A steel pipe column positioning system and method for underground structure with cover and excavation reverse construction

The system provides a fully automated method for precise steel pipe column positioning using a coordinate acquisition and feedback adjustment subsystem, addressing installation challenges and ensuring safety and cost-effectiveness in cover-excavation reverse construction.

CN111379275BActive Publication Date: 2024-12-06CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010239658.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-30
Publication Date
2024-12-06
Estimated Expiration
2040-03-30

AI Technical Summary

Technical Problem

Existing technologies have not effectively addressed the challenge of precise and efficient installation of steel pipe columns in reverse construction methods for underground engineering, and the installation and positioning of steel pipe columns in cover-excavation reverse construction methods, leading to inaccuracies and safety concerns.

Method used

A system comprising a coordinate acquisition subsystem, central processing unit subsystem, and feedback adjustment subsystem, utilizing a photoelectric sensor board and laser emitter for automated and precise positioning of steel pipe columns, with electromagnets and intelligent jacks for real-time adjustments.

Benefits of technology

Enables fully automated, precise, and cost-effective positioning of steel pipe columns, reducing manual intervention and ensuring safety while allowing for the recycling of components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111379275B_ABST
    Figure CN111379275B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of underground engineering technology, and specifically relates to a steel pipe column positioning system for underground structures with reverse excavation and cover, including a coordinate acquisition subsystem, a central processing unit subsystem and a feedback adjustment subsystem; the coordinate acquisition subsystem includes a photoelectric sensor board installed horizontally in the steel pipe column, and the photoelectric sensor board is connected to the central processing unit subsystem for communication; the feedback adjustment subsystem includes four jack assemblies arranged at equal intervals along the circumference of the steel pipe column, and each jack assembly is connected to the central processing unit subsystem for communication; its positioning method: first establish a plane rectangular coordinate system and install the photoelectric sensor board, then install the jack assembly, and then the photoelectric sensor board senses the position of the emitted laser point, and feeds back to the central processing unit subsystem for conversion into an adjustment command through calculation; finally, the intelligent jack receives the adjustment command to adjust the length until the coordinate origin coincides with the laser point. The present invention can realize the fully automated intelligent and precise positioning of the steel pipe column, and saves costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of underground engineering, and in particular relates to a steel pipe column positioning system and method for a cover-and-excavation reverse underground structure. Background Art

[0002] With the development of prefabricated technology, underground structural projects such as subway stations have also gradually become prefabricated. Currently, prefabricated structures are often constructed using the open-cut method, but open-cut construction will cause traffic congestion on the ground surface, leading to inconvenience in travel. Therefore, in order to overcome the shortcomings of the open-cut method, covered-excavation reverse construction is adopted to quickly restore road traffic and reduce the impact of construction on road traffic.

[0003] Steel pipe columns are widely used in load-bearing structures such as subway stations, but the installation and positioning of steel pipe columns in the cover-excavation reverse construction method has become a technical problem in the project. The patent with publication number CN 106958244 A proposes a method for installing and positioning ultra-deep large-diameter steel pipe columns, which uses a camera to identify the laser point on the positioning plate, and then uses a hydraulic jack to adjust the position of the steel pipe column to achieve positioning. However, the invention uses a camera to identify the position of the light spot, and manually adjusts each hydraulic jack according to the position of the light spot, which makes it difficult to ensure accuracy; and there is no mention of how to recycle the hydraulic jacks used in this method. The patent with publication number CN108374418 A mentions the use of laser to center the bull's eye, and the use of a jack to adjust the verticality at the top of the steel pipe column, but this method only adjusts the verticality at the top of the steel pipe column, and it is difficult to achieve satisfactory results for ultra-deep steel pipe columns.

[0004] Therefore, it is necessary to provide a cover-excavation reverse underground structure steel pipe column positioning system and method to solve the above problems. Summary of the invention

[0005] In order to overcome the deficiencies of the above-mentioned prior art, the object of the present invention is to provide a system and method for positioning steel pipe columns in a cover-excavation reverse underground structure, which can realize fully automated, intelligent and precise positioning of steel pipe columns.

[0006] To achieve the above-mentioned purpose, the technical solution of the present invention is a steel pipe column positioning system for underground structures with cover and excavation reverse construction, including a coordinate acquisition subsystem, a central processing unit subsystem and a feedback adjustment subsystem; the coordinate acquisition subsystem includes a photoelectric sensor board and a laser emitter, and the laser emitter is fixed directly above the steel pipe column; the photoelectric sensor board is installed in the bottom of the steel pipe column, and the photoelectric sensor board is communicatively connected to the central processing unit subsystem; the feedback adjustment subsystem includes four jack assemblies arranged between the outer wall of the steel pipe column and the inner wall of the borehole, and the four jack assemblies are arranged at equal intervals along the circumference of the steel pipe column; each of the jack assemblies is communicatively connected to the central processing unit subsystem.

[0007] Furthermore, the photoelectric sensor plate and the four jack assemblies are located on the same plane.

[0008] Furthermore, the jack assembly includes a first electromagnet, a second electromagnet and an intelligent jack; one side of the first electromagnet is connected to the rear support of the intelligent jack, and the other side faces the steel pipe column; one side of the second electromagnet is connected to the front end of the intelligent jack, and the other side faces the inner wall of the drilled hole; each of the intelligent jacks is communicatively connected to the central processing unit subsystem.

[0009] Furthermore, both the first electromagnet and the second electromagnet are connected to a power source via a switch.

[0010] Furthermore, the feedback adjustment subsystem also includes a load-bearing plate and a reaction shoe, the load-bearing plate is welded to the outer wall of the steel pipe column, the reaction shoe is supported on the inner wall of the borehole, and the jack assembly is arranged between the load-bearing plate and the reaction shoe.

[0011] Furthermore, the reaction boot includes a straight steel plate, a curved steel plate and an intermediate steel plate, the straight steel plate is connected to the rear end of the jack assembly, the curved steel plate is supported on the inner wall of the drilled hole, and the straight steel plate and the curved steel plate are connected via the intermediate steel plate.

[0012] Furthermore, the side of the bearing plate connected to the jack assembly is a plane, the side of the bearing plate connected to the steel pipe column is an arcuate surface, and the arcuate surface matches the outer wall of the steel pipe column.

[0013] Furthermore, four Y-shaped brackets are welded on the inner wall of the steel pipe column, and the four corners of the photoelectric sensor board are respectively installed on the four Y-shaped brackets.

[0014] The present invention also provides a method for positioning steel pipe columns of a cover-excavation reverse underground structure, comprising the following steps:

[0015] 1) Determine a plane rectangular coordinate system at a selected height at the bottom of the steel pipe column, with the origin of the coordinate system being the center of the steel pipe column; install the photoelectric sensor board horizontally inside the steel pipe column, and make the photoelectric sensor board be in the horizontal plane where the plane rectangular coordinate system is located;

[0016] 2) Weld the bearing plates at the intersections of the X-axis and Y-axis of the plane rectangular coordinate system and the outer wall of the steel pipe column respectively; energize the first electromagnets and the second electromagnets at both ends of the intelligent jacks of the four jack assemblies, so that the first electromagnets of the four intelligent jacks are respectively adsorbed on the four bearing plates, and the four reaction boots are adsorbed on the four second electromagnets;

[0017] 3) Hoist the steel pipe column to the top of the installation position, and set up a laser transmitter above the steel pipe column so that the laser point emitted by the laser transmitter falls on the coordinate origin of the rectangular coordinate system of the steel pipe column plane;

[0018] 4) Pour concrete at the bottom of the borehole, and drop the steel pipe column into the borehole to the designed elevation, with the bottom of the steel pipe column immersed in the concrete; extend each intelligent jack so that the reaction boot rests against the inner wall of the borehole, and then the intelligent jack feeds back its own extension value to the central processing unit subsystem, and performs zero processing in the central processing unit subsystem;

[0019] 5) The laser transmitter emits a laser point, the photoelectric sensor board senses the position of the laser point and feeds it back to the central processing unit subsystem. The central processing unit subsystem converts the coordinate signal into the elongation value of each intelligent jack of the feedback adjustment subsystem through calculation and sends the command to the intelligent jack;

[0020] 6) The intelligent jack receives the command from the central processor subsystem to adjust the length until the coordinate origin of the photoelectric sensor board coincides with the laser point; then the intelligent jack maintains the elongation value until the concrete at the bottom of the borehole solidifies, completing the positioning of the steel pipe column.

[0021] Optimally, after step 6), the photoelectric sensor board is pulled out; the power supply of the first electromagnet and the second electromagnet at both ends of the intelligent jack is cut off, so that the jack assembly is separated from the bearing plate and the reaction shoe, and the jack assembly is pulled out and recovered.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] (1) The present invention uses the three subsystems of coordinate acquisition subsystem, central processing unit subsystem and feedback adjustment subsystem to cooperate to realize fully automated intelligent and precise positioning of steel pipe columns, which can be used for precise positioning of steel pipe columns in cover-cut reverse construction subway stations;

[0024] (2) The present invention is a fully digital operation, which does not require manual adjustment, can free up manpower, and does not require people to perform dangerous operations, thus ensuring safety;

[0025] (3) The positioning system and method of the present invention are simple and easy to use, highly operable, and can realize the recycling of important components, such as photoelectric sensor boards, intelligent jacks, etc., saving costs and having high economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 A schematic diagram of a steel pipe column positioning system for a cover-and-excavation reverse underground structure provided by an embodiment of the present invention;

[0028] Figure 2 A vertical schematic diagram of a steel pipe column positioning system for a cover-and-excavation reverse underground structure provided by an embodiment of the present invention;

[0029] Figure 3 A horizontal cross-sectional view of a steel pipe column positioning system for a cover-and-excavation reverse underground structure provided by an embodiment of the present invention;

[0030] Figure 4 A schematic diagram of a coordinate acquisition subsystem provided by an embodiment of the present invention;

[0031] Figure 5 A schematic diagram of a photoelectric sensor board provided by an embodiment of the present invention;

[0032] Figure 6 A schematic diagram of a photoelectric sensor board bracket provided by an embodiment of the present invention;

[0033] Figure 7 A disassembly diagram of a feedback regulation subsystem provided in an embodiment of the present invention;

[0034] In the figure: 1. Coordinate acquisition subsystem; 2. Central processing unit subsystem; 3. Feedback adjustment subsystem; 4. Steel pipe column; 5. Photoelectric sensor board; 6. Y-shaped bracket; 7. Laser transmitter; 8. Wire; 9. Power supply; 10. Switch; 11. Load-bearing plate; 12. Jack assembly; 13. Reaction boot; 14. First electromagnet; 15. Intelligent jack; 16. Second electromagnet. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0037] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of the present invention, unless otherwise specified, "plurality" means two or more.

[0038] Embodiment 1

[0039] like Figure 1-Figure 3 As shown, an embodiment of the present invention provides a steel pipe column positioning system for a cover-excavation reverse construction underground structure, including a coordinate acquisition subsystem 1, a central processing unit subsystem 2 and a feedback adjustment subsystem 3; the coordinate acquisition subsystem 1 includes a photoelectric sensor board 5 and a laser emitter 7, and the laser emitter 7 is fixed directly above the design coordinates of the steel pipe column 4; the photoelectric sensor board 5 is horizontally installed in the bottom of the steel pipe column 4, and the photoelectric sensor board 5 is communicatively connected to the central processing unit subsystem 2; the feedback adjustment subsystem 3 includes four jack assemblies 12 arranged between the outer wall of the steel pipe column 4 and the inner wall of the borehole, and the four jack assemblies 12 are arranged at equal intervals along the circumference of the steel pipe column 4; each jack assembly 12 is communicatively connected to the central processing unit subsystem 2. In this embodiment, when the laser point emitted by the laser emitter 7 in the coordinate acquisition subsystem 1 is irradiated on the surface of the photoelectric sensor board 5, the photoelectric sensor board 5 can accurately identify the coordinate position of the laser point and feed back the coordinate point to the central processing unit subsystem 2; the central processing unit subsystem 2 is the brain of the steel pipe column 4 positioning system, which receives the coordinate data obtained by the photoelectric sensor board 5, converts the coordinate data into adjustment command information of the feedback adjustment subsystem 3, and sends it to the feedback adjustment subsystem 3; the four jack assemblies 12 in the feedback adjustment subsystem 3 adjust their elongation values ​​according to the adjustment command information issued by the central processing unit subsystem 2, and adjust the position of the steel pipe column 4 until the accuracy requirement is met; the present invention adopts the three major subsystems of the coordinate acquisition subsystem 1, the central processing unit subsystem 2 and the feedback adjustment subsystem 3 to cooperate to minimize human participation, realize fully automated intelligent and precise positioning of the steel pipe column 4, and has high positioning accuracy, which can be used for precise positioning of the steel pipe column 4 in the cover-excavation reverse construction subway station.

[0040] Furthermore, if Figure 2As shown, the photoelectric sensor board 5 and the four jack assemblies 12 are located on the same plane, so that the four jack assemblies 12 receive adjustment command information within the same plane, thereby improving the positioning accuracy of the steel pipe column 4.

[0041] Furthermore, if Figure 7 As shown, the jack assembly 12 includes a first electromagnet 14, a second electromagnet 16 and an intelligent jack 15; one side of the first electromagnet 14 is connected to the rear support of the intelligent jack 15, and the other side faces the steel pipe column 4; one side of the second electromagnet 16 is connected to the front end of the intelligent jack 15, and the other side faces the inner wall of the borehole; each intelligent jack 15 is connected to the central processing unit subsystem 2 for communication. The intelligent jack 15 of this embodiment is controlled by the central processing unit subsystem 2, and has the function of sensing its own elongation value, can receive the adjustment command information of the central processing unit subsystem 2 and adjust the elongation value of the intelligent jack 15 according to the adjustment command information, and its thrust and maximum elongation value must meet the requirements.

[0042] Furthermore, if Figure 2 As shown, the first electromagnet 14 and the second electromagnet 16 are both electrically connected to the power supply 9 through the switch 10. After being energized, the first electromagnet 14 and the second electromagnet 16 of this embodiment need to have a sufficiently strong suction force to ensure that they will not be displaced by slight scratches.

[0043] Furthermore, if Figure 3 As shown, the feedback adjustment subsystem 3 also includes a load-bearing plate 11 and a reaction shoe 13 . The load-bearing plate 11 is welded to the outer wall of the steel pipe column 4 , the reaction shoe 13 is supported on the inner wall of the borehole, and the jack assembly 12 is arranged between the load-bearing plate 11 and the reaction shoe 13 .

[0044] Furthermore, the reaction shoe 13 includes a straight steel plate, a curved steel plate and an intermediate steel plate, the straight steel plate is connected to the rear end of the jack assembly 12, the curved steel plate is supported on the inner wall of the borehole, and the straight steel plate and the curved steel plate are connected through the intermediate steel plate. The reaction shoe 13 of this embodiment is designed to be a curved steel plate at one end thereof against the inner wall of the borehole, and the curvature of the curved steel plate is optimized to match the inner wall of the borehole, so that when the intelligent jack 15 is extended, the curved steel plate can be close to the inner wall of the borehole, providing a reaction force for adjusting the position of the steel pipe column 4.

[0045] Furthermore, the side where the bearing plate 11 is connected to the jack assembly 12 is a plane, and the side where the bearing plate 11 is connected to the steel pipe column 4 is an arc-shaped surface, and the arc-shaped surface matches the outer wall of the steel pipe column 4. In this embodiment, the contact area between the bearing plate 11 and the steel pipe column 4 is increased by designing the side where the bearing plate 11 is welded to the steel pipe column 4 to be arc-shaped, so as to better adjust the position of the steel pipe column 4 through the intelligent jack 15.

[0046] Furthermore, four Y-shaped brackets 6 are welded on the inner wall of the steel pipe column 4, and the four corners of the photoelectric sensor board 5 are respectively installed on the four Y-shaped brackets 6. Figure 4 and Figure 6 As shown, the openings of the four Y-shaped brackets 6 of this embodiment are toward the center of the steel pipe column 4, forming a bracket that is the same size as the photoelectric sensor board 5 to support the photoelectric sensor board 5 and limit the photoelectric sensor board 5 to prevent displacement; at the same time, the photoelectric sensor board 5 is connected to the central processing unit subsystem 2 through the wire 8. After the steel pipe column 4 is positioned, the photoelectric sensor board 5 can be pulled out through the wire 8 for recycling, saving costs.

[0047] The wire 8 used in this embodiment needs to have sufficient strength and good waterproof performance, and the strength needs to be able to pull up the weight of the jack assembly 12 and the photoelectric sensor board 5 itself.

[0048] Embodiment 2

[0049] like Figure 1-7 As shown, this embodiment provides a method for positioning steel pipe columns of an underground structure in a cover-excavation reverse construction, comprising the following steps:

[0050] 1) Determine a plane rectangular coordinate system at a selected height at the bottom of the steel pipe column 4, with the origin of the coordinate system being the center of the steel pipe column 4; horizontally install the photoelectric sensor board 5 inside the steel pipe column 4, and make the photoelectric sensor board 5 be in the horizontal plane where the plane rectangular coordinate system is located;

[0051] 2) Weld the bearing plates 11 at the intersections of the X-axis and Y-axis of the plane rectangular coordinate system and the outer wall of the steel pipe column 4 respectively; and install the jack assembly 12 and the reaction shoe 13 between each bearing plate 11 and the cup wall of the drilled hole; the jack assembly 12 includes an intelligent jack 15, a first electromagnet 14 and a second electromagnet 16, the rear support of the intelligent jack 15 is fixed to the first electromagnet 14, and the front end of the intelligent jack 15 is fixed to the second electromagnet 16; energize the first electromagnet 14 and the second electromagnet 16 at both ends of the four intelligent jacks 15, so that the first electromagnets 14 of the four intelligent jacks 15 are firmly adsorbed on the four bearing plates 11 respectively, and the four reaction shoes 13 are firmly adsorbed on the four second electromagnets 16;

[0052] 3) The steel pipe column 4 is hoisted to the top of the installation position, and a laser transmitter 7 is set up on the top of the steel pipe column 4 so that the laser point emitted by the laser transmitter 7 falls on the coordinate origin of the rectangular coordinate system of the plane of the steel pipe column 4;

[0053] 4) Pour concrete at the bottom of the borehole, and drop the steel pipe column 4 into the borehole to the designed elevation, the bottom of the steel pipe column 4 is immersed in the concrete, and the height of the concrete in the steel pipe column 4 does not exceed the position of the photoelectric sensor board 5; uniformly extend each intelligent jack 15 so that the reaction boot 13 is against the inner wall of the borehole, and then the intelligent jack 15 feeds back its own extension value to the central processing unit subsystem 2, and performs zero processing in the central processing unit subsystem 2;

[0054] 5) The laser emitter 7 emits a laser point, the photoelectric sensor board 5 senses the position of the laser point and feeds it back to the central processing unit subsystem 2, the central processing unit subsystem 2 converts the coordinate signal into the elongation value of each intelligent jack 15 of the feedback adjustment subsystem 3 through calculation and sends the command to the intelligent jack 15;

[0055] 6) The intelligent jack 15 receives the command from the central processor subsystem 2 to adjust the length until the coordinate origin of the photoelectric sensor board 5 coincides with the laser point; then the intelligent jack 15 maintains the elongation value until the concrete at the bottom of the borehole solidifies, completing the positioning of the steel pipe column 4.

[0056] In this embodiment, after the steel pipe column 4 is hoisted into place, the positioning system needs to be activated as soon as possible to adjust the steel pipe column 4 to ensure that the adjustment is completed before the initial setting of the concrete at the bottom of the borehole, and the jack assembly 12 can be recovered only after the concrete reaches the designed strength.

[0057] Step 1) of this embodiment is specifically as follows: determine a plane rectangular coordinate system at a selected height at the bottom of the steel pipe column 4, with the origin of the coordinate system being the center of the steel pipe column 4; weld four Y-shaped brackets 6 on the inner wall at a selected height inside the bottom of the steel pipe column 4, and respectively install the four corners of the photoelectric sensor board 5 on the four Y-shaped brackets 6, so that the photoelectric sensor board 5 is in the horizontal plane where the plane rectangular coordinate system is located, and the four Y-shaped brackets 6 are respectively welded at the intersection of the 45° lines of the four quadrants of the plane rectangular coordinate system and the inner wall of the steel pipe column 4.

[0058] Optimally, after step 6), the photoelectric sensor board 5 is pulled out and recycled; the power supply 9 of the first electromagnet 14 and the second electromagnet 16 at both ends of the intelligent jack 15 is cut off, so that the jack assembly 12 is separated from the bearing plate 11 and the reaction shoe 13, and the jack assembly 12 is pulled out and recycled. This embodiment can realize the recycling and reuse of important equipment such as the photoelectric sensor board 5 and the jack assembly 12, saving costs.

[0059] The positioning method of this embodiment can achieve faster and more accurate positioning of the steel pipe column, which greatly saves costs compared to the HPE method; compared to the traditional steel casing method, the number of temporary steel casings is greatly reduced; and this embodiment can improve the positioning accuracy to the millimeter level or even higher, which has a significant promoting significance for refined construction.

[0060] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A steel pipe column positioning system for underground structures with cover and excavation reverse construction, characterized in that: It includes a coordinate acquisition subsystem, a central processing unit subsystem and a feedback adjustment subsystem; the coordinate acquisition subsystem includes a photoelectric sensor board and a laser emitter, and the laser emitter is fixed just above the steel pipe column; the photoelectric sensor board is installed in the bottom of the steel pipe column, and the photoelectric sensor board is communicatively connected with the central processing unit subsystem; the feedback adjustment subsystem includes four jack assemblies arranged between the outer wall of the steel pipe column and the inner wall of the borehole, and the four jack assemblies are arranged at equal intervals along the circumference of the steel pipe column; each of the jack assemblies is communicatively connected with the central processing unit subsystem; the jack assembly includes a first electromagnet, a second electromagnet and an intelligent jack; one side of the first electromagnet is connected to the rear support of the intelligent jack, and the other side faces the steel pipe column; one side of the second electromagnet is connected to the front support of the intelligent jack. end is connected, and the other side faces the inner wall of the borehole; each of the intelligent jacks is communicatively connected to the central processing unit subsystem; the first electromagnet and the second electromagnet are connected to the power supply through a switch; the feedback adjustment subsystem also includes a bearing plate and a reaction shoe, the bearing plate is welded to the outer wall of the steel pipe column, the reaction shoe is supported on the inner wall of the borehole, and the jack assembly is arranged between the bearing plate and the reaction shoe; the reaction shoe includes a straight steel plate, an arc-shaped steel plate and an intermediate steel plate, the straight steel plate is connected to the rear end of the jack assembly, the arc-shaped steel plate is supported on the inner wall of the borehole, and the straight steel plate is connected to the arc-shaped steel plate through the intermediate steel plate; the side of the bearing plate connected to the jack assembly is a plane, and the side of the bearing plate connected to the steel pipe column is an arc-shaped surface, and the arc-shaped surface matches the outer wall of the steel pipe column.

2. A cover-excavation reverse underground structure steel pipe column positioning system as claimed in claim 1, characterized in that: The photoelectric sensor board and the four jack assemblies are located on the same plane.

3. The underground structure steel pipe column positioning system of cover-excavation reverse construction according to claim 1, characterized in that: Four Y-shaped brackets are welded on the inner wall of the steel pipe column, and the four corners of the photoelectric sensor board are respectively installed on the four Y-shaped brackets.

4. A method for positioning steel pipe columns of underground structures constructed by reverse excavation and cover, applied to the positioning system for steel pipe columns of underground structures constructed by reverse excavation and cover as claimed in any one of claims 1 to 3, characterized in that: The steps include: 1) Determine a plane rectangular coordinate system at a selected height at the bottom of the steel pipe column, with the origin of the coordinate system being the center of the steel pipe column; install the photoelectric sensor board horizontally inside the steel pipe column, and make the photoelectric sensor board be in the horizontal plane where the plane rectangular coordinate system is located; 2) Weld the bearing plates at the intersections of the X-axis and Y-axis of the plane rectangular coordinate system and the outer wall of the steel pipe column respectively; energize the first electromagnets and the second electromagnets at both ends of the intelligent jacks of the four jack assemblies, so that the first electromagnets of the four intelligent jacks are respectively adsorbed on the four bearing plates, and the four reaction boots are adsorbed on the four second electromagnets; 3) Hoist the steel pipe column to the top of the installation position, and set up a laser transmitter above the steel pipe column so that the laser point emitted by the laser transmitter falls on the coordinate origin of the rectangular coordinate system of the steel pipe column plane; 4) Pour concrete at the bottom of the borehole, and drop the steel pipe column into the borehole to the designed elevation, with the bottom of the steel pipe column immersed in the concrete; extend each intelligent jack so that the reaction boot rests against the inner wall of the borehole, and then the intelligent jack feeds back its own extension value to the central processing unit subsystem, and performs zero processing in the central processing unit subsystem; 5) The laser transmitter emits a laser point, the photoelectric sensor board senses the position of the laser point and feeds it back to the central processing unit subsystem. The central processing unit subsystem converts the coordinate signal into the elongation value of each intelligent jack of the feedback adjustment subsystem through calculation and sends the command to the intelligent jack; 6) The intelligent jack receives the command from the central processor subsystem to adjust the length until the coordinate origin of the photoelectric sensor board coincides with the laser point; then the intelligent jack maintains the elongation value until the concrete at the bottom of the borehole solidifies, completing the positioning of the steel pipe column.

5. A method for positioning steel pipe columns for underground structures in a cover-and-excavation reverse construction according to claim 4, characterized in that: After step 6), pull out the photoelectric sensor board; cut off the power supply of the first electromagnet and the second electromagnet at both ends of the intelligent jack, separate the jack assembly from the bearing plate and the reaction shoe, pull out the jack assembly and recycle it.