A production line and production method for web beam

By designing an automated production line and using resistance welding and automated equipment for bending, cutting and welding of web beams, the problems of low production efficiency and insufficient material utilization in the existing technology have been solved, and the continuity of the production process and the accuracy of the finished product have been achieved. consistency and uniformity.

CN110449994BActive Publication Date: 2024-10-15JINAN YIZHONG SCI & TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910664644.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-23
Publication Date
2024-10-15
Estimated Expiration
2039-07-23

AI Technical Summary

Technical Problem

The existing manufacturing method of steel tube reinforced web beams has low efficiency and insufficient material utilization, resulting in inaccurate dimensions, uneven installation and uneven stress.

Method used

A production line including an upper chord preparation device, a lower chord preparation device, a web preparation device, a finished product supporting device, a control system and a welding device is designed. Resistance welding and automation equipment are used for continuous production to achieve bending, cutting and welding. Ensure the continuity and accuracy of the production process.

Benefits of technology

It improves the production efficiency of web beams, ensures the accuracy of the finished product's outer dimensions and web beam positions, and ensures the smoothness of the shed surface and the uniformity of stress during installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110449994B_ABST
    Figure CN110449994B_ABST
Patent Text Reader

Abstract

The present invention relates to a production line and production method of a web beam, comprising an upper chord preparation device, a lower chord preparation device, a web beam preparation device, a finished product supporting device, a control system, a welding device, a web beam shaping and transporting device, wherein the above-mentioned equipment is arranged in two layers, wherein the upper chord preparation device, the lower chord preparation device, and the welding device are located in the upper layer, and the web beam shaping and transporting device is located between the upper layer and the lower layer. In the present invention, the materials of the upper chord, the lower chord, and the web beam are fed into the production line by a conveying device, cut and bent into the upper chord, the lower chord, and the web beam according to a preset shape, and then the chord and the web beam are welded into a web beam by a welding device, and the finished web beam is received by a finished product bracket and transported to the end of the production line. During the production process, the web beam does not need to be turned over, thereby improving production efficiency, and the finished web beam has accurate external dimensions and web beam positions, and the installed shed surface is flat and evenly stressed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mechanical equipment, and in particular to a production line and a production method of a web beam. Background Art

[0002] The load-bearing beams of greenhouses are generally made of space web beams or plane web beams welded with steel pipes and steel bars. The upper chord of the web beam is a steel pipe, the lower chord is a steel pipe or steel bar, and the web is a steel bar. The upper and lower chords and webs are fixed by welding. This type of web beam is characterized by saving materials, strong load capacity, and not easy to deform.

[0003] At present, the method of making steel tube reinforced web beams is to bend the upper and lower chords and webs into shape and then fix them on the welding mold, and then use manual arc welding to weld the chords and webs on both sides, that is, after one side is welded, the whole is turned over and the other side is welded. The disadvantages of this method are: the web beam production takes a long time and is inefficient; after arc welding, post-processing such as slag removal and spatter removal is required, which takes up a lot of manpower; the external dimensions and web position deviations of the product are large, the installed shed surface is uneven, and the force is uneven. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a production line and a production method for web beams, which can continuously produce spatial web beams or plane web beams of predetermined shapes.

[0005] The technical solution adopted by the present invention to solve its technical problems is: a production line of web beams, including an upper chord preparation device, a lower chord preparation device, a web preparation device, a finished product supporting device, a control system, a welding device, a web shaping and transporting device, wherein the upper chord preparation device, the lower chord preparation device, and the welding device are located on the upper layer, the web preparation device is located on the lower layer, the upper chord preparation device and the lower chord preparation device are both provided with welding devices behind them, the web shaping and transporting device is located between the upper layer and the lower layer, the web shaping and transporting device is delivered to the welding position of the upper layer, and the welding device welds and fixes the web to the upper and lower chords. The finished product supporting device includes at least two movable finished product brackets, and the control system controls the upper chord preparation device, the lower chord preparation device, the web preparation device, the finished product supporting device, the web shaping and transporting device respectively.

[0006] Specifically, the welding device adopts a resistance welding device, including a fixed frame, an automatic telescopic rod, a movable welding head, a fixed welding head, and a welding transformer. The bottom of the automatic telescopic rod is hinged on the fixed frame, the top of the automatic telescopic rod is connected to one end of the robotic arm, the other end of the robotic arm is connected to the movable welding head, the fixed welding head is installed on the fixed frame, the movable welding head and the fixed welding head are both electrically connected to the welding transformer, and the parts to be welded are welded together through the movable welding head and the fixed welding head. The automatic telescopic rod adopts a cylinder, an electric push rod or a hydraulic cylinder.

[0007] Specifically, a painting device is arranged behind the welding device.

[0008] Specifically, the upper chord preparation device includes upper chord rollers, an upper chord conveying device, an upper chord length measuring device, and an upper chord bending device, which are arranged in sequence from front to back; two welding devices are arranged in sequence behind the upper chord bending device, which are arranged in sequence from front to back as an upper chord and web bar welding device H1 and an upper chord and web bar welding device H2; two painting devices are arranged in sequence behind the upper chord and web bar welding device H2, which are arranged in sequence from front to back as an upper chord painting device P1 and an upper chord painting device P2; an upper chord pressing and fixing device is arranged in front of the upper chord and web bar welding device H1, and an upper chord pressing and fixing device is arranged behind the upper chord and web bar welding device H2.

[0009] Specifically, the lower chord preparation device includes lower chord rollers, a lower chord conveying device, and a lower chord bending device which are arranged in sequence from front to back; a lower chord and web welding device is arranged behind the lower chord bending device; and a lower chord and web painting device is arranged behind the lower chord and web welding device.

[0010] Specifically, the web preparation device includes a web conveying device, a web length measuring device, and a web bending device which are arranged in sequence from front to back. A web cutting device is arranged behind the web bending device. The web conveying device adopts a relatively straight and integrated conveying device.

[0011] A method for producing a web beam comprises the following steps:

[0012] S1 Preparation

[0013] The upper chord material is placed in the initial position of the upper chord preparation device, and the upper chord material passes through the upper chord roller, the upper chord conveying device, and the upper chord metering device to reach the upper chord bending device. The upper chord bending device bends the upper chord material according to the set curvature and conveys it to the upper chord and web welding device and the upper chord and web welding device. At this time, the upper chord pressing and fixing device and the upper chord pressing and fixing device press the upper chord material;

[0014] The lower chord material is placed in the initial position of the lower chord preparation device, and the front end of the lower chord material passes through the lower chord roller and the lower chord conveying device to reach the lower chord bending device, and the lower chord bending device bends the upper chord material according to the set curvature and conveys it to the lower chord and web welding device;

[0015] At the same time, the web material is delivered to the web bending device by the web conveying device and the web length measuring device, and is measured by the web length measuring device. The web bending device bends the web material according to the set parameters to produce a formed web, and the formed web is cut by the web cutting device.

[0016] S2 welding

[0017] The formed web is transported from the web preparation device at the lower layer to the position where the formed web and the upper chord material need to be welded and the position where the formed web and the lower chord material need to be welded by the web shaping and transporting device, and the welding operation is performed. At the same time, the web preparation device starts to prepare the second web.

[0018] S3 spray paint

[0019] The upper chord conveying device drives the upper chord material forward, and drives the lower chord material forward to reach the set position. At this time, the upper chord painting device and the lower chord painting device are facing the welding point to spray paint the welding point. During the welding process, the second formed web is prepared, and S2 and S3 are repeated;

[0020] In this way, the production is continued, and the front-end formed web beam reaches the finished product supporting device, and the finished product supporting device carries the formed web beam to extend toward the end of the production line until the web beam of the set length is completed.

[0021] Specifically, the manufacturing process of the V-shaped forming web in S1 is as follows:

[0022] f1 The web material is delivered to the web bending device 21 through the web conveying device and the web length measuring device;

[0023] f2 The web bending device rotates clockwise to bend the front end of the web material;

[0024] The f3 web conveying device continues to convey the web material, and the web length measuring device measures it to the set bending position;

[0025] The f4 web bending device rotates counterclockwise to bend the web material in the opposite direction to the bending direction of the front end;

[0026] f5 The web conveying device continues to convey the web material until it reaches the set length after being measured by the web length measuring device;

[0027] The f6 web bending device rotates clockwise to bend the rear end of the web material;

[0028] After the f7 web is formed, the web cutting device is started to cut the formed web.

[0029] Specifically, when the web bending device rotates from clockwise to counterclockwise, the center of rotation moves from one side of the web material to the other side, thereby achieving bending in different directions.

[0030] The beneficial effects of the present invention are as follows: the production line can pre-set parameters such as the cross-sectional shape, material specifications of the upper chord, lower chord and web, the spacing between the upper and lower chords, and the web pitch in the control system; the materials of the upper chord, lower chord and web such as steel pipes and steel bars are fed into the production line by a conveying device, measured by a length measuring device, and cut and bent into the upper chord, lower chord and web according to the shapes pre-set in the control system; the chord and web are then welded into a web beam by a welding device; the finished web beam is received by a finished product bracket and conveyed to the end of the production line; such measuring, cutting, bending and welding are continuous and step-by-step; the web beam does not need to be turned over during the production process, thereby improving production efficiency; the production process is neat and tidy, the outer dimensions and web positions of the finished web beam are accurate, the installed shed surface is flat, and the force is evenly distributed. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is the front view of plane web beam a;

[0032] Figure 2 It is the AA structural diagram of the plane web beam a;

[0033] Figure 3 is a schematic diagram of the web structure of the plane web beam a;

[0034] Figure 4 It is the front view of the plane web beam b;

[0035] Figure 5 It is the BB structural diagram of the plane web beam b;

[0036] Figure 6 is a schematic diagram of the web structure of the plane web beam b;

[0037] Figure 7 It is the front view of the triangular cross-section web beam c;

[0038] Figure 8 It is a top view of the triangular cross-section web beam c;

[0039] Fig. 9 It is a schematic diagram of the CC direction structure of the triangular cross-section web beam c.

[0040] Fig.10 Schematic diagram of the web structure of a triangular cross-section web beam c

[0041] Fig.11 It is the front view of the triangular cross-section web beam d;

[0042] Fig.12It is a top view of the triangular cross-section web beam d;

[0043] Fig.13 It is the structural diagram of the DD direction of the triangular cross-section web beam d;

[0044] Fig.14 Schematic diagram of the web structure of the triangular cross-section web beam d;

[0045] Fig.15 This is a schematic diagram of the production line structure of the present invention, which shows the initial position during production;

[0046] Fig.16 This is the belly rod manufacturing step f1 in the production process of the present invention;

[0047] Fig.17 This is the belly rod manufacturing step f2 in the production process of the present invention;

[0048] Fig.18 This is the belly rod manufacturing step f3 in the production process of the present invention;

[0049] Fig.19 This is the belly rod manufacturing step f4 in the production process of the present invention;

[0050] Fig. 20 This is the belly rod manufacturing step f5 in the production process of the present invention;

[0051] Fig.21 This is the belly rod manufacturing step f6 in the production process of the present invention;

[0052] Fig. 22 This is the belly rod manufacturing step f7 in the production process of the present invention;

[0053] Fig.23 It is a schematic diagram of the welding process of the web member, the upper chord member and the lower chord member formed in the production process of the present invention;

[0054] Fig.24 It is a schematic diagram of the upper chord rod and the lower chord rod being transported backward after being welded in the production process of the present invention;

[0055] Fig.25 This is a schematic diagram of the first web being welded and then entering the painting process during the production process of the present invention, and the second web being manufactured;

[0056] Fig.26 In the production process of the present invention, the first web is subjected to painting, the second web enters the welding position, and the third web begins to be produced;

[0057] Fig. 27 This is a schematic diagram of the second web being welded and then entering the painting process during the production process of the present invention, and the third web being manufactured;

[0058] Fig.28 During the production process of the present invention, the second web is sprayed with paint, the third web enters the welding position, the fourth web begins to be produced, and the first web is partially transported by the finished product bracket;

[0059] Fig.29 In the production process of the present invention, the formed web beam is supported by the finished product brackets T3 and T4 and transported out of the production line.

[0060] Fig.30 It is a schematic structural diagram of the resistance welding device of the present invention.

[0061] Fig.31 It is a schematic diagram of the resistance welding device of the present invention during welding.

[0062] In the figure

[0063] 1 Upper chord rod roller, 2 Upper chord rod conveying device, 3 Upper chord rod length measuring device, 4 Upper chord rod bending device, 5 Upper chord rod clamping and fixing device, 6 Upper chord rod and belly rod welding device H1, 7 Upper chord rod and belly rod welding device H2, 8 Upper chord rod clamping and fixing device, 9 Upper chord rod painting device P1, 10 Upper chord rod painting device P1, 11 control system, 12 finished product bracket, 13 finished product bracket T4, 14 lower chord rod material roller T2, 15 - lower chord rod Conveying device S2, 16-lower chord bending device W2, 17-lower chord and web welding device 3H, 18-lower chord painting device, 19-web straightening and conveying device Z1, 20-web length measuring device J2, 21-web bending device W3, 22-web cutting device Q1, 23-web shaping and transporting device Y1, 24-molding web F1, 25-upper chord material, 26-lower chord material, 27-web material. DETAILED DESCRIPTION

[0064] The present invention will now be described in further detail with reference to the accompanying drawings.

[0065] The current web beams are plane web beams and space web beams, which are divided into many types according to the different materials used. The plane web beams include plane web beams a (such as Figure 1 , 2 , 3), plane web beam b (as shown Figure 4 , 5, 6), wherein the plane web beam a includes a steel tube upper chord a1, a steel bar web a2, a steel bar lower chord a3, and a welding point a4; the plane web beam b includes a steel tube upper chord b1, a steel bar web b2, a steel tube lower chord b3, and a welding point b4; the space web beam includes a triangular cross-section space web beam c and a space web beam d, wherein the space web beam c includes a steel tube upper chord c1, a steel bar lower chord c2, a steel bar web c3, and a welding point c4, wherein the steel bar web c3 is composed of a plurality of triangular single webs c5; the space web beam d includes a steel tube upper chord d1, a steel tube lower chord d2, a steel bar web d3, and a welding point d4, wherein the steel bar web d3 is composed of a plurality of triangular single webs c5.

[0066] A production line for producing a web beam with the above web beam comprises an upper chord preparation device, a lower chord preparation device, a web beam preparation device, a finished product supporting device, a control system, a welding device, a web beam shaping and transporting device, wherein the upper chord preparation device, the lower chord preparation device, and the welding device are located on the upper layer, and the web beam preparation device is located on the lower layer, and welding devices are provided behind the upper chord preparation device and the lower chord preparation device, the web beam shaping and transporting device is located between the upper layer and the lower layer, the web beam shaping and transporting device is delivered to the welding position of the upper layer, and the welding device welds and fixes the web beam to the upper and lower chords, and the finished product supporting device comprises at least two movable finished product brackets, and the control system controls the upper chord preparation device, the lower chord preparation device, the web beam preparation device, the finished product supporting device, the web beam shaping and transporting device respectively. To meet different needs, the production line can pre-set parameters such as cross-sectional shape, material specifications of the upper chord, the lower chord and the web beam, the spacing between the upper and lower chords, and the web beam pitch in the control system.

[0067] Specifically, Fig.30 , 31 As shown, the welding device shown adopts a resistance welding device, including a fixed frame, an automatic telescopic rod 28, a movable welding head 30, a fixed welding head 31, and a welding transformer 29. The bottom of the automatic telescopic rod 28 is hinged on the fixed frame, the top of the automatic telescopic rod 28 is connected to one end of the mechanical arm, the other end of the mechanical arm is firmly connected to the movable welding head 30, and the fixed welding head 31 is installed on the fixed frame. The movable welding head 30 and the fixed welding head 31 are both electrically connected to the welding transformer 29, and the positions to be welded are welded together through the movable welding head 30 and the fixed welding head 31. The automatic telescopic rod adopts a cylinder, an electric push rod or a hydraulic cylinder.

[0068] Specifically, a painting device is arranged behind the welding device.

[0069] Specifically, the upper chord preparation device includes an upper chord roller 1, an upper chord conveying device 2, an upper chord length measuring device 3, and an upper chord bending device 4, which are arranged in sequence from front to back; two welding devices are arranged in sequence behind the upper chord bending device 4, which are arranged in sequence from front to back as an upper chord and web bar welding device H1 and an upper chord and web bar welding device H2; two painting devices are arranged in sequence behind the upper chord and web bar welding device H2, which are arranged in sequence from front to back as an upper chord painting device P1 and an upper chord painting device P2; an upper chord pressing and fixing device 5 is arranged in front of the upper chord and web bar welding device H1, and an upper chord pressing and fixing device 8 is arranged behind the upper chord and web bar welding device H2.

[0070] Specifically, the lower chord preparation device includes a lower chord roller 14, a lower chord conveying device 15, a lower chord bending device 16, and a lower chord and web welding device 17, which are arranged in sequence from front to back. A lower chord and web painting device 18 is arranged behind the lower chord and web welding device 17.

[0071] Specifically, the web preparation device includes a web conveying device 19, a web length measuring device 20, and a web bending device 21 which are arranged in sequence from front to back. A web cutting device is arranged behind the web bending device 21. The web conveying device adopts a relatively straight and integrated conveying device.

[0072] Specifically, the web bending device 21 includes a rotating wheel, a central column, and a pressure wheel. The central column is located at the center of the rotating wheel, and the pressure wheel is located on the rotating wheel surface on the same side as the central column. The web material passes between the central column and the pressure wheel, and the bending of the web material is achieved by the rotation of the pressure wheel around the central column.

[0073] A method for producing a web beam comprises the following steps:

[0074] S1 Preparation

[0075] The upper chord material 25 is placed into the initial position of the upper chord preparation device, and the upper chord material passes through the upper chord roller, the upper chord conveying device 2, and the upper chord metering device 3 to reach the upper chord bending device 4, and the upper chord bending device 4 bends the upper chord material according to the set curvature, and conveys it to the upper chord and web welding device 6 and the upper chord and web welding device 7, at which time the upper chord pressing and fixing device 5 and the upper chord pressing and fixing device 8 press the upper chord material;

[0076] The lower chord material 26 is placed in the initial position of the lower chord preparation device, and the front end of the lower chord material 26 passes through the lower chord roller 14 and the lower chord conveying device 15 to reach the lower chord bending device 16. The lower chord bending device 16 bends the upper chord material according to the set curvature and conveys it to the lower chord and web welding device 17;

[0077] At the same time, the web material is conveyed by the web conveying device 19 and the web length measuring device 20 to the web bending device 21, and is measured by the web length measuring device 20. The web bending device 21 bends the web material 27 according to the set parameters to produce a formed web 24, and the formed web 24 is cut by the web cutting device 22.

[0078] S2 welding

[0079] The formed web 24 is transported from the web preparation device of the lower layer to the upper layer by the web shaping and transporting device 23. The positions where the formed web 24 and the upper chord material 25 need to be welded are respectively sent to the upper chord and web welding device 6 and the upper chord and web welding device 7. The positions where the formed web 24 and the lower chord material 25 need to be welded are sent to the lower chord and web welding device 18 for welding. At the same time, the web preparation device starts to prepare the second web.

[0080] S3 spray paint

[0081] The upper chord conveying device 2 drives the upper chord material forward, and at the same time drives the lower chord material forward to reach the set position. At this time, the upper chord painting device 9, the upper chord painting device 10, and the lower chord painting device 18 are facing the welding point to spray paint the welding point. During the welding process, the second formed web is prepared, and S2 and S3 are repeated;

[0082] The front-end formed web beam reaches the finished product supporting device, and the finished product supporting device carries the formed web beam to extend toward the end of the production line until the web beam of the set length is completed.

[0083] Specifically, Figure 16-22 As shown, taking a V-shaped web as an example, the manufacturing process of the web in S1 is as follows:

[0084] f1 The web material is delivered from the web conveying device 19 and the web length measuring device 20 to the web bending device 21;

[0085] f2 The web bending device 21 rotates clockwise to bend the front end of the web material 27;

[0086] f3 The web conveying device 19 continues to convey the web material 27, which is measured by the web length measuring device 20 to reach the set bending position;

[0087] f4 The web bending device 21 rotates counterclockwise to bend the web material, and the bending direction is opposite to the bending direction of the front end;

[0088] f5 The web conveying device continues to convey the web material until it reaches the set length after being measured by the web length measuring device;

[0089] f6 The web member bending device 21 rotates clockwise to bend the rear end of the web member material 27;

[0090] After the f7 web is formed, the web cutting device is started to cut off the formed web 24.

[0091] Specifically, when the web bending device rotates from clockwise to counterclockwise, the pressure wheel at the center of the rotation circle moves from one side of the web material to the other side, thereby achieving bending in different directions.

[0092] The present invention is not limited to the described implementation modes, and anyone should be aware of the structural changes made under the enlightenment of the present invention. Any technical solutions that are the same or similar to the present invention fall within the protection scope of the present invention.

[0093] The techniques, shapes, and structural parts not described in detail in the present invention are all well-known techniques.

Claims

1. A web beam production line, characterized in that: It includes an upper chord preparation device, a lower chord preparation device, a web preparation device, a finished product supporting device, a control system, a welding device, a web shaping and transporting device, wherein the upper chord preparation device, the lower chord preparation device, and the welding device are located on the upper layer, the web preparation device is located on the lower layer, the upper chord preparation device and the lower chord preparation device are both provided with welding devices behind them, the web shaping and transporting device is located between the upper layer and the lower layer, the finished product supporting device includes at least two movable finished product brackets, and the control system controls the upper chord preparation device, the lower chord preparation device, the web preparation device, the finished product supporting device, the web shaping and transporting device respectively; The welding device adopts a resistance welding device, including a fixed frame, an automatic telescopic rod, a movable welding head, a fixed welding head, and a welding transformer. The bottom of the automatic telescopic rod is hinged on the fixed frame, the top of the automatic telescopic rod is connected to one end of the mechanical arm, the other end of the mechanical arm is connected to the movable welding head, the fixed welding head is installed on the fixed frame, the movable welding head and the fixed welding head are electrically connected to the welding transformer, and the positions to be welded are welded together through the movable welding head and the fixed welding head. The automatic telescopic rod adopts a cylinder, an electric push rod or a hydraulic cylinder; A painting device is arranged behind the welding device.

2. A web beam production line according to claim 1, characterized in that: The upper chord preparation device includes upper chord rollers, an upper chord conveying device, an upper chord length measuring device, and an upper chord bending device, which are arranged in sequence from front to back; two welding devices are arranged in sequence behind the upper chord bending device, which are arranged in sequence from front to back as an upper chord and web bar welding device H1 and an upper chord and web bar welding device H2; two painting devices are arranged in sequence behind the upper chord and web bar welding device H2, which are arranged in sequence as an upper chord painting device P1 and an upper chord painting device P2 from front to back; an upper chord pressing and fixing device is arranged in front of the upper chord and web bar welding device H1, and an upper chord pressing and fixing device is arranged behind the upper chord and web bar welding device H2.

3. The web beam production line according to claim 1, characterized in that: The lower chord preparation device includes lower chord rollers, a lower chord conveying device, and a lower chord bending device which are arranged in sequence from front to back; a lower chord and web welding device is arranged behind the lower chord bending device; and a lower chord and web painting device is arranged behind the lower chord and web welding device.

4. The web beam production line according to claim 1, characterized in that: The web preparation device comprises a web conveying device, a web length measuring device, and a web bending device which are arranged in sequence from front to back. A web cutting device is arranged behind the web bending device. The web conveying device adopts a relatively straight and integrated conveying device.

5. A method for producing a web beam, characterized in that: The following steps are involved: S1 Preparation The upper chord rod material is placed in the initial position of the upper chord rod preparation device, and the upper chord rod material passes through the upper chord rod roller, the upper chord rod conveying device, and the upper chord rod metering device to reach the upper chord rod bending device. The upper chord rod bending device bends the upper chord rod material according to the set curvature and conveys it to the upper chord rod and web rod welding device and the upper chord rod and web rod welding device. At this time, the upper chord rod pressing and fixing device presses the upper chord rod material; The lower chord material is placed in the initial position of the lower chord preparation device, and the front end of the lower chord material passes through the lower chord roller and the lower chord conveying device to reach the lower chord bending device, and the lower chord bending device bends the upper chord material according to the set curvature and conveys it to the lower chord and web welding device; At the same time, the web material is delivered to the web bending device through the web conveying device and the web length measuring device, and is measured by the web length measuring device. The web bending device bends the web material according to the set parameters to produce a formed web, and the formed web is cut by the web cutting device. S2 welding The formed web is transported from the web preparation device at the lower layer to the position where the formed web and the upper chord material need to be welded and the position where the formed web and the lower chord material need to be welded by the web shaping and transporting device, and the welding operation is performed. At the same time, the web preparation device starts to prepare the second web. S3 spray paint The upper chord conveying device drives the upper chord material forward, and drives the lower chord material forward to reach the set position. At this time, the upper chord painting device and the lower chord painting device are facing the welding point to spray paint the welding point. During the welding process, the second formed web is prepared, and S2 and S3 are repeated; In this way, the production is continued, and the front-end formed web beam reaches the finished product supporting device, and the finished product supporting device carries the formed web beam to extend toward the end of the production line until the web beam of the set length is completed.

6. The method for producing a web beam according to claim 5, characterized in that: The manufacturing process of the V-shaped forming web in S1 is as follows: f1 The web material is delivered to the web bending device through the web conveying device and the web length measuring device; f2 The web bending device rotates clockwise to bend the front end of the web material; The f3 web conveying device continues to convey the web material, and the web length measuring device measures it to the set bending position; The f4 web bending device rotates counterclockwise to bend the web material in the opposite direction to the bending direction of the front end; f5 The web conveying device continues to convey the web material until it reaches the set length after being measured by the web length measuring device; The f6 web bending device rotates clockwise to bend the rear end of the web material; After the f7 web is formed, the web cutting device is started to cut the formed web.