A mining tunnel with underground transformer and distribution room and its construction method
By setting up an underground power transformation and distribution room in the middle of the cross passage of the mine method tunnel and using the cable introduction shaft to directly supply power, the problem of land use and construction complexity of power supply in the tunnel is solved, and the effects of land saving, convenient construction and investment are achieved.
Patent Information
- Application Number
- CN202010004843.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-02
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-01-02
AI Technical Summary
In the existing technology, there is a lack of clear methods for setting up underground power substations in tunnels with a length of more than 3 kilometers, resulting in problems such as inefficient land use, complicated construction, and high investment.
Design a mining method tunnel with an underground power transformation and distribution room. By setting up an underground power transformation and distribution room in the middle of the cross passage, and using cable introduction wells to directly access cables from the ground, combined with the off-wall and fire partition walls to form a fireproof and waterproof The construction method of the power transformation and distribution room includes the construction of main line tunnels, cross passages, underground power transformation and distribution rooms and cable introduction shafts.
Land saving, construction convenience, and investment reduction have been achieved. By jointly building an underground power transformation and distribution room in the cross passage and using cable introduction wells to directly supply power, the convenience and cost-effectiveness of power supply in the tunnel have been solved.
Smart Images

Figure CN111119924B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel engineering, and in particular relates to a mining tunnel including an underground transformer and distribution room and a construction method thereof. Background Art
[0002] There are many devices in the tunnel that need power supply. At present, for tunnels with a length of no more than 1.3 kilometers, a substation can be set up at the entrance or exit to supply power to the tunnel; for tunnels with a length of 1.3 to 3 kilometers, a substation is generally set up at the entrance and exit to supply power to the tunnel; and for tunnels with a length of more than 3 kilometers, an underground substation must be set up in the tunnel. There is no clear practice in the industry for the setting of underground substations in tunnels. Summary of the invention
[0003] The object of the present invention is to provide a mining tunnel containing an underground transformer and distribution room and a construction method thereof which saves land, is convenient to construct and requires less investment.
[0004] The present invention is implemented as follows: a mining tunnel containing an underground transformer and distribution room comprises two main line tunnels, a transverse passage, an underground transformer and distribution room tunnel and a cable introduction shaft; the two main line tunnels are arranged in parallel, the transverse passage is arranged perpendicular to the main line tunnels, the two ends of the transverse passage are respectively connected to the two main line tunnels, the underground transformer and distribution room tunnel is located in the middle of the transverse passage, and the length extension direction of the underground transformer and distribution room tunnel is parallel to the length direction of the transverse passage, and the underground transformer and distribution room are built together with the transverse passage; the bottom end of the cable introduction shaft is connected to the underground transformer and distribution room tunnel, and the top end of the cable introduction shaft is close to the ground line.
[0005] Furthermore, the underground transformer and distribution room tunnel is arranged on one side of the transverse passage and is formed by horizontally expanding the transverse passage.
[0006] Furthermore, the underground transformer and distribution room tunnel is provided with a wall on the inner side of the second lining, and is separated from the transverse passage by a fireproof partition wall, the fire resistance limit of the fireproof partition wall is not less than 2.0h, and the area surrounded by the wall and the fireproof partition wall forms an underground transformer and distribution room.
[0007] Furthermore, the bottom of the underground power substation is horizontal, and maintenance roads are provided on both sides of the transverse passage, and the bottom elevation of the underground power substation is not lower than the maintenance roads.
[0008] Furthermore, the construction area of the underground transformer and distribution room is not more than 200 square meters, and a door opening is provided at each longitudinal end of the fireproof partition wall as an entrance and exit passage, and a fire door is provided at the door opening, and the grade of the fire door is not lower than Class B.
[0009] Furthermore, the waterproof grade of the underground substation is level one, a drainage ditch is arranged between the wall and the second lining of the tunnel of the underground substation, a pavement drainage system is arranged in the transverse passage, and the drainage ditch is connected with the pavement drainage system of the transverse passage.
[0010] Furthermore, the cable introduction well is located in the rock and soil outside the underground transformer and distribution room tunnel, and the cable introduction well includes a vertical introduction well and a horizontal connecting channel, one end of the horizontal connecting channel is connected to the vertical introduction well, and the other end is connected to the underground transformer and distribution room tunnel; the top of the vertical introduction well is closed, and a waterproof casing is provided for cable access.
[0011] Furthermore, the cross-sections of the vertical cable introduction shaft and the horizontal connecting channel of the cable introduction shaft are both circular, with an outer diameter of not less than 1.2m.
[0012] Furthermore, when the depth of the vertical cable introduction well is not more than 25m, it is constructed by manual digging.
[0013] In order to solve the above technical problems, the present invention also provides a construction method of the above mining method tunnel, which comprises the following steps:
[0014] S1. Construction of the two main line tunnels;
[0015] S2, constructing the transverse passage from the main line tunnel towards each other and connecting it;
[0016] S3, digging laterally in the middle of the transverse passage to complete the construction of the underground transformer and distribution room tunnel;
[0017] S4, constructing a vertical cable introduction well from the ground downwards;
[0018] S5, constructing a transverse connecting passage of the cable introduction shaft from the underground transformer and distribution room tunnel, and connecting it with the vertical introduction shaft;
[0019] S6, constructing the wall and fireproof partition wall to form the underground transformer and distribution room;
[0020] S7. Install equipment and cables to complete the construction.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] The mining tunnel containing an underground power distribution room of the present invention is arranged in a transverse passage and built together with the transverse passage, thereby saving land. The cable is directly connected to the underground power distribution room from the ground through a cable introduction well, which is convenient for construction, saves investment, and is worthy of large-scale promotion. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the plan structure of a mining method tunnel including an underground power distribution room provided by an embodiment of the present invention;
[0024] Figure 2 yes Figure 1 The schematic cross-sectional view of the combined construction section of the underground transformer and distribution room tunnel and the cross passage in the mining method tunnel is shown. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0026] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be a connection between the two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0027] See also Figure 1 and Figure 2 , showing a preferred embodiment provided by the present invention, a mining method tunnel including an underground transformer and distribution room, comprising two main line tunnels 1, a cross passage 2, an underground transformer and distribution room tunnel 3 and a cable introduction shaft 4.
[0028] The two main line tunnels 1 are arranged in parallel, and the transverse passage 2 is arranged perpendicular to the main line tunnels 1. The two ends of the transverse passage 2 are respectively connected to the two main line tunnels 1. The underground transformer and distribution room tunnel 3 is located in the middle of the transverse passage 2, and the length extension direction of the underground transformer and distribution room tunnel 3 is parallel to the length direction of the transverse passage 2. The underground transformer and distribution room tunnel 3 is built together with the transverse passage 2. Specifically, the underground transformer and distribution room tunnel 3 is arranged on one side of the transverse passage 2 and is formed by the transverse expansion of the transverse passage 2.
[0029] The underground transformer room tunnel 3 is provided with a wall 32 on the inner side of the second lining 31, and is separated from the cross passage 3 by a fireproof partition wall 33, the fire resistance limit of the fireproof partition wall 33 is not less than 2.0h. The area surrounded by the wall 32 and the fireproof partition wall 33 forms an underground transformer room 30.
[0030] The bottom end of the cable introduction shaft 4 is connected to the underground transformer and distribution room 30, and the top of the cable introduction shaft 4 is close to the ground line. In this embodiment, the cable introduction shaft 4 is located in the rock and soil outside the underground transformer and distribution room tunnel 3, and the cable introduction shaft 4 includes a vertical introduction shaft 41 and a transverse connecting channel 42, which together form an L-shape. One end of the transverse connecting channel 42 is connected to the vertical introduction shaft 41, and the other end is connected to the underground transformer and distribution room tunnel 3. The top of the vertical introduction shaft 41 is closed, and a waterproof casing is provided for cable access. Preferably, the cross-sections of the vertical introduction shaft 41 and the transverse connecting channel 42 are both circular, with an outer diameter of not less than 1.2m. When the depth of the vertical introduction shaft 41 is not more than 25m, manual digging construction can be adopted.
[0031] The bottom of the underground power distribution room 30 is horizontal, and maintenance roads are set on both sides of the horizontal passage 2. The bottom elevation of the underground power distribution room 30 is not lower than the maintenance road.
[0032] The construction area of the underground transformer and distribution room 30 is not more than 200 square meters, and a door opening is set at each longitudinal end of the fireproof partition wall 33 as an ingress and egress passage, and a fire door is set at the door opening, and the grade of the fire door is not lower than Class B.
[0033] The waterproof grade of the underground transformer room 30 is level one. A drainage ditch 34 is arranged between the wall 32 and the second lining 31 of the underground transformer room tunnel 3. A road surface drainage system is arranged in the transverse passage 2. The drainage ditch 34 is connected to the road surface drainage system of the transverse passage 2.
[0034] This embodiment also provides a construction method for the above-mentioned mining method tunnel containing an underground transformer and distribution room, which comprises the following steps:
[0035] S1, construction of two main line tunnels 1;
[0036] S2, construct the cross passage 2 from the main line tunnel 1 and connect it;
[0037] S3, dig laterally in the middle of the horizontal passage 2 to complete the construction of the underground transformer and distribution room tunnel 3;
[0038] S4, constructing a vertical cable introduction well 41 from the ground downwards;
[0039] S5, construct the horizontal connecting channel 42 of the cable introduction shaft 4 from the underground transformer and distribution room tunnel 3, and connect it with the vertical introduction shaft 41;
[0040] S6, constructing the wall 32 and the fireproof partition wall 33 to form the underground transformer room 30;
[0041] S7. Install equipment, cables, etc. to complete the construction.
[0042] The mining tunnel of the present embodiment includes an underground transformer and distribution room, in which the underground transformer and distribution room tunnel 3 is arranged in the transverse passage and built together with the transverse passage 2, which saves land. The cable is directly connected to the underground transformer and distribution room from the ground through the cable introduction shaft 4, which is convenient for construction, saves investment, and is worthy of large-scale promotion.
[0043] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A mining tunnel with underground transformer and distribution room, including two main line tunnels, characterized in that: The mining tunnel also includes a cross passage, an underground transformer and distribution room tunnel, and a cable introduction shaft; The two main line tunnels are arranged in parallel, the transverse passage is arranged perpendicular to the main line tunnels, the two ends of the transverse passage are respectively connected to the two main line tunnels, the underground transformer and distribution room tunnel is located in the middle of the transverse passage, and the length extension direction of the underground transformer and distribution room tunnel is parallel to the length direction of the transverse passage, and the underground transformer and distribution room are built together; The bottom end of the cable introduction well is connected to the underground transformer and distribution room tunnel, and the top end of the cable introduction well is close to the ground line; The underground power transformer and distribution room tunnel is arranged on one side of the transverse passage and is formed by the transverse expansion of the transverse passage; the cable introduction well is located in the rock and soil body outside the underground power transformer and distribution room tunnel, and the cable introduction well includes a vertical introduction well and a transverse connecting passage, one end of the transverse connecting passage is connected to the vertical introduction well, and the other end is connected to the underground power transformer and distribution room tunnel; the top of the vertical introduction well is closed, and a waterproof casing is provided for cable access.
2. The mining tunnel according to claim 1, characterized in that: The underground transformer and distribution room tunnel is provided with a wall on the inner side of the second lining, and is separated from the transverse passage by a fireproof partition wall. The fire resistance limit of the fireproof partition wall is not less than 2.0h. The area surrounded by the wall and the fireproof partition wall forms an underground transformer and distribution room.
3. The mining tunnel according to claim 2, characterized in that: The bottom of the underground power distribution room is horizontal, and maintenance roads are arranged on both sides of the transverse passage. The bottom elevation of the underground power distribution room is not lower than the maintenance roads.
4. The mining tunnel according to claim 2, characterized in that: The construction area of the underground transformer and distribution room is not more than 200 square meters, and a door opening is set at each of the longitudinal ends of the fireproof partition wall as an entrance and exit passage. A fire door is installed at the door opening, and the grade of the fire door is not lower than Class B.
5. The mining tunnel according to claim 2, characterized in that: The waterproof grade of the underground power distribution room is level one, a drainage ditch is arranged between the wall-free wall and the second lining of the tunnel of the underground power distribution room, a pavement drainage system is arranged in the transverse passage, and the drainage ditch is connected with the pavement drainage system of the transverse passage.
6. The mining tunnel according to claim 1, characterized in that: The cross-sections of the vertical cable introduction shaft and the horizontal connecting channel of the cable introduction shaft are both circular, with an outer diameter of not less than 1.2m.
7. The mining tunnel according to claim 1, characterized in that: When the depth of the vertical cable introduction well is not more than 25m, it is constructed by manual digging.
8. A method for constructing a tunnel using a mining method as claimed in any one of claims 2 to 5, characterized in that: The following steps are involved: S1. Construction of the two main line tunnels; S2, constructing the transverse passage from the main line tunnel towards each other and connecting it; S3, digging laterally in the middle of the transverse passage to complete the construction of the underground transformer and distribution room tunnel; S4, constructing a vertical cable introduction well from the ground downwards; S5, constructing a transverse connecting passage of the cable introduction shaft from the underground transformer and distribution room tunnel, and connecting it with the vertical introduction shaft; S6, constructing the wall and fireproof partition wall to form the underground transformer and distribution room; S7. Install equipment and cables to complete the construction.
Citation Information
Patent Citations
Combined air purifying system and method for duty room in ultralong highway tunnel
CN104879839A
Remote deformation characteristic monitoring system for mountain highway tunnel construction
CN104950782A
Single-channel and vertical inclined well modular ventilation system in long and large tunnel
CN109209461A
Mining method tunnel with underground power transformation and distribution room
CN211598674U
Construction method of underground structure and underground structure
JP2006348718A