An integrated device and production process for mobile production of precast concrete panels
Through the integrated device for mobile production of precast concrete slabs, the problems of large investment, large land and difficult to relocate in the existing technology are solved, and efficient, environmentally friendly and flexible concrete slab production is achieved.
Patent Information
- Application Number
- CN202010324485.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-23
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2040-04-23
AI Technical Summary
The existing production methods of prefabricated concrete components have problems such as fixed factories, huge investment, long construction period, difficult to relocate, transportation restrictions, inability to do long-distance projects and not environmentally friendly.
The integrated device for producing precast concrete slabs is adopted to produce mobile prefabricated concrete slabs, including mold tables, walking gantry, mold table spreaders, fabric machines and mold release spreaders. The overlapping, maintenance and finished mold releases are achieved through the movement and lifting devices of the walking gantry.
The production method of precast concrete components with low input, high output, fast results, easy promotion and low energy consumption has been achieved, which has reduced the area of land, improved production efficiency and product quality, and facilitated overall relocation and project coverage.
Smart Images

Figure CN111409185B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of precast concrete slab production, and in particular relates to an integrated mobile device for producing precast concrete slabs and a production process. Background Art
[0002] Vigorously developing prefabricated buildings has become the basic direction of my country's construction industry upgrade. The use of prefabricated concrete components, especially floor slabs and wall panels, is increasing. Traditional production processes and methods not only require large investments, low efficiency, and high energy consumption, but also have production capacity that is increasingly unable to meet market demand.
[0003] In layman's terms, prefabricated construction means building a house like building a car, that is, the house is disassembled into various components (such as beams, panels, columns, etc.) and processed and produced in the factory, and then transported to the construction site for on-site assembly. Among them, the most widely used are prefabricated concrete panels, including floor panels, wall panels, air conditioning panels, etc.
[0004] The necessary process is: formwork in place → assemble the mold → place the steel bars and embedded parts → pour concrete → component curing (steam can be used) → component demoulding → hoisting and shipment. The existing production processes of precast concrete components include fixed formwork flat production and flat mold assembly line production.
[0005] Fixed mold platform flat production: Figure 1 As shown, the formwork is laid flat in the workshop and fixed in place. After the formwork is assembled and poured, the single-layer plane is maintained, which consumes a lot of energy. The finished products are hoisted in situ one by one, which occupies a large area, has a large basic investment, low production efficiency, and requires a lot of personnel.
[0006] Flat mold production line: Figure 2 As shown, the mold table is placed on the track, the production station personnel do not move, the mold table moves on the track, and is lifted to the centralized point for maintenance through extremely complex mechanical devices. This method requires high requirements for factory buildings and infrastructure, large investments, and long construction periods; high investment in production equipment and long installation periods; complex electronic control equipment and high requirements for operators; large production area; products produced at different times are maintained in the same maintenance area, which not only consumes a lot of energy, but also makes it difficult to ensure product quality; the mold table can only move in a plane and can only move along the specified route, failing to make reasonable use of space and resulting in low production efficiency. For single-line assembly line operations, once any link has a problem, the entire production line will be blocked; material organization and finished product transportation routes are too long, inefficient, and wasteful; and cross-operation is not allowed.
[0007] Therefore, the defects of the existing precast concrete component production method are: fixed plant plus permanent facilities, huge capital construction investment, long construction period, difficult relocation, transportation restrictions, inability to carry out long-distance projects and environmental pollution. Summary of the invention
[0008] In view of the above problems, the object of the present invention is to provide an integrated device and production process for mobile production of precast concrete panels.
[0009] In order to achieve the above object, the present invention adopts the following technical solutions:
[0010] An integrated device for producing mobile precast concrete panels, comprising:
[0011] The formwork table is set on the membrane table station and is used for forming the precast concrete slab;
[0012] A mold platform base, used for overlapping the mold platforms;
[0013] A walking gantry, which spans across the two sides of the mold platform and can move; a gantry sling is provided on the top of the walking gantry;
[0014] A formwork platform hoist can be connected to the gantry sling on the walking gantry, and the formwork platform hoist is used to hoist the formwork platform;
[0015] A concrete placing machine, which can be connected to the gantry sling on the walking gantry, and the concrete placing machine is used to pour concrete on the formwork platform;
[0016] Demoulding hoist, used for lifting formed precast concrete panels.
[0017] The walking gantry comprises a top frame and gantry columns arranged on both sides of the top frame, and driving wheels are arranged at the bottom of the gantry columns.
[0018] The mold platform comprises a mold platform body and a plurality of mold platform support columns arranged on the mold platform body, and an annular groove is arranged at the upper end of the mold platform support column.
[0019] The mold platform hanger includes a mold platform hanger, a clamp, a guide plate and a mold platform lifting ring, wherein the top of the mold platform hanger is provided with a mold platform lifting ring for connecting with the gantry lifting cable; the bottom of the mold platform hanger is provided with a plurality of clamps for clamping the mold platform support column; and the four corners of the mold platform hanger are provided with guide plates for positioning the mold platform.
[0020] The clamp comprises a guide rod, a spring, a telescopic guide sleeve, a chuck, a clamping guide sleeve, a clamping pin and a clamping drive mechanism, wherein the telescopic guide sleeve is arranged on the die table hanger, the guide rod is slidably inserted in the telescopic guide sleeve, the upper and lower ends of the guide rod are respectively connected to a limit block and a chuck, the spring sleeve is arranged on the outer side of the telescopic guide sleeve, and the two ends are respectively abutted against the telescopic guide sleeve and the limit block at the upper end of the guide rod;
[0021] Two clamping guide sleeves are radially provided on the side wall of the chuck, and a clamping pin is slidably fitted in each of the two clamping guide sleeves. The outer ends of the clamping pins are connected to the clamping drive mechanism; the clamping drive mechanism drives the clamping pins to extend and retract, thereby achieving the clamping and release of the mold platform support column.
[0022] The clamp is a hollow structure, and the opening at the lower end is trumpet-shaped.
[0023] The material placing machine comprises a hopper track, a fixed beam and a hopper, wherein the hopper track is provided at the bottom of the fixed beam, the hopper is connected to the hopper track via a translation wheel, and a connecting ring for connecting to the gantry sling is provided at the top of the fixed beam.
[0024] The demoulding hanger comprises a demoulding hanger, a pulley block and a demoulding ring, wherein the top of the demoulding hanger is provided with a demoulding ring for connecting with the gantry sling; the bottom of the demoulding hanger is provided with a pulley block;
[0025] The pulley block includes a steel wire rope, a plurality of fixed pulleys and a plurality of movable pulleys, wherein the plurality of fixed pulleys are arranged at intervals on the demoulding hanger; one end of the steel wire rope is connected to the fixed pulley located at one end, and the other end of the steel wire rope is alternately connected to the movable pulley and the fixed pulley in sequence and the end is connected to the fixed pulley located at the other end; each movable pulley is provided with a hook.
[0026] A production process for mobile production of precast concrete panels, comprising the above-mentioned integrated device for mobile production of precast concrete panels, the production process comprising the following steps:
[0027] 1) Workstation layout: Arrange a base station and multiple die table stations along the walking route of the walking gantry;
[0028] 2) Formwork table arrangement: Connect the formwork table hoist to the gantry sling of the traveling gantry, and hoist the formwork table to each formwork table station through the formwork table hoist;
[0029] 3) Pouring concrete: Connect a concrete placing machine to the gantry sling of the traveling gantry, the traveling gantry moves along the traveling track, and the concrete placing machine is used to place concrete on each formwork platform;
[0030] 4) Forming: forming a precast concrete slab on a formwork table, with multiple hanging points pre-installed on the precast concrete slab;
[0031] 5) Shifting and stacking: Connect the mold table hoist to the gantry sling of the traveling gantry, lift the mold table through the mold table hoist and stack it on the mold table base in sequence;
[0032] 6) Shift maintenance: lift the mold base and the mold stacked on it through the gantry sling of the walking gantry and move them to the maintenance station;
[0033] 7) Finished product demoulding: Connect the demoulding sling to the gantry sling of the traveling gantry. The demoulding sling hooks the multiple lifting points on the precast concrete slab in turn through the multiple hooks on the pulley block. Tighten the gantry sling and lift according to the operating procedures.
[0034] 8) Transport of empty formwork pallets: After removing the formwork, connect the formwork pallet hoist to the gantry sling of the traveling gantry, and stack the formwork pallets on the formwork pallet base in sequence through the formwork pallet hoist.
[0035] In step 2), the mold platform hanger clamps the mold platform support column on the mold platform through a clamp.
[0036] The advantages and beneficial effects of the present invention are:
[0037] The invention has low capital construction requirements, can be produced in the open air, or can adopt a standardized temporary factory building; the occupied area is greatly reduced, and the same production capacity is only about 20% of the existing production method, making full use of the space.
[0038] The invention has simple equipment and low investment; the raw materials can be purchased commercially, which is environmentally friendly and efficient; and the product quality is fully guaranteed.
[0039] The three-dimensional partition maintenance of the present invention has low energy consumption and flexible operation; the vertical and horizontal transportation methods are adopted, the transportation distance is shortened, the production efficiency is greatly improved; and cross-operation is possible;
[0040] The present invention is convenient for overall relocation and movement, and there is no construction waste when the factory is relocated; the project covers a wide range; the production method is flexible: nomadic production can be carried out on the construction site, and fixed factory production can also be carried out. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 Schematic diagram of tiling production for existing fixed formwork platform;
[0042] Figure 2 It is a schematic diagram of the existing flat mold production line;
[0043] Figure 3 This is one of the structural schematic diagrams of the integrated device for mobile production of precast concrete panels of the present invention;
[0044] Figure 4 This is the second structural schematic diagram of the integrated device for mobile production of precast concrete panels of the present invention;
[0045] Figure 5 It is a structural schematic diagram of the walking gantry in the present invention;
[0046] Figure 6 for Figure 5 Side view of
[0047] Figure 7It is a structural schematic diagram of the mold platform in the present invention;
[0048] Figure 8 for Figure 7 A top view of
[0049] Fig. 9 for Figure 7 Enlarged view of point A in the middle;
[0050] Fig.10 It is a structural schematic diagram of the mold base of the present invention;
[0051] Fig.11 for Fig.10 A top view of
[0052] Fig.12 It is a structural schematic diagram of the die table hanger of the present invention;
[0053] Fig.13 for Fig.12 Bottom view of
[0054] Fig.14 It is a structural schematic diagram of the clamp in the present invention;
[0055] Fig.15 for Fig.14 A top view of
[0056] Fig.16 for Fig.15 AA section view;
[0057] Fig.17 for Fig.15 BB cross-sectional view;
[0058] Fig.18 It is a structural schematic diagram of the material placing machine in the present invention;
[0059] Fig.19 It is a structural schematic diagram of the demoulding hanger in the present invention;
[0060] Fig. 20 for Fig.19 CC section view;
[0061] Fig.21 This is a schematic diagram of forming a precast concrete slab in the present invention;
[0062] Fig. 22 for Fig.21 Middle DD section view;
[0063] Fig.23 It is a schematic diagram of the displacement and stacking of mold platforms in the present invention;
[0064] Fig.24 It is a schematic diagram of stacking and lifting the mold pallets in the present invention;
[0065] Fig.25 It is a schematic diagram of demoulding and lifting of the precast concrete slab formed in the present invention;
[0066] Fig.26 It is a schematic diagram of stacking and lifting the hollow mold platform of the present invention;
[0067] Fig. 27 It is a flowchart of the process of producing precast concrete panels in the present invention.
[0068] In the figure: 1 is a mold platform, 101 is a mold platform body, 102 is a mold platform support column, 1021 is an annular groove, 2 is a walking gantry, 201 is a driving wheel, 202 is a gantry column, 203 is a side support beam, 204 is a reinforcing rib, 205 is a top frame, 3 is a mold platform hanger, 301 is a mold platform hanger, 302 is a clamp, 3021 is a guide rod, 3022 is a spring, 3023 is a telescopic guide sleeve, 3024 is a clamp, 3025 is a clamping guide sleeve, 3026 is a clamping pin, 303 is a guide , 304 is a formwork table lifting ring, 4 is a gantry sling, 5 is a placing machine, 501 is a hopper track, 502 is a fixed beam, 503 is a hopper, 504 is a translation wheel, 505 is a connecting lifting ring, 6 is a formwork table base, 601 is a formwork table base body, 602 is a formwork table base lifting ring, 7 is a demoulding hanger, 701 is a demoulding hanger, 702 is a pulley block, 7021 is a fixed pulley, 7022 is a wire rope, 7023 is a movable pulley, 7024 is a hook, 703 is a demoulding lifting ring, 8 is a precast concrete slab, and 9 is a lifting point. DETAILED DESCRIPTION
[0069] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0070] like Figure 3-4 As shown, the present invention provides an integrated device for producing precast concrete panels in a mobile manner, comprising a formwork platform 1, a walking gantry frame 2, a formwork platform hoist 3, a gantry sling 4, a material placing machine 5, a formwork platform base 6 and a demoulding hanger 7, wherein the formwork platform 1 is arranged on a membrane platform station for forming precast concrete panels; the formwork platform base 6 is used for overlapping the formwork platform 1; the walking gantry frame 2 spans across both sides of the formwork platform 1 and is movable, and a gantry sling 4 is provided on the top of the walking gantry frame 2; the formwork platform hanger 3 is connected to the gantry sling 4 on the walking gantry frame 2, and the formwork platform hanger 3 is used for hoisting the formwork platform 1; the material placing machine 5 is connected to the gantry sling 4 on the walking gantry frame 2, and the material placing machine 5 is used for pouring concrete on the formwork platform 1; the demoulding hanger 7 is used for hoisting the formed precast concrete panels.
[0071] like Figure 5-6As shown, the walking gantry 2 can be used for lifting, load-bearing, translation, material laying, handling, palletizing, etc. The walking gantry 2 includes a top frame 205 and gantry columns 202 arranged on both sides of the top frame 205. The bottom of the gantry columns 202 is provided with driving wheels 201. Side support beams 203 are connected between the gantry columns 202 on both sides to ensure the lateral stability of the gantry and to fix the power pipelines, etc. The top frame 205 is connected to the gantry columns 202 on both sides with reinforcing ribs 204. The gantry columns 202 support the top frame 205 and transfer the load of the top frame 205 to the driving wheels 201, while ensuring strength and stability. The top frame 205 is a high-strength, high-rigidity flat steel frame, which is responsible for hanging slings, hanging points, etc.
[0072] like Figure 7-9 As shown, the formwork platform 1 is a platform for making concrete slabs. The formwork platform 1 includes a formwork platform body 101 and a plurality of formwork platform support columns 102 arranged on the formwork platform body 101. The upper end of the formwork platform support column 102 is provided with an annular groove 1021, and the annular groove 1021 is used for lifting the formwork platform 1. The plurality of formwork platform support columns 102 are used for supporting the formwork platforms 1 when they are stacked. The formwork platform support columns 102 are the fulcrums for supporting the upper formwork platform and are also the lifting points of the formwork platform.
[0073] Specifically, the formwork body 101 is a plate structure, the upper surface is required to be flat, and it is used as a base for the precast concrete components, and the lower surface is placed on the formwork base or the formwork support column 102. The thickness of the formwork depends on the spacing between the formwork support columns 102: the larger the spacing between the formwork support columns 102, the greater the thickness of the formwork, so as to ensure its plane rigidity requirements.
[0074] like Figure 10-11 As shown, the mold base 6 includes a mold base body 601 and mold base lifting rings 602 arranged on both sides of the mold base body 601. The walking gantry 2 is connected to the mold base lifting rings 602 on both sides of the mold base body 601 through the gantry sling 4 to realize the lifting of the mold base 6.
[0075] The mold base 6 is the base for stacking the mold base 1, and its plane size is the same as that of the mold base 1. The mold base body 601 is a high-strength, high-rigidity platform frame, on which the multi-layer mold base 1 is stacked. The mold base 6 not only bears the weight, but also ensures the stability of the upper multi-layer mold base 1. The mold base lifting ring 602 is firmly fixed to the side of the mold base body 601, and the demoulding lifting tool 7 lifts the mold base 6 and the upper load through the mold base lifting ring 602.
[0076] like Figure 12-13As shown, the mold platform hanger 3 includes a mold platform hanger 301, a clamp 302, a guide plate 303 and a mold platform lifting ring 304, wherein the top of the mold platform hanger 301 is provided with a mold platform lifting ring 304 for connecting with the gantry sling 4; the bottom of the mold platform hanger 301 is provided with a plurality of clamps 302 for clamping the mold platform support column 102; and the four corners of the mold platform hanger 301 are provided with guide plates 303 for positioning the mold platform 1.
[0077] like Figure 14-17 As shown, the clamp 302 includes a guide rod 3021, a spring 3022, a telescopic guide sleeve 3023, a chuck 3024, a clamping guide sleeve 3025, a clamping pin 3026 and a clamping drive mechanism, wherein the telescopic guide sleeve 3023 is arranged on the die table hanger 301, the guide rod 3021 is slidably inserted in the telescopic guide sleeve 3023, the upper and lower ends of the guide rod 3021 are respectively connected to the limit block and the chuck 3024, the spring 3022 is sleeved on the outer side of the telescopic guide sleeve 3023, and the two ends are respectively abutted against the limit blocks on the upper end of the telescopic guide sleeve 3023 and the guide rod 3021. When the chuck 3024 contacts the die table support column 102, the spring 3022 plays a buffering role.
[0078] In an embodiment of the present invention, two clamping guide sleeves 3025 are radially provided on the side wall of the chuck 3024, and a clamping pin 3026 is slidably fitted in the two clamping guide sleeves 3025 respectively, and the outer end of the clamping pin 3026 is connected to the clamping drive mechanism; the clamping drive mechanism drives the clamping pin 3026 to retract and retract, thereby realizing the clamping and release of the mold table support column 102.
[0079] When the clamping drive mechanism drives the two clamping pins 3026 to extend, they enter the annular groove 1021 on the die table support column 102 to clamp the die table support column 102. The clamping drive mechanism can be driven by a hydraulic cylinder.
[0080] Furthermore, the clamp 3024 is a hollow structure, and the opening at the lower end is trumpet-shaped, which is convenient for positioning and connecting with the mold platform support column 102.
[0081] The die table hanger 301 is a flat rigid frame to ensure that each hanging point is stressed synchronously and maintains balance and stability. The clamp 302 is fixed to the lower part of the die table hanger 301, and the position and number are the same as the die table support column 102. The groove of the clamp 3024 is connected to the top of the die table support column 102 for locking and lifting.
[0082] The guide plate 303 is fixed to the four corners of the mold platform hanger 301. By aligning the guide plate 303 with the mold platform base or the four corners of the mold platform 1 to ensure that the upper and lower four corners are flush, the internal clamp 302 can be accurately connected with the mold platform support column 102.
[0083] like Fig.18As shown, the concrete placing machine 5 is used for pouring concrete, and includes a hopper track 501, a fixed beam 502 and a hopper 503, wherein the hopper track 501 is provided at the bottom of the fixed beam 502, the hopper 503 is connected to the hopper track 501 through a translation wheel 504, and the top of the fixed beam 502 is provided with a connecting ring 505 for connecting to the gantry sling 4. The hopper 503 moves on the hopper track 501 through the translation wheel 504 to adjust the position of the hopper 503.
[0084] Specifically, the hopper track 501 can be a single-beam or double-beam track, and the upper part is connected to the top steel frame of the gantry through the connecting ring 505, and the height can be adjusted up and down; the hopper 503 is suspended at the lower part. The fixed beam 502 is fixed to the support on the side of the gantry to ensure the stability of the hopper track 501 and prevent it from shaking laterally. The hopper 503 is used to store concrete, and there is a switch distribution device at the bottom. The upper part of the translation wheel 504 is connected to the hopper track 501, and the lower part is connected to the hopper 503, so that the hopper 503 can slide along the hopper track 501 to ensure the accurate distribution position. The connecting ring 505 connects the hopper track 501 and the bottom steel frame of the gantry to maintain stability.
[0085] like Figure 19-20 As shown, the demoulding hanger 7 lifts the precast concrete slab 8, i.e., the finished product is hoisted. The demoulding hanger 7 comprises a demoulding hanger 701, a pulley block 702 and a demoulding lifting ring 703, wherein the top of the demoulding hanger 701 is provided with a demoulding lifting ring 703 for connecting with the gantry sling 4; the bottom of the demoulding hanger 701 is provided with a pulley block 702.
[0086] like Fig.19 As shown, the pulley block 702 includes a steel wire rope 7022, a plurality of fixed pulleys 7021 and a plurality of movable pulleys 7023, wherein the plurality of fixed pulleys 7021 are arranged at intervals on the demoulding hanger 701; one end of the steel wire rope 7022 is connected to the fixed pulley 7021 located at one end, and the other end of the steel wire rope 7022 is alternately connected to the movable pulley 7023 and the fixed pulley 7021 in sequence and the end is connected to the fixed pulley 7021 located at the other end; each movable pulley 7023 is provided with a hook 7024, forming a pulley block hanger with uniform force.
[0087] Specifically, the demoulding hanger 701 is a U-shaped or J-shaped welded steel frame.
[0088] A production process for mobile production of precast concrete panels, comprising the above-mentioned integrated device for mobile production of precast concrete panels, the production process comprising the following steps:
[0089] 1) Workstation layout: Fig. 27 As shown, a base station and a plurality of die table stations are arranged along the walking route of the walking gantry 2;
[0090] In this embodiment, six mold table stations and one base station are arranged.
[0091] 2) Die table layout: Figure 3 As shown, the die table hoist 3 is connected to the gantry sling 4 of the traveling gantry 2, and the die table 1 is hoisted to each die table station through the die table hoist 3;
[0092] Specifically, the gantry sling 4 is drooped, and the guide plate 303 of the formwork platform hanger 3 is first aligned with the four corners of the formwork platform 1; the clamp 302 at the bottom of the formwork platform hanger 3 clamps the formwork platform support column 102 at the annular groove 1021 through the two clamping pins 3026 at the clamp head 3024. Then the formwork platform 1 is lifted, and the walking gantry 2 moves to place the formwork platform 1 on each formwork platform station in turn; at this time, according to the design drawings of the precast concrete slab, the formwork platform 1 is marked, the side formwork (edge formwork) is supported, the steel bars are tied, the embedded parts are placed, and the drawings are checked again, and after being accurate, the concrete is poured.
[0093] 3) Pouring concrete: Figure 4 As shown, a placing machine 5 is connected to the gantry sling 4 of the traveling gantry 2, the traveling gantry 2 moves along the traveling track, and the placing machine 5 places and pours concrete on each mold platform 1;
[0094] Specifically, the gantry sling 4 is connected to the connecting ring 505 on the upper part of the material placing boom 5, the material placing boom 5 is lifted to a suitable height, the fixed beam 502 is locked with the gantry side support or column, and then the material is connected.
[0095] 4) Molding: Figure 21-22 As shown, a precast concrete slab 8 is formed on a mold platform 1, and a plurality of hanging points 9 are pre-installed on the precast concrete slab 8;
[0096] Since the precast concrete slabs 8 are of different sizes, some of the formwork support columns 102 will be cast in the concrete (in this embodiment, two or two rows are cast in the component), and they need to be protected so that they can be easily separated from the concrete when the finished product is demoulded. The general method is to apply a release agent or place an isolation sleeve before pouring. At this time, the concrete slab is a semi-finished product, uncured, and has no strength; the pre-installed hanging points 9 of the precast concrete slab 8 are generally bent hook steel bars, stirrup bars or truss bars, and the hanging points 9 are evenly distributed on the top of the concrete slab.
[0097] 5) Shift and stack: Fig.23 As shown, the formwork platform hoist 3 is connected to the gantry sling 4 of the traveling gantry 2, and the formwork platforms 1 are lifted by the formwork platform hoist 3 and stacked on the formwork platform base 6 in sequence. The upper formwork platform 1 is supported by the formwork platform support column 102 on the lower formwork platform 1.
[0098] 6) Relocation maintenance: Fig.24As shown, the mold base 6 and the mold base 1 stacked thereon are lifted by the gantry sling 4 of the traveling gantry 2 and moved to the maintenance station;
[0099] Specifically, after the formwork platform 1 is stacked to the designed number of layers, the steel frame on the top of the gantry lowers the base sling, and the whole stack is moved to the curing station; the whole stack is covered with a curing cover, which is generally made of tarpaulin, plastic film and other materials, and its main purpose is to prevent the unsolidified concrete from losing water and cracking. If you want to achieve the demoulding strength as soon as possible, you can pass high-temperature steam in the cover to accelerate the solidification process of the concrete; because it is a whole stack curing, the requirements for the curing station are not high, and the curing stations can be centralized or dispersed, which is very flexible and efficient.
[0100] 7) Finished product demoulding: Fig.25 As shown, the demoulding sling 7 is connected to the gantry sling 4 of the traveling gantry 2, and the demoulding sling 7 sequentially hooks the multiple lifting points 9 on the precast concrete slab 8 through the multiple hooks 7024 on the pulley block 702, tightens the gantry sling 4 and lifts according to the operating procedures;
[0101] Specifically, after the concrete slab has been cured for a certain period of time and has reached the corresponding designed strength, it can be demolded. Demolding means separating the finished product from the formwork 1. At this time, the concrete slab is a finished product; the walking gantry 2 hangs down the demoulding hanger 7, and the multiple hooks 7024 of the pulley block 702 are evenly hooked on the corresponding hanging points 9 in turn.
[0102] 8) Transport of empty mold pallets: Fig.26 As shown, after the mold is removed, the mold platform is cleaned; the mold platform hoist 3 is connected to the gantry sling 4 of the walking gantry frame 2, and the mold platforms 1 are stacked on the mold platform base 6 in sequence through the mold platform hoist 3. Then the whole stack is lifted by the gantry hanging rope and transferred from the mold removal area to the casting area. The empty mold platforms are stacked and arranged near the casting station for use at any time.
[0103] Cycle in sequence.
[0104] The present invention can realize a precast concrete component production method with low input, high output, quick effect, easy promotion and low energy consumption, which will definitely have a huge impact on the promotion and application of prefabricated buildings in my country, and at the same time achieve both economic and social benefits.
[0105] The above description is only an embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, expansion, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.
Claims
1. An integrated device for producing mobile precast concrete panels, characterized in that: include: A mold platform (1) is arranged on a mold platform station and is used for molding precast concrete panels; A mold platform base (6) for overlapping the mold platforms (1); A walking gantry (2) spans across two sides of the mold platform (1) and is movable; a gantry sling (4) is provided on the top of the walking gantry (2); A formwork platform hoist (3) which can be connected to a gantry sling (4) on the traveling gantry (2), and the formwork platform hoist (3) is used to hoist the formwork platform (1); A material placing machine (5) which can be connected to a gantry sling (4) on the walking gantry (2), and the material placing machine (5) is used to pour concrete on the formwork platform (1); A demoulding hanger (7) is used to hang the formed precast concrete slab; The walking gantry (2) comprises a top frame (205) and gantry columns (202) arranged on both sides of the top frame (205), and driving wheels (201) are arranged at the bottom of the gantry columns (202); The mold platform (1) comprises a mold platform body (101) and a plurality of mold platform support columns (102) arranged on the mold platform body (101), wherein the upper ends of the mold platform support columns (102) are provided with an annular groove (1021); The die table hanger (3) comprises a die table hanger (301), a clamp (302), a guide plate (303) and a die table lifting ring (304), wherein the top of the die table hanger (301) is provided with a die table lifting ring (304) for connecting to the gantry lifting cable (4); the bottom of the die table hanger (301) is provided with a plurality of clamps (302) for clamping the die table support column (102); and the four corners of the die table hanger (301) are provided with guide plates (303) for positioning the die table (1); The clamp (302) comprises a guide rod (3021), a spring (3022), a telescopic guide sleeve (3023), a chuck (3024), a clamping guide sleeve (3025), a clamping pin (3026) and a clamping drive mechanism, wherein the telescopic guide sleeve (3023) is arranged on the die table hanger (301), the guide rod (3021) is slidably inserted in the telescopic guide sleeve (3023), the upper and lower ends of the guide rod (3021) are respectively connected to a limit block and the chuck (3024), the spring (3022) is sleeved on the outer side of the telescopic guide sleeve (3023), and the two ends are respectively in contact with the limit blocks at the upper ends of the telescopic guide sleeve (3023) and the guide rod (3021); Two clamping guide sleeves (3025) are radially provided on the side wall of the clamping head (3024), and a clamping pin shaft (3026) is slidably fitted in each of the two clamping guide sleeves (3025). The outer ends of the clamping pin shafts (3026) are connected to the clamping drive mechanism; the clamping drive mechanism drives the clamping pin shafts (3026) to extend and retract, thereby achieving clamping and releasing of the die table support column (102).
2. The integrated mobile device for producing precast concrete panels according to claim 1, characterized in that: The clamp (3024) is a hollow structure, and the opening at the lower end is trumpet-shaped.
3. The integrated mobile device for producing precast concrete panels according to claim 1, characterized in that: The material placing machine (5) comprises a hopper track (501), a fixed beam (502) and a hopper (503), wherein the hopper track (501) is provided at the bottom of the fixed beam (502), the hopper (503) is connected to the hopper track (501) via a translation wheel (504), and a connecting ring (505) for connecting to the gantry sling (4) is provided at the top of the fixed beam (502).
4. The integrated mobile device for producing precast concrete panels according to claim 1, characterized in that: The demoulding hanger (7) comprises a demoulding hanger (701), a pulley block (702) and a demoulding lifting ring (703), wherein the top of the demoulding hanger (701) is provided with a demoulding lifting ring (703) for connecting with the gantry sling (4); the bottom of the demoulding hanger (701) is provided with a pulley block (702); The pulley block (702) comprises a steel wire rope (7022), a plurality of fixed pulleys (7021) and a plurality of movable pulleys (7023), wherein the plurality of fixed pulleys (7021) are arranged at intervals on the demoulding hanger (701); one end of the steel wire rope (7022) is connected to the fixed pulley (7021) located at one end, and the other end of the steel wire rope (7022) is alternately connected to the movable pulley (7023) and the fixed pulley (7021) in sequence, and the end is connected to the fixed pulley (7021) located at the other end; each movable pulley (7023) is provided with a hook (7024).
5. A mobile production process for precast concrete panels, characterized in that: The integrated device for producing mobile precast concrete panels according to any one of claims 1 to 4, wherein the production process comprises the following steps: 1) Workstation layout: a base station and a plurality of die table stations are arranged along the travel route of the travel gantry (2); 2) Formwork table arrangement: Connecting the formwork table lifting device (3) to the gantry lifting cable (4) of the traveling gantry frame (2), and lifting the formwork table (1) to each formwork table workstation via the formwork table lifting device (3); 3) pouring concrete: a concrete placing machine (5) is connected to the gantry sling (4) of the traveling gantry (2), the traveling gantry (2) moves along the traveling track, and the concrete placing machine (5) places and pours concrete on each mold platform (1); 4) Forming: forming a precast concrete slab (8) on a formwork platform (1), and pre-installing a plurality of hanging points (9) on the precast concrete slab (8); 5) Shifting and stacking: Connecting the formwork platform hoist (3) to the gantry sling (4) of the traveling gantry (2), lifting the formwork platform (1) by the formwork platform hoist (3) and stacking them on the formwork platform base (6) in sequence; 6) Shift maintenance: lifting the mold base (6) and the mold base (1) stacked thereon by means of the gantry sling (4) of the traveling gantry (2) and moving them to the maintenance station; 7) Demolding of finished product: Connect a demoulding sling (7) to the gantry sling (4) of the traveling gantry (2); the demoulding sling (7) sequentially hooks multiple lifting points (9) on the precast concrete slab (8) through multiple hooks (7024) on the pulley block (702); tighten the gantry sling (4) and lift according to the operating procedures; 8) Transporting the vacant formwork pallets: After removing the formwork, connect the formwork pallet sling (3) to the gantry sling (4) of the traveling gantry (2), and stack the formwork pallets (1) on the formwork pallet base (6) in sequence through the formwork pallet sling (3).
6. The mobile production process for precast concrete panels according to claim 5 is characterized in that: In step 2), the die table hanger (3) clamps the die table support column (102) on the die table (1) through the clamp (302).
Citation Information
Patent Citations
Planer -type cloth machine
CN208497289U
Demoulding hoisting frame for prefabricated composite floor slab
CN208932792U
Mobile integrated device for producing precast concrete slabs
CN212421717U
Construction method for grade separation
JP2010031607A