESCRIPTION
[0045] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively and meticulously below in conjunction with the accompanying drawings and preferred embodiments of the present invention, but the protection scope of the present invention is not limited to the following specific embodiments.
[0046] Unless otherwise defined, all professional terms used below have the same meanings as those generally understood by those skilled in the art. The professional terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the scope of protection of the present invention.
[0047] Example:
[0048] The light steel-ultra-high performance concrete rigid composite rib plate structure of this embodiment includes a panel 1, a panel rib 2, a rigid reinforcement component 3, and a shear connector 4. The panel rib 2 is arranged at the bottom of the panel 1, cast as a whole with the panel 1 and perpendicular to the panel 1, and the rigid reinforcement component 3 is arranged at the bottom of the panel rib 2 and has the same width as the bottom surface of the panel rib 2, and is connected into a whole through the shear connector 4.
[0049] like Figures 1 to 3As shown, in this embodiment, the lightweight steel-ultra-high performance concrete rigid composite rib plate is a bridge deck in a PK steel box-ultra-high performance concrete composite beam. The thickness of the panel 1 is 0.08m, and the bottom of the panel 1 in the longitudinal and transverse directions are provided with plate ribs 2, which are longitudinal ribs 21 and transverse ribs 22, respectively. A steel mesh composed of crisscrossing is arranged in the panel 1. The height of the plate rib 2 is 0.17m. The panel 1 and the plate rib 2 are combined to form a rib plate structure. The cross-section of the plate rib 2 is an inverted trapezoid, and its upper edge width is 0.20m, the lower edge width is 0.18m, and the center distance between adjacent longitudinal ribs 2 is 0.70m. The rigid reinforcement component 3 is arranged at the bottom of the plate rib 2. The rigid reinforcement component 3 is a channel steel with a height of 0.08m, and the lower side of the plate rib 2 is wrapped on both sides. The plate rib 2 and the rigid reinforcement component 3 are connected by a shear connector 4. The shear connector is a cylindrical head weld nail, the height of the cylindrical head weld nail at the bottom of the plate rib 2 is 0.12m, the spacing of the cylindrical head weld nails in the longitudinal bridge direction is 0.15m, the height of the cylindrical head weld nails on the side of the plate rib 2 is 0.35m, the spacing of the cylindrical head weld nails in the longitudinal bridge direction is 0.15m, and they are staggered with the cylindrical head weld nails at the bottom of the plate rib 2. The panel 1 and the plate rib 2 are cast by ultra-high performance concrete.
[0050] like Figure 8 and 9 The width of the side plate rib is 0.35m, and a notch 5 is arranged at the top joint along the length direction of the side plate rib. The depth of the notch 5 is 0.05m, and the width of the notch 5 is 0.20m. A number of wedge-shaped openings 6 with narrow outside and wide inside are arranged below the notch 5 along the length direction of the side plate rib. The width of the wedge-shaped opening 6 near the outer side of the plate is 0.10m, and the width of the wedge-shaped opening 6 near the inner side of the plate is 0.20m.
[0051] The construction method of the lightweight steel-ultra-high performance concrete rigid composite rib slab of this embodiment comprises the following steps:
[0052] S1: Prefabricate the lightweight steel-UHPC composite rib slab prefabricated unit in the factory, the specific steps are as follows:
[0053] S1.1: Arrange the frame mold and the mold for forming the plate rib on the work surface according to the design requirements, and at the same time, process the stiffening component 3 that is consistent with the length and width of the plate rib according to the design requirements;
[0054] S1.2: a shear connector 4 is arranged on the upper surface of the stiffening component 3, the steel mesh and stirrups are processed according to the design requirements, and the steel mesh, stirrups and shear connector are connected into an integral steel structure;
[0055] S1.3: Pour ultra-high performance concrete and maintain it in time;
[0056] S1.4: When the pouring of ultra-high performance concrete meets the design requirements, the formwork is removed and stored in a designated location to form a precast unit of lightweight steel-ultra-high performance concrete rigid composite rib slab.
[0057] S2: erecting relatively arranged prefabricated units obtained by the prefabrication in S1 at the construction site, and installing adjacent prefabricated units on the top of the steel beam according to the design requirements and arranged relatively to form a wet joint area of the cast-in-place ultra-high performance concrete bridge deck;
[0058] S3: Use connecting bars to tie the longitudinal and transverse embedded bars of two adjacent precast units, and pay attention to staggered arrangement, and cast ultra-high performance concrete on-site in the wet joint area of cast-in-place ultra-high performance concrete;
[0059] S4: After the cast-in-place ultra-high performance concrete is cured and reaches the designed strength, the relatively arranged lightweight steel-ultra-high performance concrete rigid composite ribs are formed into an integral bridge deck.
[0060] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Therefore, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the scope of protection of the technical solution of the present invention.
Claims
1. A lightweight steel-ultra-high performance concrete rigid composite rib plate, characterized in that: The invention comprises a panel (1), a plate rib (2), a stiffening component (3) and a shear connector (4), wherein the plate rib (2) is arranged at the bottom of the panel (1) and is cast integrally with the panel (1), the plate rib (2) is perpendicular to the panel (1), and the panel (1) and the plate rib (2) are cast from ultra-high performance concrete; the stiffening component (3) is arranged at the bottom of the plate rib (2) and is the same width as the bottom surface of the plate rib (2), and the plate rib (2) and the stiffening component (3) are connected integrally via the shear connector (4); a notch (5) is arranged at the top joint of the side plate rib at the edge of the composite rib plate, the notch (5) is arranged along the length direction of the side plate rib, and a plurality of wedge-shaped openings (6) are arranged below the notch (5) along the length direction of the side plate rib, the cross section of the wedge-shaped opening (6) along the plane direction of the panel (1) is a wedge-shaped opening narrow outside and wide inside, and the wedge-shaped opening (6) is obtained by slotting the edge of the side plate rib; The stiffening component (3) does not completely cover the plate rib (2); The thickness of the stiffening component (3) is not less than 0.006 m; The stiffness-enhancing component (3) is a channel steel, a unidirectional corrugated steel plate in the width direction of the plate rib, or a patterned steel plate; The height of the channel steel is 0.05m to 0.40m, and both sides of the channel steel wrap around the lower side of the plate rib (2); The top of the wedge-shaped opening (6) passes through the notch (5); the depth of the notch (5) is 0.03 m to 0.10 m, and the width is 0.05 m to 0.40 m; the outer width of the wedge-shaped opening (6) is 0.05 m to 0.30 m, and the inner width is 0.10 m to 0.40 m.
2. The lightweight steel-ultra-high performance concrete rigid composite rib slab according to claim 1, characterized in that: The thickness of the panel (1) is 0.02m-0.30m. When the thickness of the panel (1) is greater than 0.06m, a steel mesh composed of crisscross steel bars is arranged inside the panel (1).
3. The lightweight steel-ultra-high performance concrete rigid composite rib slab according to claim 1, characterized in that: The plate ribs (2) include longitudinal bridge plate ribs (21) and / or transverse bridge plate ribs (22), and the longitudinal bridge plate ribs (21) and the transverse bridge plate ribs (22) intersect each other perpendicularly.
4. The lightweight steel-ultra-high performance concrete rigid composite rib slab according to claim 1, characterized in that: The cross section of the plate rib (2) is an inverted trapezoid or a rectangle.
5. The lightweight steel-ultra-high performance concrete rigid composite rib slab according to claim 1, characterized in that: The shear connector (4) is in the form of a cylindrical head welded nail, an angle steel or a perforated steel strip; the cylindrical head welded nail has a diameter of 0.006m to 0.019m and a length of 0.03m to 0.20m; the angle steel has a long angle leg width of 0.03m to 0.20m, a short angle leg width of 0.03m to 0.10m and a length of 0.03m to 0.20m; The perforated steel strip has a height of 0.03m to 0.15m, a thickness of 0.006m to 0.01m, a hole diameter of 0.01m to 0.10m, and at least two steel strips are provided along the width direction of the stiffening component (3).
6. A construction method for the lightweight steel-ultra-high performance concrete rigid composite rib plate according to any one of claims 1 to 5, comprising the following steps: S1. The stiffening member (3) and the shear connector (4) are connected as a whole, and ultra-high performance concrete is poured in the formwork to form a composite rib precast unit; S2. The composite rib precast unit is installed relatively to the top of the steel beam to form a cast-in-place ultra-high performance concrete bridge deck wet joint area; S3. Cast in situ UHPC wet joint areas.
Citation Information
Patent Citations
Concave rib weathering resistant steel-concrete combination bridge deck
CN105780649A
UHPC well type rib bridge panel for steel-concrete composite beam bridge and construction method thereof
CN106758813A
Ultra-high performance concrete (UHPC) combined deck slab with formwork
CN107604815A
Separately-poured connector of steel and fiber concrete combination board and construction method
CN104005337A
Construction method for rapidly reinforcing orthotropic board bridge floor of U-shaped ribs
CN104894985A