A large-cap cantilever tower crane foundation
By using a combined structure of pile foundation, concealed beam, cantilever beam and tower crane embedded legs in the cantilever tower crane foundation in the large-supported platform, the problem of difficult location selection of tower crane foundation on steep slopes is solved, and a safe and economical tower crane is achieved Fixed, reducing engineering costs.
Patent Information
- Application Number
- CN202010455592.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-05-26
AI Technical Summary
In the construction of high-pier large-span bridges, it is difficult to select the site of the tower crane foundation located on steep slopes. Conventional expansion of the foundation can easily lead to the tower crane overturning, and the cost of sheet pile foundation projects is high.
The structure adopts a structure including pile foundation, large bearing platform, concealed beam, cantilever beam and tower crane embedded legs. The concealed beam is embedded in the large bearing platform, and the cantilever beam is connected to the concealed beam, and the tower crane embedded legs are fixed to the suspension. For lifting beams, add triangular tucking angles and reverse "Z" reinforcement to improve load-bearing capacity.
The tower crane foundation is safely and effectively fixed on steep slopes, reducing project costs and avoiding the risk of tower crane overturning.
Smart Images

Figure CN111456077B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a large-cap cantilever tower crane foundation, belonging to the technical field of highway engineering, railway engineering and municipal engineering. Background Art
[0002] High-pier and long-span bridges are common structures. Unlike housing construction projects, high-pier and long-span bridges in highway projects, railway projects and municipal projects are often located on steep slopes and in valleys, which brings many difficulties to the site selection of construction tower crane foundations, especially for bridge piers located on steep slopes. If the tower crane foundation adopts a conventional expanded foundation, the risk of the tower crane tipping over is relatively large. If the tower crane foundation adopts a sheet pile foundation, the project cost is huge. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention provides a large-cap cantilever tower crane foundation with simple structure, low cost, safety and reliability to overcome the deficiencies in the prior art.
[0004] The technical solution of the present invention is achieved as follows: a large-cap cantilever tower crane foundation comprises a pile group foundation, a large-cap, a hidden beam, a cantilever beam and a tower crane embedded support leg, wherein the bottom of the large-cap is fixedly connected with the pile group foundation, the top of the large-cap is embedded with a hidden beam, the end of the hidden beam is fixedly connected with the cantilever beam, and the tower crane embedded support leg is arranged on the top of the cantilever beam.
[0005] Furthermore, the cross-sections of the concealed beam and the cantilever beam are the same, and a triangular gusset is fixedly connected at the end of the large pedestal and at the bottom of the cantilever beam.
[0006] Furthermore, upper reinforcement and lower reinforcement are respectively pre-embedded at the top and bottom of the large pedestal, the upper reinforcement passes through the hidden beam and extends to the end of the cantilever beam, and the lower reinforcement extends to the end of the hidden beam.
[0007] Furthermore, internal reinforcement is pre-embedded at the bottom of the concealed beam and the cantilever beam.
[0008] Furthermore, the buried depth of the hidden beam is greater than half of the large foundation.
[0009] Furthermore, corner reinforcement is pre-embedded in the hidden beam, and the corner reinforcement extends into the triangular corner.
[0010] Furthermore, the end of the triangular tuft is provided with an inverted "Z"-shaped reinforcement, the upper part of the inverted "Z"-shaped reinforcement is welded and fixed to the tuft reinforcement, and the lower part thereof is welded and fixed to the lower reinforcement.
[0011] Due to the adoption of the above technical scheme, the technical effects and advantages of the present invention are as follows: the present invention embeds the hidden beam in the large pedestal, and then fixes the cantilever beam on the end of the hidden beam, so that the tower crane foundation can be fixed by the pre-embedded legs of the tower crane on the cantilever beam, thereby safely and effectively solving the problem of setting the tower crane foundation on the pier of the large pedestal located on a steep slope. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a front view of the schematic diagram of the structure of the present invention;
[0013] Figure 2 It is a top view of the structural schematic diagram of the present invention.
[0014] Explanation of the accompanying numbers: 1-hidden beam, 2-cantilever beam, 3-embedded legs of tower crane, 4-triangular tuft, 5-upper reinforcement, 6-large pedestal, 7-internal reinforcement, 8-tuft reinforcement, 9-reverse "Z" type reinforcement, 10-lower reinforcement, 11-pile foundation. DETAILED DESCRIPTION
[0015] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0016] Embodiments of the present invention: See Figures 1-2 A large cap cantilever tower crane foundation comprises a pile group foundation 11, a large cap 6, a hidden beam 1, a cantilever beam 2 and a tower crane embedded support leg 3. The bottom of the large cap 6 is fixedly connected with a pile group foundation 11, the top of the large cap 6 is embedded with a hidden beam 1, the end of the hidden beam 1 is fixedly connected with a cantilever beam 2, and the top of the cantilever beam 2 is provided with a tower crane embedded support leg 3. The hidden beam 1 and the cantilever beam 2 have the same cross section, and a triangular tuck 4 is fixedly connected at the end of the large cap 6 and at the bottom of the cantilever beam 2 to improve the bearing capacity of the cantilever beam 2. The top and bottom of the large cap 6 are respectively embedded with upper reinforcement 5 and lower reinforcement 10, the upper reinforcement 5 passes through the hidden beam 1 and extends to the end of the cantilever beam 2, and the lower reinforcement 10 extends to the end of the hidden beam 1. The bottom of the hidden beam 1 and the cantilever beam 2 is embedded with internal reinforcement 7. The buried depth of the hidden beam 1 is greater than half of the large cap 6. The hidden beam 1 is pre-buried with corner reinforcement 8, and the corner reinforcement 8 extends into the triangular corner 4. The end of the triangular corner 4 is provided with an inverted "Z"-shaped reinforcement 9, the upper part of which is welded and fixed to the corner reinforcement 8, and the lower part is welded and fixed to the lower reinforcement 10.
[0017] The present invention embeds the hidden beam 1 in the large pedestal 6, and then fixes the cantilever beam 2 on the end of the hidden beam 1, so that the tower crane foundation can be fixed by the tower crane pre-embedded support legs 3 on the cantilever beam 2, thereby safely and effectively solving the problem of setting the tower crane foundation on the pier of the large pedestal located on the steep slope.
Claims
1. A large-cap cantilever tower crane foundation, comprising a pile group foundation (11), a large cap (6), a hidden beam (1), a cantilever beam (2) and a tower crane embedded support leg (3), characterized in that: The bottom of the large cap (6) is fixedly connected to a pile group foundation (11), a hidden beam (1) is embedded and fixed on the top of the large cap (6), a cantilever beam (2) is fixedly connected to the end of the hidden beam (1), and a tower crane embedded support leg (3) is arranged on the top of the cantilever beam (2); The hidden beam (1) and the cantilever beam (2) have the same cross-section, and a triangular tuck (4) is fixedly connected at the end of the large pedestal (6) and at the bottom of the cantilever beam (2); The top and bottom of the large cap (6) are respectively pre-buried with upper reinforcement (5) and lower reinforcement (10), wherein the upper reinforcement (5) passes through the concealed beam (1) and extends to the end of the cantilever beam (2), and the lower reinforcement (10) extends to the end of the concealed beam (1); Internal reinforcement (7) is pre-buried at the bottom of the concealed beam (1) and the cantilever beam (2); The concealed beam (1) is pre-buried with corner reinforcement (8), and the corner reinforcement (8) extends into the triangular corner (4); An inverted "Z"-shaped reinforcement (9) is provided at the end of the triangular corner tuck (4); the upper portion of the inverted "Z"-shaped reinforcement (9) is welded and fixed to the corner tuck reinforcement (8), and the lower portion of the inverted "Z"-shaped reinforcement (9) is welded and fixed to the lower reinforcement (10).
2. The large-cap cantilever tower crane foundation according to claim 1 is characterized in that: The buried depth of the hidden beam (1) is greater than half of the large bearing platform (6).
Citation Information
Patent Citations
Tower crane foundation used for foundation pit and construction method for tower crane foundation
CN106759439A
Tower crane foundation based on bonded pre-stressed concrete and construction method thereof
CN109235482A
Cantilever-type tower crane foundation structure and construction method thereof
CN110565676A
Modular tower crane basis
CN205024712U
Bridge tower cushion cap overhanging type tower crane foundation
CN207228146U