Cab suspension air pressure sealing detection system and method

By designing the cab suspension air pressure sealing detection system, using the air pressure sealing detection part, flow sensor and PLC control part to measure changes in gas flow, the problems of low detection efficiency and low accuracy in the existing technology are solved, and high efficiency is achieved. , Automatic sealing detection simplifies operation and improves detection accuracy.

CN111504572BActive Publication Date: 2024-10-18HUBEI UNIV OF AUTOMOTIVE TECH
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202010420007.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-18
Publication Date
2024-10-18
Estimated Expiration
2040-05-18

AI Technical Summary

Technical Problem

It is difficult to effectively detect the air pressure sealing of the automobile cab suspension with the existing technology, resulting in low detection efficiency, low accuracy, and complicated operation.

Method used

A cab suspension air pressure sealing detection system is designed, including the air pressure sealing detection part, flow sensor and PLC control part. The suspension is tested for sealing by measuring changes in gas flow, and multiple branch detection circuits and solenoid valves are used. Realize automated control, combined with touch screen real-time display and alarm.

Benefits of technology

It achieves high-precision, automated air pressure sealing testing, simplifies operations, and can detect 6 suspensions at the same time, reducing the subjectivity of testing results and the labor intensity of operators, and extending the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111504572B_ABST
    Figure CN111504572B_ABST
Patent Text Reader

Abstract

The present invention provides a cab suspension air pressure tightness detection system and method, which includes an air pressure tightness detection part, a flow sensor and a PLC control part; the air pressure tightness detection part detects the tightness of the cab air suspension by measuring the change of gas flow; the flow sensor is used to detect the flow change inside the tested product; the air pressure tightness detection part is directly connected to the PLC control part, and the detection process is completed through the electric control signal input by the touch screen connected to the PLC control part. This detection test system is used for cab suspension air pressure tightness detection, and has a high degree of automation, simple operation, and high detection accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of automobile cab suspension sealing performance detection devices, and in particular to a cab suspension air pressure sealing detection system and method. Background Art

[0002] The car's cab suspension system requires pneumatic buffer elements. In order to ensure the quality of the suspension, the air tightness of the suspension needs to be tested before leaving the factory. Summary of the invention

[0003] In order to solve the above technical problems, the present invention provides a cab suspension air pressure sealing detection system. This detection test machine is used for cab suspension air pressure sealing detection. It has a high degree of automation, simple operation and high detection accuracy.

[0004] In order to realize the above-mentioned technical features, the purpose of the present invention is realized as follows: a cab suspension air pressure sealing detection system, which includes an air pressure sealing detection part, a flow sensor and a PLC control part; the air pressure sealing detection part performs sealing detection on the cab air suspension by measuring the change of gas flow; the flow sensor is used to detect the flow change inside the tested product; the air pressure sealing detection part is directly connected to the PLC control part, and completes the detection process through the electrical control signal input by the touch screen connected to the PLC control part.

[0005] The air pressure sealing detection part includes a gas source for providing high-pressure gas, and the gas source is connected to a pneumatic triplet for preliminary processing of the gas. A plurality of branch detection circuits are connected in parallel after the pneumatic triplet, and each branch detection circuit is respectively connected to a flow sensor and a product to be detected.

[0006] The pneumatic triplex includes an air filter and an oil mist collector. A pressure reducing valve for regulating the air source pressure is installed after the air filter, and a pressure gauge is installed on the pipeline after the pressure reducing valve.

[0007] The branch detection circuit includes a first branch, a second branch, a third branch, a fourth branch, a fifth branch and a sixth branch;

[0008] The first branch includes a first two-position three-way solenoid valve, a first one-way throttle valve and a first flow sensor connected in series in sequence, and the first flow sensor is installed between the first one-way throttle valve and the first product to be detected;

[0009] The second branch includes a second two-position three-way solenoid valve, a second one-way throttle valve and a second flow sensor which are connected in series in sequence, and the second flow sensor is installed between the second one-way throttle valve and the second product to be detected;

[0010] The third branch includes a third two-position three-way solenoid valve, a third one-way throttle valve and a third flow sensor connected in series in sequence, and the third flow sensor is installed between the third one-way throttle valve and the third product to be detected;

[0011] The fourth branch comprises a fourth two-position three-way solenoid valve, a fourth one-way throttle valve and a fourth flow sensor which are connected in series in sequence, and the fourth flow sensor is installed between the fourth one-way throttle valve and the fourth product to be detected;

[0012] The fifth branch comprises a fifth two-position three-way solenoid valve, a fifth one-way throttle valve and a fifth flow sensor which are connected in series in sequence, and the fifth flow sensor is installed between the fifth one-way throttle valve and the fifth product to be detected;

[0013] The sixth branch includes a sixth two-position three-way solenoid valve, a sixth one-way throttle valve and a sixth flow sensor which are connected in series in sequence, and the sixth flow sensor is installed between the sixth one-way throttle valve and the sixth product to be detected.

[0014] The PLC control part includes a PLC controller, the output module of the PLC controller is connected to all the solenoid valves of the air pressure sealing detection part, and controls the on and off of the corresponding solenoid valves; the output module of the PLC controller is connected to an indicator light, and determines whether the gas in the tested product is leaking, and issues a leakage alarm; the input module of the PLC controller is connected to all the flow sensors and switch quantities of the air pressure sealing detection part, and is used to collect the flow signal of the flow sensor and control the on and off of various parts of the equipment; the input and output parts of the PLC controller are connected to the touch screen and the communication module, the touch screen is used to display the detection data in real time and set the system parameters, and the communication module is used to collect and record the product detection information; it also includes a power supply module.

[0015] The method for performing air pressure sealing detection using the cab suspension air pressure sealing detection test system comprises the following steps:

[0016] Step 1: Preparation for power-on self-test;

[0017] Step 2: Gas pressurization stage;

[0018] Step 3: Gas pressure maintenance stage;

[0019] Step 4: Gas decompression phase.

[0020] Specific operations of step 1: Before the detection task begins, the operator needs to ensure that the system is in an unloaded state and the pipeline and equipment are well connected. The operator transmits a signal to the PLC controller by pressing the start button on the control touch screen. At this time, the pressurization indicator light on the touch screen lights up, and then the inflation pressurization, pressure stabilization detection, and air pressure relief are performed after a delay of Ts according to the program set in the PLC controller, and then a judgment is made as to whether the tested product is qualified.

[0021] The specific operation of step 2 is as follows: debug the system through the touch screen, set the corresponding parameters, and then fill the compressed air of the set pressure into the interior of the product under test. At this time, the two-position three-way solenoid valves of all branch detection circuits are energized and the valve core moves to the right, the air inlet is connected with the working air port, and the exhaust port is closed. The gas passes from the air inlet to the working port, and then passes into the product under test through the one-way throttle valve of each branch detection circuit, thereby realizing the pressurization process of the product under test. The pressurization time of this process is T2s, or the pressurization time can be set by yourself through the touch screen as required.

[0022] The specific operation of step 3 is as follows: according to the air pressure pressurization time and pressure set by the system, the tested product is pressurized to the set pressure and then the pressure is maintained. The tested product enters the pressure holding process. The pressure holding time of this process is T3s, and the pressure holding indicator light on the touch screen lights up, or the pressure holding time can be set by the touch screen as required; the flow values ​​detected by the flow sensors of all branch detection loops will be displayed on the touch screen in real time. If the flow value fluctuates within the set range, it is considered to be qualified and the next step is carried out. If a gas leak occurs, the system will quickly issue an alarm prompt and the system will stop testing.

[0023] The specific operation of step 4 is as follows: after the tested product completes air pressure maintenance, the air source pressurization is stopped, and the gas in the tested product uses the gas pressure to push open the lower valve core of the one-way throttle valve of all branch detection circuits, thereby realizing the reverse flow of gas in the tested product. At this time, the valve core of the two-position three-way solenoid valve of all branch detection circuits moves to the left after being energized, and the working air port is connected with the exhaust port. The gas enters the exhaust port from the working air port, thereby realizing the pressure relief process of the tested product. The pressure relief time of this process is T4s, or the pressure relief time can be set by the touch screen as required. After the pressure relief process is completed, the pressure relief indicator light on the touch screen lights up, and after the detection task is completed, the motor stops, the product to be tested is disassembled, and then the sealing test of the next product is carried out.

[0024] The present invention has the following beneficial effects:

[0025] 1. The present invention performs air pressure sealing detection on the cab suspension by measuring the change of gas flow rate. It can test 6 suspension assemblies at the same time. The PLC control part controls the solenoid valve to complete the on-off and flow direction of the system pipeline through the electric control signal input by the touch screen. The flow sensor collects the signal inside the tested product through the PLC control part, and then transmits the signal to the PLC control part to perform logical judgment on whether the signal is qualified. The PLC control part can automatically complete the control action and logical judgment of the system, and display the flow inside the tested product in real time on the touch screen. The system maintenance parameter modification and alarm prompts can be realized on the touch screen.

[0026] 2. It has a reasonable structure, simple operation, and is applicable to a variety of products. It can efficiently and accurately detect the sealing performance of products, ensure the quality of products, reduce the labor intensity of operators and the subjectivity of test results, and extend the service life of workpieces. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0028] Figure 1 This is a system structure diagram of the present invention.

[0029] Figure 2 This is a schematic diagram of the system of the present invention.

[0030] Figure 3 This is a timing diagram of the solenoid valve operation in the system of the present invention.

[0031] Figure 4 This is a diagram showing the connection structure of the controller and the touch screen of the present invention.

[0032] Figure 5 This is a schematic diagram of the controller port wiring of the present invention.

[0033] Figure 6 This is a flow chart of the air pressure sealing detection part of the present invention.

[0034] Figure 7 This is the main menu screen of the touch screen of the present invention.

[0035] Figure 8 This is the pressure control screen of the touch screen of the present invention.

[0036] Fig. 9 It is the system maintenance screen of the touch screen of the present invention.

[0037] In the figure: air source 1, pneumatic triplet 2, first two-position three-way solenoid valve 3, second two-position three-way solenoid valve 4, third two-position three-way solenoid valve 5, fourth two-position three-way solenoid valve 6, fifth two-position three-way solenoid valve 7, sixth two-position three-way solenoid valve 8, first one-way throttle valve 9, second one-way throttle valve 10, third one-way throttle valve 11, fourth one-way throttle valve 12, fifth one-way throttle valve 13, sixth one-way throttle valve 14, first flow sensor 15, second flow sensor 16, third flow sensor 17, fourth flow sensor 18, fifth flow sensor 19, sixth flow sensor 20, first product to be detected 21, second product to be detected 22, third product to be detected 23, fourth product to be detected 24, fifth product to be detected 25, sixth product to be detected 26, touch screen 27, signal line 28, PLC controller 29, indicator light 30.

[0038] Air filter 201, pressure reducing valve 202, and barometer 203. DETAILED DESCRIPTION

[0039] The embodiments of the present invention are further described below in conjunction with the accompanying drawings.

[0040] Embodiment 1:

[0041] See also Figure 1-5 , a cab suspension air pressure tightness detection system, which includes an air pressure tightness detection part, a flow sensor and a PLC control part; the air pressure tightness detection part detects the tightness of the cab air suspension by measuring the change of gas flow; the flow sensor is used to detect the flow change inside the tested product; the air pressure tightness detection part is directly connected to the PLC control part, and the detection process is completed through the electric control signal input by the touch screen connected to the PLC control part. By adopting the above detection system, the tested product is the cab suspension, and the detection process is controlled by the PLC control part through the electric control signal input by the touch screen to control the reversal of the solenoid valve to control the flow and flow direction of the gas in the gas path, thereby realizing the detection process of air pressure pressurization, air pressure maintenance and air pressure relief, the flow sensor collects the flow signal inside the tested product through the PLC control part, and the PLC control part makes a logical judgment on whether the collected flow signal is qualified, the PLC control part can automatically complete the control action and logical judgment of the system, and display the flow inside the tested product in real time on the touch screen, and the system maintenance parameter modification and alarm prompt can be realized on the touch screen.

[0042] Furthermore, the air pressure sealing detection part includes a gas source 1 for providing high-pressure gas, and the gas source 1 is connected to a pneumatic triplet 2 for preliminary processing of the gas. A plurality of branch detection circuits are connected in parallel after the pneumatic triplet 2, and each branch detection circuit is respectively connected to a flow sensor and a product to be detected.

[0043] Furthermore, the pneumatic triplex 2 includes an air filter 201 and an oil mist collector, a pressure reducing valve 202 for regulating the air source pressure is installed after the air filter 201, and a pressure gauge 203 is installed on the pipeline after the pressure reducing valve 202. The pneumatic triplex 2 provides a high-pressure working medium for the system, and to ensure normal testing, the air source pressure needs to reach 10 Bar.

[0044] Furthermore, the branch detection circuit includes a first branch, a second branch, a third branch, a fourth branch, a fifth branch and a sixth branch; the first branch includes a first two-position three-way solenoid valve 3, a first one-way throttle valve 9 and a first flow sensor 15 connected in series in sequence, and the first flow sensor 15 is installed between the first one-way throttle valve 9 and the first product to be detected 21; the second branch includes a second two-position three-way solenoid valve 4, a second one-way throttle valve 10 and a second flow sensor 16 connected in series in sequence, and the second flow sensor 16 is installed between the second one-way throttle valve 10 and the second product to be detected 22; the third branch includes a third two-position three-way solenoid valve 5, a third one-way throttle valve 11 and a third flow sensor 17 connected in series in sequence, and the third flow sensor 17 is installed between the third one-way throttle valve 11 and the third product to be detected 23; the fourth branch includes a fourth two-position three-way solenoid valve 6, a fourth one-way throttle valve 12 and a fourth flow sensor 18 connected in series in sequence, and the fourth flow sensor 18 is installed between the fourth one-way throttle valve 12 and the fourth product to be detected 24; the fifth branch includes a fifth two-position three-way solenoid valve 7, a fifth one-way throttle valve 13 and a fifth flow sensor 19 connected in series in sequence, and the fifth flow sensor 19 is installed between the fifth one-way throttle valve 13 and the fifth product to be detected 25; the sixth branch includes a sixth two-position three-way solenoid valve 8, a sixth one-way throttle valve 14 and a sixth flow sensor 20 connected in series in sequence, and the sixth flow sensor 20 is installed between the sixth one-way throttle valve 14 and the sixth product to be detected 26. By adopting the above-mentioned detection branch, during the air pressure pressurization process, after IV1~IV6 of the two-position three-way solenoid valve is energized, the valve core moves to the right, allowing the gas to flow into the one-way throttle valve IV7~IV12 to start inflating and pressurizing the tested kit respectively, pressurizing to the set pressure and maintaining the pressure, the system enters the pressure holding process, and the flow change in the tested product is detected by the flow sensors 2S1~2S6. If the flow exceeds the specified value, it indicates that the tested product is leaking. After the pressure holding process is completed, the two-position three-way solenoid valves 1YA~6YA are energized, the valve core moves to the left, and the gas flow direction in the tested product is reversed, thereby realizing the air pressure relief process of the covered test piece.

[0045] Furthermore, the PLC control part includes a PLC controller 29, the output module of which is connected to all the solenoid valves of the air pressure sealing detection part and controls the on and off of the corresponding solenoid valves; the output module of the PLC controller 29 is connected to an indicator light 30, and determines whether the gas in the tested product is leaking, and issues a leakage alarm; the input module of the PLC controller 29 is connected to all the flow sensors and switch quantities of the air pressure sealing detection part, and is used to collect the flow signal of the flow sensor and control the on and off of each part of the equipment; the input and output parts of the PLC controller 29 are connected to the touch screen 27 and the communication module, the touch screen 27 is used to display the detection data in real time and set the system parameters, and the communication module is used to collect and record the product detection information; and also includes a power supply module 31. Automatic control can be achieved through the above-mentioned PLC control part.

[0046] Embodiment 2:

[0047] The method for performing air pressure sealing detection using the cab suspension air pressure sealing detection test system comprises the following steps:

[0048] Step 1: Preparation for power-on self-test; before starting the test task, the operator needs to ensure that the system is in an unloaded state and the pipeline and equipment are connected in good condition. The operator transmits a signal to the PLC controller 29 by controlling the start button on the touch screen 27. At this time, the pressurization indicator light on the touch screen lights up, and then according to the program delay Ts set in the PLC controller, inflation pressurization, pressure stabilization detection, and air pressure relief are executed, and then a judgment is made on whether the tested product is qualified.

[0049] Step 2: Gas pressurization stage; debug the system through the touch screen 27, set the corresponding parameters, and then fill the compressed air of the set pressure into the tested product. At this time, the two-position three-way solenoid valves of all branch detection circuits are energized and the valve core moves to the right, the air inlet is connected to the working air port, and the exhaust port is closed. The gas enters the working port from the air inlet, and then enters the tested product through the one-way throttle valve of each branch detection circuit, realizing the pressurization process of the tested product. The pressurization time of this process is T2s, or the pressurization time can be set by the touch screen as required.

[0050] Step 3: Gas pressure holding stage; according to the gas pressure pressurization time and pressure set by the system, the tested product is pressurized to the set pressure and then maintains the pressure. The tested product enters the pressure holding process. The pressure holding time of this process is T3s, and the pressure holding indicator light on the touch screen 27 lights up, or the pressure holding time can be set by the touch screen as required; the flow values ​​detected by the flow sensors of all branch detection loops will be displayed in real time on the touch screen 27. If the flow value fluctuates within the set range, it is considered to be qualified and proceed to the next step. If gas leakage occurs, the system will quickly issue an alarm prompt and the system will stop testing.

[0051] Step 4: Gas pressure relief stage; After the tested product completes the air pressure maintenance, stop the air source pressurization, and the gas in the tested product uses the gas pressure to push open the lower valve core of the one-way throttle valve of all branch detection circuits, so as to realize the reverse flow of gas in the tested product. At this time, the valve core of the two-position three-way solenoid valve of all branch detection circuits moves to the left after being energized, and the working air port is connected with the exhaust port. The gas flows from the working air port to the exhaust port, thereby realizing the pressure relief process of the tested product. The pressure relief time of this process is T4s, or the pressure relief time can be set by the touch screen as required. After the pressure relief process is completed, the pressure relief indicator on the touch screen lights up, and after the detection task is completed, the motor stops, the product to be tested is disassembled, and then the sealing test of the next product is carried out.

[0052] Embodiment 3:

[0053] See also Figure 6 The method for performing air pressure sealing test using the cab suspension air pressure sealing test system comprises the following steps:

[0054] Step 1: Preparation for power-on self-test; before starting the test task, the operator needs to ensure that the system is in an unloaded state and the pipeline and equipment are connected in good condition. The operator transmits the signal to the PLC controller 29 by controlling the start button on the touch screen 27. At this time, the pressurization indicator light on the touch screen lights up, and then according to the program set in the PLC controller, after a delay of 3s, the inflation pressurization, pressure stabilization test, and air pressure relief are executed, and then a judgment is made on whether the tested product is qualified.

[0055] Step 2: Gas pressurization stage; debug the system through the touch screen 27, set the corresponding parameters, and fill the compressed air of the set pressure into the tested product. At this time, the two-position three-way solenoid valves of all branch detection circuits are energized and the valve core moves to the right, the air inlet is connected to the working air port, the exhaust port is closed, and the gas is passed from the air inlet to the working port, and then through the one-way throttle valve of each branch detection circuit into the tested product, realizing the pressurization process of the tested product. The pressurization time of this process is 6s, or the pressurization time can be set by the touch screen as required.

[0056] Step 3: Gas pressure holding stage; according to the gas pressure pressurization time and pressure set by the system, the tested product is pressurized to the set pressure and then maintains the pressure. The tested product enters the pressure holding process. The pressure holding time of this process is 60s. The pressure holding indicator light on the touch screen 27 lights up, or the pressure holding time can be set by the touch screen as required; the flow values ​​detected by the flow sensors of all branch detection loops will be displayed in real time on the touch screen 27. If the flow value fluctuates within the set range, it is considered to be qualified and proceed to the next step. If gas leakage occurs, the system will quickly issue an alarm prompt and the system will stop testing.

[0057] Step 4: Gas pressure relief stage; After the tested product completes the air pressure maintenance, stop the air source pressurization, and the gas in the tested product uses the gas pressure to push open the lower valve core of the one-way throttle valve of all branch detection circuits, so as to realize the reverse flow of gas in the tested product. At this time, the valve core of the two-position three-way solenoid valve of all branch detection circuits moves to the left after being energized, and the working air port is connected with the exhaust port. The gas flows from the working air port to the exhaust port, thereby realizing the pressure relief process of the tested product. The pressure relief time of this process is 10s, or the pressure relief time can be set by the touch screen as required. After the pressure relief process is completed, the pressure relief indicator on the touch screen lights up, and the detection task is completed, the motor stops, the product to be tested is disassembled, and then the sealing test of the next product is carried out.

[0058] Embodiment 4:

[0059] In this example implementation, the specific system parameters are set as follows:

[0060] The test pressure of the tested product is 8Bar;

[0061] Rated test time for each unit: 76S;

[0062] The air pressure pressurization time is 6S;

[0063] The air pressure holding time is 60S;

[0064] The air pressure relief time is 10S;

[0065] Embodiment 5:

[0066] See also Figure 7-9 The cab suspension seal test machine can test 6 front suspension assemblies at the same time. The system maintenance and parameter setting of the air pressure detection part are all performed on the touch screen. The three functional modules displayed on the touch screen include flow control, maintenance screen, and alarm screen. The specific introduction of the functional modules is as follows:

[0067] 1. Flow control: This function module uses a digital display instrument to display the gas flow inside the tested product before and after the pressure test. The flow sensor on the sealing test machine displays the flow value inside the tested product during the sealing test on the touch screen in real time through the PLC control part.

[0068] 2 Maintenance screen: This function module is a parameter setting module, which can set the air pressure pressurization time, air pressure relief time, and the number of air circuit activations.

[0069] 3 Alarm screen: This function module is to set the pressure to zero within the set pressure resistance time. When it exceeds the set value, it will sound and light alarm, and each circuit will display the pressure drop independently. The test machine has a timed power-off function: after the rated time is completed, it will automatically power off and display the pressure drop. If there is obvious leakage observed by naked eyes within a unit time, it can be stopped urgently. When a jet-like leakage occurs that may cause harm to people, the system will immediately stop providing pressure.

Claims

1. A method for performing sealing detection using a cab suspension air pressure sealing detection test system, wherein the cab suspension air pressure sealing detection system comprises an air pressure sealing detection part, a flow sensor and a PLC control part; the air pressure sealing detection part performs sealing detection on the cab air suspension by measuring the change of gas flow; the flow sensor is used to detect the change of gas flow inside the tested product; the air pressure sealing detection part is directly connected to the PLC control part, and the detection process is completed through an electric control signal input by a touch screen connected to the PLC control part; The air pressure sealing detection part comprises an air source (1) for providing high-pressure gas, the air source (1) being connected to a pneumatic triplet (2) for preliminary processing of the gas, a plurality of branch detection circuits being connected in parallel after the pneumatic triplet (2), each branch detection circuit being respectively connected to a flow sensor and a product to be tested; The pneumatic triplex (2) comprises an air filter (201) and an oil mist collector, a pressure reducing valve (202) for regulating the air source pressure is installed behind the air filter (201), and a pressure gauge (203) is installed on the pipeline behind the pressure reducing valve (202); The branch detection loop includes a first branch, a second branch, a third branch, a fourth branch, a fifth branch and a sixth branch; The first branch comprises a first two-position three-way solenoid valve (3), a first one-way throttle valve (9) and a first flow sensor (15) which are connected in series in sequence, and the first flow sensor (15) is installed between the first one-way throttle valve (9) and the first product to be detected (21); The second branch comprises a second two-position three-way solenoid valve (4), a second one-way throttle valve (10) and a second flow sensor (16) which are connected in series in sequence, and the second flow sensor (16) is installed between the second one-way throttle valve (10) and the second product to be detected (22); The third branch comprises a third two-position three-way solenoid valve (5), a third one-way throttle valve (11) and a third flow sensor (17) which are sequentially connected in series, and the third flow sensor (17) is installed between the third one-way throttle valve (11) and the third product to be detected (23); The fourth branch comprises a fourth two-position three-way solenoid valve (6), a fourth one-way throttle valve (12) and a fourth flow sensor (18) which are connected in series in sequence, and the fourth flow sensor (18) is installed between the fourth one-way throttle valve (12) and the fourth product to be detected (24); The fifth branch comprises a fifth two-position three-way solenoid valve (7), a fifth one-way throttle valve (13) and a fifth flow sensor (19) which are connected in series in sequence, and the fifth flow sensor (19) is installed between the fifth one-way throttle valve (13) and the fifth product to be detected (25); The sixth branch comprises a sixth two-position three-way solenoid valve (8), a sixth one-way throttle valve (14) and a sixth flow sensor (20) which are connected in series in sequence, and the sixth flow sensor (20) is installed between the sixth one-way throttle valve (14) and the sixth product to be detected (26); The PLC control part comprises a PLC controller (29), the output module of the PLC controller (29) is connected to all the solenoid valves of the air pressure sealing detection part, and controls the on and off of the corresponding solenoid valves; the output module of the PLC controller (29) is connected to an indicator light (30), and determines whether the gas in the tested product is leaking, and issues a leakage alarm; the input module of the PLC controller (29) is connected to all the flow sensors and switch quantities of the air pressure sealing detection part, and is used to collect flow signals from the flow sensors and control the on and off of various parts of the equipment; the input and output parts of the PLC controller (29) are both connected to a touch screen (27) and a communication module, the touch screen (27) is used to display the detection data in real time and set system parameters, and the communication module is used to collect and record the product detection information; and also includes a power module (31); It is characterized in that The method for sealing detection comprises the following steps: Step 1: Preparation for power-on self-test; Step 2: Gas pressurization stage; Step 3: Gas pressure maintenance stage; Step 4: Gas decompression stage; The specific operation of step 1 is as follows: before the detection task begins, the operator needs to ensure that the system is in an unloaded state and the pipeline is connected to the equipment in a good state. The operator transmits a signal to the PLC controller (29) by pressing the start button on the control touch screen (27). At this time, the pressurization indicator light on the touch screen lights up, and then the inflation pressurization, pressure stabilization detection, and air pressure relief are performed after a delay of Ts according to the program set in the PLC controller, and then a judgment is made as to whether the tested product is qualified; The specific operation of step 2 is as follows: the system is debugged through the touch screen (27), and after the corresponding parameters are set, compressed air of a set pressure is filled into the interior of the tested product. At this time, the two-position three-way solenoid valves of all branch detection circuits are energized and the valve cores move to the right, the air inlet is connected to the working air port, the exhaust port is closed, and the gas is passed from the air inlet to the working port, and then passed into the tested product through the one-way throttle valves of the respective branch detection circuits, thereby realizing the pressurization process of the tested product. The pressurization time of this process is T2s, or the pressurization time can be set by the touch screen as required; The specific operation of step 3 is as follows: according to the air pressure pressurization time and pressure set by the system, the product under test is pressurized to the set pressure and then the pressure is maintained. The product under test enters the pressure holding process. The pressure holding time of this process is T3s. The pressure holding indicator light on the touch screen (27) lights up, or the pressure holding time is set by the touch screen as required. The flow values ​​detected by the flow sensors of all branch detection loops will be displayed in real time on the touch screen (27). If the flow value fluctuates within the set range, it is considered that the test is qualified and the next step is carried out. If a gas leak occurs, the system will quickly issue an alarm prompt and the system will stop testing.

2. The method for performing sealing test using a cab suspension air pressure sealing test system according to claim 1 is characterized in that: The specific operation of step 4 is as follows: after the tested product completes air pressure maintenance, the air source pressurization is stopped, and the gas in the tested product uses the gas pressure to push open the lower valve core of the one-way throttle valve of all branch detection circuits, thereby realizing the reverse flow of gas in the tested product. At this time, the valve core of the two-position three-way solenoid valve of all branch detection circuits moves to the left after being energized, and the working air port is connected with the exhaust port. The gas enters the exhaust port from the working air port, thereby realizing the pressure relief process of the tested product. The pressure relief time of this process is T4s, or the pressure relief time can be set by the touch screen as required. After the pressure relief process is completed, the pressure relief indicator light on the touch screen lights up, and after the detection task is completed, the motor stops, the product to be tested is disassembled, and then the sealing test of the next product is carried out.

Citation Information

Patent Citations

  • Bidirectional sealing performance test method of mechanical vibrator

    CN102435400A

  • Small general-purpose plane cockpit and fuel tank integrated gas tightness detecting system

    CN103487219A

  • Seal tightness detection system and detection steps thereof

    CN106706232A

  • Automatic detection device for air tightness of liquefied petroleum gas steel bottle

    CN202661239U

  • Airtightness detection device

    CN204043869U