A valve control method and valve
By predicting the heating heat load and heating power, automatically adjusting the valve opening to solve the problem of uneven heat distribution in the heating system, achieving uniform adjustment of indoor temperature, improving user comfort and energy utilization efficiency, and avoiding the need for sensors Automatic control failure caused by fault.
Patent Information
- Application Number
- CN201910726854.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-08-07
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2039-08-07
AI Technical Summary
There is a problem of uneven distribution of heat supply in my country's heating system, causing the temperature in some rooms to be too low or too high, affecting user comfort and causing energy waste. In addition, the heat price system billed by heat has not been effectively implemented, resulting in heat meters Resources are idle and investments are wasted.
By obtaining meteorological parameters and building envelope parameters, the heating heat load is predicted, the valve opening control parameters are determined based on the heating power and heating heat load, and the valve opening is automatically adjusted to control the heat supply and achieve uniform adjustment of indoor temperature.
It improves user comfort, saves heat resources, avoids energy waste, and eliminates the need to install temperature sensors indoors, avoiding automatic control failures caused by sensor failures.
Smart Images

Figure CN110345256B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of heating, and in particular to a valve control method and a valve. Background Art
[0002] At present, the hydraulic imbalance of the courtyard pipe network side of my country's heating system is serious, resulting in uneven distribution of heat supply. The temperature of some rooms is too low, below 16°C, and that of some rooms is too high, reaching 26°C. This situation not only makes the user's comfort poor, but also the low temperature is easy to cause colds, endangering the user's health, and the high temperature will cause energy waste. In order to avoid the waste of heating energy, many cities have implemented a heat price system based on heat, forcing new heating systems to install household heat meters to realize heat-based charging. However, although a large number of heat meters have been installed, charging by heat has hardly been implemented, resulting in a large number of heat meter resources being idle and a waste of investment. Summary of the invention
[0003] In view of this, the present invention provides a valve control method and a valve, which can automatically control the opening of the valve to control the heating amount according to different users' requirements on indoor temperature.
[0004] In a first aspect, an embodiment of the present invention provides a valve control method for controlling a valve in a heating system, the method comprising:
[0005] Obtain meteorological parameters, building envelope parameters, and desired temperature targets;
[0006] Predict heating loads based on meteorological parameters, building envelope parameters, and desired temperature targets;
[0007] Obtain heating power;
[0008] Determining valve opening control parameters according to the heating power and the heating heat load;
[0009] The opening of the valve is controlled according to the valve opening control parameter.
[0010] Preferably, the meteorological parameters include horizontal solar radiation intensity and outdoor air temperature, the building envelope parameters include window shading coefficients, and the heating heat load is calculated by the following formula:
[0011] Q = a(t i -t o ) 2 +b(t i -t o )+c-rS;
[0012] Wherein, Q is the heating heat load of the user controlled by the valve; a, b and c are the predetermined regression coefficients of the heating heat load; ti is the indoor target temperature that the user controlled by the valve expects to achieve; t o is the outdoor air temperature; r is the shading coefficient of the window; S is the solar radiation intensity on the horizontal plane.
[0013] Preferably, the obtaining of heating power comprises:
[0014] Read the heating power from the heat meter.
[0015] Preferably, the valve opening control parameter is determined according to the heating power and the heating heat load as follows:
[0016] The valve opening control parameter is determined according to the difference between the heating power and the heating heat load.
[0017] Preferably, the relationship between the valve opening control parameter and the heating power and the heating heat load is:
[0018]
[0019] Where V is the valve opening or the on-off time ratio; K is the predetermined proportional magnification factor; Q P is the heating heat load; Q m is the heating power; T I is the predetermined integration time constant; T D is the predetermined differential time constant; τ is the time from the start of the control process to the current moment.
[0020] In a second aspect, an embodiment of the present invention provides a valve, comprising:
[0021] A valve body having a water inlet, a water outlet, and a passage connecting the water inlet and the water outlet;
[0022] A first valve core; disposed at a first side of the channel;
[0023] a second valve core, disposed on a second side of the channel;
[0024] an electric actuator connected to the first valve core, the electric actuator being configured to drive the first valve core to adjust the opening of the first valve core;
[0025] an adjusting knob connected to the second valve core and used for adjusting the opening of the second valve core; and
[0026] a dial configured to indicate the opening of the second valve core;
[0027] A controller is configured to execute the following steps to control the opening of the first valve core:
[0028] receiving meteorological parameters, building envelope parameters, and desired temperature targets;
[0029] Predict heating loads based on meteorological parameters, building envelope parameters, and desired temperature targets;
[0030] Get heating power;
[0031] Determining valve opening control parameters according to the heating power and the heating heat load;
[0032] The opening of the first valve core is controlled according to the valve opening control parameter.
[0033] Preferably, the meteorological parameters include horizontal solar radiation intensity and outdoor air temperature, and the building envelope parameters include window shading coefficients;
[0034] The controller is configured to obtain the heating heat load through the following formula:
[0035] Q = a(t i -t o ) 2 +b(t i -t o )+c-rS;
[0036] Wherein, Q is the heating heat load of the user controlled by the valve; a, b and c are the predetermined regression coefficients of the heating heat load; t i is the indoor target temperature that the user controlled by the valve expects to achieve; t o is the outdoor air temperature; r is the shading coefficient of the window; S is the solar radiation intensity on the horizontal plane.
[0037] Preferably, the controller is configured to obtain the heating power according to a measurement value of a heat meter.
[0038] Preferably, the controller is configured to determine the valve opening control parameter according to the difference between the heating power and the heating heat load; wherein the relationship between the valve opening control parameter and the heating power and the heating heat load is:
[0039]
[0040] Where V is the valve opening or the on-off time ratio; K is the predetermined proportional magnification factor; Q P is the heating heat load; Q m is the heating power; T I is the predetermined integration time constant; T D is the predetermined differential time constant; τ is the time from the start of the control process to the current moment.
[0041] Preferably, the electric actuator is further configured as:
[0042] The valve opening control parameter determined by the controller is received.
[0043] The embodiment of the present invention provides a valve control method and a valve, which are suitable for use in the field of heating technology. The valve opening can be automatically adjusted to control the heating power obtained from the heat meter and the predicted heating heat load according to the degree of compliance, so that the indoor temperature is maintained within the temperature range preset by the user, which can improve the user's comfort, save heat resources, and avoid energy waste. At the same time, the technical solution of the embodiment of the present invention does not require the installation of a temperature sensor indoors, avoiding the problem of automatic control failure due to the failure of the indoor temperature sensor. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] The above and other objects, features and advantages of the present invention will become more apparent through the following description of the embodiments of the present invention with reference to the accompanying drawings, in which:
[0045] Figure 1 is a structural diagram of a valve control system according to an embodiment of the present invention;
[0046] Figure 2 is a flow chart of a valve control method according to an embodiment of the present invention;
[0047] Figure 3 is a schematic structural diagram of a valve according to an embodiment of the present invention;
[0048] Description of reference numerals:
[0049] 1-valve body; 11-water inlet; 12-water outlet; 13-channel; 2-first valve core; 3-second valve core; 4-electric actuator; 5-adjusting knob; 6-dial. DETAILED DESCRIPTION
[0050] The present invention is described below based on embodiments, but the present invention is not limited to these embodiments. In the detailed description of the present invention below, some specific details are described in detail. It is possible for a person skilled in the art to fully understand the present invention without the description of these details. In order to avoid confusing the essence of the present invention, known methods, processes, flows, components and circuits are not described in detail.
[0051] In addition, persons of ordinary skill in the art will appreciate that the drawings provided herein are for illustration purposes and are not necessarily drawn to scale.
[0052] Unless the context clearly requires otherwise, throughout the specification and claims, the words "include", "comprising" and similar words should be interpreted in an inclusive sense rather than an exclusive or exhaustive sense; that is, in the sense of "including but not limited to".
[0053] In the description of the present invention, it should be understood that the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0054] The shading coefficient of a window is used to characterize the degree to which the window glass reduces the heat gain from solar radiation transmission without other shading measures. Its value is the ratio of the solar radiation heat gain through the window glass to the solar radiation heat gain through ordinary transparent window glass with a thickness of 3 mm.
[0055] Solar radiation intensity is a physical quantity that indicates the strength of solar radiation. It is called solar radiation intensity and its unit is W / m 2 The total solar radiation intensity is the sum of the direct solar radiation intensity and the diffuse solar radiation intensity.
[0056] Figure 1 is a structural diagram of a valve control system according to an embodiment of the present invention. Figure 1 As shown, the valve control system of this embodiment includes a heat meter, an outdoor meteorological parameter sensor, a processor, a PID controller and a valve. The heat meter is installed on the heating pipe of the heating user to obtain the heating power. The outdoor meteorological parameter sensor is installed outside the building, including a solar radiation intensity sensor and a temperature sensor, which are used to obtain meteorological parameters. The processor is connected to the outdoor meteorological parameter sensor, receives the meteorological parameters of the outdoor meteorological parameter sensor, receives the building envelope parameters input by a technician in this field and the desired temperature target input by the user, and calculates the heating heat load. The PID controller is connected to the heat meter, the processor and the valve. The valve is an electrically controlled valve. The PID controller receives the heating power measured by the heat meter and the heating heat load calculated by the processor, calculates the valve opening control parameter and controls the opening of the valve according to the valve opening control parameter.
[0057] PID controller (Proportion Integration Differentiation) consists of a proportional unit P, an integral unit I and a differential unit D. PID controllers are mainly suitable for systems with basic linearity and dynamic characteristics that do not change over time. PID controller is a common feedback loop component in industrial control applications. This controller compares the collected data with a reference value, and then uses the difference to calculate a new input value. The purpose of this new input value is to make the system data reach or remain at the reference value. Unlike other simple control operations, the PID controller can adjust the input value based on historical data and the occurrence rate of the difference, which can make the system more accurate and more stable.
[0058] Figure 2 1 is a flow chart of a valve control method according to an embodiment of the present invention. Figure 2 As shown, the valve control method of the embodiment of the present invention includes the following steps:
[0059] Step S100: Acquire meteorological parameters, building envelope parameters and desired temperature targets.
[0060] The meteorological parameters include horizontal plane solar radiation intensity and outdoor air temperature. The horizontal plane solar radiation intensity can be measured by a solar radiation intensity sensor arranged outside the building. Those skilled in the art can also determine the horizontal plane solar radiation intensity according to the "National Major Cities Winter and Summer Solar Radiation Intensity Table" in the "JGJ35-87 Building Meteorological Parameter Standard" issued by the Ministry of Urban and Rural Construction and Environmental Protection of the People's Republic of China, or refer to other studies on solar radiation intensity. The outdoor air temperature can be obtained by setting a temperature sensor outside the building, or obtaining the real-time outdoor air temperature from the local meteorological station.
[0061] In this embodiment, the building envelope structure parameters include the shading coefficient of the window. Those skilled in the art can calculate it according to the actual situation of the exterior window glass of the user's building, such as glass type, thickness, etc. Of course, the building envelope structure parameters can also include the heat transfer coefficient of the exterior wall, the window-to-wall area ratio, etc.
[0062] The desired temperature target is determined according to user requirements.
[0063] Step S200: predicting heating heat load according to meteorological parameters, building envelope parameters and desired temperature target.
[0064] The heating heat load can be calculated by the following formula:
[0065] Q = a(t i -t o ) 2+b(t i -t o )+c-rS;
[0066] Wherein, Q is the heating heat load of the user controlled by the valve; a, b and c are predetermined regression coefficients of the heating heat load, and their values are obtained by fitting according to the previous heating heat load calculation results; t i is the indoor target temperature that the user controlled by the valve expects to achieve; t o is the outdoor air temperature; r is the shading coefficient of the window; S is the solar radiation intensity on the horizontal plane.
[0067] Those skilled in the art may also modify the above formula to calculate the heating heat load according to actual conditions and other correction items, such as cold air penetration, etc.
[0068] Step S300, obtaining heating power.
[0069] The heating power is measured by a heat meter installed on the user's heating pipe.
[0070] Step S400: determining a valve opening control parameter according to the heating power and the heating heat load.
[0071] The valve opening control parameter can be calculated by the PID controller according to the following formula:
[0072]
[0073] Where V is the valve opening or the on-off time ratio; K is the predetermined proportional magnification factor; Q P is the heating heat load; Q m is the heating power; T I is the predetermined integration time constant; T D is the predetermined differential time constant; τ is the time from the start of the control process to the current moment.
[0074] Step S500: controlling the opening of the valve according to the valve opening control parameter.
[0075] The PID controller controls the opening of the electronically controlled valve according to the calculated valve opening control parameter.
[0076] The above steps S100 to S500 are cyclically performed after the control process starts, and the cycle can be determined by those skilled in the art according to actual conditions.
[0077] It should be understood that the valve control method of the embodiment of the present invention is not necessarily performed strictly according to the above steps, and some adaptive adjustments may also be made, for example, step S300 and step S100 may be performed simultaneously.
[0078] Figure 3 Schematic diagram of the structure of the valve of the embodiment of the present invention. Figure 3 As shown, the valve of this embodiment is arranged on a heating pipe, and the valve comprises a valve body 1, a first valve core 2, a second valve core 3, an electric actuator 4, an adjusting knob 5, a dial 6 and a controller. The valve body 1 comprises a water inlet 11, a water outlet 12 and a channel 13 connecting the water inlet 11 and the water outlet 12. The first valve core 2 and the second valve core 3 are arranged on both sides of the channel 13 respectively. When any one of the first valve core 2 or the second valve core 3 or the first valve core 2 and the second valve core 3 are both in a fully closed state, the fluid in the pipeline cannot reach the water outlet 12 from the water inlet 11. The electric actuator 4 is connected to the first valve core 2, and the controller is connected to the electric actuator 4 to control the electric actuator 4 to change the opening of the first valve core 2. The adjusting knob 5 is connected to the second valve core 3 for adjusting the opening of the second valve core 3, and the dial 6 is arranged at the adjusting knob 5 for indicating the opening of the second valve core 3.
[0079] In this embodiment, the valve may be in the form of a gate valve, a butterfly valve or a ball valve, etc., and those skilled in the art may select the valve according to actual needs. The opening of the second valve core 3 may be adjusted by operating the adjustment knob 5 according to the upper limit of the indoor temperature desired by the user. Optionally, a second electric actuator may be provided to be connected to the second valve core 3, and the controller controls the second electric actuator to adjust the opening of the second valve core 3 according to the upper limit of the indoor temperature input by the user. The second valve core 3 may also be manually adjusted or shut down by the user or maintenance personnel when the first valve core 2, the electric actuator 4 or the controller fails or is under maintenance, so as to ensure the safety of the use and maintenance process.
[0080] The controller may be an independent processor or a collection of multiple processors. In this embodiment, the controller includes a PID controller, which is connected to the heat meter in the heating pipe and the valve. A person skilled in the art may determine meteorological parameters and building envelope parameters according to the method in step S100 of the above valve control method flow, and input the meteorological parameters into the controller, for example, by connecting a solar radiation intensity sensor and an outdoor temperature sensor to the controller and transmitting relevant data to the controller. The controller executes step S200 of the above method flow to calculate the heating heat load.
[0081] The PID controller calculates the valve opening control parameter according to the following formula based on the heating power measured by the heat meter and the heating heat load calculated by the controller:
[0082]
[0083] Where V is the valve opening or the on-off time ratio; K is the predetermined proportional magnification factor; QP is the heating heat load; Q m is the heating power; T I is the predetermined integration time constant; T D is the predetermined differential time constant; τ is the time from the start of the control process to the current moment.
[0084] The PID controller controls the electric actuator 4 to drive the second valve core 3 to move according to the calculated valve opening control parameter, adjusts the opening of the second valve core 3, and thus adjusts the heating supply of the heating pipe to keep the indoor temperature within the temperature range set by the user.
[0085] In this embodiment, the valve can also automatically adjust the hydraulic balance of the heating network. The controller is also configured to calculate the hydraulic balance valve core position of the valve according to the hydraulic balance status of the network, and control the opening of the first valve core 2 and / or the second valve core 3 according to the hydraulic balance valve core position to achieve hydraulic balance in the heating network, so that the heating network can stably deliver the required amount of water to the end user according to the load changes of each end user. The hydraulic balance valve core position can be calculated according to the following formula:
[0086]
[0087] Among them, k b is the hydraulic balance spool position of the valve; ΔP v,r is the design water flow resistance of the valve; ΔP v is the heating water flow resistance of the valve, ΔP v It can be calculated by the following formula:
[0088] ΔP v =ΔP max -ΔP p
[0089] Where ΔP max is the water circulation resistance of the most unfavorable branch of the heating network; ΔP p It is the pipe resistance of the heating branch where the valve is located.
[0090] A valve control method and valve provided in an embodiment of the present invention are suitable for application in the field of heating technology. The valve opening can be automatically adjusted to control the heating power obtained from the heat meter and the predicted heating heat load according to the degree of compliance, so that the indoor temperature is maintained within the temperature range preset by the user, which can improve the user's comfort, save heat resources, and avoid energy waste. At the same time, the technical solution of the embodiment of the present invention does not require the installation of a temperature sensor indoors, avoiding the problem of automatic control failure due to the failure of the indoor temperature sensor.
[0091] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A valve control method for controlling a valve in a heating system, wherein the valve comprises a first valve core and a second valve core, wherein: The method comprises: Obtain meteorological parameters, building envelope parameters, and desired temperature targets; Predict heating loads based on meteorological parameters, building envelope parameters, and desired temperature targets; Obtain heating power; Determining valve opening control parameters according to the heating power and the heating heat load; controlling the opening of the second valve core according to the desired temperature target; The opening of the first valve core is controlled according to the valve opening control parameter, and the first valve core and the second valve core simultaneously determine the overall opening of the valve.
2. The method according to claim 1, characterized in that: The meteorological parameters include the horizontal solar radiation intensity and the outdoor air temperature, the building envelope parameters include the shading coefficient of the windows, and the heating heat load is calculated by the following formula: Q=a(t i -t o ) 2 +b(t i -t o )+c-rS; Wherein, Q is the heating heat load of the user controlled by the valve; a, b and c are the predetermined regression coefficients of the heating heat load; t i is the indoor target temperature that the user controlled by the valve expects to achieve; t o is the outdoor air temperature; r is the shading coefficient of the window; S is the horizontal solar radiation intensity.
3. The method according to claim 1, characterized in that The obtaining of heating power comprises: Read the heating power from the heat meter.
4. The method according to claim 1, characterized in that: The valve opening control parameters determined according to the heating power and the heating heat load are specifically: The valve opening control parameter is determined according to the difference between the heating power and the heating heat load.
5. The method according to claim 4, characterized in that The relationship between the valve opening control parameter and the heating power and the heating heat load is: Where V is the valve opening or the on-off time ratio; K is the predetermined proportional magnification factor; Q P is the heating heat load; Q m is the heating power; T I is the predetermined integration time constant; T D is the predetermined differential time constant; τ is the time from the start of the control process to the current moment.
6. A valve, characterized in that: include: A valve body (1) having a water inlet (11), a water outlet (12), and a channel (13) connecting the water inlet (11) and the water outlet (12); A first valve core (2) is arranged on a first side of the channel (13); A second valve core (3) is arranged on a second side of the channel (13), wherein the first valve core (2) and the second valve core (3) simultaneously determine the overall opening of the valve; An electric actuator (4) connected to the first valve core (2), the electric actuator (4) being configured to drive the first valve core (2) to adjust the opening of the first valve core (2); an adjusting knob (5), connected to the second valve core (3), and used for adjusting the opening of the second valve core (3), wherein the opening of the second valve core (3) is controlled according to a desired temperature target; as well as a dial (6) configured to indicate the opening of the second valve core (3); A controller, wherein the controller is configured to execute the following steps to control the opening of the first valve core (2): receiving meteorological parameters, building envelope parameters, and desired temperature targets; Predict heating loads based on meteorological parameters, building envelope parameters, and desired temperature targets; Obtain heating power; Determining valve opening control parameters according to the heating power and the heating heat load; The opening of the first valve core (2) is controlled according to the valve opening control parameter.
7. The valve according to claim 6, characterized in that The meteorological parameters include horizontal solar radiation intensity and outdoor air temperature, and the building envelope parameters include window shading coefficients; The controller is configured to obtain the heating heat load through the following formula: Q=a(t i -t o ) 2 +b(t i -t o )+c-rS; Wherein, Q is the heating heat load of the user controlled by the valve; a, b and c are the predetermined regression coefficients of the heating heat load; t i is the indoor target temperature that the user controlled by the valve expects to achieve; t o is the outdoor air temperature; r is the shading coefficient of the window; S is the horizontal solar radiation intensity.
8. The valve according to claim 7, characterized in that The controller is configured to obtain the heating power according to a measurement value of a heat meter.
9. The valve according to claim 8, characterized in that The controller is configured to determine a valve opening control parameter according to a difference between the heating power and the heating heat load; wherein the relationship between the valve opening control parameter and the heating power and the heating heat load is: Where V is the valve opening or the on-off time ratio; K is the predetermined proportional magnification factor; Q P is the heating heat load; Q m is the heating power; T I is the predetermined integration time constant; T D is the predetermined differential time constant; τ is the time from the start of the control process to the current moment.
10. The valve according to claim 6, characterized in that The electric actuator (4) is further configured as follows: The valve opening control parameter determined by the controller is received.
Citation Information
Patent Citations
Fluid valve with integrated safety shut-off device
CN102272497A
Centralized heating public building heat supply energy-saving control method
CN102865623A
Heat supply method, device and system based on building heat supply load forecasting
CN108240679A