A kind of architectural landscape ecological river retaining wall and construction technology

By applying 3D printing technology and reinforced concrete structures on river retaining walls, a landscape ecological river retaining wall with permeability and ornamentality is designed, which solves the problems of traditional retaining wall blocking water systems and lacks ornamentality, and achieves the maintenance and aesthetic effect of river ecological system.

CN109881629BActive Publication Date: 2025-03-18JINAN BAIJUN CONSTR TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN201910281324.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-04-09
Publication Date
2025-03-18
Estimated Expiration
2039-04-09

AI Technical Summary

Technical Problem

The traditional river retaining wall lacks permeability, blocking the connection between river water and groundwater, destroying the river ecosystem, and also lacking ornamentality.

Method used

A landscape ecological river retaining wall is designed using 3D printing technology combined with reinforced concrete structures. The retaining wall is permeable and plants are planted in the leaking areas to form a continuous arch structure to improve impact resistance and aesthetics.

Benefits of technology

The water permeability of the retaining wall is realized, connecting the river water system with the groundwater system, maintaining the health of the river ecosystem, and purifying the water quality and increasing the ornamental value by planting different types of plants.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109881629B_ABST
    Figure CN109881629B_ABST
Patent Text Reader

Abstract

The present invention discloses a building landscape ecological river retaining wall, comprising a foundation bottom plate, at least two pier walls are arranged on the foundation bottom plate, and a multi-layer arch wall is arranged between adjacent pier walls, and the multi-layer arch wall is distributed in a step-like manner from bottom to top, and there is a gap area between two adjacent layers of arch walls. The retaining wall is not only permeable, but also can plant plants in the gap area, and has both practical value and ornamental value. The present invention also discloses a construction process of the building landscape ecological river retaining wall, which combines 3D printing construction technology with reinforced concrete structure, not only ensuring the overall structural strength of the retaining wall, but also simple construction and easy operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a retaining wall, in particular to a landscape ecological river retaining wall constructed by using 3D printing technology, and a construction process of the retaining wall. Background Art

[0002] In order to prevent the collapse of soil on both sides of the river and cause blockage of the river, retaining walls are generally set up on both sides of the river.

[0003] At present, the retaining walls on both sides of the river channel basically adopt gravity or arm retaining walls. Although this type of retaining wall can effectively prevent the blockage of the river channel caused by soil collapse, since this type of retaining wall is not permeable, under the protection of this type of retaining wall, the river channel is like wearing "armor", blocking the connection between river water and groundwater, and destroying the river ecosystem.

[0004] In addition, although the traditional retaining wall has a protective function, it is just a bare wall and lacks ornamental value. Summary of the invention

[0005] In view of the above problems, the present invention provides a building landscape ecological river retaining wall, which is not only permeable, but also capable of planting plants in the leaky area, and has both practical value and ornamental value.

[0006] At the same time, the present invention also provides a construction process for the architectural landscape ecological river retaining wall, which combines 3D printing construction technology with reinforced concrete structure, which not only ensures the overall structural strength of the retaining wall, but also makes the construction simple and easy to operate.

[0007] The technical solution adopted by the present invention to solve the technical problem is:

[0008] A building landscape ecological river retaining wall comprises a foundation bottom plate, wherein at least two pier walls are arranged on the foundation bottom plate, and multiple layers of connected arch walls are arranged between adjacent pier walls. The multiple layers of connected arch walls are distributed in a step-like manner from bottom to top, and there is a gap area between two adjacent layers of connected arch walls.

[0009] Furthermore, the water-facing surface of the pier wall is stepped and corresponds one-to-one with the continuous arch wall.

[0010] Furthermore, the water-facing surface of the continuous arch wall is arched.

[0011] Furthermore, the vertical portion of the water-facing surface of the pier wall is in an arc shape and is smoothly connected to the water-facing surface of the corresponding layer of the connected arch wall.

[0012] Furthermore, the back-to-water surface of the multi-arch wall is arched, and the rise-to-span ratio of the back-to-water surface is smaller than the rise-to-span ratio of the front-to-water surface of the multi-arch wall.

[0013] Furthermore, the back surface of the pier wall facing the water is a vertical plane.

[0014] Furthermore, the pier wall includes a pier wall outer formwork wall, the connected arch wall includes a connected arch wall outer formwork wall, and the pier wall outer formwork wall and the connected arch wall outer formwork wall together form a stepped outer formwork wall frame, concrete is poured in the outer formwork wall frame, and a steel mesh is arranged in each layer of the outer formwork wall frame.

[0015] Furthermore, the foundation slab comprises a foundation slab outer formwork wall, concrete is poured in the foundation slab outer formwork wall, and a steel mesh is arranged in the foundation slab outer formwork wall.

[0016] Furthermore, connecting steel bars are tied to the steel mesh, and the connecting steel bars extend into the adjacent upper concrete layer.

[0017] A construction process for a building landscape ecological river retaining wall includes the following construction steps:

[0018] First, level the land and lay the cushion layer;

[0019] Second, foundation slab construction

[0020] 2.1 Print the outer formwork wall of the foundation slab on the cushion layer using 3D printing technology;

[0021] 2.2 Set up a steel mesh inside the outer formwork wall of the foundation slab, and tie connecting steel bars on the steel mesh, with the upper end of the connecting steel bars at least 50cm higher than the upper end of the outer formwork wall of the foundation slab;

[0022] 2.3 Pour concrete inside the outer formwork wall of the foundation slab to complete the construction of the foundation slab;

[0023] Third, wall construction

[0024] 3.1 Print the first layer of outer formwork wall frame on the base plate using 3D printing technology;

[0025] 3.2 A steel mesh is installed inside the first layer of the outer formwork wall frame, and connecting steel bars are tied to the steel mesh, and the upper end of the connecting steel bars is at least 50cm higher than the upper end surface of the first layer of the outer formwork wall frame;

[0026] 3.3 Pour concrete in the first layer of outer formwork wall frame to complete the construction of the first layer of wall;

[0027] 3.4 Backfill soil on the backwater side of the first layer of wall, and the upper surface of the backfill soil is flush with the upper surface of the first layer of wall, and the compaction degree of the backfill soil is above 85%;

[0028] 3.5 Repeat steps 3.1-3.4 to complete the construction of the middle layer wall;

[0029] 3.6 Print the top outer formwork wall frame on the completed top wall using 3D printing technology;

[0030] 3.7 Set up steel mesh inside the top outer formwork wall frame;

[0031] 3.8 Pour concrete in the top-floor external formwork wall frame to complete the construction of the top-floor wall;

[0032] 3.9 Backfill soil on the backwater side of the top wall, and the upper surface of the backfill soil is flush with the upper surface of the top wall, and the compaction degree of the backfill soil is above 85%.

[0033] The beneficial effects of the present invention are:

[0034] 1. By adopting the staggered design, a leaky area is formed between adjacent arch walls, and soil is backfilled on the back of the retaining wall. In this way, on the one hand, the permeability of the retaining wall can be guaranteed, and the water system in the river channel can be connected with the groundwater system, which is conducive to the maintenance of the river channel ecosystem; on the other hand, water plants, water-drought plants and drought-tolerant plants can be planted in the leaky area between adjacent arch walls according to the water level of the river channel. By planting different kinds of plants, on the one hand, the water quality can be purified, and on the other hand, it can have an ornamental effect, making the retaining wall both practical and ornamental.

[0035] 2. By designing the retaining wall into a continuous arch structure, on the one hand, the arch structure is more beautiful and can be combined with modern beautification methods such as colored light strips to create a more beautiful visual effect; on the other hand, the arch structure can improve impact resistance and be more solid and durable.

[0036] 3. This construction process combines 3D printing construction technology with reinforced concrete structure, changing the problem that traditional buildings built with 3D printing technology alone are more beautiful than structural stability. This process not only ensures the beauty of the retaining wall, but also ensures the structural strength, stability and durability. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 The three-dimensional structural diagram of the retaining wall;

[0038] Figure 2 This is a top view of the retaining wall;

[0039] Figure 3 for Figure 2 AA section view in (rotated 90°);

[0040] Figure 4 for Figure 2 BB section view in (rotated 90°);

[0041] Figure 5For process steps Figure 1 ;

[0042] Figure 6 For process steps Figure 2 ;

[0043] Figure 7 For process steps Figure 3 ;

[0044] Figure 8 For process steps Figure 4 ;

[0045] Fig. 9 For process steps Figure 5 ;

[0046] Fig.10 For process steps Figure 6 ;

[0047] Fig.11 For process steps Figure 7 .

[0048] In the figure: 1- foundation slab, 11- foundation slab outer formwork wall,

[0049] 2-first floor wall, 21-first floor pier wall, 22-first floor arch wall, 23-first floor outer formwork wall frame,

[0050] 3-second layer wall, 31-second layer pier wall, 32-second layer arch wall, 33-second layer outer formwork wall frame,

[0051] 4-third floor wall, 41-third floor pier wall, 42-third floor arch wall, 43-third floor outer formwork wall frame,

[0052] 5-the fourth floor wall, 51-the fourth floor pier wall, 52-the fourth floor arch wall, 53-the fourth floor outer formwork wall frame,

[0053] 6- Concrete,

[0054] 7- Steel mesh,

[0055] 8- Connecting steel bars,

[0056] 9- Backfill soil. DETAILED DESCRIPTION

[0057] like Figure 1 As shown, a building landscape ecological river retaining wall includes a foundation slab 1, and at least two pier walls are arranged on the foundation slab 1. As a specific implementation method, five pier walls are arranged on the foundation slab 1 described in this embodiment.

[0058] Multiple layers of arched walls that are recessed outward (the side away from the river channel is the outer side) are arranged between adjacent pier walls from bottom to top. As a specific implementation, four layers of arched walls are arranged between adjacent pier walls in this embodiment. For the convenience of description, the arched walls are defined as the first arched wall 22, the second arched wall 32, the third arched wall 42 and the fourth arched wall 52 from bottom to top. The four layers of arched walls are staggered in sequence along the horizontal direction (the direction of the river channel is the longitudinal direction), forming a step shape together, and as shown in FIG. Figure 2 and Figure 3 As shown in FIG. 1 , there is a gap between two adjacent layers of arch walls, and the back surface of the retaining wall is backfilled with soil. Figure 3 As shown, water in the river channel can infiltrate into the groundwater system through the leakage areas between adjacent arch walls, and different types of plants can be planted in the leakage areas between adjacent arch walls according to the water depth.

[0059] Furthermore, in order to improve the structural strength of the retaining wall, Figure 2 As shown, the water-facing surface and the back-facing surface of the arched wall are both arched, and the rise-span ratio of the back-facing surface of the arched wall is smaller than the rise-span ratio of the water-facing surface of the arched wall. Preferably, the rise-span ratio of the back-facing surface of the arched wall is 1 / 4, and the rise-span ratio of the water-facing surface of the arched wall is 1 / 3. In this way, the arched wall will form an effect of being thin in the middle and thick at both ends, which can enhance the structural strength of the arched wall on the one hand, and on the other hand, when the slope of the water-facing surface of the retaining wall is constant, the area of ​​the leaking area can be increased, the planting area can be increased, and the beautification effect can be enhanced.

[0060] Furthermore, in order to enhance the beautification effect of the retaining wall, e.g. Figure 1 As shown, the water-facing surface of the pier wall is in a step-like shape, and the number of layers is the same as that of the continuous arch wall, and the positions correspond one to one. The vertical part of the water-facing surface of the pier wall is in an arc shape, and the two ends of the water-facing surface of the continuous arch wall are respectively connected to the vertical part of the water-facing surface of the pier wall in a smooth transition. In this way, the pier wall and the continuous arch wall together form a wave-shaped step.

[0061] For the convenience of description, the pier wall is divided into a first-layer pier wall 21, a second-layer pier wall 31, a third-layer pier wall 41 and a fourth-layer pier wall 51 from bottom to top, and the first-layer pier wall 21 and the first-layer connected arch wall 22 form a continuous first-layer wall body 2, the second-layer pier wall 31 and the second-layer connected arch wall 32 form a continuous second-layer wall body 3, the third-layer pier wall 41 and the third-layer connected arch wall 42 form a continuous third-layer wall body 4, and the fourth-layer pier wall 51 and the fourth-layer connected arch wall 52 form a continuous fourth-layer wall body 5.

[0062] Furthermore, if Figure 1 and Figure 2As shown, the back surface of the pier wall is a vertical plane, and the two ends of the back surface of the arch wall are connected to the inner side surface of the pier wall in a smooth transition. Here, the inner side surface of the pier wall is the opposite side of the two pier walls.

[0063] In order to improve the structural strength of the retaining wall, Figure 2 and Figure 4 As shown, the foundation slab 1 includes a foundation slab outer formwork wall 11, in which concrete 6 is poured, and connecting steel bars 8 are pre-embedded in the concrete 6, and the upper end of the connecting steel bars 8 is at least 50 cm higher than the upper end surface of the foundation slab 1, that is, Figure 4 The value of M is greater than or equal to 50cm.

[0064] The first layer of wall 2 includes a first layer of outer formwork wall frame 23 formed by the first layer of pier wall outer formwork wall and the first layer of continuous arch wall outer formwork wall, the second layer of wall 3 includes a second layer of outer formwork wall frame 33 formed by the second layer of pier wall outer formwork wall and the second layer of continuous arch wall outer formwork wall, the third layer of wall 4 includes a third layer of outer formwork wall frame 43 formed by the third layer of pier wall outer formwork wall and the third layer of continuous arch wall outer formwork wall, the fourth layer of wall 5 includes a fourth layer of outer formwork wall frame 53 formed by the fourth layer of pier wall outer formwork wall and the fourth layer of continuous arch wall outer formwork wall, the first layer of outer formwork wall frame 23, the second layer of outer formwork wall frame 33, the third layer of outer formwork wall frame 43 and the fourth layer of outer formwork wall frame 53 together form a complete outer formwork wall frame. Concrete 6 is poured in the outer formwork wall frame, and connecting steel bars 8 are arranged between the concrete 6 of two adjacent layers of outer formwork wall frames, and the upper end of the connecting steel bars 8 is inserted into the upper layer of concrete 6 by a distance greater than or equal to 50 cm.

[0065] Furthermore, if Figure 4 As shown, the foundation slab 1, the first layer wall 2, the second layer wall 3, the third layer wall 4 and the fourth layer wall 5 are all provided with steel meshes 7, and the lower ends of the connecting steel bars 8 are respectively tied and connected with the corresponding steel meshes 7.

[0066] As a specific implementation, the concrete 6 used for pouring in this embodiment is of grade C30. The foundation slab outer formwork wall 11 and the outer formwork wall frame are of grade C40-C50.

[0067] A construction process for a building landscape ecological river retaining wall includes the following construction steps:

[0068] First, the land is leveled and a cushion layer is laid. As a specific implementation, the cushion layer described in this embodiment is laid with C20 concrete and has a laying thickness of 15 cm.

[0069] Second, the construction of the foundation slab 1

[0070] 2.1 The outer formwork wall 11 of the foundation slab is printed on the cushion layer by 3D printing technology, and the shape is as follows Figure 5 As shown;

[0071] 2.2 A steel mesh 7 is arranged inside the outer formwork wall 11 of the foundation slab, such as Figure 6 As shown, the connecting steel bars 8 are tied to the steel mesh 7, and the upper end of the connecting steel bars 8 is at least 50 cm higher than the upper end surface of the foundation bottom plate outer formwork wall 11;

[0072] 2.3 As Figure 7 As shown, concrete 6 is poured in the outer formwork wall 11 of the foundation slab to complete the construction of the foundation slab 1.

[0073] Third, wall construction

[0074] 3.1 As Figure 8 As shown, a first layer of outer formwork wall frame 23 is printed on the base slab 1 by 3D printing technology;

[0075] 3.2 A steel mesh 7 is arranged in the first layer outer formwork wall frame 23, such as Fig. 9 As shown, the connecting steel bars 8 are tied to the steel mesh 7, and the upper end of the connecting steel bars 8 is at least 50 cm higher than the upper end surface of the first layer outer formwork wall frame 23;

[0076] 3.3 As Fig.10 As shown, concrete 6 is poured in the first layer outer formwork wall frame 23 to complete the construction of the first layer pier wall 21 and the first layer continuous arch wall 22 (i.e., the first layer wall body 2);

[0077] 3.4 Backfill soil on the backwater surface of the first wall 2, and the upper surface of the backfill soil 9 is flush with the upper surface of the first wall 2, and the compaction degree of the backfill soil 9 is above 85%;

[0078] 3.5 Repeat steps 3.1-3.4 to complete the construction of the second layer wall 3 and the third layer wall 4;

[0079] 3.6 Printing the fourth layer outer formwork wall frame 53 (i.e. the top layer outer formwork wall frame) on the third layer wall 4 by 3D printing technology;

[0080] 3.7 As Fig.11 As shown, a steel mesh 7 is arranged in the outer formwork wall frame 53 of the fourth layer;

[0081] 3.8 Pour concrete 6 in the outer formwork wall frame 53 of the fourth floor to complete the construction of the fourth floor wall 5;

[0082] 3.9 Backfill soil on the backwater surface of the fourth layer wall 5, and the upper surface of the backfill soil 9 is flush with the upper surface of the fourth layer wall 5, and the compaction degree of the backfill soil 9 is above 85%.

Claims

1. A building landscape ecological river retaining wall, characterized by: It comprises a foundation bottom plate, wherein at least two pier walls are arranged on the foundation bottom plate, and a multi-layer continuous arch wall is arranged between adjacent pier walls, and the multi-layer continuous arch wall is distributed in a step-like manner from bottom to top, and there is a gap area between two adjacent layers of continuous arch walls; The water-facing surface of the pier wall is in a step-like shape and corresponds one-to-one with the continuous arch wall; The water-facing surface of the continuous arch wall is arched; The back surface of the pier wall is a vertical plane.

2. The architectural landscape ecological river retaining wall according to claim 1 is characterized by: The vertical part of the water-facing surface of the pier wall is in an arc shape and is smoothly connected with the water-facing surface of the connected arch wall of the corresponding layer.

3. The architectural landscape ecological river retaining wall according to claim 1 is characterized by: The back-to-water surface of the multi-arch wall is arched, and the rise-to-span ratio of the back-to-water surface is smaller than the rise-to-span ratio of the front-to-water surface of the multi-arch wall.

4. The architectural landscape ecological river retaining wall according to claim 1 is characterized by: The pier wall includes a pier wall outer formwork wall, the connected arch wall includes a connected arch wall outer formwork wall, and the pier wall outer formwork wall and the connected arch wall outer formwork wall together form a stepped outer formwork wall frame, concrete is poured in the outer formwork wall frame, and a steel mesh is arranged in each layer of the outer formwork wall frame.

5. The architectural landscape ecological river retaining wall according to claim 4 is characterized by: The foundation slab comprises a foundation slab outer formwork wall, concrete is poured in the foundation slab outer formwork wall, and a steel mesh is arranged in the foundation slab outer formwork wall.

6. The architectural landscape ecological river retaining wall according to claim 5 is characterized by: The steel mesh is tied with connecting steel bars, and the connecting steel bars extend into the adjacent upper concrete layer.

7. A construction process for a building landscape ecological river retaining wall as claimed in claim 6, characterized in that: The construction steps include: First, level the land and lay the cushion layer; Second, foundation slab construction 2.1 Print the outer formwork wall of the foundation slab on the cushion layer using 3D printing technology; 2.2 Set up a steel mesh inside the outer formwork wall of the foundation slab, and tie connecting steel bars on the steel mesh, with the upper end of the connecting steel bars at least 50cm higher than the upper end of the outer formwork wall of the foundation slab; 2.3 Pour concrete inside the outer formwork wall of the foundation slab to complete the construction of the foundation slab; Third, wall construction 3.1 Print the first layer of outer formwork wall frame on the base plate using 3D printing technology; 3.2 A steel mesh is installed inside the first layer of the outer formwork wall frame, and connecting steel bars are tied to the steel mesh, and the upper end of the connecting steel bars is at least 50cm higher than the upper end surface of the first layer of the outer formwork wall frame; 3.3 Pour concrete in the first layer of outer formwork wall frame to complete the construction of the first layer of wall; 3.4 Backfill soil on the backwater side of the first layer of wall, and the upper surface of the backfill soil is flush with the upper surface of the first layer of wall, and the compaction degree of the backfill soil is above 85%; 3.5 Repeat steps 3.1-3.4 to complete the construction of the middle layer wall; 3.6 Print the top outer formwork wall frame on the completed top wall using 3D printing technology; 3.7 Set up steel mesh inside the top outer formwork wall frame; 3.8 Pour concrete in the top-floor external formwork wall frame to complete the construction of the top-floor wall; 3.9 Backfill soil on the backwater side of the top wall, and the upper surface of the backfill soil is flush with the upper surface of the top wall, and the compaction degree of the backfill soil is above 85%.

Citation Information

Patent Citations

  • Building landscape ecological riverway retaining wall

    CN209836925U

  • Reinforced soil retaining wall construction method

    JP1997242096A

  • Retaining wall formed by integrating a concrete base slab and precast concrete blocks.