A multifunctional integrated intelligent tower building device
By using multi-functional integrated intelligent tower construction devices in bridge tower construction, integrating climbing, maintenance, spreading and vibration systems, the problems of low construction efficiency, poor quality and high safety risks are solved, and an efficient and safe bridge tower is achieved put up.
Patent Information
- Application Number
- CN201910973857.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2039-10-14
AI Technical Summary
There are problems in the construction of existing bridge towers such as poor working conditions, low construction efficiency, low construction quality and high safety risks. Especially in the harsh high-altitude working environment, how to improve the quality, efficiency and personnel safety of bridge towers is an urgent need to solve. subject.
Provide a multi-functional integrated intelligent tower construction device, including external form brackets and inner form brackets, integrated climbing system, maintenance system, distribution system, vibration system and shielding system, to improve construction efficiency and safety through centralized control, and through Innovative designs such as the observation structure, reverse buckle structure and adjusting screw improve the stability and operability of the equipment.
It has improved the safety and efficiency of bridge tower construction in harsh high-altitude environments, improved construction quality, reduced steel bar positioning errors and concrete maintenance difficulties, enhanced operating conditions, and ensured the safety and efficiency of the construction process.
Smart Images

Figure CN110644375B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction structures, and in particular to a multifunctional integrated intelligent tower building device. Background Art
[0002] Conventional bridge tower construction uses top formwork, lifting formwork and hydraulic climbing formwork. The main problems in construction are as follows:
[0003] 1) Poor working conditions: The climbing formwork has poor shielding conditions and is highly affected by weather factors; the working space is small, construction machinery is difficult to arrange, and there is little consideration for people-oriented;
[0004] 2) Low construction efficiency: The average speed of domestic large-scale bridge towers is about 0.7m / d; the time for bulk steel bar binding accounts for more than 60% of the segment construction time, and the repetitive auxiliary operations take a long time.
[0005] 3) Poor construction quality: low steel bar positioning accuracy and low protective layer qualification rate; poor concrete curing conditions, short curing time, easy to crack, and poor appearance quality.
[0006] 4) The safety risks are relatively high: the amount of high-altitude operations is large, the number of personnel is large, and the operation time is long; the operation supervision is difficult, the information transmission channel is single and easily missing; emergency rescue and escape routes are missing.
[0007] How to improve the quality of bridge towers, work efficiency and personnel safety in harsh high-altitude working environments is an issue that urgently needs to be addressed. Summary of the invention
[0008] The purpose of the present invention is to solve the deficiencies of the above-mentioned background technology and provide a multifunctional integrated intelligent tower building device.
[0009] The technical solution of the present invention is: a multifunctional integrated intelligent tower building device, characterized in that it comprises an outer mold support located outside the bridge tower and an inner mold support located inside the bridge tower;
[0010] The outer mold support is provided with:
[0011] An outer mold climbing system, which is fixed to the inner side of the outer mold support and is used to drive the outer mold support to move vertically along the outer side of the bridge tower;
[0012] A curing system, which is located inside the outer formwork support and is used to maintain moisture retention of the poured bridge tower concrete;
[0013] A material distribution system, the material distribution system is located at the top of the outer formwork support and is used for pouring concrete into the bridge tower pouring space;
[0014] The inner mold support is provided with:
[0015] The inner mold climbing system is movably connected to the outer side of the inner mold bracket to drive the inner mold bracket to move vertically along the inner side of the bridge tower.
[0016] A vibrating system, the vibrating system is located on the inner formwork support and is used to vibrate the concrete after the concrete is laid;
[0017] A shielding system, which is fixed to the top of the inner mold support and is located directly above the bridge tower casting space;
[0018] The outer mold support is also provided with a control system for controlling the outer mold climbing system, the maintenance system, the material distribution system, the inner mold climbing system and the vibration system.
[0019] By integrating the outer formwork climbing system, maintenance system and material distribution system on the outer formwork support, and integrating the inner formwork climbing system, vibration system and shielding system on the inner formwork support, and centrally controlling the outer formwork climbing system, maintenance system, material distribution system, inner formwork climbing system and vibration system through a control system, the problems of low construction efficiency, poor working conditions and low construction quality of traditional equipment in the bridge tower construction process have been changed, and safe, high-quality and efficient construction of super-high bridge towers can be achieved.
[0020] Preferably, the outer formwork climbing system includes an outer formwork track anchored on the surface of the poured concrete, an outer formwork stepping device arranged on the outer formwork track and a control platform fixed on the outer formwork stepping device; the outer formwork stepping device includes two groups of outer formwork climbing boxes arranged along the vertical interval; an outer formwork climbing cylinder is arranged between the two groups of outer formwork climbing boxes; the control platform is fixed on a group of outer formwork climbing boxes on the upper layer; it also includes a hanging claw rotatably hingedly connected to the outer formwork climbing box through a horizontal outer formwork rotating shaft; one end of the hanging claw extends into the outer formwork climbing box, and the other end is hooked and fixed with the outer formwork track or loosened; an observation structure for observing the connection between the hanging claw and the outer formwork track is provided on the side wall of the box body of the outer formwork climbing box.
[0021] By setting up an observation structure on the outer mold climbing box, the hooking status of the hanging claw and the outer mold track can be clearly seen, avoiding problems such as decoupling, and improving the safety and operability of the entire outer mold climbing box climbing process.
[0022] Preferably, the observation structure includes an observation window opened on the side wall of the outer mold climbing box; the observation window is an arc-shaped through hole coinciding with the rotation path of the hanging claw, and a pointer is passed through the observation window; one end of the pointer is fixed on the hanging claw, and the other end passes through the observation window and extends out of the outer mold climbing box; the side walls of the outer mold climbing box located around the observation window are marked with scales showing the movement of the pointer.
[0023] The combined structure of the observation window, the scale and the pointer can clearly reflect the rotation of the hanging claw, so as to judge the hooking condition of the hanging claw and the outer mold track, and ensure that the hanging claw can be stably hooked and fixed with the outer mold track.
[0024] Preferably, the hanging claw includes a main board connected to the outer mold climbing box through an outer mold rotating shaft; an eagle-beak-shaped hook is provided at one end of the main board extending outside the outer mold climbing box, and a counterweight block is provided on the side of the main board away from the hook; a limit plate is provided in the outer mold climbing box below the counterweight block; the limit plate is pressed against the lower end of the main board when the hook hooks the outer mold track.
[0025] By equipping the hanging claw with a counterweight, the center of gravity of the entire hanging claw is located inside the outer mold climbing box, so that the hanging claw can be restored to its initial state through the counterweight after it detaches from the outer mold track. The limit plate can prevent the hanging claw from continuing to flip downward, so that the hanging claw can be stably hooked on the outer mold track. The structure is simple, and no power equipment is required to drive the hanging claw, so the operation is convenient.
[0026] Preferably, a buckle structure is provided between the outer mold climbing box and the outer mold track to limit the outer mold climbing box from escaping from the outer mold track in the horizontal direction.
[0027] By providing a buckle structure between the outer mold climbing box and the outer mold track, the outer mold climbing box can be restricted from being disengaged from the outer mold track in the horizontal direction, thereby improving the connection stability between the outer mold climbing box and the outer mold track.
[0028] Preferably, the outer mold track is provided with inwardly recessed slide grooves on both sides thereof; the slide groove is a U-shaped groove with a lateral side opening and arranged throughout the length of the outer mold track; the reverse lock structure includes reverse lock brackets arranged on both sides thereof; one end of the reverse lock bracket is welded to the outer mold climbing box, and the other end extends into the slide groove, and a slider slidably connected to the slide groove is provided on the reverse lock bracket.
[0029] The reverse buckle bracket is engaged in the slide groove, thereby limiting the outer mold climbing box from escaping from the outer mold track in the horizontal direction. The structure is simple and easy to assemble, and the stability of the connection between the two can be effectively improved.
[0030] Preferably, one side of the sliding block is a smooth plane that fits tightly with the sliding groove, and the other side is universally rotatably connected to the reverse buckle bracket through a ball joint.
[0031] The slider can be universally rotated by setting a ball joint. Such a setting structure can make the slider adapt to the outer mold track structure with different inclination angles. It is used in the case where there is an inclined surface on some concrete casting surfaces, and the scope of application is greatly improved.
[0032] Preferably, a tightening structure is provided between the outer mold climbing box and the outer mold track to enable the slider to be tightly attached to the surface of the slide groove.
[0033] By arranging a tightening structure between the outer mold climbing box and the outer mold track, and using the tightening structure in conjunction with the buckle structure, the outer mold climbing box is fixed to the outer mold track in the horizontal direction, thereby improving the connection stability between the two.
[0034] Preferably, the clamping structure includes a reaction seat fixed at the lower end of the outer form climbing box; the reaction seat is provided with an adjusting screw arranged in the horizontal direction; the free end of the adjusting screw is provided with a clamping shoe; one end of the clamping shoe is connected to the adjusting screw in an adjustable position through a bolt, and the other end is clamped to the side of the outer form track away from the poured concrete.
[0035] The sliding shoe is connected to the outer mold climbing box by adjusting the screw, and the horizontal position of the sliding shoe can be adjusted in a simple and convenient manner, so that the sliding shoe can always be stably supported on the outer surface of the outer mold track.
[0036] Preferably, at least two groups of hanging claws arranged at intervals along the vertical direction are provided in each group of outer mold climbing boxes.
[0037] By arranging two sets of hanging claws on each set of outer mold climbing boxes, it is ensured that at any time, at least one set of hanging claws of each set of outer mold climbing boxes is hooked on the outer mold track, thereby improving the stability and safety of the connection between the outer mold climbing box and the outer mold track.
[0038] Preferably, a plurality of blocks for hooking claws arranged at intervals in the vertical direction are provided on the side of the outer mold track facing the outer mold climbing box; the blocks are block structures protruding from the surface of the outer mold track.
[0039] The stopper is used as a hooking point for connecting the hanging claw with the outer mold track, which has a simple structure and is easy to install, so that the hanging claw can be quickly hooked on the stopper.
[0040] Preferably, the outer formwork support includes a fixed truss anchored on the outside of the bridge tower, and is characterized in that: it also includes a movable truss; the movable truss is a movable truss structure that can be movably connected to the fixed truss along the longitudinal direction, and the mobile truss is provided with a clamping structure for clamping the track unit component; the clamping structure is a temporary fixing structure of the track unit component that can be movably connected to the mobile truss along the transverse direction; the fixed truss is installed with a lifting structure for vertically lifting the track unit component.
[0041] By arranging a movable truss at the lower end of the fixed truss which can adjust the position of the track unit in the horizontal and vertical directions, it is convenient to dismantle and move the used track unit components, and it is convenient for the lifting device to quickly lift them to the appropriate position. The track unit components can be reused and can be applied to various irregular-shaped high-rise buildings, with a wide range of applications.
[0042] Preferably, a longitudinal guide rail extending longitudinally is provided at the lower end of the fixed truss; a guide shoe slidably connected to the longitudinal guide rail is provided on the movable truss, and a longitudinal cylinder for pushing the movable truss to slide along the longitudinal guide rail is installed between the movable truss and the fixed truss.
[0043] By setting up a combined structure of a longitudinal guide rail and a longitudinal oil cylinder, the longitudinal position of the mobile truss can be adjusted conveniently. The adjustment method is simple and the controllability is good, and it can be centrally and uniformly controlled.
[0044] Preferably, the movable truss is provided with a transverse guide rail extending in the transverse direction; the clamping structure is slidably connected to the transverse guide rail; and the movable truss is provided with a transverse cylinder for driving the clamping structure to move along the transverse guide rail.
[0045] By moving the combined structure of the transverse guide rail and the transverse oil cylinder on the truss, the transverse position of the clamping structure can be adjusted conveniently. The adjustment method is simple and can be centrally controlled like the longitudinal oil cylinder, with a wide adjustment range.
[0046] Preferably, the clamping structure includes a clamping plate; one end of the clamping plate is fixed to the track unit component to be transported by a connecting pin passing through the track unit component and the clamping plate, and the other end is provided with two sliding blocks arranged at vertical intervals and clamped on the upper and lower sides of the transverse guide rail; the sliding blocks are slidably connected to the transverse guide rail.
[0047] The track unit can be fixed on the mobile truss by passing the connecting pin on the clamping plate through the track unit. The installation and fixing method is extremely simple and can be quickly loaded and unloaded.
[0048] Preferably, the fixed truss is provided with a guide structure for horizontally limiting the track unit when the track unit is lifted vertically.
[0049] By arranging a guide structure on the fixed truss, the track unit component is horizontally limited when it is hoisted, avoiding the shaking of the track unit component due to interference from external force factors, thereby improving the safety of hoisting.
[0050] Preferably, the guide structure includes two guide rods vertically fixed on the fixed truss, and the two guide rods are arranged at intervals in the horizontal direction; the guide rod is a U-shaped groove structure with an opening on one side and is engaged with the lateral sides of the track unit component to limit the horizontal movement of the track unit component.
[0051] The guide rods of the U-shaped groove structure are clamped on both lateral sides of the track unit to limit the horizontal movement of the track unit during lifting. The structure is simple and the installation and operation are convenient.
[0052] Preferably, the fixed truss is also provided with an anti-falling structure for preventing the track unit from suddenly falling when the track unit is lifted vertically.
[0053] By setting up an anti-fall structure, the track unit components can be prevented from falling rapidly when unhooking, the potential safety hazards caused by falling objects from high altitudes can be avoided, and the safety of lifting the track unit components can be improved.
[0054] Preferably, the anti-fall structure includes a support plate fixed on the fixed truss and a claw hingedly connected to the support plate through a horizontal rotating shaft; one end of the claw is provided with a hook that hooks on the track unit when the track unit is lowered; the support plate is provided with a limit baffle that limits the claw from continuing to rotate when the hook hooks the track unit; the upper end of the limit baffle is fixed to the support plate, and the lower end is pressed against the upper end of the claw away from the track unit when the hook hooks the track unit.
[0055] Through the combined structure of the clamping claw and the limit plate, the track unit component can be hooked when it is unhooked, which can effectively prevent the track unit component from falling. It has a simple structure, is easy to operate, does not require any power equipment, and is low in cost.
[0056] Preferably, the lifting structure includes a lifting frame and a winch arranged at the top of the fixed truss; the lifting frame is provided with a sliding guide rail arranged in a horizontal transverse direction; and the winch is slidably connected to the sliding guide rail.
[0057] The slide rail structure can facilitate the movement of the winch on the slide rail to adjust the lateral position of the winch, which is convenient for the later installation of the track unit components.
[0058] Preferably, the lifting frame is connected to the fixed truss so as to be movable in the horizontal longitudinal direction; a longitudinal telescopic cylinder for driving the lifting frame to move in the horizontal longitudinal direction is provided at the top end of the fixed truss.
[0059] Through the combined structure of the longitudinal telescopic cylinder and the lifting frame, the longitudinal position of the winch can be effectively adjusted. When used in conjunction with the slide rail, the horizontal position of the winch can be quickly adjusted. The winch can vertically adjust the track unit components, so the lifting structure can adjust the track unit components to any position with a wide adjustment range.
[0060] Preferably, the inner mold climbing system includes an inner mold track arranged vertically on the outside of the inner mold bracket and at least two groups of inner mold climbing devices arranged on the inner mold track at vertical intervals; the inner mold climbing device is a telescopic structure whose one end can move stepwise along the inner mold track and the other end can be connected to the side wall of the inner cavity of the bridge tower by contraction and extension in the horizontal direction.
[0061] By installing an inner form climbing system on the inner form support, the inner form support can be driven to move vertically along the side wall of the inner cavity of the bridge tower to adapt to the casting of the bridge tower, thereby greatly improving the efficiency of the bridge tower casting.
[0062] Preferably, the inner mold climbing device includes a bearing platform and a first inner mold stepping device with one end fixed on the bearing platform and the other end loosely removable or hooked on the inner mold track; the bearing platform includes a frame structure spliced by a transverse main beam and a longitudinal main beam; transverse telescopic arms that can move along the length direction are arranged at both ends of the transverse main beam, and a transverse telescopic cylinder for driving the transverse telescopic arm to extend and retract is arranged between the transverse telescopic arm and the transverse main beam; longitudinal telescopic arms that can move along the length direction are arranged at both ends of the longitudinal main beam, and a longitudinal telescopic cylinder for driving the longitudinal telescopic arm to extend and retract is arranged between the longitudinal telescopic arm and the longitudinal main beam; a first anchoring structure connected to the side wall of the inner cavity of the bridge tower is arranged at one end of the transverse telescopic arm and the longitudinal telescopic arm away from the inner mold bracket.
[0063] The load-bearing platform can be extended and changed to adapt to the changes in the inner cavity of the bridge tower of various shapes, and the adjustment method is simple and convenient. The adjustment process can be completed by extending the horizontal telescopic arm and the longitudinal telescopic arm.
[0064] Preferably, a main body platform is slidably connected to the transverse main beam; the main body platform is a frame structure sleeved on the outer side of the inner mold bracket, the main body platform is detachably fixed to the inner mold track by means of positioning pins passing through the main body platform and the inner mold track, the lower end of the main body platform can be slidably connected to the transverse main beam along the length direction of the transverse main beam, and the upper end is fixedly connected to the first inner mold stepping device, and limiting hooks are arranged on both sides of the main platform to limit the main body platform from disengaging from the transverse main beam; the upper end of the limiting hook is fixed to the main platform, and the lower end extends vertically to fit with the side of the transverse main beam.
[0065] By setting up a combined structure of the main platform and the first inner mold stepping device, the inner mold bracket can be conveniently moved vertically and lifted, and the bearing platform and the main platform can also be moved vertically. The entire driving process is simple and efficient.
[0066] Preferably, the first inner mold stepping device includes an inner mold climbing cylinder; two groups of inner mold climbing boxes are hinged at both ends of the inner mold climbing cylinder; the inner mold climbing box is a hollow box structure, and a cam is provided in the inner mold climbing box; the cam is hinged to the inner wall of the inner mold climbing box through a rotating shaft, and the cam is fixedly connected with a lever; the other end of the lever is hinged with a reset spring; the other end of the reset spring is hinged to the inner mold climbing box.
[0067] By setting an inner mold climbing box with an integrated cam as the first inner mold stepping device, the vertical movement of the main platform, the load-bearing platform and the inner mold bracket can be easily realized. The structure is simple and the operation mode is convenient, which greatly improves the construction efficiency.
[0068] Preferably, the cross-section of the inner mold rail is a box-shaped structure, and a plurality of positioning grooves arranged at intervals are vertically arranged on its outer side surface; the inner mold climbing box is also provided with a limiting groove that cooperates with the flange plate of the inner mold rail; the two ends of the cam are tapered, one end of the cam is in limiting contact with the positioning groove, and the other end is in limiting contact with the inner wall of the inner mold climbing box.
[0069] By setting positioning grooves and limiting grooves, the relative displacement of the inner mold track and the inner mold climbing box in the horizontal direction can be limited, thereby improving the stability of the connection between the two. During the vertical jacking process, the inner mold track and the inner mold climbing box can always maintain a stable connection, thereby improving the safety of the inner mold construction.
[0070] Preferably, the first anchoring structure includes a corbel; the corbel is a supporting member fixedly connected to a fastening screw embedded in the inner wall of the bridge tower through a fastening nut; the transverse telescopic arm and the longitudinal telescopic arm are provided with a tightening screw arranged in the horizontal direction and capable of being pressed against the inner wall of the bridge tower, and a supporting screw arranged in the vertical direction and capable of being supported on the upper end of the corbel.
[0071] By installing the corbels in the side walls of the inner cavity of the bridge tower as the supporting points of the bearing platform, the structure is simple, the installation is convenient, the supporting stability is good, and no structural damage is caused to the bridge tower.
[0072] Preferably, the inner mold climbing device includes a supporting frame sleeved on the outside of the inner mold bracket; the inner side of the supporting frame is vertically movably connected to the inner mold track through a second inner mold stepping device, and a plurality of vertically inclined support legs are arranged on the outside of the supporting frame; the upper end of the support leg is hingedly connected to the supporting frame, and the lower end is provided with a second anchoring structure connected to the side wall of the inner cavity of the bridge tower; a support leg cylinder is arranged between the support leg and the supporting frame for driving the support leg to rotate around the upper end hinge point.
[0073] Through the combined structure of the bearing frame and the second inner mold stepping device, the inner mold bracket can be quickly lifted and adjusted, and the structure is simple, the operation is more convenient, it is suitable for most bridge tower inner cavity structures, and the adjustment mode is more concise and efficient.
[0074] Preferably, the second inner mold stepping device includes an inner mold lifting cylinder; the upper and lower ends of the inner mold lifting cylinder are respectively hinged with a load-bearing climbing box and a lifting climbing box; the load-bearing climbing box and the lifting climbing box are hollow box structures, and the load-bearing climbing box is fixed on the inner side of the load-bearing frame.
[0075] Through the combined structure of the load-bearing climbing box and the lifting climbing box, it is possible to switch between the modes of releasing the fixed connection and completing the fixed connection to achieve the purpose of vertical adjustment and movement of the load-bearing frame or vertical adjustment and movement of the inner mold bracket. The switching method is simple and convenient.
[0076] Preferably, the second anchoring structure comprises a hinged support which is hingedly connected to the lower end of the supporting leg and can rotate along a horizontal axis; the hinged support is a rotating support which can be supported on the corbel of the side wall of the bridge tower.
[0077] By installing a hinge support at the lower end of the supporting leg, the hinge support can adapt to the position of the corbel and the inclination change of the supporting leg, ensuring that the corbel can provide a stable supporting force for the supporting leg, while avoiding slippage between the supporting leg and the corbel, thereby improving stability.
[0078] Preferably, a positioning system for adjusting the position of the steel bar component and the inner formwork is provided at the upper end of the inner mold support; the positioning system includes a base fixed at the upper end of the inner mold support, and the base is provided with a longitudinal shifting layer, a transverse shifting layer, a rotation layer and a vertical lifting layer from bottom to top, the longitudinal shifting layer slides longitudinally relative to the base, the transverse shifting layer slides transversely relative to the longitudinal shifting layer, the rotation layer rotates relative to the transverse shifting layer, and the vertical lifting layer moves vertically relative to the rotation layer.
[0079] By setting a positioning system at the top of the inner mold support, the steel bar components and the inner formwork hoisted to the top of the inner mold support can be positioned and adjusted, so that the steel bar components and the inner formwork can be quickly aligned, and the positioning system is simple to adjust and convenient to adjust, which greatly improves the construction efficiency.
[0080] Preferably, the longitudinal shift layer is a frame structure that is slidably connected to the base in the longitudinal direction, and a longitudinal shift cylinder for driving the longitudinal shift layer to slide in the longitudinal direction is provided between the longitudinal shift layer and the base.
[0081] Preferably, the transverse shifting layer is a frame structure that can be slidably connected to the longitudinal shifting layer in the transverse direction, and a transverse shifting cylinder for driving the transverse shifting layer to move in the transverse direction is provided between the transverse shifting layer and the longitudinal shifting layer.
[0082] Preferably, the rotating layer is a frame structure that is rotatably hingedly connected to the transverse layer through a rotating pin that vertically penetrates the rotating layer and the transverse layer, and a rotating cylinder is provided between the rotating layer and the transverse layer for driving the rotating layer to rotate around the rotating pin.
[0083] Preferably, a vertical positioning cylinder is provided on the vertical lifting layer; the vertical positioning cylinder is arranged vertically, with the lower end fixed on the vertical lifting layer and the upper end fixedly connected to a hoisting device hoisted on the vertical lifting layer.
[0084] By setting up longitudinal shifting layers, transverse shifting layers, rotation layers and vertical lifting layers with clear structural levels, the working functions of each part are clear, the adjustment method is simple and the adjustment range is wide. It can realize rapid adjustment of the steel parts and inner formwork in the horizontal, longitudinal, inclination and vertical directions, and the adjustment structure can be centrally controlled. The entire adjustment process is intelligently operated, which greatly improves the construction efficiency.
[0085] Preferably, the hoist includes a main load-bearing frame; a plurality of slideways are arranged on the main load-bearing frame; the slideways are arranged circumferentially along the main load-bearing frame with the midpoint of the main load-bearing frame as the center, and the plurality of slideways surround to form an annular structure corresponding to the cross-section of the bridge tower; the slideway is a guide rail movably connected to the main load-bearing frame along the radial direction of the main load-bearing frame, and a plurality of connectors for hanging steel bar components are arranged on the slideway; the connector is a hanging connection point movably connected to the slideway along the length direction of the slideway.
[0086] A slideway that can move along the radial direction of the main load-bearing frame is arranged on the main load-bearing frame, and a connector that can move along the length direction of the slideway is arranged on the slideway. The slideways are arranged around to form a ring structure corresponding to the cross-section of the bridge tower. The connectors are arranged along the slideway to form a hanging connection point covering the entire cross-section of the bridge tower. The movable slideway and connector can be adjusted according to the shape of the cross-section of the bridge tower, and can adapt to the requirements of various cross-sectional specifications. It has a wide range of applications and is easy to adjust, and has great promotion value.
[0087] Preferably, the main load-bearing frame is provided with a fixing structure for fixing the slideway after the slideway is adjusted.
[0088] By setting a fixed structure on the main load-bearing frame, the slideway is fixed after adjustment, so as to avoid the problem of the lifting point position being offset due to the sliding of the slideway during the later lifting process, thereby improving the stability and safety of the entire lifting device structure.
[0089] Preferably, the fixing structure comprises a precision-rolled threaded steel bar inserted into a slideway; the precision-rolled threaded steel bar passes through the slideway in a radial direction of the main load-bearing frame, and both ends of the precision-rolled threaded steel bar are respectively anchored and connected to a fixing seat on the main load-bearing frame.
[0090] The slide can be easily fixed through the matching structure of the fine-rolled threaded steel and the fixing seat. The fixing method is simple. The fine-rolled threaded steel can stably position the slide on the main load-bearing frame to avoid shaking, thereby improving the stability and safety of the entire structure.
[0091] Preferably, a shielding structure for shielding the casting cross section of the bridge tower is provided at the upper end of the main load-bearing frame.
[0092] By setting up a unloading platform on the main load-bearing frame, the unloading platform can shield the pouring position of the bridge tower section, protect the poured concrete from sun and rain, and improve the efficiency of concrete maintenance. In addition, the unloading platform can also be used as a working platform for the pouring construction process.
[0093] Preferably, the shielding system includes a unloading platform arranged on the main load-bearing frame; the unloading platform includes a fixed platform fixed on the slide and a sliding platform movably connected to the fixed platform along the length direction of the slide; the sliding platform is connected to the fixed platform on both sides along the circumferential direction of the main load-bearing frame to form a platform structure with the fixed platform for shielding the casting section of the bridge tower.
[0094] Through the combined structure of the sliding platform and the fixed platform, the fixed platform itself can follow the movement of the slide to adjust its radial position, and the sliding platform can move along the length direction of the slide, that is, its position along the axial direction can be adjusted. The annular platform structure formed in this way can adapt to bridge tower sections of various sizes and has good versatility.
[0095] Preferably, a hoisting structure for hoisting the inner formwork of the bridge tower is provided at the lower end of the main load-bearing frame.
[0096] Preferably, the hoisting structure includes a hanging rail fixed at the lower end of the main load-bearing frame; the hanging rail is a guiding structure arranged along the axial direction of the main load-bearing frame, and multiple hanging rails are surrounded to form a ring structure corresponding to the inner side template of the bridge tower; the hanging rail is provided with an electric hoist that can slide along the length direction of the hanging rail.
[0097] By setting up a lifting structure on the main load-bearing frame, it is convenient to control the inner formwork of the bridge tower. Due to the obstruction of the lifting equipment, the inner formwork is not convenient to lift. This problem is solved by setting up a lifting structure on the main load-bearing frame. The lifting structure on the main load-bearing frame is relatively simple, and there is no need to use large lifting equipment, so the construction cost is lower.
[0098] Preferably, the main load-bearing frame is a single-layer truss structure formed by multiple steel sections cross-connected vertically and horizontally. A track is installed at the lower end of the main load-bearing frame, and an electric hoist that can move along the length of the track is installed on the track. The track itself is arranged along the circumference of the main load-bearing frame to form a ring structure around the installation position of the inner template of the corresponding bridge tower section. The electric hoist adjusts its position along the track according to the hoisting position of the inner template, and adjustment and hoisting are extremely convenient.
[0099] Preferably, the vibration system includes a vibrator arranged on the inner mold bracket; the vibrator includes a vibrating motor placed on the inner mold bracket and a vibrating head connected to the vibrating motor through a vibrating pipe; and an adjustment structure for adjusting the vertical and horizontal positions of the vibrating head is provided on the inner mold bracket.
[0100] Preferably, the adjustment structure includes a sliding bracket; the inner mold bracket is provided with a sliding rail arranged along a horizontal transverse direction; the upper end of the sliding bracket is provided with a sliding roller slidably connected to the sliding rail; the vibrating pipe is retractably connected to the sliding bracket.
[0101] By arranging an adjustment structure on the inner mold bracket, the adjustment structure adjusts the vertical and horizontal positions of the vibrating head so that the vibrating head can enter the concrete area to be vibrated for vibrating. There is no need for construction workers to go down to the area to be vibrated for hand-held vibration, which has high construction efficiency and good safety.
[0102] Through the combined structure of the slide rail and the sliding roller, the sliding bracket can be adjusted horizontally and longitudinally, so as to achieve the purpose of horizontally and longitudinally adjusting the vibrating head. The adjustment method is simple and the operation is convenient.
[0103] Preferably, the adjustment structure further comprises a fixed frame fixed on the sliding bracket and a telescopic frame connected to the fixed frame so as to be movably connected in the horizontal and longitudinal direction; a driving cylinder for driving the telescopic frame to move in the horizontal and longitudinal direction is arranged between the telescopic frame and the fixed frame.
[0104] The combined structure of the telescopic frame and the fixed frame facilitates the horizontal and lateral adjustment of the vibrating head. The adjustment method is simple and efficient and can be centrally controlled.
[0105] Preferably, a driving wheel for retraction and extension is installed on the fixed frame; a guide wheel for guiding is provided on the telescopic frame; one end of the vibrating tube is connected to the vibrating motor, and the other end passes through the driving wheel and the driven wheel in sequence to be connected to the vibrating head.
[0106] The vibrating pipe can be retracted and extended through the driving wheel and the guide wheel, so as to facilitate the adjustment of the vertical position of the vibrating head.
[0107] Preferably, the maintenance system includes an atomizer unit arranged on the outer mold bracket and a spray pipe rack fixed at the bottom of the outer mold plate inside the outer mold bracket; the atomizer unit is connected to the spray pipe rack through a connecting hose; the spray pipe rack is a pipe network structure formed by a plurality of water pipes crisscrossed and connected, a plurality of nozzles are arranged on the spray pipe rack, the spray pipe rack is fixed to the outer mold plate through a spray pipe hanger, and a maintenance film is arranged on the outside of the spray pipe rack; the maintenance film is a water-impermeable film covering the outside of the spray pipe rack, and the maintenance film is fixed to the outer mold plate through a maintenance film hanger.
[0108] By arranging a maintenance system between the outer formwork and the outer formwork support, the poured concrete can be well moisturized and maintained, thereby improving the effect of concrete maintenance for the bridge tower. The maintenance system can move vertically with the outer formwork and automatically adjust its position, thereby greatly reducing the difficulty of arranging the maintenance structure on the tall bridge tower. The various structural parts of the maintenance system of the present invention are extremely convenient to install and disassemble.
[0109] The present invention adheres to the concept of industrialized construction and people-oriented. The low-position support, large-tonnage and large-stroke climbing system is adopted to reduce the requirements of climbing on the concrete strength, shorten the maintenance time with formwork, and improve construction efficiency. Through the fire-proof and heat-insulating enclosure curtain system, the temperature and humidity adjustable hot mist generation equipment and the homogenizing guide pipeline, automatic heat preservation and moisture maintenance are realized to ensure the construction quality. When pouring concrete, a multifunctional hoist is used as a covering and material distribution platform, and two diagonally arranged material distribution machines are used to automatically distribute materials through an intelligent control system. At the same time, the vibration system set under the hoist is used to reduce the labor intensity of personnel and improve the vibration efficiency and quality. The tower crane hoists the steel cage as a whole, and the positioning system is used to quickly put the bottom of the steel cage into place. The hoist is placed on the positioning system, and the positioning system is used to accurately adjust the spatial coordinates of the top of the steel cage in three directions, and the conical sleeve is squeezed to complete the steel bar connection. Through humanized service facilities, the living or survival needs of people in different environments can be met. In the event of dangerous situations such as fire, people can quickly gather on the bottom-level refuge platform for temporary shelter. When people are injured, they can use the special hanging baskets set up in the partitions to quickly evacuate the scene. BRIEF DESCRIPTION OF THE DRAWINGS
[0110] Figure 1 : A schematic structural diagram of the multifunctional integrated intelligent tower building device of the present invention;
[0111] Figure 2 : A schematic diagram of the structure of the outer mold climbing system of the present invention;
[0112] Figure 3 : Schematic diagram of the outer mold climbing box structure of the present invention;
[0113] Figure 4 : Schematic diagram of the observation structure of the present invention;
[0114] Figure 5 : Schematic diagram of the connection between the outer mold climbing box and the outer mold track of the present invention;
[0115] Figure 6 : Schematic diagram of the abutting structure of the present invention;
[0116] Figure 7 : Schematic diagram of the outer mold track structure of the present invention;
[0117] Figure 8 : Schematic diagram of the leveling structure of the present invention;
[0118] Fig. 9 : Schematic diagram of the installation structure of the balance beam and the leveling cylinder of the present invention;
[0119] Fig.10 ; Schematic diagram of step 1 of the climbing process of the outer mold climbing system of the present invention;
[0120] Fig.11; Schematic diagram of step 2 of the climbing process of the outer mold climbing system of the present invention;
[0121] Fig.12 ; Schematic diagram of step 3 of the climbing process of the outer mold climbing system of the present invention;
[0122] Fig.13 ; Schematic diagram of step 4 of the climbing process of the outer mold climbing system of the present invention;
[0123] Fig.14 ; Schematic diagram of step 5 of the climbing process of the outer mold climbing system of the present invention;
[0124] Fig.15 ; Schematic diagram of step 6 of the climbing process of the outer mold climbing system of the present invention;
[0125] Fig.16 : A front view of the track lifting device of the present invention;
[0126] Fig.17 : A schematic diagram of the structure of the connection between the fixed truss and the movable truss of the present invention;
[0127] Fig.18 : Front view of the mobile truss of the present invention;
[0128] Fig.19 : A side view of the mobile truss of the present invention;
[0129] Fig. 20 : Schematic diagram of the clamping structure of the present invention;
[0130] Fig.21 : A schematic diagram of the structure in which the guide structure of the present invention is installed on a fixed truss;
[0131] Fig. 22 : The present invention Fig.21 AA view in;
[0132] Fig.23 : The present invention Fig.21 BB view in;
[0133] Fig.24 : Schematic diagram of the anti-falling structure of the present invention;
[0134] Fig.25 : Schematic diagram of the lifting structure of the present invention;
[0135] Fig.26 : A schematic diagram of the structure of the maintenance system of the present invention;
[0136] Fig. 27 : Schematic diagram of the arrangement structure of the spray pipe rack and the curing membrane of the curing system of the present invention;
[0137] Fig.28: Schematic diagram of the installation and connection of the spray pipe rack of the present invention;
[0138] Fig.29 : Schematic diagram of the installation and connection of the curing film of the present invention;
[0139] Fig.30 : A schematic diagram of the connection between the inner mold climbing system with the first inner mold stepping device and the inner mold bracket of the present invention;
[0140] Fig.31 : Schematic diagram of the connection structure between the load-bearing platform and the main platform of the present invention;
[0141] Fig.32 : A side view of the connection structure between the load-bearing platform and the main platform of the present invention;
[0142] Fig.33 : A top view of the carrying platform of the present invention;
[0143] Fig.34 : A top view of the main platform of the present invention;
[0144] Fig.35 : Schematic diagram of the main platform structure of the present invention;
[0145] Fig.36 : A schematic structural diagram of the first inner mold stepping device of the present invention;
[0146] Fig.37 : A schematic diagram of the connection between the inner mold climbing system with the second inner mold stepping device of the present invention and the inner mold bracket;
[0147] Fig.38 : A top view of the connection structure between the load-bearing frame and the inner mold support of the present invention;
[0148] Fig.39 : A schematic diagram of the structure of the second inner mold stepping device of the present invention;
[0149] Fig.40 : Schematic diagram of the connection structure between the support leg and the support leg cylinder of the present invention;
[0150] Fig.41 : Schematic diagram of the installation structure of the positioning system, vibrating system, hanger and inner mold support of the present invention;
[0151] Fig.42 : A front view of the positioning system of the present invention;
[0152] Fig.43 : A side view of the positioning system of the present invention;
[0153] Fig.44 : A top view of the longitudinal shift layer structure of the present invention;
[0154] Fig.45 : A top view of the lateral shift layer structure of the present invention;
[0155] Fig.46 : A top view of the rotating layer structure of the present invention;
[0156] Fig.47 : A schematic structural diagram of the vibrating system of the present invention;
[0157] Fig.48 : Schematic diagram of the connection structure between the sliding bracket and the slide rail of the present invention;
[0158] Fig.49 : Schematic diagram of the connection structure between the fixed frame and the telescopic frame of the present invention;
[0159] Fig.50 : Front view of the sling structure of the present invention;
[0160] Fig.51 : A side view of the sling structure of the present invention;
[0161] Fig.52 : Schematic diagram of the connection structure between the fixed platform and the sliding platform of the present invention;
[0162] Fig.53 : A top view of the blanking platform of the present invention;
[0163] Among them: 1—external mold support;
[0164] 101—fixed truss; 102—movable truss; 103—track unit; 104—longitudinal guide rail; 105—guide shoe; 106—longitudinal cylinder; 107—transverse guide rail; 108—transverse cylinder; 109—clamping plate; 1010—connecting pin; 1011—sliding block; 1012—support plate; 1013—claw; 1014—limit baffle; 1015—lifting frame; 1016—winch; 1017—sliding guide rail; 1018—longitudinal telescopic cylinder; 1019—guide rod; 1020—holding rod; 1021—guide roller; 11—external mold climbing system; 111—external mold track; 112—control platform; 113—external mold climbing box; 114—external mold climbing cylinder; 115—external Mold shaft; 116-claw; 1161-main board; 1162-hook; 1163-weight block; 117-observation window; 118-pointer; 119-scale; 1110-limit plate; 1111-slideway; 1112-reverse bracket; 1113-slider; 1114-ball joint; 1115-reaction seat; 1116-adjusting screw; 1117-tightening shoe; 1118-stopper; 1119-balance beam; 1120-leveling cylinder; 1121-locking screw; 1122-plug; 1123-socket; 12-maintenance system; 121-atomizing unit; 122-connecting hose; 123-spray pipe rack; 124-maintenance film; 125-spray pipe rack; 126-maintenance film rack; 127 —Support roller; 2—Inner mold bracket; 21—Inner mold climbing system; 211—Inner mold track; 212—Horizontal main beam; 213—Longitudinal main beam; 214—Horizontal telescopic arm; 215—Longitudinal telescopic arm; 216—Horizontal telescopic cylinder; 217—Longitudinal telescopic cylinder; 218—Main platform; 219—Location pin; 2110—Limiting roller; 2111—Tightening screw; 2112—Support screw; 2113—First inner mold stepping device; 2114—Inner mold climbing cylinder; 2115—Inner mold climbing box; 2116—Cam; 2117—Inner mold shaft; 2118—Lever; 2119—Reset spring; 2120—Location groove; 2121—Horizontal translation cylinder; 2122—Carrying frame; 212 3—support leg; 2124—support leg oil cylinder; 2125—second inner mold stepping device; 2126—inner mold lifting oil cylinder; 2127—bearing climbing box; 2128—lifting climbing box; 2129—hinge support; 2130—corbel; 2131—limiting hook; 22—vibration system; 222—vibration motor; 223—vibration pipe; 224—vibration head; 225—sliding bracket; 226—slide rail; 227—sliding roller; 228—fixed frame; 229—telescopic frame; 2210—driving oil cylinder; 2211—driving wheel; 2212—guide wheel; 23—hanging device; 231—main load-bearing frame; 232—slideway; 233—connector; 234—finely rolled threaded steel bar; 235—fixed seat; 236—hanging rail;237—Electric hoist; 24—Positioning system; 241—Base; 242—Vertical shifting layer; 243—Horizontal shifting layer; 244—Rotation layer; 245—Vertical lifting layer; 246—Vertical shifting cylinder; 247—Horizontal shifting cylinder; 248—Rotation cylinder; 249—Vertical position adjusting cylinder; 250—Rotation pin; 25—Shielding system; 251—Fixed platform; 252—Sliding platform; 253—Unloading hole; 3—Bridge tower; 4—Concrete placing machine. ; DETAILED DESCRIPTION
[0165] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0166] like Figures 1 to 53 This embodiment is used for casting the bridge tower 3, and includes an outer mold support 1 located outside the casting space of the bridge tower 3 and an inner mold support 2 located inside the casting space of the bridge tower 3. The outer mold support 1 and the inner mold support 2 cooperate with each other in construction to complete the casting construction of the bridge tower 3. Among them, the outer mold support 1 is provided with an outer mold climbing system 11, a maintenance system 12 and a material distribution system. The outer mold climbing system 11 is fixed to the inner side of the outer mold support 1 to drive the outer mold support 1 to move vertically along the outer side of the bridge tower 3. The maintenance system 12 is located inside the outer mold support 1 to moisturize and maintain the concrete of the bridge tower 3 after casting. The material distribution system is located at the top of the outer mold support 1 to distribute and cast concrete into the casting space of the bridge tower 3.
[0167] The inner formwork bracket 2 is provided with an inner formwork climbing system 21, a vibration system 22 and a shielding system 25. The inner formwork climbing system 21 is movably connected to the outer side of the inner formwork bracket 2 to drive the inner formwork bracket 2 to move vertically along the inner side of the bridge tower 3. The vibration system 22 is located on the inner formwork bracket 2 to vibrate the concrete after the laying. The shielding system 25 is fixed at the top of the inner formwork bracket 2 and is located directly above the casting space of the bridge tower 3 to isolate the influence of the climate environment on the casting construction.
[0168] The outer mold climbing system 11 of this embodiment is as follows Figures 2 to 9 As shown, it includes an outer mold track 111 anchored on the surface of the poured concrete, an outer mold stepping device arranged on the outer mold track 111, and a control platform 112 fixed on the outer mold stepping device. Figure 2 As shown, the outer mold stepping device of this embodiment includes two groups of outer mold climbing boxes 113 arranged at intervals along the vertical direction, and an outer mold climbing oil cylinder 114 is arranged between the two groups of outer mold climbing boxes 113. The outer mold climbing oil cylinder 114 is used to perform vertical lifting to achieve alternating stepping movement of the two outer mold climbing boxes 113.
[0169] like Figures 3-4As shown, at least two groups of hanging claws 116 are arranged in each group of outer mold climbing box 113 of this embodiment. In this embodiment, there are two groups of hanging claws 116, and the two groups of hanging claws 116 are arranged at intervals along the vertical direction. The hanging claws 116 include a main board 1161 connected to the outer mold climbing box 113 through the outer mold rotating shaft 115, and an eagle-shaped hook 1162 is arranged at one end of the main board 1161 extending outside the outer mold climbing box 113, and a counterweight block 1163 is arranged on the side of the main board 1161 away from the hook 1162. A limit plate 1110 is arranged below the counterweight block 1163 in the outer mold climbing box 113, and the limit plate 1110 is pressed against the lower end of the main board 1161 when the hook 1162 hooks the outer mold track 111. That is, when the hook 1162 is subjected to a vertical force from top to bottom, the hook 1162 can rotate around the outer mold shaft 115, and when the force disappears, the hook 1162 returns to its initial state under the action of the counterweight 1163. Therefore, in fact, the hook 116 of this embodiment does not need to be driven by a power device to move, and the operation is convenient.
[0170] In order to know the hooking status of the hook claw 116 at any time, in this embodiment, an observation structure for observing the connection status between the hook claw 116 and the outer mold track 111 is provided on the side wall of the outer mold climbing box 113. Figures 3-4 As shown, the observation structure includes an observation window 117 opened on the side wall of the outer mold climbing box 113. The observation window 117 is an arc-shaped through hole that coincides with the rotation path of the hanging claw 116. A pointer 118 is inserted in the observation window 117. One end of the pointer 118 is fixed on the main board 1161, and the other end passes through the observation window 117 and extends out of the outer mold climbing box 113. The side wall of the outer mold climbing box 113 located around the observation window 117 is marked with a scale 119 showing the movement of the pointer 118. When the hanging claw 116 rotates, the pointer 118 rotates accordingly, and the pointer 118 points to the scale 119 outside the observation window 117, showing the rotation of the hanging claw 116. By observing the indication of the pointer 118 at any time, the hooking condition of the hook 1162 can be mastered.
[0171] like Figure 5 and 7As shown, the outer mold rail 111 of this embodiment is anchored on the surface of the poured concrete through an anchoring structure, and a plurality of blocks 1118 arranged vertically and spaced apart for hooking the hooks 116 are provided on the side of the outer mold rail 111 facing the outer mold climbing box 113. The outer mold rail 111 is provided with inwardly recessed chute 1111 on both lateral sides, and the chute 1111 is a U-shaped groove with lateral side openings and arranged throughout the length of the outer mold rail 111. In this embodiment, reverse buckle brackets 1112 are provided on both sides of the outer mold climbing box 113, one end of the reverse buckle bracket 1112 is welded to the outer mold climbing box 113, and the other end extends into the chute 1111 in the lateral direction, and a slider 1113 slidably connected to the chute 1111 is provided on the side of the reverse buckle bracket 1112 away from the poured concrete. The slider 1113 can be slidably connected in the slide groove 1111 along the length direction of the outer mold track 111, and through the buckling of the reverse buckle bracket 1112, the outer mold climbing box 113 can be restricted from escaping from the outer mold track 111 in the horizontal direction.
[0172] For some concrete tower column structures with special shapes, the outer mold track 111 may not be arranged in a vertical direction, and may have a certain inclination angle. In order to adapt to such changes, a ball joint 1114 is arranged on the reverse buckle bracket 1112 in this embodiment. Figures 4-5 As shown, one side of the slider 1113 is a smooth plane that fits tightly with the slide groove 1111, and the other side is universally rotatably connected to the reverse bracket 1112 through a ball joint 1114. When the outer mold track 111 is vertically tilted, the slider 1113 can rotate through the ball joint 1114 to adapt to the tilt change.
[0173] In order to avoid the problem that the slider 1113 does not fit the surface of the slide groove 1111, a tight structure is provided between the outer mold climbing box 113 and the outer mold track 111 to make the slider 1113 fit tightly against the surface of the slide groove 1111. Figure 6 As shown, the abutting structure includes a reaction seat 1115 fixed to the lower end of the outer mold climbing box 113, and an adjusting screw 1116 arranged in the horizontal direction is inserted on the reaction seat 1115. The free end of the adjusting screw 1116 is inserted with a abutting sliding shoe 1117. One end of the abutting sliding shoe 1117 is connected to the adjusting screw 1116 through a bolt position adjustable, and the other end is abutted against the side of the outer mold track 111 away from the poured concrete. The position of the abutting sliding shoe 1117 can be adjusted by turning the bolt so that it always fits on the outer surface of the outer mold track 111. The abutting sliding shoe 1117 and the slider 1113 clamp the outer mold track 111 to ensure that the outer mold climbing box 113 will not fall off the outer mold track 111 in the horizontal direction.
[0174] like Figure 2 , 8As shown in Figures 1 and 9, the control platform 112 of this embodiment is used for construction personnel to enter and place construction equipment. A leveling structure for adjusting the horizontality of the control platform 112 is provided between the outer mold climbing box 113 and the control platform 112. Figure 8 and 9 As shown, the leveling structure includes a balance beam 1119, one end of which is hingedly connected to the outer mold climbing box 113 so as to be rotatable around a horizontal axis, and a leveling cylinder 1120 for driving the balance beam 1119 to rotate is arranged between the other end and the outer mold climbing box 113, and the control platform 112 is fixed on the balance beam 1119. A locking screw 1121 is arranged between the balance beam 1119 and the outer mold climbing box 113, and the upper and lower ends of the locking screw 1121 are respectively hingedly connected to the balance beam 1119 and the outer mold climbing box 113, and the balance beam 1119 is fixed to the outer mold climbing box 113 through the locking screw 1121 after being leveled by the leveling cylinder 1120.
[0175] In actual construction, Figures 10 to 15 As shown:
[0176] 1. If Fig.10 As shown, the upper hanging claw b1 of the lower outer mold climbing box B is hooked on the block E, the lower hanging claw b2 of the lower outer mold climbing box b is disengaged from the outer mold track 111, the upper hanging claw a1 of the upper outer mold climbing box a is hooked on the block B, and the lower hanging claw a2 of the upper outer mold climbing box a is disengaged from the outer mold track 111, at this time, the lower outer mold climbing box b is kept stationary, and the outer mold climbing cylinder 114 is ready to extend the cylinder;
[0177] 2. If Fig.11 As shown, the outer mold climbing cylinder 114 drives the upper outer mold climbing box a to climb 300mm. At this time, the lower hanging claw a2 of the upper outer mold climbing box a reaches the position of the block B. The block B presses the lower hanging claw a2 to force the lower hanging claw a2 to start to flip clockwise and leave the track. The upper hanging claw a1 of the upper outer mold climbing box a is in the notch between the two blocks A and B of the outer mold track 111.
[0178] 3. If Fig.12 As shown, the outer mold climbing cylinder 114 continues to extend the cylinder to drive the upper outer mold climbing box a to climb 750mm. At this time, the lower hanging claw a2 of the upper outer mold climbing box a is higher than the block B. Under the action of the counterweight block, the lower hanging claw a2 is ready to start to flip back counterclockwise. At the same time, the upper hanging claw a1 of the upper outer mold climbing box a just reaches the block A position and is ready to start to flip clockwise to leave the outer mold track 111 (the upper and lower hanging claws are seamlessly connected to ensure that at least one layer of hanging claws is in the notch between adjacent blocks of the outer mold track 111 to ensure safety);
[0179] 4. If Fig.13As shown, the outer mold climbing cylinder 114 continues to extend to drive the upper outer mold climbing box a to climb 750mm. At this time, the upper hanging claw a1 of the upper outer mold climbing box a is higher than the stopper A, and is ready to start to flip back counterclockwise. At the same time, the lower hanging claw just reaches the stopper A position, and is ready to start to flip clockwise to leave the outer mold track 111.
[0180] 5. If Fig.14 As shown, the outer mold climbing oil cylinder 114 retracts and drives the upper outer mold climbing box a to drop 300mm. At this time, the upper hanging claw a1 of the upper outer mold climbing box a is hung on the track block A, and the upper outer mold climbing box a begins to be stressed;
[0181] 6. If Fig.15 As shown, keep the upper outer mold climbing box a stationary, shrink the outer mold climbing oil cylinder 114, repeat steps 2 to 5, and complete the climbing of the lower outer mold climbing box b. At this time, the upper hanging claw b1 of the lower outer mold climbing box b is hooked on the block D, and the lower hanging claw b2 of the lower outer mold climbing box b is hooked on the block E;
[0182] 7. Repeat steps 1-6 to complete a 6m climbing section.
[0183] The outer mold track 111 of this embodiment is composed of a plurality of track unit components assembled together, and each track unit component is provided with a plug 1122 and a socket 1123 at both ends thereof. Figure 7 As shown, during installation, the plug 1122 of the upper track unit is inserted into the socket 1123 of the lower track unit to be assembled into one piece.
[0184] In order to improve the operating efficiency of the outer mold track 111 and reduce the investment cost of the equipment, in this embodiment, a lifting device for lifting the outer mold track 111 is provided on the outer mold support 1 to achieve repeated use of the outer mold track 111. Figures 16 to 25 A movable track lifting device is provided. The lifting device of this embodiment is used to lift the track unit 103, so that the track unit 103 can be reused repeatedly, thereby reducing the cost of the track structure. The lifting device of this embodiment includes a fixed truss 101 and a movable truss 102, such as Fig.16 As shown, the fixed truss 101 of this embodiment is anchored on the finished concrete surface through embedded parts, and the movable truss 102 can be moved along the longitudinal direction (such as Fig.18 As shown, the vertical Fig.18 A movable truss structure is movably connected to the fixed truss 101 (in the left and right directions).
[0185] like Fig.17As shown, a longitudinal guide rail 104 extending in the longitudinal direction is provided at the lower end of the fixed truss 101, a guide shoe 105 slidably connected to the longitudinal guide rail 104 is provided on the mobile truss 102, and a longitudinal oil cylinder 106 for pushing the mobile truss 102 to slide along the longitudinal guide rail 104 is installed between the mobile truss 102 and the fixed truss 101. Driven by the longitudinal oil cylinder 106, the mobile truss 102 slides along the longitudinal guide rail 104 through the guide shoe 105, so as to adjust the position of the mobile truss 102 along the longitudinal guide rail 104.
[0186] In this embodiment, a clamping structure for clamping the track unit 103 is provided on the mobile truss 102. The clamping structure can be moved in a horizontal direction (such as Fig.18 As shown, the horizontal Fig.18 The mobile truss 102 is a temporary fixing structure that is movably connected to the track unit 103 of the mobile truss 102 (in the direction perpendicular to the paper surface in the figure). The mobile truss 102 is provided with a transverse guide rail 107 extending in the transverse direction. The clamping structure is slidably connected to the transverse guide rail 107. The mobile truss 102 is provided with a transverse oil cylinder 108 that drives the clamping structure to move along the transverse guide rail 107. After the clamping structure clamps and fixes the track unit 103, the clamping track unit 103 can be adjusted to move along the transverse guide rail 107 through the drive of the transverse oil cylinder 108 to achieve the adjustment of the transverse position. The longitudinal oil cylinder 106 can adjust the longitudinal position of the entire mobile truss 102, so the track unit 103 of this embodiment can be adjusted in both transverse and longitudinal directions.
[0187] like Figures 17-20 As shown, the clamping structure includes a clamping plate 109, one end of which is fixed to the track unit 103 to be transported by a connecting pin 1010 that penetrates the track unit 103 and the clamping plate 109, and the other end is provided with two vertical (such as Fig.18 As shown, the vertical direction of this embodiment Fig.18 The sliding blocks 1011 are arranged at intervals (in the vertical direction) and clamped on the upper and lower sides of the transverse guide rail 107, and the sliding blocks 1011 are slidably connected to the transverse guide rail 107. During actual installation, the track unit 103 can be conveniently fixed on the clamping plate 109 by passing the connecting pin 1010 through the track unit 103 and the clamping plate 109. In order to stably fix the track unit 103, at least two clamping structures arranged at intervals along the vertical direction are provided on the mobile truss 102 in this embodiment.
[0188] The mobile truss 102 of this embodiment moves to the track unit 103 to be transported, the clamping structure clamps the fixed track unit 103, and then adjusts the position of the track unit 103 through the horizontal cylinder 108 and the longitudinal cylinder 106, so that the lifting structure on the fixed truss 101 can lift it. Fig.25As shown, the lifting structure of this embodiment includes a lifting frame 1015 and a winch 1016 arranged at the top of the fixed truss 101. The lifting frame 1015 can be connected to the fixed truss 101 in a horizontal longitudinal movement. The top of the fixed truss 101 is provided with a longitudinal telescopic oil cylinder 1018 for driving the lifting frame 1015 to move in the horizontal longitudinal direction. The lifting frame 1015 is provided with a sliding guide rail 1017 arranged in the horizontal transverse direction, and the winch 1016 is slidably connected to the sliding guide rail 1017. The longitudinal position of the lifting frame 1015 can be adjusted by the longitudinal telescopic oil cylinder 1018, and the winch 1016 can be adjusted in the transverse position by driving the winch 1016 to move along the sliding guide rail 1017, that is, the winch 1016 of this embodiment can be adjusted in the transverse and longitudinal positions. A sling is wound around the winch 1016, and the sling hooks the track unit 103 to realize the lifting of the track unit 103.
[0189] In order to safely lift the track unit 103, in this embodiment, a guide structure is provided on the fixed truss 101 to horizontally limit the track unit 103 when the track unit 103 is lifted vertically. The guide structure limits the horizontal movement of the track unit 103 to avoid safety problems such as unhooking caused by shaking during the lifting process. Figures 21 to 23 As shown, the guide structure of this embodiment includes a guide rod 1019, which is a U-shaped groove structure fixed on the inner side of the fixed truss 101 and arranged in the vertical direction. There are two guide rods 1019, which are spaced laterally. One side of the opening of the guide rod 1019 is engaged with the lateral sides of the track unit 103 to limit the horizontal movement of the track unit 103, that is, after the track unit 103 enters the guide rod 1019, it can only move vertically but not horizontally, thereby solving the shaking problem caused by high-altitude lifting.
[0190] The lower end of the guide rod 1019 is set as a bell mouth structure, which is convenient for the track unit 103 to enter the guide rod 1019 from bottom to top. The guide rod 1019 is assembled from multiple U-shaped channel steels in sequence, and a group of roller structures are set between adjacent channel steels. Fig.23 As shown, the roller structure includes a holding rod 1020, one end of which is fixed on the fixed truss 101, and the other end of the holding rod 1020 extends laterally into grooves on both sides of the track unit 103, and a guide roller 1021 is passed through the end extending into the groove, and the guide roller 1021 is attached to the surface of the groove to guide the track unit 103.
[0191] In addition, since the track unit 103 is hoisted by a sling, there is a risk of possible unhooking. In order to prevent the track unit 103 from falling suddenly when unhooking occurs, the present embodiment further provides an anti-falling structure on the fixed truss 101 to prevent the track unit 103 from falling suddenly when the track unit 103 is lifted vertically. Fig.24 As shown, the anti-falling structure includes a support plate 1012 fixed on the fixed truss 101 and a claw 1013 hingedly connected to the support plate 1012 through a horizontal rotating shaft, one end of the claw 1013 is provided with a hook hooked on the track unit 103 when the track unit 103 descends, and the support plate 1012 is provided with a limit baffle 1014 for limiting the claw 1013 from continuing to rotate when the hook hooks the track unit 103. When the track unit 103 is suddenly unhooked, the stopper 1118 on the track unit 103 moves downward, hits the claw 1013, and forces one end of the hook of the claw 1013 to rotate downward, and the hook extends below the stopper to limit the downward movement of the track unit 103. The other end of the claw 1013 is pressed against the lower end of the limit baffle 1014, limiting the claw 1013 from continuing to rotate, thereby stably fixing the track unit 103 on the claw 1013. However, the claw 1013 itself does not limit the upward movement of the track unit component 103. When the track unit component 103 is lifted and moved upward, the block 1118 acts on the claw 1013, applying an upward vertical force to the claw 1013. The end of the claw 1013 provided with a hook rotates upward, and the hook is away from the block 1118 and will not hook the block 1118, so it does not limit the upward movement of the track unit component 103.
[0192] During actual lifting, follow the steps below:
[0193] 1. The clamping structure is driven to move to the track unit 103 to be transported by the longitudinal cylinder 106 and the transverse cylinder 108;
[0194] 2. Pass the connecting pin 1010 through the track unit 103 and the clamping plate 109 to fix the track unit 103 on the clamping plate 109, and remove the track unit 103 to separate it from the concrete surface;
[0195] 3. The clamping structure and the track unit 103 are driven to move to a position facing the guide rod 1019 by the longitudinal cylinder 106 and the transverse cylinder 108;
[0196] 4. Lower the sling to make it fixedly connected to the track unit 103, pull out the connecting pin 1010, release the fixed connection between the track unit 103 and the clamping plate 109, and hoist the track unit 103 into the guide rod 1019 with the winch 1016. The winch 1016 continues to lift the track unit 103 and moves it along the guide rod 1019;
[0197] 5. When it is moved to the installation position, lift the track unit 103 out of the guide structure, and then adjust the position of the winch 1016 and the track unit 103 by longitudinally moving the telescopic cylinder 1018 and the sliding guide rail 1017, so that the track unit 103 is exactly in the installation position on the concrete surface, fix the track unit 103 on the concrete surface, and complete the entire lifting process.
[0198] After a certain bridge tower 3 segment is cast, it is necessary to perform maintenance on the segment. In this embodiment, a maintenance system 12 is provided on the outer formwork support 1. Figures 26 to 29 As shown, the curing system 12 of this embodiment is located inside the outer formwork support 1 and is used to perform moisture curing on the poured concrete. The curing system 12 includes an atomizing unit 121, a spray pipe rack 123 and a curing film 124, wherein the atomizing unit 121 is arranged on the outer formwork support 1 and is used to provide spray water mist to the spray pipe rack 123, and the atomizing unit 121 is connected to the spray pipe rack 123 through a connecting pipe 122.
[0199] like Fig. 27 As shown, the spray pipe rack 123 is a pipe network structure formed by staggered connection of multiple water pipes. Multiple spray heads are arranged on the spray pipe rack 123. The overall size of the spray pipe rack 123 is 2800*4500. Three spray pipe racks 123 are required on the side of the largest bridge tower section, and 2 to 3 pieces are used in the other sections according to the needs, which realizes the standardization of the spray pipe rack 123 to a certain extent. The spray pipe rack is composed of φ95 and φ85 steel pipes connected by threads, which is easy to assemble. The maintenance steam of each spray pipe is produced by the atomizing unit 121 and transported through the connecting hose 122.
[0200] like Fig.28 As shown, the spray pipe rack 123 is fixed to the bottom of the outer template inside the outer template support 1 through the spray pipe hanger 125, the upper end of the spray pipe rack 123 is connected to the spray pipe hanger 125 through a U-bolt, and the spray pipe hanger 125 and the outer template are connected by a pin. This connection method can make the entire maintenance system 12 move with the outer template support 1. After the outer template is demoulded, the outer template climbs up one section synchronously with the outer template and the maintenance system 12 through the outer template climbing system 11, saving the time of installing the maintenance system 12 separately and greatly improving the construction efficiency.
[0201] In this embodiment, a curing film 124 is arranged on the outside of the spray pipe rack 123. The curing film 124 is a water-impermeable moisturizing film. Fig.29As shown, the curing film 124 is fixed to the outer template by the curing film hanger 126. The hanging rod of the curing film 124 is connected to the curing film hanger 126 by U-bolts, and the curing film hanger 126 is connected to the outer template by pins. The U-bolt and pin connection creates better convenience for the installation and disassembly of the entire curing system 12, and facilitates on-site construction.
[0202] In addition, a support roller 127 is installed on the spray pipe rack 123. Fig.26 As shown, one end of the support roller 127 is fixed on the spray pipe rack 123, and the other end is pressed against the concrete surface of the bridge tower in the horizontal direction, so that the maintenance system 12 can be lifted along with the outer formwork. At the same time, the support roller 127 and the pin shaft connection make the maintenance system 12 adaptable to the angle change of the tower surface.
[0203] In actual use, the following steps are followed: 1. Fix the spray pipe rack 123 to the lower end of the outer template through the spray pipe rack 125, fix the curing film 124 to the lower end of the outer template through the curing film rack 126, and connect the atomizing unit 121 and the spray pipe rack 123 with the connecting hose 122;
[0204] 2. When the outer formwork is lifted by the lifting equipment on the outer formwork support 1 and moves upward to the next pouring construction stage, the spray pipe rack 123 and the curing membrane 124 at the lower end of the outer formwork are just at the concrete of the bridge tower segment after demoulding. After the outer formwork moves into place, the atomizing unit 121 starts to inject water mist into the spray pipe rack 123. The water mist is sprayed onto the surface of the concrete to be cured through the spray pipe rack 123 to moisturize and maintain the concrete. The curing membrane 124 is located on the outside of the spray pipe rack 123, which can prevent the water mist from escaping and maintain the concrete to be cured;
[0205] 3. After the concrete is completely stable and the segment pouring of the outer formwork is completed, the outer formwork is demoulded and moved upward, and the spray pipe rack 123 and the curing membrane 124 rise accordingly to carry out the curing work of the next segment.
[0206] like Figures 30-36 As shown, the inner mold support 2 of this embodiment is a truss structure in the inner cavity of the bridge tower. The inner mold climbing system 21 includes an inner mold track 211 arranged vertically and fixed to the outer side of the inner mold support 2, and at least two groups of inner mold climbing devices arranged vertically on the inner mold track 211 at intervals. The inner mold climbing device is a telescopic structure with one end being able to move stepwise along the inner mold track 211 and the other end being able to be retracted and extended in the horizontal direction and connected to the inner cavity side wall of the bridge tower 3.
[0207] There are two kinds of inner mold climbing devices of the present invention, one is as follows Figures 30-36As shown, the inner mold climbing device includes a bearing platform and a first inner mold stepping device 2113, one end of which is fixed on the bearing platform and the other end of which can be loosened or hooked on the inner mold track 211. The bearing platform includes a frame structure spliced by a transverse main beam 212 and a longitudinal main beam 213. Both ends of the transverse main beam 212 are provided with transverse telescopic arms 214 that can move along its length direction. The transverse main beam 212 is a hollow cavity structure with openings at both ends. One end of the transverse telescopic arm 214 extends into the openings at both ends of the transverse main beam 212, and the other end can move along the length direction of the transverse main beam 212. A transverse telescopic cylinder 216 for driving the transverse telescopic arm 214 to extend and retract is provided between the transverse telescopic arm 214 and the transverse main beam 212. The extension length of the transverse telescopic arm 214 can be adjusted by driving the transverse telescopic cylinder 216.
[0208] like Figures 31-33 As shown, longitudinal telescopic arms 215 movable along the length direction are arranged at both ends of the longitudinal main beam 213, and longitudinal telescopic cylinders 217 driving the longitudinal telescopic arms 215 to extend and retract are arranged between the longitudinal telescopic arms 215 and the longitudinal main beam 213. Similarly, the extension length of the longitudinal telescopic arms 215 can be adjusted by the longitudinal telescopic cylinders 217. The adjustment of the longitudinal telescopic arms 215 and the transverse telescopic arms 214 can change the length and width of the entire bearing platform to adapt to the changes in the inner cavity of the bridge tower.
[0209] In this embodiment, the longitudinal telescopic arm 215 and the transverse telescopic arm 214 are supported on one end of the bearing platform of the bridge tower 3. Fig.30 and 32 As shown, in this embodiment, a plurality of first anchoring structures are arranged on the inner side wall of the bridge tower 3. The first anchoring structure includes a corbel 2130, which is a supporting member fixedly connected to a fastening screw pre-buried in the inner side wall of the bridge tower 3 through a fastening nut. A tightening screw 2111 arranged in the horizontal direction and capable of being pressed against the inner side wall of the bridge tower 3 and a supporting screw 2112 arranged in the vertical direction and capable of being supported on the upper end of the corbel 2130 are installed on the transverse telescopic arm 214 and the longitudinal telescopic arm 215. When the longitudinal telescopic arm 215 and the transverse telescopic arm 214 need to be fixed to the inner side wall of the bridge tower 3, the supporting screw 2112 is supported on the upper end surface of the corbel 2130, and the tightening screw 2111 is pressed against the inner side wall of the bridge tower 3.
[0210] In this way, when the inner mold bracket 2 is fixed and the bearing platform climbs upward, the tightening screw 2111 is first adjusted to release the bearing platform from the supporting effect on the inner wall of the bridge tower 3. Since the inner wall of the bridge tower 3 has a certain slope in the horizontal direction, after the climbing is completed, the telescopic amount of the transverse telescopic arm 214 and the longitudinal telescopic arm 215 are respectively adjusted by the transverse telescopic cylinder 216 and the longitudinal telescopic cylinder 217 to make their respective tightening screws 2111 re-contact the inner wall of the bridge tower 3, and then the supporting screw 2112 is supported on the corbel 2130 at the target height.
[0211] like Figures 31-32 As shown, a main body platform 218 is slidably connected to the transverse main beam 212. The main body platform 218 is a frame structure sleeved on the outer side of the inner mold bracket 2. The main body platform 218 is detachably fixed to the inner mold track 211 through a positioning pin 219 that penetrates the main body platform 218 and the inner mold track 211. That is, when the main body platform 218 needs to move along the inner mold track 211, the positioning pin 219 is pulled out, and then the main body platform 218 and the inner mold track 211 are driven to produce a relative displacement in the vertical direction. When the two need to be fixed, the positioning pin 219 is inserted to complete the fixed connection.
[0212] The main platform 218 is a rectangular frame structure. The inner side of the main platform 218 is provided with a limiting roller 2110 that rolls with the inner mold bracket 2. The lower end surface of the main platform 218 is provided with limiting hooks 2131 on both longitudinal edges. The limiting hooks 2131 are engaged with the longitudinal edges of the transverse main beam 212. A transverse translation cylinder 2121 is fixedly connected between the main platform 218 and the transverse main beam 212, and the main platform 218 can move transversely relative to the load-bearing platform. In this way, when the inner mold bracket 2 and the first inner mold stepping device 2113 are alternately climbed, the connection between the positioning pin 219 and the inner mold track 211 is released, and the limiting roller 2110 rolls with the inner mold bracket 2. At the same time, when the entire device is first installed and each climbing is completed, since the inner mold bracket 2, the main platform 218 and the load-bearing platform must be kept in the center of the inner cavity of the bridge tower in the transverse and longitudinal directions, the position of the load-bearing platform can be adjusted by the transverse translation cylinder 2121.
[0213] The structure of the first inner mold stepping device 2113 is similar to the climbing device in the patent number "CN271998Y" named "Climbing device of hydraulic automatic climbing mold system". The first inner mold stepping device 2113 of this embodiment includes an inner mold climbing oil cylinder 2114, and the upper and lower ends of the inner mold climbing oil cylinder 2114 are respectively hinged with two sets of inner mold climbing boxes 2115. The inner mold climbing box 2115 is a hollow box structure. A cam 2116 is arranged in the inner mold climbing box 2115. The cam 2116 is hinged to the inner wall of the inner mold climbing box 2115 through the inner mold rotating shaft 2117. The cam 2116 is fixedly connected to a lever 2118. The other end of the lever 2118 is hinged to a return spring 2119 in a compressed state. The other end of the return spring 2119 is hinged to the inner mold climbing box 2115.
[0214] like Fig.36 As shown, the cross-section of the inner mold rail 211 is a box-shaped structure, and a plurality of spaced positioning grooves 2120 are vertically arranged on its outer surface. The inner mold climbing box 2115 is also provided with a limiting groove that cooperates with the flange plate of the inner mold rail 211. The two ends of the cam 2116 are tapered, one end of the cam is in limiting contact with the positioning groove 2120, and the other end is in limiting contact with the inner wall of the inner mold climbing box 2115. In this way, when the first inner mold stepping device 2113 pushes the inner mold bracket 2 to climb upward, the bearing platform and the inner wall of the bridge tower remain fixed, the main platform 218 and the inner mold bracket 2 are released from the pin connection, and the conical end of the cam 2116 of the inner mold climbing box 2115 on the side of the inner mold track 211 is obliquely embedded in the positioning groove 2120 and abuts against the upper wall of the inner cavity of the positioning groove 2120, and the conical surface of the other end of the cam 2116 abuts against the inner cavity of the inner mold climbing box 2115. When the piston rod of the inner mold climbing cylinder 2114 pushes the upper inner mold climbing box 2115, both ends of the cam 2116 of the upper inner mold climbing box 2115 are limited and cannot be relative to the inner mold climbing box 211 5 rotates, and the cam 2116 applies a thrust force to the upper wall surface of the inner cavity of the positioning groove 2120, thereby pushing the inner mold bracket 2 to climb upward; when the first inner mold stepping device 2113 climbs upward, the lever 2118 is pushed downward to drive the cam 2116 to rotate a certain angle, so that the conical end of the cam 2116 on the side of the inner mold track 211 is obliquely embedded in the positioning groove 2120 and abuts against the lower wall surface of the inner cavity of the positioning groove 2120. When the piston rod of the inner mold climbing cylinder 2114 contracts, the upper inner mold climbing box 2115 cannot move downward, and the upper inner mold climbing box 2115 climbs upward under the contraction pulling force of the piston rod until the piston rod returns to its original state.
[0215] like Fig.30 As shown, the inner mold support 2 of the present solution is provided with three sets of inner mold climbing systems 21, including an upper inner mold climbing system, a middle inner mold climbing system and a lower inner mold climbing system arranged in sequence from top to bottom. In the process of alternating climbing between the inner mold support 2 and the inner mold climbing system:
[0216] 1. The main platform 218 and the bearing platform where the middle-layer inner mold climbing system is located are respectively released from the fixed connection with the inner mold bracket 2 and the inner cavity wall of the bridge tower 3, and the direction of the cam is adjusted to be obliquely downward toward the side of the inner mold track 211. The inner mold climbing cylinder 2114 first pushes the inner mold climbing box of the upper layer to the predetermined position, and then the inner mold climbing box of the upper layer remains stationary, and the piston rod of the inner mold climbing cylinder 2114 contracts to pull the inner mold climbing box of the lower layer upward to the predetermined position;
[0217] 2. Repeat the above process to complete the climbing of the lower inner mold climbing system;
[0218] 3. Ensure that all the bearing platforms are fixedly connected to the inner wall of the bridge tower 3, release the fixed connection between all the main platforms 218 and the inner mold bracket 2, and adjust the direction of the cam 2116 of each inner mold climbing box 2115 to face the inner mold track 211 and tilt upward, start the inner mold climbing cylinder 2114 to lift the upper inner mold climbing box, and the upper inner mold climbing box drives the inner mold bracket 2 to climb to the predetermined position, completing a climbing process of the inner mold bracket 2, and continue in sequence until the inner mold bracket 2 climbs to the position to be constructed;
[0219] 4. After a certain section of the inner cavity concrete construction of the bridge tower 3 is completed, the above climbing process is repeated again to make the height of the inner formwork support 2 rise continuously along with the concrete construction section.
[0220] The second type Figures 37-40 As shown, the inner mold climbing device of this scheme includes a load-bearing frame 2122 sleeved on the outer side of the inner mold bracket 2, and the inner side of the load-bearing frame 2122 is vertically movably connected to the inner mold track 211 through the second inner mold stepping device 2125. A plurality of vertically inclined support legs 2123 are arranged on the outer side of the load-bearing frame 2122. The upper ends of the support legs 2123 are hingedly connected to the load-bearing frame 2122, and the lower ends are provided with a second anchoring structure connected to the inner cavity side wall of the bridge tower 3. A leg support cylinder 2124 for driving the support legs 2123 to rotate around the upper end hinge support is arranged between the support legs 2123 and the load-bearing frame 2122. The second anchoring structure of this scheme is the same as the anchoring structure in the first scheme, and both are brackets 2130 fixed to the inner cavity side wall of the bridge tower 3 through the anchoring structure. The support legs 2123 of this scheme are supported on the brackets 2130 through hinged supports 2129.
[0221] like Fig.39As shown, the second inner mold stepping device 2125 includes an inner mold lifting oil cylinder 2126, and the upper and lower ends of the inner mold lifting oil cylinder 2126 are respectively hinged with a bearing climbing box 2127 and a lifting climbing box 2128, and the bearing climbing box 2127 and the lifting climbing box 2128 are hollow box structures, and the bearing climbing box 2127 is fixed on the inner side of the bearing frame 2122. The structure of the bearing climbing box 2127 and the lifting climbing box 2128 of this scheme is the same as that of the inner mold climbing box 2115 in the first scheme mentioned above, and each group of the bearing frame 2122 includes two groups of bearing climbing boxes 2127 disposed at the upper and lower ends of the bearing frame 2122 and one group of lifting climbing boxes 2128 disposed between the two groups of bearing climbing boxes 2127. The two groups of bearing climbing boxes 2127 can improve the connection stability between the bearing frame 2122 and the inner mold track 211. The inner mold climbing box 2115 is not fixedly connected to the supporting frame 2122 , and the inner mold lifting cylinder 2126 drives the inner mold climbing box 2115 to move along the inner mold track 211 .
[0222] like Fig.37 As shown, the inner mold support 2 of this solution is provided with three groups of bearing frames 2122, including an upper bearing frame, a middle bearing frame and a lower bearing frame arranged in sequence from top to bottom. In the process of alternating climbing of the inner mold support 2 and the bearing frame:
[0223] First, the support legs 2123 corresponding to the upper load-bearing frame are driven by the leg cylinder 2124 to release the fixed connection between the upper load-bearing frame and the inner mold support 2 and the inner cavity side wall of the bridge tower 3, and the inner mold lifting cylinder 2126 pushes the middle load-bearing frame to the predetermined position, and then the middle load-bearing frame remains stationary, and the piston rod of the inner mold lifting cylinder 2126 contracts to pull the lifting climbing 2128 upward to the predetermined position; secondly, the above process is repeated to complete the climbing of the middle load-bearing frame and the lower load-bearing frame; finally, ensure that all load-bearing frames are fixedly connected to the inner cavity wall of the bridge tower 3, release the fixed connection between all load-bearing frames and the inner mold track 211, and start all the inner mold lifting cylinders 2126 to move the inner mold support 2 upward until the inner mold support 2 moves to the concrete construction position of the lower section.
[0224] A positioning system 24 and a hoist 23 are arranged at the upper end of the inner formwork support 2 to realize the climbing and hoisting positioning of the inner formwork and the steel cage. At the same time, a vibration system 22 that can automatically control the vibration position is arranged on the positioning system 24. The inner formwork support 2 maintains a height match with the concrete segment to be poured by alternately pushing and climbing with the inner formwork climbing system 21. The main platform 218 and the bearing platform can automatically adapt to the changes in the inclination of the inner cavity of the inclined tower column. The entire multifunctional platform integrates multiple functions such as inner formwork climbing, steel cage hoisting and positioning, precise vibration, automatic climbing of the inner formwork support 2, etc., which greatly improves the efficiency of the concrete inner cavity construction of the inclined tower column.
[0225] like Figures 41 to 46As shown, the positioning system 24 includes a base 241, the base 241 includes a rectangular base frame, the base frame is fixedly connected to the inner mold support 2 at the lower end, and the base 241 is provided with a longitudinal shift layer 242, a transverse shift layer 243, a rotation layer 244 and a vertical lifting layer 245 from bottom to top. The longitudinal shift cylinder 246 drives the longitudinal shift layer 242 to move longitudinally relative to the base 241 (such as Fig.43 As shown, the vertical Figure 1 The lateral displacement cylinder 247 drives the lateral displacement layer 243 to move horizontally (such as in the left and right directions) relative to the longitudinal displacement layer 242. Fig.43 As shown, the horizontal Fig.43 The rotary cylinder 248 drives the rotary layer 244 to rotate relative to the transverse layer 243, and the vertical adjustment cylinder 249 drives the vertical lifting layer 245 to rotate relative to the rotary layer 244 (such as Fig.43 As shown, vertical Fig.43 In this way, by sequentially arranging the longitudinal shifting layer, the transverse shifting layer, the rotation layer and the vertical lifting layer on the base, the four degrees of freedom of longitudinal translation, transverse translation, vertical movement and rotation of the equipment to be hoisted can be adjusted. The whole adjustment process can be completed at one time, and the construction efficiency is high. The corresponding movement between each moving layer is achieved by the cylinder, and the position of the equipment to be hoisted can be accurately adjusted by controlling the stroke of the cylinder.
[0226] In the above technical solution, if Figures 42-44 As shown, the longitudinal shift layer 242 includes a rectangular longitudinal shift frame, one end of the longitudinal shift cylinder 246 is fixed to the longitudinal shift layer 242, and the other end is fixed to the base 241, so that the longitudinal shift layer 242 can be longitudinally translated relative to the base 241 by controlling the longitudinal shift cylinder 246. Fig.42 , 43 As shown in FIG. 45 , the transverse shift layer 243 includes a rectangular transverse shift frame, one end of the transverse shift cylinder 247 is fixed on the transverse shift layer 243, and the other end is fixed on the longitudinal shift layer 242, so that the transverse shift layer 243 can be horizontally translated relative to the longitudinal shift layer 242 by controlling the transverse shift cylinder 247. Fig.42 , 43 As shown in FIG. 46 , the rotating layer 244 includes a rectangular rotating frame, which is embedded in the transverse frame and is rotatably connected to the transverse frame through a rotating pin 250. One end of a rotating oil cylinder 248 is hingedly connected to the rotating frame of the rotating layer 244, and the other end is hingedly connected to the transverse frame of the transverse layer 243. The rotating oil cylinder 248 forms a certain angle with both the transverse and longitudinal directions. In this way, the rotating layer 244 can rotate relative to the transverse layer 243 around the rotating pin 250 by controlling the rotating oil cylinder 248.
[0227] like Fig.42 , 43As shown in FIG. 46 , the vertical lifting layer 245 includes a vertical positioning cylinder 249 , the lower end of which is fixed on the rotating layer 244 , and the upper end of which is supported on the lower end of the sling 23 to drive the sling 23 to move vertically.
[0228] During actual construction, the hanger 23 is spatially adjusted according to the following steps:
[0229] 1. The tower crane hoists the sling 23 and the steel cage to the upper end of the inner mold support 2 as a whole, and places the sling 23 on the vertical adjustment cylinder 249;
[0230] 2. The sling 23 is spatially adjusted by controlling the longitudinal cylinder 246, the transverse cylinder 247, and the rotary cylinder 248 until the steel cage is aligned with the sleeve below, and the vertical adjustment cylinder 249 is controlled to lower the steel cage to complete the connection.
[0231] like Figures 47-49 As shown, the vibrating system 22 of this embodiment is fixed on the transverse shifting layer 243 of the positioning system 24 at the top of the inner mold support 2. The vibrating system 22 of this embodiment includes a vibrator on the inner mold support 2, and the vibrator includes a vibrating motor 222 placed on the inner mold support 2 and a vibrating head 224 connected to the vibrating motor 222 through a vibrating pipe 223.
[0232] like Figures 47-48 As shown, the transverse layer 243 is provided with a slide rail 226 arranged horizontally and transversely, the slide rail 226 is an I-shaped steel structure, a slide bracket 225 is slidably connected to the slide rail 226, and a slide roller 227 is provided on the slide bracket 225. The slide roller 227 is passed through a rotating shaft extending horizontally and longitudinally on the slide bracket 225, and two groups of slide rollers 227 are arranged opposite to each other and are respectively placed on both sides of the slide rail 226. The slide bracket 225 is slidably connected to the slide rail 226 through the slide roller 227.
[0233] like Fig.47 and 48 As shown, the sliding bracket 225 is also provided with a fixed frame 228 and a telescopic frame 229 connected to the fixed frame 228 in a horizontal and longitudinal manner, and a driving cylinder 2210 is provided between the telescopic frame 229 and the fixed frame 228 for driving the telescopic frame 229 to move in the horizontal and longitudinal direction. A driving wheel 2211 for retracting and extending is installed on the fixed frame 228, and a guide wheel 2212 for guiding is provided on the telescopic frame 229. One end of the vibrating pipe 223 is connected to the vibrating motor 222, and the other end passes through the driving wheel 2211 and the guide wheel 2212 in sequence and is connected to the vibrating head 224.
[0234] During actual construction, after the inner mold support 2 climbs to the designed position, the driving wheel 2211 is controlled by remote control to start working, the rope is released, the vibrating head 224 is lowered to the required vertical height, and the vibration work begins. After the vibration of the vibration area is completed, it is necessary to manually drag the vibrating device to the next vibration area within the horizontal working plane. Since the sliding bracket 225 has very little friction resistance, workers can shift the vibrating device within the horizontal plane. When pouring reaches a certain stage, due to the shrinkage and change of the concrete cross-sectional size, the telescopic frame 229 of the frame needs to be retracted to a certain length, and the driving cylinder 2210 is started to shorten the telescopic frame 229 to meet the vibration work requirements of smaller sections. The vibrating device of this embodiment can save manual operation time to a large extent.
[0235] During actual construction, the rope is lowered to the required vertical height by remotely controlling the driving wheel 2211 to start vibrating. After the vibration of the area is completed, the position of the sliding support 225 and the telescopic frame 229 is adjusted to move the vibrating head 224 to the next vibration area. The next vibration area is vibrated, and the above process is carried out area by area until the vibration construction of the bridge tower concrete at this stage is completed.
[0236] like Figures 50-53 The lifting device 23 of this embodiment is lifted to the top of the vertical adjustment cylinder 249 of the adjustment system 24. The lifting device 23 of this embodiment includes a main load-bearing frame 231. The main load-bearing frame 231 is a single-layer truss structure formed by multiple steel sections cross-connected vertically and horizontally. Fig.53 As shown, the main load-bearing frame 231 of this embodiment is a frame structure formed by staggered arrangement of two longitudinal beams and two transverse beams. After the main load-bearing frame 231 together with the steel bar components are hoisted onto the cast section of the bridge tower, the longitudinal beams and transverse beams on the main load-bearing frame 231 are fixed on the inner mold trusses of the bridge tower casting.
[0237] In this embodiment, a slideway 232 is installed on the main load-bearing frame 231. Figures 50-51 As shown, the slideway 232 of this embodiment is an I-beam structure, and the slideway 232 itself is arranged along the circumference of the frame structure formed by the main load-bearing frame 231 (such as Fig.53 As shown, with the center of the frame structure formed by the main load-bearing frame 231 as the center of the circle), the slideway 232 is arranged along the shape of the bridge tower section, and multiple slideways 232 surround to form a ring structure corresponding to the bridge tower section. The bridge tower section of this embodiment is approximately quadrilateral, so the slideway 232 of this embodiment can be arranged longitudinally and transversely, and the slideway 232 itself can move along the radial direction of the main load-bearing frame 231, that is, the slideway 232 arranged longitudinally can slide transversely, and the slideway 232 arranged transversely can slide longitudinally, and corresponding adjustments are made according to the shape and scale of the bridge tower section.
[0238] A plurality of connectors 233 are provided on the slideway 232. The connectors 233 are lifting connection points for connecting the steel bar components. Figures 50-52 As shown, the connector 233 includes a ring that is sleeved on the slide 232, and a lifting lug is provided at the lower end of the ring. The lifting lug is connected to a connecting chain, and the steel bar component can be connected through the connecting chain. The connector 233 can adjust its position along the length direction of the slide 232 to adapt to the change of the cross section of the bridge tower. Such an adjustment structure can ensure that the lifting position of the connector 233 is always directly above the center of gravity of the steel bar component, and the lifting safety is greatly improved.
[0239] After the position adjustment of the slideway 232 is completed, the slideway 232 needs to be fixed. Figures 50-52 As shown, the main load-bearing frame 231 of this embodiment is provided with a fixing structure for fixing the slideway 232 after the adjustment of the slideway 232 is completed. The fixing structure includes a finely rolled threaded steel bar 234 passing through the slideway 232, and the finely rolled threaded steel bar 234 passes through the slideway 232 along the radial direction of the main load-bearing frame 231, and the two ends are respectively anchored and connected to the fixing seats 235 on the main load-bearing frame 231. After the adjustment is completed, the finely rolled threaded steel bar 234 vertically passing through the slideway 232 is fixedly connected to the fixing seats 235 on both sides, so as to fix the slideway 232, limit its position, and prevent it from shaking.
[0240] After the main bearing frame 231 of this embodiment is hoisted together with the steel bar parts to the cross section of the bridge tower, it is not convenient to hoist the inner template of the bridge tower due to the obstruction of the main bearing frame 231. In order to solve this problem, this embodiment is provided with a hoisting structure for hoisting the inner template of the bridge tower at the lower end of the main bearing frame 231. Figures 50-51 As shown, the hoisting structure includes a hanging rail 238 fixed at the lower end of the main load-bearing frame 231. The hanging rail 238 is a guiding structure arranged along the axial direction of the main load-bearing frame 231. Multiple hanging rails 238 are formed around a ring structure corresponding to the inner side template of the bridge tower. The hanging rail 238 is provided with an electric hoist 239 which can slide along the length direction of the hanging rail 238.
[0241] In addition, the shielding system 25 of this embodiment includes a material unloading platform disposed on the main load-bearing frame 231, such as Figures 50-53 As shown, in this embodiment, a material unloading platform is arranged at the upper end of the main load-bearing frame 231, which can be used as a working platform for pouring construction and as a shielding structure for the pouring section of the bridge tower to prevent the poured concrete from being exposed to the sun and rain. Figures 52-53As shown, it includes a material unloading platform arranged on the main load-bearing frame 231, and the material unloading platform includes a fixed platform 251 fixed on the slideway 232 and a sliding platform 252 movably connected to the fixed platform 251 along the length direction of the slideway 232. The sliding platform 252 is connected to both sides of the fixed platform 251 along the circumferential direction of the main load-bearing frame 231, and together with the fixed platform 251, forms a platform structure for shielding the casting section of the bridge tower. Fig.53 As shown, in this embodiment, a plurality of discharge holes 253 are provided on the fixed platform 251 and the sliding platform 252 to serve as discharge holes for concrete.
[0242] During actual construction, follow the steps below:
[0243] 1. According to the shape and specifications of the steel bar component to be hoisted, adjust the position of the slideway 232 on the main load-bearing frame 231. After the adjustment is completed, anchor the slideway 232 through the fine-rolled threaded steel bar 234, adjust the position of the connector 233 on the slideway 232, and connect the connector 233 to the steel bar component through a chain;
[0244] 2. The tower crane hoists the main load-bearing frame 231 and the steel bar components onto the inner mold support 2, and places the main load-bearing frame 231 on the vertical adjustment cylinder 249;
[0245] 3. Adjust the position of the sliding platform 252 on the main load-bearing frame 231 so that the unloading platform formed by the sliding platform 252 and the fixed platform 251 can completely cover the casting section;
[0246] 4. Then, the bridge tower section is cast based on the fixed platform 251 and the sliding platform 252 on the main load-bearing frame 231;
[0247] 5. After the construction is completed, the connection between the steel bar component and the connector 233 is released, the main load-bearing frame 231 is disassembled from the inner mold support 2 as a whole, and then hoisted to the bottom of the bridge tower to facilitate the hoisting of the steel bar component of the next section.
[0248] In addition, the present embodiment also integrates a control system on the outer formwork support 1. The intelligent control system is the nervous system of the present embodiment. The system consists of two parts: a local centralized monitoring system and a remote centralized monitoring system. The local centralized monitoring system is mainly used for hydraulic control systems, video monitoring, stress detection, concrete vibration maintenance, and angle, wind speed and other key parameter measurements. The remote centralized monitoring system transmits data to the backstage through a wireless network or a 5G network. Secondly, the present embodiment also has multiple concrete placing machines 4 at the top of the outer formwork support 1, and the concrete placing machines 4 are used to pour concrete in the space to be poured in the bridge tower 3. Furthermore, the present embodiment also has humanized service facilities on the outer formwork support 1. The humanized service facilities are mainly to improve the working and living environment of the construction personnel. The humanized service facilities include toilets, shelter platforms and special hanging baskets to meet the living or survival needs of personnel in different environments. In the event of a fire, personnel can quickly gather on the bottom shelter platform for temporary shelter; when personnel are injured, they can use the special hanging baskets set in the partitions to quickly evacuate the scene.
[0249] During actual construction, the following steps are followed: 1. After the concrete construction of the bridge tower of the Nth segment is completed, the inner mold support 2 in the inner cavity of the bridge tower 3 is driven by the inner mold climbing system 21 to vertically climb along the inner mold track 211 to the construction position of the bridge tower 3 of the N+1th segment;
[0250] 2. According to the concrete structure of the N+1 segment bridge tower, the steel cage is split into steel meshes, and the steel meshes are made by a three-dimensional bending process. The steel meshes are assembled into the concrete steel cage of the N+1 segment bridge tower. The steel meshes can also be directly hoisted to the construction location and assembled in the casting area. The structure of the hanger 23 is adjusted to correspond to the steel cage, and the steel cage is fixed on the hanger 23. The tower crane hoists the hanger 23 and the steel cage to the inner mold support 2 as a whole. The tower crane places the hanger 23 on the positioning system 24 at the top of the inner mold support 2, and the N+1 segment steel cage is spatially adjusted by the positioning system 24 until the N+1 segment steel cage corresponds to the exposed part of the N segment steel cage, and the N+1 segment steel cage is lowered to connect it with the N segment steel cage;
[0251] 3. Use the track clamping device at the lower end of the outer mold support 1 to remove a track unit 103 at the lower end of the track 111 from the outer side of the bridge tower 3, and then use the lifting equipment on the outer mold support 1 to lift the track unit 103 to the top of the track 111, connect the lower end of the lifted track unit 103 to the upper end of the track unit 103 at the upper end of the track 111, and re-anchor the lifted track unit 103 to the outer side of the bridge tower 3, so as to complete the re-laying of the track unit 103;
[0252] The outer formwork support 1 is driven by the outer formwork climbing system 11 to vertically climb along the outer formwork track 111 to the construction position of the N+1 segment bridge tower, and the N segment bridge tower is demoulded. After the outer formwork is demoulded, it is hoisted to the construction position of the N+1 segment bridge tower by the hoisting equipment on the outer formwork support 1. After the inner formwork is demoulded, it is hoisted to the construction position of the N+1 segment bridge tower by the electric hoist 237 on the hoist 23. The outer formwork, the inner formwork and the N+1 segment steel cage are fixedly connected as a whole by the tension screw rod, and the template installation of the N+1 segment bridge tower is completed;
[0253] 4. The curing system 12 at the lower end of the outer formwork is just at the concrete of the Nth segment bridge tower after demoulding, and the curing system 12 is used to perform heat preservation and moisture maintenance on the concrete of the Nth segment bridge tower after demoulding;
[0254] 5. Cast the N+1 segment bridge tower. Use two diagonally arranged concrete placing machines 4 on the top construction platform of the external formwork support 1 to place concrete into the casting space of the N+1 segment bridge tower. Concrete enters the casting space of the N+1 segment bridge tower through the discharge hole 253 on the shielding system 25. The shielding system 25 covers the top of the casting space to isolate the influence of the climate environment on the casting construction. The entire placing process can be automatically placed through the intelligent control system.
[0255] 6. Use the vibrating system 22 on the top of the inner form support 2 to vibrate the concrete of the N+1 section bridge tower, adjust the horizontal, longitudinal and vertical positions of the vibrating head 224 in the vibrating system 22, and lower it into the concrete of the N+1 section bridge tower to vibrate the concrete until the concrete pouring construction of the N+1 section bridge tower is completed;
[0256] 7. Repeat the above steps until the construction of all sections of the bridge tower 3 is completed. The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. The present invention may have various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A multifunctional integrated intelligent tower building device, characterized in that: It comprises an outer mold support (1) located outside the bridge tower (3) and an inner mold support (2) located inside the inner cavity of the bridge tower (3); The outer mold support (1) is provided with: An outer formwork climbing system (11), wherein the outer formwork climbing system (11) is fixed to the inner side of the outer formwork support (1) and is used to drive the outer formwork support (1) to move vertically along the outer side of the bridge tower (3); A curing system (12), the curing system (12) being located inside the outer formwork support (1) and being used for maintaining moisture in the poured concrete of the bridge tower (3); A material distribution system, the material distribution system is located at the top of the outer formwork support (1) and is used for pouring spatial material distribution and concrete onto the bridge tower (3); The inner mold support (2) is provided with: An inner mold climbing system (21), wherein the inner mold climbing system (21) is movably connected to the outer side of the inner mold support (2) and is used to drive the inner mold support (2) to move vertically along the inner side of the bridge tower (3). A vibration system (22), the vibration system (22) being located on the inner form support (2) and being used for vibrating the concrete after the concrete is laid; A shielding system (25), wherein the shielding system (25) is fixed to the top of the inner mold support (2) and is located directly above the pouring space of the bridge tower (3); The outer mold support (1) is also provided with a control system for controlling the outer mold climbing system (11), the maintenance system (12), the material distribution system, the inner mold climbing system (21) and the vibration system (22); The outer formwork climbing system (11) comprises an outer formwork track (111) anchored on a poured concrete surface, an outer formwork stepping device arranged on the outer formwork track (111), and a control platform (112) fixed on the outer formwork stepping device; the outer formwork stepping device comprises two groups of outer formwork climbing boxes (113) arranged at intervals along a vertical direction; an outer formwork climbing oil cylinder (114) is arranged between the two groups of outer formwork climbing boxes (113); the control platform (112) is fixed on the outer formwork stepping device; On a group of outer mold climbing boxes (113) at the upper layer; further comprising a hanging claw (116) rotatably hingedly connected to the outer mold climbing box (113) via a horizontal outer mold rotating shaft (115); one end of the hanging claw (116) extends into the outer mold climbing box (113), and the other end is hooked and fixed with the outer mold track (111) or is loosened; an observation structure for observing the connection between the hanging claw (116) and the outer mold track (111) is provided on the side wall of the outer mold climbing box (113); The observation structure comprises an observation window (117) provided on a side wall of the outer mold climbing box (113); the observation window (117) is an arc-shaped through hole that coincides with the rotation path of the hanging claw (116); a pointer (118) is provided in the observation window (117); one end of the pointer (118) is fixed to the hanging claw (116), and the other end passes through the observation window (117) and extends out of the outer mold climbing box (113); and scales (119) showing the movement of the pointer (118) are marked on the side walls of the outer mold climbing box (113) located around the observation window (117).
2. A multifunctional integrated intelligent tower building device as claimed in claim 1, characterized in that: The outer formwork support comprises a fixed truss (101) anchored on the outside of the bridge tower (3), and also comprises a movable truss (102); the movable truss (102) is a movable truss structure that is movably connected to the fixed truss (101) in the longitudinal direction, and a clamping structure for clamping a track unit component (103) is provided on the movable truss (102); the clamping structure is a temporary fixing structure of the track unit component (103) that is movably connected to the movable truss (102) in the transverse direction; and a lifting structure for lifting the track unit component (103) in the vertical direction is installed on the fixed truss (101).
3. A multifunctional integrated intelligent tower building device as claimed in claim 1, characterized in that: The inner mold climbing system (21) comprises an inner mold track (211) arranged vertically on the outside of the inner mold bracket (2), a bearing platform, and a first inner mold stepping device (2113) having one end fixed on the bearing platform and the other end loosely detachable from or hooked on the inner mold track (211); the bearing platform comprises a frame structure formed by splicing a transverse main beam (212) and a longitudinal main beam (213); transverse telescopic arms (214) movable along the length direction of the transverse main beam (212) are arranged at both ends of the transverse main beam (212), and the transverse telescopic arms (214) are connected to the transverse main beam (212). A transverse telescopic oil cylinder (216) for driving the transverse telescopic arm (214) to extend and retract is provided between the main beams (212); longitudinal telescopic arms (215) movable along the length direction are provided at both ends of the longitudinal main beam (213); a longitudinal telescopic oil cylinder (217) for driving the longitudinal telescopic arm (215) to extend and retract is provided between the longitudinal telescopic arm (215) and the longitudinal main beam (213); and a first anchoring structure connected to the inner cavity side wall of the bridge tower (3) is provided at one end of the transverse telescopic arm (214) and the longitudinal telescopic arm (215) away from the inner mold support (2).
4. The multifunctional integrated intelligent tower-building device according to claim 1, characterized in that: The inner mold climbing system (21) comprises an inner mold track (211) arranged vertically on the outside of the inner mold support (2) and a bearing frame (2122) sleeved on the outside of the inner mold support (2); the inner side of the bearing frame (2122) is vertically movably connected to the inner mold track (211) via a second inner mold stepping device (2125), and a plurality of vertically inclined support legs (2123) are arranged on the outside of the bearing frame (2122); the upper ends of the support legs (2123) are hingedly connected to the bearing frame (2122), and the lower ends are provided with a second anchoring structure connected to the inner cavity side wall of the bridge tower (3); and a leg support cylinder (2124) is arranged between the support legs (2123) and the bearing frame (2122) for driving the support legs (2123) to rotate around the upper end hinge support.
5. The multifunctional integrated intelligent tower-building device according to claim 1, characterized in that: The upper end of the inner mold support (2) is provided with a positioning system (24) for adjusting the position of the steel bar parts and the inner mold fixed on the hanger (23); the positioning system (24) includes a base (241) fixed on the upper end of the inner mold support (2), and the base (241) is provided with a longitudinal shift layer (242), a transverse shift layer (243), a rotation layer (244) and a vertical lifting layer (245) from bottom to top, the longitudinal shift layer (242) is longitudinally slidable relative to the base (241), the transverse shift layer (243) is transversely slidable relative to the longitudinal shift layer (242), the rotation layer (244) is rotationally engaged relative to the transverse shift layer (243), and the vertical lifting layer (245) is vertically movable relative to the rotation layer (244).
6. A multifunctional integrated intelligent tower-building device as claimed in claim 5, characterized in that: The hoist comprises a main load-bearing frame (231); a plurality of slideways (232) are arranged on the main load-bearing frame (231); the slideways (232) are arranged circumferentially along the main load-bearing frame (231) with the midpoint of the main load-bearing frame (231) as the center, and the plurality of slideways (232) surround to form an annular structure corresponding to the cross-section of the bridge tower; the slideway (232) is a guide rail movably connected to the main load-bearing frame (231) along the radial direction of the main load-bearing frame (231), and a plurality of connectors (233) for hanging steel bar components are arranged on the slideway (232); the connector (233) is a hanging connection point movably connected to the slideway (232) along the length direction of the slideway (232).
7. The multifunctional integrated intelligent tower-building device according to claim 1, characterized in that: The vibrating system (22) comprises a vibrator arranged on the inner mold support (2); the vibrator comprises a vibrating motor (222) placed on the inner mold support (2) and a vibrating head (224) connected to the vibrating motor (222) via a vibrating pipe (223); and an adjustment structure for adjusting the vertical and horizontal positions of the vibrating head (224) is arranged on the inner mold support (2).
8. The multifunctional integrated intelligent tower-building device according to claim 1, characterized in that: The curing system (12) comprises an atomizing unit (121) arranged on the outer mold support (1) and a spray pipe rack (123) fixed to the bottom of the outer mold plate inside the outer mold support (1); the atomizing unit (121) is connected to the spray pipe rack (123) via a connecting hose (122); the spray pipe rack (123) is a pipe network structure formed by a plurality of water pipes connected in a crisscross manner; a plurality of spray heads are arranged on the spray pipe rack (123); the spray pipe rack (123) is fixed to the outer mold plate via a spray pipe hanging rack (125); a curing film (124) is arranged on the outer side of the spray pipe rack (123); the curing film (124) is a water-impermeable film covering the outer side of the spray pipe rack (123); the curing film (124) is fixed to the outer mold plate via a curing film hanging rack (126).
Citation Information
Patent Citations
Tower crane internal-climbing support system
CN103601081A
Light intelligent hydraulic formwork climbing device with good wind and fire resistant performance
CN103806645A
Hydropower station rectangular high tower hydraulic climb slip form system and construction method
CN105839985A
Climbing device of hydraulic climbing formwork system and control method
CN106567333A
Truss type non-strut hydraulic climbing formwork system and construction technology thereof
CN107190650A
Cited By
Integrated intelligent tower building machine for industrial building of bridge tower
CN117026808A
Integrated intelligent tower building machine for industrialized construction of bridge tower
CN117026808B