Grouting device and grouting method suitable for pull-out test of grouting reinforced concrete
Through the grouting device of the cross bracket and the tapered support structure, the problems of steel bar positioning and unbonded section setting in the fan foundation grouting are solved, high-precision grouting operation and effective grouting of annular cracks are achieved, and the test efficiency is improved. quality and simplicity.
Patent Information
- Application Number
- CN201910514253.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-06-14
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing grouting device cannot effectively solve the problems of centering the steel bars and setting up unbonded sections in the grouting reinforcement of the wind turbine foundation. Especially when grouting in annular cracks, it is difficult to control the interface between the bonded section and the unbonded section. location, and conventional grouting pipes cannot be inserted into millimeter-scale annular cracks.
A cross bracket and conical support structure are used, and a grouting port is set through the side wall of the conical support to achieve bottom-up grouting. The contact between the conical support and the steel bar is sealed with a rubber ring, and magnesium carbonate cement seals the conical support and the concrete. The gap between them ensures that the diameter of the grouting pipe is not affected by the thickness of the annular crack, simplifying the test operation.
It improves the test accuracy, ensures that the steel bar is positioned in the center of the concrete, reduces the generation of air bubbles, improves the grouting quality and grouting effect, can effectively grout millimeter-level annular cracks, and simplifies the test equipment.
Smart Images

Figure CN110344602B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a grouting device and a grouting method suitable for a pull-out test of grouting reinforced concrete, in particular to a device and a method for grouting an annular crack between a steel bar and a concrete through hole. Background Art
[0002] Under the action of long-term wind loads, the wind turbine foundation has local accumulated damage between the foundation ring and the foundation concrete, resulting in failure of the anchoring of the concrete to the foundation ring, visible detachment cracks between the foundation ring and the concrete, cavities in the concrete at the bottom flange of the foundation ring, reduced foundation stiffness, and reduced tower frequency, which may affect the normal operation of the wind turbine. Pressure grouting is the use of air pressure or hydraulic pressure to inject a solidifying slurry into cracks or pores. The slurry drives away the air and moisture in the cracks or pores by filling, penetrating and compacting, and then fills its position. After the slurry solidifies, it achieves the purpose of reinforcement and anti-seepage.
[0003] For the research on the grouting reinforcement effect of wind turbine foundation, it is necessary to consider the influence of factors such as seam width, temperature, and humidity, but the field test is costly and difficult to carry out. In order to solve the above problems, it is proposed to use plain round steel bars to simulate the foundation ring, leave a gap between the plain round steel bars and the concrete block, and then conduct a pull-out test and analyze the test results. However, most of the existing grouting devices are aimed at underground projects, which cannot meet the research on the bonding effect of the foundation ring and the interface between concrete and slurry, and cannot solve the problems of centering the steel bars and setting non-bonded sections in the pull-out test.
[0004] The top-down grouting method is commonly used in wind turbine foundation grouting reinforcement projects. In the grouting steel bar pull-out test, since it is necessary to set up a non-bonded section, when the top-down grouting method is used, firstly, the slurry will pass through the non-bonded section, and the interface between the bonded section and the non-bonded section cannot be controlled at the specified position. Secondly, the test crack is annular. When the crack width is at the millimeter level, the conventional grouting pipe cannot be inserted for grouting.
[0005] Based on the above analysis, this case was created to overcome the defects of the existing grouting method. Summary of the invention
[0006] The purpose of the present invention is to provide a grouting device and method suitable for grouting reinforced concrete pull-out test, which has a simple and reliable structure, the non-bonded section is not disturbed by grouting, and the diameter of the grouting pipe does not change due to the change of the thickness of the annular crack, which is convenient and fast.
[0007] In order to achieve the above object, the solution of the present invention is:
[0008] A grouting device suitable for grouting reinforced concrete pull-out test comprises a cross bracket, a conical support and a grouting device, wherein the cross bracket comprises a cross bar and a vertical bar penetrating the cross bar, the vertical bar is a hollow structure and is inserted into the upper part of the steel bar, the cross bar is located on the top of the concrete and is used to fix the vertical bar; the conical support is installed at the lower part of the steel bar, and the bottom surface of the conical support contacts the bottom surface of the concrete; the side wall of the conical support is provided with a grouting port for the grouting pipe of the grouting device to be inserted.
[0009] The overlapping length between the above-mentioned vertical rod and the steel bar is 5 times the diameter of the steel bar.
[0010] A rubber ring is arranged at the contact point between the conical support and the steel bar.
[0011] The gap between the conical support and the concrete is sealed with magnesium carbonate cement.
[0012] The grouting method based on the grouting device suitable for the pull-out test of grouting reinforced concrete as described above comprises the following steps:
[0013] Step 1: insert the vertical rod of the cross support into the upper part of the steel bar, install the conical support on the lower part of the steel bar, and insert the grouting pipe of the grouting device into the grouting port of the side wall of the conical support;
[0014] Step 2: Use a grouting device to inject slurry into the grouting pipe, grouting from bottom to top, and make sure that the grouting pipe cannot exceed the grouting liquid surface. When the slurry cannot be injected further, slowly pull out the grouting pipe and seal the grouting port with a rubber plug; after a period of time, open the grouting port at the same position, insert the grouting pipe and repeat the grouting, so that the slurry fills the cracks;
[0015] Step 3, invert the whole, wait until the slurry is in a semi-solidified state, remove the conical support, clean up the excess slurry, seal the annular crack formed by the conical support with medical tape, and apply magnesium carbonate cement to seal the crack;
[0016] Step 4: After curing until the slurry solidifies, remove the cross bracket and clean the surface residue.
[0017] In the above step 1, a rubber ring is used to seal the gap between the conical support and the steel bar, and magnesium carbonate cement is used to seal the gap between the conical support and the concrete.
[0018] In the above step 2, before injecting the slurry, first apply soapy water to the magnesium carbonate cement seal, inject air into the grouting pipe with a grouting device, and observe whether there is any leakage. If there is leakage, fill it with magnesium carbonate cement until there is no leakage.
[0019] After adopting the above scheme, the present invention has the following advantages compared with the prior art:
[0020] (1) Compared with the traditional grouting device, the present invention is mainly aimed at the simulation test of the grouting reinforcement effect of the wind turbine foundation, that is, the grouting reinforced concrete pull-out test. The conical support and the cross bracket can fix the steel bar, so that the steel bar is positioned in the center of the concrete, improve the test accuracy, and facilitate the grouting operation;
[0021] (2) The present invention adopts grouting from bottom to top, and the cross bracket closes the upper half of the steel bar to prevent the slurry from passing through the unbonded section during grouting, which is conducive to accurately setting the unbonded section required for the pull-out test, and is also conducive to reducing bubbles generated during the grouting process and improving the grouting quality;
[0022] (3) The present invention sets a grouting port on the side wall of the conical support. The diameter of the grouting pipe is not affected by the crack width and can grout millimeter-level annular cracks, thereby simplifying the test equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 is a cross-sectional view of a grouting device of the present invention;
[0024] Figure 2 , Figure 3 It is a plan view of the grouting device of the present invention. DETAILED DESCRIPTION
[0025] The technical solutions and beneficial effects of the present invention will be described in detail below with reference to the accompanying drawings.
[0026] like Figures 1 to 3 As shown, the present invention provides a grouting device suitable for grouting reinforced concrete pull-out test, which is used to realize gap grouting between the steel bar 1 and the concrete 3, including a cross bracket 2, a conical support 4, a grouting device and a rubber ring 6, wherein the steel bar 1 and the concrete 3 are the test piece bodies, the steel bar 1 is inserted into the center of the through hole of the concrete 3, and an annular crack is left between the steel bar 1 and the through hole of the concrete 3.
[0027] The cross bracket 2 is inserted into the upper part of the steel bar 1, and includes a vertical rod for forming a non-bonded section and a horizontal rod for fixing the vertical rod, wherein the vertical rod is a hollow structure for the steel bar to be inserted, thereby playing a positioning role, and the vertical rod passes through the horizontal rod, and the overlapping length of the vertical rod and the steel bar (that is, the length of the non-bonded section) is 5 times the diameter of the steel bar; by cooperating with the cross bracket 2 and the steel bar 1, the cross bracket 2 plays the role of fixing the steel bar 1, setting the non-bonded section and sealing the top of the grouting channel, and is taken out after the grouting is completed.
[0028] The conical support 4 is installed at the lower part of the steel bar 1 to play a supporting and positioning role, fixing the steel bar 1 at the center of the through hole of the concrete 3, and a rubber ring 6 is provided at the contact point between the conical support 4 and the steel bar 1, and the gap between the conical support 4 and the concrete 3 is sealed with magnesium carbonate cement to play a role in closing the grouting environment.
[0029] The side wall of the conical support 4 is provided with a grouting port for inserting the grouting pipe 5 of the grouting device to realize grouting from bottom to top, and it is noted that during the grouting process, the grouting pipe port does not exceed the slurry liquid level, thereby reducing the generation of bubbles and improving the grouting quality.
[0030] In this embodiment, the side length of the concrete cube is 10 times the diameter of the steel bar, the length of the unbonded section is 5 times the diameter of the steel bar, the distance between the upper surface of the steel bar and the upper surface of the concrete cube is not less than 300 mm, and the distance between the lower surface of the steel bar and the lower surface of the concrete cube is not less than 50 mm.
[0031] The present invention also provides a grouting method suitable for a grouting reinforced concrete pull-out test, comprising the following steps:
[0032] Step 1, clean the dust and residue on the surface of the steel bar 1 and the concrete 3 with a hair dryer, assemble and seal the grouting device, specifically including sealing the gap between the conical support 4 and the steel bar 1 with a rubber ring 6, and sealing the gap between the conical support 4 and the concrete 3 with magnesium carbonate cement;
[0033] Step 2, apply soapy water to the magnesium carbonate cement seal, inject air into the grouting pipe 5 with a grouting device, and observe whether there is leakage. If there is leakage, fill it with magnesium carbonate cement until there is no leakage;
[0034] Step 3, inject slurry into the grouting pipe 5 with a grouting device, grouting from bottom to top, the grouting pipe 5 cannot exceed the grouting liquid surface, when the slurry can no longer be injected, slowly pull out the grouting pipe, and seal the grouting port with a rubber plug; after a few minutes, open the grouting port at the same position, insert the grouting pipe and repeat the grouting, so that the slurry fills the cracks;
[0035] Step 4, invert the component, wait until the slurry is in a semi-solidified state, remove the conical support 4, clean up the excess slurry, seal the annular crack with medical tape, and apply magnesium carbonate cement to seal the crack;
[0036] Step 5: After curing until the slurry solidifies, remove the cross bracket 2 and clean the surface residue.
[0037] The above embodiments are only for illustrating the technical idea of the present invention, and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the present invention.
Claims
1. A grouting method for a grouting device suitable for a pull-out test of grouting reinforced concrete, characterized in that: The steps include: Step 1: insert the vertical rod of the cross support into the upper part of the steel bar, install the conical support on the lower part of the steel bar, and insert the grouting pipe of the grouting device into the grouting port of the side wall of the conical support; Step 2: Use a grouting device to inject slurry into the grouting pipe, grouting from bottom to top, and make sure that the grouting pipe cannot exceed the grouting liquid surface. When the slurry cannot be injected further, slowly pull out the grouting pipe and seal the grouting port with a rubber plug; after a period of time, open the grouting port at the same position, insert the grouting pipe and repeat the grouting, so that the slurry fills the cracks; Step 3, invert the whole, wait until the slurry is in a semi-solidified state, remove the conical support, clean up the excess slurry, seal the annular crack formed by the conical support with medical tape, and apply magnesium carbonate cement to seal the crack; Step 4, after curing until the slurry solidifies, remove the cross bracket and clean the surface residue; The grouting device suitable for the pull-out test of grouting reinforced concrete comprises a cross bracket, a conical support and a grouting device, wherein the cross bracket comprises a cross bar and a vertical bar penetrating the cross bar, the vertical bar is a hollow structure, which is inserted into the upper part of the steel bar, and the cross bar is located at the top of the concrete and is used to fix the vertical bar; the conical support is installed at the lower part of the steel bar, and the bottom surface of the conical support contacts the bottom surface of the concrete; the side wall of the conical support is provided with a grouting port for inserting a grouting pipe of the grouting device; A rubber ring is arranged at the contact point between the conical support and the steel bar.
2. The grouting method of the grouting device suitable for grouting reinforced concrete pull-out test according to claim 1, characterized in that: The overlapping length between the vertical rod and the steel bar is 5 times the diameter of the steel bar.
3. The grouting method of the grouting device suitable for grouting reinforced concrete pull-out test according to claim 1, characterized in that: The gap between the conical support and the concrete is sealed with magnesium carbonate cement.
4. The grouting method of the grouting device suitable for grouting reinforced concrete pull-out test according to claim 1, characterized in that: In the step 1, a rubber ring is used to seal the gap between the conical support and the steel bar, and magnesium carbonate cement is used to seal the gap between the conical support and the concrete.
5. The grouting method of the grouting device suitable for grouting reinforced concrete pull-out test according to claim 4, characterized in that: In step 2, before injecting the slurry, first apply soapy water to the magnesium carbonate cement seal, inject air into the grouting pipe with a grouting device, and observe whether there is any leakage. If there is any leakage, fill it with magnesium carbonate cement until there is no leakage.