Central heating large temperature difference centralized combined cascade heat exchanger unit

By using a large temperature difference centralized combined cascade heat exchange unit and a multi-stage pump heating system in the combined heat and power centralized hot water heating system, the problem of coordinating the pressure and heat load of the primary and secondary pipe networks in long-distance heat supply is solved. It has achieved a stable reduction in return water temperature and improved heating capacity, meeting the heating needs of secondary network thermal stations.

CN110748940BActive Publication Date: 2024-10-15CEEC SHANXI ELECTRIC POWER EXPLORATION & DESIGN INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911078024.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-06
Publication Date
2024-10-15
Estimated Expiration
2039-11-06

AI Technical Summary

Technical Problem

The existing combined heat and power centralized hot water heating system is difficult to effectively coordinate the pressure and heat load of the primary and secondary pipe networks in long-distance transmission and heating projects, resulting in insufficient heating capacity and a large footprint for distributed cooling methods. , The return water temperature in centralized arrangement is unstable.

Method used

A centralized heating large temperature difference centralized combined cascade heat exchange unit is used, including a lithium bromide absorption heat exchange unit, the first and second compression heat pumps, a multi-stage pump and valve system, and a high and low temperature hot water storage tank. The first-stage heat exchange and pump heating system coordinates and balances the pressure and heat load of the primary and secondary pipe networks to increase the heating capacity.

Benefits of technology

It achieves a stable reduction in the return water temperature of the primary network, makes full use of the waste heat of the power plant, improves the heating capacity of the heating system, meets the heat exchange requirements of each thermal station in the secondary network, reduces the heating energy consumption and cost, and through storage The hot water tank balances the heat load and increases the heating capacity by 20%-50%.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110748940B_ABST
    Figure CN110748940B_ABST
Patent Text Reader

Abstract

The present invention discloses a centralized heating large temperature difference centralized combined cascade heat exchange unit, which solves the problem of how to make full use of various waste heat of power plants. The first stage is that the return water in front of the first circulation pump (43) of the secondary network is boosted by the first booster pump (6), cooled by the evaporator of the second compression heat pump (9), and then replenished into the return water of the primary network; the second stage is that the outlet water of the lithium bromide absorption heat exchange unit (2) on the primary pipe network enters the evaporator inlet of the first compression heat pump (4) for cooling, and then merges into the return water main of the primary network, and the return water of the secondary network is boosted by the first circulation pump (43) and enters the condenser of the first compression heat pump for heating, and then mixed with the water supply main of the secondary network; the third stage is that the return water of the primary network heat exchange is cooled by the lithium bromide absorption heat exchange unit (2), enters the first compression heat pump for further cooling, and then merges into the return water main of the primary pipe network; the fourth stage is that the water supply of the primary network and the water supply of the secondary network are mixed and heated to reach the design required temperature and then supplied.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a centralized heating system of cogeneration of heat and power, and in particular to a centralized combined cascade heat exchange unit with a large temperature difference that can coordinate and balance the pressure and heat load of a primary heating pipe network and a secondary heating pipe network and increase the heating capacity of the heating system. Background Art

[0002] There are more and more long-distance heating projects (hereinafter referred to as long-distance heating) in the cogeneration centralized hot water heating system. In order to achieve the economy of heat energy transmission and make full use of the waste heat of the power plant, long-distance heating requires that the temperature difference between the supply and return water of the hot water transmission pipeline should be greater than the temperature difference between the supply and return water of the conventional centralized hot water heating. For example, when the supply water temperature of the conventional cogeneration centralized hot water heating is 130℃-110℃ and the return water is 60℃-50℃, the required temperature difference between the supply water and the return water is 50℃-60℃; while the long-distance heating project requires the supply water temperature of the transmission trunk line to be 130℃-110℃, the return water temperature to be 30℃-15℃, and the temperature difference between the supply water and the return water to be 80℃-115℃; that is to say, under the same pipe diameter and flow conditions, the heat transmission capacity of long-distance heating is 30%-100% higher than that of the conventional cogeneration centralized hot water heating. There are two main ways to reduce the return water temperature in the primary pipeline network of long-distance heating supply in the prior art. The first is a distributed cooling method, that is, installing a lithium bromide large temperature difference heat exchanger unit in each thermal power station. Its advantage is that it can reduce the return water temperature and increase the temperature difference. However, its disadvantage is that the lithium bromide large temperature difference heat exchanger unit occupies a large area. Urban thermal power stations generally occupy a limited space, and thermal power stations with small spaces cannot be arranged. When the proportion of thermal power stations that cannot be equipped with lithium bromide large temperature difference heat exchangers is relatively large, the reduction in the total return water temperature is not ideal. The second is a centralized arrangement method. According to the characteristics of the secondary network, a number of centralized lithium bromide large temperature difference heat exchangers are centrally arranged. Its advantage is that it is centralized. The large temperature difference unit is set in the middle, which avoids the defects of the distributed lithium bromide large temperature difference heat exchange unit in each thermal power station. The original thermal power station and the newly built thermal power station can be arranged and designed according to the traditional thermal power station. The centralized large temperature difference unit can be built at the original boiler room location or on the new site. It is easy to arrange and design, and the return water temperature is relatively easy to control. However, the disadvantage is that the water supply temperature of the secondary network is low after heat exchange by the lithium bromide large temperature difference heat exchange unit, which cannot meet the heat exchange requirements of the lower thermal power station. It is necessary to add a peak heating heat source on the water supply side of the secondary network. At the same time, the return water temperature of the secondary network is high after heat exchange in the thermal power station, resulting in a small reduction in the return water on the primary network side and poor stability in cooling. Summary of the invention

[0003] The present invention provides a centralized combined cascade heat exchanger unit with a large temperature difference for centralized heating, which solves the technical problems of how to make full use of various waste heat from power plants, meet the heat exchange requirements of various thermal power stations in the secondary network, and how to coordinate and balance the pressure and heat load of the primary and secondary pipe networks.

[0004] The present invention solves the above technical problems through the following technical solutions:

[0005] A centralized heating large temperature difference centralized combined cascade heat exchange unit, comprising a lithium bromide absorption heat exchange unit, a first compression heat pump, a second compression heat pump, a primary network water supply main pipe, a primary network return water main pipe, a secondary network water supply main pipe and a secondary network return water main pipe, the primary network water supply main pipe is connected to the heat exchange and cooling input end of the lithium bromide absorption heat exchange unit, the heat exchange and cooling output end of the lithium bromide absorption heat exchange unit is connected to the heat exchange and cooling input end of the first compression heat pump through a heat exchange and cooling output pipe, and the first compression heat pump The heat exchange and cooling output end is connected to the primary network return water main pipe, and the secondary network return water main pipe is connected to the first return water input branch pipe and the second return water input branch pipe respectively after passing through the first circulation pump and the first check valve, the other end of the first return water input branch pipe is connected to the condenser heating input end of the second compression heat pump, the condenser heating output end of the second compression heat pump is connected to the secondary network water supply main pipe through the first return water output branch pipe, a first electric regulating valve is arranged on the first return water input branch pipe, the other end of the second return water branch pipe is connected to the condenser heating input end of the first compression heat pump, the condenser heating output end of the first compression heat pump is connected to the secondary network water supply main pipe through the second return water output branch pipe, and a second electric regulating valve is arranged on the second return water input branch pipe; the condenser heating input end of the first compression heat pump is connected to the heat exchange heating input pipe of the lithium bromide absorption heat exchange unit, and the other end of the heat exchange heating input pipe is connected to the heat exchange heating input end of the lithium bromide absorption heat exchange unit, The heat exchange and heating output end of the lithium bromide absorption heat exchanger unit is connected to the secondary network water supply main pipe through the heat exchange and heating output pipe; a third return water input branch pipe is arranged on the secondary network return water main pipe, and the other end of the third return water input branch pipe is connected to the heat exchange and cooling input end of the second compression heat pump, and the heat exchange and cooling output end of the second compression heat pump is connected to the primary network return water main pipe through the heat exchange and cooling output pipe of the second compression heat pump, and a first booster pump and a second check valve are respectively arranged on the third return water input branch pipe.

[0006] A primary network water supply pipe branch pipe is arranged on the primary network water supply main pipe, and a secondary network water supply pipe branch pipe is arranged on the secondary network water supply main pipe. A primary network water supply pipe pressure lower than secondary network water supply pipe pressure regulating branch pipe and a primary network water supply pipe water pressure higher than secondary network water supply pipe water pressure regulating branch pipe are connected in parallel between the other end of the primary network water supply pipe branch pipe and the other end of the secondary network water supply pipe branch pipe. A first shut-off valve, a first pressure reducing valve, a second booster pump and a third check valve are connected in series in sequence on the primary network water supply pipe pressure lower than the secondary network water supply pipe pressure regulating branch pipe, and a second shut-off valve, a second pressure reducing valve, a third electric regulating valve and a third shut-off valve are connected in series in sequence on the primary network water supply pipe pressure higher than the secondary network water supply pipe pressure regulating branch pipe.

[0007] The secondary network return water main is respectively connected with a low-temperature hot water storage tank input water branch pipe and a low-temperature hot water storage tank output water branch pipe, the other end of the low-temperature hot water storage tank input water branch pipe is connected to the input end of the low-temperature hot water storage tank, and the other end of the low-temperature hot water storage tank output water branch pipe is connected to the output end of the low-temperature hot water storage tank. The low-temperature hot water storage tank input water branch pipe is sequentially provided with a fourth shut-off valve, a fourth electric regulating valve and a fifth shut-off valve, and the low-temperature hot water storage tank output water branch pipe is respectively provided with a first water replenishment pump and a fourth check valve; the secondary network water supply main is provided with a plurality of high-temperature hot water storage tank input water branch pipes respectively connected to the high-temperature hot water storage tank input water branch pipes. A sixth shut-off valve, a fifth electric regulating valve and a seventh shut-off valve are sequentially arranged on the high-temperature water storage tank input water branch pipe, and a second water supply pump and a fifth check valve are respectively arranged on the high-temperature water storage tank output water branch pipe; a soft water supply pipeline is connected to the low-temperature water storage tank, a soft water treatment device is connected to the other end of the soft water supply pipeline, and a tap water pipe is connected to the soft water treatment device.

[0008] A temperature sensor is arranged on the secondary network water supply main pipe, and the temperature sensor is electrically connected to the first electric regulating valve controller and the first frequency converter respectively through the temperature sensor control line, the first electric regulating valve controller is electrically connected to the third electric regulating valve, and the first frequency converter is electrically connected to the second booster pump; a first pressure sensor is arranged on the secondary network return water main pipe, and the first pressure sensor is electrically connected to the second frequency converter and the second electric regulating valve controller respectively through the first pressure sensor control line, the second frequency converter is electrically connected to the first make-up water pump, and the second electric regulating valve controller is electrically connected to the fourth electric regulating valve; a second pressure sensor is arranged on the primary network return water main pipe, and the second pressure sensor is electrically connected to the third frequency converter through the second pressure sensor control line, and the third frequency converter is electrically connected to the first booster pump.

[0009] The present invention can stably reduce the return water temperature of the primary network as required, make full use of the waste heat of the power plant, increase the heating capacity of the unit, and reduce the heating energy consumption and cost; a relatively high secondary network water supply temperature can be provided through a four-stage heating system to meet the heat exchange requirements of each thermal power station in the secondary network; and by setting high and low temperature water storage tanks and a discharge and water replenishment system, the pressure and heat load of the primary and secondary pipe networks can be coordinated and balanced, thereby increasing the heating capacity of the heating system. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a structural schematic diagram of the present invention. DETAILED DESCRIPTION

[0011] The present invention is described in detail below in conjunction with the accompanying drawings:

[0012] A centralized heating large temperature difference centralized combined cascade heat exchange unit, comprising a lithium bromide absorption heat exchange unit 2, a first compression heat pump 4, a second compression heat pump 9, a primary network water supply main pipe 1, a primary network return water main pipe 11, a secondary network water supply main pipe 18 and a secondary network return water main pipe 42, the primary network water supply main pipe 1 is connected to the heat exchange and cooling input end of the lithium bromide absorption heat exchange unit 2, the heat exchange and cooling output end of the lithium bromide absorption heat exchange unit 2 is connected to the heat exchange and cooling input end of the first compression heat pump 4 through a heat exchange and cooling output pipe 3, the heat exchange and cooling output end of the first compression heat pump 4 is connected to the heat exchange and cooling input end of the first compression heat pump 4 The temperature output end is connected to the primary network return water main pipe 11, and the secondary network return water main pipe 42 is connected to the first return water input branch pipe 12 and the second return water input branch pipe 45 respectively after passing through the first circulation pump 43 and the first check valve 44 in sequence. The other end of the first return water input branch pipe 12 is connected to the condenser temperature increase input end of the second compression heat pump 9, and the condenser temperature increase output end of the second compression heat pump 9 is connected to the secondary network water supply main pipe 18 through the first return water output branch pipe 15. A first electric regulating valve 13 is arranged on the first return water input branch pipe 12. The other end of the second return water branch pipe 45 is connected to the condenser heating input end of the first compression heat pump 4, and the condenser heating output end of the first compression heat pump 4 is connected to the secondary network water supply main pipe 18 through the second return water output branch pipe 46. The second electric regulating valve 16 is arranged on the second return water input branch pipe 45; the heat exchange heating input pipe 47 of the lithium bromide absorption heat exchange unit is connected to the condenser heating input end of the first compression heat pump 4, and the other end of the heat exchange heating input pipe 47 is connected to the heat exchange heating input end of the lithium bromide absorption heat exchange unit 2 The heat exchange and heating output end of the lithium bromide absorption heat exchanger unit 2 is connected to the secondary network water supply main 18 through the heat exchange and heating output pipe 17; a third return water input branch pipe 5 is arranged on the secondary network return water main 42, and the other end of the third return water input branch pipe 5 is connected to the heat exchange and cooling input end of the second compression heat pump 9, and the heat exchange and cooling output end of the second compression heat pump 9 is connected to the primary network return water main 11 through the heat exchange and cooling output pipe 10 of the second compression heat pump, and a first booster pump 6 and a second check valve 7 are respectively arranged on the third return water input branch pipe 5.The present invention is composed of a four-stage heat exchange system. The first stage is that the return water in front of the first circulation pump 43 of the secondary network is boosted by the first booster pump 6, cooled by the evaporator of the second compression heat pump 9, and then replenished into the return water of the primary network. At the same time, there is another secondary network return water that is boosted by the first circulation pump 43 and enters the condenser of the second compression heat pump 9 to be heated and then mixed with the water of the secondary network water supply main 18; the second stage is that the water outlet of the lithium bromide absorption heat exchange unit 2 on the primary pipe network enters the evaporator inlet of the first compression heat pump 4 to be cooled and then merged into the return water of the primary network The secondary network return water is pressurized by the first circulation pump 43 and then enters the condenser of the first compression heat pump 4 for heating and then mixes with the secondary network water supply main; the third stage is that the primary network heat exchange return water is cooled by the lithium bromide absorption heat exchanger unit 2 and then enters the first compression heat pump 4 for further cooling and then merges into the primary network return water main. The secondary network return water is pressurized by the first circulation pump 43 and then enters the lithium bromide absorption heat exchanger 2 for heating and then enters the secondary network water supply main; the fourth stage is that the primary network supply water and the secondary network supply water are mixed and heated to reach the design temperature and then supplied.

[0013] A primary network water supply pipe branch pipe 19 is arranged on the primary network water supply main pipe 1, and a secondary network water supply pipe branch pipe 24 is arranged on the secondary network water supply main pipe 18. A primary network water supply pipe pressure lower than the secondary network water supply pipe pressure regulating branch pipe 14 and a primary network water supply pipe water pressure higher than the secondary network water supply pipe water pressure regulating branch pipe 8 are connected in parallel between the other end of the primary network water supply pipe branch pipe 19 and the other end of the secondary network water supply pipe branch pipe 24. The first shut-off valve 20, the first pressure reducing valve 21, the second booster pump 22 and the third check valve 23 are connected in series in sequence on the primary network water supply pipe pressure lower than the secondary network water supply pipe pressure regulating branch pipe 14. The second shut-off valve 25, the second pressure reducing valve 26, the third electric regulating valve 27 and the third shut-off valve 28 are connected in series in sequence on the primary network water supply pipe pressure higher than the secondary network water supply pipe pressure regulating branch pipe 8; that is, the fourth stage is supplied by mixing the primary network water supply and the secondary network water supply and heating them to reach the design required temperature.

[0014] A low-temperature hot water storage tank input water branch pipe 48 and a low-temperature hot water storage tank output water branch pipe 41 are respectively connected to the secondary network return water main pipe 42, the other end of the low-temperature hot water storage tank input water branch pipe 48 is connected to the input end of the low-temperature hot water storage tank 38, and the other end of the low-temperature hot water storage tank output water branch pipe 41 is connected to the output end of the low-temperature hot water storage tank 38. A fourth shut-off valve 49, a fourth electric regulating valve 50 and a fifth shut-off valve 51 are sequentially arranged on the low-temperature hot water storage tank input water branch pipe 48, and a first replenishment pump 39 and a fourth check valve 40 are respectively arranged on the low-temperature hot water storage tank output water branch pipe 41; a high-temperature hot water storage tank input water branch pipe 33 and a high-temperature hot water storage tank output water branch pipe 32 are respectively connected to the secondary network water supply main pipe 18, the other end of the high-temperature hot water storage tank input water branch pipe 33 is connected to the input end of the high-temperature hot water storage tank 37, and the other end of the high-temperature hot water storage tank output water branch pipe 32 is connected to the output end of the high-temperature hot water storage tank 37. The branch pipe 33 is provided with a sixth shut-off valve 34, a fifth electric regulating valve 35 and a seventh shut-off valve 36 in sequence, and the high-temperature hot water storage tank output water branch pipe 32 is provided with a second water supply pump 30 and a fifth check valve 31 respectively; the low-temperature hot water storage tank 38 is connected to a soft water supply pipeline 54, and the other end of the soft water supply pipeline 54 is connected to a soft water treatment device 53, and the soft water treatment device 53 is connected to a tap water pipe 52; the high-temperature hot water storage tank 37 can be used during the low heat load period (such as at night) Water is discharged from the secondary network water supply main to the water tank for heat storage. During the peak period of heat load (such as daytime), the high-temperature water in the high-temperature water storage tank can be replenished into the secondary network water supply main by a water replenishment pump to increase the heating load; the low-temperature water storage tank 38 can be provided with a drainage pipe on the secondary network return water main, and the excess water of the secondary network heating system due to the expansion of the water body after the mixing of the primary network water supply and the secondary network water supply or the heating is discharged into the low-temperature water storage tank through the drainage valve of the secondary network return water main. The water tank also plays the role of replenishing water and maintaining pressure for the secondary network heating system.

[0015] A temperature sensor 55 is provided on the secondary network water supply main 18. The temperature sensor 55 is electrically connected to the first electric regulating valve controller 58 and the first frequency converter 57 through the temperature sensor control line 56, the first electric regulating valve controller 58 is electrically connected to the third electric regulating valve 27, and the first frequency converter 57 is electrically connected to the second booster pump 22; a first pressure sensor 59 is provided on the secondary network return water main 42. The first pressure sensor 59 is electrically connected to the second frequency converter 61 and the second electric regulating valve controller 62 through the first pressure sensor control line 60, the second frequency converter 61 is electrically connected to the first water supply pump 39, and the second electric regulating valve controller 62 is electrically connected to the fourth electric regulating valve 50; a second pressure sensor 63 is provided on the primary network return water main 11. The second pressure sensor 63 is electrically connected to the third frequency converter 64 through the second pressure sensor control line 29, and the third frequency converter 64 is electrically connected to the first booster pump 6.

[0016] The present invention can reduce the return water of the primary network to the required return water temperature through the above four-stage heating system, and return the heat to the power plant to fully utilize the waste heat of the thermal power plant. At the same time, it can provide a higher water supply temperature for the secondary network to meet the heating needs of each thermal power station in the secondary network. The high and low temperature water storage tanks can store heat in the low heat load period and supply heat in the peak heat load period to increase the heating capacity. The present invention uses a four-stage heat exchange system of a centralized heating large temperature difference centralized combined cascade heat exchanger unit to gradually reduce the temperature of the primary network return water to a minimum of 10-15°C and return it to the power plant to deeply utilize various types of waste heat from the power plant. At the same time, the water supply temperature of the secondary pipe network can be increased to 95-100°C, which can fully meet the heat exchange requirements of each thermal power station in the urban secondary network. The present invention is equipped with one large cold and hot water storage tank, which can store excess hot water and heat to balance the heat load during the day and night, and can increase the heating capacity by 20%-50%.

Claims

1. A centralized heating large temperature difference centralized combined cascade heat exchange unit, comprising a lithium bromide absorption heat exchange unit (2), a first compression heat pump (4), a second compression heat pump (9), a primary network water supply main pipe (1), a primary network return water main pipe (11), a secondary network water supply main pipe (18) and a secondary network return water main pipe (42), characterized in that: The primary network water supply main pipe (1) is connected to the heat exchange and cooling input end of the lithium bromide absorption heat exchange unit (2); the heat exchange and cooling output end of the lithium bromide absorption heat exchange unit (2) is connected to the heat exchange and cooling input end of the first compression heat pump (4) through the heat exchange and cooling output pipe (3); the heat exchange and cooling output end of the first compression heat pump (4) is connected to the primary network return water main pipe (11); the secondary network return water main pipe (42) is connected to the first return water input branch pipe (12) and the second return water output branch pipe (11) respectively after passing through the first circulation pump (43) and the first check valve (44). The first return water input branch pipe (45) is connected together with the other end of the first return water input branch pipe (12) and the condenser temperature increase input end of the second compression heat pump (9). The condenser temperature increase output end of the second compression heat pump (9) is connected to the secondary network water supply main pipe (18) through the first return water output branch pipe (15). A first electric regulating valve (13) is provided on the first return water input branch pipe (12). The other end of the second return water input branch pipe (45) is connected to the condenser temperature increase input end of the first compression heat pump (4). The condenser temperature rise output end of the first compression heat pump (4) is connected to the secondary network water supply main pipe (18) through the second return water output branch pipe (46), and a second electric regulating valve (16) is arranged on the second return water input branch pipe (45); the condenser temperature rise input end of the first compression heat pump (4) is connected to the heat exchange temperature rise input pipe (47) of the lithium bromide absorption heat exchange unit, and the other end of the heat exchange temperature rise input pipe (47) is connected to the heat exchange temperature rise input end of the lithium bromide absorption heat exchange unit (2), and the heat exchange temperature rise output end of the lithium bromide absorption heat exchange unit (2) is connected to the heat exchange temperature rise input end of the lithium bromide absorption heat exchange unit (2) through the heat exchange temperature rise input pipe (47). The temperature output pipe (17) is connected to the secondary network water supply main pipe (18); a third return water input branch pipe (5) is provided on the secondary network return water main pipe (42); the other end of the third return water input branch pipe (5) is connected to the heat exchange and cooling input end of the second compression heat pump (9); the heat exchange and cooling output end of the second compression heat pump (9) is connected to the primary network return water main pipe (11) through the heat exchange and cooling output pipe (10) of the second compression heat pump; and a first booster pump (6) and a second check valve (7) are respectively provided on the third return water input branch pipe (5).

2. A centralized heating large temperature difference centralized combined cascade heat exchanger unit according to claim 1, characterized in that: A primary network water supply pipe branch pipe (19) is provided on the primary network water supply main pipe (1), and a secondary network water supply pipe branch pipe (24) is provided on the secondary network water supply main pipe (18). A primary network water supply pipe pressure lower than secondary network water supply pipe pressure regulating branch pipe (14) and a primary network water supply pipe water pressure higher than secondary network water supply pipe water pressure regulating branch pipe (8) are connected in parallel between the other end of the primary network water supply pipe branch pipe (19) and the other end of the secondary network water supply pipe branch pipe (24). A first shutoff valve (20), a first pressure reducing valve (21), a second booster pump (22) and a third check valve (23) are sequentially connected in series on the primary network water supply pipe pressure lower than secondary network water supply pipe pressure regulating branch pipe (14), and a second shutoff valve (25), a second pressure reducing valve (26), a third electric regulating valve (27) and a third shutoff valve (28) are sequentially connected in series on the primary network water supply pipe pressure higher than secondary network water supply pipe water pressure regulating branch pipe (8).

3. A centralized heating large temperature difference centralized combined cascade heat exchanger unit according to claim 2, characterized in that: A low-temperature hot water storage tank input water branch pipe (48) and a low-temperature hot water storage tank output water branch pipe (41) are respectively connected to the secondary network return water main pipe (42); the other end of the low-temperature hot water storage tank input water branch pipe (48) is connected to the input end of the low-temperature hot water storage tank (38); the other end of the low-temperature hot water storage tank output water branch pipe (41) is connected to the output end of the low-temperature hot water storage tank (38); a fourth shutoff valve (49), a fourth electric regulating valve (50) and a fifth shutoff valve (51) are sequentially arranged on the low-temperature hot water storage tank input water branch pipe (48); a first water replenishment pump (39) and a fourth check valve (40) are respectively arranged on the low-temperature hot water storage tank output water branch pipe (41); and a plurality of valves (49) and a fourth electric regulating valve (50) are respectively connected to the high-temperature hot water storage tank input water branch pipe (33) and the high-temperature hot water storage tank output water branch pipe (41). The hot water storage tank output water branch pipe (32), the other end of the high-temperature hot water storage tank input water branch pipe (33) is connected to the input end of the high-temperature hot water storage tank (37), the other end of the high-temperature hot water storage tank output water branch pipe (32) is connected to the output end of the high-temperature hot water storage tank (37), a sixth shutoff valve (34), a fifth electric regulating valve (35) and a seventh shutoff valve (36) are sequentially arranged on the high-temperature hot water storage tank input water branch pipe (33), and a second water replenishment pump (30) and a fifth check valve (31) are respectively arranged on the high-temperature hot water storage tank output water branch pipe (32); a soft water replenishment pipeline (54) is connected to the low-temperature hot water storage tank (38), a soft water treatment device (53) is connected to the other end of the soft water replenishment pipeline (54), and a tap water pipe (52) is connected to the soft water treatment device (53).

4. The centralized heating large temperature difference centralized combined cascade heat exchanger unit according to claim 3, characterized in that: A temperature sensor (55) is provided on the secondary network water supply main pipe (18). The temperature sensor (55) is electrically connected to a first electric regulating valve controller (58) and a first frequency converter (57) through a temperature sensor control line (56). The first electric regulating valve controller (58) is electrically connected to a third electric regulating valve (27). The first frequency converter (57) is electrically connected to a second booster pump (22). A first pressure sensor (59) is provided on the secondary network return water main pipe (42). The first pressure sensor (59) is electrically connected to a first pressure sensor control line (56). (60) are electrically connected to the second frequency converter (61) and the second electric regulating valve controller (62), respectively; the second frequency converter (61) is electrically connected to the first water supply pump (39), and the second electric regulating valve controller (62) is electrically connected to the fourth electric regulating valve (50); a second pressure sensor (63) is provided on the primary network return water main pipe (11); the second pressure sensor (63) is electrically connected to the third frequency converter (64) through the second pressure sensor control line (29), and the third frequency converter (64) is electrically connected to the first booster pump (6).