A wind turbine concrete tower forming machine

By designing a concrete tower forming machine for wind turbines, on-site automated casting and real-time inspection are achieved, solving the problems of high costs and low safety under prefabricated methods, reducing the cost of tower forming and improving overall safety.

CN110469115BActive Publication Date: 2024-11-01YANCHENG INST OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910802114.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-28
Publication Date
2024-11-01
Estimated Expiration
2039-08-28

AI Technical Summary

Technical Problem

The prefabricated method of existing wind turbine concrete towers leads to high costs, complex transportation and installation, and low matching on-site environment, making it difficult to achieve automated casting and real-time inspection, affecting the safety of the tower.

Method used

A concrete tower forming machine for wind turbines was designed, including tower forming machine bracket, concrete detection unit, steel structure laying unit, concrete pouring unit and tower forming machine control center to realize on-site automatic pouring and real-time inspection, and pass the tower The combination of frame forming machine bracket, concrete inspection unit, steel structure laying unit and concrete pouring unit is used to achieve automatic operation and real-time inspection using elevators, inspection units, welding units and pouring units, and in conjunction with the control center.

Benefits of technology

It realizes on-site automatic pouring of concrete towers, reduces transportation and installation steps, reduces costs, and ensures the overall safety of the tower through real-time inspection, saves human resources, and improves the quality and safety of tower forming.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110469115B_ABST
    Figure CN110469115B_ABST
Patent Text Reader

Abstract

The present invention discloses a wind turbine concrete tower forming machine, which belongs to the technical field of automated equipment, and comprises a tower forming machine bracket, a concrete detection unit, a steel structure laying unit, a concrete pouring unit and a tower forming machine control center. The present invention can not only realize the on-site automated pouring of the concrete tower, avoid the intermediate steps such as precast concrete transportation and installation, save human resources, and play a certain role in reducing the cost of concrete tower forming, but also realize the real-time online detection of the size, hardness and internal defects of the concrete tower during the forming period, thereby effectively ensuring the overall safety of the concrete tower.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of automation equipment, and in particular relates to a wind turbine generator concrete tower forming machine. Background Art

[0002] Compared with traditional wind power towers, concrete towers are widely used because of their lower price, more practical use, and easier transportation. Concrete towers are suitable for wind power generation. They can not only effectively increase the height of the wind turbine, but also reduce the vibration effect of the wind turbine, providing more and higher space for large blade applications. At present, concrete towers are mostly prefabricated, and the concrete towers are formed and installed by on-site piece-by-piece installation, which is costly and the prefabricated components have a low matching degree with the on-site environment. Summary of the invention

[0003] The purpose of the present invention is to solve the problems existing in the prior art and to propose a wind turbine concrete tower forming machine, the purpose of which is to realize on-site automated pouring of the concrete tower, save transportation and on-site installation links, and reduce the tower cost; to realize real-time detection of the concrete tower and effectively ensure the overall safety of the concrete tower.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A wind turbine concrete tower forming machine comprises a tower forming machine bracket, a concrete detection unit, a steel structure laying unit, a concrete pouring unit and a tower forming machine control center.

[0006] As a further preferred scheme, the tower forming machine support includes a support base, a support base fixed connection hole, a cylinder-type elevator, an elevator control port, a support top plate and a support top plate fixed connection hole; a plurality of support base fixed connection holes are distributed on the support base, a plurality of support top plate fixed connection holes are distributed on the support top plate, the cylinder-type elevator is located between the support base and the support top plate, and the cylinder-type elevator is provided with an elevator control port.

[0007] As a further preferred embodiment, the concrete detection unit consists of a detection unit output port, a detection unit chassis, a detection unit chassis fixing hole, a first detection unit vertical lifting rod, a first detection unit steering unit, a first detection unit horizontal telescopic rod, a second detection unit vertical lifting rod, a second detection unit steering unit, a concrete ultrasonic unit, a concrete rebound test unit and a concrete laser detection unit; the detection unit output port is located at the side of the detection unit chassis, the detection unit chassis fixing hole is located at the bottom of the detection unit chassis, the first detection unit vertical lifting rod is installed on the detection unit chassis, one end of the first detection unit steering unit is inserted into the first detection unit vertical lifting rod, one end of the first detection unit horizontal telescopic rod is inserted into the other end of the first detection unit steering unit, one end of the second detection unit vertical lifting rod is inserted into the other end of the first detection unit horizontal telescopic rod, the second detection unit steering unit is located at the other end of the second detection unit vertical lifting rod, and the concrete ultrasonic unit, the concrete rebound test unit and the concrete laser detection unit are all installed on the second detection unit steering unit.

[0008] As a further preferred solution, the steel structure laying unit includes a steel structure laying welding unit and a steel structure laying feeding unit;

[0009] The steel structure laying feeding unit comprises a steel structure laying welding unit output port, a steel structure laying welding unit chassis, a steel structure laying welding unit chassis fixing hole, a first steel structure laying welding unit vertical lifting rod, a first steel structure laying welding unit steering unit, a first steel structure laying welding unit horizontal telescopic rod, a second steel structure laying welding unit vertical lifting rod, a second steel structure laying welding unit steering unit and a steel structure laying welding unit welding head element; the steel structure laying welding unit output port is located at the side of the steel structure laying welding unit chassis, the steel structure laying welding unit chassis fixing hole is located at the bottom of the steel structure laying welding unit chassis, the first steel structure laying welding The vertical lifting rod of the connecting unit is installed on the chassis of the steel structure laying welding unit, one end of the steering unit of the first steel structure laying welding unit is inserted into the vertical lifting rod of the first steel structure laying welding unit, one end of the horizontal telescopic rod of the first steel structure laying welding unit is inserted into the other end of the steering unit of the first steel structure laying welding unit, one end of the vertical lifting rod of the second steel structure laying welding unit is inserted into the other end of the horizontal telescopic rod of the first steel structure laying welding unit, the steering unit of the second steel structure laying welding unit is located at the other end of the vertical lifting rod of the second steel structure laying welding unit, and the welding head element of the steel structure laying welding unit is installed on the steering unit of the second steel structure laying welding unit;

[0010] The steel structure laying feeding unit comprises a steel structure laying feeding unit output port, a steel structure laying feeding unit chassis, a steel structure laying feeding unit chassis fixing hole, a first steel structure laying feeding unit vertical lifting rod, a steel structure laying feeding unit silo, a first steel structure laying feeding unit steering unit, a first steel structure laying welding unit feeding telescopic rod, a second steel structure laying feeding unit vertical lifting rod, a second steel structure laying feeding unit steering unit and a steel structure laying feeding unit clamping element; the steel structure laying feeding unit output port and the steel structure laying feeding unit silo are both located on the side of the steel structure laying feeding unit chassis, and the steel structure laying feeding unit chassis fixing hole is located on the steel structure laying feeding unit chassis. A feeding unit chassis is provided at the bottom, a steel structure laying feeding unit silo is installed on the steel structure laying feeding unit chassis, one end of the first steel structure laying feeding unit steering unit is inserted in the steel structure laying feeding unit silo, one end of the first steel structure laying welding unit feeding telescopic rod is inserted in the other end of the first steel structure laying feeding unit steering unit, one end of the second steel structure laying feeding unit vertical lifting rod is inserted in the other end of the first steel structure laying welding unit feeding telescopic rod, the second steel structure laying feeding unit steering unit is located at the other end of the second steel structure laying feeding unit vertical lifting rod, and the second steel structure laying feeding unit steering unit is provided with a steel structure laying feeding unit clamping element.

[0011] As a further preferred embodiment, the concrete pouring unit includes a concrete pouring unit communication port, a concrete pouring unit base, a concrete pouring unit connection hole, a first concrete pouring baffle vertical lifting rod, a concrete pouring baffle silo, a first concrete pouring baffle steering unit, a first concrete pouring baffle horizontal telescopic rod, a second concrete pouring baffle vertical lifting rod, a second concrete pouring baffle steering unit, a concrete pouring baffle clamping element, a first concrete pouring tool vertical lifting rod, a first concrete pouring tool steering unit, and a first concrete pouring tool horizontal telescopic rod. , a second concrete pouring tool vertical lifting rod, a second concrete tool baffle steering unit, a concrete pouring tool placement platform, a concrete pouring concrete spray gun, a concrete pouring spray gun switch, a concrete pouring baffle fastening tool and a concrete pouring smoothing tool; the concrete pouring unit communication port is located on the side of the concrete pouring unit base; the concrete pouring unit connection hole is located at the bottom of the concrete pouring unit base; the concrete pouring baffle silo and the concrete pouring tool placement platform are located on the side of the concrete pouring unit base, the concrete pouring concrete spray gun, the concrete pouring spray gun switch, the concrete pouring baffle The plate fastening tool and the concrete pouring and smoothing tool are located on the concrete pouring tool placement platform; the first concrete pouring baffle vertical lifting rod and the first concrete pouring tool vertical lifting rod are located on the concrete pouring unit base; one end of the first concrete pouring tool steering unit is inserted into the first concrete pouring tool vertical lifting rod, one end of the first concrete pouring tool horizontal telescopic rod is inserted into the other end of the first concrete pouring tool steering unit, one end of the second concrete pouring tool vertical lifting rod is inserted into the other end of the first concrete pouring tool horizontal telescopic rod, and the second concrete tool baffle steering unit is inserted into the second end of the first concrete pouring tool. The element is located at the other end of the vertical lifting rod of the second concrete pouring tool; one end of the first concrete pouring baffle steering unit is inserted into the first concrete pouring baffle vertical lifting rod, one end of the first concrete pouring baffle horizontal telescopic rod is inserted into the other end of the first concrete pouring baffle steering unit, one end of the second concrete pouring baffle vertical lifting rod is inserted into the other end of the first concrete pouring baffle horizontal telescopic rod, the second concrete pouring baffle steering unit is located at the other end of the second concrete pouring baffle vertical lifting rod, and the concrete pouring baffle clamping element is located on the second concrete pouring baffle steering unit.

[0012] As a further preferred embodiment, the tower forming machine control center includes a tower forming machine control center unit, a tower forming machine bracket communication port, a concrete detection unit communication port, a steel structure laying welding unit communication port, a steel structure laying feeding unit communication port and a concrete pouring unit communication port; wherein, the tower forming machine bracket communication port, the concrete detection unit communication port, the steel structure laying welding unit communication port, the steel structure laying feeding unit communication port and the concrete pouring unit communication port are respectively connected to the tower forming machine control center unit; the tower forming machine bracket communication port is connected to the elevator control port; the concrete detection unit communication port is connected to the detection unit output port; the steel structure laying welding unit communication port is connected to the steel structure laying welding unit output port, the steel structure laying feeding unit communication port is connected to the steel structure laying feeding unit output port; the concrete pouring unit communication port is connected to the concrete pouring unit communication port.

[0013] Compared with the prior art, the wind turbine concrete tower forming machine of the present invention can not only realize the on-site automated pouring of the concrete tower, avoid the intermediate steps of precast concrete transportation and installation, save human resources, and play a certain role in reducing the cost of concrete tower forming, but also realize the real-time online detection of the size, hardness, and internal defects of the concrete tower during the forming period, thereby effectively ensuring the overall safety of the concrete tower. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A schematic diagram of a wind turbine concrete tower forming machine;

[0015] Figure 2 It is a schematic diagram of the tower forming machine bracket;

[0016] Figure 3 It is a schematic diagram of a concrete testing unit;

[0017] Figure 4 Schematic diagram of laying welding units for steel structures;

[0018] Figure 5 Schematic diagram of feeding unit for laying steel structure;

[0019] Figure 6 It is a schematic diagram of the concrete pouring unit;

[0020] Figure 7 This is a schematic diagram of the control center of the tower forming machine;

[0021] In the figure: 1-tower forming machine bracket, 2-concrete detection unit, 3-steel structure laying unit, 4-concrete pouring unit, 5-tower forming machine control center, 101-bracket base, 102-bracket base fixed connection hole, 103-cylinder lift, 104-lift control port, 105-bracket top plate, 106-bracket top plate fixed connection hole 201-detection unit output port, 202-detection unit chassis, 203-detection unit chassis fixing hole, 204-detection unit vertical lifting rod 1, 205-first detection unit steering unit, 206-first detection unit horizontal telescopic rod, 207-second detection unit vertical lifting rod, 208-second detection unit steering unit, 209-concrete ultrasonic unit, 210-concrete rebound test unit, 211-concrete laser detection unit, 31-steel structure laying welding unit, 32-steel structure laying delivery Material unit, 3101-steel structure laying welding unit output port, 3102-steel structure laying welding unit chassis, 3103-steel structure laying welding unit chassis fixing hole, 3104-first steel structure laying welding unit vertical lifting rod, 3105-first steel structure laying welding unit steering unit, 3106-first steel structure laying welding unit horizontal telescopic rod, 3107-second steel structure laying welding unit vertical lifting rod 3108-second steel structure laying welding unit steering unit, 3109-steel structure laying welding unit welding head element, 3201-steel structure laying feeding unit output port, 3202-steel structure laying feeding unit chassis, 3203-steel structure laying feeding unit chassis fixing hole, 3204-steel structure laying feeding unit silo, 3205-first steel structure laying feeding unit vertical lifting rod, 3206-first steel structure laying feeding unit steering unit,3207-feeding telescopic rod of the first steel structure laying welding unit, 3208-vertical lifting rod of the second steel structure laying feeding unit, 3209-steering unit of the second steel structure laying feeding unit, 3210-clamping element of the steel structure laying feeding unit, 401-communication port of the concrete pouring unit, 402-base of the concrete pouring unit, 403-connecting hole of the concrete pouring unit, 404-vertical lifting rod of the first concrete pouring baffle, 405-bin of the concrete pouring baffle, 406-steering unit of the first concrete pouring baffle, 407-horizontal telescopic rod of the first concrete pouring baffle, 408-vertical lifting rod of the second concrete pouring baffle, 409-steering unit of the second concrete pouring baffle, 410-clamping element of the concrete pouring baffle, 411-first concrete pouring baffle Concrete pouring tool vertical lifting rod, 412-first concrete pouring tool steering unit, 413-first concrete pouring tool horizontal telescopic rod, 414-second concrete pouring tool vertical lifting rod, 415-second concrete tool baffle steering unit, 416-concrete pouring tool placement table, 417-concrete pouring concrete spray gun, 418-concrete pouring spray gun switch, 419-concrete pouring baffle fastening tool, 420-concrete pouring leveling tool, 501-tower forming machine control center unit, 502-tower forming machine bracket communication port, 503-concrete detection unit communication port, 504-steel structure laying welding unit communication port, 505-steel structure laying feeding unit communication port, 506-concrete pouring unit communication port. , DETAILED DESCRIPTION

[0022] The present invention will be further described below in conjunction with the accompanying drawings and specific implementation examples.

[0023] A wind turbine concrete tower forming machine mainly comprises a tower forming machine support 1, a concrete detection unit 2, a steel structure laying unit 3, a concrete pouring unit 4 and a tower forming machine control center 5.

[0024] The tower forming machine support 1 comprises a support base 101, a support base fixing connection hole 102, a sleeve cylinder type lift 103, a lift control port 104, a support top plate 105 and a support top plate fixing connection hole 106. The support base fixing connection hole 102 is embeddedly connected with the support base 101; the sleeve cylinder type lift 103 is connected with the support base 101; the lift control port 104 is connected with the sleeve cylinder type lift 103; the support top plate 105 is connected with the upper surface of the sleeve cylinder type lift 103; and the support top plate fixing connection hole 106 is embeddedly connected with the support top plate 105.

[0025] The tower forming machine bracket 1 receives the control signal of the tower forming machine control center 5 through the communication between the tower forming machine bracket communication port 502 and the elevator control port 104, and controls the cylinder-type elevator 103 to move up and down; the bracket base fixing connection hole 102 realizes the fixation of the bracket base 101; the bracket top plate fixing connection hole 106 realizes the fixed connection between the tower forming machine bracket 1 and the concrete detection unit 2, the steel structure laying unit 3, and the concrete pouring unit 4.

[0026] The concrete detection unit 2 consists of a detection unit output port 201, a detection unit chassis 202, a detection unit chassis fixing hole 203, a first detection unit vertical lifting rod 204, a first detection unit steering unit 205, a first detection unit horizontal telescopic rod 206, a second detection unit vertical lifting rod 207, a second detection unit steering unit 208, a concrete ultrasonic unit 209, a concrete rebound test unit 210 and a concrete laser detection unit 211. The detection unit output port 201 is connected to the detection unit chassis 202; the detection unit chassis fixing hole 203 is embeddedly connected to the detection unit chassis 202; the first detection unit vertical lifting rod is connected to the detection unit chassis 202; the first detection unit steering unit 205 is sleeved with the first detection unit vertical lifting rod; the first detection unit horizontal telescopic rod 206 is sleeved with the first detection unit steering unit 205; the second detection unit vertical lifting rod 207 is sleeved with the first detection unit horizontal telescopic rod 206; the second detection unit steering unit 208 is connected to the second detection unit vertical lifting rod 207; the concrete ultrasonic unit 209, the concrete rebound test unit 210 and the concrete laser detection unit 211 are connected to the second detection unit steering unit 208.

[0027] The concrete detection unit 2 receives the control signal from the tower forming machine control center 5 through the communication between the concrete detection unit communication port 503 and the detection unit output port 201 . The detection unit chassis 202 is connected to the bracket top plate fixed connection hole 106 through the detection unit chassis fixing hole 203 to achieve connection with the bracket top plate 105; the concrete detection unit 2 adjusts the spatial position of the concrete ultrasonic unit 209, the concrete rebound test unit 210 and the concrete laser detection unit 211 through the first detection unit vertical lifting rod 204, the first detection unit steering unit 205, the first detection unit horizontal telescopic rod 206, the second detection unit vertical lifting rod 207, and the second detection unit steering unit 208, so as to realize the detection of the forming quality of the wind turbine concrete tower by the concrete ultrasonic unit 209, the concrete rebound test unit 210 and the concrete laser detection unit 211; the detection signals of the concrete ultrasonic unit 209, the concrete rebound test unit 210 and the concrete laser detection unit 211 are sent to the control center 5 through the concrete detection unit communication port 503 and the detection unit output port 201.

[0028] The steel structure laying unit 3 is composed of a steel structure laying welding unit 31 and a steel structure laying feeding unit 32, wherein the steel structure laying feeding unit 31 is composed of a steel structure laying welding unit output port 3101, a steel structure laying welding unit chassis 3102, a steel structure laying welding unit chassis fixing hole 3103, a first steel structure laying welding unit vertical lifting rod 3104, a first steel structure laying welding unit steering unit 3105, a first steel structure laying welding unit horizontal telescopic rod 3106, a second steel structure laying welding unit vertical lifting rod 3107, a second steel structure laying welding unit steering unit 3108 and a steel structure laying welding unit welding unit. The steel structure laying feeding unit 32 is composed of a steel structure laying feeding unit output port 3201, a steel structure laying feeding unit chassis 3202, a steel structure laying feeding unit chassis fixing hole 3203, a steel structure laying feeding unit silo 3204, a first steel structure laying feeding unit vertical lifting rod 3105, a first steel structure laying feeding unit steering unit 3206, a first steel structure laying welding unit feeding telescopic rod 3207, a second steel structure laying feeding unit vertical lifting rod 3208, a second steel structure laying feeding unit steering unit 3209 and a steel structure laying feeding unit clamping element 3210.The output port 3101 of the steel structure laying welding unit is connected to the chassis 3102 of the steel structure laying welding unit; the fixing hole 3103 of the chassis of the steel structure laying welding unit is embedded in the chassis 3102 of the steel structure laying welding unit; the vertical lifting rod 3104 of the first steel structure laying welding unit is connected to the chassis 3102 of the steel structure laying welding unit; the steering unit 3105 of the first steel structure laying welding unit is sleeved with the vertical lifting rod 3104 of the first steel structure laying welding unit; the horizontal extension rod 3106 of the first steel structure laying welding unit is connected to the vertical lifting rod 3106 of the first steel structure laying welding unit; the horizontal extension rod 3107 of the first steel structure laying welding unit is connected to the vertical lifting rod 3107 of the first steel structure laying welding unit; the vertical lifting rod 3107 of the first steel structure laying welding unit is sleeved with ... The retractable rod 3106 is sleeved with the steering unit 3105 of the first steel structure laying welding unit; the vertical lifting rod 3107 of the second steel structure laying welding unit is sleeved with the horizontal telescopic rod 3106 of the first steel structure laying welding unit; the steering unit 3108 of the second steel structure laying welding unit is sleeved with the vertical lifting rod 3107 of the second steel structure laying welding unit; the welding head element 3109 of the steel structure laying welding unit is connected to the steering unit 3108 of the second steel structure laying welding unit; the output port 3201 of the steel structure laying feeding unit is connected to The steel structure is connected to the chassis 3202 of the feeding unit; the fixing hole 3203 of the steel structure is connected to the chassis 3202 of the feeding unit for embedded connection; the silo 3204 of the steel structure is connected to the chassis 3202 of the feeding unit; the vertical lifting rod 3105 of the first steel structure is connected to the chassis 3202 of the feeding unit; the steering unit 3206 of the first steel structure is connected to the vertical lifting rod 310 5; the first steel structure laying welding unit feeding telescopic rod 3207 is socketed with the first steel structure laying feeding unit steering unit 3206; the second steel structure laying feeding unit vertical lifting rod 3208 is socketed with the first steel structure laying welding unit feeding telescopic rod 3207; the second steel structure laying feeding unit steering unit 3209 is connected with the second steel structure laying feeding unit vertical lifting rod 3208; the steel structure laying feeding unit clamping element 3210 is connected with the second steel structure laying feeding unit steering unit 3209.

[0029] The steel structure laying welding unit 31 in the steel structure laying unit 3 receives the control signal of the tower forming machine control center 5 through the communication between the steel structure laying welding unit communication port 504 and the steel structure laying welding unit output port 3101. The steel structure laying welding unit chassis 3102 is connected with the bracket top plate fixed connection hole 106 through the steel structure laying welding unit chassis fixing hole 3103 to realize the connection with the bracket top plate 105; the steel structure laying welding unit 31 realizes the change of the spatial position of the steel structure laying welding unit welding head element 3109 through the spatial action of the first steel structure laying welding unit vertical lifting rod 3104, the first steel structure laying welding unit steering unit 3105, the first steel structure laying welding unit horizontal telescopic rod 3106, the second steel structure laying welding unit vertical lifting rod 3107 and the second steel structure laying welding unit steering unit 3108; the steel structure laying welding unit 31 receives the control signal of the tower forming machine control center 5 to realize the control of whether the steel structure laying welding unit welding head element 3109 starts welding.

[0030] The steel structure laying feeding unit 32 in the steel structure laying unit 3 receives the control signal of the tower forming machine control center 5 through the communication between the steel structure laying feeding unit communication port 505 and the steel structure laying feeding unit output port 3201 . The steel structure laying feeding unit chassis 3202 is connected to the bracket top plate 105 through the steel structure laying feeding unit chassis fixing hole 3203 and the bracket top plate fixed connection hole 106; the steel structure laying feeding unit 32 is connected to the bracket top plate 105 through the spatial action of the first steel structure laying feeding unit vertical lifting rod 3105, the first steel structure laying feeding unit steering unit 3206, the first steel structure laying welding unit feeding telescopic rod 3207, the second steel structure laying feeding unit vertical lifting rod 3208, and the second steel structure laying feeding unit steering unit 3209; the steel structure laying feeding unit 32 receives the control signal of the tower forming machine control center 5 to realize the grabbing control of the steel structure laying feeding unit clamping element 3210 from the steel structure laying feeding unit silo 3204 to realize the steel structure laying material.

[0031] The concrete pouring unit 4 is composed of a concrete pouring unit communication port 401, a concrete pouring unit base 402, a concrete pouring unit connecting hole 403, a first concrete pouring baffle vertical lifting rod 404, a concrete pouring baffle silo 405, a first concrete pouring baffle steering unit 406, a first concrete pouring baffle horizontal telescopic rod 407, a second concrete pouring baffle vertical lifting rod 408, a second concrete pouring baffle steering unit 409, a concrete pouring baffle clamping element 410, a first concrete pouring tool vertical lifting rod 411, a first concrete pouring tool steering unit 412, a first concrete pouring tool horizontal telescopic rod 413, a second concrete pouring tool vertical lifting rod 414, a second concrete tool baffle steering unit 415, a concrete pouring tool placement platform 416, a concrete pouring concrete spray gun 417, a concrete pouring spray gun switch 418, a concrete pouring baffle fastening tool 419 and a concrete pouring smoothing tool 420. The concrete pouring unit communication port 401 is connected to the concrete pouring unit base 402; the concrete pouring unit connection hole 403 is embeddedly connected to the concrete pouring unit communication port 401; the first concrete pouring baffle vertical lifting rod 404 is connected to the concrete pouring unit base 402; the concrete pouring baffle silo 405 is connected to the concrete pouring unit base 402; the first concrete pouring baffle steering unit 406 is sleeved with the first concrete pouring baffle vertical lifting rod 404; the first concrete pouring baffle horizontal telescopic rod 407 is sleeved with the first concrete pouring baffle steering unit 406; the second concrete pouring baffle vertical lifting rod 408 is sleeved with the first concrete pouring baffle horizontal telescopic rod 407; the second concrete pouring baffle steering unit 409 is sleeved with the second concrete pouring baffle vertical lifting rod 408; the concrete pouring baffle clamping element 410 is connected to the second concrete pouring baffle steering unit 409 ; The first concrete pouring tool vertical lifting rod 411 is connected to the concrete pouring unit base 402; the first concrete pouring tool steering unit 412 is sleeved with the first concrete pouring tool vertical lifting rod 411; the first concrete pouring tool horizontal telescopic rod 413 is sleeved with the first concrete pouring tool steering unit 412; the second concrete pouring tool vertical lifting rod 414 is sleeved with the first concrete pouring tool horizontal telescopic rod 413; the second concrete tool baffle steering unit 415 is connected to the second concrete pouring tool vertical lifting rod 414; the concrete pouring tool placement platform 416 is connected to the concrete pouring unit base 402; the concrete pouring concrete spray gun 417, the concrete pouring baffle fastening tool 419 and the concrete pouring smoothing tool 420 are placed in the card slot of the concrete pouring tool placement platform 416 according to the fixed position; the concrete pouring spray gun switch 418 is connected to the concrete pouring concrete spray gun 417.

[0032] The concrete pouring unit 4 receives the control signal of the tower forming machine control center 5 through the communication of the concrete pouring unit communication port 506 connected to the concrete pouring unit communication port 401 . The concrete pouring unit base 402 is connected to the bracket top plate fixed connection hole 106 through the concrete pouring unit connection hole 403 to achieve connection with the bracket top plate 105; the concrete pouring unit 4 realizes the change of the spatial position of the concrete pouring baffle clamping element 410 through the first concrete pouring baffle vertical lifting rod 404, the first concrete pouring baffle steering unit 406, the first concrete pouring baffle horizontal telescopic rod 407, the second concrete pouring baffle vertical lifting rod 408, and the second concrete pouring baffle steering unit 409; the concrete pouring unit 4 receives the control signal of the tower forming machine control center 5 to realize the concrete pouring baffle clamping element 410 from the concrete pouring baffle silo 405 to realize the concrete pouring baffle taking and placing operation; the concrete pouring unit 4 realizes the change of the spatial position of the concrete pouring baffle clamping element 410 through the first concrete pouring tool vertical lifting rod 411, the first concrete pouring tool steering unit 412, the first concrete pouring tool The horizontal telescopic rod 413 and the second concrete pouring tool vertical lifting rod 414 realize the change and adjustment of the spatial position of the second concrete tool baffle steering unit 415; the concrete pouring unit 4 receives the control signal of the tower forming machine control center 5 to realize the single pick-up and placement operation of the second concrete tool baffle steering unit 415 from the concrete pouring tool placement platform 416 to the concrete pouring concrete spray gun 417, the concrete pouring baffle fastening tool 419 and the concrete pouring smoothing tool 420; the concrete pouring unit 4 realizes the control of whether the concrete pouring concrete spray gun 417 sprays concrete through the concrete pouring spray gun switch 418; the concrete pouring baffle fastening tool 419 is used to work together with the concrete pouring baffle clamping element 410 to realize the fastening of the concrete pouring baffle; the concrete pouring smoothing tool 420 realizes the smoothing function of concrete after the concrete pouring concrete spray gun 417 sprays and receives the concrete.

[0033] The tower forming machine control center 5 mainly includes a tower forming machine control center unit 501, a tower forming machine bracket communication port 502, a concrete detection unit communication port 503, a steel structure laying welding unit communication port 504, a steel structure laying feeding unit communication port 505 and a concrete pouring unit communication port 506. The tower forming machine bracket communication port 502, the concrete detection unit communication port 503, the steel structure laying welding unit communication port 504, the steel structure laying feeding unit communication port 505 and the concrete pouring unit communication port 506 are connected to the tower forming machine control center unit 501; the tower forming machine bracket communication port 502 is connected to the elevator control port 104; the concrete detection unit communication port 503 is connected to the detection unit output port 201; the steel structure laying welding unit communication port 504 is connected to the steel structure laying welding unit output port 3101, and the steel structure laying feeding unit communication port 505 is connected to the steel structure laying feeding unit output port 3201; the concrete pouring unit communication port 506 is connected to the concrete pouring unit communication port 401.

[0034] The present invention can not only realize the on-site automated pouring of concrete towers, avoid intermediate steps such as precast concrete transportation and installation, save human resources, and play a certain role in reducing the cost of concrete tower molding, but also realize real-time online detection of concrete tower size, hardness, and internal defects during the molding period, thereby effectively ensuring the overall safety of the concrete tower.

Claims

1. A wind turbine concrete tower forming machine, characterized in that: It comprises a tower forming machine support (1), a concrete detection unit (2), a steel structure laying unit (3), a concrete pouring unit (4) and a tower forming machine control center (5); The tower forming machine support (1) comprises a support base (101), a support base fixing connection hole (102), a sleeve cylinder lift (103), a lift control port (104), a support top plate (105), and a support top plate fixing connection hole (106); a plurality of support base fixing connection holes (102) are distributed on the support base (101), a plurality of support top plate fixing connection holes (106) are distributed on the support top plate (105), the sleeve cylinder lift (103) is located between the support base (101) and the support top plate (105), and a lift control port (104) is provided on the sleeve cylinder lift (103); The concrete detection unit (2) comprises a detection unit output port (201), a detection unit chassis (202), a detection unit chassis fixing hole (203), a first detection unit vertical lifting rod (204), a first detection unit steering unit (205), a first detection unit horizontal telescopic rod (206), a second detection unit vertical lifting rod (207), a second detection unit steering unit (208), a concrete ultrasonic unit (209), a concrete rebound tester detection unit (210) and a concrete laser detection unit (211); the detection unit output port (201) is located at the side of the detection unit chassis (202), the detection unit chassis fixing hole (203) is located at the bottom of the detection unit chassis (202), the first detection unit vertical lifting rod (204), the first detection unit steering unit (205), the first detection unit horizontal telescopic rod (206), the second detection unit vertical lifting rod (207), the second detection unit steering unit (208), a concrete ultrasonic unit (209), a concrete rebound tester detection unit (210) and a concrete laser detection unit (211); The lifting rod (204) is installed on the detection unit chassis (202); one end of the first detection unit steering unit (205) is inserted into the first detection unit vertical lifting rod (204); one end of the first detection unit horizontal telescopic rod (206) is inserted into the other end of the first detection unit steering unit (205); one end of the second detection unit vertical lifting rod (207) is inserted into the other end of the first detection unit horizontal telescopic rod (206); the second detection unit steering unit (208) is located at the other end of the second detection unit vertical lifting rod (207); and the concrete ultrasonic unit (209), the concrete rebound test unit (210), and the concrete laser detection unit (211) are all installed on the second detection unit steering unit (208); The steel structure laying unit (3) comprises a steel structure laying welding unit (31) and a steel structure laying feeding unit (32); The steel structure laying welding unit (31) comprises a steel structure laying welding unit output port (3101), a steel structure laying welding unit chassis (3102), a steel structure laying welding unit chassis fixing hole (3103), a first steel structure laying welding unit vertical lifting rod (3104), a first steel structure laying welding unit steering unit (3105), a first steel structure laying welding unit horizontal telescopic rod (3106), a second steel structure laying welding unit vertical lifting rod (3107), a second steel structure laying welding unit steering unit (3108) and a steel structure laying welding unit welding head element (3109); the steel structure laying welding unit output port (3101) is located at the side of the steel structure laying welding unit chassis (3102), the steel structure laying welding unit chassis fixing hole (3103) is located at the bottom of the steel structure laying welding unit chassis (3102), and the first steel structure laying welding unit horizontal telescopic rod (3106) is located at the side of the steel structure laying welding unit chassis (3102). The vertical lifting rod (3104) of the structure laying welding unit is installed on the chassis (3102) of the steel structure laying welding unit, one end of the first steel structure laying welding unit steering unit (3105) is inserted into the first steel structure laying welding unit vertical lifting rod (3104), one end of the first steel structure laying welding unit horizontal telescopic rod (3106) is inserted into the other end of the first steel structure laying welding unit steering unit (3105), one end of the second steel structure laying welding unit vertical lifting rod (3107) is inserted into the other end of the first steel structure laying welding unit horizontal telescopic rod (3106), the second steel structure laying welding unit steering unit (3108) is located at the other end of the second steel structure laying welding unit vertical lifting rod (3107), and the steel structure laying welding unit welding head element (3109) is installed on the second steel structure laying welding unit steering unit (3108); The steel structure laying feeding unit (32) comprises a steel structure laying feeding unit output port (3201), a steel structure laying feeding unit chassis (3202), a steel structure laying feeding unit chassis fixing hole (3203), a first steel structure laying feeding unit vertical lifting rod (3204), a steel structure laying feeding unit silo (3205), a first steel structure laying feeding unit steering unit (3206), a first steel structure laying welding unit feeding telescopic rod ( 3207), a second steel structure laying feeding unit vertical lifting rod (3208), a second steel structure laying feeding unit steering unit (3209) and a steel structure laying feeding unit clamping element (3210); the steel structure laying feeding unit output port (3201) and the steel structure laying feeding unit silo (3205) are both located on the side of the steel structure laying feeding unit chassis (3202), and the steel structure laying feeding unit chassis fixing hole (3203) is located on the steel structure laying feeding unit chassis. A feeding unit chassis (3202) is provided at the bottom, a first steel structure laying feeding unit vertical lifting rod (3204) is installed on the steel structure laying feeding unit chassis (3202), one end of the first steel structure laying feeding unit steering unit (3206) is inserted into the first steel structure laying feeding unit vertical lifting rod (3204), one end of the first steel structure laying welding unit feeding telescopic rod (3207) is inserted into the other end of the first steel structure laying feeding unit steering unit (3206), one end of the second steel structure laying feeding unit vertical lifting rod (3208) is inserted into the other end of the first steel structure laying welding unit feeding telescopic rod (3207), the second steel structure laying feeding unit steering unit (3209) is located at the other end of the second steel structure laying feeding unit vertical lifting rod (3208), and the second steel structure laying feeding unit steering unit (3209) is provided with a steel structure laying feeding unit clamping element (3210); The concrete pouring unit (4) comprises a first concrete pouring unit communication port (401), a concrete pouring unit base (402), a concrete pouring unit connection hole (403), a first concrete pouring baffle vertical lifting rod (404), a concrete pouring baffle material bin (405), a first concrete pouring baffle steering unit (406), a first concrete pouring baffle horizontal telescopic rod (407), a second concrete pouring baffle vertical lifting rod (408), a second concrete pouring baffle steering unit (409), a concrete pouring baffle clamping element (410), and a first concrete pouring tool A vertical lifting rod (411), a first concrete pouring tool steering unit (412), a first concrete pouring tool horizontal telescopic rod (413), a second concrete pouring tool vertical lifting rod (414), a second concrete tool baffle steering unit (415), a concrete pouring tool placement platform (416), a concrete pouring concrete spray gun (417), a concrete pouring spray gun switch (418), a concrete pouring baffle fastening tool (419) and a concrete pouring smoothing tool (420); the first concrete pouring unit communication port (401) is located on the side of the concrete pouring unit base (402) The concrete pouring unit connection hole (403) is located at the bottom of the concrete pouring unit base (402); the concrete pouring baffle silo (405) and the concrete pouring tool placement platform (416) are located on the side of the concrete pouring unit base (402); the concrete pouring concrete spray gun (417), the concrete pouring spray gun switch (418), the concrete pouring baffle fastening tool (419) and the concrete pouring smoothing tool (420) are located on the concrete pouring tool placement platform (416); the first concrete pouring baffle vertical lifting rod (404) and the first concrete pouring tool vertical lifting rod (411 ) is located on the concrete pouring unit base (402); one end of the first concrete pouring tool steering unit (412) is inserted into the first concrete pouring tool vertical lifting rod (411), one end of the first concrete pouring tool horizontal telescopic rod (413) is inserted into the other end of the first concrete pouring tool steering unit (412), one end of the second concrete pouring tool vertical lifting rod (414) is inserted into the other end of the first concrete pouring tool horizontal telescopic rod (413), and the second concrete tool baffle steering unit (415) is located at the other end of the second concrete pouring tool vertical lifting rod (414);One end of the first concrete pouring baffle steering unit (406) is inserted into the first concrete pouring baffle vertical lifting rod (404), one end of the first concrete pouring baffle horizontal telescopic rod (407) is inserted into the other end of the first concrete pouring baffle steering unit (406), one end of the second concrete pouring baffle vertical lifting rod (408) is inserted into the other end of the first concrete pouring baffle horizontal telescopic rod (407), the second concrete pouring baffle steering unit (409) is located at the other end of the second concrete pouring baffle vertical lifting rod (408), and the concrete pouring baffle clamping element (410) is located on the second concrete pouring baffle steering unit (409); The tower forming machine control center (5) comprises a tower forming machine control center unit (501), a tower forming machine bracket communication port (502), a concrete detection unit communication port (503), a steel structure laying welding unit communication port (504), a steel structure laying feeding unit communication port (505) and a second concrete pouring unit communication port (506); wherein the tower forming machine bracket communication port (502), the concrete detection unit communication port (503), the steel structure laying welding unit communication port (504), the steel structure laying feeding unit communication port (505) and the second concrete pouring unit communication port (506) The communication ports (506) of the tower forming machine are respectively connected to the tower forming machine control center unit (501); the tower forming machine bracket communication port (502) is connected to the elevator control port (104); the concrete detection unit communication port (503) is connected to the detection unit output port (201); the steel structure laying welding unit communication port (504) is connected to the steel structure laying welding unit output port (3101), and the steel structure laying feeding unit communication port (505) is connected to the steel structure laying feeding unit output port (3201); the second concrete pouring unit communication port (506) is connected to the first concrete pouring unit communication port (401); The tower forming machine bracket (1) receives a control signal from a tower forming machine control center (5) through communication between the tower forming machine bracket communication port (502) and the elevator control port (104), and controls the sleeve cylinder type elevator (103) to move up and down; The concrete detection unit (2) receives a control signal from a tower forming machine control center (5) through communication between a concrete detection unit communication port (503) and a detection unit output port (201); the detection unit chassis (202) is connected to the bracket top plate (105) through a detection unit chassis fixing hole 203 and a bracket top plate fixing connection hole (106); the concrete detection unit (2) is connected to the bracket top plate (105) through a first detection unit vertical lifting rod (204), a first detection unit steering unit (205), a first detection unit horizontal telescopic rod (206), a second detection unit vertical lifting rod (207), and a second detection unit steering unit (2 08) adjusting the spatial positions of the concrete ultrasonic unit (209), the concrete rebound test unit (210) and the concrete laser detection unit (211), thereby realizing detection of the forming quality of the concrete tower of the wind turbine generator by the concrete ultrasonic unit (209), the concrete rebound test unit (210) and the concrete laser detection unit (211); the detection signals obtained by the concrete ultrasonic unit (209), the concrete rebound test unit (210) and the concrete laser detection unit (211) are sent to the control center (5) through the concrete detection unit communication port (503) and the detection unit output port (201); The steel structure laying welding unit (31) in the steel structure laying unit (3) receives the control signal of the tower forming machine control center (5) through the communication between the steel structure laying welding unit communication port (504) and the steel structure laying welding unit output port (3101); the steel structure laying welding unit chassis (3102) is connected to the bracket top plate (105) through the steel structure laying welding unit chassis fixing hole (3103) and the bracket top plate fixing connection hole (106); the steel structure laying welding unit (31) is connected to the bracket top plate (105) through the first steel structure laying welding unit vertical lifting rod (3 104), the first steel structure laying welding unit steering unit (3105), the first steel structure laying welding unit horizontal telescopic rod (3106), the second steel structure laying welding unit vertical lifting rod (3107) and the second steel structure laying welding unit steering unit (3108) spatially move to change the spatial position of the steel structure laying welding unit welding head element (3109); the steel structure laying welding unit (31) receives the control signal of the tower forming machine control center (5) to control whether the steel structure laying welding unit welding head element (3109) starts welding; The steel structure laying feeding unit (32) in the steel structure laying unit (3) receives the control signal of the tower forming machine control center (5) through the communication between the steel structure laying feeding unit communication port (505) and the steel structure laying feeding unit output port (3201); the steel structure laying feeding unit chassis (3202) is connected to the bracket top plate fixed connection hole (106) through the steel structure laying feeding unit chassis fixing hole (3203) to achieve connection with the bracket top plate (105); the steel structure laying feeding unit (32) is connected to the bracket top plate fixed connection hole (106) through the steel structure laying feeding unit silo (3205), the first steel structure laying feeding unit transfer port (3201) and the steel structure laying feeding unit silo (3205). The spatial movement of the direction unit (3206), the first steel structure laying welding unit feeding telescopic rod (3207), the second steel structure laying feeding unit vertical lifting rod (3208), and the second steel structure laying feeding unit steering unit (3209) realizes the change of the spatial position of the steel structure laying feeding unit clamping element (3210); the steel structure laying feeding unit (32) receives the control signal of the tower forming machine control center (5) to realize the grabbing control of the steel structure laying feeding unit clamping element (3210) from the first steel structure laying feeding unit vertical lifting rod (3204) to realize the steel structure laying material; The concrete pouring unit (4) receives control signals from the tower forming machine control center (5) through the communication connection between the second concrete pouring unit communication port (506) and the first concrete pouring unit communication port (401); the concrete pouring unit base (402) is connected to the support top plate fixed connection hole (106) through the concrete pouring unit connection hole (403) to achieve connection with the support top plate (105); the concrete pouring unit (4) is connected to the support top plate through the first concrete pouring baffle vertical lifting rod (404) and the first concrete pouring baffle steering unit (40 6), the first concrete pouring baffle horizontal telescopic rod (407), the second concrete pouring baffle vertical lifting rod (408), and the second concrete pouring baffle steering unit (409) realize the change of the spatial position of the concrete pouring baffle clamping element (410); the concrete pouring unit (4) receives the control signal of the tower forming machine control center (5) to realize the concrete pouring baffle clamping element (410) to take and place the concrete pouring baffle from the concrete pouring baffle bin (405); the concrete pouring unit (4) vertically moves the first concrete pouring tool to the concrete pouring baffle. The lifting rod (411), the first concrete pouring tool steering unit (412), the first concrete pouring tool horizontal telescopic rod (413), and the second concrete pouring tool vertical lifting rod (414) are used to adjust the spatial position of the second concrete pouring tool baffle steering unit (415); the concrete pouring unit (4) receives the control signal of the tower forming machine control center (5) to realize the second concrete tool baffle steering unit (415) from the concrete pouring tool placement platform (416) to the concrete pouring concrete spray gun (417), the concrete pouring A single pick-up and placement operation of a baffle fastening tool (419) and a concrete pouring and smoothing tool (420); the concrete pouring unit (4) controls whether the concrete pouring concrete spray gun (417) sprays concrete through a concrete pouring spray gun switch (418); the concrete pouring baffle fastening tool (419) is used to operate in conjunction with the concrete pouring baffle clamping element (410) to fasten the concrete pouring baffle; the concrete pouring and smoothing tool (420) realizes the function of smoothing the concrete after the concrete pouring concrete spray gun (417) sprays and receives the concrete.