Six rope arm

By designing a multi-connected pulley and a motor-driven six-rope arm head, a stable triangular wire rope hanging point structure is formed, which solves the problem of hanging basket shaking and tilting caused by unreasonable design of the suspension arm head, and achieves the stability and stability of the working platform sex.

CN110668369BActive Publication Date: 2024-12-03PINGHU POINT HIGH RISE EQUIP +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN201910941558.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-30
Publication Date
2024-12-03
Estimated Expiration
2039-09-30

AI Technical Summary

Technical Problem

The existing suspension arm head design is connected to the hanging basket through two wire rope hanging points, which causes the hanging basket to shake easily when high altitude and tilt left and right.

Method used

A six-rope arm head is designed, including an arm head seat, a slewing mechanism, an arm seat, a left arm and a right arm. It is driven by a multi-connected pulley and a motor to form a stable triangular wire rope hanging point structure to ensure the stability of the hanging basket. The rotational torque is enhanced by a dual motor slewing mechanism.

Benefits of technology

It effectively avoids the risk of hanging basket tilting left and right, ensures the stability and reliability of the working platform, and is suitable for heavy working platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110668369B_ABST
    Figure CN110668369B_ABST
Patent Text Reader

Abstract

The invention discloses a six-rope arm head, comprising an arm head seat, a slewing mechanism, and an arm seat. The slewing mechanism is fixed below the arm head seat, the arm seat is fixed to the slewing mechanism by bolts, the left side of the arm seat is connected to the left arm, the right side of the arm seat is connected to the right arm, a first double pulley and a first quadruple pulley are arranged in the arm head seat, a second double pulley and a second quadruple pulley are arranged in the arm seat, a third double pulley is arranged at the left end of the left arm, a third quadruple pulley is arranged at the left part of the right arm, the right end of the right arm is connected to the middle part of the rear arm, a fourth double pulley and a fifth double pulley are arranged on the middle part of the rear arm, and a sixth double pulley and a seventh double pulley are arranged on the left and right ends of the rear arm. The six-rope arm head of the invention has three suspension points and six steel wire ropes connected to a working platform, and the three suspension points form a stable triangular structure, thereby avoiding the danger of the working platform tipping over left and right.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of mechanical equipment, in particular to a six-rope arm head. Background Art

[0002] The hanging basket is a construction machinery used for high-altitude operations in construction projects, and is used for curtain wall installation and exterior wall cleaning. The hanging basket is usually suspended on the suspension arm head by steel wire ropes, and then the suspension arm head is driven by the lifting mechanism to suspend the hanging basket, and the workers can perform exterior wall cleaning and other operations on the hanging basket. The existing suspension arm head design is unreasonable. The suspension arm head is usually connected to the hanging basket through two steel wire rope suspension points. The two-point connection method makes the hanging basket easy to shake when it is in the air, and there is a risk of tipping over from side to side. Summary of the invention

[0003] The invention provides a six-rope arm head.

[0004] The purpose of the present invention is to solve the problem that the existing suspension arm head is irrational in design, in which the suspension arm head is connected to the hanging basket through two steel wire rope hanging points, which makes the hanging basket easy to shake when in the air and there is a risk of tipping over to the left and right.

[0005] The technical solution adopted by the present invention to solve its technical problems is: a six-rope arm head, including an arm head seat, a slewing mechanism, and an arm seat, the slewing mechanism is fixed below the arm head seat, the arm seat is fixed to the slewing mechanism by bolts, the left side of the arm seat is connected to the left arm, and the right side of the arm seat is connected to the right arm, a first double pulley and a first quadruple pulley are arranged in the arm head seat, a second double pulley and a second quadruple pulley are arranged in the arm seat, a third double pulley is arranged at the left end of the left arm, a third quadruple pulley is arranged at the left part of the right arm, the right end of the right arm is connected to the middle part of the rear arm, a fourth double pulley and a fifth double pulley which are symmetrical on the left and right are arranged on the middle part of the rear arm, and a sixth double pulley and a seventh double pulley which are symmetrical on the left and right ends of the rear arm are arranged on the left and right ends.

[0006] Preferably, the rotating mechanism is provided with two motors, which is a dual-motor rotating mechanism.

[0007] Preferably, the first double pulley is located on the upper side of the first quadruple pulley; and the second double pulley is located on the left side of the second quadruple pulley.

[0008] Preferably, the first double pulley, the first quadruple pulley, the second double pulley and the second quadruple pulley, the third double pulley, the third quadruple pulley, the sixth double pulley and the seventh double pulley are all arranged vertically, and the fourth double pulley and the fifth double pulley are arranged horizontally.

[0009] Preferably, through holes for allowing the steel wire rope to pass through are provided between the arm head seat, the slewing mechanism, the arm seat, the left arm, the right arm and the rear arm.

[0010] Preferably, it also includes 6 steel wire ropes, namely the first steel wire rope, the second steel wire rope, the third steel wire rope, the fourth steel wire rope, the fifth steel wire rope and the sixth steel wire rope. The third steel wire rope and the fourth steel wire rope are successively passed around the first double pulley, the second double pulley and the third double pulley and pass out from the left end of the left arm. The first steel wire rope, the second steel wire rope, the fifth steel wire rope and the sixth steel wire rope successively pass through the first quadruple pulley, the second quadruple pulley and the third quadruple pulley. Then the first steel wire rope and the second steel wire rope successively pass through the fourth double pulley and the sixth double pulley and pass out from the left end of the rear arm. The fifth steel wire rope and the sixth steel wire rope successively pass through the fifth double pulley and the seventh double pulley and pass out from the right end of the rear arm.

[0011] The beneficial effects of the present invention are as follows: the six-rope arm head of the present invention forms a total of three wire rope suspension points at the left end of the left arm and the left and right ends of the rear arm, and six wire ropes at the three suspension points are connected to the working platform (i.e., the hanging basket), and the three suspension points form a stable triangular structure, thereby avoiding the danger of the working platform tipping over to the left and right. At the same time, since the slewing mechanism is at the center of the entire working platform, the overturning moment of the slewing mechanism is small, and the operation is stable and reliable. The dual-motor slewing mechanism has a larger slewing torque and is suitable for heavy-duty working platforms. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the external structure of the six-rope arm head of the present invention.

[0013] Figure 2 It is a schematic diagram of the internal structure of the six-rope arm head of the present invention.

[0014] Figure 3 Schematic diagram of wire rope threading for six-rope arm head. DETAILED DESCRIPTION

[0015] The present invention is further described below in conjunction with the accompanying drawings and embodiments:

[0016] As shown in the figure, an embodiment of the six-rope arm head of the present invention is provided, including an arm head seat 1, a slewing mechanism 2, and an arm seat 3. The slewing mechanism 2 is fixed below the arm head seat 1, and the arm seat 3 is fixed to the slewing mechanism 2 by bolts. The left side of the arm seat 3 is connected to the left arm 4, and the right side of the arm seat 3 is connected to the right arm 5. A first double pulley 6 and a first quadruple pulley 7 are provided in the arm head seat 1, and a second double pulley 8 and a second quadruple pulley 9 are provided in the arm seat 3. A third double pulley 10 is provided at the left end of the left arm 4, and a third quadruple pulley 11 is provided at the left part of the right arm 5. The right end of the right arm 5 is connected to the middle part of the rear arm 12, and a fourth double pulley 13 and a fifth double pulley 14 are provided on the middle part of the rear arm 12, and a sixth double pulley 15 and a seventh double pulley 16 are provided on the left and right ends of the rear arm 12.

[0017] The slewing mechanism 2 is provided with two motors, which is a dual-motor slewing mechanism.

[0018] The first double pulley 6 is located on the upper side of the first quadruple pulley 7 ; the second double pulley 8 is located on the left side of the second quadruple pulley 9 .

[0019] The first double pulley 6, the first quadruple pulley 7, the second double pulley 8, the second quadruple pulley 9, the third double pulley 10, the third quadruple pulley 11, the sixth double pulley 15 and the seventh double pulley 16 are all arranged vertically, and the fourth double pulley 13 and the fifth double pulley 14 are arranged horizontally.

[0020] A through hole for allowing the steel wire rope to pass through is provided between the arm head seat 1, the slewing mechanism 2, the arm seat 3, the left arm 4, the right arm 5, and the rear arm 12.

[0021] In actual use, the arm head seat 1 is fixed to the main arm of the crane through a connecting shaft, the slewing mechanism 2 is fixed to the arm head seat 1 by bolts, and the arm seat 3 is fixed to the rotatable part of the slewing mechanism 2 by bolts. Then the slewing mechanism 2 rotates to drive the arm seat 3, the left arm 4 and the right arm 5 to rotate. Six steel wire ropes come from the pulley on the upper arm to reach the arm head seat 1, and the six steel wire ropes are respectively the first steel wire rope 17, the second steel wire rope 18, the third steel wire rope 19, the fourth steel wire rope 20, the fifth steel wire rope 21, and the sixth steel wire rope 22. The third steel wire rope 19 and the fourth steel wire rope 20 pass through the first double pulley 6, the second double pulley 8, and the third double pulley 10 in turn, and pass through the left end of the left arm 4. The first steel wire rope 17, the second steel wire rope 18, the fifth steel wire rope 21, and the sixth steel wire rope 22 pass through the first quadruple pulley 7, the second quadruple pulley 9, and the third quadruple pulley 11 in turn, and then the first steel wire rope 17 and the second steel wire rope 18 pass through the fourth double pulley 13 and the sixth double pulley 15 in turn, and pass through the left end of the rear arm 12. The fifth steel wire rope 21 and the sixth steel wire rope 22 pass through the fifth double pulley 14 and the seventh double pulley 16 in turn, and pass through the right end of the rear arm 12. In this way, a total of three wire rope suspension points are formed at the left end of the left arm 4 and the left and right ends of the rear arm 12. Six wire ropes at the three suspension points are connected to the working platform (i.e., the hanging basket). The three suspension points form a stable triangular structure, which avoids the danger of the working platform tipping over. At the same time, since the slewing mechanism is at the center of the entire working platform, the overturning moment of the slewing mechanism is small, and the work is stable and reliable. The dual-motor slewing mechanism has a larger slewing torque and is suitable for heavy-duty working platforms.

Claims

1. A six-rope arm head, comprising an arm head seat, a slewing mechanism, and an arm seat. Features: The slewing mechanism is fixed below the arm head seat, and the arm seat is fixed to the slewing mechanism by bolts. The left side of the arm seat is connected to the left arm, and the right side of the arm seat is connected to the right arm. A first double pulley and a first quadruple pulley are arranged in the arm head seat, and a second double pulley and a second quadruple pulley are arranged in the arm seat. A third double pulley is arranged at the left end of the left arm, and a third quadruple pulley is arranged on the left part of the right arm. The right end of the right arm is connected to the middle of the rear arm, and a fourth double pulley and a fifth double pulley are arranged on the middle of the rear arm, and a sixth double pulley and a seventh double pulley are arranged on the left and right ends of the rear arm; two motors are arranged on the slewing mechanism, which is a dual-motor slewing mechanism; the first double pulley, the first quadruple pulley, the second double pulley and the second quadruple pulley, the third double pulley, the third quadruple pulley, the sixth double pulley and the seventh double pulley are all vertically arranged, and the fourth double pulley and the fifth double pulley are horizontally arranged.

2. The six-rope arm head according to claim 1, Features: The first double pulley is located on the upper side of the first quadruple pulley; the second double pulley is located on the left side of the second quadruple pulley.

3. The six-rope arm head according to claim 1, Features: Through holes for allowing the steel wire rope to pass through are arranged between the arm head seat, the slewing mechanism, the arm seat, the left arm, the right arm and the rear arm.

4. The six-rope arm head according to claim 1, Features: It also includes 6 steel wire ropes, namely the first steel wire rope, the second steel wire rope, the third steel wire rope, the fourth steel wire rope, the fifth steel wire rope and the sixth steel wire rope. The third steel wire rope and the fourth steel wire rope are passed around the first double pulley, the second double pulley and the third double pulley in turn, and pass out from the left end of the left arm. The first steel wire rope, the second steel wire rope, the fifth steel wire rope and the sixth steel wire rope pass through the first quadruple pulley, the second quadruple pulley and the third quadruple pulley in turn, and then the first steel wire rope and the second steel wire rope pass through the fourth double pulley and the sixth double pulley in turn, and pass out from the left end of the rear arm. The fifth steel wire rope and the sixth steel wire rope pass through the fifth double pulley and the seventh double pulley in turn, and pass out from the right end of the rear arm.

Citation Information

Patent Citations

  • Semi-traction dolly type light-weight portal crane

    CN102616666A

  • Folding knuckle arm head

    CN201010454Y

  • First subassembly of crane arm and hoist

    CN207713308U

  • Six-rope arm head

    CN211110938U

  • A motion compensating crane for use on an offshore vessel

    WO2018199743A2