A low temperature insulation cylinder front support assembly device

By using the combined design of cylinder and elastomer in the low-temperature insulated cylinder front support assembly device, the problem of inconsistent gaps during neck tube welding is solved, pneumatic compression dual positioning is achieved, and product quality and work efficiency are improved.

CN110842463BActive Publication Date: 2024-10-15CHANGCHUN ZHIYUAN NEW ENERGY EQUIP CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN201911271804.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-12
Publication Date
2024-10-15
Estimated Expiration
2039-12-12

AI Technical Summary

Technical Problem

In the low-temperature insulated cylinder front support assembly device, inconsistent gaps during neck tube welding lead to product quality being affected, high rework rates, and increased manufacturing costs.

Method used

Design a device including a cylinder, an upper support plate, a bearing, a guide column and an elastomer. The neck tube is fixed by the telescopic force generated by the cylinder to ensure the consistency of the gap and realize the dual positioning function of pneumatic compression.

Benefits of technology

It improves the accuracy of neck tube assembly, reduces inconsistent gaps during welding, reduces the rework rate, and improves work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110842463B_ABST
    Figure CN110842463B_ABST
Patent Text Reader

Abstract

The present invention discloses a low-temperature insulated steel cylinder front support assembly device in the field of steel cylinder production technology, comprising a cylinder, an upper support plate, an upper bearing center positioning plate, a bearing, an upper bearing outer ring positioning plate, a first connecting plate, a support plate, a second connecting plate, an elastic body, a first guide cone block, a third connecting plate, a second guide cone block, a bottom positioning block and a bottom plate, wherein the top of the support plate is connected to the upper support plate, and the bottom of the support plate is connected to the bottom of the bottom plate, the guide column is installed through the second connecting plate, the elastic body and the middle position of the first guide cone block, the third connecting plate is installed at the bottom of the second connecting plate, the second guide cone block is installed at the bottom of the third connecting plate, the bottom positioning block is installed at the top of the bottom plate, and the bottom positioning block is rotatably connected to the bottom plate. In actual production operation, the device is used to realize the double positioning function of pneumatically pressing two neck tubes, which greatly improves the accuracy of neck tube assembly and improves work efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel cylinder production, in particular to a front support assembly device for a low-temperature heat-insulating steel cylinder. Background Art

[0002] Since the front support (C-type structure) of the cryogenic insulated steel cylinder (hereinafter referred to as the steel cylinder) needs to have sufficient strength and maintain low heat transfer performance, the spacing requirements for the large and small neck tubes are relatively strict.

[0003] At present, it relies on the workpiece's own stop (limit) positioning and manual assembly.

[0004] When welding the neck tube, the gap of the neck tube has relatively high requirements on the performance of the product. However, due to the effect of welding deformation, inconsistent gaps often occur in the actual production process, which affects product quality, increases the rework rate, and increases manufacturing costs. Summary of the invention

[0005] The object of the present invention is to provide a front support assembly device for a low-temperature insulated steel cylinder to solve the problem of different gaps caused by welding the neck tube on the steel cylinder mentioned in the above background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a front support assembly device for a low-temperature insulated steel cylinder, comprising a cylinder, an upper support plate, an upper bearing center positioning plate, a bearing, an upper bearing outer ring positioning plate, a first connecting plate, a support plate, a guide column, a second connecting plate, an elastic body, a first guide cone block, a third connecting plate, a second guide cone block, a bottom positioning block and a bottom plate, wherein the bottom of the cylinder is connected to the upper support plate, the upper bearing center positioning plate is installed in the middle of the bottom of the upper support plate, the bearing is installed on the outer wall of the upper bearing center positioning plate, the outer wall of the bearing is connected to the upper bearing outer ring positioning plate, and the first connecting plate Installed on the outer wall of the upper bearing outer ring positioning plate, the top of the support plate is connected to the upper support plate, the bottom of the support plate is connected to the bottom plate, the bottom of the first connecting plate is connected to the second connecting plate, the elastomer is installed at the bottom of the second connecting plate, the first guide cone block is installed at the bottom of the elastomer, the guide column is installed through the middle position of the second connecting plate, the elastomer and the first guide cone block, the third connecting plate is installed at the bottom of the second connecting plate, the second guide cone block is installed at the bottom of the third connecting plate, the bottom positioning block is installed on the top of the bottom plate, and the bottom positioning block is rotatably connected to the bottom plate.

[0007] Preferably, a first threaded rod is installed between the upper bearing outer ring positioning plate and the first connecting plate.

[0008] Preferably, a second threaded rod is installed between the first connecting plate and the second connecting plate, and the bottom of the second threaded rod passes through the second connecting plate and is connected to the third connecting plate.

[0009] Preferably, a third threaded rod is installed between the third connecting plate and the second guide cone block.

[0010] Preferably, a fourth threaded rod is installed at the connection between the bottom of the guide column and the first guide cone block.

[0011] Compared with the prior art, the beneficial effects of the present invention are as follows: through the setting of the low-temperature insulated steel cylinder front support assembly device, the structural design is reasonable. When the existing device welds the neck tube, the gap of the neck tube has relatively high requirements on the performance of the product, but due to the effect of welding deformation, inconsistent gaps often occur in the actual production process, affecting product quality, high rework rate, and increasing manufacturing costs. In the present application document, the two neck tubes are respectively fixed on the upper fixing device and the bottom fixing device, and the gap between the upper neck tube and the bottom neck tube is fixed by the telescopic force generated by the cylinder to reduce shaking, thereby preventing the occurrence of different gap spacings when welding the neck tubes. It is convenient to use, and the use of this device in the actual production operation process realizes the pneumatic compression of the two neck tubes and the double positioning function, greatly improving the accuracy of the neck tube assembly and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the structure of the present invention;

[0013] Figure 2 It is a schematic diagram of the overall structure of the present invention.

[0014] In the figure: 1 cylinder, 2 upper support plate, 3 upper bearing center positioning plate, 4 bearing, 5 upper bearing outer ring positioning plate, 6 first connecting plate, 7 support plate, 8 guide column, 9 second connecting plate, 10 elastic body, 11 first guide cone block, 12 third connecting plate, 13 second guide cone block, 14 bottom positioning block, 15 bottom plate, 16 first threaded rod, 17 second threaded rod, 18 third threaded rod, 19 fourth threaded rod. DETAILED DESCRIPTION

[0015] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0016] The present invention provides the following technical solutions: a low-temperature insulated steel cylinder front support assembly device, which is used in the actual production operation process to realize the pneumatic compression of the two neck tubes and the double positioning function, greatly improving the accuracy of the neck tube assembly and improving the work efficiency. Figure 1-2 , including a cylinder 1, an upper support plate 2, an upper bearing center positioning plate 3, a bearing 4, an upper bearing outer ring positioning plate 5, a first connecting plate 6, a support plate 7, a guide column 8, a second connecting plate 9, an elastic body 10, a first guide cone block 11, a third connecting plate 12, a second guide cone block 13, a bottom positioning block 14 and a bottom plate 15, the bottom of the cylinder 1 is connected to the upper support plate 2, the upper bearing center positioning plate 3 is installed in the middle of the bottom of the upper support plate 2, the bearing 4 is installed on the outer wall of the upper bearing center positioning plate 3, the outer wall of the bearing 4 is connected to the upper bearing outer ring positioning plate 5, and the first connecting plate 6 is installed on the outer wall of the upper bearing outer ring positioning plate 5 The top of the support plate 7 is connected to the upper support plate 2, the bottom of the support plate 7 is connected to the bottom plate 15, the bottom of the first connecting plate 6 is connected to the second connecting plate 9, the elastomer 10 is installed at the bottom of the second connecting plate 9, the first guide cone block 11 is installed at the bottom of the elastomer 10, the guide column 8 is installed through the middle position of the second connecting plate 9, the elastomer 10 and the first guide cone block 11, the third connecting plate 12 is installed at the bottom of the second connecting plate 9, the second guide cone block 13 is installed at the bottom of the third connecting plate 12, the bottom positioning block 14 is installed on the top of the bottom plate 15, and the bottom positioning block 14 is rotatably connected to the bottom plate 15.

[0017] Please refer again Figure 1 A first threaded rod 16 is installed between the upper bearing outer ring positioning plate 5 and the first connecting plate 6. Specifically, the first threaded rod 16 is used to connect the upper bearing outer ring positioning plate 5 and the first connecting plate 6 to achieve the purpose of fixing and facilitate disassembly.

[0018] Please refer again Figure 1 A second threaded rod 17 is installed between the first connecting plate 6 and the second connecting plate 9. The bottom of the second threaded rod 17 passes through the second connecting plate 9 and is connected to the third connecting plate 12. Specifically, the second threaded rod 17 is used to fix the first connecting plate 6, the second connecting plate 9 and the third connecting plate 12, and is convenient for disassembly.

[0019] Please refer again Figure 1 A third threaded rod 18 is installed between the third connecting plate 12 and the second guide cone block 13. Specifically, the third threaded rod 18 is used to connect the third connecting plate 12 and the second guide cone block 13 to achieve the purpose of fixing.

[0020] Please refer again Figure 1 A fourth threaded rod 19 is installed at the connection between the bottom of the guide column 8 and the first guide cone block 11. Specifically, the fourth threaded rod 19 is used to connect the guide column 8 and the first guide cone block 11 to achieve the purpose of fixing.

[0021] During specific use, one neck tube is installed on the top of the bottom positioning block 14 for fixation, and then the other neck tube is installed between the first guide cone block 11 and the second guide cone block 13, and the cylinder 1 is started to drive the first guide cone block 11 and the second guide cone block 13 to be pressed downward. Since the first guide cone block 11 and the second guide cone block 13 are both conical surfaces, automatic counterweight can be achieved through the neck tube, thereby ensuring the consistency of the gap. At the same time, the installation of the upper bearing center positioning plate 3 and the bearing 4 structure of the bottom positioning block 14 can achieve that the neck tube can still be rotated when fixed, thereby improving work efficiency.

[0022] Although the present invention has been described above with reference to some embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalent components without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the various embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. A low temperature insulated steel cylinder front support assembly device, Features: The invention comprises a cylinder (1), an upper support plate (2), an upper bearing center positioning plate (3), a bearing (4), an upper bearing outer ring positioning plate (5), a first connecting plate (6), a support plate (7), a guide column (8), a second connecting plate (9), an elastic body (10), a first guide cone block (11), a third connecting plate (12), a second guide cone block (13), a bottom positioning block (14) and a bottom plate (15), wherein the bottom of the cylinder (1) is connected to the upper support plate (2), and the upper bearing center positioning plate (3) is mounted on the upper support plate (2 ), the bearing (4) is mounted on the outer wall of the upper bearing center positioning plate (3), the outer wall of the bearing (4) is connected to the upper bearing outer ring positioning plate (5), the first connecting plate (6) is mounted on the outer wall of the upper bearing outer ring positioning plate (5), the top of the support plate (7) is connected to the upper support plate (2), the bottom of the support plate (7) is connected to the bottom plate (15), the bottom of the first connecting plate (6) is connected to the second connecting plate (9), the elastic body (10) is mounted on the bottom of the second connecting plate (9), The first guide cone block (11) is mounted on the bottom of the elastic body (10); the guide column (8) is installed through the middle position of the second connecting plate (9), the elastic body (10) and the first guide cone block (11); the third connecting plate (12) is mounted on the bottom of the second connecting plate (9); the second guide cone block (13) is mounted on the bottom of the third connecting plate (12); the bottom positioning block (14) is mounted on the top of the bottom plate (15); the bottom positioning block (14) is rotatably connected to the bottom plate (15); and the upper bearing A first threaded rod (16) is installed between the outer ring positioning plate (5) and the first connecting plate (6), a second threaded rod (17) is installed between the first connecting plate (6) and the second connecting plate (9), the bottom of the second threaded rod (17) passes through the second connecting plate (9) and is connected to the third connecting plate (12), a third threaded rod (18) is installed between the third connecting plate (12) and the second guide cone block (13), and a fourth threaded rod (19) is installed at the connection between the bottom of the guide column (8) and the first guide cone block (11).

Citation Information

Patent Citations

  • Automatic welding machine for liquefied petroleum gas steel cylinder accessory

    CN102240876A

  • Mounting and welding fixing device for base of liquefied gas steel cylinder

    CN104148856A

  • Welding clamp of circumferential weld of liquefied petroleum gas cylinder body

    CN104942520A

  • Multi-point synchronous intermittent girth welding device

    CN202344185U

  • Front support structure for inner container of low-temperature insulated gas cylinder

    CN203771020U