A fabricated flood dam and a processing technology of a flood dam unit

Through prefabricated flood dam design and 3D printing technology, combined with reinforced concrete structures, the problems of complex construction and hollowed out foundations were solved, the structural strength and aesthetics were improved, the construction process was simplified and the cost was reduced.

CN109881630BActive Publication Date: 2024-10-18JINAN BAIJUN CONSTR TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN201910280777.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-04-09
Publication Date
2024-10-18
Estimated Expiration
2039-04-09

AI Technical Summary

Technical Problem

The construction technology of existing overflow dams is complex and costly, and the vortex formed when water overflows over the dam causes the foundation to be hollowed out, affecting the stability of the dam body.

Method used

Adopting a prefabricated overflow dam design, combining 3D printing technology and reinforced concrete structure, arched walls and buffer zones are set up to avoid eddy current erosion, T-shaped rubber waterstops are used to ensure sealing, and steel cages and cages are pre-embedded in the foundation floor. Connect steel bars to increase structural strength.

Benefits of technology

It simplifies construction, reduces costs, avoids hollowing out of the foundation, enhances the strength and aesthetics of the dam structure, and extends its service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109881630B_ABST
    Figure CN109881630B_ABST
Patent Text Reader

Abstract

The present invention discloses an assembled flooding dam, including a dam body formed by flooding dam monomers connected in sequence. First steel plates are respectively provided at the left and right ends of the flooding dam monomers, and a second steel plate is provided between two adjacent flooding dam monomers on the water-facing side, and the second steel plates are respectively fixedly connected to the front end faces of the first steel plates. The flooding dam monomers include a foundation bottom plate, at least two piers are provided on the foundation bottom plate, and an arched first wall is provided between two adjacent piers, the piers and the first wall together form a main wall, and an arched second wall is provided on the backwater side of the first wall. The flooding dam can not only be assembled on site, but also effectively avoid the phenomenon of foundation hollowing out, which is beneficial to the stability of the dam body. At the same time, a process combining 3D printing construction technology with reinforced concrete structure is also disclosed, which ensures structural strength and simple construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy engineering, in particular to a fabricated flood dam and a processing technology of a flood dam monomer constituting the fabricated flood dam. Background Art

[0002] As a water conservancy project, flood dams are widely used in agricultural irrigation, fisheries, ship locks, seawater tidal barriers, urban river landscape projects, etc.

[0003] As far as construction technology is concerned, at present, the construction of flood dams generally adopts the on-site construction method, which is affected by the on-site construction environment. This not only complicates the construction technology, but also increases the construction cost accordingly.

[0004] As for the structure of current flood dams, the current flood dams are generally as follows: Fig.10 As shown in the figure, when the water overflows the flood dam and falls, a huge vortex will be formed below the flood dam. The formed vortex will scour the foundation below the flood dam and carry away the silt washed away, thus causing the following Fig.10 The hollowing out of the foundation is not conducive to the stability of the dam. Summary of the invention

[0005] In view of the above problems, the present invention provides an assembled flood dam, which can not only be assembled on site, but also effectively avoids the hollowing out of the foundation, thus being beneficial to the stability of the dam body.

[0006] At the same time, the present invention also provides a processing technology for the flood dam monomer of the assembled flood dam, which combines 3D printing construction technology with reinforced concrete structure, which not only ensures the overall structural strength of the retaining wall, but also makes the construction simple and easy to operate.

[0007] The technical solution adopted by the present invention to solve the technical problem is:

[0008] An assembled flood dam comprises a dam body formed by flood dam monomers connected in sequence;

[0009] The left and right ends of the flood dam monomer are respectively provided with a first steel plate, and a second steel plate is provided between two adjacent flood dam monomers on the water-facing side, and the second steel plates are respectively fixedly connected to the front end surfaces of the first steel plates;

[0010] The flood dam unit includes a foundation bottom plate, on which at least two piers are arranged, and between two adjacent piers an arched first wall is arranged, the piers and the first wall together form a main wall, and an arched second wall is arranged on the back side of the first wall, and the height of the second wall is smaller than that of the first wall.

[0011] Furthermore, the rise-to-span ratio of the water-facing surface of the first wall is smaller than the rise-to-span ratio of the water-retaining surface of the first wall.

[0012] Furthermore, the main wall comprises a hollow formwork wall, a steel skeleton is arranged in the mold cavity of the formwork wall, and concrete is poured.

[0013] Furthermore, the formwork wall adopts C40-C50 concrete, and the concrete grade in the mold cavity of the formwork wall is C30.

[0014] Furthermore, the steel skeleton includes a steel mesh cage arranged in the pier body and arched steel bars arranged in the first wall body, and both ends of the arched steel bars are fixedly connected to the steel mesh cage, at least three connecting steel bars are respectively arranged at both ends of the arched steel bars in the first wall body, the arched steel bars are fixedly connected to the connecting steel bars, and the lower ends of the steel mesh cage and the connecting steel bars are pre-buried in the foundation slab.

[0015] Furthermore, the connecting steel bars are respectively arranged at the front and rear sides of the arched steel bars, and the steel bars at the front and rear sides are arranged at intervals.

[0016] Furthermore, foundation walls are arranged at the left and right ends of the dam body, and flap gates are arranged between the foundation wall and the dam body.

[0017] Furthermore, slope protection walls are respectively arranged on the front and rear sides of the foundation wall, and the slope protection wall comprises a slope protection wall foundation, an arc-shaped hollow slope protection wall body is arranged on the slope protection wall foundation, and a wavy reinforcing support body is arranged inside the slope protection wall body.

[0018] Furthermore, a rubber water stop strip with a T-shaped cross section is arranged between the first steel plate and the second steel plate, and the raised portion of the rubber water stop strip is clamped between the first steel plates of two adjacent flood dam units, and an elastic compression hole is arranged on the raised portion of the rubber water stop strip.

[0019] A processing technology for a flood dam monomer of an assembled flood dam comprises the following steps:

[0020] First, the foundation slab is prepared by pouring, and a steel mesh cage and connecting steel bars are embedded in the foundation formwork;

[0021] Second, print the formwork wall and the second wall to a preset height H1 on the foundation slab using 3D printing technology;

[0022] Third, placing an arched steel bar in the mold cavity of the mold wall obtained in the second step, and fixing both ends of the arched steel bar to the steel mesh cage and the connecting steel bar respectively;

[0023] Fourth, continue to print the mold wall and the second wall by 3D printing until the second wall reaches the designed height H2;

[0024] Fifth, continue to print the mold wall to the preset height H3 by 3D printing;

[0025] Sixth, placing an arched steel bar in the mold cavity of the mold wall obtained in the fifth step, and fixing both ends of the arched steel bar to the steel mesh cage and the connecting steel bar respectively;

[0026] Seventh, repeat the fifth and sixth steps to set the arched steel bars at the preset heights respectively;

[0027] Eighth, continuing to print the formwork wall by 3D printing on the basis of the formwork wall obtained in the seventh step until the formwork wall reaches the designed height;

[0028] Ninth, pour concrete in the mold cavity formed by the mold wall.

[0029] The beneficial effects of the present invention are:

[0030] 1. The flood dam monomers are assembled to form the dam body, which does not require on-site construction. The flood dam monomers can be prefabricated in advance and assembled on-site, which is not only beautiful and practical, but also reduces the construction difficulty and cost.

[0031] 2. By designing the first wall between the piers into an arched wall, not only the structural strength of the dam body is increased and the service life is extended, but also the appearance is beautiful, the ornamental value is increased, and the practicality is enhanced.

[0032] 3. By setting a second wall on the back side of the first wall, a buffer zone is formed between the first wall and the second wall to prevent water from falling directly from a high place to form a vortex and cause foundation hollowing.

[0033] 4. This construction process combines 3D printing construction technology with reinforced concrete structure, changing the problem that traditional buildings built with 3D printing technology alone are more beautiful than structural stability. This process not only ensures the beauty of the flood dam, but also ensures the structural strength, stability and durability. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a three-dimensional structural diagram of the flood dam;

[0035] Figure 2 for Figure 1 A schematic diagram of the enlarged structure of part A;

[0036] Figure 3 It is a three-dimensional structural diagram of the flood dam unit;

[0037] Figure 4 This is the main view of the flood dam unit;

[0038] Figure 5 for Figure 4 AA section view in;

[0039] Figure 6 It is a schematic diagram of the three-dimensional structure of the steel frame of the flood dam unit;

[0040] Figure 7 for Figure 6 A schematic diagram of the enlarged structure of part B;

[0041] Figure 8 It is a three-dimensional structural diagram of the flood dam unit before concrete is poured;

[0042] Fig. 9 The three-dimensional structural diagram of the slope protection wall;

[0043] Fig.10 Schematic diagram of the hollowing out of a traditional flood dam.

[0044] In the figure: 1-flood dam monomer, 11-foundation bottom plate, 12-pier body, 121-pier body outer formwork wall, 122-steel mesh cage, 13-first wall, 131-first wall outer formwork wall, 132-arched steel bars, 133-connecting steel bars, 14-second wall, 15-concrete, 16-first steel plate, 2-foundation wall, 3-flip gate, 4-slope protection wall, 41-slope protection wall foundation, 42-slope protection wall, 43-reinforced support body, 5-second steel plate, 6-rubber water stop strip, 61-elastic compression hole. DETAILED DESCRIPTION

[0045] For the convenience of description, here, the direction along the river is taken as the front-back direction, the direction of the water is taken as the back direction, and the direction across the river is taken as the left-right direction. Figure 1 The coordinate system shown.

[0046] like Figure 1 As shown, an assembled flood dam includes a dam body formed by flood dam monomers 1 connected in sequence, with foundation walls 2 arranged at the left and right ends of the dam body, and a flap gate arranged between the foundation wall 2 and the dam body. Retaining walls 4 are arranged at the front and rear sides of the foundation wall 2, respectively.

[0047] The structure and installation method of the flap gate 3 belong to the prior art and will not be described in detail here.

[0048] like Figure 2As shown, first steel plates 16 are respectively provided at the left and right ends of the flood dam monomer 1, and a second steel plate 5 is provided between two adjacent flood dam monomers 1. The second steel plate 5 is fixedly connected to the first steel plates 16 on the two flood dam monomers by screws.

[0049] Here, the first steel plate 16 can be fixedly connected to the flood dam monomer 1 by expansion bolts, or can be fixed in the flood dam monomer 1 by pre-embedding.

[0050] Furthermore, in order to ensure the sealing performance, Figure 2 As shown, a rubber water stop strip 6 with a T-shaped cross section is provided between the first steel plate 16 and the second steel plate 5 , and the raised portion of the rubber water stop strip 6 is clamped between the first steel plates 16 of two adjacent flood dam units 1 .

[0051] Furthermore, since the spacing error between the flood dam units 1 may be relatively large during assembly, in order to facilitate installation, Figure 2 As shown, the raised portion of the rubber water stop strip 6 is provided with an elastic compression hole 61 penetrating the rubber water stop strip 6 along the length direction.

[0052] Furthermore, the second steel plate 5 is arranged on the water-facing surface of the dam body and is fixedly connected to the front end surface of the first steel plate 16 by screws. In this way, the second steel plate 5 will be tightened more and more under the action of water pressure, thereby ensuring good sealing performance.

[0053] like Figure 3 As shown, the flood dam unit 1 includes a foundation slab 11, and at least two piers 12 are arranged on the foundation slab 11, and the piers 12 are arranged in a line. As a specific implementation, three piers 12 are arranged on the foundation slab 11 described in this embodiment. A first wall 13 is arranged between two adjacent piers 12, and the piers 12 and the first wall 13 together form a continuous main wall. The first wall 13 is arched and concave in the direction of incoming water. A second wall 14 is arranged between two adjacent piers 12 on the back side of the first wall 13, and the height of the second wall 14 is less than that of the first wall 13. As shown Figure 4 and Figure 5 As shown, a buffer zone is formed between the first wall 13 and the second wall 14. The water overflowing the first wall 13 first enters the buffer zone, and then overflows from the second wall 14 after overflowing the buffer zone, thereby reducing the height of the water drop, reducing the scouring of the vortex, and avoiding damage to the foundation below the dam body.

[0054] As a specific implementation, in this embodiment, the height of the first wall 13 is 2.5 meters, and as an optimal solution, the height of the second wall 14 is 0.5 meters. The second wall 14 is arched and concave toward the incoming water direction.

[0055] Furthermore, in order to improve the structural strength of the dam, Figure 3 As shown, the rise-span ratio of the water-facing surface of the first wall 13 is smaller than the rise-span ratio of the water-receiving surface of the first wall 13. Preferably, the rise-span ratio of the water-facing surface of the first wall 13 is 1 / 5, and the rise-span ratio of the water-receiving surface of the first wall 13 is 1 / 4-1 / 3. In this way, the first wall 13 will form an effect of being thin in the middle and thick at both ends, which can enhance the structural strength of the dam body on the one hand, and enhance the beautification effect on the other hand.

[0056] Furthermore, in order to further improve the structural strength of the dam, Figure 5 , Figure 6 and Figure 8 As shown, the pier body 12 includes a pier outer formwork wall 121, and the first wall body 13 includes a first wall outer formwork wall 131. The pier outer formwork wall 121 and the first wall outer formwork wall 131 together form a hollow formwork wall, and concrete 15 is poured in the mold cavity of the formwork wall. The formwork wall adopts concrete with a grade of C40-C50, and the concrete 15 used for pouring adopts concrete with a grade of C30. A steel mesh cage 122 is arranged in the pier outer formwork wall 121, and at least two arched steel bars 132 are arranged in the first wall outer formwork wall 131, and the two ends of the arched steel bars 132 are fixedly connected to the steel mesh cage 122 by binding. At least three connecting steel bars 133 are arranged at the two ends of the arched steel bars 132 in the first wall outer formwork wall 131, and the arched steel bars 132 are fixedly connected to the connecting steel bars 133 by binding. The lower ends of the steel mesh cage 122 and the connecting steel bars 133 are pre-buried in the foundation slab 11 .

[0057] Preferably, Figure 7 As shown, the connecting steel bars 133 are respectively arranged at the front and rear sides of the arched steel bars 132, and the steel bars located at the front side of the arched steel bars 132 and the steel bars located at the rear side of the arched steel bars 132 are arranged at intervals.

[0058] like Fig. 9 As shown, the slope protection wall 4 includes a slope protection wall foundation 41, on which a curved hollow slope protection wall body 42 is arranged, and a wave-shaped reinforcement support body 43 is arranged inside the slope protection wall body 42. Here, the curvature of the slope protection wall 4 can be designed according to the specific environment of the river channel.

[0059] A processing technology for a flood dam unit 1 of an assembled flood dam comprises the following steps:

[0060] First, the foundation slab 11 is manufactured by pouring, and a steel mesh cage 122 and connecting steel bars 133 are embedded in the foundation formwork.

[0061] Second, the mold wall and the second wall 14 are printed on the base slab 11 by 3D printing technology until the printing height reaches a preset height H1.

[0062] As a specific implementation, the preset height H1 in this embodiment is 0.3 meters.

[0063] Third, an arched steel bar 132 is placed in the mold cavity of the mold wall obtained in the second step, and the two ends of the arched steel bar 132 are fixedly connected to the steel mesh cage 122 and the connecting steel bar 133 respectively by binding.

[0064] Here, the arched steel bar 132 may not be completely located in the mold cavity, but may be partially located in the mold cavity and partially located above the mold cavity, so as to facilitate the binding operation.

[0065] Fourth, based on the mold wall and the second wall 14 obtained in the second step, continue to print the mold wall and the second wall 14 by 3D printing until the second wall 14 reaches the designed height H2.

[0066] As a specific implementation, in this embodiment, the design height H2 of the second wall 14 is 0.5 meters.

[0067] Fifth, based on the mold wall obtained in the fourth step, continue to print the mold wall by 3D printing until the mold wall reaches a preset height H3.

[0068] As a specific implementation, the preset height H3 in this embodiment is 0.9 meters.

[0069] Sixth, an arched steel bar 132 is placed in the mold cavity of the mold wall obtained in the fifth step, and the two ends of the arched steel bar 132 are fixedly connected to the steel mesh cage 122 and the connecting steel bar 133 respectively by binding.

[0070] Seventh, repeat the fifth and sixth steps to respectively set the arched steel bars 132 at 1.5 meters and 2.1 meters.

[0071] Eighth, based on the formwork wall obtained in the seventh step, continue to print the formwork wall by 3D printing until the formwork wall reaches the designed height of 2.5 meters.

[0072] Ninth, pour concrete 15 in the mold cavity formed by the mold wall.

Claims

1. An assembled flood dam, Features: It includes a dam body formed by connecting flood dam units in sequence; The left and right ends of the flood dam monomer are respectively provided with a first steel plate, and a second steel plate is provided between two adjacent flood dam monomers on the water-facing side, and the second steel plates are respectively fixedly connected to the front end surfaces of the first steel plates; The flood dam monomer comprises a foundation bottom plate, on which at least two piers are arranged, between two adjacent piers an arched first wall is arranged, the piers and the first wall together form a main wall, and an arched second wall is arranged on the back side of the first wall, and the height of the second wall is smaller than that of the first wall; The main wall comprises a hollow formwork wall, a steel bar skeleton is arranged in the mold cavity of the formwork wall, and concrete is poured.

2. The assembled flood dam according to claim 1, Features: The rise-to-span ratio of the water-facing surface of the first wall is smaller than the rise-to-span ratio of the water-receiving surface of the first wall.

3. The assembled flood dam according to claim 1, Features: The formwork wall adopts C40-C50 concrete, and the concrete grade in the mold cavity of the formwork wall is C30.

4. The assembled flood dam according to claim 1, Features: The steel frame includes a steel mesh cage arranged in the pier body and arched steel bars arranged in the first wall body, and the two ends of the arched steel bars are respectively fixedly connected to the steel mesh cage, and at least three connecting steel bars are respectively arranged at the two ends of the arched steel bars in the first wall body, and the arched steel bars are fixedly connected to the connecting steel bars, and the lower ends of the steel mesh cage and the connecting steel bars are both pre-buried in the foundation slab.

5. The assembled flood dam according to claim 4, Features: The connecting steel bars are respectively arranged at the front and rear sides of the arched steel bars, and the steel bars at the front and rear sides are arranged at intervals.

6. The assembled flood dam according to claim 1, Features: The left and right ends of the dam body are provided with foundation walls, and a flap gate is provided between the foundation wall and the dam body.

7. The assembled flood dam according to claim 6, Features: The front and rear sides of the foundation wall are respectively provided with slope protection walls, the slope protection wall comprises a slope protection wall foundation, an arc-shaped hollow slope protection wall body is arranged on the slope protection wall foundation, and a wave-shaped reinforcing support body is arranged in the slope protection wall body.

8. The assembled flood dam according to claim 1, Features: A rubber water stop strip with a T-shaped cross section is arranged between the first steel plate and the second steel plate, and the raised portion of the rubber water stop strip is clamped between the first steel plates of two adjacent flood dam units, and an elastic compression hole is arranged on the raised portion of the rubber water stop strip.

9. A processing technology for the flood dam monomer according to any one of claims 1 to 8, Features: The following steps are included: First, the foundation slab is prepared by pouring, and a steel mesh cage and connecting steel bars are embedded in the foundation formwork; Second, print the formwork wall and the second wall to a preset height H1 on the foundation slab using 3D printing technology; Third, placing an arched steel bar in the mold cavity of the mold wall obtained in the second step, and fixing both ends of the arched steel bar to the steel mesh cage and the connecting steel bar respectively; Fourth, continue to print the mold wall and the second wall by 3D printing until the second wall reaches the designed height H2; Fifth, continue to print the mold wall to the preset height H3 by 3D printing; Sixth, placing an arched steel bar in the mold cavity of the mold wall obtained in the fifth step, and fixing both ends of the arched steel bar to the steel mesh cage and the connecting steel bar respectively; Seventh, repeat the fifth and sixth steps to set the arched steel bars at the preset heights respectively; Eighth, continuing to print the formwork wall by 3D printing on the basis of the formwork wall obtained in the seventh step until the formwork wall reaches the designed height; Ninth, pour concrete in the mold cavity formed by the mold wall.

Citation Information

Patent Citations

  • Concrete shear wall structure based on 3D printing and construction method of concrete shear wall structure

    CN104153493A

  • Water retaining dam

    CN105862664A

  • Landscape barrage with hydrophilic effect and construction method of landscape barrage

    CN106836147A

  • Dam for blocking mountainous area and river way mountain torrents and debris flow

    CN108547262A

  • Assembled overflow dam

    CN209836929U