Gas-liquid separation device, gas well and gas well production method
By designing a gas-liquid separation device in the production of natural gas wells, using liquid storage tanks and high-pressure gas to push liquid through the pipeline quickly, the problems of plunger entry and pipeline freezing are solved, and production efficiency and stability are improved.
Patent Information
- Application Number
- CN201910889424.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-19
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2039-09-19
AI Technical Summary
In the production of existing natural gas wells, it is difficult for the plunger to directly enter the wellhead pipeline, resulting in a decrease in production efficiency. In the low-temperature environment, the production pipeline is prone to freezing and blockage, affecting normal production.
Design a gas-liquid separation device. Through the combination of a liquid storage tank, a fluid delivery pipe, a gas delivery pipe and a control valve, the liquid can be separated in the liquid storage tank to prevent liquid from entering the production pipeline, and use high-pressure gas to promote the liquid to pass quickly. Pipeline to prevent freezing and blockage.
It solves the back pressure problem when the plunger is upward, ensures that the plunger enters the wellhead pipeline smoothly, improves production efficiency, and prevents liquid freezing through heating devices, avoids freezing of production pipelines, and ensures the normal production of natural gas wells.
Smart Images

Figure CN110469316B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of natural gas extraction technology, and in particular to a gas-liquid separation device, a gas well, and a gas well production method. Background Technology
[0002] To increase the production and lifespan of natural gas wells, it is necessary to drain the liquid accumulated at the bottom of the well during the production process. Currently, some natural gas wells use plunger lift drainage. The reciprocating motion of the plunger within the well removes the liquid accumulated at the bottom. The wellhead is connected to a gathering station via a production pipeline. The mixture of natural gas and liquid reaches the gathering station through the production pipeline, where vapor-liquid separation takes place.
[0003] However, the inventors of this application have discovered the following two problems with the plunger lifting and drainage technology:
[0004] 1. During the upward movement of the plunger, there is a high probability that it will move up and down near the wellhead pipeline, preventing it from directly entering the wellhead pipeline. This significantly affects the normal efficiency of the natural gas well.
[0005] 2. In low-temperature environments, production pipelines are highly susceptible to freezing and blockage. Summary of the Invention
[0006] The embodiments of this application provide a gas-liquid separation device that can improve the problem that the plunger cannot directly enter the inlet pipeline and can improve the problem that the production pipeline is prone to freezing and blockage in low temperature environments.
[0007] An embodiment of this application also provides a gas well having the above-described gas-liquid separation device.
[0008] An embodiment of this application also provides a gas well production method based on the above-described gas well.
[0009] To achieve the above objectives, the embodiments of this application adopt the following technical solutions:
[0010] A gas-liquid separation device includes: a liquid storage tank having a fluid inlet, an exhaust port, and a drain port; a fluid delivery pipe connected to the fluid inlet; a gas delivery pipe connected to the exhaust port; a liquid delivery pipe having one end connected to the drain port and the other end connected to the gas delivery pipe; and a control valve disposed on the gas delivery pipe; wherein the control valve is located between the exhaust port and the liquid delivery pipe.
[0011] The inventors of this application discovered through research that the reason why the upward-moving plunger cannot directly enter the wellhead pipeline is that the diameter of the production pipeline is much smaller than the diameter of the wellhead pipeline and the downhole pipeline of the natural gas well. This causes a large back pressure to be generated after the liquid enters the production pipeline under the lifting action of the plunger. The large back pressure makes it difficult for the plunger to move upward into the wellhead pipeline, thus affecting the normal production of the natural gas well.
[0012] The inventors of this application have further discovered through research that the reason why production pipelines are prone to freezing is that during the plunger lifting and drainage process, the liquid enters the production pipeline in small, intermittent amounts. Specifically, during the plunger lifting and drainage process, the liquid enters the production pipeline intermittently in multiple stages, and the amount of liquid entering the production pipeline each time is small. Furthermore, because the plunger does not enter the wellhead pipeline, the gas well oil pressure is low, and the movement speed of the liquid segment in the production pipeline is also low. These factors cause the liquid segment to freeze before reaching the gas gathering station. Multiple freezing blockages within the production pipeline will prevent the gas well from producing normally.
[0013] The gas-liquid separation device provided in this application, during use, connects a fluid delivery pipe to the production port of the wellhead pipeline, and a gas delivery pipe to the production pipeline extending to the gas gathering station. When the plunger moves upward, the control valve opens. Fluid ejected from the production port of the wellhead pipeline enters the storage tank through the fluid delivery pipe. Gas-liquid separation is completed in the storage tank; the gas enters the production pipeline through the gas delivery pipe and is then transported to the gas gathering station. The liquid is stored in the storage tank. In this way, during the plunger's upward movement, the liquid does not enter the production pipeline, thus avoiding the problem of significant back pressure generated in the production pipeline during the plunger's upward movement, allowing the plunger to smoothly enter the wellhead pipeline of the gas well. After the plunger enters the inlet pipeline of the gas well, the high-pressure gas accumulated below the plunger can be directly ejected from the production port of the wellhead pipeline, causing a sudden increase in oil pressure. At this time, the control valve is closed. After the high-pressure gas enters the storage tank, it forces the liquid in the storage tank into the gas delivery pipe and propels the liquid rapidly along the gas delivery pipe and the production pipeline to the gas gathering station. Driven by high-pressure gas, the liquid stored in the storage tank can pass through the production pipeline quickly in one go, avoiding the possibility of the liquid freezing inside the production pipeline.
[0014] Furthermore, the fluid inlet and exhaust port are higher than the drain port; the connection between the liquid delivery pipe and the gas delivery pipe is higher than the drain port.
[0015] Furthermore, both the fluid inlet and the vent are located at the top of the storage tank.
[0016] Furthermore, the drain outlet is located at the bottom of the storage tank.
[0017] Furthermore, the storage tank is equipped with a heat preservation device and / or a heating device.
[0018] A gas well includes: a wellhead pipeline; a downhole pipeline connected to the wellhead pipeline; a plunger configured to move within the wellhead pipeline and the downhole pipeline; and any one of the above-mentioned gas-liquid separation devices; wherein a fluid delivery pipe is connected to the production port of the wellhead pipeline.
[0019] In the gas well provided in this embodiment, the control valve opens when the plunger moves upward. Fluid ejected from the production port of the wellhead pipeline enters the storage tank through the fluid delivery pipe. Gas-liquid separation is completed in the storage tank; the gas enters the production pipeline through the gas delivery pipe and is then transported to the gas gathering station. The liquid is stored in the storage tank. This prevents liquid from entering the production pipeline during the plunger's upward movement, thus avoiding the problem of significant back pressure generated in the production pipeline and allowing the plunger to smoothly enter the wellhead pipeline. After the plunger enters the gas well's inlet pipeline, the high-pressure gas accumulated below the plunger can be directly ejected from the production port of the wellhead pipeline, causing a sudden increase in oil pressure. At this time, the control valve is closed. The high-pressure gas enters the storage tank, forcing the liquid in the storage tank into the gas delivery pipe and propelling the liquid rapidly along the gas delivery pipe and production pipeline to the gas gathering station. Driven by high-pressure gas, the liquid stored in the storage tank can pass through the production pipeline quickly in one go, avoiding the possibility of the liquid freezing inside the production pipeline.
[0020] A gas well production method, based on the aforementioned gas well, includes the following steps: opening a control valve during the upward movement of the plunger; and closing the control valve after the plunger reaches the wellhead pipeline.
[0021] The gas well production method provided in this application involves opening a control valve during the plunger's upward movement. Fluid ejected from the production port of the wellhead pipeline enters a storage tank through a fluid delivery pipe. Gas-liquid separation is completed within the storage tank. The gas enters the production pipeline through a gas delivery pipe and is then transported to the gas gathering station. The liquid is stored in the storage tank. This prevents liquid from entering the production pipeline during the plunger's upward movement, thus avoiding significant back pressure in the production pipeline and allowing the plunger to smoothly enter the gas wellhead pipeline. After the plunger enters the gas well's inlet pipeline, the high-pressure gas accumulated below the plunger can be directly ejected from the production port of the wellhead pipeline, causing a sudden increase in oil pressure. At this point, the control valve is closed. The high-pressure gas enters the storage tank, forcing the liquid in the storage tank into the gas delivery pipe and propelling the liquid rapidly along the gas delivery pipe and production pipeline to the gas gathering station. Driven by high-pressure gas, the liquid stored in the storage tank can pass through the production pipeline quickly in one go, avoiding the possibility of the liquid freezing inside the production pipeline.
[0022] Furthermore, the control valve is opened before the plunger descends.
[0023] Furthermore, the method also includes: opening the control valve after closing the control valve and after a first preset time.
[0024] Furthermore, the method also includes: monitoring the wellhead oil pressure of the gas well; and opening the control valve when the wellhead oil pressure is lower than a first preset value after the control valve is closed.
[0025] Furthermore, the method also includes: monitoring the back pressure of the gas well; and calculating a first preset value using the following formula: E1 = P R *K; where E1 represents the first preset value, P R This represents back pressure, and K represents the calculation coefficient. Attached Figure Description
[0026] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings used in the embodiments are briefly described below. It should be understood that the following drawings only illustrate some embodiments of this application and should not be considered as limiting the scope of this application. Those skilled in the art can obtain other drawings based on these drawings without any creative effort.
[0027] Figure 1 A schematic diagram of the structure of a gas well provided in an embodiment of this application.
[0028] In the diagram: 010 - Gas well; 100 - Gas-liquid separator; 110 - Storage tank; 111 - Fluid inlet; 112 - Exhaust port; 113 - Drain port; 120 - Fluid delivery pipe; 130 - Gas delivery pipe; 140 - Liquid delivery pipe; 150 - Control valve; 200 - Wellhead pipeline; 210 - First production port; 220 - Second production port; 300 - Downhole pipeline; 310 - Tubing; 320 - Casing; 330 - Locking device; 400 - Plunger. Detailed Implementation
[0029] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application.
[0030] Therefore, the following detailed description of the embodiments of this application is not intended to limit the scope of the claimed application, but merely illustrates some embodiments of the application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.
[0031] It should be noted that, unless otherwise specified, the embodiments and features and technical solutions in this application can be combined with each other.
[0032] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.
[0033] In the description of this application, it should be noted that the terms "upper" and "lower" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the product of the invention is usually placed when in use, or the orientation or positional relationship in which those skilled in the art would conventionally understand. Such terms are only for the convenience of describing this application and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application.
[0034] In the description of this application, "gas well" refers to a natural gas well, which can be a natural gas well used to extract conventional natural gas or a natural gas well used to extract unconventional natural gas (shale gas, coalbed methane, etc.).
[0035] The inventors of this application discovered through research that the reason why the upward-moving plunger cannot directly enter the wellhead pipeline is that the diameter of the production pipeline is much smaller than the diameter of the wellhead pipeline and the downhole pipeline of the natural gas well. This causes a large back pressure to be generated after the liquid enters the production pipeline under the lifting action of the plunger. The large back pressure makes it difficult for the plunger to move upward into the wellhead pipeline, thus affecting the normal production of the natural gas well.
[0036] The inventors of this application have further discovered through research that the reason why production pipelines are prone to freezing is that during the plunger lifting and drainage process, the liquid enters the production pipeline in small, intermittent amounts. Specifically, during the plunger lifting and drainage process, the liquid enters the production pipeline intermittently in multiple stages, and the amount of liquid entering the production pipeline each time is small. Furthermore, because the plunger does not enter the wellhead pipeline, the gas well oil pressure is low, and the movement speed of the liquid segment in the production pipeline is also low. These factors cause the liquid segment to freeze before reaching the gas gathering station. Multiple freezing blockages within the production pipeline will prevent the gas well from producing normally.
[0037] To overcome the above problems, the following embodiments will provide a gas-liquid separation device, a gas well, and a gas well production method.
[0038] Example 1:
[0039] Figure 1 This is a schematic diagram of the structure of the gas well 010 provided in this embodiment. The gas well 010 provided in this embodiment includes a gas-liquid separation device 100, a wellhead pipeline 200, a downhole pipeline 300, and a plunger 400.
[0040] The wellhead piping 200, also known as the gas production tree, includes multiple valve bodies and piping connecting them, as well as devices such as a plunger blowout preventer and a plunger catcher. The lower end of the wellhead piping 200 connects to the downhole piping 300. The wellhead piping 200 has two production ports: a first production port 210 and a second production port 220.
[0041] The downhole pipeline 300 includes tubing 310 and casing 320 fitted over tubing 310. Tubing 310 is connected to wellhead pipeline 200. Wellhead pipeline 200 is located above ground level, while downhole pipeline 300 is located below ground level. A locking device 330 is installed at the lower part of tubing 310. A plunger 400 is disposed inside tubing 310 and can move up and down along tubing 310. When the plunger 400 descends along tubing 310 to the locking device 330, the locking device 330 prevents tubing 310 from continuing to descend. During the upward movement of the plunger 400, the plunger 400 lifts the accumulated fluid above it and discharges it through the first production port 210 and the second production port 220 of wellhead pipeline 200. After the plunger 400 enters the wellhead pipeline 200, the high-pressure gas below the plunger 400 is directly discharged from the first production port 210 and the second production port 220. At this time, the gas well 010 is in production. After the gas well 010 has been producing for a period of time, the plunger 400 falls back to the locking device 330. This process is repeated to achieve fluid drainage.
[0042] The gas-liquid separation device 100 includes a storage tank 110, a fluid delivery pipe 120, a gas delivery pipe 130, a liquid delivery pipe 140, and a control valve 150. The storage tank 110 is equipped with a fluid inlet 111, an exhaust port 112, and a drain port 113. The fluid delivery pipe 120 is connected to the fluid inlet 111. The fluid delivery pipe 120 extends away from the fluid inlet 111 and forms two branches, which are respectively connected to a first production port 210 and a second production port 220.
[0043] One end of the gas delivery pipe 130 is connected to the exhaust port 112, and the other end of the gas delivery pipe 130 is used to connect to the production pipeline extending to the gas gathering station. One end of the liquid delivery pipe 140 is connected to the drain port 113, and the other end of the liquid delivery pipe 140 is connected to the gas delivery pipe 130. A control valve 150 is disposed on the gas delivery pipe 130. The control valve 150 is located between the exhaust port 112 and the liquid delivery pipe 140. In this embodiment, the fluid inlet 111 and the exhaust port 112 are higher than the drain port 113; the connection between the liquid delivery pipe 140 and the gas delivery pipe 130 is higher than the drain port 113. Preferably, both the fluid inlet 111 and the exhaust port 112 are located at the top of the storage tank 110. The drain port 113 is located at the bottom of the storage tank 110.
[0044] In the gas well 010 provided in this embodiment, the control valve 150 opens when the plunger 400 moves upward. Fluid ejected from the first production port 210 and the second production port 220 of the wellhead pipeline 200 enters the storage tank 110 through the fluid delivery pipe 120. Gas-liquid separation is completed within the storage tank 110; the gas enters the production pipeline through the gas delivery pipe 130 and is then transported to the gas gathering station. The liquid is stored in the storage tank 110. In this way, during the upward movement of the plunger 400, the liquid does not enter the production pipeline, thus avoiding the problem of large back pressure generated by the liquid in the production pipeline when the plunger 400 moves upward, allowing the plunger 400 to smoothly enter the wellhead pipeline 200 of the gas well 010. After the plunger 400 enters the wellhead pipeline 200 of gas well 010, the high-pressure gas accumulated below the plunger 400 can be directly ejected from the first production port 210 and the second production port 220 of the wellhead pipeline 200, causing a sudden increase in oil pressure. At this time, the control valve 150 is closed. After the high-pressure gas enters the storage tank 110, it forces the liquid in the storage tank 110 into the gas delivery pipe 130, and pushes the liquid to move rapidly along the gas delivery pipe 130 and the production pipeline to the gas gathering station. Driven by the high-pressure gas, the liquid accumulated in the storage tank 110 can pass through the production pipeline quickly in one go, avoiding the possibility of the liquid freezing in the production pipeline.
[0045] To further prevent the liquid from freezing within the production pipeline, an insulation device and / or heating device can be installed on the storage tank 110. The insulation device can be an insulation layer wrapped around the storage tank 110, or a double-layer vacuum insulation structure installed on the storage tank 110. The liquid ejected from the wellhead pipeline 200 has a high temperature; the insulation device keeps the liquid warm, preventing it from freezing as it flows through the production pipeline. The heating device can be an electric heating device installed on the storage tank 110. Heating the liquid in the storage tank 110 and maintaining it at a high temperature further prevents freezing as it flows through the production pipeline.
[0046] This embodiment also provides a gas well production method. This method is based on gas well 010 and includes the following steps:
[0047] S01: During the upward movement of the plunger 400, the control valve 150 is opened.
[0048] As the plunger 400 moves upward, the control valve 150 opens. Fluid ejected from the first production port 210 and the second production port 220 of the wellhead pipeline 200 enters the storage tank 110 through the fluid delivery pipe 120. Gas-liquid separation is completed within the storage tank 110; the gas enters the production pipeline through the gas delivery pipe 130 and is then transported to the gas gathering station. The liquid is stored in the storage tank 110. In this way, during the upward movement of the plunger 400, the liquid does not enter the production pipeline, thus avoiding the problem of significant back pressure generated by the liquid in the production pipeline during the upward movement of the plunger 400, allowing the plunger 400 to smoothly enter the wellhead pipeline 200 of gas well 010.
[0049] S02: After the plunger 400 reaches the wellhead pipeline 200, close the control valve 150.
[0050] After the plunger 400 enters the wellhead pipeline 200 of gas well 010, the high-pressure gas accumulated below the plunger 400 can be directly ejected from the first production port 210 and the second production port 220 of the wellhead pipeline 200, causing a sudden increase in oil pressure. At this time, the control valve 150 is closed. After the high-pressure gas enters the storage tank 110, it forces the liquid in the storage tank 110 into the gas delivery pipe 130, and pushes the liquid to move rapidly along the gas delivery pipe 130 and the production pipeline to the gas gathering station. Driven by the high-pressure gas, the liquid accumulated in the storage tank 110 can pass through the production pipeline quickly in one go, avoiding the possibility of the liquid freezing in the production pipeline.
[0051] In this embodiment, step S03 is also included: before the plunger 400 moves downward, the control valve 150 is opened.
[0052] Before the plunger 400 descends, the control valve 150 is opened, which allows the low-pressure fluid flowing from the first production port 210 and the second production port 220 of the wellhead pipeline 200 to undergo gas-liquid separation in the storage tank 110, thus preventing liquid from entering the production pipeline and causing freezing blockage.
[0053] Furthermore, in step S03, after the control valve 150 is closed and a first preset time has elapsed, the control valve 150 is opened.
[0054] After the plunger 400 reaches the wellhead pipeline 200, the oil pressure rises sharply. As high-pressure gas continues to be ejected below the plunger 400, the oil pressure gradually decreases. When the oil pressure drops to a certain level, the gas pressure cannot quickly drive the liquid through the production pipeline, which may lead to freezing. Therefore, in this embodiment, after closing the control valve 150 and waiting for a first preset time, the control valve 150 is opened. After opening the control valve 150, the liquid can be stored in the storage tank 110, preventing liquid from entering the production pipeline and causing freezing. The first preset time can be set according to the energy status of the gas well 010. If the gas well 010 itself has sufficient energy and the oil pressure is high after the plunger 400 reaches the wellhead pipeline 200, the first preset time can be set to be longer. Conversely, the first preset time can be set to be shorter. In most cases, the first preset time can be set between 3 minutes and 10 minutes.
[0055] In other embodiments, step S03 may be further defined as follows: monitoring the wellhead oil pressure of gas well 010; after closing control valve 150, when the wellhead oil pressure is lower than a first preset value, opening control valve 150. Specifically, monitoring the back pressure of gas well 010; calculating the first preset value using the following formula: E1 = P R *K; where E1 represents the first preset value, P R This represents back pressure, and K represents the calculation coefficient.
[0056] The greater the difference between the wellhead oil pressure and the back pressure of gas well 010, the faster the fluid flows through the production pipeline, the shorter the time the fluid spends in the production pipeline, and the less likely freezing blockage will occur. A first preset value can be set. When the wellhead oil pressure is not less than the first preset value, it means that the difference between the wellhead oil pressure and the back pressure of gas well 010 is large enough to ensure that the fluid flows quickly through the production pipeline. When the wellhead oil pressure is lower than the first preset value, the control valve 150 is opened, allowing the fluid to accumulate in the storage tank 110, preventing the fluid from entering the production pipeline and thus avoiding freezing blockage.
[0057] The above description is only a partial embodiment of this application and is not intended to limit this application. For those skilled in the art, this application can have various modifications and variations. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.
Claims
1. A gas well production method, Features: The method is implemented based on a gas well; The gas well comprises a wellhead pipeline, a downhole pipeline, a plunger and a gas-liquid separation device; the downhole pipeline is connected to the wellhead pipeline, and the plunger is configured to move in the wellhead pipeline and the downhole pipeline; The gas-liquid separation device comprises a liquid storage tank, a fluid delivery pipe, a gas delivery pipe, a liquid delivery pipe and a control valve; the liquid storage tank is provided with a fluid inlet, an exhaust port and a liquid discharge port; The fluid delivery pipe is connected to the fluid inlet; the gas delivery pipe is connected to the exhaust port; one end of the liquid delivery pipe is connected to the liquid discharge port, and the other end of the liquid delivery pipe is connected to the gas delivery pipe; the control valve is arranged on the gas delivery pipe; the control valve is located between the exhaust port and the liquid delivery pipe; The fluid delivery pipe is connected to the production port of the wellhead pipeline; The fluid inlet and the exhaust port are higher than the drain port; The connection point between the liquid delivery pipe and the gas delivery pipe is higher than the liquid discharge port; The method comprises the following steps: During the upward movement of the plunger, the control valve is opened; After the plunger reaches the wellhead pipeline, closing the control valve; Before the plunger moves downward, the control valve is opened. Specifically, the oil pressure at the wellhead of the gas well is monitored. After the control valve is closed, when the oil pressure at the wellhead is lower than a first preset value, the control valve is opened. monitoring back pressure of the gas well; The first preset value is calculated by the following formula: E 1 =P R *K; Among them, E 1 represents the first preset value, P R represents the back pressure, and K represents the calculation coefficient.
2. The gas well production method according to claim 1, Features: The fluid inlet and the exhaust port are both opened at the top of the liquid storage tank.
3. The gas well production method according to claim 1, Features: The liquid discharge port is opened at the bottom of the liquid storage tank.
4. The gas well production method according to claim 1, Features: The liquid storage tank is provided with a heat preservation device and / or a heating device.
