A passive core cooling system flow resistance test emergency system and its use method

By optimizing the flow resistance test temporary system of the non-active core cooling system, the problems of numerous facilities, dispersed arrangements and long-term filling and drainage are solved, and efficient and safe flow resistance tests are achieved, reducing costs and management complexity. In AP/CAP series nuclear power plants.

CN111370151BActive Publication Date: 2024-11-22SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010291807.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-14
Publication Date
2024-11-22
Estimated Expiration
2040-04-14

AI Technical Summary

Technical Problem

There are many temporary facilities for flow resistance tests for non-active core cooling systems, scattered layout, high installation and management costs, and long time to charge and drainage.

Method used

A flow resistance test temporary system including water supply source, user box, water supply pipeline, water supply pump group, drainage pipeline and measuring device was designed. By optimizing the water replenishment path and instrument selection, the number of pipelines and instruments has been reduced and the number of pipelines and instruments has been improved. Reliability and integration of Lincuo.

Benefits of technology

It realizes efficient flow resistance test, reduces equipment procurement costs, simplifies temporary management, improves the reliability and safety of tests, and reduces test time. It is suitable for non-active core cooling of AP/CAP series nuclear power plants. system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111370151B_ABST
    Figure CN111370151B_ABST
Patent Text Reader

Abstract

The present invention discloses a passive core cooling system flow resistance test emergency system and a method of use, including: a water supply pipeline connecting a water source to a user box, a water supply pump group providing power, a drainage pipeline from the user box to a drainage pit, valves, instruments, pipe fittings and other accessories, online control of the water replenishment path of different user boxes according to different valves, and data collection through a flow meter set on the discharge pipeline, thereby achieving the purpose of data analysis and test result evaluation. The present invention has high integration and strong portability, and can be disassembled as a whole and directly used for the flow resistance test of the passive core cooling system of the same reactor type nuclear power plant, or used for subsequent similar AP / CAP reactor type nuclear power plant system commissioning test with the scheme as a guide.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to a temporary measure scheme for debugging a nuclear island system of a nuclear power plant, and provides guidance for a special integrated temporary measure arrangement for flow resistance test of a passive core cooling system of an AP / CAP series nuclear power plant. Background Art

[0002] As a unique safety system of AP / CAP series nuclear power plants, the passive core cooling system (hereinafter referred to as PXS) is the focus of nuclear island commissioning, and also the key point and difficulty. In view of the passive design of PXS, there is no pump as a driving force in the design, and the flow resistance of its piping system becomes the determining factor affecting the injection capacity. The flow resistance cannot be directly measured, so it is necessary to conduct flow resistance tests on each injection path to verify that the flow resistance of the piping system meets the design requirements.

[0003] According to experience, the PXS flow resistance test has the following characteristics:

[0004] Many test items: As a dedicated safety system for AP / CAP series nuclear power plants, it is necessary to fully verify that its functions can meet the design requirements. The passive design also has higher requirements for the adjustment of the orifice plate. Some flow resistance tests often need to be performed multiple times to pass the acceptance criteria.

[0005] Complex temporary measures: The flow resistance test requires high measurement accuracy, and the system does not have a flow meter in its layout, so a large number of temporary instruments were installed during the flow resistance test. As a safety system, part of the flow channel is directly discharged into the containment after an accident. During the commissioning period, temporary measures must be taken to establish a safe flow path;

[0006] Long time consumption for water replenishment: The flow resistance test itself lasts for a short time, often only a few minutes of data collection time. Before the test, the relevant box needs to be filled with water. During the flow resistance test, the formal system often does not have the conditions for replenishing water to the box. Therefore, it is necessary to use the desalted water distribution system (hereinafter referred to as DWS) to replenish water to the box through temporary measures, which takes a long time to replenish water;

[0007] High pressure on schedule: The PXS system is directly connected to the primary circuit, and its flow resistance test boundaries are all located within the primary circuit water pressure test boundaries. Completing the flow resistance test is an important prerequisite for the primary circuit water pressure test. The primary circuit water pressure test is a major milestone in the commissioning phase, with a tight schedule and high pressure on schedule.

[0008] The filling and drainage capacity of the nuclear island's formal filling and drainage system (including the desalted water storage and distribution system DWS, the chemical and volume control system CVS, the nuclear island liquid waste system WLS, the radioactive wastewater drainage system WRS, etc.) is limited and cannot meet the requirements of the on-site test schedule. In view of the characteristics of the PXS flow resistance test, temporary measures need to be adopted to establish the prerequisites for the filling and drainage of the flow resistance test. Summary of the invention

[0009] The present invention aims to solve the problem that the existing passive core cooling system flow resistance test temporary measures facilities are numerous, scattered, high in installation and management costs, and time-consuming for filling and draining. To this end, the present invention provides a passive core cooling system flow resistance test temporary measures system and a method of using the same, including: a water supply source, a user box, a water supply pipeline, a water supply pump group, a drainage pipeline and a measuring device;

[0010] The water supply source may be a demineralized water storage and distribution system water tank (A), and a demineralized water source quick connector (B);

[0011] The user box body may be an internal refueling water tank (C), a core water supply tank (D), an injection tank (E), a containment pressure vessel reinforcement rib water collection tank (H) and a ring suspension beam water collection tank (I);

[0012] The water supply pipeline is a main water supply pipe connecting the water supply source to the user who needs water replenishment during the flow resistance test;

[0013] The water supply pump group (P1, P2) is located between the water supply source and the user box, and is used to provide water replenishment power;

[0014] The drainage pipeline is a drainage pipeline from the user box to the drainage pit, providing a passage for the user box discharge test;

[0015] The measuring device is a measuring instrument arranged on the water supply pipeline and the drainage pipeline, including a water supply parameter measuring instrument and a drainage flow measuring instrument.

[0016] Preferably, the measuring device includes a water supply pump group outlet pressure gauge, a water supply pipeline flow meter, a tank drainage cumulative flow meter and a turbine flow meter.

[0017] Preferably, the water supply pump group (P1, P2) consists of two water supply pumps connected in parallel.

[0018] Preferably, the water supply pump group (P1, P2) is provided with a recirculation pipeline to avoid cavitation when the water supply flow rate is very small at the initial start-up of the pump group.

[0019] Preferably, the water supply pump group (P1, P2) is provided with a drain pipeline and an exhaust pipeline.

[0020] Preferably, the water supply main pipe providing the outlet of the pump group (P1, P2) is provided with a pressure gauge P for monitoring the outlet pressure of the pump group and a flow meter F1 for monitoring the water supply flow rate.

[0021] Preferably, a temporary manhole water supply pipeline is provided on the core water supply tank (D), and the temporary manhole water supply pipeline is connected to the water supply mother pipe, so as to increase the water supply flow rate.

[0022] Preferably, the core water makeup tank (D) and the injection tank (E) are connected in parallel to the desalted water source quick connector (B), and a six-valve group and corresponding bridging pipes are arranged on the pipeline, and they are discharged through a common section of the drainage pipeline.

[0023] Preferably, the water supply pipeline and the drainage pipeline are made of stainless steel.

[0024] The present invention also provides a method for using the passive core cooling system flow resistance test emergency system, characterized in that the steps are:

[0025] S1: One end of the water supply pipeline enters the containment through the lower equipment gate, and the other end of the water supply pipeline is branched and supplied to the core water supply tank (D), the injection tank (E), the internal refueling water tank (C), the containment pressure vessel reinforcement sump (H) and the ring hanger beam sump (I);

[0026] S2: The reinforcing rib sump (H) of the containment pressure vessel and the ring beam sump (I) can be tested by the water supply pump group (P1, P2) directly supplying water through the water supply main pipe, and the measuring device arranged on the drainage pipeline is used to collect data, analyze data and evaluate test results;

[0027] S3: The core make-up water tank (D) is connected to the water supply main pipe through the temporary manhole make-up water pipeline, and a manual valve is arranged on the temporary manhole make-up water pipeline; the core make-up water tank (D) and the safety injection tank (E) are bridged to the desalted water source quick connector (B) by arranging a six-valve group; the core make-up water tank (D) is replenished through the water supply main pipe and the desalted water source quick connector (B) by opening and closing the manual valve and the six-valve group, and the safety injection tank (E) can pass through the measuring device for collecting data required for the test arranged on the drainage pipeline to record the flow parameters of the tank discharge test; the core make-up water tank (D) discharge test can also be performed while the safety injection tank (E) is replenished by water by opening and closing the manual valve and the six-valve group;

[0028] S4: Replenish water to the user box that needs to be tested through the water supply pipeline, perform a discharge test after the water replenishment is completed, collect data through the instrument set on the discharge pipeline, and perform data analysis and experimental result evaluation.

[0029] According to the test method and system design of the passive core cooling system, the present invention reduces the corresponding instruments, pipelines and pipe fittings, saves equipment procurement costs, and realizes the integration of temporary measures, improves the reliability and safety of temporary measures, and is convenient for the implementation and management of temporary measures, and is also convenient for the operation of commissioning personnel, which is conducive to the execution of the test. The present invention has high integration and strong portability, and can be disassembled as a whole and directly used for the flow resistance test of the passive core cooling system of the same reactor type nuclear power plant, or guided by the scheme for subsequent similar AP / CAP reactor type nuclear power plant passive core cooling system system commissioning test. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 A simplified flow chart of the temporary measures for the passive core cooling system flow resistance test;

[0031] Figure 2 A simplified diagram of the water replenishment measures for the core makeup tank (CMT) and the safety injection tank (ACC) used in the flow resistance test of the existing passive core cooling system;

[0032] Figure 3 It is a schematic diagram of the water replenishment measures for the core makeup tank (CMT) and the safety injection tank (ACC) of the passive core cooling system flow resistance test of the present invention;

[0033] Figure 4 This is a simplified diagram of the temporary manhole water supply pipeline structure of the core water supply tank (CMT). DETAILED DESCRIPTION

[0034] In order to make the present invention more clearly understood, preferred embodiments are described in detail below with related data.

[0035] Figure 1 to Figure 4 They are respectively a schematic diagram of the integrated emergency measure scheme provided in this embodiment, a schematic diagram of the emergency water replenishment of the core makeup water tank (CMT) and the safety injection tank (ACC) of the existing passive core cooling system flow resistance test, a schematic diagram of the emergency water replenishment of the core makeup water tank (CMT) and the safety injection tank (ACC) of the optimized passive core cooling system flow resistance test, and a schematic diagram of the temporary manhole water replenishment pipeline structure of the core makeup water tank (CMT), including:

[0036] Desalted water storage and distribution system water tank A, desalted water source quick connector B, as the water supply source of this embodiment;

[0037] The internal refueling water tank C, the core water supply tank D, the injection tank E, the containment pressure vessel (CV) reinforcement sump H and the ring suspension beam sump I serve as water supply users in this embodiment;

[0038] The water supply pump group consists of two water supply pumps P1 and P2 connected in parallel, which provide a power source for water supply in this embodiment;

[0039] The water supply pump group and the water tank of the desalted water storage and distribution system are provided with parallel manual isolation valves V1 and V2;

[0040] The outlet water supply main pipe of the pump group is provided with a pressure gauge P for monitoring the outlet pressure of the pump group and a flow meter F1 for monitoring the water supply flow;

[0041] The main water supply pipe is provided with a branch pipe to the internal material replacement water tank C, and a manual flow regulating valve V14 is provided on the pipeline;

[0042] Each row of core water supply tank D and injection tank E is equipped with an additional water supply pipeline, which is connected to the desalted water source quick connector B;

[0043] From the water supply main pipe to the CV reinforcement rib water collection tank H, a manual flow regulating valve V16 and a turbine flow meter F3 for collecting flow data during the test are installed on the pipeline;

[0044] A manual flow regulating valve V17 and a turbine flow meter F4 for collecting flow data during the test are installed on the pipeline from the water supply main pipe to the ring hanger beam sump I.

[0045] In a specific embodiment, the water supply pipeline is made of stainless steel;

[0046] In a specific embodiment, the valves and pipes are made of stainless steel;

[0047] In a specific embodiment, the water supply pump group is provided with a drain line and a drain valve V3, an exhaust line and exhaust valves V7 and V8;

[0048] In a specific embodiment, each water supply pump outlet is provided with a manual stop valve V5, V6 for regulating flow;

[0049] In a specific embodiment, a check valve V9, V10 is provided downstream of each water supply pump outlet stop valve;

[0050] In a specific embodiment, the recirculation pipeline of the water supply pump group is provided with a check valve V11;

[0051] In a specific embodiment, a temporary manhole water supply pipeline is set in the core water supply tank CMT and connected to the water supply main pipe, and a manual isolation valve V15 is set on the pipeline;

[0052] In a specific embodiment, each row of core water replenishment tanks D and injection tanks E share a water supply main pipe and a drainage main pipe. Through the bridge arrangement of six valve groups Q1~Q6, one box water replenishment and one box drainage test can be operated simultaneously. The drainage pipeline is provided with a cumulative flow meter F2 for collecting flow data during the test, and finally the water is discharged to the rainwater well G.

[0053] The method for using the integrated emergency measure for the flow resistance test of the CAP1400 passive core cooling system comprises the following steps:

[0054] S1: Take water from the desalted water storage and distribution system tank through the feed water pump set outside the containment, and supply water to the internal refueling tank C, core water tank D, injection tank E, CV stiffener sump H and ring beam sump I respectively through different valve state control to establish the test prerequisites;

[0055] S2: During the water supply process, the pressure gauge P and flow meter F1 set at the outlet main pipe of the pump group are used to monitor the operation status of the integrated temporary measure;

[0056] S3: The core water supply tank D and injection tank E of each sequence are connected by six valve groups Q1 to Q6, so that one tank can be replenished with water and the other tank can be drained at the same time;

[0057] S4: Taking the core water supply tank D replenishing water while the injection tank E performs the discharge test as an example, the manual valves V15, Q1, Q2, Q5, and Q6 are opened, and Q3 and Q4 are closed. The core water supply tank D can be replenished with water through the water supply main pipe and the desalted water source quick connector B, and the injection tank E can be drained through the drainage pipeline through the cumulative flow meter F2 that collects flow data during the test, and finally drained to the rainwater well G;

[0058] S5: Similarly, by opening the manual valves Q1, Q2, Q3, and Q4 and closing V15, Q5, and Q6, the discharge test of the core water supply tank D can be performed while the injection tank E is being replenished;

[0059] S6: The CV stiffener sump H and the ring beam sump I tests can be supplied with water directly by the water supply pump group through the water supply main pipe, and the turbine flow meters F3 and F4 installed on the discharge pipeline can be used for data collection, data analysis and test result evaluation.

[0060] Although preferred embodiments of the present invention have been described, additional changes and modifications may be made to these embodiments by those skilled in the art once the basic inventive concepts are known. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. Those skilled in the art may make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, the present invention is intended to include such changes and modifications if they fall within the scope of the claims of the present invention and their equivalents.

Claims

1. A passive core cooling system flow resistance test emergency system, characterized in that: It includes water supply source, user box, water supply pipeline, water supply pump set, drainage pipeline and measuring device; The water supply source is a demineralized water storage and distribution system water tank (A), and a demineralized water source quick connector (B); The user box body is an internal refueling water tank (C), a core water tank (D), an injection tank (E), a containment pressure vessel reinforcement rib water collection tank (H) and a ring suspension beam water collection tank (I); The water supply pipeline is a main water supply pipe connecting the water supply source to the user who needs water replenishment during the flow resistance test; The water supply pump group (P1, P2) is located between the water supply source and the user box, and is used to provide water replenishment power; The drainage pipeline is a drainage pipeline from the user box to the drainage pit, providing a passage for the user box discharge test; The measuring device is a measuring instrument arranged on the water supply pipeline and the drainage pipeline, including a water supply parameter measuring instrument and a drainage flow measuring instrument; A temporary manhole water supply pipeline is arranged on the core water supply tank (D), and the temporary manhole water supply pipeline is connected to the water supply main pipe.

2. According to claim 1, a passive core cooling system flow resistance test emergency system, characterized in that: The measuring device comprises a water supply pump group outlet pressure gauge, a water supply pipeline flow meter, a box drainage cumulative flow meter and a turbine flow meter.

3. A passive core cooling system flow resistance test emergency system according to claim 1, characterized in that: The water supply pump group (P1, P2) consists of two water supply pumps connected in parallel.

4. A passive core cooling system flow resistance test emergency system according to claim 1, characterized in that: The water supply pump group (P1, P2) is provided with a recirculation pipeline.

5. The passive core cooling system flow resistance test emergency system according to claim 1, characterized in that: The water supply pump group (P1, P2) is provided with a drain pipeline and an exhaust pipeline.

6. A passive core cooling system flow resistance test emergency system according to claim 1, characterized in that: The water supply main pipe at the outlet of the water supply pump group (P1, P2) is provided with a pressure gauge P for monitoring the outlet pressure of the pump group and a flow meter F1 for monitoring the water supply flow rate.

7. The emergency system for flow resistance test of passive core cooling system according to claim 1, characterized in that: The core water supply tank (D) and the injection tank (E) are connected in parallel to the desalted water source quick connector (B), and a six-valve group and corresponding bridging pipes are arranged on the pipeline, and a section of the drainage pipeline is used for discharge.

8. The emergency system for flow resistance test of passive core cooling system according to claim 1, characterized in that: The water supply pipeline and the drainage pipeline are made of stainless steel.

9. The method for using the passive core cooling system flow resistance test emergency system according to any one of claims 1 to 8, characterized in that: The steps are: S1: One end of the water supply pipeline enters the containment through the lower equipment gate, and the other end of the water supply pipeline is branched and supplied to the core water supply tank (D), the injection tank (E), the internal refueling water tank (C), the containment pressure vessel reinforcement sump (H) and the ring hanger beam sump (I); S2: The reinforcing rib sump (H) of the containment pressure vessel and the ring beam sump (I) can be tested by the water supply pump group (P1, P2) directly supplying water through the water supply main pipe, and the measuring device arranged on the drainage pipeline is used to collect data, analyze data and evaluate test results; S3: The core make-up water tank (D) is connected to the water supply main pipe through the temporary manhole make-up water pipeline, and a manual valve is arranged on the temporary manhole make-up water pipeline; the core make-up water tank (D) and the injection tank (E) are bridged to the desalted water source quick connector (B) by arranging a six-valve group; the core make-up water tank (D) is replenished with water through the water supply main pipe and the desalted water source quick connector (B) by opening and closing the manual valve and the six-valve group, and the injection tank (E) passes through the measuring device for collecting data required for the test arranged on the drainage pipeline to record the flow parameters of the tank discharge test; or the discharge test of the core make-up water tank (D) is performed while the injection tank (E) is replenished with water by opening and closing the manual valve and the six-valve group; S4: Replenish water to the user box that needs to be tested through the water supply pipeline, perform a discharge test after the water replenishment is completed, collect data through the instrument installed on the drainage pipeline, and perform data analysis and experimental result evaluation.