Yuba production and forming equipment under normal pressure steam conditions

Through reverse-burning normal pressure superheated steam furnace and hot air circulation heating technology, the problems of uneven heating and high energy consumption of yuba processing equipment have been solved, efficient and environmentally friendly yuba production has been achieved, and production efficiency and quality have been improved.

CN111449141BActive Publication Date: 2024-10-25SHANGHAI GOKA SPORTS MOTOR CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202010432394.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-20
Publication Date
2024-10-25
Estimated Expiration
2040-05-20

AI Technical Summary

Technical Problem

Existing yuba processing equipment has problems such as uneven heating, insufficient fuel combustion, environmental pollution, safety hazards and high energy consumption in the heating method. It is difficult to meet the high efficiency, environmental protection and safety requirements of yuba production.

Method used

It uses a reverse-burning normal-pressure superheated steam furnace to achieve full combustion of fuel through secondary combustion technology. It combines the circulating heating of steam and hot air to provide high-temperature steam and hot air for pulp cooking and molding to ensure temperature stability and heat energy utilization. Reduce energy consumption and pollution.

Benefits of technology

It achieves efficient, environmentally friendly and safe production of yuba processing, improves production efficiency and quality, reduces fuel costs and environmental pollution, and simplifies equipment operation and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111449141B_ABST
    Figure CN111449141B_ABST
Patent Text Reader

Abstract

A bean curd sheet production and forming equipment under normal pressure steam conditions, comprising a reverse-firing normal-pressure superheated steam furnace and a bean curd sheet forming device, wherein the reverse-firing normal-pressure superheated steam furnace provides steam for the bean curd sheet forming device for heating and forming; the reverse-firing normal-pressure superheated steam furnace further heats the generated saturated steam using the heat of flue gas to generate superheated steam under normal pressure, and then uses the superheated steam for bean curd sheet forming, with high forming efficiency, while also being able to meet the needs of pulping and drying heating in the bean curd sheet production process; the reverse-firing normal-pressure superheated steam furnace generates superheated steam under normal pressure, which can meet the steam supply needs of multiple bean curd sheet forming devices, has high thermal efficiency and low energy consumption compared to traditional normal-pressure steam furnaces; and has relatively small safety hazards compared to pressure steam boilers, has relatively low technical requirements for design, manufacturing and use, is safer and more convenient for users to use, and has lower operating costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bean curd stick processing equipment, in particular to bean curd stick production and molding equipment under normal pressure steam conditions. Background Art

[0002] Yuba, also known as yuba or tofu skin, is a thin film solidified on the surface of boiled soy milk. It can be eaten fresh or dried. Yuba originated in the Tang Dynasty and has a history of more than a thousand years. It is a traditional food that Chinese people love very much. Its process is peeling - soaking - mixing - grinding - filtering and removing residue - boiling - peeling to extract yuba - drying to obtain yuba products. Yuba is a high-quality soy product that is rich in nutrients and can provide balanced energy for the human body. It is widely known as "the meat in the vegetarian". However, from a nutritional point of view, the energy ratio of yuba is balanced, and the nutrient density is higher than that of ordinary soy products. Yuba is rich in nutrients, rich in VE, unsaturated fatty acids, isopropyl ketone, lecithin and other functional ingredients, and does not contain cholesterol. Regular consumption can improve cardiovascular function and supplement the amino acids needed by the human body. It is a high-level nutritional product for patients with hypertension, arteriosclerosis and cardiovascular diseases. With the improvement of people's living standards, the quality requirements for yuba are also higher.

[0003] Research has found that the boiling and membrane removal of yuba is a key step in the production of yuba. At present, there are three ways to process yuba on a large scale:

[0004] 1. The traditional tunnel-type fire channel heating method, the structure of this method is mainly composed of: yuba forming tank, steam generating tank, tunnel-type fire channel (made of bricks), and chimney. The connection method of this structure is: the tunnel-type fire channel is placed at the bottom, the steam generating tank falls above the fire channel, and the yuba forming tank is placed directly above the steam generating tank. The bottom of the steam generating tank is directly in contact with the flame of the fire channel, and the water inside the steam generating tank is heated to generate steam, which heats the bottom of the yuba forming tank. The disadvantages of this heating method are:

[0005] 1) A combustion chamber is set at the front end of the tunnel-type fire channel, and the end is connected to the chimney. The flames and high-temperature flue gas generated by the combustion penetrate the bottom of the entire steam generating tank under the action of self-absorption of the chimney. The longer fire tunnel causes uneven heating of the bean curd forming tank, resulting in excessive temperature difference in the bean curd forming tank. When the temperature is too high, the bottom of the forming tank will become sticky and burnt; when the temperature is too low, the soy milk will turn into tofu pudding and cannot be formed into a film, affecting the yield and quality of the bean curd.

[0006] 2) The front end of the tunnel fire channel has a large flame and high temperature of high-temperature flue gas, and the front end of the steam generator tank is locally heated, which is easy to cause deformation and affect the service life.

[0007] 3) Tunnel-type fire channels do not burn fuel completely, emitting black smoke, which is discharged directly into the atmosphere through self-absorption in tall chimneys, causing environmental pollution; the fuel heat conversion efficiency is low, the fuel loss is large, and the cost of use is high.

[0008] 2. Pressurized steam heating method. The structure of this method is mainly composed of: pressure steam boiler, bean curd forming tank, steam tank, and steam pipe. The connection method of this structure is that the high-pressure steam generated by the steam boiler is transported to the steam tank cavity through the steam pipe to heat the bottom of the bean curd forming tank. According to the provisions of the current "Boiler Safety Technical Supervision Regulations" in my country, steam boilers with a steam pressure greater than or equal to 0.1Mpa, that is, pressure steam boilers, are special equipment. The design, processing, manufacturing, installation and use of this type of steam boiler must be subject to the supervision of the technical supervision department. Users can only use steam boilers after obtaining a boiler use permit. The disadvantages of this heating method are:

[0009] 1) Pressure steam boilers generally use coal and biomass as fuel, and adopt a normal combustion method. This combustion method is not sufficient, and smoke and dust removal treatment devices need to be added to treat the exhaust flue gas, especially coal-fired boilers also need to treat sulfides. The flue gas treatment device supporting the pressure steam boiler has a large investment and high operating cost.

[0010] 2) Pressure steam boilers are special equipment, and operators must be qualified through special training and hold a certificate before taking up their posts. The installation and use of boilers must be reported, reviewed and approved by the relevant departments. During operation, they must also be supervised and inspected by the relevant departments.

[0011] 3) Safety hazards are prone to occur during the use of pressure steam boilers. If they are not strictly operated and used according to regulations and the equipment is not properly maintained, safety accidents are likely to occur, causing equipment damage and personal injury.

[0012] 3. Normal pressure steam generator heating method. The structure of this method mainly consists of: normal pressure steam generator, bean curd forming tank, steam tank, and steam pipe. The connection method of this structure is that the saturated steam generated by the normal pressure steam generator is transported to the steam tank cavity through the steam pipe to heat the bottom of the bean curd forming tank. The disadvantages of this heating method are:

[0013] 1) Atmospheric pressure steam generators generally use coal and biomass as fuel, and adopt a normal combustion method. This combustion method is not sufficient, and smoke and dust removal treatment devices need to be added to treat the exhaust flue gas. In particular, coal-fired steam generators also need to treat sulfides. The flue gas treatment device supporting the atmospheric pressure steam generator has a large investment and high operating cost.

[0014] 2) The saturated steam generated by the atmospheric pressure steam generator enters the steam tank through the steam pipe and is evenly dispersed into the cavity, and performs heat exchange with the bottom of the bean curd stick forming tank. After the saturated steam enters the steam tank, the steam space expands, the pressure drops, and after the heat exchange, the steam temperature in the steam tank drops. The steam temperature in the tank is lower than the condensation temperature of the steam, and condensed water is generated. The steam heat utilization efficiency is low, and it is difficult to meet the normal working temperature required for bean curd stick forming. In order to meet the normal working temperature required for bean curd stick forming, a large amount of saturated steam needs to be input for supplementary heating, resulting in large steam usage, high energy consumption, and high production costs. Summary of the invention

[0015] The purpose of the present invention is to provide a bean curd sheet production and molding equipment under normal pressure steam conditions. The equipment is energy-saving and environmentally friendly, has high bean curd sheet molding efficiency and good quality, and the normal pressure steam furnace used is in a normal pressure state during operation. The steam generated can simultaneously meet the heating needs of bean curd sheet boiling and molding, thereby realizing multi-shift continuous production of bean curd sheet processing.

[0016] In order to achieve the purpose of the present invention, the technical solution adopted is:

[0017] There are many structures of yuba production and forming equipment under normal pressure steam conditions, three of which are listed below.

[0018] The first type of yuba production and forming equipment under normal pressure steam conditions includes a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming;

[0019] The yuba forming device comprises a slurry loading tank and a bracket. The slurry loading tank is in a rectangular shape with an opening at the top, and a plurality of partitions are installed in the slurry loading tank through a slot, and the partitions divide the slurry loading tank into a plurality of forming pools, and the plurality of forming pools can be arranged in two rows; the slurry loading tank is installed on the bracket; a steam bin is arranged at the bottom of the slurry loading tank, and a steam inlet pipe is installed in the steam bin, and the steam inlet pipe extends from one end of the steam bin to the middle of the steam bin, and the ends of the steam inlet pipe are respectively connected to a steam distribution pipe extending to the two ends of the steam bin, and steam distribution holes are arranged on both sides of the steam distribution pipe, and steam is passed through the steam distribution holes of the steam distribution pipe to provide steam for the slurry loading tank for heating and forming, and a drainage and steam exhaust port is arranged at the other end of the steam bin; the outside of the slurry loading tank and the steam bin is wrapped with a heat preservation layer to avoid or reduce energy dissipation;

[0020] The reverse-firing normal-pressure superheated steam furnace comprises a furnace seat and a furnace body, which is installed on the furnace seat; a furnace is arranged in the furnace body, and water layers are arranged on the furnace walls on both sides of the furnace; a steam generator is arranged on the upper part of the furnace, and a pressure relief valve and a water replenishing port are arranged on the steam generator; a plurality of water heating pipes are arranged horizontally through the steam generator; a water-cooled grate is installed at the lower part of the furnace through a grate mounting frame; the water-cooled grate is connected with the water layer, and the water layer is connected with the steam generator through a connecting pipe; an ash discharge port and a furnace door are arranged on the furnace body at the front of the furnace; a secondary combustion chamber and a flue gas bin are respectively arranged on both sides of the furnace; the lower part of the secondary combustion chamber is connected with the furnace through a fire port, the furnace is provided with a primary oxygen inlet, and the secondary combustion chamber is provided with a secondary oxygen inlet; the upper part of the secondary combustion chamber is connected with one end of the water heating pipe, and the other end of the water heating pipe is connected with the upper part of the flue gas bin The heat exchanger is connected to the smoke bin; a smoke separation chamber is provided at the bottom of the heat exchanger, and the smoke separation chamber is connected to the lower part of the smoke bin; a plurality of heat exchange tubes are vertically arranged in the heat exchanger; the bottom end of the heat exchange tube is connected to the smoke separation chamber, and the top end of the heat exchange tube is connected to a smoke exhaust port, and the smoke exhaust port is connected to a smoke pipe for exhausting smoke; a smoke purification and emission device can be optionally connected to the smoke pipe, and the smoke purification and emission device is a traditional smoke purification and emission device, which includes a water film dust collector, a smoke exhaust fan and a chimney; a steam superheating chamber is provided in the heat exchanger, and the lower part of the steam superheating chamber is connected to the top of the steam generator through a steam conduit; a three-way valve for distributing and transporting steam is installed on the steam conduit, which can be transported to pulp boiling, molding and drying; a steam outlet is provided at the upper part of the steam superheating chamber; the steam outlet is connected to the steam inlet pipe through a steam pipe. The secondary combustion chamber is provided with an ash cleaning port to facilitate cleaning of dust in the secondary combustion chamber. The smoke separation chamber is provided with a slag cleaning port to facilitate cleaning of dust in the smoke separation chamber.

[0021] Preferably: the heat exchanger is further provided with a hot air chamber; the hot air chamber is provided at the upper part of the steam superheating chamber, the lower part of the hot air chamber is provided with an air inlet, and the upper part of the hot air chamber is provided with a hot air outlet; the hot air outputted from the hot air outlet is transported to the bottom of the steam bin to heat and insulate the steam bin. The shell of the heat exchanger is cylindrical or elliptical, and the heat exchanger is divided into a steam superheating chamber and a hot air chamber from top to bottom; the heat exchange tube passes through the steam superheating chamber and the hot air chamber; the steam conduit, the steam outlet, the air inlet and the hot air outlet are all tangently connected to the cylindrical surface of the heat exchanger.

[0022] The second type of bean curd stick production and forming equipment under normal pressure steam conditions includes a reverse-firing normal-pressure superheated steam furnace and a bean curd stick forming device, wherein the reverse-firing normal-pressure superheated steam furnace provides steam for the bean curd stick forming device for heating and forming; the bean curd stick forming device includes a slurry loading tank and a bracket, wherein the slurry loading tank is in a rectangular shape with an opening at the top, and a plurality of partitions are installed in the slurry loading tank through slots, and the partitions divide the slurry loading tank into a plurality of forming pools, and the forming pools are arranged in two rows; the slurry loading tank is installed on the bracket; a steam bin is provided at the bottom of the slurry loading tank, and a steam inlet pipe is installed in the steam bin, and the steam inlet pipe extends from one end of the steam bin to the middle of the steam bin, and a steam distribution pipe extending to both ends of the steam bin is connected to both sides of the end of the steam inlet pipe, and steam distribution holes are provided on both sides of the steam distribution pipe, and steam is passed through the steam distribution holes of the steam distribution pipe to provide steam for the slurry loading tank for heating and forming, and a drainage and steam exhaust port is provided at the other end of the steam bin; the outside of the slurry loading tank and the steam bin is wrapped with a thermal insulation layer to avoid or reduce energy dissipation;

[0023] The reverse-firing normal-pressure superheated steam furnace comprises a furnace seat and a furnace body, and the furnace body is installed on the furnace seat; a furnace is arranged in the furnace body, and water layers are arranged on the furnace walls on both sides of the furnace; a steam generator is arranged on the upper part of the furnace, and a pressure relief valve and a water replenishing port are arranged on the steam generator; a partition is arranged horizontally in the steam generator to divide the upper and lower parts of the steam generator into a steam superheating chamber and a steam generating chamber; one end of the steam superheating chamber is connected to the steam generating chamber through a steam port, and a steam conduit is arranged on the top of the other end of the steam superheating chamber; a three-way valve is installed on the steam conduit; the three-way valve distributes steam to pulp boiling and drying, and the three-way valve is also connected to the steam inlet pipe through a steam pipe to provide steam for the steam bin; multiple valves are arranged horizontally through the steam superheating chamber A steam superheating pipe; a plurality of water heating pipes are arranged transversely through the steam generating chamber; the ends of the steam superheating pipe and the water heating pipe near the steam outlet are connected with a smoke storage bin; the end of the steam superheating pipe away from the steam outlet is connected with a smoke collecting bin, and a smoke conveying pipe is arranged in the smoke collecting bin; a water-cooled grate is installed at the lower part of the furnace through a grate bracket; the water-cooled grate is connected with the water layer, and the water layer is connected with the steam generating chamber of the steam generator through a connecting pipe; an ash discharge port and a furnace door are arranged on the furnace body at the front of the furnace; a secondary combustion chamber is arranged on one side of the furnace; the lower part of the secondary combustion chamber is connected with the furnace through a fire port, the furnace is provided with a primary oxygen inlet, and the secondary combustion chamber is provided with a secondary oxygen inlet; the upper part of the secondary combustion chamber is connected with the end of the water heating pipe away from the steam outlet. The secondary combustion chamber is provided with an ash cleaning port to facilitate cleaning of dust in the secondary combustion chamber. The smoke storage bin is provided with a slag cleaning port to facilitate cleaning of dust in the smoke storage bin.

[0024] The third type of yuba production and forming equipment under normal pressure steam conditions includes a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming;

[0025] The yuba forming device comprises a slurry loading tank and a bracket. The slurry loading tank is in a rectangular shape with an opening at the top, and a plurality of partitions are installed in the slurry loading tank through a card slot. The partitions divide the slurry loading tank into a plurality of forming pools, and the forming pools are arranged in two rows. The slurry loading tank is installed on the bracket. A steam bin is arranged at the bottom of the slurry loading tank, and a steam inlet pipe is installed in the steam bin. The steam inlet pipe extends from one end of the steam bin to the middle of the steam bin. The ends of the steam inlet pipe are respectively connected to a steam distribution pipe extending to the two ends of the steam bin. Steam distribution holes are arranged on both sides of the steam distribution pipe. Steam is introduced into the steam distribution holes of the steam distribution pipe to provide steam for the slurry loading tank for heating and forming. A drainage and steam exhaust port is arranged at the other end of the steam bin. The outside of the slurry loading tank and the steam bin is wrapped with a heat preservation layer to avoid or reduce energy dissipation.

[0026] The reverse-firing normal-pressure superheated steam furnace comprises a furnace seat and a furnace body, which is mounted on the furnace seat; a furnace is arranged in the furnace body, and water layers are arranged on the furnace walls on both sides of the furnace; a water-cooled grate is installed at the lower part of the furnace through a grate bracket; the water-cooled grate is connected to the water layer, and the water layer is connected to the steam generating chamber of the steam generator through a connecting pipe; an ash discharge port and a furnace door are arranged on the furnace body at the front of the furnace; a secondary combustion chamber is arranged on one side of the furnace; the lower part of the secondary combustion chamber is connected to the furnace through a fire port, the furnace is provided with a primary oxygen inlet, and the secondary combustion chamber is provided with a secondary oxygen inlet; a steam generator is arranged at the upper part of the furnace, and a pressure relief valve and a water supply port are arranged on the steam generator; a steam generator is arranged horizontally in the steam generator. A partition is provided to divide the steam generator into a steam superheating chamber and a steam generating chamber from top to bottom; one end of the steam superheating chamber is connected to the steam generating chamber through a steam port, and a steam conduit is provided on the top of the other end of the steam superheating chamber; a three-way valve for distributing and conveying steam is installed on the steam conduit; the three-way valve distributes steam to pulp cooking and drying, and the three-way valve is also connected to the steam inlet pipe through a steam pipe to provide steam for the steam generating chamber; a plurality of steam superheating pipes are transversely arranged in the steam superheating chamber; a plurality of water heating pipes are transversely arranged in the steam generating chamber; one end of the steam superheating pipe and the water heating pipe are connected to a smoke collecting bin, and a smoke conveying pipe is provided in the smoke collecting bin, and the other ends of the steam superheating pipe and the water heating pipe are connected to a secondary combustion chamber. The secondary combustion chamber is provided with an ash cleaning port to facilitate cleaning of dust in the secondary combustion chamber. The smoke collecting bin is provided with a slag cleaning port to facilitate cleaning of dust in the smoke collecting bin.

[0027] Preferably: the smoke conveying pipe is connected to a heat exchanger, a smoke separation chamber is provided at the bottom of the heat exchanger, and the smoke separation chamber is connected to the smoke conveying pipe; the heat exchanger is provided with a hot air chamber; a plurality of heat exchange tubes are vertically penetrated in the hot air chamber; the bottom end of the heat exchange tube is connected to the smoke separation chamber, the top end of the heat exchange tube is connected to a smoke exhaust port, the smoke exhaust port is connected to a smoke pipe for exhausting smoke, and the smoke pipe can be optionally connected to a smoke purification and exhaust device; an air inlet is provided at the lower part of the hot air chamber, and a hot air outlet is provided at the upper part of the hot air chamber; the hot air output from the hot air outlet is transported to the bottom of the steam bin to heat and keep the steam bin warm.

[0028] Preferably: a hot air bin is provided at the bottom of the steam bin, and the hot air bin is provided between the steam bin and the insulation layer at the bottom thereof; a hot air inlet is provided at one end of the hot air bin, and a return air outlet is provided at the other end; the hot air inlet is connected with the hot air outlet through a hot air duct; the return air outlet is connected with the air inlet through the return air duct and the induced draft fan to realize the circulation heating of the hot air; the hot air inlet of the hot air bin introduces hot air to heat and insulate the steam in the steam bin, maintain the steam in the steam bin within a certain temperature range, avoid or reduce the space temperature of the steam bin below the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the stable working temperature of the slurry loading tank. The heating device of the bean curd forming pool adopts a double-layer independent channel design. The upper layer is a steam channel that directly heats the bean curd forming pool. It is characterized by uniform heating and stable and controllable temperature, which avoids the phenomenon of burning the soy milk at the bottom of the bean curd forming pool due to excessive temperature, affecting the quality and output of bean curd; the lower layer is a hot air channel, which is connected to the circulating fan and the steam hot air furnace heat exchanger through the air duct to form a closed-loop circulation, improve the thermal utilization rate of hot air, and reduce energy consumption. The upper steam is heated by hot air (temperature greater than 120℃) to ensure that the space temperature of the upper steam channel is maintained at 100℃~110℃, avoid or reduce the space temperature of the upper steam channel below the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of steam, and meet the working temperature stability of the upper space channel. When the conventional single-layer steam channel uses normal pressure saturated steam, the heating temperature of the bean curd forming pool is low, which is difficult to meet the normal working temperature required for bean curd forming; or in order to meet the normal working temperature required for bean curd forming, a large amount of saturated steam is consumed, resulting in excessive energy consumption.

[0029] Preferably: a burner connection port is arranged on the furnace body corresponding to the furnace chamber, and the burner connection port is arranged to facilitate connection with the burner, and biomass particles, natural gas or fuel oil can be used as fuel to burn and generate heat.

[0030] Preferably, the furnace body is provided with an observation and maintenance opening, which is convenient for observing the working conditions inside the furnace body and for entering for maintenance.

[0031] Preferably: a flue gas cooling water tank is installed on the smoke pipe, and the flue gas cooling water tank is installed between the smoke exhaust port and the smoke purification and discharge device. A water inlet pipe and a hot water outlet pipe are connected to the smoke cooling water tank, and the hot water outlet pipe is connected to the water replenishment port and the pulping tank respectively; hot water is provided for the water replenishment port and the pulping tank. The flue gas cooling water tank comprises a water tank shell with a thermal insulation layer, and the water tank shell with a thermal insulation layer is wrapped around the outside of the smoke pipe. The space between the water tank shell with a thermal insulation layer and the smoke pipe is a water cavity, and the smoke pipe in the water cavity is penetrated by a plurality of water pipes, and the water inlet pipe is arranged at the end of the water cavity close to the smoke exhaust port, and the hot water outlet pipe is arranged at the end of the water cavity far from the smoke exhaust port. The heat of the flue gas is used to exchange heat with water to generate hot water, and the generated hot water is used to supply water to the steam generator through a water pump. By adding hot water, the water replenishment temperature difference is reduced, and the continuous and stable generation of steam is ensured, and the fluctuation of steam pressure is reduced, so as to ensure the stable operation of pulping, forming and drying during the processing of bean curd sheets. At the same time, the utilization rate of thermal energy is improved and fuel consumption is reduced. In the later stage of yuba forming, as the soy milk in the yuba forming pool becomes less, when the slurry depth is less than 10mm, it is difficult to form yuba, so water needs to be replenished. The generated hot water can be used as replenishment to improve the efficiency, yield and quality of yuba forming.

[0032] Preferably, the water-cooled grate is composed of a plurality of transverse grate pipes and longitudinal grate pipes, the transverse grate pipes are arranged at the lower part of the longitudinal grate pipes, the two ends of the longitudinal grate pipes are respectively connected to the water layer through the water collecting pipes, and the two ends of the transverse grate pipes are respectively connected to the water layer. The water-cooled grate adopts this structure for easy disassembly, assembly and maintenance.

[0033] Preferably: two steam inlet pipes are installed in the steam bin, both of which extend from one end of the steam bin to the middle of the steam bin and are arranged symmetrically with respect to the center line of the steam bin, and both ends of the two steam inlet pipes are connected to a steam distribution pipe extending to both ends of the steam bin; the distance between the steam distribution pipes on both sides of the ends of the steam inlet pipes is equal to the distance between the steam distribution pipes and the center line, and is also equal to the distance between the steam distribution pipes and the side wall of the steam bin. When setting the steam distribution holes of the steam distribution pipes on both sides of the steam inlet pipes, the steam distribution holes of the cross section of the steam distribution pipes cannot be opened on the same straight line, but need to be opened staggered.

[0034] Advantages of this yuba production and molding equipment under normal pressure steam conditions:

[0035] 1. The reverse-firing atmospheric pressure superheated steam furnace of the present application adopts reverse-firing secondary combustion technology to realize full combustion of fuel, improve heat conversion efficiency, and eliminate black smoke; water is used as the heating medium, and the heat and heat by-radiation are generated by the primary combustion chamber and the secondary combustion chamber of the reverse-firing atmospheric pressure superheated steam furnace for heat exchange to generate saturated steam, which is then introduced into the heat exchanger, and the heat of the high-temperature flue gas is used to continue to heat the saturated steam, and superheated steam with a temperature greater than 135°C is generated under the condition of a pressure less than 0.1Mpa. The superheated steam is transported to the pulp cooking device for pulp cooking, and the pulp cooking is achieved by steam heating with a temperature greater than 135°C, which increases the heating speed, shortens the pulp cooking time, and solves the problem of long pulp cooking time using atmospheric pressure saturated steam, and improves efficiency. The overheated steam is transported to the steam bin of the bean curd forming device to heat and form the bean curd forming pool. The bean curd forming pool is heated by superheated steam with a temperature greater than 135°C to avoid or reduce the space temperature of the steam channel below the steam dew point, reduce the generation of condensed water, improve the thermal utilization rate of steam, and meet the working temperature stability of the bean curd forming pool; the superheated steam is transported to the steam radiator of the drying room to form hot air, dry the bean curd, reduce the generation of condensed water, increase the drying temperature rise rate, and improve the thermal utilization rate; the structure of this reverse-fired atmospheric pressure superheated steam furnace is made according to the standard of pressure steam boilers and can also be used as a pressure steam boiler. And when used for bean curd production, a reverse-fired atmospheric pressure superheated steam furnace (evaporation capacity 1 ton / hour) can simultaneously provide heat for more than 3 18*1.5m forming tanks and their matching pulp boiling pots and drying bean curd rooms, realizing multi-shift continuous production of bean curd processing.

[0036] 2. A steam inlet pipe is installed in the steam bin of the bean curd forming device. The steam inlet pipe extends from one end of the steam bin to the middle of the steam bin. Both sides of the end of the steam inlet pipe are respectively connected with a steam distribution pipe extending to both ends of the steam bin. Steam distribution holes are arranged on both sides of the steam distribution pipe. Steam is passed through the steam distribution holes of the steam distribution pipe to provide steam for the slurry tank for heating and forming. The characteristics are that the soymilk is heated evenly and the temperature is stable and controllable, so as to avoid the soymilk at the bottom of the bean curd forming pool from being burnt due to excessive temperature, thereby affecting the quality and yield of the bean curd. A drainage and steam exhaust port is arranged at the other end of the steam bin, so as to remove condensed water and steam, so as to avoid the steam bin from forming a pressure container and causing safety hazards and accidents.

[0037] 3. This reverse-firing normal-pressure superheated steam furnace generates superheated steam under normal pressure, which can meet the large-scale production of bean curd sheets (boiling, forming, and drying). A reverse-firing normal-pressure superheated steam furnace can meet the heat energy supply for boiling, forming, and drying of bean curd sheets. Compared with normal-pressure steam furnaces, it has high thermal efficiency and low energy consumption. Normal-pressure steam furnaces refer to steam furnaces with a steam outlet pressure of ≤0.1Mpa. Compared with pressurized steam boilers, this reverse-firing normal-pressure superheated steam furnace (normal pressure, i.e., non-pressurized) has fewer safety hazards, lower technical requirements for design, manufacturing, and use, is safer and more convenient for users to use, and has lower operating costs.

[0038] 4. This equipment can also use the heat of flue gas to exchange heat with water to generate hot water. The generated hot water is used to supply water to the steam generator through a water pump. By adding hot water, the temperature difference of water replenishment is reduced, and the continuous and stable generation of steam is ensured, the fluctuation of steam pressure is reduced, and the stable operation of pulping, forming and drying during the processing of yuba is ensured. At the same time, the utilization rate of thermal energy is improved and fuel consumption is reduced. In the later stage of yuba forming, as the soy milk in the yuba forming pool becomes less, when the pulp depth is less than 10mm, yuba forming is difficult, so water replenishment is required. The generated hot water can be used as a supplement, which can improve the efficiency, output and quality of yuba forming.

[0039] 5. The bean curd forming device can adopt a double-layer independent channel design. The upper layer is a steam warehouse that directly heats the bean curd forming pool. It is characterized by uniform heating, stable and controllable temperature, and avoids the phenomenon of burning the soybean milk at the bottom of the bean curd forming pool due to excessive temperature, which affects the quality and output of bean curd. The lower layer is a hot air warehouse, which is connected to the induced draft fan and heat exchanger through the return air duct to form a closed-loop circulation, improve the thermal utilization rate of hot air, and reduce energy consumption. Use hot air (temperature greater than 120℃) to heat and insulate the upper steam to ensure that the space temperature of the upper steam channel is maintained at 100℃~110℃, avoid the space temperature of the upper steam channel being lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of steam, and meet the working temperature stability of the upper space channel. Solve the problem that when the conventional single-layer steam channel uses normal pressure saturated steam, the heating temperature of the bean curd forming pool is low, which is difficult to meet the normal working temperature required for bean curd forming; or in order to meet the normal working temperature required for bean curd forming, a large amount of saturated steam is required, resulting in excessive energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 is a schematic structural diagram of the reverse-firing atmospheric-pressure superheated steam furnace in Example 2;

[0041] Figure 2 yes Figure 1 A top view connection diagram;

[0042] Figure 3 yes Figure 1 Schematic diagram of the left side;

[0043] Figure 4 yes Figure 3 AA direction schematic diagram;

[0044] Figure 5 yes Figure 1 BB direction schematic diagram;

[0045] Figure 6 It is a schematic diagram of the three-dimensional structure of a reverse-firing atmospheric pressure superheated steam furnace;

[0046] Figure 7 It is a schematic diagram of the connection structure of the yuba production and molding equipment under normal pressure steam conditions;

[0047] Figure 8 It is a structural schematic diagram of a yuba forming device;

[0048] Fig. 9 yes Figure 8 A top view schematic diagram of

[0049] Fig.10 yes Fig. 9 The CC direction diagram in the figure;

[0050] Fig.11 is a schematic structural diagram of the reverse-firing atmospheric-pressure superheated steam furnace in Example 5;

[0051] Fig.12 yes Fig.11 Schematic diagram of the left side;

[0052] Fig.13 yes Fig.11 DD direction schematic diagram;

[0053] Fig.14 yes Fig.12 EE connection diagram;

[0054] Fig.15 is a schematic structural diagram of the reverse-firing atmospheric-pressure superheated steam furnace in Example 8;

[0055] Fig.16 yes Fig.15 Schematic diagram of the left side;

[0056] Fig.17 yes Fig.15 FF direction schematic diagram;

[0057] Fig.18 yes Fig.16 Schematic diagram of GG connection;

[0058] The names of the parts with serial numbers in the figure are:

[0059] 1. Furnace base, 2. Ash removal port, 3. Secondary combustion chamber, 4. Ash discharge port, 5. Primary oxygen inlet, 6. Furnace door, 7. Furnace, 8. Furnace body, 9. Steam generator, 10. Pressure relief valve, 11. Steam duct, 12. Three-way valve, 13. Smoke bin, 14. Smoke exhaust port, 15. Hot air outlet, 16. Air inlet, 17. Steam outlet, 18. Heat exchanger, 19. Slag removal port, 20. Secondary oxygen inlet, 21. Observation and maintenance port, 22. Burner connection port, 23. Water supply port, 24. Water heating pipe, 25. Grate mounting frame, 26. Water collecting pipe, 27. Longitudinal grate pipe, 28. Horizontal grate pipe, 29. Fire port, 30. Connecting pipe, 31. Water layer, 32. Smoke separation chamber, 33. Heat Exchange tube, 34, steam superheating chamber, 35, hot air chamber, 36, flue gas purification and emission device, 37, flue gas cooling water tank, 38, hot water outlet pipe, 39, induced draft fan, 40, hot air pipe, 41, steam pipe, 42, hot air inlet, 43, steam inlet pipe, 44, hot air bin, 45, steam bin, 46, slurry loading trough, 47, drainage and steam outlet, 48, return air outlet, 49, return air duct, 50, water inlet pipe, 51, bracket, 52, partition, 53, slot, 54, steam pipe, 55, steam hole, 56, insulation layer, 57, water tank shell with insulation layer, 58, smoke pipe, 59, water pipe, 60, smoke collecting bin, 61, steam generating chamber, 62, partition, 63, steam superheating pipe, 64, steam outlet. DETAILED DESCRIPTION

[0060] In order to make the technical solution and advantages of the present application clearer, the technical solution of the yuba production and molding equipment under normal pressure steam conditions is clearly and completely described below in combination with the embodiments and drawings.

[0061] Example 1

[0062] A yuba production and forming device under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming;

[0063] The yuba forming device comprises a slurry loading tank 46 and a bracket 51. The slurry loading tank 46 is in a rectangular shape with an opening at the top, and a plurality of partitions 52 are installed in the slurry loading tank 46 through a slot 53. The partitions 52 divide the slurry loading tank 46 into a plurality of forming pools, and the forming pools are arranged in two rows. The slurry loading tank 46 is installed on the bracket 51. A steam bin 45 is arranged at the bottom of the slurry loading tank 46, and a steam inlet pipe 43 is installed in the steam bin 45. The steam inlet pipe 43 extends from one end of the steam bin 45 to the middle of the steam bin 45, and the end of the steam inlet pipe 43 is The two sides are respectively connected with a steam distribution pipe 54 extending to the two ends of the steam bin 45, and steam distribution holes 55 are arranged on both sides of the steam distribution pipe 54. Steam is introduced into the steam distribution holes 55 of the steam distribution pipe 54 to provide steam for the slurry tank 46 for heating and forming. The other end of the steam bin 45 is provided with a drainage and steam exhaust port 47; the outside of the steam bin 45 is wrapped with a heat preservation layer 56; when the steam distribution holes 55 are arranged on the steam distribution pipe 54 on both sides of the steam inlet pipe 43, the steam distribution holes 55 of the cross section of the steam distribution pipe 54 cannot be opened on the same straight line, but need to be opened staggered;

[0064] The reverse-firing atmospheric-pressure superheated steam furnace comprises a furnace seat 1 and a furnace body 8, which is mounted on the furnace seat 1; a furnace 7 is arranged in the furnace body 8, and water layers 31 are arranged on the furnace walls on both sides of the furnace 7; a steam generator 9 is arranged on the upper part of the furnace 7, and a pressure relief valve 10 and a water replenishment port 23 are arranged on the steam generator 9; a plurality of water heating pipes 24 are arranged transversely through the steam generator 9; a water-cooled grate is installed at the lower part of the furnace 7 through a grate mounting frame 25; the water-cooled grate is connected to the water layer 31, and the water layer 31 is connected to the steam generator 9 through a connecting pipe 30; an ash discharge port 4 and a furnace door 6 are arranged on the furnace body 8 at the front of the furnace 7; a secondary combustion chamber 3 and a smoke warehouse 13 are arranged on both sides of the furnace 7 respectively; the lower part of the secondary combustion chamber 3 is connected to the furnace 7 through a fire port 29, the furnace 7 is provided with a primary oxygen inlet 5, and the secondary combustion chamber 3 is provided with a secondary oxygen inlet 20; the upper part of the secondary combustion chamber 3 The upper part of the heat exchanger 18 is connected with one end of the water heating pipe 24, and the other end of the water heating pipe 24 is connected with the upper part of the smoke warehouse 13; a heat exchanger 18 is arranged on one side of the smoke warehouse 13; a smoke separation chamber 32 is arranged at the bottom of the heat exchanger 18, and the smoke separation chamber 32 is connected with the lower part of the smoke warehouse 13; a plurality of heat exchange pipes 33 are vertically penetrated in the heat exchanger 18; the bottom end of the heat exchange pipe 33 is connected with the smoke separation chamber 32, and the top end of the heat exchange pipe 33 is connected with the smoke exhaust port 14, and the smoke exhaust port 14 is connected with the smoke purification and emission device 36 through the smoke pipe; a steam superheating chamber 34 is arranged in the heat exchanger 18, and the lower part of the steam superheating chamber 34 is connected with the top of the steam generator 9 through the steam conduit 11; a three-way valve 12 for distributing and transporting steam is installed on the steam conduit 11; a steam outlet 17 is arranged at the upper part of the steam superheating chamber 34; the steam outlet 17 is connected with the steam inlet pipe 43 through the steam pipe 41. The secondary combustion chamber 3 is provided with an ash cleaning port 2. The smoke separation chamber 32 is provided with a slag cleaning port 19.

[0065] Example 2

[0066] A yuba production and forming device under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming;

[0067] The yuba forming device comprises a slurry loading tank 46 and a bracket 51. The slurry loading tank 46 is in a rectangular shape with an opening at the top, and a plurality of partitions 52 are installed in the slurry loading tank 46 through a slot 53. The partitions 52 divide the slurry loading tank 46 into a plurality of forming pools, and the forming pools are arranged in two rows. The slurry loading tank 46 is installed on the bracket 51. A steam bin 45 is arranged at the bottom of the slurry loading tank 46, and a steam inlet pipe 43 is installed in the steam bin 45. The steam inlet pipe 43 extends from one end of the steam bin 45 to the middle of the steam bin 45, and the end of the steam inlet pipe 43 is The two sides are respectively connected with a steam distribution pipe 54 extending to the two ends of the steam bin 45, and steam distribution holes 55 are arranged on both sides of the steam distribution pipe 54. Steam is introduced into the steam distribution holes 55 of the steam distribution pipe 54 to provide steam for the slurry tank 46 for heating and forming. The other end of the steam bin 45 is provided with a drainage and steam exhaust port 47; the outside of the steam bin 45 is wrapped with a heat preservation layer 56; when the steam distribution holes 55 are arranged on the steam distribution pipe 54 on both sides of the steam inlet pipe 43, the steam distribution holes 55 of the cross section of the steam distribution pipe 54 cannot be opened on the same straight line, but need to be opened staggered;

[0068] The reverse-firing atmospheric superheated steam furnace comprises a furnace seat 1 and a furnace body 8, wherein the furnace body 8 is mounted on the furnace seat 1; a furnace 7 is arranged in the furnace body 8, and water layers 31 are arranged on the furnace walls on both sides of the furnace 7; a steam generator 9 is arranged on the upper part of the furnace 7, and a pressure relief valve 10 and a water replenishment port 23 are arranged on the steam generator 9; a plurality of water heating pipes 24 are arranged transversely through the steam generator 9; a water-cooled grate is installed at the lower part of the furnace 7 through a grate mounting frame 25; The cold grate is connected to the water layer 31, and the water layer 31 is connected to the steam generator 9 through the connecting pipe 30; the furnace body 8 at the front of the furnace 7 is provided with an ash discharge port 4 and a furnace door 6; the two sides of the furnace 7 are respectively provided with a secondary combustion chamber 3 and a smoke gas storage 13; the lower part of the secondary combustion chamber 3 is connected to the furnace 7 through the fire port 29, the furnace 7 is provided with a primary oxygen inlet 5, and the secondary combustion chamber 3 is provided with a secondary oxygen inlet 20; the upper part of the secondary combustion chamber 3 is connected to the water heating pipe 24 is connected, and the other end of the water heating pipe 24 is connected to the upper part of the smoke warehouse 13; a heat exchanger 18 is arranged on one side of the smoke warehouse 13; a smoke separation chamber 32 is arranged at the bottom of the heat exchanger 18, and the smoke separation chamber 32 is connected to the lower part of the smoke warehouse 13; a plurality of heat exchange tubes 33 are vertically penetrated in the heat exchanger 18; the bottom end of the heat exchange tube 33 is connected to the smoke separation chamber 32, and the top end of the heat exchange tube 33 is connected to the smoke exhaust port 14, and the smoke exhaust port 14 is connected to a smoke pipe for discharging smoke, and the smoke pipe can be optionally connected to a smoke purification and emission device 36; a steam superheating chamber 34 is arranged in the heat exchanger 18, and the lower part of the steam superheating chamber 34 is connected to the top of the steam generator 9 through the steam conduit 11; a three-way valve 12 for distributing and transporting steam is installed on the steam conduit 11; a steam outlet 17 is arranged at the upper part of the steam superheating chamber 34; the steam outlet 17 is connected to the steam inlet pipe 43 through the steam pipe 41. The secondary combustion chamber 3 is provided with an ash cleaning port 2. The smoke separation chamber 32 is provided with a slag cleaning port 19.

[0069] The heat exchanger 18 is also provided with a hot air chamber 35; the hot air chamber 35 is provided at the upper part of the steam superheating chamber 34, the lower part of the hot air chamber 35 is provided with an air inlet 16, and the upper part of the hot air chamber 35 is provided with a hot air outlet 15; the hot air outputted from the hot air outlet 15 is transported to the bottom of the steam bin 45 to heat and keep the steam bin 45 warm. The shell of the heat exchanger 18 is cylindrical or elliptical, and the heat exchanger 18 is divided into a steam superheating chamber 34 and a hot air chamber 35 at the upper and lower parts; the heat exchange pipe 33 passes through the steam superheating chamber 34 and the hot air chamber 35; the steam conduit 11, the steam outlet 17, the air inlet 16 and the hot air outlet 15 are all connected to the cylindrical surface of the heat exchanger 18 in a tangential manner. A hot air bin 44 is provided at the bottom of the steam bin 45, and the hot air bin 44 is provided between the steam bin 45 and the insulation layer at the bottom thereof; a hot air inlet 42 is provided at one end of the hot air bin 44, and a return air outlet 48 is provided at the other end; the hot air inlet 42 is connected with the hot air outlet 14 through a hot air pipe 40; the return air outlet 48 is connected with the air inlet 16 through a return air pipe 49 and an induced draft fan 39, so as to realize the circulation heating of the hot air; the hot air inlet 42 of the hot air bin 44 introduces hot air to heat and insulate the steam in the steam bin 45, and maintain the steam in the steam bin 45 at 100°C to 110°C, so as to avoid or reduce the space temperature of the steam bin 45 to be lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the working temperature stability of the slurry tank 46.

[0070] A burner connection port 22 is provided on the furnace body 8 corresponding to the furnace chamber 7. The burner connection port 22 is convenient for connection with the burner, and can use biomass particles, natural gas or fuel oil as fuel to burn and generate heat.

[0071] The furnace body 8 is also provided with an observation and maintenance opening 21, which is convenient for observing the working conditions inside the furnace body 8 and for entering for maintenance.

[0072] The smoke pipe is equipped with a smoke cooling water tank 37, which is installed between the smoke exhaust port 14 and the smoke purification and discharge device 36. The smoke cooling water tank 37 is connected with a water inlet pipe 50 and a hot water outlet pipe 38, which are respectively connected to the water replenishment port 23 and the slurry tank 46 to provide hot water for the water replenishment port 23 and the slurry tank 46. The smoke cooling water tank 37 includes a water tank shell 57 with a thermal insulation layer, which is wrapped around the outside of the smoke pipe 58. The space between the water tank shell 57 with a thermal insulation layer and the smoke pipe 58 is a water cavity, and the smoke pipe 58 in the water cavity is penetrated by multiple water pipes 59. The water inlet pipe 50 is arranged at the end of the water cavity close to the smoke exhaust port 14, and the hot water outlet pipe 38 is arranged at the end of the water cavity away from the smoke exhaust port 14.

[0073] The water-cooled grate is composed of a plurality of transverse grate pipes 28 and longitudinal grate pipes 27. The transverse grate pipes 28 are arranged at the lower part of the longitudinal grate pipes 27. Both ends of the longitudinal grate pipes 27 are connected to the water layer 31 through the water collecting pipes 26, and both ends of the transverse grate pipes 28 are connected to the water layer 31.

[0074] Example 3

[0075] A yuba production and forming device under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming;

[0076] The yuba forming device comprises a slurry loading tank 46 and a bracket 51. The slurry loading tank 46 is in a rectangular shape with an upper opening, and a plurality of partitions 52 are installed in the slurry loading tank through a slot 53. The partitions 52 divide the slurry loading tank 46 into a plurality of forming pools, and the forming pools are arranged in two rows. The slurry loading tank 46 is installed on the bracket 51. A steam chamber 45 is arranged at the bottom of the slurry loading tank 46.

[0077] Two steam inlet pipes 43 are installed in the steam bin 45. The two steam inlet pipes 43 extend from one end of the steam bin 45 to the middle of the steam bin 45 and are arranged symmetrically with respect to the center line of the steam bin 45. The ends of the two steam inlet pipes 43 are connected to a steam distribution pipe 54 extending to both ends of the steam bin 45 on both sides. The distance a between the steam distribution pipes 54 on both sides of the ends of the steam inlet pipes 43 is equal to the distance a between the steam distribution pipes 54 and the center line, and is equal to the distance a between the steam distribution pipes 54 and the steam bin. The spacing a between the side walls of 45 is also equal; steam distribution holes 55 are arranged on both sides of the steam distribution pipe 54, and steam is introduced into the steam distribution holes 55 of the steam distribution pipe 54 to provide steam for the slurry tank 46 for heating and forming, and a drainage and steam exhaust port 47 is arranged at the other end of the steam bin 45; the outside of the steam bin 45 is wrapped with a heat preservation layer 56; when the steam distribution holes 55 are arranged on the steam distribution pipes 54 on both sides of the steam inlet pipe 43, the steam distribution holes 55 of the cross section of the steam distribution pipe 54 cannot be opened on the same straight line, and need to be opened in a staggered manner;

[0078] The reverse-firing atmospheric-pressure superheated steam furnace comprises a furnace seat 1 and a furnace body 8, which is mounted on the furnace seat 1; a furnace 7 is arranged in the furnace body 8, and water layers 31 are arranged on the furnace walls on both sides of the furnace 7; a steam generator 9 is arranged on the upper part of the furnace 7, and a pressure relief valve 10 and a water replenishment port 23 are arranged on the steam generator 9; a plurality of water heating pipes 24 are arranged transversely through the steam generator 9; a water-cooled grate is installed at the lower part of the furnace 7 through a grate mounting frame 25; the water-cooled grate is connected to the water layer 31, and the water layer 31 is connected to the steam generator 9 through a connecting pipe 30; an ash discharge port 4 and a furnace door 6 are arranged on the furnace body 8 at the front of the furnace 7; a secondary combustion chamber 3 and a smoke warehouse 13 are respectively arranged on both sides of the furnace 7; the lower part of the secondary combustion chamber 3 is connected to the furnace 7 through a fire port 29, the furnace 7 is provided with a primary oxygen inlet 5, and the secondary combustion chamber 3 is provided with a secondary oxygen inlet 20; The upper part of the chamber 3 is connected with one end of the water heating pipe 24, and the other end of the water heating pipe 24 is connected with the upper part of the smoke warehouse 13; a heat exchanger 18 is arranged on one side of the smoke warehouse 13; a smoke separation chamber 32 is arranged at the bottom of the heat exchanger 18, and the smoke separation chamber 32 is connected with the lower part of the smoke warehouse 13; a plurality of heat exchange tubes 33 are vertically penetrated in the heat exchanger 18; the bottom end of the heat exchange tube 33 is connected with the smoke separation chamber 32, and the top end of the heat exchange tube 33 is connected with the smoke exhaust port 14, and the smoke exhaust port 14 is connected with the smoke pipe for discharging smoke; a steam superheating chamber 34 is arranged in the heat exchanger 18, and the lower part of the steam superheating chamber 34 is connected with the top of the steam generator 9 through the steam conduit 11; a three-way valve 12 for distributing and transporting steam is installed on the steam conduit 11; a steam outlet 17 is arranged at the upper part of the steam superheating chamber 34; the steam outlet 17 is connected with the steam inlet pipe 43 through the steam pipe 41. The secondary combustion chamber 3 is provided with an ash cleaning port 2. The smoke separation chamber 32 is provided with a slag cleaning port 19.

[0079] The heat exchanger 18 is also provided with a hot air chamber 35; the hot air chamber 35 is provided at the upper part of the steam superheating chamber 34, the lower part of the hot air chamber 35 is provided with an air inlet 16, and the upper part of the hot air chamber 35 is provided with a hot air outlet 15; the hot air outputted from the hot air outlet 15 is transported to the bottom of the steam bin 45 to heat and keep the steam bin 45 warm. The shell of the heat exchanger 18 is cylindrical or elliptical, and the heat exchanger 18 is divided into a steam superheating chamber 34 and a hot air chamber 35 at the upper and lower parts; the heat exchange pipe 33 passes through the steam superheating chamber 34 and the hot air chamber 35; the steam conduit 11, the steam outlet 17, the air inlet 16 and the hot air outlet 15 are all connected to the cylindrical surface of the heat exchanger 18 in a tangential manner. A hot air bin 44 is provided at the bottom of the steam bin 45, and the hot air bin 44 is provided between the steam bin 45 and the insulation layer at the bottom thereof; a hot air inlet 42 is provided at one end of the hot air bin 44, and a return air outlet 48 is provided at the other end; the hot air inlet 42 is connected with the hot air outlet 14 through a hot air pipe 40; the return air outlet 48 is connected with the air inlet 16 through a return air pipe 49 and an induced draft fan 39, so as to realize the circulation heating of the hot air; the hot air inlet 42 of the hot air bin 44 introduces hot air to heat and insulate the steam in the steam bin 45, and maintain the steam in the steam bin 45 at 100°C to 110°C, so as to avoid or reduce the space temperature of the steam bin 45 to be lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the working temperature stability of the slurry tank 46.

[0080] A burner connection port 22 is provided on the furnace body 8 corresponding to the furnace chamber 7. The burner connection port 22 is convenient for connection with the burner, and can use biomass particles, natural gas or fuel oil as fuel to burn and generate heat.

[0081] The furnace body 8 is also provided with an observation and maintenance opening 21, which is convenient for observing the working conditions inside the furnace body 8 and for entering for maintenance.

[0082] The smoke pipe is equipped with a smoke cooling water tank 37, which is installed between the smoke exhaust port 14 and the smoke purification and discharge device 36. The smoke cooling water tank 37 is connected with a water inlet pipe 50 and a hot water outlet pipe 38, which are respectively connected to the water replenishment port 23 and the slurry tank 46 to provide hot water for the water replenishment port 23 and the slurry tank 46. The smoke cooling water tank 37 includes a water tank shell 57 with a thermal insulation layer, which is wrapped around the outside of the smoke pipe 58. The space between the water tank shell 57 with a thermal insulation layer and the smoke pipe 58 is a water cavity, and the smoke pipe 58 in the water cavity is penetrated by multiple water pipes 59. The water inlet pipe 50 is arranged at the end of the water cavity close to the smoke exhaust port 14, and the hot water outlet pipe 38 is arranged at the end of the water cavity away from the smoke exhaust port 14.

[0083] The water-cooled grate is composed of a plurality of transverse grate pipes 28 and longitudinal grate pipes 27. The transverse grate pipes 28 are arranged at the lower part of the longitudinal grate pipes 27. Both ends of the longitudinal grate pipes 27 are connected to the water layer 31 through the water collecting pipes 26, and both ends of the transverse grate pipes 28 are connected to the water layer 31.

[0084] Example 4

[0085] A yuba production and forming device under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming; the yuba forming device comprises a slurry tank 46 and a bracket 51, wherein the slurry tank 46 is in a rectangular shape with an upper opening, wherein a plurality of partitions 52 are installed through a card slot 53, wherein the partitions 52 divide the slurry tank 46 into a plurality of forming pools, wherein the forming pools are arranged in two rows; the slurry tank 46 is installed on the bracket 51; the bottom of the slurry tank 46 is provided with a plurality of partitions 52, wherein the partitions 52 divide the slurry tank 46 into a plurality of forming pools, and the forming pools are arranged in two rows; the slurry tank 46 is installed on the bracket 51; A steam bin 45 is provided in the part, and a steam inlet pipe 43 is installed in the steam bin 45. The steam inlet pipe 43 extends from one end of the steam bin 45 to the middle of the steam bin 45. The ends of the steam inlet pipe 43 are respectively connected to a steam distribution pipe 54 extending to both ends of the steam bin 45. Steam distribution holes 55 are provided on both sides of the steam distribution pipe 54. Steam is passed through the steam distribution holes 55 of the steam distribution pipe 54 to provide steam for the slurry tank 46 for heating and forming. A drainage and steam exhaust port 47 is provided at the other end of the steam bin 45; the outside of the steam bin 45 is wrapped with a heat preservation layer 56;

[0086] The reverse-firing normal-pressure superheated steam furnace comprises a furnace seat 1 and a furnace body 8, and the furnace body 8 is mounted on the furnace seat 1; a furnace 7 is arranged in the furnace body 8, and water layers 31 are arranged on the furnace walls on both sides of the furnace 7; a steam generator 9 is arranged on the upper part of the furnace 7, and a pressure relief valve 10 and a water replenishment port 23 are arranged on the steam generator 9; a partition 62 is arranged horizontally in the steam generator 9 to divide the upper and lower parts of the steam generator 9 into a steam superheating chamber 34 and a steam generating chamber 61; one end of the steam superheating chamber 34 is connected to the steam generating chamber 61 through a steam port 64, and a steam conduit 11 is arranged on the top of the other end of the steam superheating chamber 34; a three-way valve 12 is installed on the steam conduit 11; the three-way valve 12 distributes steam to pulp cooking and drying, and the three-way valve 12 is also connected to the steam inlet pipe 43 through the steam pipe 41 to provide steam for the steam bin 45; a plurality of steam pipes are arranged horizontally through the steam superheating chamber 34 Steam overheating pipe 63; a plurality of water heating pipes 24 are arranged transversely through the steam generating chamber 61; the ends of the steam overheating pipe 63 and the water heating pipe 24 near the steam outlet 64 are connected with a smoke storage bin 13; the end of the steam overheating pipe 63 away from the steam outlet 64 is connected with a smoke collecting bin 60, and the smoke collecting bin 60 is provided with a smoke conveying pipe; a water-cooling grate is installed at the lower part of the furnace 7 through a grate bracket 25; the water-cooling grate is connected with the water layer 31, and the water layer 31 is connected with the steam generating chamber 61 of the steam generator 9 through a connecting pipe 30; an ash discharge port 4 and a furnace door 6 are arranged on the furnace body 8 at the front of the furnace 7; a secondary combustion chamber 3 is arranged on one side of the furnace 7; the lower part of the secondary combustion chamber 3 is connected with the furnace 7 through the fire port 29, the furnace 7 is provided with a primary oxygen inlet 5, and the secondary combustion chamber 3 is provided with a secondary oxygen inlet 20; the upper part of the secondary combustion chamber 3 is connected with the end of the water heating pipe 24 away from the steam outlet 64. The secondary combustion chamber 3 is provided with an ash cleaning port 2. The smoke storage bin 13 is provided with a slag cleaning port 19.

[0087] A burner connection port 22 is provided on the furnace body 8 corresponding to the furnace chamber 7. The burner connection port 22 is convenient for connection with the burner, and can use biomass particles, natural gas or fuel oil as fuel to burn and generate heat.

[0088] The furnace body 8 is also provided with an observation and maintenance opening 21, which is convenient for observing the working conditions inside the furnace body 8 and for entering for maintenance.

[0089] The water-cooled grate is composed of a plurality of transverse grate pipes 28 and longitudinal grate pipes 27. The transverse grate pipes 28 are arranged at the lower part of the longitudinal grate pipes 27. Both ends of the longitudinal grate pipes 27 are connected to the water layer 31 through the water collecting pipes 26, and both ends of the transverse grate pipes 28 are connected to the water layer 31.

[0090] Example 5

[0091] A yuba production and forming device under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming; the yuba forming device comprises a slurry tank 46 and a bracket 51, wherein the slurry tank 46 is in a rectangular shape with an upper opening, wherein a plurality of partitions 52 are installed through a card slot 53, wherein the partitions 52 divide the slurry tank 46 into a plurality of forming pools, wherein the forming pools are arranged in two rows; the slurry tank 46 is installed on the bracket 51; the bottom of the slurry tank 46 is provided with a plurality of partitions 52, wherein the partitions 52 divide the slurry tank 46 into a plurality of forming pools, and the forming pools are arranged in two rows; the slurry tank 46 is installed on the bracket 51; A steam bin 45 is provided in the part, and a steam inlet pipe 43 is installed in the steam bin 45. The steam inlet pipe 43 extends from one end of the steam bin 45 to the middle of the steam bin 45. The ends of the steam inlet pipe 43 are respectively connected to a steam distribution pipe 54 extending to both ends of the steam bin 45. Steam distribution holes 55 are provided on both sides of the steam distribution pipe 54. Steam is passed through the steam distribution holes 55 of the steam distribution pipe 54 to provide steam for the slurry tank 46 for heating and forming. A drainage and steam exhaust port 47 is provided at the other end of the steam bin 45; the outside of the steam bin 45 is wrapped with a heat preservation layer 56;

[0092] The reverse-firing normal-pressure superheated steam furnace comprises a furnace seat 1 and a furnace body 8, and the furnace body 8 is mounted on the furnace seat 1; a furnace 7 is arranged in the furnace body 8, and water layers 31 are arranged on the furnace walls on both sides of the furnace 7; a steam generator 9 is arranged on the upper part of the furnace 7, and a pressure relief valve 10 and a water replenishment port 23 are arranged on the steam generator 9; a partition 62 is arranged horizontally in the steam generator 9 to divide the upper and lower parts of the steam generator 9 into a steam superheating chamber 34 and a steam generating chamber 61; one end of the steam superheating chamber 34 is connected to the steam generating chamber 61 through a steam port 64, and a steam conduit 11 is arranged on the top of the other end of the steam superheating chamber 34; a three-way valve 12 is installed on the steam conduit 11; the three-way valve 12 distributes steam to pulp cooking and drying, and the three-way valve 12 is also connected to the steam inlet pipe 43 through the steam pipe 41 to provide steam for the steam bin 45; a plurality of steam pipes are arranged horizontally through the steam superheating chamber 34 Steam overheating pipe 63; a plurality of water heating pipes 24 are arranged transversely through the steam generating chamber 61; the ends of the steam overheating pipe 63 and the water heating pipe 24 near the steam outlet 64 are connected with a smoke storage bin 13; the end of the steam overheating pipe 63 away from the steam outlet 64 is connected with a smoke collecting bin 60, and the smoke collecting bin 60 is provided with a smoke conveying pipe; a water-cooling grate is installed at the lower part of the furnace 7 through a grate bracket 25; the water-cooling grate is connected with the water layer 31, and the water layer 31 is connected with the steam generating chamber 61 of the steam generator 9 through a connecting pipe 30; an ash discharge port 4 and a furnace door 6 are arranged on the furnace body 8 at the front of the furnace 7; a secondary combustion chamber 3 is arranged on one side of the furnace 7; the lower part of the secondary combustion chamber 3 is connected with the furnace 7 through the fire port 29, the furnace 7 is provided with a primary oxygen inlet 5, and the secondary combustion chamber 3 is provided with a secondary oxygen inlet 20; the upper part of the secondary combustion chamber 3 is connected with the end of the water heating pipe 24 away from the steam outlet 64. The secondary combustion chamber 3 is provided with an ash cleaning port 2. The smoke storage bin 13 is provided with a slag cleaning port 19.

[0093] The smoke conveying pipe is connected to the heat exchanger 18, and a smoke separation chamber 32 is arranged at the bottom of the heat exchanger 18, and the smoke separation chamber 32 is connected to the smoke conveying pipe; the heat exchanger 18 is provided with a hot air chamber 35; a plurality of heat exchange tubes 33 are vertically penetrated in the hot air chamber 35; the bottom end of the heat exchange tube 33 is connected to the smoke separation chamber 32, and the top end of the heat exchange tube 33 is connected to the smoke exhaust port 14, and the smoke exhaust port 14 is connected to the smoke purification and discharge device 36 through the smoke pipe; the lower part of the hot air chamber 35 is provided with an air inlet 16, and the upper part of the hot air chamber 35 is provided with a hot air outlet 15; the hot air output from the hot air outlet 15 is transported to the bottom of the steam bin 45 to heat and keep the steam bin 45 warm. A hot air bin 44 is provided at the bottom of the steam bin 45, and the hot air bin 44 is provided between the steam bin 45 and the insulation layer at the bottom thereof; a hot air inlet 42 is provided at one end of the hot air bin 44, and a return air outlet 48 is provided at the other end; the hot air inlet 42 is connected with the hot air outlet 14 through a hot air pipe 40; the return air outlet 48 is connected with the air inlet 16 through a return air pipe 49 and an induced draft fan 39, so as to realize the circulation heating of the hot air; the hot air inlet 42 of the hot air bin 44 introduces hot air to heat and insulate the steam in the steam bin 45, and maintain the steam in the steam bin 45 at 100°C to 110°C, so as to avoid or reduce the space temperature of the steam bin 45 to be lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the working temperature stability of the slurry tank 46.

[0094] A burner connection port 22 is provided on the furnace body 8 corresponding to the furnace chamber 7. The burner connection port 22 is convenient for connection with the burner, and can use biomass particles, natural gas or fuel oil as fuel to burn and generate heat.

[0095] The furnace body 8 is also provided with an observation and maintenance opening 21, which is convenient for observing the working conditions inside the furnace body 8 and for entering for maintenance.

[0096] The smoke pipe is equipped with a smoke cooling water tank 37, which is installed between the smoke exhaust port 14 and the smoke purification and discharge device 36. The smoke cooling water tank 37 is connected with a water inlet pipe 50 and a hot water outlet pipe 38, which are respectively connected to the water replenishment port 23 and the slurry tank 46 to provide hot water for the water replenishment port 23 and the slurry tank 46. The smoke cooling water tank 37 includes a water tank shell 57 with a thermal insulation layer, which is wrapped around the outside of the smoke pipe 58. The space between the water tank shell 57 with a thermal insulation layer and the smoke pipe 58 is a water cavity, and the smoke pipe 58 in the water cavity is penetrated by multiple water pipes 59. The water inlet pipe 50 is arranged at the end of the water cavity close to the smoke exhaust port 14, and the hot water outlet pipe 38 is arranged at the end of the water cavity away from the smoke exhaust port 14.

[0097] The water-cooled grate is composed of a plurality of transverse grate pipes 28 and longitudinal grate pipes 27. The transverse grate pipes 28 are arranged at the lower part of the longitudinal grate pipes 27. Both ends of the longitudinal grate pipes 27 are connected to the water layer 31 through the water collecting pipes 26, and both ends of the transverse grate pipes 28 are connected to the water layer 31.

[0098] Example 6

[0099] A bean curd stick production and forming device under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a bean curd stick forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the bean curd stick forming device for heating and forming; the bean curd stick forming device comprises a slurry loading tank 46 and a bracket 51, wherein the slurry loading tank 46 is in a rectangular shape with an upper opening, wherein a plurality of partitions 52 are installed in the slurry loading tank through a slot 53, wherein the partitions 52 divide the slurry loading tank 46 into a plurality of forming pools, wherein the forming pools are arranged in two rows; the slurry loading tank 46 is installed on the bracket 51; and a steam bin 45 is arranged at the bottom of the slurry loading tank 46;

[0100] Two steam inlet pipes 43 are installed in the steam bin 45. The two steam inlet pipes 43 extend from one end of the steam bin 45 to the middle of the steam bin 45 and are symmetrically arranged with respect to the center line of the steam bin 45. The ends of the two steam inlet pipes 43 are respectively connected with a steam distribution pipe 54 extending to the two ends of the steam bin 45. The spacing a between the steam distribution pipes 54 on both sides of the ends of the steam inlet pipes 43 is equal to the spacing a between the steam distribution pipes 54 and the center line, and is also equal to the spacing a between the steam distribution pipes 54 and the side wall of the steam bin 45. Steam distribution holes 55 are arranged on both sides of the steam distribution pipes 54. The steam distribution holes 55 of the steam distribution pipes 54 pass steam to provide steam for the slurry tank 46 for heating and forming. When the steam distribution holes 55 are arranged, the steam distribution holes 55 of the steam distribution pipes 54 cannot be opened on the same straight line, but need to be opened staggered. A water drainage and steam exhaust port 47 is arranged at the other end of the steam bin 45. The outside of the steam bin 45 is wrapped with a heat preservation layer 56.

[0101] The reverse-firing normal-pressure superheated steam furnace comprises a furnace seat 1 and a furnace body 8, and the furnace body 8 is mounted on the furnace seat 1; a furnace 7 is arranged in the furnace body 8, and water layers 31 are arranged on the furnace walls on both sides of the furnace 7; a steam generator 9 is arranged on the upper part of the furnace 7, and a pressure relief valve 10 and a water replenishment port 23 are arranged on the steam generator 9; a partition 62 is arranged horizontally in the steam generator 9 to divide the upper and lower parts of the steam generator 9 into a steam superheating chamber 34 and a steam generating chamber 61; one end of the steam superheating chamber 34 is connected to the steam generating chamber 61 through a steam port 64, and a steam conduit 11 is arranged on the top of the other end of the steam superheating chamber 34; a three-way valve 12 is installed on the steam conduit 11; the three-way valve 12 distributes steam to pulp cooking and drying, and the three-way valve 12 is also connected to the steam inlet pipe 43 through the steam pipe 41 to provide steam for the steam bin 45; a plurality of steam pipes are arranged horizontally through the steam superheating chamber 34 Steam overheating pipe 63; a plurality of water heating pipes 24 are arranged transversely through the steam generating chamber 61; the ends of the steam overheating pipe 63 and the water heating pipe 24 near the steam outlet 64 are connected with a smoke storage bin 13; the end of the steam overheating pipe 63 away from the steam outlet 64 is connected with a smoke collecting bin 60, and the smoke collecting bin 60 is provided with a smoke conveying pipe; a water-cooling grate is installed at the lower part of the furnace 7 through a grate bracket 25; the water-cooling grate is connected with the water layer 31, and the water layer 31 is connected with the steam generating chamber 61 of the steam generator 9 through a connecting pipe 30; an ash discharge port 4 and a furnace door 6 are arranged on the furnace body 8 at the front of the furnace 7; a secondary combustion chamber 3 is arranged on one side of the furnace 7; the lower part of the secondary combustion chamber 3 is connected with the furnace 7 through the fire port 29, the furnace 7 is provided with a primary oxygen inlet 5, and the secondary combustion chamber 3 is provided with a secondary oxygen inlet 20; the upper part of the secondary combustion chamber 3 is connected with the end of the water heating pipe 24 away from the steam outlet 64. The secondary combustion chamber 3 is provided with an ash cleaning port 2. The smoke storage bin 13 is provided with a slag cleaning port 19.

[0102] The smoke conveying pipe is connected to the heat exchanger 18, and a smoke separation chamber 32 is arranged at the bottom of the heat exchanger 18, and the smoke separation chamber 32 is connected to the smoke conveying pipe; the heat exchanger 18 is provided with a hot air chamber 35; a plurality of heat exchange tubes 33 are vertically penetrated in the hot air chamber 35; the bottom end of the heat exchange tube 33 is connected to the smoke separation chamber 32, and the top end of the heat exchange tube 33 is connected to the smoke exhaust port 14, and the smoke exhaust port 14 is connected to the smoke purification and discharge device 36 through the smoke pipe; the lower part of the hot air chamber 35 is provided with an air inlet 16, and the upper part of the hot air chamber 35 is provided with a hot air outlet 15; the hot air output from the hot air outlet 15 is transported to the bottom of the steam bin 45 to heat and keep the steam bin 45 warm. A hot air bin 44 is provided at the bottom of the steam bin 45, and the hot air bin 44 is provided between the steam bin 45 and the insulation layer at the bottom thereof; a hot air inlet 42 is provided at one end of the hot air bin 44, and a return air outlet 48 is provided at the other end; the hot air inlet 42 is connected with the hot air outlet 14 through a hot air pipe 40; the return air outlet 48 is connected with the air inlet 16 through a return air pipe 49 and an induced draft fan 39, so as to realize the circulation heating of the hot air; the hot air inlet 42 of the hot air bin 44 introduces hot air to heat and insulate the steam in the steam bin 45, and maintain the steam in the steam bin 45 at 100°C to 110°C, so as to avoid or reduce the space temperature of the steam bin 45 to be lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the working temperature stability of the slurry tank 46.

[0103] A burner connection port 22 is provided on the furnace body 8 corresponding to the furnace chamber 7. The burner connection port 22 is convenient for connection with the burner, and can use biomass particles, natural gas or fuel oil as fuel to burn and generate heat.

[0104] The furnace body 8 is also provided with an observation and maintenance opening 21, which is convenient for observing the working conditions inside the furnace body 8 and for entering for maintenance.

[0105] The smoke pipe is equipped with a smoke cooling water tank 37, which is installed between the smoke exhaust port 14 and the smoke purification and discharge device 36. The smoke cooling water tank 37 is connected with a water inlet pipe 50 and a hot water outlet pipe 38, which are respectively connected to the water replenishment port 23 and the slurry tank 46 to provide hot water for the water replenishment port 23 and the slurry tank 46. The smoke cooling water tank 37 includes a water tank shell 57 with a thermal insulation layer, which is wrapped around the outside of the smoke pipe 58. The space between the water tank shell 57 with a thermal insulation layer and the smoke pipe 58 is a water cavity, and the smoke pipe 58 in the water cavity is penetrated by multiple water pipes 59. The water inlet pipe 50 is arranged at the end of the water cavity close to the smoke exhaust port 14, and the hot water outlet pipe 38 is arranged at the end of the water cavity away from the smoke exhaust port 14.

[0106] The water-cooled grate is composed of a plurality of transverse grate pipes 28 and longitudinal grate pipes 27. The transverse grate pipes 28 are arranged at the lower part of the longitudinal grate pipes 27. Both ends of the longitudinal grate pipes 27 are connected to the water layer 31 through the water collecting pipes 26, and both ends of the transverse grate pipes 28 are connected to the water layer 31.

[0107] Example 7

[0108] A yuba production and forming device under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming;

[0109] The yuba forming device comprises a slurry loading tank 46 and a bracket 51. The slurry loading tank 46 is in a rectangular shape with an opening at the top, and a plurality of partitions 52 are installed in the slurry loading tank 46 through a slot 53. The partitions 52 divide the slurry loading tank 46 into a plurality of forming pools, and the forming pools are arranged in two rows; the slurry loading tank 46 is installed on the bracket 51; a steam bin 45 is arranged at the bottom of the slurry loading tank 46, and a steam inlet pipe 43 is installed in the steam bin 45. The steam inlet pipe 43 extends from one end of the steam bin 45 to the middle of the steam bin 45, and the ends of the steam inlet pipe 43 are respectively connected to a steam distribution pipe 54 extending to the two ends of the steam bin 45, and steam distribution holes 55 are arranged on both sides of the steam distribution pipe 54. Steam is passed through the steam distribution holes 55 of the steam distribution pipe 54 to provide steam for the slurry loading tank 46 for heating and forming, and a drainage and steam exhaust port 47 is arranged at the other end of the steam bin 45; the outside of the steam bin 45 is wrapped with a heat preservation layer 56;

[0110] The reverse-firing atmospheric-pressure superheated steam furnace comprises a furnace seat 1 and a furnace body 8, which is mounted on the furnace seat 1; a furnace 7 is arranged in the furnace body 8, and water layers 31 are arranged on the furnace walls on both sides of the furnace 7; a water-cooled grate is installed at the lower part of the furnace 7 through a grate bracket 25; the water-cooled grate is communicated with the water layer 31, and the water layer 31 is communicated with the steam generating chamber 61 of the steam generator 9 through a connecting pipe 30; an ash discharge port 4 and a furnace door 6 are arranged on the furnace body 8 at the front of the furnace 7; a secondary combustion chamber 3 is arranged on one side of the furnace 7; the lower part of the secondary combustion chamber 3 is communicated with the furnace 7 through a fire port 29, the furnace 7 is provided with a primary oxygen inlet 5, and the secondary combustion chamber 3 is provided with a secondary oxygen inlet 20; a steam generator 9 is arranged at the upper part of the furnace 7, and a pressure relief valve 10 and a water replenishment port 23 are arranged on the steam generator 9; A partition 62 is provided to divide the steam generator 9 into a steam superheating chamber 34 and a steam generating chamber 61 at the top and bottom; one end of the steam superheating chamber 34 is connected to the steam generating chamber 61 through a steam port 64, and a steam conduit 11 is provided on the top of the other end of the steam superheating chamber 34; a three-way valve 12 is installed on the steam conduit 11; the three-way valve 12 distributes steam to pulp boiling and drying, and the three-way valve 12 is also connected to the steam inlet pipe 43 through the steam pipe 41 to provide steam for the steam bin 45; a plurality of steam superheating pipes 63 are transversely arranged in the steam superheating chamber 34; a plurality of water heating pipes 24 are transversely arranged in the steam generating chamber 61; one end of the steam superheating pipe 63 and the water heating pipe 24 are connected to the smoke collecting bin 60, and the smoke collecting bin 60 is provided with a smoke conveying pipe, and the other ends of the steam superheating pipe 63 and the water heating pipe 24 are connected to the secondary combustion chamber 3. The secondary combustion chamber 3 is provided with an ash cleaning port 2. The smoke collecting bin 60 is provided with a slag cleaning port 19.

[0111] A burner connection port 22 is provided on the furnace body 8 corresponding to the furnace chamber 7. The burner connection port 22 is convenient for connection with the burner, and can use biomass particles, natural gas or fuel oil as fuel to burn and generate heat.

[0112] The furnace body 8 is also provided with an observation and maintenance opening 21, which is convenient for observing the working conditions inside the furnace body 8 and for entering for maintenance.

[0113] The water-cooled grate is composed of a plurality of transverse grate pipes 28 and longitudinal grate pipes 27. The transverse grate pipes 28 are arranged at the lower part of the longitudinal grate pipes 27. Both ends of the longitudinal grate pipes 27 are connected to the water layer 31 through the water collecting pipes 26, and both ends of the transverse grate pipes 28 are connected to the water layer 31.

[0114] Example 8

[0115] A yuba production and forming device under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming;

[0116] The yuba forming device comprises a slurry loading tank 46 and a bracket 51. The slurry loading tank 46 is in a rectangular shape with an opening at the top, and a plurality of partitions 52 are installed in the slurry loading tank 46 through a slot 53. The partitions 52 divide the slurry loading tank 46 into a plurality of forming pools, and the forming pools are arranged in two rows; the slurry loading tank 46 is installed on the bracket 51; a steam bin 45 is arranged at the bottom of the slurry loading tank 46, and a steam inlet pipe 43 is installed in the steam bin 45. The steam inlet pipe 43 extends from one end of the steam bin 45 to the middle of the steam bin 45, and the ends of the steam inlet pipe 43 are respectively connected to a steam distribution pipe 54 extending to the two ends of the steam bin 45, and steam distribution holes 55 are arranged on both sides of the steam distribution pipe 54. Steam is passed through the steam distribution holes 55 of the steam distribution pipe 54 to provide steam for the slurry loading tank 46 for heating and forming, and a drainage and steam exhaust port 47 is arranged at the other end of the steam bin 45; the outside of the steam bin 45 is wrapped with a heat preservation layer 56;

[0117] The reverse-firing atmospheric-pressure superheated steam furnace comprises a furnace seat 1 and a furnace body 8, which is mounted on the furnace seat 1; a furnace 7 is arranged in the furnace body 8, and water layers 31 are arranged on the furnace walls on both sides of the furnace 7; a water-cooled grate is installed at the lower part of the furnace 7 through a grate bracket 25; the water-cooled grate is communicated with the water layer 31, and the water layer 31 is communicated with the steam generating chamber 61 of the steam generator 9 through a connecting pipe 30; an ash discharge port 4 and a furnace door 6 are arranged on the furnace body 8 at the front of the furnace 7; a secondary combustion chamber 3 is arranged on one side of the furnace 7; the lower part of the secondary combustion chamber 3 is communicated with the furnace 7 through a fire port 29, the furnace 7 is provided with a primary oxygen inlet 5, and the secondary combustion chamber 3 is provided with a secondary oxygen inlet 20; a steam generator 9 is arranged at the upper part of the furnace 7, and a pressure relief valve 10 and a water replenishment port 23 are arranged on the steam generator 9; A partition 62 is provided to divide the steam generator 9 into a steam superheating chamber 34 and a steam generating chamber 61 at the top and bottom; one end of the steam superheating chamber 34 is connected to the steam generating chamber 61 through a steam port 64, and a steam conduit 11 is provided on the top of the other end of the steam superheating chamber 34; a three-way valve 12 is installed on the steam conduit 11; the three-way valve 12 distributes steam to pulp boiling and drying, and the three-way valve 12 is also connected to the steam inlet pipe 43 through the steam pipe 41 to provide steam for the steam bin 45; a plurality of steam superheating pipes 63 are transversely arranged in the steam superheating chamber 34; a plurality of water heating pipes 24 are transversely arranged in the steam generating chamber 61; one end of the steam superheating pipe 63 and the water heating pipe 24 are connected to the smoke collecting bin 60, and the smoke collecting bin 60 is provided with a smoke conveying pipe, and the other ends of the steam superheating pipe 63 and the water heating pipe 24 are connected to the secondary combustion chamber 3. The secondary combustion chamber 3 is provided with an ash cleaning port 2. The smoke collecting bin 60 is provided with a slag cleaning port 19.

[0118] The smoke conveying pipe is connected to the heat exchanger 18, and a smoke separation chamber 32 is arranged at the bottom of the heat exchanger 18, and the smoke separation chamber 32 is connected to the smoke conveying pipe; the heat exchanger 18 is provided with a hot air chamber 35; a plurality of heat exchange tubes 33 are vertically penetrated in the hot air chamber 35; the bottom end of the heat exchange tube 33 is connected to the smoke separation chamber 32, and the top end of the heat exchange tube 33 is connected to the smoke exhaust port 14, and the smoke exhaust port 14 is connected to the smoke purification and discharge device 36 through the smoke pipe; the lower part of the hot air chamber 35 is provided with an air inlet 16, and the upper part of the hot air chamber 35 is provided with a hot air outlet 15; the hot air output from the hot air outlet 15 is transported to the bottom of the steam bin 45 to heat and keep the steam bin 45 warm. A hot air bin 44 is provided at the bottom of the steam bin 45, and the hot air bin 44 is provided between the steam bin 45 and the insulation layer at the bottom thereof; a hot air inlet 42 is provided at one end of the hot air bin 44, and a return air outlet 48 is provided at the other end; the hot air inlet 42 is connected with the hot air outlet 14 through a hot air pipe 40; the return air outlet 48 is connected with the air inlet 16 through a return air pipe 49 and an induced draft fan 39, so as to realize the circulation heating of the hot air; the hot air inlet 42 of the hot air bin 44 introduces hot air to heat and insulate the steam in the steam bin 45, and maintain the steam in the steam bin 45 at 100°C to 110°C, so as to avoid or reduce the space temperature of the steam bin 45 to be lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the working temperature stability of the slurry tank 46.

[0119] A burner connection port 22 is provided on the furnace body 8 corresponding to the furnace chamber 7. The burner connection port 22 is convenient for connection with the burner, and can use biomass particles, natural gas or fuel oil as fuel to burn and generate heat.

[0120] The furnace body 8 is also provided with an observation and maintenance opening 21, which is convenient for observing the working conditions inside the furnace body 8 and for entering for maintenance.

[0121] The smoke pipe is equipped with a smoke cooling water tank 37, which is installed between the smoke exhaust port 14 and the smoke purification and discharge device 36. The smoke cooling water tank 37 is connected with a water inlet pipe 50 and a hot water outlet pipe 38, which are respectively connected to the water replenishment port 23 and the slurry tank 46 to provide hot water for the water replenishment port 23 and the slurry tank 46. The smoke cooling water tank 37 includes a water tank shell 57 with a thermal insulation layer, which is wrapped around the outside of the smoke pipe 58. The space between the water tank shell 57 with a thermal insulation layer and the smoke pipe 58 is a water cavity, and the smoke pipe 58 in the water cavity is penetrated by multiple water pipes 59. The water inlet pipe 50 is arranged at the end of the water cavity close to the smoke exhaust port 14, and the hot water outlet pipe 38 is arranged at the end of the water cavity away from the smoke exhaust port 14.

[0122] The water-cooled grate is composed of a plurality of transverse grate pipes 28 and longitudinal grate pipes 27. The transverse grate pipes 28 are arranged at the lower part of the longitudinal grate pipes 27. Both ends of the longitudinal grate pipes 27 are connected to the water layer 31 through the water collecting pipes 26, and both ends of the transverse grate pipes 28 are connected to the water layer 31.

[0123] Example 9

[0124] A yuba production and forming device under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming;

[0125] The yuba forming device comprises a slurry loading tank 46 and a bracket 51. The slurry loading tank 46 is in a rectangular shape with an upper opening, and a plurality of partitions 52 are installed in the slurry loading tank 46 through a slot 53. The partitions 52 divide the slurry loading tank 46 into a plurality of forming pools, and the forming pools are arranged in two rows. The slurry loading tank 46 is installed on the bracket 51. A steam bin 45 is arranged at the bottom of the slurry loading tank 46. Two steam inlet pipes 43 are installed in the steam bin 45. The two steam inlet pipes 43 extend from one end of the steam bin 45 to the middle of the steam bin 45, and are symmetrically arranged with respect to the center line of the steam bin 45. The ends of the two steam inlet pipes 43 are respectively connected to a steam pipe extending to the steam bin. The steam pipes 54 at both ends of the steam inlet pipe 43 are arranged; the distance a between the steam pipes 54 at both sides of the end of the steam inlet pipe 43 is equal to the distance a between the steam pipes 54 and the center line, and is also equal to the distance a between the steam pipes 54 and the side wall of the steam bin 45; steam holes 55 are arranged on both sides of the steam pipes 54, and when the steam holes 55 are arranged, the steam holes 55 of the cross section of the steam pipes 54 cannot be arranged on the same straight line, but need to be arranged in a staggered manner, and the steam holes 55 of the steam pipes 54 are passed with steam to provide steam for the slurry tank 46 for heating and forming, and the other end of the steam bin 45 is provided with a drainage and steam exhaust port 47; the outside of the steam bin 45 is wrapped with a heat preservation layer 56;

[0126] The reverse-firing atmospheric-pressure superheated steam furnace comprises a furnace seat 1 and a furnace body 8, which is mounted on the furnace seat 1; a furnace 7 is arranged in the furnace body 8, and water layers 31 are arranged on the furnace walls on both sides of the furnace 7; a water-cooled grate is installed at the lower part of the furnace 7 through a grate bracket 25; the water-cooled grate is communicated with the water layer 31, and the water layer 31 is communicated with the steam generating chamber 61 of the steam generator 9 through a connecting pipe 30; an ash discharge port 4 and a furnace door 6 are arranged on the furnace body 8 at the front of the furnace 7; a secondary combustion chamber 3 is arranged on one side of the furnace 7; the lower part of the secondary combustion chamber 3 is communicated with the furnace 7 through a fire port 29, the furnace 7 is provided with a primary oxygen inlet 5, and the secondary combustion chamber 3 is provided with a secondary oxygen inlet 20; a steam generator 9 is arranged at the upper part of the furnace 7, and a pressure relief valve 10 and a water replenishment port 23 are arranged on the steam generator 9; A partition 62 is provided to divide the steam generator 9 into a steam superheating chamber 34 and a steam generating chamber 61 at the top and bottom; one end of the steam superheating chamber 34 is connected to the steam generating chamber 61 through a steam port 64, and a steam conduit 11 is provided on the top of the other end of the steam superheating chamber 34; a three-way valve 12 is installed on the steam conduit 11; the three-way valve 12 distributes steam to pulp boiling and drying, and the three-way valve 12 is also connected to the steam inlet pipe 43 through the steam pipe 41 to provide steam for the steam bin 45; a plurality of steam superheating pipes 63 are transversely arranged in the steam superheating chamber 34; a plurality of water heating pipes 24 are transversely arranged in the steam generating chamber 61; one end of the steam superheating pipe 63 and the water heating pipe 24 are connected to the smoke collecting bin 60, and the smoke collecting bin 60 is provided with a smoke conveying pipe, and the other ends of the steam superheating pipe 63 and the water heating pipe 24 are connected to the secondary combustion chamber 3. The secondary combustion chamber 3 is provided with an ash cleaning port 2. The smoke collecting bin 60 is provided with a slag cleaning port 19.

[0127] The smoke conveying pipe is connected to the heat exchanger 18, and a smoke separation chamber 32 is arranged at the bottom of the heat exchanger 18, and the smoke separation chamber 32 is connected to the smoke conveying pipe; the heat exchanger 18 is provided with a hot air chamber 35; a plurality of heat exchange tubes 33 are vertically penetrated in the hot air chamber 35; the bottom end of the heat exchange tube 33 is connected to the smoke separation chamber 32, and the top end of the heat exchange tube 33 is connected to the smoke exhaust port 14, and the smoke exhaust port 14 is connected to the smoke purification and discharge device 36 through the smoke pipe; the lower part of the hot air chamber 35 is provided with an air inlet 16, and the upper part of the hot air chamber 35 is provided with a hot air outlet 15; the hot air output from the hot air outlet 15 is transported to the bottom of the steam bin 45 to heat and keep the steam bin 45 warm. A hot air bin 44 is provided at the bottom of the steam bin 45, and the hot air bin 44 is provided between the steam bin 45 and the insulation layer at the bottom thereof; a hot air inlet 42 is provided at one end of the hot air bin 44, and a return air outlet 48 is provided at the other end; the hot air inlet 42 is connected with the hot air outlet 14 through a hot air pipe 40; the return air outlet 48 is connected with the air inlet 16 through a return air pipe 49 and an induced draft fan 39, so as to realize the circulation heating of the hot air; the hot air inlet 42 of the hot air bin 44 introduces hot air to heat and insulate the steam in the steam bin 45, and maintain the steam in the steam bin 45 at 100°C to 110°C, so as to avoid or reduce the space temperature of the steam bin 45 to be lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the working temperature stability of the slurry tank 46.

[0128] A burner connection port 22 is provided on the furnace body 8 corresponding to the furnace chamber 7. The burner connection port 22 is convenient for connection with the burner, and can use biomass particles, natural gas or fuel oil as fuel to burn and generate heat.

[0129] The furnace body 8 is also provided with an observation and maintenance opening 21, which is convenient for observing the working conditions inside the furnace body 8 and for entering for maintenance.

[0130] The smoke pipe is equipped with a smoke cooling water tank 37, which is installed between the smoke exhaust port 14 and the smoke purification and discharge device 36. The smoke cooling water tank 37 is connected with a water inlet pipe 50 and a hot water outlet pipe 38, which are respectively connected to the water replenishment port 23 and the slurry tank 46 to provide hot water for the water replenishment port 23 and the slurry tank 46. The smoke cooling water tank 37 includes a water tank shell 57 with a thermal insulation layer, which is wrapped around the outside of the smoke pipe 58. The space between the water tank shell 57 with a thermal insulation layer and the smoke pipe 58 is a water cavity, and the smoke pipe 58 in the water cavity is penetrated by multiple water pipes 59. The water inlet pipe 50 is arranged at the end of the water cavity close to the smoke exhaust port 14, and the hot water outlet pipe 38 is arranged at the end of the water cavity away from the smoke exhaust port 14.

[0131] The water-cooled grate is composed of a plurality of transverse grate pipes 28 and longitudinal grate pipes 27. The transverse grate pipes 28 are arranged at the lower part of the longitudinal grate pipes 27. Both ends of the longitudinal grate pipes 27 are connected to the water layer 31 through the water collecting pipes 26, and both ends of the transverse grate pipes 28 are connected to the water layer 31.

[0132] The working process of the yuba production and forming equipment under normal pressure steam conditions in Example 2 is as follows: water is introduced into the steam generator 9, and the water also enters the water-cooled grate and the water layer 31. Biomass fuel, coal, fuel oil and / or natural gas are burned in the furnace 7 to generate radiant heat, and heat exchange is performed on the water in the steam generator 9, the water-cooled grate and the water layer 31. Due to the action of the flue gas induced draft fan, the flue gas generated by the combustion in the furnace 7 enters the secondary combustion chamber 3 and burns again to heat the water in the connecting pipe 30, and the flue gas is then discharged from the steam generator 7. The flue gas passes through the water heating pipe 24 in the steam generator 9, and continues to exchange heat with the water in the steam generator 9. The flue gas then passes through the heat exchange pipe 32 of the flue gas storage bin 13, the smoke separation chamber 31 and the heat exchange bin shell 17 in sequence, and then passes through the flue gas cooling water tank 37 to exchange heat with the condensed water and then is discharged from the flue gas purification and discharge device 36; the steam generated in the steam generator 9 passes through the steam conduit 11 into the steam superheating chamber 33 to continue to exchange heat with the flue gas in the heat exchange pipe 32 to generate superheated steam, which is output from the steam outlet 16 and passes through the steam pipe 41 and the cloth steam pipe 42 are passed into the steam bin 44 to heat and shape the slurry tank 46. The slurry tank 46 needs to heat the soy milk after boiling. After adding a suitable amount, a partition 52 is installed in the slurry tank 46 to divide the slurry tank 46 into a plurality of shaping pools; the wind entering from the air inlet 15 of the hot air chamber 35 exchanges heat with the smoke in the heat exchange pipe 32 to form hot air, and the hot air is discharged from the hot air outlet 14, and enters the hot air bin 43 through the hot air pipe 39 and the hot air inlet 41, and the steam in the steam bin 44 is heated by the hot air. Ensure that the space temperature of the upper steam channel is maintained at 100°C ~ 110°C, then the wind is discharged from the return air port 47, and returned to the hot air chamber 35 through the return air duct 48 and the induced draft fan 38 for circulating heating; the flue gas cooling water tank 37 exchanges heat with the flue gas to produce hot water, and the produced hot water is supplied to the steam generator through a water pump. By replenishing hot water, the replenishment temperature difference is reduced, ensuring the continuous and stable generation of steam and reducing the fluctuation of steam pressure. At the same time, hot water can be supplied to the slurry tank 46, thereby improving the forming efficiency, output and quality of bean curd sheets.

[0133] The working process of the yuba production and forming equipment under normal pressure steam conditions in Example 5 is as follows: water is introduced into the steam generator 9, and the water also enters the water-cooled grate and the water layer 31. Biomass fuel, coal, fuel oil and / or natural gas are burned in the furnace 7 to generate radiant heat, and heat exchange is performed on the water in the steam generator 9, the water-cooled grate and the water layer 31. Due to the action of the flue gas induced draft fan, the flue gas generated by the combustion in the furnace 7 enters the secondary combustion chamber 3 and burns again, heating the water in the connecting pipe 30. The flue gas then passes through the water heating pipe 24 in the steam generating chamber 61 of the steam generator 9, and continues to heat the water in the steam generating chamber 61. The flue gas enters the flue gas storage bin 13 from the water heating pipe 24, and then enters the steam superheating pipe 63 of the steam superheating chamber 34 in the steam generator 9. The water in the steam generating chamber 61 is heated to form steam, and passes through the steam port 64 to rise to the steam superheating chamber 34, and continues to exchange heat with the flue gas in the steam superheating pipe 63 to form superheated steam. The superheated steam is discharged from the steam conduit 11, and the three-way valve 12 distributes the steam to the pulping and passes through the steam pipe 41, the steam inlet pipe 43 and the steam distribution pipe 54 to the steam storage bin 45 to heat the pulping tank 46 so that the soybean milk in the forming pool is formed into bean curd sticks. The soybean milk in the pulping tank 46 needs to be heated after the pulping. After adding a suitable amount of slurry, a partition 52 is installed in the slurry tank 46 to divide the slurry tank 46 into a plurality of forming pools; the smoke passes from the steam superheating pipe 63 into the smoke collecting bin 60, and then enters the heat exchange pipe 33 of the heat exchanger 18 from the smoke separation chamber 32 through the smoke conveying pipe, and then passes through the smoke cooling water tank 37 to exchange heat with condensed water and is discharged from the smoke purification discharge device 36; the wind entering from the air inlet 16 of the hot air chamber 35 exchanges heat with the smoke in the heat exchange pipe 33 to form hot air, and the hot air is discharged from the hot air outlet 15, and enters the hot air bin 44 through the hot air pipe 40 and the hot air inlet 42, and the steam in the steam bin 45 is purified by the hot air. Heating ensures that the space temperature of the upper steam channel is maintained at 100°C ~ 110°C, and then the wind is discharged from the return air port 48, and returned to the hot air chamber 35 through the return air duct 49 and the induced draft fan 39 for circulation heating; the flue gas cooling water tank 37 exchanges heat with the flue gas to produce hot water, and the produced hot water is supplied to the steam generator through a water pump. By replenishing hot water, the replenishment temperature difference is reduced, ensuring that steam is continuously and stably generated, reducing the fluctuation of steam pressure, and at the same time, hot water can be supplied to the slurry tank 46, thereby improving the forming efficiency, output and quality of bean curd sheets; a part of the hot air discharged from the hot air outlet 15 can also be transported to dry the formed bean curd sheets.

[0134] The working process of the yuba production and forming equipment under normal pressure steam conditions in Example 8 is as follows: water is introduced into the steam generator 9, and the water also enters the water-cooled grate and the water layer 31. Biomass fuel, coal, fuel oil and / or natural gas are burned in the furnace 7 to generate radiant heat, and heat exchange is performed on the water in the steam generator 9, the water-cooled grate and the water layer 31. Due to the action of the flue gas induced draft fan, the flue gas generated by the combustion in the furnace 7 enters the secondary combustion chamber 3 and burns again, heating the water in the connecting pipe 30. The flue gas is then heated from the water heating pipe 24 in the steam generation chamber 61 of the steam generator 9 and the steam in the steam superheating chamber 34 of the steam generator 9. The flue gas in the water heating pipe 24 continues to exchange heat with the water in the steam generating chamber 61. The water in the steam generating chamber 61 is heated to form steam, and passes through the steam port 64 to rise to the steam superheating chamber 34. The steam continues to exchange heat with the flue gas in the steam superheating pipe 63 to form superheated steam. The superheated steam is discharged from the steam conduit 11, and the three-way valve 12 distributes the steam to boil the slurry and passes through the steam pipe 41, the steam inlet pipe 43 and the steam distribution pipe 54 to the steam bin 45 to heat the slurry tank 46 so that the soy milk in the forming pool is formed into yuba. The soy milk after boiling needs to be heated in the slurry tank 46. After adding a suitable amount, A partition 52 is installed in the slurry tank 46 to divide the slurry tank 46 into a plurality of forming pools; the smoke in the water heating pipe 24 and the steam superheating pipe 63 enters the smoke collecting bin 60, and then enters the heat exchange pipe 33 of the heat exchanger 18 from the smoke separation chamber 32 through the smoke conveying pipe, and then passes through the smoke cooling water tank 37 to perform heat exchange with condensed water and then is discharged from the smoke purification and discharge device 36; the wind entering from the air inlet 16 of the hot air chamber 35 performs heat exchange with the smoke in the heat exchange pipe 33 to form hot air, and the hot air is discharged from the hot air outlet 15, and enters the hot air bin 44 through the hot air pipe 40 and the hot air inlet 42, and the steam in the steam bin 45 is heated by the hot air. , ensuring that the space temperature of the upper steam channel is maintained at 100℃~110℃, and then the wind is discharged from the return air port 48, and returned to the hot air chamber 35 through the return air duct 49 and the induced draft fan 39 for circulating heating; the flue gas cooling water tank 37 exchanges heat with the flue gas heat to produce hot water, and the generated hot water is supplied to the steam generator through a water pump. By replenishing hot water, the replenishment temperature difference is reduced, ensuring the continuous and stable generation of steam, reducing the fluctuation of steam pressure, and at the same time, hot water can be supplied to the slurry tank 46, thereby improving the forming efficiency, output and quality of bean curd sheets; a part of the hot air discharged from the hot air outlet 15 can also be transported to dry the formed bean curd sheets.

[0135] Application Examples

[0136] 1. A company in Guangxi used to use a traditional steam furnace with an evaporation capacity of 1 ton / hour (pressure less than 0.1Mpa) to produce bean curd sticks. One normal-pressure steam furnace could only provide steam for two bean curd stick forming devices (without a hot air bin, with a length of 18 meters and a width of 1.5 meters), and it was difficult to achieve multi-shift continuous production of bean curd sticks. Later, the company used the pulping equipment in Implementation 6, a reverse-firing normal-pressure superheated steam furnace (pressure less than 0.1Mpa) to produce bean curd sticks. One reverse-firing normal-pressure superheated steam furnace (evaporation capacity of 1 ton / hour) could provide steam for three bean curd stick forming devices (with a hot air bin, with a length of 18 meters and a width of 1.5 meters), and could also provide steam for the pulping pot and heat source for bean curd stick drying at the same time, meeting the pulp supply needs of the three bean curd stick forming devices and achieving multi-shift continuous production of bean curd stick processing. According to incomplete statistics, the production efficiency of bean curd sticks was increased by more than 30%, and the fuel cost used to produce bean curd sticks of the same weight was saved by more than 15% compared with the original.

[0137] The above description is not a limitation of the present application, and the present application is not limited to the above examples. Any changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present application should fall within the scope of protection of the present application.

Claims

1. A yuba production and forming equipment under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba forming device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba forming device for heating and forming; characterized in that: The reverse-firing atmospheric pressure superheated steam furnace generates superheated steam with a temperature greater than 135°C under a pressure less than 0.1Mpa, and the superheated steam with a temperature greater than 135°C is used to heat the yuba forming pool; The yuba forming device comprises a slurry loading tank (46) and a bracket (51). The slurry loading tank (46) is in a rectangular shape with an opening at the top. A plurality of partitions (52) are installed in the slurry loading tank (46) via a slot (53). The partitions (52) divide the slurry loading tank (46) into a plurality of forming pools. The slurry loading tank (46) is installed on the bracket (51). A steam bin (45) is provided at the bottom of the slurry loading tank (46). A steam inlet pipe (43) is installed in the steam bin (45). The steam inlet pipe (43) is connected to the steam bin (45). 5) extends into the middle of the steam bin (45), and the ends of the steam inlet pipe (43) are respectively connected to a steam distribution pipe (54) extending to both ends of the steam bin (45), and steam distribution holes (55) are provided on both sides of the steam distribution pipe (54). Steam is introduced into the steam distribution holes (55) of the steam distribution pipe (54) to provide steam for the slurry loading tank (46) for heating and forming, and a water discharge and steam outlet (47) is provided at the other end of the steam bin (45); the outside of the steam bin (45) is wrapped with a heat-insulating layer (56); The reverse-firing atmospheric-pressure superheated steam furnace comprises a furnace seat (1) and a furnace body (8), wherein the furnace body (8) is mounted on the furnace seat (1); a furnace (7) is arranged in the furnace body (8), and water layers (31) are arranged on the furnace walls on both sides of the furnace (7); a steam generator (9) is arranged at the upper part of the furnace (7), and a pressure relief valve (10) and a water replenishment port (23) are arranged on the steam generator (9); a plurality of water heating pipes (24) are arranged transversely through the steam generator (9); a water-cooled grate is installed at the lower part of the furnace (7) through a grate mounting frame (25); the water-cooled grate is connected to the water layer (31), and the water layer (31) is connected to the steam generator (9) through a connecting pipe (30); an ash discharge port (4) and a furnace door are arranged on the furnace body (8) at the front of the furnace (7). (6); a secondary combustion chamber (3) and a smoke passage bin (13) are respectively arranged on both sides of the furnace (7); the lower part of the secondary combustion chamber (3) is connected to the furnace (7) through a fire port (29); the furnace (7) is provided with a primary oxygen inlet (5), and the secondary combustion chamber (3) is provided with a secondary oxygen inlet (20); the upper part of the secondary combustion chamber (3) is connected to one end of a water heating pipe (24), and the other end of the water heating pipe (24) is connected to the upper part of the smoke passage bin (13); a heat exchanger (18) is arranged on one side of the smoke passage bin (13); a smoke separation chamber (32) is arranged at the bottom of the heat exchanger (18), and the smoke separation chamber (32) is connected to the lower part of the smoke passage bin (13); a plurality of heat exchange tubes (33) are vertically penetrated in the heat exchanger (18); The bottom end of the heat exchange tube (33) is connected to the smoke separation chamber (32), and the top end of the heat exchange tube (33) is connected to a smoke exhaust port (14), and the smoke exhaust port (14) is connected to a smoke pipe for exhausting smoke; a steam superheating chamber (34) is provided in the heat exchanger (18), and the lower part of the steam superheating chamber (34) is connected to the top of the steam generator (9) through a steam conduit (11); a three-way valve (12) for distributing and transporting steam is installed on the steam conduit (11); a steam outlet (17) is provided at the upper part of the steam superheating chamber (34); the steam outlet (17) is connected to a steam inlet pipe (43) through a steam pipe (41); a hot air chamber (35) is also provided in the heat exchanger (18); the hot air chamber (35) is provided at the upper part of the steam superheating chamber (34), and the hot air The lower part of the cavity (35) is provided with an air inlet (16), and the upper part of the hot air cavity (35) is provided with a hot air outlet (15); the bottom of the steam bin (45) is provided with a hot air bin (44), which is arranged between the steam bin (45) and the insulation layer at the bottom thereof, and adopts a double-layer independent channel design, the upper layer is a steam channel for directly heating the bean curd stick forming pool, and the lower layer is a hot air channel, which is connected to the circulating fan and the steam hot air furnace heat exchanger through an air duct to form a closed-loop circulation, and the upper layer steam is heated by hot air with a temperature greater than 120° C., ensuring that the space temperature of the upper layer steam channel is maintained at 100° C. to 110° C., and one end of the hot air bin (44) is provided with a hot air inlet (42), and the other end is provided with a return air outlet (48);The hot air inlet (42) is connected to the hot air outlet (15) through the hot air pipe (40); the return air port (48) is connected to the air inlet (16) through the return air pipe (49) and the induced draft fan (39), so as to realize the circulation heating of the hot air; the hot air inlet (42) of the hot air bin (44) introduces hot air to heat and keep the steam in the steam bin (45), so as to maintain the steam in the steam bin (45) within a certain temperature range, avoid or reduce the space temperature of the steam bin (45) being lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the working temperature stability of the slurry loading tank (46); the steam bin (45) is equipped with two steam inlet pipes (43), the two steam inlet pipes (43) and the steam inlet pipes (44) are connected to the steam bin (45). The pipes (43) extend from one end of the steam bin (45) to the middle of the steam bin (45) and are arranged symmetrically with respect to the center line of the steam bin (45). The ends of the two steam inlet pipes (43) are respectively connected to a steam distribution pipe (54) extending to both ends of the steam bin (45). The distance between the steam distribution pipes (54) on both sides of the ends of the steam inlet pipes (43) is equal to the distance between the steam distribution pipes (54) and the center line, and is also equal to the distance between the steam distribution pipes (54) and the side wall of the steam bin (45). When the steam distribution holes (55) are arranged on the steam distribution pipes (54) on both sides of the steam inlet pipes (43), the steam distribution holes (55) of the cross section of the steam distribution pipes (54) cannot be opened on the same straight line, but need to be opened staggered. ; 2. A yuba production and molding equipment under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba molding device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba molding device for heating and molding; characterized in that: The reverse-firing atmospheric pressure superheated steam furnace generates superheated steam with a temperature greater than 135°C under a pressure less than 0.1Mpa, and the superheated steam with a temperature greater than 135°C is used to heat the yuba forming pool; The yuba forming device comprises a slurry loading tank (46) and a bracket (51). The slurry loading tank (46) is in a rectangular shape with an opening at the top. A plurality of partitions (52) are installed in the slurry loading tank (46) via a slot (53). The partitions (52) divide the slurry loading tank (46) into a plurality of forming pools. The slurry loading tank (46) is installed on the bracket (51). A steam bin (45) is provided at the bottom of the slurry loading tank (46). A steam inlet pipe (43) is installed in the steam bin (45). The steam inlet pipe (43) is connected to the steam bin (45). 5) extends into the middle of the steam bin (45), and the ends of the steam inlet pipe (43) are respectively connected to a steam distribution pipe (54) extending to both ends of the steam bin (45), and steam distribution holes (55) are provided on both sides of the steam distribution pipe (54). Steam is introduced into the steam distribution holes (55) of the steam distribution pipe (54) to provide steam for the slurry loading tank (46) for heating and forming, and a water discharge and steam outlet (47) is provided at the other end of the steam bin (45); the outside of the steam bin (45) is wrapped with a heat-insulating layer (56); The reverse-firing atmospheric-pressure superheated steam furnace comprises a furnace seat (1) and a furnace body (8), wherein the furnace body (8) is mounted on the furnace seat (1); a furnace (7) is arranged in the furnace body (8), and water layers (31) are arranged on the furnace walls on both sides of the furnace (7); a steam generator (9) is arranged in the upper part of the furnace (7), and a pressure relief valve (10) and a water replenishment port (23) are arranged on the steam generator (9); a partition (62) is arranged transversely in the steam generator (9) for dividing the upper and lower parts of the steam generator (9) into a steam superheating chamber (34) and a steam generating chamber (61); one end of the steam superheating chamber (34) is connected to the steam generating chamber (61) through a steam passing port (64), and the steam superheating chamber (61) is connected to the steam generating chamber (61) through a steam passing port (64). A steam conduit (11) is provided at the top of the other end of the steam generating chamber (34); a three-way valve (12) is installed on the steam conduit (11); the three-way valve (12) distributes steam to pulp boiling and drying, and the three-way valve (12) is also connected to the steam inlet pipe (43) through the steam pipe (41) to provide steam for the steam bin (45); a plurality of steam superheating pipes (63) are transversely arranged through the steam superheating chamber (34); a plurality of water heating pipes (24) are transversely arranged through the steam generating chamber (61); the ends of the steam superheating pipes (63) and the water heating pipes (24) close to the steam outlet (64) are connected to the smoke bin (13); the ends of the steam superheating pipes (63) away from the steam outlet (64) are connected to the smoke collecting bin ( 60, the smoke collecting bin (60) is provided with a smoke conveying pipe; a water-cooled grate is installed at the lower part of the furnace (7) through a grate bracket (25); the water-cooled grate is connected to the water layer (31), and the water layer (31) is connected to the steam generating chamber (61) of the steam generator (9) through a connecting pipe (30); an ash discharge port (4) and a furnace door (6) are provided on the furnace body (8) at the front of the furnace (7); a secondary combustion chamber (3) is provided on one side of the furnace (7); the lower part of the secondary combustion chamber (3) is connected to the furnace (7) through a fire port (29), the furnace (7) is provided with a primary oxygen inlet (5), and the secondary combustion chamber (3) is provided with a secondary oxygen inlet (20); the upper part of the secondary combustion chamber (3) is connected to the furnace (7) through a fire port (29), the furnace (7) is provided with a primary oxygen inlet (5), and the secondary combustion chamber (3) is provided with a secondary oxygen inlet (20); the upper part of the secondary combustion chamber (3) is connected to the The end of the water heating pipe (24) away from the steam outlet (64) is connected; the smoke delivery pipe is connected to the heat exchanger (18); a smoke separation chamber (32) is provided at the bottom of the heat exchanger (18); the smoke separation chamber (32) is connected to the smoke delivery pipe; the heat exchanger (18) is provided with a hot air cavity (35); a plurality of heat exchange pipes (33) are vertically penetrated in the hot air cavity (35); the bottom end of the heat exchange pipe (33) is connected to the smoke separation chamber (32); the top end of the heat exchange pipe (33) is connected to the smoke exhaust port (14); the smoke exhaust port (14) is connected to a smoke pipe for exhausting smoke; the lower part of the hot air cavity (35) is provided with an air inlet (16); the upper part of the hot air cavity (35) is provided with a hot air outlet (15);A hot air bin (44) is arranged at the bottom of the steam bin (45). The hot air bin (44) is arranged between the steam bin (45) and the insulation layer at the bottom thereof. A double-layer independent channel design is adopted. The upper layer is a steam channel for directly heating the bean curd stick forming pool. The lower layer is a hot air channel. The hot air channel is connected to the circulating fan and the steam hot air furnace heat exchanger through an air duct to form a closed-loop circulation. The upper steam is heated by hot air with a temperature greater than 120° C., ensuring that the space temperature of the upper steam channel is maintained at 100° C. The temperature of the hot air bin (44) is 110°C, a hot air inlet (42) is provided at one end of the hot air bin (44), and a return air outlet (48) is provided at the other end; the hot air inlet (42) is connected to the hot air outlet (15) through the hot air pipe (40); the return air outlet (48) is connected to the air inlet (16) through the return air pipe (49) and the induced draft fan (39), so as to realize the circulation heating of the hot air; the hot air inlet (42) of the hot air bin (44) introduces hot air to heat and keep the steam in the steam bin (45), thereby heating the steam in the steam bin (45) The steam is maintained within a certain temperature range, so as to avoid or reduce the space temperature of the steam bin (45) being lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the requirement of stable working temperature of the slurry loading tank (46); two steam inlet pipes (43) are installed in the steam bin (45), and the two steam inlet pipes (43) extend from one end of the steam bin (45) to the middle of the steam bin (45), and are arranged symmetrically with respect to the center line of the steam bin (45), and the ends of the two steam inlet pipes (43) are connected to the steam bin (45). The steam distribution pipes (54) extending to both ends of the steam bin (45) are respectively connected to the sides; the distance between the steam distribution pipes (54) on both sides of the end of the steam inlet pipe (43) is equal to the distance between the steam distribution pipes (54) and the center line, and is also equal to the distance between the steam distribution pipes (54) and the side wall of the steam bin (45); when the steam distribution holes (55) are arranged on the steam distribution pipes (54) on both sides of the steam inlet pipe (43), the steam distribution holes (55) of the cross section of the steam distribution pipes (54) cannot be opened on the same straight line, but need to be opened staggered. ; 3. A yuba production and molding equipment under normal pressure steam conditions, comprising a reverse-firing normal pressure superheated steam furnace and a yuba molding device, wherein the reverse-firing normal pressure superheated steam furnace provides steam for the yuba molding device for heating and molding; characterized in that: The reverse-firing atmospheric pressure superheated steam furnace generates superheated steam with a temperature greater than 135°C under a pressure less than 0.1Mpa, and the superheated steam with a temperature greater than 135°C is used to heat the yuba forming pool; The yuba forming device comprises a slurry loading tank (46) and a bracket (51). The slurry loading tank (46) is in a rectangular shape with an opening at the top. A plurality of partitions (52) are installed in the slurry loading tank (46) via a slot (53). The partitions (52) divide the slurry loading tank (46) into a plurality of forming pools. The slurry loading tank (46) is installed on the bracket (51). A steam bin (45) is provided at the bottom of the slurry loading tank (46). A steam inlet pipe (43) is installed in the steam bin (45). The steam inlet pipe (43) is connected to the steam bin (45). 5) extends into the middle of the steam bin (45), and the ends of the steam inlet pipe (43) are respectively connected to a steam distribution pipe (54) extending to both ends of the steam bin (45), and steam distribution holes (55) are provided on both sides of the steam distribution pipe (54). Steam is introduced into the steam distribution holes (55) of the steam distribution pipe (54) to provide steam for the slurry loading tank (46) for heating and forming, and a water discharge and steam outlet (47) is provided at the other end of the steam bin (45); the outside of the steam bin (45) is wrapped with a heat-insulating layer (56); The reverse-firing atmospheric-pressure superheated steam furnace comprises a furnace seat (1) and a furnace body (8), wherein the furnace body (8) is mounted on the furnace seat (1); a furnace (7) is arranged in the furnace body (8), and water layers (31) are arranged on the furnace walls on both sides of the furnace (7); a water-cooling grate is installed at the lower part of the furnace (7) through a grate support (25); the water-cooling grate is connected to the water layer (31), and the water layer (31) is connected to the steam generating chamber (61) of the steam generator (9) through a connecting pipe (30); an ash discharge port (4) and a furnace door (6) are arranged on the furnace body (8) at the front of the furnace (7); a secondary combustion chamber (3) is arranged on one side of the furnace (7); the secondary combustion chamber (3) The lower part of the furnace (7) is connected to the furnace (7) through the fire port (29), the furnace (7) is provided with a primary oxygen inlet (5), and the secondary combustion chamber (3) is provided with a secondary oxygen inlet (20); the upper part of the furnace (7) is provided with a steam generator (9), and the steam generator (9) is provided with a pressure relief valve (10) and a water replenishment port (23); a partition (62) is transversely provided in the steam generator (9) to divide the upper and lower parts of the steam generator (9) into a steam superheating chamber (34) and a steam generating chamber (61); one end of the steam superheating chamber (34) is connected to the steam generating chamber (61) through the steam port (64), and the other end of the steam superheating chamber (34) is provided at the top A steam conduit (11) is provided; a three-way valve (12) is installed on the steam conduit (11); the three-way valve (12) distributes steam to pulp boiling and drying, and the three-way valve (12) is also connected to a steam inlet pipe (43) through a steam pipe (41) to provide steam for a steam bin (45); a plurality of steam superheating pipes (63) are transversely arranged in a steam superheating chamber (34); a plurality of water heating pipes (24) are transversely arranged in a steam generating chamber (61); one end of each of the steam superheating pipe (63) and the water heating pipe (24) is connected to a smoke collecting bin (60), and a smoke conveying pipe is provided in the smoke collecting bin (60); the other ends of the steam superheating pipe (63) and the water heating pipe (24) are connected to a smoke collecting bin (60). The heat exchanger (18) is connected to the smoke conveying pipe, and a smoke separation chamber (32) is provided at the bottom of the heat exchanger (18), and the smoke separation chamber (32) is connected to the smoke conveying pipe; the heat exchanger (18) is provided with a hot air chamber (35); a plurality of heat exchange tubes (33) are vertically penetrated in the hot air chamber (35); the bottom end of the heat exchange tube (33) is connected to the smoke separation chamber (32), and the top end of the heat exchange tube (33) is connected to a smoke exhaust port (14), and the smoke exhaust port (14) is connected to a smoke pipe for exhausting smoke; an air inlet (16) is provided at the bottom of the hot air chamber (35), and a hot air outlet (15) is provided at the top of the hot air chamber (35);A hot air bin (44) is arranged at the bottom of the steam bin (45). The hot air bin (44) is arranged between the steam bin (45) and the insulation layer at the bottom thereof. A double-layer independent channel design is adopted. The upper layer is a steam channel for directly heating the bean curd stick forming pool. The lower layer is a hot air channel. The hot air channel is connected to the circulating fan and the steam hot air furnace heat exchanger through an air duct to form a closed-loop circulation. The upper steam is heated by hot air with a temperature greater than 120° C., ensuring that the space temperature of the upper steam channel is maintained at 100° C. The temperature of the hot air bin (44) is 110°C, a hot air inlet (42) is provided at one end of the hot air bin (44), and a return air outlet (48) is provided at the other end; the hot air inlet (42) is connected to the hot air outlet (15) through the hot air pipe (40); the return air outlet (48) is connected to the air inlet (16) through the return air pipe (49) and the induced draft fan (39), so as to realize the circulation heating of the hot air; the hot air inlet (42) of the hot air bin (44) introduces hot air to heat and keep the steam in the steam bin (45), thereby heating the steam in the steam bin (45) The steam is maintained within a certain temperature range, so as to avoid or reduce the space temperature of the steam bin (45) being lower than the steam dew point temperature, reduce the generation of condensed water, improve the thermal utilization rate of the steam, and meet the requirement of stable working temperature of the slurry loading tank (46); two steam inlet pipes (43) are installed in the steam bin (45), and the two steam inlet pipes (43) extend from one end of the steam bin (45) to the middle of the steam bin (45), and are arranged symmetrically with respect to the center line of the steam bin (45), and the ends of the two steam inlet pipes (43) are connected to the steam bin (45). The steam distribution pipes (54) extending to both ends of the steam bin (45) are respectively connected to the sides; the distance between the steam distribution pipes (54) on both sides of the end of the steam inlet pipe (43) is equal to the distance between the steam distribution pipes (54) and the center line, and is also equal to the distance between the steam distribution pipes (54) and the side wall of the steam bin (45); when the steam distribution holes (55) are arranged on the steam distribution pipes (54) on both sides of the steam inlet pipe (43), the steam distribution holes (55) of the cross section of the steam distribution pipes (54) cannot be opened on the same straight line, but need to be opened staggered. ; 4. The yuba production and forming equipment under normal pressure steam conditions according to claim 1, 2 or 3, characterized in that: A flue gas cooling water tank (37) and a flue gas purification and emission device (36) are installed on the flue gas duct. The flue gas cooling water tank (37) is installed between the smoke exhaust port (14) and the flue gas purification and emission device (36). A water inlet pipe (50) and a hot water outlet pipe (38) are connected to the flue gas cooling water tank (37). The hot water outlet pipe (38) is respectively connected to the water replenishment port (23) and the slurry loading tank (46); hot water is provided to the water replenishment port (23) and the slurry loading tank (46).

5. The yuba production and forming equipment under normal pressure steam conditions according to claim 1, 2 or 3, characterized in that: A burner connection port (22) is provided on the furnace body (8) corresponding to the furnace chamber (7). The burner connection port (22) is convenient for connection with the burner, and can use biomass particles, natural gas or fuel oil as fuel to burn and generate heat.

6. The yuba production and forming equipment under normal pressure steam conditions according to claim 1, 2 or 3, characterized in that: The water-cooled grate is composed of a plurality of transverse grate pipes (28) and longitudinal grate pipes (27). The transverse grate pipes (28) are arranged at the lower part of the longitudinal grate pipes (27). Both ends of the longitudinal grate pipes (27) are connected to the water layer (31) through the water collecting pipes (26), and both ends of the transverse grate pipes (28) are connected to the water layer (31).

Citation Information

Cited By

  • System and method for efficient forming and lossless stripping of dried beancurd stick film

    CN121153890A

  • A system and method for efficient forming and non-destructive peeling of a dried beancurd sheet film

    CN121153890B