A system for increasing the capacity of a water plant
By setting up sedimentation tanks, activated carbon filter tanks and uniform filter filters in parallel in the water plant, and using technologies such as bypass switches and ozone contact tanks, the problem of limited production capacity improvement in the water plant is solved, achieving high efficiency and low cost The energy expansion and increase of the water treatment system has significantly improved the utilization rate and economic benefits of the equipment.
Patent Information
- Application Number
- CN201910976711.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-15
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2039-10-15
AI Technical Summary
When existing water plants face increasing water demand, the expansion cycle is long and the investment is huge, so they cannot meet the development needs of cities in the short term. In addition, conventional water plants lack parallel pipeline configurations for activated carbon filters and sand filters in deep water treatment. , resulting in limited production capacity improvement.
By setting up parallel sedimentation tanks, activated carbon filter tanks and uniform filter filters in existing facilities, and adjusting the treatment water volume using bypass switches to increase margin to increase production capacity, combining the ozone contact pool to treat sludge, optimize the distribution The well and backwashing system are connected by light PE pipes and flanges to achieve the energy expansion of the system.
It has doubled the water plant production capacity, reduced costs, shortened the implementation cycle, avoided repeated investment and waste, and significantly improved equipment utilization and economic benefits.
Smart Images

Figure CN110563210B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to a system for increasing the capacity of a water plant, and belongs to the technical field of water, wastewater, sewage or muddy water treatment. Background Art
[0002] As one of the infrastructure projects, water plants play a very critical role in urban operations. However, with the gradual increase in population and urban scale, the water plants planned and constructed in the early stage can no longer meet the existing water demand. Taking a city in the south as an example, it now has a first-phase production capacity of 300,000 tons / day, with a peak daily overload of 20%, reaching a water supply capacity of 360,000 tons / day (this indicator is close to the overload capacity limit of the water plant), and will face an external increase of about 5% every year, about 10,000-20,000 tons / day, that is, in 2018, it is hoped that the water plant will have a production capacity of 380,000 tons / day; in 2019, it will have a production capacity of 400,000 tons / day; in 2020, it will have a production capacity of 420,000 tons / day. In the face of the problem of insufficient water plant capacity, in the short term, the reserved DN1000 pipe can be opened to replace part of the water supply area currently belonging to the water plant, but the amount of this part is very limited, estimated to be around 20,000 tons / day, which is far from the long-term expected scale of the city's water plant. In order to meet the water production and supply needs, how to expand the water plant's production capacity has become an urgent problem that needs to be solved.
[0003] In response to this problem, the conventional approach is to expand the second phase of the project. Assuming that the second phase of the project is 200,000 tons / day, the expected construction time is 2 years, and the investment is about 200 million yuan (only considering the construction of sedimentation tanks and filter tanks, and the rest is just adding equipment); the long construction period and huge investment of the expansion cannot meet the development needs of the city in the short term; at the same time, when conventional water plants are conducting deep water treatment, combined with Figure 1 Generally, the reaction sedimentation tank 1a→sand filter 2a→activated carbon filter 3a→clean water tank 4a is adopted, reaction sedimentation tank 1a→activated carbon filter 3a→sand filter 2a→clean water tank 4a. A small part of this series connection is equipped with an override pipe 5a. By means of the bypass switch 51a on the override pipe 5a, a certain stage of the process is directly short-circuited to achieve capacity adjustment. However, so far, there has been no design or practice to reserve parallel pipelines for the activated carbon filter and the sand filter. Summary of the invention
[0004] In view of this, the present application provides a system for increasing the capacity of a water plant, which can achieve the purpose of increasing the capacity of the water plant by utilizing existing facilities instead of expanding the plant.
[0005] Specifically, the present application is implemented through the following scheme:
[0006] A transformation system for water plant capacity expansion and increment includes a sedimentation tank, a filter tank, a muddy water treatment tank, a dosing facility and a clear water tank. The filter tank has a secondary filter tank, which is an activated carbon filter tank and a uniform particle filter tank in sequence. The sedimentation tank is connected to two water delivery branches. The first water delivery branch is connected to a dosing facility to deliver the water to be treated and the agent to the activated carbon filter tank, and the second water delivery branch is delivered to the uniform particle filter tank. A muddy water treatment tank is set at the end of the activated carbon filter tank. The muddy water treatment tank is connected to an outlet pipe and two branch pipes. The outlet pipe is connected to the clear water tank. Branch pipes 1 and 2 are respectively connected to the uniform particle filter tank. Bypass pipes are distributed between branch pipe 1 and branch pipe 2, and between branch pipe 2 and water delivery branch pipe 2. Switches are respectively set on the bypass pipe and the outlet pipe. The uniform particle filter tank is provided with an outlet branch pipe, which is connected to the outlet pipe. The sludge treatment tank is preferably a post-ozone contact tank.
[0007] As the core unit of the water plant operation, the filter tank has an upper limit for its design filtration rate and operation filtration rate. However, the sedimentation tank at the front end is designed according to the most unfavorable water quality and has a relatively large load margin in normal times. If the margin is configured on the bypass, it can generally exceed the rated load by 50% to ensure normal operation. The above scheme makes full use of existing facilities for transformation. The sedimentation tank and the parallel tank (activated carbon filter tank and uniform particle filter tank) are connected in parallel with the help of water branch pipes 1 and 2. Compared with the series connection method of conventional water plants, it can be adjusted to the sedimentation tank, activated carbon filter tank, and uniform particle filter tank in series according to the real-time environment, or it can be adjusted to the activated carbon filter tank and the uniform particle filter tank connected in parallel after the sedimentation tank. It can also be connected in series and parallel with the activated carbon filter tank and the uniform particle filter tank after the sedimentation tank by turning on and off the switch, so that the water treatment capacity of the whole system can be increased. The above solution eliminates the bottleneck of the filter tank and doubles the production capacity. In addition, the coordination between the storage tank and the sludge treatment tank also realizes the operation frequency of the sludge discharge and sludge treatment system, effectively improving the utilization factor of the equipment with low cost and quick effect.
[0008] Further, as a preference:
[0009] A water distribution well is set at the sedimentation tank, and the water delivery branch pipe is connected to the clean water tank through the water distribution well to realize water inflow from the open water distribution well. More preferably, in order to avoid the problem of insufficient capacity of the water distribution well, three solutions can be adopted: (1) The water distribution well is relative to the activated carbon filter tank elevation, which realizes the elevation of the water distribution well and increases the water level to offset the head loss; (2) The second water distribution well adopts a pressure-type water distribution well, which uses the pressure principle of the water distribution well itself to achieve capacity supplement.
[0010] The uniform particle filter tank is provided with a filter grid, in which the filter material is fixed, and the filter material in the uniform particle filter tank is quartz sand or carbon sand. According to specific needs, filter grids of different sizes are used to achieve the change of different filter tank scales. If all the filter grids are in effect, the production capacity of the sedimentation tank can be doubled, and when half of the filter grids are in effect, the production capacity can be increased by 1 / 2.
[0011] The water delivery branch pipe 1 and the water delivery branch pipe 2 are made of PE pipes, and are laid on one side of the parallel pool (activated carbon filter and uniform particle filter). In the entire system, the lack of pipeline positions is mainly reflected in the two pipelines from the sedimentation tank to the filter. Initial consideration is to use open pipes on the road surface; after the open pipes are used, the impact on traffic roads is considered to use light PE pipes, and flange connections are used in the road section to facilitate temporary disassembly and transportation; the pipes are laid on one side, so that the road can be passed on at least one side.
[0012] A backwashing water pump is provided in the uniform particle filter tank, and more preferably, a backwashing pipe is provided at the position of the backwashing water pump facing the filter grid. Since the equipment and pipelines of the original backwashing pump room were designed according to the carbon filter tank, after changing to a uniform particle filter tank with a sand filter tank structure, the backwashing intensity requirement is increased. Without changing the pipeline, the selected pump head and the matching motor power will be very large. If it is used as a temporary emergency project, it is more convenient to adopt this method under the premise of sufficient power capacity. Increasing the caliber of the backwashing pipe can effectively increase the backwashing intensity. Compared with conventional activated carbon filters, the activated carbon filter tank in this case is equipped with a backwashing system (backwashing pump, backwashing pipe, etc.), a valve system, and an automatic control system, which can all be used universally. The quartz sand can be removed and used as filter material for backup or expansion, without waste. When deep water treatment is required, a post-ozone contact tank is set at the end of the activated carbon filter. It is preferred that a storage tank is set in the sludge treatment tank. The storage tank is located on both sides of the end of the activated carbon filter. An ozone generator is also set in the storage tank, and related facilities and equipment are provided. Therefore, there is no problem of wasting time during the replacement of carbon with sand.
[0013] Conventional expansion is in line with public thinking and has good overall engineering quality, so it is of course the first choice. However, there are factors of large investment and long time. In terms of capital cost, an investment of 200 million yuan, calculated at an interest rate of 6%, is enough to complete the transformation system provided in this application in one year. In the transformation system provided in this application, except for the civil engineering involved in the setting of the storage tank, the rest are the purchase and installation of materials and equipment, with almost no repeated investment and waste. The investment is about 15 million yuan, which is 1 / 10 of the expansion funds, and the economic benefits are obvious. In addition, from a time perspective, due to factors such as engineering difficulty, manpower and material resources occupied, this application is expected to be implemented for 6-8 months, which also has obvious time advantages. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is the schematic diagram of the water plant system structure before the transformation.
[0015] 1a. Reaction sedimentation tank, 2a. Sand filter, 3a. Activated carbon filter, 4a. Clean water tank, 5a. Override pipe, 51. Bypass switch;
[0016] Figure 2This is a schematic diagram of the water plant system structure after the transformation.
[0017] 1. Sedimentation tank; 11. Water branch pipe 1; 12. Water branch pipe 2; 2. Activated carbon filter; 3. Post-ozone contact tank; 4. Uniform particle filter; 41. Outlet branch pipe; 5. Clean water tank; 6. Dosing facilities; 7. Branch pipe; 71. Branch pipe 1; 72. Branch pipe 2; 73. Branch pipe 3; 74. Bypass pipe; 8. Outlet pipe; 9. Switch; 91. Switch 1; 92. Switch 2; 93. Switch 3. DETAILED DESCRIPTION
[0018] Example 1: Water plant capacity expansion and increment systems with different structures
[0019] This embodiment is a system for increasing the capacity of a water plant, combined with Figure 2 , including a sedimentation tank 1, a filter tank, a muddy water treatment tank, a dosing facility 6 and a clear water tank 5, wherein: the filter tank has a secondary filter tank, which is an activated carbon filter tank 2 and a uniform particle filter tank 4 in sequence; the sedimentation tank 1 is connected to two water delivery branches, the water delivery branch 1 11 is connected to the dosing facility 6, and the water to be treated and the agent are delivered to the activated carbon filter tank 2, and the water delivery branch 2 12 is delivered to the uniform particle filter tank 4; a muddy water treatment tank is set at the end of the activated carbon filter tank 2, and the muddy water treatment tank is connected to the outlet pipe 8 and Two branch pipes 7 and an outlet pipe 8 are connected to the clean water tank 5, and the branch pipe 1 71 and the branch pipe 2 72 are respectively connected to the uniform particle filter tank; bypass pipes 74 are distributed between the branch pipe 1 71 and the branch pipe 2 72, and between the branch pipe 2 72 and the water supply branch pipe 2 12, and switches 9 are respectively provided on the bypass pipe 74 and the outlet pipe 8; the uniform particle filter tank 4 is provided with an outlet branch pipe 41, and the outlet branch pipe 41 is connected to the outlet pipe 8; the sludge treatment tank is preferably a post-ozone contact tank 3.
[0020] As the core unit of the water plant operation, the filter tank has an upper limit for its design filtration rate and operation filtration rate. However, the sedimentation tank 1 at the front end is designed according to the most unfavorable water quality and has a relatively large load margin at ordinary times. If the margin is configured on the bypass, it is generally 50% over the rated load to ensure normal operation. The above scheme makes full use of existing facilities for transformation. The sedimentation tank 1 and the parallel tanks (activated carbon filter 2 and uniform particle filter 4) are connected in parallel by means of the water delivery branch pipe 1 11 and the water delivery branch pipe 2 12. Compared with the series connection mode of the conventional water plant, it can be adjusted to the sedimentation tank 1, the activated carbon filter 2 and the uniform particle filter 4 in series according to the real-time environment, or it can be adjusted to the activated carbon filter 2 and the uniform particle filter 4 connected in parallel after the sedimentation tank 1. It can also be connected in series and parallel after the sedimentation tank 1 by means of the opening and closing of the switch 2 92 and the switch 3 93, and the activated carbon filter 2 and the uniform particle filter 4 connected in series and parallel can be connected after the sedimentation tank 1, so that the water treatment capacity of the whole system can be increased. The above solution eliminates the bottleneck of the filter tank and doubles the production capacity. In addition, the coordination between the storage tank and the sludge treatment tank also realizes the operation frequency of the sludge discharge and sludge treatment system, effectively improving the utilization factor of the equipment with low cost and quick effect.
[0021] Furthermore, the above scheme can also be set up in the following manner: a water distribution well is set up at the sedimentation tank 1, and the water branch pipe 1 11 and the water branch pipe 2 12 are respectively connected to the clean water tank through the water distribution well, so as to realize the water inflow of the open water distribution well. More preferably, in order to avoid the problem of insufficient capacity of the water distribution well, three schemes can be adopted: (1) the water distribution well is at an elevation relative to the activated carbon filter tank 2, which realizes the elevation of the water distribution well and the increase of the water level to offset the head loss; (2) the water distribution well adopts a pressure-type water distribution well, and realizes capacity supplementation by means of the pressure principle of the water distribution well itself.
[0022] Furthermore, the above scheme can also be arranged as follows: a filter grid is arranged in the uniform particle filter tank 4, a filter material is fixed in the filter grid, and the filter material is selected from quartz sand or carbon sand. According to specific needs, filter grids of different sizes are used to achieve the change of different filter tank scales. If all the filter grids are in effect, the production capacity of the sedimentation tank can be doubled, and when half of the filter grids are in effect, the production capacity can be increased by 1 / 2.
[0023] Furthermore, the above scheme can also be set up in the following manner: the water delivery branch pipe 11 and the water delivery branch pipe 2 12 use PE pipes, and the pipes are laid on one side of the parallel pool (activated carbon filter 2 and uniform particle filter 4). In the whole system, the shortage of pipeline positions is mainly reflected in the two pipelines from the sedimentation tank to the parallel pool. The open pipe on the road surface is initially considered; after the open pipe is used, the impact on the traffic road is considered to use light PE material pipes, and flange connection is used in the road section to facilitate temporary disassembly and transportation; the pipes are laid on one side, so that the road can be passed on at least one side.
[0024] Furthermore, the above scheme can also be arranged as follows: a backwash water pump is arranged in the uniform particle filter tank 4, and more preferably, a backwash pipe is arranged at the position of the backwash water pump facing the filter grid. Since the equipment and pipelines of the original backwash pump room are considered according to the carbon filter tank / i.e., the uniform particle filter tank 4, after changing to the uniform particle filter tank 4 of the sand filter tank structure, the backwash intensity requirement is increased. Without changing the pipeline, the selected pump head and the matching motor power will be very large. If it is used as a temporary emergency project, it is more convenient to adopt this method under the premise of sufficient power capacity. Increasing the caliber of the backwash pipe can effectively improve the backwash intensity. Compared with the conventional activated carbon filter tank, the activated carbon filter tank in this case is equipped with a backwash system (backwash pump, backwash pipe, etc.), a valve system, and an automatic control system, which can be universal, and the quartz sand can be removed and used as a filter material for backup or expansion, without waste. When deep water treatment is required, a post-ozone contact tank 3 is set at the end of the activated carbon filter 2. Preferably, a storage tank is set in the sludge treatment tank. The storage tank is located on both sides of the end of the activated carbon filter 2. An ozone generator is also set in the storage tank, and related facilities and equipment are provided. Therefore, there is no problem of wasting time during the period of replacing carbon with sand.
[0025] Conventional expansion is in line with public thinking and has good overall engineering quality, so it is of course the first choice. However, there are factors of large investment and long time. In terms of capital cost, an investment of 200 million yuan, calculated at an interest rate of 6%, is enough to complete the transformation system provided in this application in one year. In the transformation system provided in this application, except for the civil engineering involved in the setting of the storage tank, the rest are the purchase and installation of materials and equipment, with almost no repeated investment and waste. The investment is about 15 million yuan, which is 1 / 10 of the expansion funds, and the economic benefits are obvious. In addition, from a time perspective, due to factors such as engineering difficulty, manpower and material resources occupied, this application is expected to be implemented for 6-8 months, which also has obvious time advantages.
[0026] Example 2: Implementation of different expansion scales
[0027] Option 1: Expansion of 200,000 m 3 / d
[0028] 1. Expansion content:
[0029] 1) 200,000 m 3 One pre-ozone contact pool for / d;
[0030] 2) 100,000 m 3 / d Two flocculation sedimentation tanks;
[0031] 3) 200,000 m 3 / d uniform particle filter tank 4 (in this case, the filter medium is carbon sand) one (including backwashing room);
[0032] 4) Clear water tank 5 can be built no longer (the total storage capacity is considered to be 15%, which is about 3000m 3 );
[0033] 5) Second pump room additional pump Q = 8125m 3 / h, H=51m, N=1250KW 2 sets of water pumps (1 each of industrial frequency and variable frequency, 4 for use and 1 for standby), including supporting equipment;
[0034] 6) Supporting sludge system (one thickening tank, one dehydrator and one set of supporting equipment);
[0035] 7) Addition of equipment for chemical dosing facility 6 (200,000 m 3 / d scale);
[0036] 8) Supporting process pipelines, valves, fields, etc.;
[0037] 9) Supporting strong and weak current systems.
[0038] 2. Conditions:
[0039] 1) Water intake engineering equipment is based on 500,000 m 3 / d installation, matching the scale of the water plant;
[0040] 2) Raw water pipeline has 500,000 m 3 / d designed water delivery capacity;
[0041] 3) The expansion project is constructed independently and has little impact on current production;
[0042] 4) The expansion of the water plant is in line with the planning of a certain water plant construction.
[0043] Option 2: Expansion of 300,000 m 3 / d
[0044] 1. Expansion content:
[0045] 1) 300,000 m 3 One pre-ozone contact pool for / d;
[0046] 2) 150,000 m 3 / d Two flocculation sedimentation tanks;
[0047] 3) 300,000 m 3 / d uniform particle filter tank 4 (in this case, the filter medium is carbon sand) one (including backwashing room);
[0048] 4) Build 5 new clear water tanks with an effective volume of 18,000m 3 (The total storage capacity is considered to be 15%);
[0049] 5) Second pump room additional pump Q = 8125m 3 / h, H=51m, N=1250KW 2 sets of water pumps (1 each of industrial frequency and variable frequency, 4 for use and 1 for standby), including supporting equipment;
[0050] 6) Supporting sludge system (one new thickening tank, two sets of dehydrators and supporting equipment);
[0051] 7) Addition of equipment for chemical dosing facility 6 (300,000 m 3 / d scale);
[0052] 8) Supporting process pipelines, valves, fields, etc.;
[0053] 9) Supporting strong and weak current systems.
[0054] 2. Conditions:
[0055] 1) The water intake project equipment needs to be equipped with at least one water intake pump;
[0056] 2) Raw water pipeline has 500,000 m 3 / d designed water delivery capacity;
[0057] 3) The expansion project is constructed independently and has little impact on current production;
[0058] 4) The expansion of the water plant is in line with the planning of a certain water plant construction.
[0059] Option 3: Sedimentation tank reconstruction based on 400,000-420,000 m 3 / d meter
[0060] 1. Expansion content:
[0061] 1) DN1000 steel pipe, 350m long, exposed. Two valves of the same diameter, attached to the well; (sedimentation tank 1 to uniform particle filter tank 4 (the filter material is carbon sand));
[0062] 2) 3m 3 / min vacuum pumping system 2 sets, each set is equipped with 2 vacuum pumps, 1 for use and 1 for standby;
[0063] 3) Two groups of uniform particle filter tanks 4 (carbon sand is used as filter media), each with 2 grids (adding grids can further increase the water volume), sand volume 970m 3 ;
[0064] 4) 2 backwash pumps, Q = 3124m 3 / h, H=53m, N=630KW, front and rear pipes and valves are replaced; power distribution system is replaced accordingly (high voltage power supply is required) (whether the pump foundation can meet the pump replacement requirements is required);
[0065] 5) The second pump room is equipped with a variable frequency pump Q = 8125m 3 / h, H=51m, N=1250KW water pump 1 set, including supporting equipment (electrical and automatic control equipment);
[0066] 6) Supporting sludge system (one thickening tank, one additional dewatering machine and supporting equipment) (the solid load of the existing thickening tank is close to the regulatory limit).
[0067] 2. Conditions:
[0068] 1) There is no need to expand water intake projects and raw water pipelines;
[0069] 2) During the transformation, there is basically no impact on the current production;
[0070] 3) Temporary measures will be abolished when the deep water treatment project is launched, but there will be basically no waste in the facilities and equipment invested.
[0071] Table 1 Comparison of transformation effects of different schemes
[0072]
[0073]
[0074] By comparing the above scheme with the table, it can be seen that the adoption of this application not only achieves a short-time, high-efficiency capacity increase, but also saves investment and eliminates repeated investment. When deep processing is required, appropriate addition and adjustment of the filter grid and replacement of quartz sand can be performed.
Claims
1. A system for increasing the capacity of a water plant, comprising a sedimentation tank, a filter tank, a sludge treatment tank, a dosing facility and a clear water tank, characterized in that: The filter tank has two levels of filter tanks, which are activated carbon filter tank and uniform particle filter tank in sequence. Two water delivery branches are connected to the sedimentation tank. The first water delivery branch is connected to a dosing facility to deliver the water to be treated and the agent to the activated carbon filter tank, and the second water delivery branch is delivered to the uniform particle filter tank. The sedimentation tank, the activated carbon filter tank and the uniform particle filter tank are connected in parallel by means of the first water delivery branch and the second water delivery branch. The sedimentation tank, the activated carbon filter tank and the uniform particle filter tank can be adjusted to be connected in series with the sedimentation tank, the activated carbon filter tank and the uniform particle filter tank according to the real-time environment, or the activated carbon filter tank and the uniform particle filter tank can be connected in parallel after the sedimentation tank. The activated carbon filter tank and the uniform particle filter tank can also be connected in parallel after the sedimentation tank by means of the on and off of a switch. filter tank and uniform particle filter tank; a sludge treatment tank is arranged at the end of the activated carbon filter tank, and the sludge treatment tank is a post-ozone contact tank; the sludge treatment tank is equipped with storage tanks, which are located on both sides of the end of the activated carbon filter tank; the sludge treatment tank is connected to an outlet pipe and two branch pipes, the outlet pipe is connected to the clean water tank, and branch pipe one and branch pipe two are respectively connected to the uniform particle filter tank; bypass pipes are arranged between branch pipe one and branch pipe two, and between branch pipe two and water branch pipe two, and switches are respectively arranged on the bypass pipe and the outlet pipe; a filter grid is arranged in the uniform particle filter tank, and the filter media is fixed in the filter grid; an outlet branch pipe is arranged in the uniform particle filter tank, and the outlet branch pipe is connected to the outlet pipe.
2. A system for increasing the capacity of a water plant according to claim 1, characterized in that: A water distribution well is arranged at the sedimentation tank, and a water delivery branch pipe is connected to the clean water tank through the water distribution well to realize water inflow from the open water distribution well.
3. A system for increasing the capacity of a water plant according to claim 2, characterized in that: The water distribution well is a pressure type water distribution well.
4. A system for increasing the capacity of a water plant according to claim 1, characterized in that: The water delivery branch pipe adopts PE pipe, and is laid on one side of the activated carbon filter tank and the uniform particle filter tank.
5. The system for increasing the capacity of a water plant according to claim 1, characterized in that: A backwash water pump is arranged in the uniform particle filter tank.
6. A system for increasing the capacity of a water plant according to claim 5, characterized in that: A backwash pipe is arranged at the position of the backwash water pump facing the filter grid.
7. A system for increasing the capacity of a water plant according to claim 1, characterized in that: The uniform particle filter material filter tank is filled with quartz sand or carbon sand.