Test device for measuring compression shear properties and porosity change of lining filling materials

By designing a shear test device that combines a rectangular lower box and an upper cylinder, the problem that existing devices cannot realistically simulate the shear performance and porosity changes of granular filling materials behind tunnel lining walls is solved. This enables the realistic simulation and accurate measurement of filling materials behind tunnel lining walls, guiding shield tunneling construction.

CN111175148BActive Publication Date: 2024-11-26CHINA RAILWAY 19TH BUREAU GROUP RAIL TRANSPORTATION ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010109773.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-02-22
Publication Date
2024-11-26
Estimated Expiration
2040-02-22

AI Technical Summary

Technical Problem

Existing testing equipment cannot accurately simulate the shear properties and porosity changes of granular filling materials behind tunnel lining walls, and therefore cannot accurately guide shield tunneling construction.

Method used

Design a shear test device with a rectangular lower box and a rectangular upper cylinder, combined with a gantry frame, an electro-hydraulic cylinder and a water pump, to measure the compressive shear performance and porosity change by simulating the shear process of the backfill material of the tunnel lining wall.

Benefits of technology

It enables a realistic simulation of the backfill material of the tunnel lining wall, accurately measures its shear properties and porosity changes, and guides the design and construction of shield tunneling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111175148B_ABST
    Figure CN111175148B_ABST
Patent Text Reader

Abstract

The present invention discloses a test device for measuring the compressive shear performance and porosity change of lining filling materials, which solves the problem that the existing test devices cannot well simulate the real state of the pea-grain filling materials at the construction site to obtain the compressive shear performance parameters and porosity change of the filling materials. A rectangular lower box with a cylindrical inner cavity of the lower box is combined with a rectangular upper cylinder with a cylindrical inner cavity of the upper cylinder to form a filling material cylinder that can truly simulate the elastic support layer of the filling material behind the tunnel lining wall. An environment that can dynamically form shear on the filling material cylinder is constructed around the outer side of the filling material cylinder, so as to obtain the test modulus of the compressive shear performance of the filling material behind the tunnel lining wall under the real simulation of the on-site tunnel shield environment. In particular, water is injected into the cylindrical filling material through a water pump to make it in a saturated state, and then the change in the porosity of the filling material is calculated by measuring the change in the amount of water during the compression and shearing process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a shear test device, in particular to a device for testing the shear performance of a granular filling material behind a tunnel lining wall and the change of porosity in compression shear. Background Art

[0002] The shield method has many advantages such as fast construction speed and high safety, and has become an important method for tunnel construction. In engineering practice, the shield method is suitable for the construction of tunnels under various strata with different diameters. In the process of using the shield method to excavate deep and long tunnels, the excavation of the tunnel will cause deformation of the surrounding rock, causing the surrounding rock stress to be redistributed; the process of the shield machine constantly moving forward and supporting the segments is also the process of the subsequent excavation of the cavern surrounding rock gradually unloading and the support structure suppressing the deformation of the surrounding rock; in the process of excavation and support, the structure of the cutterhead, shield shell, segment lining and backfill layer together constitute the tunnel body's support system for the surrounding rock. The backfill layer of the pea-grain stone of the segment support plays a role of flexible support in this combined support system, making the load of the surrounding rock on the segment more uniform; therefore, accurately testing and evaluating the shear mechanical properties of the backfill layer of pea-grain stone (pure pea-grain stone or pea-grain stone plus mortar combined filling material) is particularly necessary and urgent for guiding on-site construction.

[0003] In the prior art, in order to obtain the shear strength of soil and rock, it is often measured through on-site or indoor tests. The main test methods are: triaxial shear test, cross-plate shear test, direct shear test and unconfined compression test. For large-diameter granular soil and rockfill, large-scale direct shear test is sometimes selected; among these tests, the simplest method is the direct shear test method, and its theoretical basis is Coulomb's law and shear strength theory; but the existing conventional shear test equipment cannot well simulate the actual state of granular filling materials such as pea-grain stones at the construction site. In addition, the control of the porosity of the filling material behind the tunnel lining wall also directly affects the mechanical properties of the flexible filling layer behind the tunnel lining wall. How to control the porosity of the filling material behind the wall, especially the filling sand and gravel being sheared How does its porosity change during the shearing process? The experimental acquisition of these parameters has very important guiding significance for on-site shield construction. Therefore, if we want to accurately determine the on-site shear strength of the filling material and experimentally determine the change in the porosity of the filling material, we need to develop a device that can simultaneously determine the shear performance of the filling material and the change in the porosity of the filling material during the shearing process, so as to achieve the goal of conveniently and realistically simulating the on-site construction status and serve the design, construction and later maintenance of the project. The test device is required to simulate the pea-grain filling layer behind the wall under different gradings, densities, grouting times, and pea-grain layer thicknesses, and obtain the shear performance parameters and porosity changes, so as to obtain the changes in the pore structure of the filling material and the displacement between particles under different conditions. Summary of the invention

[0004] The present invention provides a test device for measuring the compression shear performance and porosity change of lining filling materials, which solves the technical problem that the existing test devices cannot well simulate the real state of granular filling materials such as pea-grained stone at the construction site to obtain the compression shear performance parameters and porosity change of the filling materials.

[0005] The present invention solves the above technical problems through the following technical solutions:

[0006] The overall concept of the present invention is: a closed columnar space is constructed by combining a rectangular lower box with a cylindrical inner cavity of the lower box and a rectangular upper cylinder with a cylindrical inner cavity of the upper cylinder, and the closed columnar space is filled with pea-grained stones and other tunnel lining wall back filling materials to form a filling material cylinder that can truly simulate the elastic support layer of the filling material behind the tunnel lining wall, and a gantry, a reaction frame, a vertical electric-controlled hydraulic cylinder and a horizontal electric-controlled hydraulic cylinder are used to construct an environment around the outer side of the filling material cylinder that can dynamically form a shearing effect on the filling material cylinder, that is, by The horizontal electric-controlled hydraulic cylinder pushes the rectangular lower box horizontally to form a cylinder of filling material, which is sheared under a certain vertical downward pressure to obtain the test modulus of the compression shear performance of the filling material behind the tunnel lining wall that truly simulates the on-site tunnel shield environment. In particular, the cylindrical filling material is injected with water by a water pump to make it saturated, and then the change in water volume during the compression and shear process is measured to calculate the change in the porosity of the filling material, thereby truly reproducing the filling process of the filling material behind the tunnel lining wall at the construction site, making the test parameters of this experiment closer to the actual situation on site.

[0007] A test device for measuring the compression shear performance and porosity change of lining filling materials, comprising a gantry, a rectangular lower box, a rectangular upper cylinder, filling materials behind the tunnel lining wall, a vertical electric-controlled hydraulic oil cylinder, a horizontal electric-controlled hydraulic oil cylinder, a water pump and an electric control box, a lower box cylindrical inner cavity is arranged in the rectangular lower box, an upper cylinder cylindrical inner cavity is arranged in the rectangular upper cylinder, a lower box cantilever ear with a through hole is fixedly arranged at the top of the outer wall of the rectangular lower box, and a lower box cantilever ear with a through hole is fixedly arranged at the top of the outer wall of the rectangular upper cylinder There is an upper box cantilever ear with a through hole, a steel plate test bench is fixedly set on the ground inside the gantry, support rollers are evenly arranged on the steel plate test bench, a rectangular lower box is arranged on the support roller, a rectangular upper cylinder is arranged on the rectangular lower box, the cylindrical inner cavity of the lower box and the cylindrical inner cavity of the upper cylinder correspond to form a closed columnar space, the closed columnar space is filled with bean-grain stone and other tunnel lining wall back filling materials, and a vertical pressure test sensor is pre-buried in the tunnel lining wall back filling material at the upper end of the closed columnar space A horizontal pressure test sensor is pre-buried in the filling material behind the tunnel lining wall at the left end of the closed columnar space, a piston-type pressure transmission plate is arranged in the upper end inner cavity of the cylindrical inner cavity of the upper cylinder, a vertical electric-controlled hydraulic cylinder is arranged between the piston-type pressure transmission plate and the top beam of the gantry, a horizontal electric-controlled hydraulic cylinder is arranged between the left side wall of the rectangular lower box and the left column of the gantry, a horizontal reaction frame is arranged between the right side wall of the rectangular upper cylinder and the right column of the gantry, and an injection A slurry port is provided with a grouting port closing cover, a water injection port is provided on the rectangular lower box body, the water injection port is connected with the cylindrical inner cavity of the lower box body, and a water injection pipe is connected between the water injection port and the water pump; a water pipe extending vertically upward is provided on the side wall of the rectangular upper cylinder body, the water pipe extending vertically upward is connected with the cylindrical inner cavity of the upper cylinder body, the vertical electric-controlled hydraulic cylinder, the horizontal electric-controlled hydraulic cylinder, the water pump, the vertical pressure test sensor and the horizontal pressure test sensor are electrically connected with the electric control box respectively.

[0008] An upper cylinder gel injection port is arranged on the side wall of the rectangular upper cylinder, an upper cylinder gel injection port closing cover is arranged on the upper cylinder gel injection port, a lower box gel injection port is arranged on the side wall of the rectangular lower box, and a lower box gel injection port closing cover is arranged on the lower box gel injection port; a grease layer is arranged between the top end surface of the side wall of the rectangular lower box and the bottom end surface of the side wall of the rectangular upper cylinder; a tenon is arranged on the inner side wall of the cylindrical inner cavity of the upper cylinder, and a tenon is arranged on the inner side wall of the cylindrical inner cavity of the lower box; a sealing ring is arranged between the upper end of the inner side wall of the cylindrical inner cavity of the lower box and the lower end of the inner side wall of the cylindrical inner cavity of the upper cylinder.

[0009] A lower ball embedding groove is arranged on the top end surface of the side wall of the rectangular lower box body, an upper ball embedding groove is arranged on the bottom end surface of the side wall of the rectangular upper cylinder body, and a ball is arranged between the lower ball embedding groove and the upper ball embedding groove; a fixing pin is movably connected between the upper box cantilever ear with a through hole and the lower box cantilever ear with a through hole.

[0010] A test method for measuring the compressive shear performance and porosity change of lining filling materials comprises the following steps:

[0011] The first step is to fix a steel plate test bench on the ground inside the gantry, arrange support rollers at equal intervals on the steel plate test bench, and movably place a rectangular lower box on the support rollers;

[0012] The second step is to pour the prepared pea-shaped stones into the cylindrical inner cavity of the lower box in the rectangular lower box according to the mix ratio of the backfill material at the shield site. The upper top surface of the poured pea-shaped stones should be flush with the box mouth. The balls are placed in the lower ball embedding grooves provided on the top end surface of the side wall of the rectangular lower box. The rectangular upper cylinder is placed on the rectangular lower box so that the upper half of the balls are embedded in the upper ball embedding grooves provided on the bottom end surface of the side wall of the rectangular upper cylinder. The cylindrical inner cavity of the lower box corresponds to the cylindrical inner cavity of the upper cylinder to form a closed columnar space. A sealing ring is arranged between the end and the lower end of the inner side wall of the cylindrical inner cavity of the upper cylinder, and a fixing pin is inserted between the through hole of the cantilever ear of the upper box body and the through hole of the cantilever ear of the lower box body; the combined rectangular upper cylinder and the rectangular lower box body are moved to the left, so that the left end of the horizontal direction reaction frame fixed on the right column of the gantry is connected with the left side surface of the rectangular upper cylinder; the configured bean-shaped stone is poured into the cylindrical inner cavity of the upper cylinder, so that the upper top surface of the poured bean-shaped stone is flush with the upper port of the cylindrical inner cavity of the upper cylinder, and the piston-type pressure transmission plate is embedded in the upper port of the cylindrical inner cavity of the upper cylinder;

[0013] Step 3: Control the water pump to start through the electric control box, inject water into the closed columnar space, observe the change of the water column in the water pipe extending vertically upward, and turn off the water pump when the water column is flush with the top surface of the rectangular upper cylinder;

[0014] Step 4: Control the output shaft of the vertical electric-controlled hydraulic oil cylinder through the electric control box to extend downward and then connect to the piston-type pressure transmission plate, and continue to control the output shaft of the vertical electric-controlled hydraulic oil cylinder to press downward. When the downward displacement of the piston-type pressure transmission plate reaches the surrounding rock deformation parameter value set before the test, the output shaft of the vertical electric-controlled hydraulic oil cylinder stops pressing downward; record the increase of the water column in the water pipe extending vertically upward, and the porosity change rate of the filling material can be calculated based on the increase;

[0015] The fifth step is to pull out the fixing pin that is connected between the through hole of the cantilever ear of the upper box body and the through hole of the cantilever ear of the lower box body, and control the output shaft of the horizontal electric hydraulic cylinder through the electric control box to extend to the right and connect with the left wall of the rectangular lower box body, and continue to control the output shaft of the horizontal electric hydraulic cylinder to press to the right. When the rectangular lower box body and the rectangular upper cylinder body are displaced, the readings of the vertical pressure test sensor and the horizontal pressure test sensor are read through the electric control box to obtain: the filling material with a determined mix ratio behind the shield wall, and the compression shear modulus of the material when it is destroyed under the set surrounding rock deformation parameters.

[0016] A test method for measuring the compressive shear performance and porosity change of lining filling materials comprises the following steps:

[0017] The first step is to fix a steel plate test bench on the ground inside the gantry, arrange support rollers at equal intervals on the steel plate test bench, and movably place a rectangular lower box on the support rollers;

[0018] The second step is to pour the prepared bean-shaped stone filling material into the cylindrical inner cavity of the lower box in the rectangular lower box according to the mix ratio of the filling material behind the shield wall at the site. The upper top surface of the poured bean-shaped stone should be flush with the box mouth. The balls are placed in the lower ball embedding grooves provided on the top end surface of the side wall of the rectangular lower box; the rectangular upper cylinder is placed on the rectangular lower box, so that the upper half of the balls are embedded in the upper ball embedding grooves provided on the bottom end surface of the side wall of the rectangular upper cylinder, and the cylindrical inner cavity of the lower box corresponds to the cylindrical inner cavity of the upper cylinder to form a closed columnar space, and the solid The fixed pin is inserted between the through hole of the cantilever ear of the upper box body and the through hole of the cantilever ear of the lower box body; the combined rectangular upper cylinder body and the rectangular lower box body are moved to the left, so that the left end of the horizontal reaction frame fixed on the right column of the gantry is connected with the left side of the rectangular upper cylinder body; the piston-type pressure transmission plate is embedded in the cylindrical inner cavity of the upper cylinder body, and the prepared mortar filling material is pressed into the bean-grain stone through the grouting port on the piston-type pressure transmission plate. When the piston-type pressure transmission plate rises to be flush with the upper port of the cylindrical inner cavity of the upper cylinder body, the pressing of the mortar filling material is stopped;

[0019] Step 3: Control the water pump to start through the electric control box, inject water into the closed columnar space, observe the change of the water column in the water pipe extending vertically upward, and turn off the water pump when the water column is flush with the top surface of the rectangular upper cylinder;

[0020] Step 4: Control the output shaft of the vertical electric-controlled hydraulic cylinder through the electric control box to extend downward and then connect to the piston-type pressure transmission plate, and continue to control the output shaft of the vertical electric-controlled hydraulic cylinder to press downward. When the downward displacement of the piston-type pressure transmission plate reaches the surrounding rock deformation parameter value set before the test, the output shaft of the vertical electric-controlled hydraulic cylinder stops pressing downward;

[0021] The fifth step is to pull out the fixing pin that is connected between the through hole of the cantilever ear of the upper box body and the through hole of the cantilever ear of the lower box body, and control the output shaft of the horizontal electric hydraulic cylinder through the electric control box to extend to the right and connect with the left wall of the rectangular lower box body, and continue to control the output shaft of the horizontal electric hydraulic cylinder to press to the right. When the rectangular lower box body and the rectangular upper cylinder body are displaced, the readings of the vertical pressure test sensor and the horizontal pressure test sensor are read through the electric control box to obtain: the filling material with a determined mix ratio behind the shield wall, and the compression shear modulus of the material when it is destroyed under the set surrounding rock deformation parameters.

[0022] A test method for measuring the compression shear performance and porosity change of lining filling materials, characterized in that the second step is to pour the configured filling material of pea-grain stone and mortar into the cylindrical inner cavity of the lower box in the rectangular lower box, and when the rectangular upper cylinder and the rectangular lower box are combined, continue to add the configured filling material of pea-grain stone and mortar into the cylindrical inner cavity of the upper cylinder in the rectangular upper cylinder, and when the added filling material of pea-grain stone and mortar reaches half of the capacity of the cylindrical inner cavity of the upper cylinder, embed the piston-type pressure transmission plate into the cylindrical inner cavity of the upper cylinder, and then continue to inject the configured mortar filling material into the cylindrical inner cavity of the upper cylinder through the grouting port on the piston-type pressure transmission plate, and when the piston-type pressure transmission plate rises to be flush with the upper port of the cylindrical inner cavity of the upper cylinder, stop pressing the mortar filling material.

[0023] The compression shear box constructed by the present invention can control the internal filling material to be accurately compressed to a specified thickness, and at the same time measure the changes in the modulus and porosity of its shear performance, which is of great value for in-depth research on the reliability and safety of the filling material behind the tunnel lining wall during the construction, normal service and maintenance stages of the shield tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a structural schematic diagram of the present invention. DETAILED DESCRIPTION

[0025] The present invention is described in detail below in conjunction with the accompanying drawings:

[0026] A test device for measuring the compression shear performance and porosity change of lining filling materials, comprising a gantry 1, a rectangular lower box 4, a rectangular upper cylinder 7, filling materials behind the tunnel lining wall, a vertical electric-controlled hydraulic cylinder 15, a horizontal electric-controlled hydraulic cylinder 16, a water pump 27 and an electric control box 18, a lower box cylindrical inner cavity 5 is arranged in the rectangular lower box 4, an upper cylinder cylindrical inner cavity 8 is arranged in the rectangular upper cylinder 7, a lower box cantilever ear 6 with a through hole is fixedly arranged at the top of the outer wall of the rectangular lower box 4, an upper box cantilever ear 9 with a through hole is fixedly arranged at the top of the outer wall of the rectangular upper cylinder 7, a steel plate test bench 2 is fixedly arranged on the ground in the gantry 1, support rollers 3 are arranged at equal intervals on the steel plate test bench 2, and a support roller 3 is arranged on the support roller 3. A rectangular lower box body 4 is provided, a rectangular upper cylinder body 7 is provided on the rectangular lower box body 4, the cylindrical inner cavity 5 of the lower box body and the cylindrical inner cavity 8 of the upper cylinder body correspond to form a closed columnar space 11, the closed columnar space 11 is filled with tunnel lining wall back filling material, a vertical pressure test sensor 13 is pre-buried in the tunnel lining wall back filling material at the upper end of the closed columnar space 11, a horizontal pressure test sensor 12 is pre-buried in the tunnel lining wall back filling material at the left end of the closed columnar space 11, a piston-type pressure transmission plate 24 is provided in the upper end inner cavity of the cylindrical inner cavity 8 of the upper cylinder body, a vertical electric-controlled hydraulic cylinder 15 is provided between the piston-type pressure transmission plate 24 and the top beam of the gantry 1, and a pressure sensor 13 is pre-buried in the tunnel lining wall back filling material at the left end of the closed columnar space 11. A horizontal electric-controlled hydraulic cylinder 16 is arranged, a horizontal reaction frame 17 is arranged between the right side wall of the rectangular upper cylinder 7 and the right column of the gantry 1, a grouting port 14 is arranged on the piston-type pressure transmission plate 24, a grouting port closing cover is arranged on the grouting port 14, a water injection port 25 is arranged on the rectangular lower box 4, the water injection port 25 is connected with the cylindrical inner cavity 5 of the lower box, and a water injection pipe 26 is connected between the water injection port 25 and the water pump 27; a water pipe 28 extending vertically upward is arranged on the side wall of the rectangular upper cylinder 7, and the water pipe 28 extending vertically upward is connected with the cylindrical inner cavity 8 of the upper cylinder, a vertical electric-controlled hydraulic cylinder 15, a horizontal electric-controlled hydraulic cylinder 16, a water pump 27, a vertical pressure test sensor 13 and a horizontal pressure test sensor The devices 12 are electrically connected to the electric control box 18 respectively; the rectangular upper cylinder 7 is set to a cuboid with an outer dimension of: length × width × height = 660 mm × 660 mm × 200 mm, and a cylindrical inner cavity 8 of the upper cylinder with a diameter of 600 mm and a height of 230 mm is processed inside the cuboid for placing the back filling material of the shield tunnel wall; in order to increase the roughness of the inner wall of the shear box, a certain number of grooves and tenons are chiseled on the inner wall of the cylindrical inner cavity 8 of the upper cylinder, and a piston-type pressure transmission plate 24 with a diameter of 600 mm and a thickness of 30 mm similar to a manhole cover is provided in the cylindrical inner cavity 8; the lower box cantilever ear 6 and the upper box cantilever ear 9 have the same structure, and its width is 800 mm and the thickness is 30 mm.

[0027] An upper cylinder gel injection port 19 is provided on the side wall of the rectangular upper cylinder 7, and an upper cylinder gel injection port closing cover is provided on the upper cylinder gel injection port 19; a lower box gel injection port 20 is provided on the side wall of the rectangular lower box 4, and a lower box gel injection port closing cover is provided on the lower box gel injection port 20; a grease layer is provided between the top end surface of the side wall of the rectangular lower box 4 and the bottom end surface of the side wall of the rectangular upper cylinder 7; a tenon is provided on the inner side wall of the cylindrical inner cavity 8 of the upper cylinder, and a tenon is provided on the inner side wall of the cylindrical inner cavity 5 of the lower box; a sealing ring is provided between the upper end of the inner side wall of the cylindrical inner cavity 5 of the lower box and the lower end of the inner side wall of the cylindrical inner cavity 8 of the upper cylinder; a tenon is provided on the inner side wall of the cylindrical inner cavity 8 of the upper cylinder, and a tenon is provided on the inner side wall of the cylindrical inner cavity 5 of the lower box.

[0028] A ball lower embedding groove 22 is arranged on the top end surface of the side wall of the rectangular lower box body 4, and a ball upper embedding groove 23 is arranged on the bottom end surface of the side wall of the rectangular upper cylinder 7. A ball 21 is arranged between the ball lower embedding groove 22 and the ball upper embedding groove 23. This structural design enables the rectangular lower box body 4 to reduce the friction between the box body and the ground, and between the box body and the rectangular upper cylinder 7 to a smaller range under the action of the horizontal electric hydraulic cylinder 16, so that the shearing of the filling material cylinder is closer to the actual situation on site; a fixing pin 10 is movably connected between the upper box body cantilever ear 9 with a through hole and the lower box body cantilever ear 6 with a through hole. The setting of the positioning pin makes the combined connection of the rectangular upper cylinder 7 and the rectangular lower box body 4 more convenient and accurate.

[0029] A test method for measuring the compressive shear performance and porosity change of lining filling materials comprises the following steps:

[0030] The first step is to fix a steel plate test bench 2 on the ground inside the gantry 1, arrange support rollers 3 at equal intervals on the steel plate test bench 2, and movably place a rectangular lower box 4 on the support rollers 3;

[0031] The second step is to pour the prepared pea-shaped stones into the cylindrical inner cavity 5 of the lower box body 4 in the rectangular lower box body 4 according to the proportion of the filling material behind the shield wall. The upper top surface of the poured pea-shaped stones should be flush with the box mouth. The balls 21 are placed in the lower ball embedding grooves 22 provided on the top end surface of the side wall of the rectangular lower box body 4. The rectangular upper cylinder 7 is placed on the rectangular lower box body 4, so that the upper half of the balls 21 are embedded in the upper ball embedding grooves 23 provided on the bottom end surface of the side wall of the rectangular upper cylinder 7, and the cylindrical inner cavity 5 of the lower box body and the cylindrical inner cavity 8 of the upper cylinder body correspond to form a closed columnar space 11. A sealing ring is arranged between the upper end and the lower end of the inner wall of the cylindrical inner cavity 8 of the upper cylinder, and the fixing pin 10 is inserted between the penetration hole of the cantilever ear 9 of the upper box body and the penetration hole of the cantilever ear 6 of the lower box body; the combined rectangular upper cylinder 7 and the rectangular lower box body 4 are moved to the left, so that the left end of the horizontal direction reaction frame 17 fixed on the right column of the gantry 1 is connected with the left side of the rectangular upper cylinder 7; the configured bean-shaped stone is poured into the cylindrical inner cavity 8 of the upper cylinder, so that the upper top surface of the poured bean-shaped stone is flush with the upper port of the cylindrical inner cavity 8 of the upper cylinder, and the piston-type pressure transmission plate 24 is embedded in the upper port of the cylindrical inner cavity 8 of the upper cylinder;

[0032] Step 3: Control the water pump 27 to start through the electric control box 18, inject water into the closed columnar space 11, observe the change of the water column 29 in the water pipe 28 extending vertically upward, and turn off the water pump 27 when the water column 29 is flush with the top surface of the rectangular upper cylinder 7;

[0033] Step 4: Control the output shaft of the vertical electric-controlled hydraulic cylinder 15 through the electric control box 18 to extend downward and then connect to the piston-type pressure transmission plate 24, and continue to control the output shaft of the vertical electric-controlled hydraulic cylinder 15 to press downward. When the downward displacement of the piston-type pressure transmission plate 24 reaches the surrounding rock deformation parameter value set before the test, the output shaft of the vertical electric-controlled hydraulic cylinder 15 stops pressing downward; record the increase of the water column 29 in the water pipe 28 extending vertically upward, and the porosity change rate of the filling material can be calculated based on the increase;

[0034] The fifth step is to pull out the fixing pin 10 which is connected between the through hole of the cantilever ear 9 of the upper box body and the through hole of the cantilever ear 6 of the lower box body, and control the output shaft of the horizontal electric hydraulic cylinder 16 to extend to the right and abut on the left side wall of the rectangular lower box body 4 through the electric control box 18, and continue to control the output shaft of the horizontal electric hydraulic cylinder 16 to press to the right. When the rectangular lower box body 4 and the rectangular upper cylinder body 7 are displaced, the readings of the vertical pressure test sensor 13 and the horizontal pressure test sensor 12 are read through the electric control box 18 to obtain: the filling material with a determined mix ratio behind the shield site wall, and the compression shear modulus of the material when it is destroyed under the set surrounding rock deformation parameters.

[0035] When the above-mentioned third step continues to control the output shaft of the vertical electric-controlled hydraulic cylinder 15 to press downward, if point contact occurs between particles in the filling material behind the tunnel lining wall, making it impossible for the piston-type pressure transmission plate 24 to move downward, gel is injected into the filling material behind the tunnel lining wall in the closed columnar space 11 through the upper cylinder gel injection port 19 and the lower box gel injection port 20 respectively.

[0036] A test method for measuring the compressive shear performance and porosity change of lining filling materials comprises the following steps:

[0037] The first step is to fix a steel plate test bench 2 on the ground inside the gantry 1, arrange support rollers 3 at equal intervals on the steel plate test bench 2, and movably place a rectangular lower box 4 on the support rollers 3;

[0038] The second step is to pour the prepared bean-shaped stone filling material into the cylindrical inner cavity 5 of the lower box body 4 in the rectangular lower box body 4 according to the mix ratio of the filling material behind the shield wall. The upper top surface of the poured bean-shaped stone should be flush with the box mouth. The ball 21 is placed in the ball lower embedding groove 22 provided on the top end surface of the side wall of the rectangular lower box body 4; the rectangular upper cylinder 7 is placed on the rectangular lower box body 4, so that the upper half of the ball 21 is embedded in the ball upper embedding groove 23 provided on the bottom end surface of the side wall of the rectangular upper cylinder 7, and the cylindrical inner cavity 5 of the lower box body and the cylindrical inner cavity 8 of the upper cylinder body correspond to form a closed columnar space 11, and the fixed The pin 10 is inserted between the through hole of the cantilever ear 9 of the upper box body and the through hole of the cantilever ear 6 of the lower box body; the combined rectangular upper cylinder 7 and the rectangular lower box 4 are moved to the left, so that the left end of the horizontal reaction frame 17 fixed on the right column of the gantry 1 is connected with the left side of the rectangular upper cylinder 7; the piston-type pressure transmission plate 24 is embedded in the cylindrical inner cavity 8 of the upper cylinder, and the prepared mortar filling material is pressed into the bean-shaped stone through the grouting port 14 on the piston-type pressure transmission plate 24. When the piston-type pressure transmission plate 24 rises to be flush with the upper end of the cylindrical inner cavity 8 of the upper cylinder, the pressing of the mortar filling material is stopped;

[0039] Step 3: Control the water pump 27 to start through the electric control box 18, inject water into the closed columnar space 11, observe the change of the water column 29 in the water pipe 28 extending vertically upward, and turn off the water pump 27 when the water column 29 is flush with the top surface of the rectangular upper cylinder 7;

[0040] Step 4: The output shaft of the vertical electric-controlled hydraulic oil cylinder 15 is controlled by the electric control box 18 to extend downward and then be connected to the piston-type pressure transmission plate 24, and the output shaft of the vertical electric-controlled hydraulic oil cylinder 15 is continued to be controlled to be pressed downward. When the downward displacement of the piston-type pressure transmission plate 24 reaches the surrounding rock deformation parameter value set before the test, the output shaft of the vertical electric-controlled hydraulic oil cylinder 15 stops pressing downward;

[0041] The fifth step is to pull out the fixing pin 10 which is connected between the through hole of the cantilever ear 9 of the upper box body and the through hole of the cantilever ear 6 of the lower box body, and control the output shaft of the horizontal electric hydraulic cylinder 16 to extend to the right and abut on the left side wall of the rectangular lower box body 4 through the electric control box 18, and continue to control the output shaft of the horizontal electric hydraulic cylinder 16 to press to the right. When the rectangular lower box body 4 and the rectangular upper cylinder body 7 are displaced, the readings of the vertical pressure test sensor 13 and the horizontal pressure test sensor 12 are read through the electric control box 18 to obtain: the filling material with a determined mix ratio behind the shield site wall, and the compression shear modulus of the material when it is destroyed under the set surrounding rock deformation parameters.

[0042] A test method for measuring the compression shear performance and porosity change of lining filling materials, characterized in that the second step is to pour the configured filling material of bean-grain stone and mortar into the cylindrical inner cavity 5 of the lower box in the rectangular lower box 4, and when the rectangular upper cylinder 7 and the rectangular lower box 4 are combined, continue to add the configured filling material of bean-grain stone and mortar into the cylindrical inner cavity 8 of the upper cylinder in the rectangular upper cylinder 7, and when the added filling material of bean-grain stone and mortar reaches half of the capacity of the cylindrical inner cavity 8 of the upper cylinder, the piston-type pressure transmission plate 24 is embedded in the cylindrical inner cavity 8 of the upper cylinder, and then, the configured mortar filling material is continued to be injected into the cylindrical inner cavity 8 of the upper cylinder through the grouting port 14 on the piston-type pressure transmission plate 24, and when the piston-type pressure transmission plate 24 rises to be flush with the upper port of the cylindrical inner cavity 8 of the upper cylinder, the pressing of the mortar filling material is stopped; this filling method is also called a mixed filling method.

[0043] The above embodiments are only preferred embodiments of the present invention and are not limitations on the technical solutions of the present invention. Any technical solution that can be implemented on the basis of the above embodiments without creative work should be deemed to fall within the scope of protection of the patent of the present invention.

Claims

1. A test device for measuring the compressive shear performance and porosity change of a lining filling material, comprising a gantry (1), a rectangular lower box (4), a rectangular upper cylinder (7), a filling material behind a tunnel lining wall, a vertical electric-controlled hydraulic cylinder (15), a horizontal electric-controlled hydraulic cylinder (16), a water pump (27) and an electric control box (18); a lower box cylindrical inner cavity (5) is arranged in the rectangular lower box (4); an upper cylinder cylindrical inner cavity (8) is arranged in the rectangular upper cylinder (7); a lower box cantilever ear (6) with a through hole is fixedly arranged at the top of the outer wall of the rectangular lower box (4); and an upper box cantilever ear (9) with a through hole is fixedly arranged at the top of the outer wall of the rectangular upper cylinder (7); the device is characterized in that: A steel plate test bench (2) is fixedly arranged on the ground inside the gantry (1), support rollers (3) are arranged at equal intervals on the steel plate test bench (2), a rectangular lower box (4) is arranged on the support rollers (3), a rectangular upper cylinder (7) is arranged on the rectangular lower box (4), the cylindrical inner cavity (5) of the lower box and the cylindrical inner cavity (8) of the upper cylinder form a closed columnar space (11) correspondingly, the closed columnar space (11) is filled with tunnel lining wall backfilling material, a vertical pressure test sensor (13) is pre-buried in the tunnel lining wall backfilling material at the upper end of the closed columnar space (11), a horizontal pressure test sensor (12) is pre-buried in the tunnel lining wall backfilling material at the left end of the closed columnar space (11), and a cylindrical inner cavity (5) of the upper cylinder (8) forms a closed columnar space (11). A piston-type pressure transmission plate (24) is arranged in the upper inner cavity of the rectangular inner cavity (8); a vertical electric-controlled hydraulic oil cylinder (15) is arranged between the piston-type pressure transmission plate (24) and the top beam of the gantry (1); a horizontal electric-controlled hydraulic oil cylinder (16) is arranged between the left side wall of the rectangular lower box (4) and the left column of the gantry (1); a horizontal reaction frame (17) is arranged between the right side wall of the rectangular upper cylinder (7) and the right column of the gantry (1); a grouting port (14) is arranged on the piston-type pressure transmission plate (24); a grouting port closing cover is arranged on the grouting port (14); a water injection port (25) is arranged on the rectangular lower box (4); the water injection port (25) is connected to the cylindrical inner cavity (5) of the lower box; and the water injection port (25) is connected to the water injection port (17). A water injection pipe (26) is connected between the pump (27); a water guide pipe (28) extending vertically upward is provided on the side wall of the rectangular upper cylinder (7); the water guide pipe (28) extending vertically upward is communicated with the cylindrical inner cavity (8) of the upper cylinder; the vertical electric-controlled hydraulic cylinder (15), the horizontal electric-controlled hydraulic cylinder (16), the water pump (27), the vertical pressure test sensor (13) and the horizontal pressure test sensor (12) are respectively electrically connected with the electric control box (18); an upper cylinder gel injection port (19) is provided on the side wall of the rectangular upper cylinder (7); an upper cylinder gel injection port sealing cover is provided on the upper cylinder gel injection port (19); a lower box gel injection port (20) is provided on the side wall of the rectangular lower box (4); A lower box body gel injection port closing cover is provided on the body gel injection port (20); a grease layer is provided between the top end surface of the side wall of the rectangular lower box body (4) and the bottom end surface of the side wall of the rectangular upper cylinder body (7); a tenon is provided on the inner side wall of the cylindrical inner cavity (8) of the upper cylinder body, and a tenon is provided on the inner side wall of the cylindrical inner cavity (5) of the lower box body; a sealing ring is provided between the upper end of the inner side wall of the cylindrical inner cavity (5) of the lower box body and the lower end of the inner side wall of the cylindrical inner cavity (8) of the upper cylinder body; a ball lower embedding groove (22) is provided on the top end surface of the side wall of the rectangular lower box body (4), a ball upper embedding groove (23) is provided on the bottom end surface of the side wall of the rectangular upper cylinder body (7), and a ball (21) is provided between the ball lower embedding groove (22) and the ball upper embedding groove (23);A fixing pin (10) is movably connected between the upper box cantilever ear (9) with the through hole and the lower box cantilever ear (6) with the through hole. ;